Grade-Separated Trail Crossings How Do We Get Over There? 2008 National Trails Symposium Rory Renfro, Alta Planning + Design Scott Belonger, Loris and Associates Peter Loris, Loris and Associates

Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning

Grade-Separated Trail CrossingsHow Do We Get Over There?

2008 National Trails Symposium

Rory Renfro, Alta Planning + DesignScott Belonger, Loris and Associates

Peter Loris, Loris and Associates

Page 2: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning

PRESENTATION OVERVIEW

Why grade-separated crossings?What barriers are we trying to cross?Decision-making processAt-grade or grad-separated? Go over or under? Where to build it? Etc.Pedestrian underpass design considerationsBridge/overpass design considerations

Page 3: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning

WHY GRADE-SEPARATED CROSSINGS?

Critical links in the bike/ped network: overcome barriersProvide bike/ped links where at-grade crossings are not possibleRespond to a demand for safe crossings where they didn’t previously existProvide direct links where the surrounding transportation system offers limited connectivityMore than just a transportation facility

Page 4: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning

What are the barriers?

What are we trying to cross?

Page 5: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning
Page 6: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning
Page 7: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning
Page 8: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning
Page 9: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning
Page 10: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning

The decision-making process

HOW DO WE GET OVER THERE?

At-grade or grade-separated?Go over or go under?Where do we build it?What kind of access can/do we provide?What are the details?Can we afford it?

Page 11: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning

DECISION-MAKING PROCESS

Largely depends on the barrier being crossed

Question 1:At-grade or grade-separated?

Page 12: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning

WATERWAYS

Page 13: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning

FREEWAYS

Page 14: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning

RAILROADS

Page 15: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning

MAJOR ROADS

Page 16: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning

DECISION-MAKING PROCESS

The main dilemma: Getting across major roads (and to some extent, railroads)

Page 17: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning

USING A BRIDGE/TUNNEL VS. CROSSING AT-GRADE

User’s decision based on:• Bridge/tunnel location relative to desired travel

route• Availability of alternative crossings• Elements precluding/discouraging at-grade

crossings• Perceived risk of crossing at-grade• Distance/time needed to access and cross the

bridge/tunnel

Page 18: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning

USING A BRIDGE/TUNNEL VS. CROSSING AT-GRADE

Institute of Transportation Engineers Study (1998):• 70% of peds would use a bridge/tunnel if travel time

= at-grade crossing time• If If bridge/tunnel travel time >50% of at-grade

crossing time: Very low useWashington State DOT Design Manual:• Low bridge/tunnel use if walking distance for 85%

of peds is ¼-mile of at-grade crossing distance

Page 19: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning
Page 20: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning
Page 21: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning
Page 22: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning

X

X

Page 23: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning

X

X

Page 24: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning
Page 25: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning

DECISION-MAKING PROCESS

Drainage, environmental impacts, adjacent property impacts, constructability, user safety and security, etc.Vertical ascent/descent necessary to reach bridge/tunnel

Question 2:Go over or go under?

Page 26: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning

Source: Oregon Bicycle and Pedestrian Plan

Page 27: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning
Page 28: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning
Page 29: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning

Source: Oregon Bicycle and Pedestrian Plan

Page 30: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning
Page 31: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning
Page 32: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning

X

Page 33: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning
Page 34: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning

Question 3:Where do we build it?

DECISION-MAKING PROCESS

Bridge/tunnel proximity to:• Surrounding pedestrian/bicycle facilities• Logical walking/bicycling routes and

destinations• Alternative crossing opportunities

Page 35: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning

Surrounding pedestrian/bicycle facilities• Good connections to surrounding facilities

highly important• Bridges/tunnels within an overall

comprehensive network = potentially higher usage

• Wayfinding critical

DECISION-MAKING PROCESS

Page 36: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning
Page 37: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning
Page 38: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning
Page 39: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning

Logical walking/bicycling routes; Proximity to destinations• Should not require out-of-direction

travel to/from a logical travel route or desired destination

DECISION-MAKING PROCESS

Page 40: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning

Bridge

Primarywalk/bike

route

Alternatecrossing

Page 41: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning

Question 4:What kind of access can/do we

provide?

