85
i Standard No. S24.809 December 01, 1989 (Revised 12/22/2000) GROUNDING STANDARD 1.0 SCOPE 1.1 Scope. This document establishes standard electrical, electronic, and mechanical requirements for ground electronic equipment. 1.2 Application. The requirements of this standard shall apply to equipment developed or fabricated to Government specifications, including commercial production (original equipment manufacture (OEM)) items. When applied to OEM items, the requirement of this document shall serve as a basis of selection among comparably performing equipment. 1.3 Contracting Officer's Technical Representative. The Contracting Officer's Technical Representative (COTR) shall provide the final interpretation of any conflict between this standard and specific contract requirements. 1.4 Waivers. Any request for waiver of specific requirements of this standard shall be submitted in writing to the COTR and to the Contracting Officer. A request for waiver must include: a) identification of the paragraphs for which the waiver is requested; b) identification of the systems, equipment, or components for which the waiver is requested; and c) a discussion of rationale for granting the waiver, including impact on reliability, maintainability, schedule, and cost if the waiver is not granted. 2.0 APPLICABLE DOCUMENTS 2.1 Government documents. The following documents, of the issue in effect on the date of invitation for bid or request for proposal, form a part of this standard to the extent specified herein: The requirements of the following NOAA/NESDIS standards shall apply to all hardware and software, as described in this document. Standard No. S24.801 - Preparation of Operation and Maintenance Manuals. Standard No. S24.802 - General Requirements for Ground Electronic Equipment Standard No. S24.803 - Cable and Wire Identification. Standard No. S24.804 - General Requirements for Training on Electronic and Computer Equipment

GROUNDING STANDARD

  • Upload
    flake03

  • View
    217

  • Download
    16

Embed Size (px)

DESCRIPTION

GROUNDING

Citation preview

Page 1: GROUNDING STANDARD

i

Standard No. S24.809December 01, 1989(Revised 12/22/2000)

GROUNDING STANDARD

1.0 SCOPE

1.1 Scope. This document establishes standard electrical, electronic, and mechanical requirements forground electronic equipment.

1.2 Application. The requirements of this standard shall apply to equipment developed or fabricated toGovernment specifications, including commercial production (original equipment manufacture (OEM))items. When applied to OEM items, the requirement of this document shall serve as a basis of selectionamong comparably performing equipment.

1.3 Contracting Officer's Technical Representative. The Contracting Officer's Technical Representative(COTR) shall provide the final interpretation of any conflict between this standard and specific contractrequirements.

1.4 Waivers. Any request for waiver of specific requirements of this standard shall be submitted in writingto the COTR and to the Contracting Officer. A request for waiver must include: a) identification of theparagraphs for which the waiver is requested; b) identification of the systems, equipment, or componentsfor which the waiver is requested; and c) a discussion of rationale for granting the waiver, including impacton reliability, maintainability, schedule, and cost if the waiver is not granted.

2.0 APPLICABLE DOCUMENTS

2.1 Government documents. The following documents, of the issue in effect on the date of invitation forbid or request for proposal, form a part of this standard to the extent specified herein:

The requirements of the following NOAA/NESDIS standards shall apply to all hardware and software,as described in this document.

Standard No. S24.801 - Preparation of Operation and Maintenance Manuals.

Standard No. S24.802 - General Requirements for Ground Electronic Equipment

Standard No. S24.803 - Cable and Wire Identification. Standard No. S24.804 - General Requirements for Training on Electronic and Computer Equipment

Page 2: GROUNDING STANDARD

ii

Standard No. S24.805 - Spare Parts

Standard No. S24.806 - Software Development, and Maintenance and User Documentation

NOAA/NESDIS standards are available from: U.S. Department of Commerce, National Oceanic andAtmospheric Administration, National Environmental Satellite, Data, and Information Service, OSD3,Washington, D.C. 20233.

Military specifications and standards are available from: Commanding Officer, U.S. Naval Supply Center,580l Tabor Avenue, Philadelphia, Pennsylvania 19120.

Federal Specifications and Standards are available from: The Superintendent of Documents, U. S.Government Printing Office, Washington, D.C. 20402.

Federal Information Processing Standards Publications are available from: The Suprintendent ofDocuments, U.S. Government Printing Office, Washington, D.C. 20402.

