INTERNATIONAL GENERAL CERTIFICATE
UNIT GC 3 – HEALTH & SAFETY PRACTICAL APPLICATION
As part of the NEBOSH International Certificate Course, you have to complete a hand written assessment
within 2 weeks after the last date of the course and have it assessed.
For this assessment, the delegate would carry out a safety inspection of a workplace, identifying hazards and
deciding whether they are adequately controlled and where necessary, suggest appropriate and cost effective
remedial action.
Contact & address to send your completed practical assessment paper:
Euro Gulf Safety Consultant
Ghantoot Properties, Mussaffah Sanaiya - M 03
Mezz Floor - Office # 03, Abu Dhabi - U A E
Phone: 00971 25530845 Fax: 00971 25530846
EMail: [email protected] http://www.egsc.ae
Name of the Student B. GOPIKRISHNAN
Registration Number 00289170 Note:
Please do not remove this page during your submission of your practical assessment paper.
All sections of this assessment sheet should be completed before submission
Your assessment paper is signed by your nominated supervisor I manager. Return original assessment
paper by recorded delivery ie courier or special delivery. Keep a photocopy for your own records.
The Inspection takes no longer than 45 minutes.
The writing of the report takes no longer than 1 hour
The whole exercise takes no longer than 2 hours
A quite room is made available for writing the report, which must be hand written / type written.
The assessment is carried out unaided and with no access to any kind of reference material
The whole exercise is properly supervised at all times by a suitable member of the management team. By
preference, this should be someone as independent of the candidate as possible. The organizations Health &
Safety Advisor or the Training Manager, If such post exists, are normally ideal choices.
Alternatively, a manager from another department might be approached. Please contact Euro Gulf Safety Consultant. If there are any doubts on who might be considered suitable.
INTERNATIONAL GENERAL CERTIFICATE
UNIT GC 3 – HEALTH & SAFETY PRACTICAL APPLICATION
CANDIDATE AND COURSE PROVIDER DECLARATIONS
For completion by the candidate :
I declare that the work submitted for this practical application assessment, i.e, the completed observation sheets and the report to management, is my own work. I recognize that contravention of this statement constitutes malpractice and may result in my being subject to the penalties set out in the NEBOSH Malpractice policy
Name ( Print ) B. GOPIKRISHNAN
Signature ………………………………………………………………………
Date ………………………………………………………………………
For completion by a course provider representative : ( e.g. internal practical assessor )
I declare that the work marked is identical to that received from the candidate. I recognize that contravention of this statement constitutes malpractice and may result in my being subject to the penalties set out in the NEBOSH Malpractice policy.
Name ( Print ) ………………………………………………………………………
Signature ………………………………………………………………………
Date ………………………………………………………………………
For completion by the course provider’s internal practical assessor :
I declare that I have marked this work and am both qualified and approved by NEBOSH to do so. I recognize that contravention of this statement constitutes malpractice and may result in my being subject to the penalties set out in the NEBOSH Malpractice policy
Name ( Print ) ………………………………………………………………………
Signature ………………………………………………………………………
Date ………………………………………………………………………
NB: This declaration must be completed in full, submitted and retained with the candidate’s script.If this script is not submitted that candidate’s result may be declared void
INTERNATIONAL GENERAL CERTIFICATE
UNIT GC 3 – HEALTH & SAFETY PRACTICAL APPLICATION
Date of Practical Application Name of Assessor
Course Provider Number Course Provider Name
Student Number Student Name
Criteria Maximum Marks Available
Assessor’s marks awarded
NEBOSH moderated marks
( if different )
1 COMPLETION OF OBSERVATION SHEETS
1.1 Range and outline of hazards and consequences 15
1.2 Identification of suitable control measures and timescales 15
2 REPORT – INTRODUCTION AND EXECUTIVE SUMMARY
2.1 Introduction providing an overview of the chosen area 5
2.2 Executive summary 5
3 REPORT – MAIN FINDINGS OF THE INSPECTION
3.1 Quality of interpretation of findings 15
3.2 Identification of possible breaches of international standards
5
3.3 Persuasiveness / conciseness / technical content 10
4 REPORT – CONCLUSIONS AND RECOMMENDATIONS
4.1 Clear and concise conclusions which are clearly related to report findings and are effective in convincing management to take action
15
4.2 Recommendations which present realistic actions to improve health and safety in the chosen area
15
TOTAL MARKS
878 Euro Gulf Safety Consultant
00289170
INTERNATIONAL GENERAL CERTIFICATE
UNIT GC 3 – HEALTH & SAFETY PRACTICAL APPLICATION
Outcome : PASS ( 60% or more ) REFER ( less than 60 %)
Date Assessed : ……………………………………………. …………………………………………….
