Ricor Engineering Ltd. Talbotville Gore Road Trunk Sewer Township of Southwold, Ontario Geotechnical Engineering Report Date: February 22, 2017 Ref. N°: 160-B-0016580-1-GE-R-0001-01

Geotechnical Engineering Report - Southwold · Englobe Corp. (Englobe) was retained by Ricor Engineering Ltd. to perform a geotechnical investigation along a section Talbotville Gore

  • Upload
    others

  • View
    5

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Geotechnical Engineering Report - Southwold · Englobe Corp. (Englobe) was retained by Ricor Engineering Ltd. to perform a geotechnical investigation along a section Talbotville Gore

Ricor Engineering Ltd.

Talbotville Gore Road Trunk Sewer Township of Southwold, Ontario

Geotechnical Engineering Report

Date: February 22, 2017

Ref. N°: 160-B-0016580-1-GE-R-0001-01

Page 2: Geotechnical Engineering Report - Southwold · Englobe Corp. (Englobe) was retained by Ricor Engineering Ltd. to perform a geotechnical investigation along a section Talbotville Gore

Unit 12 – 60 Meg Drive, London (Ontario) Canada N6E 3T6 – 519..685.6400 | F 519.685-0943 – [email protected]

Ricor Engineering Ltd.

Talbotville Gore Road Trunk Sewer Township of Southwold, Ontario

Geotechnical Engineering Report 160-B-0016580-1-GE-R-0001-01

Prepared by:

Stephen W. Burt, P.Eng.

Consulting Geotechnical Engineer

Reviewed by :

Robert J. Helwig, P.Geo.

Senior Geoscientist

Page 3: Geotechnical Engineering Report - Southwold · Englobe Corp. (Englobe) was retained by Ricor Engineering Ltd. to perform a geotechnical investigation along a section Talbotville Gore

TABLE OF CONTENTS

160-B-0016580-1-GE-R-0001-01

GEOTECHNICAL ENGINEERING REPORT – TALBOTVILLE GORE ROAD TRUNK SEWER , TOWNS IP OF SOUTHWOLD, ONT ARIO

i

INTRODUCTION ............................................................................................................................ 1

1 INVESTIGATION PROCEDURE ...................................................................................2

1.1 Field Program .......................................................................................................2

1.2 Laboratory Testing ...............................................................................................2

2 SUMMARIZED SUBSURFACE CONDITIONS .............................................................3

3 DISCUSSION AND RECOMMENDATIONS..................................................................3

3.1 Excavations and Groundwater Control ................................................................3

3.2 Sewer Construction ..............................................................................................4

3.3 Trenchless Railway Crossing ...............................................................................5

3.4 Pavement Design .................................................................................................5

3.5 Haul Roads ..........................................................................................................6

3.6 Soil Corrosiveness ...............................................................................................6

3.7 Removal of Site Excavated Material ....................................................................6

4 STATEMENT OF LIMITATIONS ...................................................................................7

Tables

Table 1 - Pavement Design ................................................................................................... 5

Appendices

Appendix 1 Borehole Location Plan

Appendix 2 Borehole Logs

Appendix 3 Figure 1

Appendix 4 Chemical Analysis

Page 4: Geotechnical Engineering Report - Southwold · Englobe Corp. (Englobe) was retained by Ricor Engineering Ltd. to perform a geotechnical investigation along a section Talbotville Gore

160-B-0016580-1-GE-R-0001-01

GEOTECHNICAL ENGINEERING REPORT – TALBOTVILLE GORE ROAD TRUNK SEWER , TOWNS IP OF SOUTHWOLD, ONT ARIO

ii

Property and Confidentiality

“This engineering document is the property of Englobe Corp. and, as such, is protected under Copyright Law. It can only be

used for the purposes mentioned herein. Any reproduction or adaptation, whether partial or total, is strictly prohibited without

having obtained Englobe’s and its client’s prior written authorization to do so.

Test results mentioned herein are only valid for the sample(s) stated in this report.