DECISION-MAKING PROCESS

Depends on:• Amount of necessary vertical

ascent/descent• Available “footprint” space

Page 42: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning
Page 43: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning
Page 44: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning
Page 45: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning
Page 46: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning
Page 47: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning
Page 48: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning
Page 49: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning
Page 50: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning
Page 51: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning
Page 52: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning
Page 53: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning

Bridges/tunnels serving multiple functions• Visual icons• Enhance user experience• Bridges as community gathering places• Tourism

DECISION-MAKING PROCESS

Page 54: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning

DECISION-MAKING PROCESS

Pedestrian Underpass

Question 5:What are the details?

Page 55: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning

UNDERPASS ISSUES

FeasibilitySuccess

Critical Issues• site constraints• constructability• structure selection• drainage• lighting• safety

Page 56: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning

EVALUATING THE SITE

UtilitiesRight of WayEnvironmentalSoil ConditionsTraffic ControlDrainage

At what cost?

Page 57: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning

UTILITIES

Locate all utilities and coordinate with ownersPothole critical utilitiesAsbestos conduits require special treatmentAvoid costly utility delays

Page 58: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning

RIGHT OF WAY

Identify available right of wayConsider space required for construction Talk with property owners earlyRight of way negotiations can take time

Page 59: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning

SOIL CONDITIONS

Hire a geotechnical consultantIdentify groundwater elevations and soil conditionsPlan for ground water during and after construction

Page 60: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning

TRAFFIC CONTROLConsider impacts to traffic

during construction•can the road be closed during construction?•design speed?•number of lanes?•pedestrian and bikes during construction?

Page 61: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning

TRAFFIC CONTROL

Consider impacts to traffic during construction

Page 62: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning

TRAFFIC CONTROL

Don’t forget pedestrians, bus stops, etc

Page 63: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning

EVALUATING THE SITE

Site challenges have been identified

Page 64: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning

LAYOUT DESIGN

Identify path connection to at-grade facilities (sidewalks, bus stops…)Determine approach grades• use ADA and AASTHO Bike

Guide Requirements• provide 5% max if possible

Provide horizontal curves• consider sight distance• bicycle movements• maintenance vehicles

Consider ramps and stairs, depending on usage

Page 65: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning

LAYOUT DESIGN

AASHTO Guide for Development of Bicycle Facilities• 5 - 6% up to 800 ft• 7% up to 400 ft • 8% up to 300 ft • 9% up to 200 ft• 10% up to 100 ft• 11+% up to 50 ft

ADA Guidelines for Outdoor Developed Facilities• 1:20 (5%) any distance• 1:12 (8.33%) up to 200 ft • 1:10 (10%) up to 30 ft • 1:8 (12.5%) up to 10 ft

Page 66: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning

LAYOUT DESIGN

Provide alternate routes

Page 67: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning

LAYOUT DESIGN

Provide alternate routes

Page 68: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning

STRUCTURE SIZING

AASTHO: 10-ft vert. clearance8-ft Vert. is typically acceptableHoriz. clearance of 14-ft min.Consider impacts to utilities and drainageSize for flood conveyance if appropriateAdditional height usually adds more to cost than width

8’

14’

Page 69: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning

STRUCTURE SIZING

There are plenty of functional examples less than 8’Provide warnings

6’11”

Page 70: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning

STRUCTURE TYPES

Cast-In-PlaceConcrete

PrecastConcrete

CorrugatedSteel

Page 71: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning

CAST-IN-PLACE CONCRETE

Advantages• can be

“customized”• no joints

Disadvantages• longer duration

of construction• cost

Page 72: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning

CAST-IN-PLACE CONCRETE

Fabrication on site takes timeConsider impacts to traffic and control of water

Page 73: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning

CAST-IN-PLACE CONCRETE

Standard designs are available from many state DOTs

Page 74: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning

CAST-IN-PLACE CONCRETE

Page 75: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning

CAST-IN-PLACE CONCRETE

Combined hydraulic structure

Page 76: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning

CAST-IN-PLACE CONCRETE

Enhanced aesthetic structures

Page 77: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning

CAST-IN-PLACE CONCRETE

Controlled DrainageTextured SurfacingRecessed Lighting

Page 78: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning

PRECAST CONCRETE

Advantages• quick

installationDisadvantages• less

flexibility• joints• leakage

Page 79: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning

PRECAST CONCRETE

Three-sided arch structure

Page 80: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning

PRECAST CONCRETE

Three-sided arch structureSpans up to 35’

Page 81: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning

PRECAST CONCRETE

Delivered to the site in 4’ to 8’ sectionsSpans up to 15’Base preparation is important