Assessor’s Signature : ……………………………………………. …………………………………………….
Date received by ……………………………………………. …………………………………………….
course provider :
Date received by NEBOSH ……………………………………………. …………………………………………….
( if applicable )
Assessor’s additional comments on the practical application :
ASSESSED BY ( name in block letters ) ……………………………………………. …………………………………………….……………………………………………. …………………………………………….
The mark sheet must be retained by the Course Provider and sent to NEBOSH only if requested
NEBOSH USE ONLY
NEBOSH Moderator’s comments :
INTERNATIONAL GENERAL CERTIFICATE
UNIT GC 3 – HEALTH & SAFETY PRACTICAL APPLICATION
Sheet Number of
Student Name Student Number
Place Inspected Date
Observations
Hazards & Consequences
Control Measures
Immediate and longer term actions Timescale
1) Not receiving approved drawing
for construction site survey.
a) Receive immediately approved drawing for
construction site survey.
b) Improve effective management
Immediate
1 week
2) Risk of poor housekeeping. a) Clear all unwanted thinks in the work place.
b) Ensure good housekeeping by
* Supervision
*Frequency monitoring
Immediate
1 day
3) Employee’s and follow the
proper manual handling
a) Continuous monitoring by Supervisor.
b) Training for all level of employee (manual
handling) procedure.
Immediate
1 Week
4) Maximum number of electrical
tools are defective.
a) Repair and proper maintenance / Regular
inspection
b) Replace defective electrical tools.
2 days
1 week
5) Electrical cables wires are
defective (ageing) cracked
etc.,)
a) Insulate wire, cables (Repair)
b) Replace defective cables and wires
1 day
B. GOPIKRISHNAN
VIJAY CONSTRUCTION PVT LTD , CHENNAI-20
00289170
08-06-2015
INTERNATIONAL GENERAL CERTIFICATE
UNIT GC 3 – HEALTH & SAFETY PRACTICAL APPLICATION
Sheet Number of
Student Name Student Number
Place Inspected Date
Observations
Hazards & Consequences
Control Measures
Immediate and longer term actions Timescale
6) Portable power tools are defective (improper guarding)
a) Remove defective tools
b) Provide guard for defective tools
Immediate
1 week
7) Ladder (A-Type) spreader / locking hinges are loss.
a) Remove the defective ladder
b) Repair / maintenance, proper inspection by competent person.
Immediate
2 weeks
8) Risk of falling as many of the excavated tranches are not barricaded.
a) Excavated trenches are properly shielded.
b) Provide Signboards.
1 day
2 weeks
9) No fire extinguisher is provided in hot work area. Risk of spreading of fire.
a) Provide suitable fire extinguisher.
b) Provide supervision.
Immediately
1 month
10) Risk of collaps of scaffold structure due to the improper erecting.
a) Inform the immediate supervisor or competent person.
b) Give training to scarf folders.
c) Scaffold must be inspected by a competent person.
Immediately
1 weekly
Weekly
11) Water filling into trench risk of trench collaps.
a) Use of special support (or) shield system approved by a registered profession engineer.
b) Water removal. Equipment used and
c) Monitoring by a competent person.
d) Surface diverted away from the trench.
1 day
1 day
1 weeks
7 days
B. GOPIKRISHNAN
VIJAY CONSTRUCTION PVT LTD
CHENNAI-20
00289170
08-06-2015
INTERNATIONAL GENERAL CERTIFICATE
UNIT GC 3 – HEALTH & SAFETY PRACTICAL APPLICATION
Sheet Number of
Student Name Student Number
Place Inspected Date
12) Soil condition is poor risk of collaps trench
a) Ensure structure stability by
Sharing
Benching
Sloping (450 (or) 350)
b) Monitoring by competent person.
2 days
1 weeks
13) Person working in height with and proper PPE’s risk of falling from height (or) fall from same level.
a) Provide PFAS (Personal fall arrest system)
Safety Net
Harness
Shoes
b) Ensure good supervision.
1 day
1 weeks
14) Lot of dust by cement mixer, circular saw risk of eye irritation
a) Isolate the area.
b) Proper maintenance and inspection.
1 day
1week
15) In Excavation work rise of underground utilities (Electrical Shock)
a) Stop the work immediately receive area map and clearly isolable.
b) We double insoluble tools and other PPE’s.
