INTERNATIONAL GENERAL CERTIFICATE UNIT GC 3 HEALTH & SAFETY PRACTICAL APPLICATION As part of the NEBOSH International Certificate Course, you have to complete a hand written assessment within 2 weeks after the last date of the course and have it assessed. For this assessment, the delegate would carry out a safety inspection of a workplace, identifying hazards and deciding whether they are adequately controlled and where necessary, suggest appropriate and cost effective remedial action. Contact & address to send your completed practical assessment paper: Euro Gulf Safety Consultant Ghantoot Properties, Mussaffah Sanaiya - M 03 Mezz Floor - Office # 03, Abu Dhabi - U A E Phone: 00971 25530845 Fax: 00971 25530846 EMail: info@egsc.ae http://www.egsc.ae Name of the Student B. GOPIKRISHNAN Registration Number 00289170 Note: Please do not remove this page during your submission of your practical assessment paper. All sections of this assessment sheet should be completed before submission Your assessment paper is signed by your nominated supervisor I manager. Return original assessment paper by recorded delivery ie courier or special delivery. Keep a photocopy for your own records. The Inspection takes no longer than 45 minutes. The writing of the report takes no longer than 1 hour The whole exercise takes no longer than 2 hours A quite room is made available for writing the report, which must be hand written / type written. The assessment is carried out unaided and with no access to any kind of reference material The whole exercise is properly supervised at all times by a suitable member of the management team. By preference, this should be someone as independent of the candidate as possible. The organizations Health & Safety Advisor or the Training Manager, If such post exists, are normally ideal choices. Alternatively, a manager from another department might be approached. Please contact Euro Gulf Safety Consultant. If there are any doubts on who might be considered suitable.

Gopikrishna Project

  • Upload
    prakash

  • View
    21

  • Download
    0

Embed Size (px)

DESCRIPTION

j

Citation preview

Page 1: Gopikrishna Project

INTERNATIONAL GENERAL CERTIFICATE

UNIT GC 3 – HEALTH & SAFETY PRACTICAL APPLICATION

As part of the NEBOSH International Certificate Course, you have to complete a hand written assessment

within 2 weeks after the last date of the course and have it assessed.

For this assessment, the delegate would carry out a safety inspection of a workplace, identifying hazards and

deciding whether they are adequately controlled and where necessary, suggest appropriate and cost effective

remedial action.

Contact & address to send your completed practical assessment paper:

Euro Gulf Safety Consultant

Ghantoot Properties, Mussaffah Sanaiya - M 03

Mezz Floor - Office # 03, Abu Dhabi - U A E

Phone: 00971 25530845 Fax: 00971 25530846

EMail: [email protected] http://www.egsc.ae

Name of the Student B. GOPIKRISHNAN

Registration Number 00289170 Note:

Please do not remove this page during your submission of your practical assessment paper.

All sections of this assessment sheet should be completed before submission

Your assessment paper is signed by your nominated supervisor I manager. Return original assessment

paper by recorded delivery ie courier or special delivery. Keep a photocopy for your own records.

The Inspection takes no longer than 45 minutes.

The writing of the report takes no longer than 1 hour

The whole exercise takes no longer than 2 hours

A quite room is made available for writing the report, which must be hand written / type written.

The assessment is carried out unaided and with no access to any kind of reference material

The whole exercise is properly supervised at all times by a suitable member of the management team. By

preference, this should be someone as independent of the candidate as possible. The organizations Health &

Safety Advisor or the Training Manager, If such post exists, are normally ideal choices.

Alternatively, a manager from another department might be approached. Please contact Euro Gulf Safety Consultant. If there are any doubts on who might be considered suitable.

Page 2: Gopikrishna Project

INTERNATIONAL GENERAL CERTIFICATE

UNIT GC 3 – HEALTH & SAFETY PRACTICAL APPLICATION

CANDIDATE AND COURSE PROVIDER DECLARATIONS

For completion by the candidate :

I declare that the work submitted for this practical application assessment, i.e, the completed observation sheets and the report to management, is my own work. I recognize that contravention of this statement constitutes malpractice and may result in my being subject to the penalties set out in the NEBOSH Malpractice policy

Name ( Print ) B. GOPIKRISHNAN

Signature ………………………………………………………………………

Date ………………………………………………………………………

For completion by a course provider representative : ( e.g. internal practical assessor )

I declare that the work marked is identical to that received from the candidate. I recognize that contravention of this statement constitutes malpractice and may result in my being subject to the penalties set out in the NEBOSH Malpractice policy.