Englobe’s subcontractors who may have accomplished work either on site or in laboratory are duly qualified as stated in our

Quality Manual’s procurement procedure. Should you require any further information, please contact your Project Manager.”

Ricor Engineering Ltd.

211 Adelaide Street South

London, Ontario N5Z 3K7

Attention: Mr. Justin Blythe, Construction Technician

REVISION AND PUBLICATION REGISTER

Revision N° Date Modification And/Or Publication Details

00 2017-02-16 Report Issued

DISTRIBUTION

1 electronic copy Client

original File

km

Page 5: Geotechnical Engineering Report - Southwold · Englobe Corp. (Englobe) was retained by Ricor Engineering Ltd. to perform a geotechnical investigation along a section Talbotville Gore

160-B-0016580-1-GE-R-0001-01

GEOTECHNICAL ENGINEERING REPORT – TALBOTVILLE GORE ROAD TRUNK SEWER , TOWNS IP OF SOUTHWOLD, ONT ARIO

1

INTRODUCTION

Englobe Corp. (Englobe) was retained by Ricor Engineering Ltd. to perform a geotechnical

investigation along a section Talbotville Gore Road, Southwold Township, Ontario, from

Municipal Number (MN) 10089 to MN 10441 shown on the Borehole Location Plan in Appendix

1. This work was authorized by Ricor Engineering Ltd. on December 23, 2016.

The project involves the installation of a new 300 mm diameter sanitary trunk sewer with a

trenchless installation beneath the railway line and pavement reconstruction. The purpose of

this investigation was to determine the subsurface conditions at the site and, based on that

information; provide geotechnical recommendations for the design and installation of the sewer

and pavement structure.

Page 6: Geotechnical Engineering Report - Southwold · Englobe Corp. (Englobe) was retained by Ricor Engineering Ltd. to perform a geotechnical investigation along a section Talbotville Gore

160-B-0016580-1-GE-R-0001-01

GEOTECHNICAL ENGINEERING REPORT – TALBOTVILLE GORE ROAD TRUNK SEWER , TOWNS IP OF SOUTHWOLD, ONT ARIO

2

1 INVESTIGATION PROCEDURE

1.1 FIELD PROGRAM

The fieldwork for this investigation involved drilling eight boreholes on January 26, 27, and 30,

2017, at the following locations. The approximate borehole locations are shown on the

Borehole Location Plan in Appendix 1 with the most northern borehole as Borehole 01-17.

Borehole 01-17: 2.7 m east of west curb and 4.5 m north of south property line of MN 10445.

Borehole 02-17: 0.7 m east of road centreline and 5.0 m north of north property line of MN

10435.

Borehole 03-17: 2.6 m east of west curb and 15.5 m north of south property line of MN 10420.

Borehole 04-17: 2.7 m west of east curb and 6.3 m north of south wall of property line of MN

10364.

Borehole 05-17: 2.8 m east of west curb and 10.0 m north of centreline of Shady Lane.

Borehole 06-17: 2.4 m west of east curb and 12.0 m north of centreline of railway tracks.

Borehole 07-17: 1.7 m east of west edge of pavement and 14.0 m south of centreline of

railway tracks.

Borehole 08-17: 1.3 m east of west east edge of pavement and 16.0 m south of north

property line of MN 10089.

The boreholes were advanced to sampling depths of 7.3 to 11.2 metres (m) using a power

auger machine equipped with conventional soil sampling equipment, which was supplied and

operated by a specialist drilling company.

Soil samples were recovered from the boreholes at frequent intervals of depth using a

50 millimetre (mm) O.D. split spoon sampler in accordance with the Standard Penetration Test

(SPT) procedure. The SPT N-values are shown on the borehole logs in Appendix 2.

Groundwater observations were carried out in the boreholes during and upon completion of the

drilling operations and the observations are summarized on the appended borehole logs.

The fieldwork was monitored throughout by a member of our engineering staff who directed the

drilling and sampling procedures; documented the soil strata; and cared for the recovered soil

samples.

The soil strata was related to the asphalt surface at each borehole location.