1 days
2 days
16) Some person found. Working with damaged helmets. Risk of getting physical injury.
a) Damaged helmet to replace.
b) PPF to be supplied regularly.
Immediately
Regularly
B. GOPIKRISHNAN
VIJAY CONSTRUCTION PVT LTD , CHENNAI-20
00289170
08-06-2015
INTERNATIONAL GENERAL CERTIFICATE
UNIT GC 3 – HEALTH & SAFETY PRACTICAL APPLICATION
Sheet Number of
Student Name Student Number
Place Inspected Date
17) Risk of scaffolding due be guard rail is missing.
a) Provide guard rail by competent person.
b) Provide strict. Supervision, to ensure the scaffolding and frequently monitor.
1 day
2 days.
18) Wooden pieces with protruding nails found on the site. Risk of piercing injury.
a) De nailing to be done.
b) Remove wooden pieces.
Immediately
3 days
19) Found overloading of power points. Risk of fire and electrical shock.
a) Stop using multiple pluging at a single outcell point and use RCD’s (Residual circuit device)
b) Provide adequate number of power points.
2 days
1 week
20) Risk of crane collapse. Due to lifting in complex geometrical shape.
a) Stop the work immediately and lift in appropriate position
b) Crane operator and supervisor should training and competent.
Immediately
1 week
21) Risk of dropping. Lifting Load due to damage slings and hook.
a) Stop the work and remove the damage slings and hook and are correct thinks.
b) Proper maintenance and inspection. (Statuary inspection)
1 day
3 weeks
22) Surface preparation risk of dust Silica partials reach through inhalation.
a) One respiratory mark (or) are special equipments.
b) Change the process.
1 day
1 week
B. GOPIKRISHNAN
VIJAY CONSTRUCTION PVT LTD , CHENNAI-20
00289170
08-06-2015
INTERNATIONAL GENERAL CERTIFICATE
UNIT GC 3 – HEALTH & SAFETY PRACTICAL APPLICATION
Sheet Number of
Student Name Student Number
Place Inspected Date
23) In confine space risk of fire and explosive due to oxygen enrich level the work is welding
a) Stop the work immediately reduce the oxygen level below the ignition level (16%) and are SCBA self contained breathing apparatus
b) Ensure good supervision and competent.
1 day
2 weeks
24) Storage of hazard substance without any labeling and poor housekeeping. Risk of explosion.
a) Area should be clear labeled and ensure good housekeeping.
b) Stored in minimum quantity and proper maintenance and inspection
1 week
3 weeks
25) Oil spillage was found all the oil storage area. Risk of slip hazard.
a) Spilled oil to be removed and cleared.
b) Spill kit to be made available
Immediate
1 week
B. GOPIKRISHNAN
VIJAY CONSTRUCTION PVT LTD , CHENNAI-20
00289170
08-06-2015
INTERNATIONAL GENERAL CERTIFICATE
UNIT GC 3 – HEALTH & SAFETY PRACTICAL APPLICATION
Sheet Number of
Student Name Student Number
Place Inspected Date
INTRODUCTION INCLUDING OVERVIEW OF
AREA INSPECTED & ACTIVITIES TAKING PLACE
Introduction
I, B.Gopikrishnan, Safety Officer has done inspection in Vijay Construction Pvt.
Ltd, Chennai on 08-06-2015 at 10.35 am the purpose of the inspection was the
identify the hazards existing in the workplace and report those to management for
taking remedial actions many like scaffolding, working all height welding operation,
crane operation and manual handling were observed during inspection there were
approximately 500 employees working in the site.
The work is designed the meet erecting good and safe structure the area
covers about 100 acres and located near sea.
B. GOPIKRISHNAN
VIJAY CONSTRUCTION PVT LTD , CHENNAI-20
00289170
08-06-2015
INTERNATIONAL GENERAL CERTIFICATE
UNIT GC 3 – HEALTH & SAFETY PRACTICAL APPLICATION
Sheet Number of
Student Name Student Number
Place Inspected Date
EXECUTIVE SUMMARY
The main objectives of the inspection is the identify the hazards and associated risk
related the activities going on all work place the major hazard found in the work site are
use of damaged web sling during lifting operations, scaffold collapse, working in trench and
excess emission of silica dust.
