GALAXY RESOURCES LIMITED (ABN: 11 071 976 442) Level 2, 16 Ord Street, West Perth, WA 6005 T: +618 9215 1700 F: +618 9215 1799 www.galaxylithium.com ASX ANNOUNCEMENT / MEDIA RELEASE meeting a lithium future 24 February 2012 GALAXY PROGRESSES JIANGSU PLANT HOT COMMISSIONING Highlights Hot commissioning of Jiangsu Lithium Carbonate Plant underway Cold commissioning successfully completed mid February Full commissioning of Jiangsu Plant on schedule On track for first production end-Q1 2012 Galaxy Resources Limited (ASX: GXY) (Galaxy or the Company) is pleased to advise the commissioning of its wholly- owned Jiangsu Lithium Carbonate Plant (Jiangsu or the Plant) in China continues on schedule, with hot commissioning of the plant now formally underway. Galaxy successfully completed cold commissioning in mid-February 2012, which involved ensuring integrity of the plant equipment at Jiangsu, as well as electrical, instrumentation and control systems. Hot commissioning is the final stage prior to start-up and first production. It involves the introduction of process materials and testing of major areas of the plant under partial or full load. Galaxy Managing Director, Iggy Tan, said: “Our commissioning activities are progressing according to schedule without any major defect issues being identified to date. “We are confident hot commissioning will be completed in time for us to commence lithium carbonate production at Jiangsu by the end of the current quarter,” Mr Tan said. Hot Commissioning Update Galaxy said the kilns and coolers in Area 20 were now operational. The calciner kiln was fired at the end of January and is now in the final stages of the refractory dry-out and curing phase. The sulphation kiln has also been successfully fired and the refractory brickwork dry-out has been completed. This particular kiln is now ready to accept final milled beta spodumene. The Jiangsu site’s utilities - such as process water, plant air, steam and natural gas – are fully established and operational. The leach area has also been successfully tested, with process water being pumped throughout the plant. This area is also ready to accept slurry material. Galaxy was able to hot commission the lithium carbonate production area and purification plant ahead of schedule. This includes centrifuge dewatering, drying, micronising and packaging. Galaxy has tested this area, where purchased product has been successfully digested, crystallized, micronised and processed through to final bagging. This part of the plant will be operated on a continuous basis until the rest of the plant is ready to process material. Similarly, the ore unloading and storage area has been fully commissioned. For personal use only

GALAXY PROGRESSES JIANGSU PLANT HOT ... PROGRESSES JIANGSU PLANT HOT COMMISSIONING Highlights Hot commissioning of Jiangsu Lithium Carbonate Plant underway Cold commissioning successfully

  • Upload
    vudien

  • View
    232

  • Download
    0

Embed Size (px)

Citation preview

Page 1: GALAXY PROGRESSES JIANGSU PLANT HOT ... PROGRESSES JIANGSU PLANT HOT COMMISSIONING Highlights Hot commissioning of Jiangsu Lithium Carbonate Plant underway Cold commissioning successfully

 

GALAXY RESOURCES LIMITED (ABN: 11 071 976 442)

Level 2, 16 Ord Street, West Perth, WA 6005 T: +618 9215 1700 F: +618 9215 1799 www.galaxylithium.com 

ASX ANNOUNCEMENT / MEDIA RELEASE

meeting a lithium future

24 February 2012

GALAXY PROGRESSES JIANGSU PLANT HOT COMMISSIONING

Highlights Hot commissioning of Jiangsu Lithium Carbonate Plant underway

Cold commissioning successfully completed mid February

Full commissioning of Jiangsu Plant on schedule

On track for first production end-Q1 2012

Galaxy Resources Limited (ASX: GXY) (Galaxy or the Company) is pleased to advise the commissioning of its wholly-owned Jiangsu Lithium Carbonate Plant (Jiangsu or the Plant) in China continues on schedule, with hot commissioning of the plant now formally underway. Galaxy successfully completed cold commissioning in mid-February 2012, which involved ensuring integrity of the plant equipment at Jiangsu, as well as electrical, instrumentation and control systems. Hot commissioning is the final stage prior to start-up and first production. It involves the introduction of process materials and testing of major areas of the plant under partial or full load. Galaxy Managing Director, Iggy Tan, said: “Our commissioning activities are progressing according to schedule without any major defect issues being identified to date. “We are confident hot commissioning will be completed in time for us to commence lithium carbonate production at Jiangsu by the end of the current quarter,” Mr Tan said. Hot Commissioning Update Galaxy said the kilns and coolers in Area 20 were now operational. The calciner kiln was fired at the end of January and is now in the final stages of the refractory dry-out and curing phase. The sulphation kiln has also been successfully fired and the refractory brickwork dry-out has been completed. This particular kiln is now ready to accept final milled beta spodumene. The Jiangsu site’s utilities - such as process water, plant air, steam and natural gas – are fully established and operational. The leach area has also been successfully tested, with process water being pumped throughout the plant. This area is also ready to accept slurry material. Galaxy was able to hot commission the lithium carbonate production area and purification plant ahead of schedule. This includes centrifuge dewatering, drying, micronising and packaging. Galaxy has tested this area, where purchased product has been successfully digested, crystallized, micronised and processed through to final bagging. This part of the plant will be operated on a continuous basis until the rest of the plant is ready to process material. Similarly, the ore unloading and storage area has been fully commissioned.