1.2 LABORATORY TESTING

All soil samples recovered during this investigation were returned to our laboratory for visual

examination and moisture content testing. The moisture content values are shown on the

appended borehole logs.

Page 7: Geotechnical Engineering Report - Southwold · Englobe Corp. (Englobe) was retained by Ricor Engineering Ltd. to perform a geotechnical investigation along a section Talbotville Gore

160-B-0016580-1-GE-R-0001-01

GEOTECHNICAL ENGINEERING REPORT – TALBOTVILLE GORE ROAD TRUNK SEWER , TOWNS IP OF SOUTHWOLD, ONT ARIO

3

Two grain size distribution analyses were performed on samples of the pavement granular

materials from Boreholes 2 and 7, and the test results are shown graphically on Figure 1 in

Appendix 3.

Five soil samples were submitted to the ALS Environmental office in London for chemical

analyses testing, and the Certificate of Analysis is provided in Appendix 4.

The soil samples will be stored for a period of three months from date of storage. After this

time, they will be discarded unless prior arrangements have been made for longer storage.

2 SUMMARIZED SUBSURFACE CONDITIONS

Refer to the borehole logs in Appendix 2 for descriptions of the soil stratigra, results of SPT

testing, moisture content values, and groundwater observations. The following notes are

intended only to amplify this data.

The boreholes revealed a surface layer of asphalt, measuring 100 to 125 mm thick, supported

by 405 to 760 mm of granular fill. The grain size distribution analyses test results, plotted on

Figure 1 in Appendix 3, indicate that the pavement granular materials tested from Boreholes 2

and 7 contain 36 to 55 % gravel, 28 to 42% sand and 16 to 17% silt.

Beneath the pavement structures, Boreholes 4, 6, and 7, encountered layers of soft to firm silty

clay fill and loose silt, sand and cinder fill materials, and the fill was penetrated at depths 0.9 to

2.9 m. The fill samples yielded moisture contents ranging from 11 to 36%.

Beneath the fill and/or pavement structure, Boreholes 7 and 8 contacted layers of loose to

compact silt and fine sand material displaying natural moisture contents of 15 and 18%, and

these layers were penetrated at depths of 1.7 to 2.6 m.

The underlying soil within the borehole depths consists of firm to hard silty clay till that

displayed natural moisture contents ranging typically from 13 to 19, with the upper two silty clay

samples in Borehole 2 yielded values 23 and 28%.

At completion of the drilling operations the boreholes remained dry and open.

3 DISCUSSION AND RECOMMENDATIONS

3.1 EXCAVATIONS AND GROUNDWATER CONTROL

The soils revealed on this site which are not excessively wet can be classified as Type 3 soil in

accordance with the Occupational Health and Safety Act and Regulations for Construction

Projects. Any saturated and submerged non-cohesive soil (silt, sand and gravel materials) shall

be classified as Type 4 soil.

Page 8: Geotechnical Engineering Report - Southwold · Englobe Corp. (Englobe) was retained by Ricor Engineering Ltd. to perform a geotechnical investigation along a section Talbotville Gore

160-B-0016580-1-GE-R-0001-01

GEOTECHNICAL ENGINEERING REPORT – TALBOTVILLE GORE ROAD TRUNK SEWER , TOWNS IP OF SOUTHWOLD, ONT ARIO

4

The sides of open excavations within a Type 3 soil must be carried out using side slopes not

steeper than 1 vertical to 1 horizontal from the bottom of the excavation. Type 4 soil may be

dewatered to be classified as a Type 3 soil or adequately braced, otherwise side slopes of 1

vertical to 3 horizontal or flatter shall be used for excavations intersecting Type 4 soil.

Where Type 4 soil is not present, workmen may be protected by the use of a trench liner to

allow for steeper excavations than those recommended.

Levels of permanent saturation is indicated by the change in colour of the silty clay till from

brown to grey in the boreholes at depths of 2.1 to 4.0 m, however due to the impermeable

nature of the silty clay the boreholes remained dry and open at completion of the drilling

operations. Water can be found at higher levels perched within the fill and the silt and sand

layers, which may lead to ponding on the ground surface.