Page 82: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning

PRECAST CONCRETE

3-sided structures used for longer spansSpans up to 35’Cast-in-place footings requiredAdditional Vertical Clearance Required

Page 83: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning

PRECAST CONCRETE

JointsNo control of drainageSurface Mounted Lighting

Page 84: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning

PRECAST CONCRETE

Asphalt paving with curb and gutter

Page 85: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning

PRECAST CONCRETE

Textured surfacingRecessed lighting

Page 86: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning

PRECAST CONCRETE

Waterproof joints from the outside

Page 87: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning

PRECAST CONCRETE

Properly seal and waterproof joints in precast concrete structuresAvoid using in wet locations

Page 88: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning

CORRUGATED STEEL

Advantages• quickest

installation• least Cost

Disadvantages• less flexibility• geometric

constraints• more vertical

clearance needed

• leakage• aesthetics• service Life

Page 89: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning

CORRUGATED STEEL

Page 90: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning

CORRUGATED STEEL

Assembled on site and lifted in place

Page 91: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning

CORRUGATED STEEL

Circular pipe

Page 92: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning

CORRUGATED STEEL

Concrete collar required

Vertical arch “underpass” shape

Page 93: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning

CORRUGATED STEEL

Three-sided arch

Page 94: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning

CORRUGATED STEEL

Surface mounted lighting

Page 95: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning

WALL TYPES

Cast-In-PlaceConcrete

MechanicallyStabilized

Earth

GravityWall

Page 96: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning

WALL TYPES

Cast-In-PlaceConcreteH = 20’+

MechanicallyStabilized Earth

H = 20’+Reinforcing

Needed

Rock Gravity Wall

H= 4’-5’Multiple Tears

Page 97: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning

RETAINING WALLS

Consider constructability issues

Page 98: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning

DRAINAGE

Underpasses are low and dark• drainage is critical

Avoid cross-path drainageCollect drainage before entering underpassConsider icing issues

Page 99: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning

DRAINAGE

Direct water away from pathControl water, keep it from crossing pathLocate inlets at low points, off travel way

Page 100: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning

DRAINAGE

Controlling water contains debris

Page 101: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning

DRAINAGE

Better to direct drainage away from path rather than to the center

Page 102: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning

DRAINAGE

Better to control drainage and catch it outside the structure

Page 103: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning

DRAINAGE

Standing water and debris reduces user value

Page 104: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning

DRAINAGE

Must provide drainage outfall

Page 105: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning

DRAINAGE

Outfall location water surface must be below inlet elevationConsider back-flow conditions and flood wall heights

Page 106: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning

DRAINAGE

Page 107: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning

DRAINAGE

Lift station design

Page 108: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning

DRAINAGE

Provide access to lift station and control panel

Page 109: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning

DRAINAGE

Avoid Drainage Mistakes!

Page 110: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning

LIGHTING

Natural and artificial lightingBalance interior and exterior lightProvide approach lightingVandal resistance & maintenance

Page 111: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning

LIGHTING

Various levels of vandal resistance and aesthetics available

Page 112: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning

LIGHTING

Lighting is most critical in long structuresBright interior color helps

Page 113: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning

LIGHTING

Skylights• provide natural

light• brighten long

underpasses • Median required

Page 114: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning

LIGHTING

Provide approach lighting

Page 115: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning

SAFETY CONSIDERATIONS

Safety Concerns•collisions / user conflicts•wipe-outs

Safety Solutions•channelize / separate users•provide adequate visibility•control speeds•control water / ice / debris•provide slope protection (railings and barriers)