Name ( Print ) ………………………………………………………………………

Signature ………………………………………………………………………

Date ………………………………………………………………………

For completion by the course provider’s internal practical assessor :

I declare that I have marked this work and am both qualified and approved by NEBOSH to do so. I recognize that contravention of this statement constitutes malpractice and may result in my being subject to the penalties set out in the NEBOSH Malpractice policy

Name ( Print ) ………………………………………………………………………

Signature ………………………………………………………………………

Date ………………………………………………………………………

NB: This declaration must be completed in full, submitted and retained with the candidate’s script.If this script is not submitted that candidate’s result may be declared void

Page 3: Gopikrishna Project

INTERNATIONAL GENERAL CERTIFICATE

UNIT GC 3 – HEALTH & SAFETY PRACTICAL APPLICATION

Date of Practical Application Name of Assessor

Course Provider Number Course Provider Name

Student Number Student Name

Criteria Maximum Marks Available

Assessor’s marks awarded

NEBOSH moderated marks

( if different )

1 COMPLETION OF OBSERVATION SHEETS

1.1 Range and outline of hazards and consequences 15

1.2 Identification of suitable control measures and timescales 15

2 REPORT – INTRODUCTION AND EXECUTIVE SUMMARY

2.1 Introduction providing an overview of the chosen area 5

2.2 Executive summary 5

3 REPORT – MAIN FINDINGS OF THE INSPECTION

3.1 Quality of interpretation of findings 15

3.2 Identification of possible breaches of international standards

5

3.3 Persuasiveness / conciseness / technical content 10

4 REPORT – CONCLUSIONS AND RECOMMENDATIONS

4.1 Clear and concise conclusions which are clearly related to report findings and are effective in convincing management to take action

15

4.2 Recommendations which present realistic actions to improve health and safety in the chosen area

15

TOTAL MARKS

878 Euro Gulf Safety Consultant

00289170

Page 4: Gopikrishna Project

INTERNATIONAL GENERAL CERTIFICATE

UNIT GC 3 – HEALTH & SAFETY PRACTICAL APPLICATION

Outcome : PASS ( 60% or more ) REFER ( less than 60 %)

Date Assessed : ……………………………………………. …………………………………………….

Assessor’s Signature : ……………………………………………. …………………………………………….

Date received by ……………………………………………. …………………………………………….

course provider :

Date received by NEBOSH ……………………………………………. …………………………………………….

( if applicable )

Assessor’s additional comments on the practical application :

ASSESSED BY ( name in block letters ) ……………………………………………. …………………………………………….……………………………………………. …………………………………………….

The mark sheet must be retained by the Course Provider and sent to NEBOSH only if requested

NEBOSH USE ONLY

NEBOSH Moderator’s comments :

Page 5: Gopikrishna Project

INTERNATIONAL GENERAL CERTIFICATE

UNIT GC 3 – HEALTH & SAFETY PRACTICAL APPLICATION

Sheet Number of

Student Name Student Number

Place Inspected Date

Observations

Hazards & Consequences

Control Measures

Immediate and longer term actions Timescale

1) Not receiving approved drawing

for construction site survey.

a) Receive immediately approved drawing for

construction site survey.

b) Improve effective management

Immediate

1 week

2) Risk of poor housekeeping. a) Clear all unwanted thinks in the work place.

b) Ensure good housekeeping by

* Supervision

*Frequency monitoring

Immediate

1 day

3) Employee’s and follow the

proper manual handling

a) Continuous monitoring by Supervisor.

b) Training for all level of employee (manual

handling) procedure.

Immediate

1 Week

4) Maximum number of electrical

tools are defective.

a) Repair and proper maintenance / Regular

inspection

b) Replace defective electrical tools.