Based on the borehole findings, it is anticipated that groundwater and surface water entering

open excavations may be controlled by gravity drainage and filtered pumps. To ensure

stability, it will be necessary to flatten the excavation side slopes where groundwater seepage

or sloughing within more permeable layers or lenses is occurring.

3.2 SEWER CONSTRUCTION

The silty clay till revealed within the boreholes will provide adequate indirect support for the

pipes.

Where the base of the trench is wet, it is recommended that the pipe bedding consist of well

graded clear crushed stone with a maximum aggregate size of 19 mm. Where the trench base

is dry the bedding may consist of Granular ‘B’ type material with a maximum aggregate size of

25 mm compacted to 95% of the material’s maximum standard Proctor dry density (MSPDD) or

well graded clear crushed stone (max. 19 mm size).

A geotextile separator, such as Terrafix 270R or equivalent, shall be placed on top of the stone

bedding to preclude mixing of trench backfill with the underlying stone.

The silty clay till materials will tend to retain a voided structure when placed as backfill. It is

important to ensure that the silty clay has a moisture content to allow it to be remolded and that

sufficient compactive effort is applied with a vibratory sheepsfoot roller to breakdown all chunks

to achieve a non-voided condition, otherwise significant post-construction settlements can

result. Granular backfill should be specified in areas where use of heavy compaction

equipment is limited, such as around manholes and within trenches of private drain

connections.

All backfill and bedding materials shall be placed in maximum 300mm thick lifts and each lift

compacted to a minimum of 95% of the material's maximum standard Proctor dry density

(MSPDD).

Page 9: Geotechnical Engineering Report - Southwold · Englobe Corp. (Englobe) was retained by Ricor Engineering Ltd. to perform a geotechnical investigation along a section Talbotville Gore

160-B-0016580-1-GE-R-0001-01

GEOTECHNICAL ENGINEERING REPORT – TALBOTVILLE GORE ROAD TRUNK SEWER , TOWNS IP OF SOUTHWOLD, ONT ARIO

5

3.3 TRENCHLESS RAILWAY CROSSING

It is understood that the 300 mm diameter sewer invert depth at the railway crossing is at an

approximate depth of 10 m and this places the pipe within the stiff to very stiff silty clay till at

Borehole 6 and 7 locations positioned on each side of the tracks.

The borehole findings indicate that the sewer installation by jack and bore or horizontal

directional drilling (HDD) techniques would be geotechnically feasible within the silty clay till.

During the jack and bore procedure the lead casing must be maintained beyond the mining

operation to prevent the creation of voids outside the casing. At the end of each work shift, the

mining auger shall be placed at the end of the mining operation to provide support to the

unexcavated soil within the casing. The casing shall have an appropriate wall thickness to

withstand the jacking forces during construction, the overburden loads, and the railway

surcharge loadings.

The presence of cobbles or other obstructions was not observed in the boreholes, however

cobbles and boulders can be present within glacial silty clay till material, and if contacted could

impede the advancement of the jack and bore liner or HDD operation.

Settlement monitoring of the tracks is recommended.

It is recommended that the contractors review this report and make their own determination of

equipment required to complete the work in a satisfactory manner.

3.4 PAVEMENT DESIGN

Under dry subgrade and weather conditions during construction, the following pavement

design is recommended for a residential collector roadway.

Table 1 - Pavement Design

HL 3

SURFACE

ASPHALT

HL 8 BASE

ASPHALT

GRANULAR

‘A’ BASE

GRANULAR

‘B’ SUB-BASE

50 mm 60 mm 150 mm 450 mm

The grain size analysis test results, plotted on Figure 1 in Appendix 3, indicate that the

samples of existing pavement granular materials from Boreholes 2 and 7 exceeds the

maximum 8% silt content for Granular ‘B’ material by 8 and 9%. It may be considered for reuse

in the new pavement structure providing it is segregated to prevent mixing with other materials,

approved, and placed in the bottom half of the new Granular B sub-base layer.