CONSIDER THESE THROUGHOUT THE DESIGN

Page 116: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning

SAFETY CONSIDERATIONS

Provide warnings and channelization

Page 117: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning

SAFETY CONSIDERATIONS

Center striping

Page 118: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning

SAFETY CONSIDERATIONS

Island channelization to improve user separation

Page 119: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning

SAFETY CONSIDERATIONS

Page 120: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning

SAFETY CONSIDERATIONS

Don’t encourage conflicts

Page 121: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning

SAFETY CONSIDERATIONS

Enhance sight lines with mirrors

Page 122: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning

SAFETY CONSIDERATIONS

Provide warnings

Page 123: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning

SAFETY CONSIDERATIONS

Control user movements

Page 124: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning

SAFETY CONSIDERATIONS

Delineate edges

Page 125: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning

SAFETY CONSIDERATIONS

Control speed

Page 126: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning

SAFETY CONSIDERATIONS

Consider visibility

Page 127: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning

ESTIMATING UNDERPASS COST

Underpass Structure $100-$200 / SF ……………… 14’x100’=$140k - $280kTemporary Traffic Control ………………………….……………..$50k - $200kConcrete Path $4 - $8 / SF …..….……………………….. 10’x600’=$24k - $48kDrainage …………………………………….……….……………..……..$5k - $50kLighting ……………………………………….……..……………………..$5k - $25kPavement Restoration $2 - $4 / SF ……….……...… 100’x75’ = $15k - $30kRailings $50 -$200 / LF ………………………....….……... x100’ = $5k - $20kRetaining Walls $20 - $60 / SF …….….…………… 15’x100’ = $30k - $90kLandscape…………………………………………….………………?????????Utilities…………….……………………………………………..……?????????Right of Way.…………………………………………………………?????????

UNDERPASS PROJECTS OFTEN COST $500k TO OVER $2 MIL

Page 128: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning

DECISION-MAKING PROCESS

Pedestrian Overpass

Question 6:What are the details?

Page 129: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning

PURPOSE OF BRIDGE

Functional• aesthetics don’t matter• low cost is everything

Statement• gateway• community icon• cost doesn’t matter

On a system ofFunctional Bridges

try to include a Statement Bridge

every now and then!!!

Page 130: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning
Page 131: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning
Page 132: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning
Page 133: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning

BRIDGE NOMENCLATURE

SPAN LENGTH

BRIDGE LENGTH

ABUTMENT PIERFREEBOARD

Page 134: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning

TRAFFIC BRIDGE ISSUES

Critical Issues• bridge selection• ramp length & configuration

Other Issues• constructability• railings• lighting

Page 135: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning

RIVER BRIDGE ISSUES

Critical Issues• bridge selection• river impact• constructability

Other Issues• railings• lighting

Page 136: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning

DESIGN LOADS

Dead Load ~ Structure Self WeightPedestrian Load• 85 psf AASHTO• reduce per span length (65 psf min)

Vehicle Load• maintenance (10,000 lb typical)• emergency (54,000 lb)• Snow Cat (6,000 lb)• equestrian

Snow, Wind, Thermal & Earthquake

Page 137: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning

CLEARANCES

Vertical• Street & Highway ~ AASHTO ~ 16.5’• Railroad ~ AREMA ~ 25.0’• River

• Local ~ 2’ min. over 100-year event• DOT ~ F=0.89*Q0.3+0.26*V2

Horizontal• Approach width plus 2’ recommended• Approach width plus 0’ common

Page 138: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning

BRIDGE TYPES

• Short Spans• 5’ to 100’Girder

• Medium Spans• 20’ to 150’Truss

• Medium Spans• 50’ to 300’Arch

• Long Spans• 100’ to 300’Cable Stay

• Long Spans• 200’ to 500’Suspension

Page 139: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning

SUPERSTRUCTURE COSTS

$-$50

$100 $150 $200 $250 $300 $350 $400 $450 $500

0 100 200 300

Span Length vs. Cost

0 Piers

Page 140: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning

BRIDGE AESTHETICS

Integral to Bridge Structure• truss• arch• cable Stay• suspension

Add-on aesthetics• railings• pilasters at abutments• veneers

Try to make thebridge crossing

and viewing experience

memorable!!!

Page 141: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning

GIRDER BRIDGE

Material Types• steel• concrete• timber

Advantages• many fabrication &

construction options• unique identity with

railing• cost ~ $75 - $150 / sf

Disadvantages• girder depth &

vertical clearance

Page 142: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning

STEEL

Page 143: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning

STEEL

Page 144: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning

CONCRETE

Page 145: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning

TIMBER

Page 146: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning

TIMBER

Page 147: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning

TRUSS BRIDGE

Material Types• steel• timber• fiberglass (FRP)