2 days

1 week

5) Electrical cables wires are

defective (ageing) cracked

etc.,)

a) Insulate wire, cables (Repair)

b) Replace defective cables and wires

1 day

B. GOPIKRISHNAN

VIJAY CONSTRUCTION PVT LTD , CHENNAI-20

00289170

08-06-2015

Page 6: Gopikrishna Project

INTERNATIONAL GENERAL CERTIFICATE

UNIT GC 3 – HEALTH & SAFETY PRACTICAL APPLICATION

Sheet Number of

Student Name Student Number

Place Inspected Date

Observations

Hazards & Consequences

Control Measures

Immediate and longer term actions Timescale

6) Portable power tools are defective (improper guarding)

a) Remove defective tools

b) Provide guard for defective tools

Immediate

1 week

7) Ladder (A-Type) spreader / locking hinges are loss.

a) Remove the defective ladder

b) Repair / maintenance, proper inspection by competent person.

Immediate

2 weeks

8) Risk of falling as many of the excavated tranches are not barricaded.

a) Excavated trenches are properly shielded.

b) Provide Signboards.

1 day

2 weeks

9) No fire extinguisher is provided in hot work area. Risk of spreading of fire.

a) Provide suitable fire extinguisher.

b) Provide supervision.

Immediately

1 month

10) Risk of collaps of scaffold structure due to the improper erecting.

a) Inform the immediate supervisor or competent person.

b) Give training to scarf folders.

c) Scaffold must be inspected by a competent person.

Immediately

1 weekly

Weekly

11) Water filling into trench risk of trench collaps.

a) Use of special support (or) shield system approved by a registered profession engineer.

b) Water removal. Equipment used and

c) Monitoring by a competent person.

d) Surface diverted away from the trench.

1 day

1 day

1 weeks

7 days

B. GOPIKRISHNAN

VIJAY CONSTRUCTION PVT LTD

CHENNAI-20

00289170

08-06-2015

Page 7: Gopikrishna Project

INTERNATIONAL GENERAL CERTIFICATE

UNIT GC 3 – HEALTH & SAFETY PRACTICAL APPLICATION

Sheet Number of

Student Name Student Number

Place Inspected Date

12) Soil condition is poor risk of collaps trench

a) Ensure structure stability by

Sharing

Benching

Sloping (450 (or) 350)

b) Monitoring by competent person.

2 days

1 weeks

13) Person working in height with and proper PPE’s risk of falling from height (or) fall from same level.

a) Provide PFAS (Personal fall arrest system)

Safety Net

Harness

Shoes

b) Ensure good supervision.

1 day

1 weeks

14) Lot of dust by cement mixer, circular saw risk of eye irritation

a) Isolate the area.

b) Proper maintenance and inspection.

1 day

1week

15) In Excavation work rise of underground utilities (Electrical Shock)

a) Stop the work immediately receive area map and clearly isolable.

b) We double insoluble tools and other PPE’s.

1 days

2 days

16) Some person found. Working with damaged helmets. Risk of getting physical injury.

a) Damaged helmet to replace.

b) PPF to be supplied regularly.

Immediately

Regularly

B. GOPIKRISHNAN

VIJAY CONSTRUCTION PVT LTD , CHENNAI-20

00289170

08-06-2015

Page 8: Gopikrishna Project

INTERNATIONAL GENERAL CERTIFICATE

UNIT GC 3 – HEALTH & SAFETY PRACTICAL APPLICATION

Sheet Number of

Student Name Student Number

Place Inspected Date

17) Risk of scaffolding due be guard rail is missing.

a) Provide guard rail by competent person.

b) Provide strict. Supervision, to ensure the scaffolding and frequently monitor.

1 day

2 days.

18) Wooden pieces with protruding nails found on the site. Risk of piercing injury.

a) De nailing to be done.

b) Remove wooden pieces.

Immediately

3 days

19) Found overloading of power points. Risk of fire and electrical shock.

a) Stop using multiple pluging at a single outcell point and use RCD’s (Residual circuit device)

b) Provide adequate number of power points.

2 days

1 week

20) Risk of crane collapse. Due to lifting in complex geometrical shape.

a) Stop the work immediately and lift in appropriate position

b) Crane operator and supervisor should training and competent.