To provide drainage for the granular base and sub-base materials, the subgrades shall be

graded to allow favourable drainage to side road sub-drains and/or side road ditches in

accordance with OPSD – 200.010. Prior to placing the pavement Granular ‘B’ sub-base layer,

the road subgrade shall be proof-rolled to compact loose zones and to identify spongy areas.

Page 10: Geotechnical Engineering Report - Southwold · Englobe Corp. (Englobe) was retained by Ricor Engineering Ltd. to perform a geotechnical investigation along a section Talbotville Gore

160-B-0016580-1-GE-R-0001-01

GEOTECHNICAL ENGINEERING REPORT – TALBOTVILLE GORE ROAD TRUNK SEWER , TOWNS IP OF SOUTHWOLD, ONT ARIO

6

Any spongy zones identified should be sub-excavated and replaced with compacted drier

material to provide uniform subgrade support conditions.

To provide adequate support for the asphalt layers, the pavement granular materials shall be

compacted to 100% of the materials MSPDD. The asphalt must be supplied and placed in

accordance with OPSS forms 310 and 1150.

A 50mm thick step joint should be provided were the new asphalt abuts the existing asphalt.

3.5 HAUL ROADS

Where required, construction roads for concrete trucks and other heavily loaded vehicles may

consist of a minimum of 450 mm of Granular ‘B’ material placed on a woven geotextile to

preclude mixing or pumping of the subgrade into the Granular ‘B’. The geotextile may consist

of Terratrack 24-15, Amoco 2002, Mirafi 500XL, or equivalent. A surface layer of Granular ‘A’

or recycled asphalt should be placed on the surface to provide a seal.

3.6 SOIL CORROSIVENESS

Samples of the silty clay till from Boreholes 2 and 7 were submitted to the ALS Environmental

office in London to determine the corrosive potential of the soil and the requirement for

sulphate resistant concrete. The Certificate of Analysis is presented in Appendix 4.

Points were assigned to the test results as shown on the Corrosion Potential Table in Appendix

4. Soil is considered to be corrosive to ferrous pipe if ten or more points are obtained.

Assuming the pipe is located within a continuously wet condition, both soil samples tested

received 2 points.

The soil samples tested yielded levels of water soluble sulphate of 48 and 37 mg/kg (0.0048%

and 0.0037%), which are below the 0.1% level above which CSA specifies the use of sulphate

resistant concrete.

3.7 REMOVAL OF SITE EXCAVATED MATERIAL

Soil samples were submitted to the ALS Environmental office in London for chemical analyses

testing, and the Certificate of Analysis is provided in Appendix 4. Silty clay till samples from

Boreholes 1 and 4, and the upper fill sample form Borehole 6 were subjected to metals and

inorganic analyses.

The test results indicate that the Table 1 Soil Standards under Ont. Reg. 153/04 as amended

has been exceeded for conductivity and/or the sodium absorption ratio (SAR) for the samples

tested from Boreholes 4 and 6, which may be due to the application of road salt. The fill

sample from Borehole 6 located adjacent the railway line also exhibited exceedances of

arsenic and selenium.

Prior to removal of excavated soil from this site, a copy of the test results should be forwarded

to authorities at the receiving sites for approval.

Page 11: Geotechnical Engineering Report - Southwold · Englobe Corp. (Englobe) was retained by Ricor Engineering Ltd. to perform a geotechnical investigation along a section Talbotville Gore

160-B-0016580-1-GE-R-0001-01

GEOTECHNICAL ENGINEERING REPORT – TALBOTVILLE GORE ROAD TRUNK SEWER , TOWNS IP OF SOUTHWOLD, ONT ARIO

7

4 STATEMENT OF LIMITATIONS

The geotechnical recommendations provided in this report are applicable only to the project

described in the text and then only if constructed substantially in accordance with the details

stated in this report. Since all details of the design may not be known at the time of report

preparation, we recommend that we be retained during the final design stage to verify that the

geotechnical recommendations have been correctly interpreted in the design. Also, if any

further clarification and/or elaboration are needed concerning the geotechnical aspects of the

project, Englobe Corp. should be contacted. We recommend that we be retained during

construction to confirm that the subsurface conditions do not deviate materially from those

encountered in the test holes and to ensure that our recommendations are properly

understood. Quality assurance testing and inspection services during construction are a

necessary part of the evaluation of the subsurface conditions.