Advantages• fitting aesthetics• railing integral with

structure• easy construction• installs quickly• cost ~ $75 - $150 / sf

Disadvantages• lead time• “common” look

Page 148: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning

TRUSS BRIDGE

Page 149: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning

TRUSS BRIDGE

Page 150: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning

TRUSS BRIDGE

Page 151: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning

ARCH BRIDGE

Material types• steel• concrete• timber

Advantages• graceful aesthetics• low below trail profile

Disadvantages• cost ~ $150 - $300 / sf

Page 152: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning

ARCH BRIDGE

Page 153: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning

ARCH BRIDGE

Page 154: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning

ARCH BRIDGE

Page 155: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning

CABLE STAY BRIDGE

Material Types• steel• timber• concrete

Advantages• aesthetics• long span• low profile

Disadvantages• cost ~ $400 - $500 / sf• few contractors

Page 156: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning

CABLE STAY BRIDGE

Page 157: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning

CABLE STAY BRIDGE

Page 158: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning

SUSPENSION BRIDGE

Material Types• steel• concrete• timber

Advantages• long river crossings• graceful aesthetics• inaccessible pier

locationsDisadvantages• few contractors• cost ~ $400 - $500 / sf

Page 159: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning

SUSPENSION BRIDGE

Page 160: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning

SUSPENSION BRIDGE

Page 161: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning

SUSPENSION BRIDGE

Page 162: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning

APPROACH RAMPS

Use ADA GuidelinesLong Ramps Due to Vertical Clearances• 370’ at 5%• 225’ at 8.33%

Significant “Overlooked” Cost

Page 163: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning

APPROACH RAMPS

Page 164: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning

APPROACH RAMPS

Page 165: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning

APPROACH RAMPS

Page 166: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning

ABUTMENTS & PIERS

Types • footings• piles*• caissons*• helical/screw

Cost • abutment ~ $5,000 to

$15,000• pier ~ $5,000 to

$25,000Requires soils investigation & utility locates

* Preferred when scour is possible

Page 167: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning

BENEFIT OF PIERS

$-$50

$100 $150 $200 $250 $300 $350 $400 $450 $500

0 50 100 150 200 250 300

Span Length vs. Cost

0 Piers1 Pier2 Piers

Page 168: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning

IMPACT TO RIVER

Regulatory RequirementsFreeboard & Bridge DepthApproach Embankments

Page 169: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning

IMPACT TO RIVER

Number of PiersScour ProtectionConstructionWetland ImpactMitigation

Page 170: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning

BRIDGE RAILINGS

Urban & High Risk Areas * • IBC-based• 42” high• 4” sphere to 34”, 8” sphere above 34”

* USFS Trail Bridge Catalogue

Highway Overpass• 2” sphere to 7’-10”

Page 171: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning

BRIDGE RAILINGS

Page 172: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning

BRIDGE RAILINGS

Page 173: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning

BRIDGE RAILINGS

Rural & Moderate Risk Areas *• AASHTO-based• 42” for peds & 54” for bikes + equestrian• 6” sphere to 27”, 8” sphere above 27”

* USFS Trail Bridge Catalogue

Page 174: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning

BRIDGE RAILINGS

Page 175: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning

BRIDGE RAILINGS

Page 176: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning

BRIDGE RAILINGS

Page 177: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning

BRIDGE RAILINGS

Remote & Low Risk Areas *• OSHA-based• 42” for peds & 54” for bikes + equestrian• 15” between 2”x4” wood rails and 19” between

steel rails

* USFS Trail Bridge Catalogue

Page 178: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning

BRIDGE RAILINGS

Page 179: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning

BRIDGE LIGHTING

Functional = SafeArchitecturalHuman scaleVandal resistantMaintenance

LED use is revolutionizing

lighting!!!

Page 180: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning

BRIDGE LIGHTING

Page 181: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning

BRIDGE LIGHTING

Page 182: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning

BRIDGE LIGHTING

Page 183: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning

BRIDGE LIGHTING

Page 184: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning

UNDERPASS VS. BRIDGE

CATEGORY UNDERPASS OVERPASSSafety

Convenience

User Experience

Resident Impact

Environmental Impact

Aesthetics

Constructability

CostLegendClear AdvantageNeutral

Clear Disadvantage

Page 185: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning

COST CONSIDERATIONS

Grading & DrainageUtility RelocationTraffic ControlRetaining WallsMain StructureSecondary StructureRailingsStreet or River RepairPath ConcreteLandscapingRight-of-way

Costs add up quickly.

Don’t get caught short.

Page 186: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning

SELECTION BASICS

Is crossing at-grade or separatedDo you go over or underWhat is the best locationHow is it accessedFigure out the detailsMake sure you budget enough $$$

Page 187: Grade-Separated Trail Crossings - American Trails · 2013-10-13 · Grade-Separated Trail Crossings. How Do We Get Over There? 2008 National Trails Symposium. Rory Renfro, Alta Planning