Immediately

1 week

21) Risk of dropping. Lifting Load due to damage slings and hook.

a) Stop the work and remove the damage slings and hook and are correct thinks.

b) Proper maintenance and inspection. (Statuary inspection)

1 day

3 weeks

22) Surface preparation risk of dust Silica partials reach through inhalation.

a) One respiratory mark (or) are special equipments.

b) Change the process.

1 day

1 week

B. GOPIKRISHNAN

VIJAY CONSTRUCTION PVT LTD , CHENNAI-20

00289170

08-06-2015

Page 9: Gopikrishna Project

INTERNATIONAL GENERAL CERTIFICATE

UNIT GC 3 – HEALTH & SAFETY PRACTICAL APPLICATION

Sheet Number of

Student Name Student Number

Place Inspected Date

23) In confine space risk of fire and explosive due to oxygen enrich level the work is welding

a) Stop the work immediately reduce the oxygen level below the ignition level (16%) and are SCBA self contained breathing apparatus

b) Ensure good supervision and competent.

1 day

2 weeks

24) Storage of hazard substance without any labeling and poor housekeeping. Risk of explosion.

a) Area should be clear labeled and ensure good housekeeping.

b) Stored in minimum quantity and proper maintenance and inspection

1 week

3 weeks

25) Oil spillage was found all the oil storage area. Risk of slip hazard.

a) Spilled oil to be removed and cleared.

b) Spill kit to be made available

Immediate

1 week

B. GOPIKRISHNAN

VIJAY CONSTRUCTION PVT LTD , CHENNAI-20

00289170

08-06-2015

Page 10: Gopikrishna Project

INTERNATIONAL GENERAL CERTIFICATE

UNIT GC 3 – HEALTH & SAFETY PRACTICAL APPLICATION

Sheet Number of

Student Name Student Number

Place Inspected Date

INTRODUCTION INCLUDING OVERVIEW OF

AREA INSPECTED & ACTIVITIES TAKING PLACE

Introduction

I, B.Gopikrishnan, Safety Officer has done inspection in Vijay Construction Pvt.

Ltd, Chennai on 08-06-2015 at 10.35 am the purpose of the inspection was the

identify the hazards existing in the workplace and report those to management for

taking remedial actions many like scaffolding, working all height welding operation,

crane operation and manual handling were observed during inspection there were

approximately 500 employees working in the site.

The work is designed the meet erecting good and safe structure the area

covers about 100 acres and located near sea.

B. GOPIKRISHNAN

VIJAY CONSTRUCTION PVT LTD , CHENNAI-20

00289170

08-06-2015

Page 11: Gopikrishna Project

INTERNATIONAL GENERAL CERTIFICATE

UNIT GC 3 – HEALTH & SAFETY PRACTICAL APPLICATION

Sheet Number of

Student Name Student Number

Place Inspected Date

EXECUTIVE SUMMARY

The main objectives of the inspection is the identify the hazards and associated risk

related the activities going on all work place the major hazard found in the work site are

use of damaged web sling during lifting operations, scaffold collapse, working in trench and

excess emission of silica dust.

Adequate control measures are advised to minimize the risk involve in the activities

and some of them required urgent action they are use of damaged web sling for lifting

operation there is a risk of fall of suspended load and the control measures the minimize

the risk if repair or replace the damage web slings, pre check of web sling, and periodic

inspection by competent person. Another hazard is collapse of scaffold due to incomplete

erection. Sitting in unstable ground and use of damaged components is another hazard

observed and the risk of serious injury the people and damage to the properly. The control

measure are scaffold erection by competent person in a firm level ground using good

components daily inspection before use and weekly inspection by competent person. Other

hazard are slip, trip, fall the advised control measure are proper housekeeping and

supervision gas test provision of good ventilation, adequate access / egress, permit to work

system emergency procedures and first aid facility use REP and confined space work

training Excess emission of silica dual in surface preparation and another hazard. Observed

and the risk are irritation to skin, eye, lungs. Respiratory truck and can cause silicosis and

skin diseases. Control measure are one of RPE, reduce exposure time, use of vacuuming to

clean the dual and provision of LEV system.