For

per

sona

l use

onl

y

Page 2: GALAXY PROGRESSES JIANGSU PLANT HOT ... PROGRESSES JIANGSU PLANT HOT COMMISSIONING Highlights Hot commissioning of Jiangsu Lithium Carbonate Plant underway Cold commissioning successfully

 

GALAXY RESOURCES LIMITED (ABN: 11 071 976 442)

Level 2, 16 Ord Street, West Perth, WA 6005 T: +618 9215 1700 F: +618 9215 1799 www.galaxylithium.com 

ASX ANNOUNCEMENT / MEDIA RELEASE

meeting a lithium future

Final plant areas to be hot commissioned include the sodium sulphate and reagent plants. These plants represent the last areas to be brought on line before first production can be achieved. Pictorial Update Below

--ENDS--

For more information, please contact: Corporate Australia Media Contact Hong Kong Media Contact Iggy Tan Jane Grieve Cindy Lung Managing Director FTI Consulting Strategic Financial Relations Limited Galaxy Resources Limited Tel (office): +61 (0)8 9386 1233 Tel (office): +852 2864 4867 Tel (office): + 61 (0)8 9215 1700    Tel (mobile): +61 (0)488 400 248 Tel (mobile): +852 9282 4640 Email: [email protected]    Email: [email protected] Email: [email protected]

About Galaxy (ASX: GXY) Galaxy Resources Ltd (“Galaxy”) is an Australian-based integrated lithium mining, chemicals and battery company listed on the Australian Securities Exchange (Code: GXY) and is a S&P/ASX 300 Index Company. Galaxy wholly owns the Mt Cattlin project near Ravensthorpe in Western Australia where it mines lithium pegmatite ore and processes it on site to produce a spodumene concentrate and tantalum by-product. At full capacity, Galaxy will process 137,000 tpa of spodumene concentrate and 56,000 lbs per annum of contained tantalum. The concentrated spodumene is shipped to Galaxy’s wholly-owned Lithium Carbonate Plant in China’s Jiangsu province. Once complete, the Jiangsu plant will produce 17,000 tpa of battery grade lithium carbonate, the largest producer in the Asia Pacific region and the fourth largest in the world. Galaxy is also advancing plans for a lithium-ion battery plant, to produce 620,000 battery packs per annum for the electric bike (e-bike) market. The Company also has a farm in agreement with TSX-listed Lithium One Inc to acquire up to 70% of the James Bay Lithium Pegmatite Project in Quebec, Canada. Lithium compounds are used in the manufacture of ceramics, glass, electronics and are an essential cathode material for long life lithium-ion batteries used to power e-bikes and hybrid and electric vehicles. Galaxy is bullish about the global lithium demand outlook and is positioning itself to achieve its goal of being involved in every step of the lithium supply chain.

For

per

sona

l use

onl

y

Page 3: GALAXY PROGRESSES JIANGSU PLANT HOT ... PROGRESSES JIANGSU PLANT HOT COMMISSIONING Highlights Hot commissioning of Jiangsu Lithium Carbonate Plant underway Cold commissioning successfully

 

GALAXY RESOURCES LIMITED (ABN: 11 071 976 442)

Level 2, 16 Ord Street, West Perth, WA 6005 T: +618 9215 1700 F: +618 9215 1799 www.galaxylithium.com 

ASX ANNOUNCEMENT / MEDIA RELEASE

meeting a lithium future

Company also has a farm in agreement with TSX-listed Lithium One Inc to acquire up to 70% of the James Bay Lithium Pegmatite Project in Quebec, Canada. Lithium compounds are used in the manufacture of ceramics, glass, electronics and are an essential cathode material for long life lithium-ion batteries used to power e-bikes and hybrid and electric vehicles. Galaxy is bullish about the global lithium demand outlook and is positioning itself to achieve its goal of being involved in every step of the lithium supply chain. For more information, please contact: 

Corporate Australia Media Contact Hong Kong Media Contact Iggy Tan Jane Grieve Cindy Lung Managing Director FD Strategic Financial Relations Limited Tel (office): 08 9215 1700 Tel (office): 08 9386 1233 Tel (office): (852) 2864 4867 Email: [email protected]  Tel (mobile): 0488 400 248 Tel (mobile): (852) 9282 4640 Email: [email protected] Email: [email protected]

compounds – the essential component for powering the world’s fast expanding fleet of hybrid and electric cars. Galaxy wholly-owns and operates the Mt. Cattlin mine, which is currently producing spodumene concentrate. Galaxy’s Jiangsu lithium carbonate plant, once completed, will have a design capacity of 17,000 tpa of lithium carbonate, which Galaxy expects would make it one of the largest plants in China converting hard rock lithium mineral concentrates into lithium compounds and chemicals. Lithium compounds such as lithium carbonate are forecast to be in high future demand due to advances in long life batteries and sophisticated Galaxy Resources has positioned itself to meet this lithium future by not only mining the lithium, but also by downstream processing to supply lithium carbonate to the expanding Asian market.