The geotechnical recommendations provided in this report are intended for the use of the

Client or its’ agent and may not be used by a Third Party without the expressed written consent

of Englobe and the Client. They are not intended as specifications or instructions to

contractors. Any use which a contractor makes of this report, or decisions made based on it,

are the responsibility of the contractor. The contractor must also accept the responsibility for

means and methods of construction, seek additional information if required, and draw their own

conclusions as to how the subsurface conditions may affect their work. Englobe accepts no

responsibility and denies any liability whatsoever for any damages arising from improper or

unauthorized use of the report or parts thereof.

It is important to note that the geotechnical assessment involves a limited sampling of the site

gathered at specific test hole locations and the conclusions in this report are based on this

information gathered and in accordance with normally accepted practices. The subsurface

geotechnical, hydrogeological, environmental and geologic conditions between and beyond the

test holes will differ from those encountered at the test holes. Also such conditions are not

uniform and can vary over time. Should subsurface conditions be encountered which differ

materially from those indicated at the test holes, we request that we be notified in order to

assess the additional information and determine whether or not changes should be made as a

result of the conditions. Englobe will not be responsible to any party for damages incurred as a

result of failing to notify Englobe that differing site or subsurface conditions are present upon

becoming aware of such conditions.

The professional services provided for this project include only the geotechnical aspects of the

subsurface conditions at the site, unless otherwise stated specifically in the report. The

recommendations and opinions given in this report are based on our professional judgment

and are for the guidance of the Client or its’ Agent in the design of the specific project. No

other warranties or guarantees, expressed or implied, are made.

Page 12: Geotechnical Engineering Report - Southwold · Englobe Corp. (Englobe) was retained by Ricor Engineering Ltd. to perform a geotechnical investigation along a section Talbotville Gore

Appendix 1 Borehole Location Plan

Page 13: Geotechnical Engineering Report - Southwold · Englobe Corp. (Englobe) was retained by Ricor Engineering Ltd. to perform a geotechnical investigation along a section Talbotville Gore

TALBOTVILLE TRUNK

SEWER

Engineering Ltd.

211 Adelaide St. SouthLondon ON N5Z [email protected] BOREHOLE LOCATION

PLAN

Page 14: Geotechnical Engineering Report - Southwold · Englobe Corp. (Englobe) was retained by Ricor Engineering Ltd. to perform a geotechnical investigation along a section Talbotville Gore

Appendix 2 Borehole Logs

List of Abbreviations

Boreholes 01-17 to 08-17

Page 15: Geotechnical Engineering Report - Southwold · Englobe Corp. (Englobe) was retained by Ricor Engineering Ltd. to perform a geotechnical investigation along a section Talbotville Gore
Page 16: Geotechnical Engineering Report - Southwold · Englobe Corp. (Englobe) was retained by Ricor Engineering Ltd. to perform a geotechnical investigation along a section Talbotville Gore
Page 17: Geotechnical Engineering Report - Southwold · Englobe Corp. (Englobe) was retained by Ricor Engineering Ltd. to perform a geotechnical investigation along a section Talbotville Gore
Page 18: Geotechnical Engineering Report - Southwold · Englobe Corp. (Englobe) was retained by Ricor Engineering Ltd. to perform a geotechnical investigation along a section Talbotville Gore
Page 19: Geotechnical Engineering Report - Southwold · Englobe Corp. (Englobe) was retained by Ricor Engineering Ltd. to perform a geotechnical investigation along a section Talbotville Gore
Page 20: Geotechnical Engineering Report - Southwold · Englobe Corp. (Englobe) was retained by Ricor Engineering Ltd. to perform a geotechnical investigation along a section Talbotville Gore
Page 21: Geotechnical Engineering Report - Southwold · Englobe Corp. (Englobe) was retained by Ricor Engineering Ltd. to perform a geotechnical investigation along a section Talbotville Gore
Page 22: Geotechnical Engineering Report - Southwold · Englobe Corp. (Englobe) was retained by Ricor Engineering Ltd. to perform a geotechnical investigation along a section Talbotville Gore
Page 23: Geotechnical Engineering Report - Southwold · Englobe Corp. (Englobe) was retained by Ricor Engineering Ltd. to perform a geotechnical investigation along a section Talbotville Gore
Page 24: Geotechnical Engineering Report - Southwold · Englobe Corp. (Englobe) was retained by Ricor Engineering Ltd. to perform a geotechnical investigation along a section Talbotville Gore