Adequate control measures are advised to minimize the risk involve in the activities
and some of them required urgent action they are use of damaged web sling for lifting
operation there is a risk of fall of suspended load and the control measures the minimize
the risk if repair or replace the damage web slings, pre check of web sling, and periodic
inspection by competent person. Another hazard is collapse of scaffold due to incomplete
erection. Sitting in unstable ground and use of damaged components is another hazard
observed and the risk of serious injury the people and damage to the properly. The control
measure are scaffold erection by competent person in a firm level ground using good
components daily inspection before use and weekly inspection by competent person. Other
hazard are slip, trip, fall the advised control measure are proper housekeeping and
supervision gas test provision of good ventilation, adequate access / egress, permit to work
system emergency procedures and first aid facility use REP and confined space work
training Excess emission of silica dual in surface preparation and another hazard. Observed
and the risk are irritation to skin, eye, lungs. Respiratory truck and can cause silicosis and
skin diseases. Control measure are one of RPE, reduce exposure time, use of vacuuming to
clean the dual and provision of LEV system.
B. GOPIKRISHNAN
VIJAY CONSTRUCTION PVT LTD , CHENNAI-20
00289170
08-06-2015
INTERNATIONAL GENERAL CERTIFICATE
UNIT GC 3 – HEALTH & SAFETY PRACTICAL APPLICATION
Sheet Number of
Student Name Student Number
Place Inspected Date
MAIN FINDINGS OF THE INSPECTION
Observation 10
Risk of scaffold collapsing of structure due the improper erection of scaffolding
can result in major accident. This can result in collapse of scaffold in the time of work
and can result in fall from height, also can result in fatality. This is a violation of
regulation of health and safety all work the situation should be dealt with
immediately.
Observation 12
Soil condition is poor risk of collapse trench and worker may came injure (or)
death. Take remedial action like shoring shielding benching etc.,
Observation 13
Person working in height without proper PPE’s risk of falling from height other
hazards are object falls from height, courses fatal injures take appropriate action such
as provision of personal prohibition equipment Ex. (PFAS) and supervision.
B. GOPIKRISHNAN
VIJAY CONSTRUCTION PVT LTD , CHENNAI-20
00289170
08-06-2015
INTERNATIONAL GENERAL CERTIFICATE
UNIT GC 3 – HEALTH & SAFETY PRACTICAL APPLICATION
Sheet Number of
Student Name Student Number
Place Inspected Date
Observation 19
Found overloading of power points. Risk of fire and electrical shock and other
hazard fall from height, fall from same level and take remedial action provide
adequate number of power point and also result in heavy loss.
Observation 20
Risk of crane collapse due to lifting in complex geometrical shape. Other hazard
are falling load from highly risk of property damage, environmental damage by lifting
hazards, substance came fire and explosion and take appropriate action by
supervision, competent still operators.
Breaches of statutory laws like coshh 2002, where found in many places in the
work site this needed to be rectified to attain maximum safety for the organization.
B. GOPIKRISHNAN
VIJAY CONSTRUCTION PVT LTD , CHENNAI-20
00289170
08-06-2015
INTERNATIONAL GENERAL CERTIFICATE
UNIT GC 3 – HEALTH & SAFETY PRACTICAL APPLICATION
Sheet Number of
Student Name Student Number
Place Inspected Date
CONCLUSIONS
The work site is found to be a safe place to work. After inspection is carried
out. Event through there are few issues that require urgent management attention.
A number of hazard have aroused from in effective management stabilities which
are highlighted in the observation and recommendations of report few matters that
come the attention as a defect of management system in notably training accident
precaution.
Breaches of statutory laws like wish 1, power, where found in many places in
the work site this needed to be rectified to attain maximum safety for the
organization.
B. GOPIKRISHNAN
VIJAY CONSTRUCTION PVT LTD , CHENNAI-20
00289170
08-06-2015
INTERNATIONAL GENERAL CERTIFICATE
UNIT GC 3 – HEALTH & SAFETY PRACTICAL APPLICATION
Sheet Number of
Student Name Student Number
Place Inspected Date
RECOMMENDATIONS
Recommendation Likely Resource Implications Priority Target Date
Observation : 10
Scaffold should always be erected by a competent erector and daily inspected.
No cost implications, only manpower supply
High 09-06-2015
Observation: 12
Risk of trench collapse be rectified by are of trench box, shielding
Trench box, shield, and related equipments.
Rs. 15000 – 20000
High 10-06-2015
Observation : 13
Risk of fall from height there is lack of PPE’s
Personal perfective equipments such as helmets safety harness, etc., 5000 – 10000
Medium. 11-06-2015
Observation: 19
Available of number of power points and RCD’s (Residual circuit devices)
Power Point cables and RCD’s cost Rs. 20000 – 25000
High
12-06-2015
Observation : 20
The lifting operation is held.
No cost implicating only competent operator and supervision.
High