Area 10 – Ore Unloading & Storage

Area 10 now is fully commissioned and ready for operation

Area 20 Calcination Kiln

Calciner kiln firing and building to operating temperature

Burner flame

Unloading from ship

For

per

sona

l use

onl

y

Page 4: GALAXY PROGRESSES JIANGSU PLANT HOT ... PROGRESSES JIANGSU PLANT HOT COMMISSIONING Highlights Hot commissioning of Jiangsu Lithium Carbonate Plant underway Cold commissioning successfully

 

GALAXY RESOURCES LIMITED (ABN: 11 071 976 442)

Level 2, 16 Ord Street, West Perth, WA 6005 T: +618 9215 1700 F: +618 9215 1799 www.galaxylithium.com 

ASX ANNOUNCEMENT / MEDIA RELEASE

meeting a lithium future

Final product bins and sodium sulphate crystalliser

Area 20 Sulphation Kiln

Sulphation kiln and cooler ready to accept beta spodumene

Leach plant is commissioned and ready to accept slurry

Area 30 Leach Plant

For

per

sona

l use

onl

y

Page 5: GALAXY PROGRESSES JIANGSU PLANT HOT ... PROGRESSES JIANGSU PLANT HOT COMMISSIONING Highlights Hot commissioning of Jiangsu Lithium Carbonate Plant underway Cold commissioning successfully

 

GALAXY RESOURCES LIMITED (ABN: 11 071 976 442)

Level 2, 16 Ord Street, West Perth, WA 6005 T: +618 9215 1700 F: +618 9215 1799 www.galaxylithium.com 

ASX ANNOUNCEMENT / MEDIA RELEASE

meeting a lithium future

Area 50 Purification Plant

Bought product successfully processed in purification plant

Area 40 LC Plant

Filtration centrifuge in full operation

Centrifuge drum with product

Bought product used for commissioning

For

per

sona

l use

onl

y

Page 6: GALAXY PROGRESSES JIANGSU PLANT HOT ... PROGRESSES JIANGSU PLANT HOT COMMISSIONING Highlights Hot commissioning of Jiangsu Lithium Carbonate Plant underway Cold commissioning successfully

 

GALAXY RESOURCES LIMITED (ABN: 11 071 976 442)

Level 2, 16 Ord Street, West Perth, WA 6005 T: +618 9215 1700 F: +618 9215 1799 www.galaxylithium.com 

ASX ANNOUNCEMENT / MEDIA RELEASE

meeting a lithium future

Product dryer in operation

Lithium carbonate in dryer

Area 40 Product Dryer

Micronising of lithium carbonate and achieving size specification

Micronised product being sampled

Area 40 Microniser

For

per

sona

l use

onl

y

Page 7: GALAXY PROGRESSES JIANGSU PLANT HOT ... PROGRESSES JIANGSU PLANT HOT COMMISSIONING Highlights Hot commissioning of Jiangsu Lithium Carbonate Plant underway Cold commissioning successfully

 

GALAXY RESOURCES LIMITED (ABN: 11 071 976 442)

Level 2, 16 Ord Street, West Perth, WA 6005 T: +618 9215 1700 F: +618 9215 1799 www.galaxylithium.com 

ASX ANNOUNCEMENT / MEDIA RELEASE

meeting a lithium future

Packaging plant in full operation

Area 40 Packaging Plant

For

per

sona

l use

onl

y

Page 8: GALAXY PROGRESSES JIANGSU PLANT HOT ... PROGRESSES JIANGSU PLANT HOT COMMISSIONING Highlights Hot commissioning of Jiangsu Lithium Carbonate Plant underway Cold commissioning successfully

 

GALAXY RESOURCES LIMITED (ABN: 11 071 976 442)

Level 2, 16 Ord Street, West Perth, WA 6005 T: +618 9215 1700 F: +618 9215 1799 www.galaxylithium.com 

ASX ANNOUNCEMENT / MEDIA RELEASE

meeting a lithium future

Area 60 Sodium Sulphate Plant

All utilities established on site

Sodium sulphate plant cold commissioning completed

Area 80 Utilities

Administration building and control room fully operational