Appendix 3 Figure 1

Grain Size Distribution Analyses

Page 25: Geotechnical Engineering Report - Southwold · Englobe Corp. (Englobe) was retained by Ricor Engineering Ltd. to perform a geotechnical investigation along a section Talbotville Gore
Page 26: Geotechnical Engineering Report - Southwold · Englobe Corp. (Englobe) was retained by Ricor Engineering Ltd. to perform a geotechnical investigation along a section Talbotville Gore

Appendix 4 Chemical Analysis

ALS Lab Work Order: L1885339

Corrosion Potential Table

Page 27: Geotechnical Engineering Report - Southwold · Englobe Corp. (Englobe) was retained by Ricor Engineering Ltd. to perform a geotechnical investigation along a section Talbotville Gore
Page 28: Geotechnical Engineering Report - Southwold · Englobe Corp. (Englobe) was retained by Ricor Engineering Ltd. to perform a geotechnical investigation along a section Talbotville Gore
Page 29: Geotechnical Engineering Report - Southwold · Englobe Corp. (Englobe) was retained by Ricor Engineering Ltd. to perform a geotechnical investigation along a section Talbotville Gore
Page 30: Geotechnical Engineering Report - Southwold · Englobe Corp. (Englobe) was retained by Ricor Engineering Ltd. to perform a geotechnical investigation along a section Talbotville Gore
Page 31: Geotechnical Engineering Report - Southwold · Englobe Corp. (Englobe) was retained by Ricor Engineering Ltd. to perform a geotechnical investigation along a section Talbotville Gore
Page 32: Geotechnical Engineering Report - Southwold · Englobe Corp. (Englobe) was retained by Ricor Engineering Ltd. to perform a geotechnical investigation along a section Talbotville Gore
Page 33: Geotechnical Engineering Report - Southwold · Englobe Corp. (Englobe) was retained by Ricor Engineering Ltd. to perform a geotechnical investigation along a section Talbotville Gore
Page 34: Geotechnical Engineering Report - Southwold · Englobe Corp. (Englobe) was retained by Ricor Engineering Ltd. to perform a geotechnical investigation along a section Talbotville Gore
Page 35: Geotechnical Engineering Report - Southwold · Englobe Corp. (Englobe) was retained by Ricor Engineering Ltd. to perform a geotechnical investigation along a section Talbotville Gore
Page 36: Geotechnical Engineering Report - Southwold · Englobe Corp. (Englobe) was retained by Ricor Engineering Ltd. to perform a geotechnical investigation along a section Talbotville Gore
Page 37: Geotechnical Engineering Report - Southwold · Englobe Corp. (Englobe) was retained by Ricor Engineering Ltd. to perform a geotechnical investigation along a section Talbotville Gore
Page 38: Geotechnical Engineering Report - Southwold · Englobe Corp. (Englobe) was retained by Ricor Engineering Ltd. to perform a geotechnical investigation along a section Talbotville Gore
Page 39: Geotechnical Engineering Report - Southwold · Englobe Corp. (Englobe) was retained by Ricor Engineering Ltd. to perform a geotechnical investigation along a section Talbotville Gore
Page 40: Geotechnical Engineering Report - Southwold · Englobe Corp. (Englobe) was retained by Ricor Engineering Ltd. to perform a geotechnical investigation along a section Talbotville Gore