B. GOPIKRISHNAN

VIJAY CONSTRUCTION PVT LTD , CHENNAI-20

00289170

08-06-2015

Page 12: Gopikrishna Project

INTERNATIONAL GENERAL CERTIFICATE

UNIT GC 3 – HEALTH & SAFETY PRACTICAL APPLICATION

Sheet Number of

Student Name Student Number

Place Inspected Date

MAIN FINDINGS OF THE INSPECTION

Observation 10

Risk of scaffold collapsing of structure due the improper erection of scaffolding

can result in major accident. This can result in collapse of scaffold in the time of work

and can result in fall from height, also can result in fatality. This is a violation of

regulation of health and safety all work the situation should be dealt with

immediately.

Observation 12

Soil condition is poor risk of collapse trench and worker may came injure (or)

death. Take remedial action like shoring shielding benching etc.,

Observation 13

Person working in height without proper PPE’s risk of falling from height other

hazards are object falls from height, courses fatal injures take appropriate action such

as provision of personal prohibition equipment Ex. (PFAS) and supervision.

B. GOPIKRISHNAN

VIJAY CONSTRUCTION PVT LTD , CHENNAI-20

00289170

08-06-2015

Page 13: Gopikrishna Project

INTERNATIONAL GENERAL CERTIFICATE

UNIT GC 3 – HEALTH & SAFETY PRACTICAL APPLICATION

Sheet Number of

Student Name Student Number

Place Inspected Date

Observation 19

Found overloading of power points. Risk of fire and electrical shock and other

hazard fall from height, fall from same level and take remedial action provide

adequate number of power point and also result in heavy loss.

Observation 20

Risk of crane collapse due to lifting in complex geometrical shape. Other hazard

are falling load from highly risk of property damage, environmental damage by lifting

hazards, substance came fire and explosion and take appropriate action by

supervision, competent still operators.

Breaches of statutory laws like coshh 2002, where found in many places in the

work site this needed to be rectified to attain maximum safety for the organization.

B. GOPIKRISHNAN

VIJAY CONSTRUCTION PVT LTD , CHENNAI-20

00289170

08-06-2015

Page 14: Gopikrishna Project

INTERNATIONAL GENERAL CERTIFICATE

UNIT GC 3 – HEALTH & SAFETY PRACTICAL APPLICATION

Sheet Number of

Student Name Student Number

Place Inspected Date

CONCLUSIONS

The work site is found to be a safe place to work. After inspection is carried

out. Event through there are few issues that require urgent management attention.

A number of hazard have aroused from in effective management stabilities which

are highlighted in the observation and recommendations of report few matters that

come the attention as a defect of management system in notably training accident

precaution.

Breaches of statutory laws like wish 1, power, where found in many places in

the work site this needed to be rectified to attain maximum safety for the

organization.

B. GOPIKRISHNAN

VIJAY CONSTRUCTION PVT LTD , CHENNAI-20

00289170

08-06-2015

Page 15: Gopikrishna Project

INTERNATIONAL GENERAL CERTIFICATE

UNIT GC 3 – HEALTH & SAFETY PRACTICAL APPLICATION

Sheet Number of

Student Name Student Number

Place Inspected Date

RECOMMENDATIONS

Recommendation Likely Resource Implications Priority Target Date

Observation : 10

Scaffold should always be erected by a competent erector and daily inspected.

No cost implications, only manpower supply

High 09-06-2015

Observation: 12

Risk of trench collapse be rectified by are of trench box, shielding

Trench box, shield, and related equipments.

Rs. 15000 – 20000

High 10-06-2015

Observation : 13

Risk of fall from height there is lack of PPE’s

Personal perfective equipments such as helmets safety harness, etc., 5000 – 10000

Medium. 11-06-2015

Observation: 19

Available of number of power points and RCD’s (Residual circuit devices)

Power Point cables and RCD’s cost Rs. 20000 – 25000

High

12-06-2015

Observation : 20

The lifting operation is held.

No cost implicating only competent operator and supervision.

High

13-06-2015

B. GOPIKRISHNAN

VIJAY CONSTRUCTION PVT LTD , CHENNAI-20

00289170