ANSI Standards are available from: American National Standards Institute, Inc., 1430 Broadway, NewYork City, New York 10018.

NASA/GSFC specifications are available from: National Aeronautics and Space Administration, GoddardSpace Flight Center, Greenbelt Road, Greenbelt, Maryland 20771. NFPA Standards are available from: National Fire Protection Association, Batterymarch Park, Quincy,Massachusetts 02269.

EIA Standards are available from: Electronics Industries Association, 2001 Eye Street, N.W., Washington,D.C. 20006.

The National Oceanic and Atmospheric Administration, National Environmental Satellite, Data, andInformation Service (NOAA/NESDIS), operates satellite tracking and computer processing systems whichrequire a comprehensive grounding standard to ensure personnel and equipment safety. This groundingstandard provides equipment requirements, design and installation procedures, and test methods, suitablefor all communications and data processing systems. Specific requirements are defined for perimetergrounds, air terminals, down conductors, equipment rooms, antennas with integral electronic rooms, powergrounds, and the interconnection of these subsystems throughout a widely spread site. The need forlightning and power fault protection, ground returns for signal and control cables, and radiation andinterference suppression are addressed and integrated into a system for the entire facility. Priorities forupgrading existing facilities are identified, post installation and maintenance test procedures are detailed,and guidelines are given for tracing and correcting problems that may arise during the upgrade process.

Page 3: GROUNDING STANDARD

iii

This document was developed by MITRE Corporation under NOAA/NESDIS Contract Number 50-DGNE-5-0089. It was reviewed and approved by a panel of twenty people concerned with the groundingof electronic equipment, from both within and outside of the NOAA/NESDIS organization, which wasconvened by NOAA/NESDIS on November 8, 1989.

Page 4: GROUNDING STANDARD

iv

TABLE OF CONTENTS

SECTION PAGE

1 Introduction 1-1

1.1 Background 1-11.2 Scope 1-11.3 Document Organization 1-2

1.3.1 Section Organization 1-21.3.2 Verification Requirements 1-2

2 Reference Documents 2-1

2.1 Documents 2-12.2 Sources 2-12.3 Conflict Resolution 2-2

3 Basic Requirements 3-1

3.1 Application 3-13.2 Definition of Components Used in the Ground System 3-1

3.2.1 Vertical Ground Rods 3-13.2.2 Horizontal Ground Conductors 3-13.2.3 Perimeter Ground Cable 3-13.2.4 Ground Terminal Plate 3-23.2.5 Interconnections 3-23.2.6 Bonding 3-23.2.7 Air Terminals 3-33.2.8 Roof Conductors 3-33.2.9 Down Conductors 3-33.2.10 Chemical Treatment 3-33.2.11 Signal Reference Grid 3-43.2.12 Electrical Service Well 3-43.2.13 Cable Entrance Plate 3-5

3.3 Definition of Special Terms 3-53.3.1 Zone of Protection 3-53.3.2 Minimum Slope 3-63.3.3 Structure 3-63.3.4 Group of Structures 3-63.3.5 Distance Measurements 3-6

Page 5: GROUNDING STANDARD

v

3.3.6 Conductor Sizes 3-63.3.7 Parallel Connections 3-7

4 Grounding System Composition 4-1

4.1 Perimeter Counterpoise 4-14.1.1 Adjacent Structures 4-14.1.2 Resistance to True Ground 4-24.1.3 Achievement Methods 4-24.1.4 Selection Criteria 4-44.1.5 Structural Steel Columns and Other Building Metal 4-4

4.2 Ground Terminal Plate 4-54.2.1 Connection to the PCP 4-54.2.2 Connections to Other Cables 4-5

4.3 Lightning Ground System 4-54.3.1 Air Terminal Mounting 4-6

4.3.1.1 Roof Mounting 4-64.3.1.2 Towers and Masts 4-94.3.1.3 Antennas 4-94.3.1.4 Partial Protection 4-9

4.3.2 Roof Conductors 4-104.3.3 Down Conductors 4-10

4.3.3.1 Down Conductors for Building 4-114.3.3.2 Down Conductors for Towers and Masts 4-114.3.3.3 Down Conductors for Antennas 4-11

4.3.4 Waveguide, Coaxial and Shielded Cable Grounding 4-144.4 Equipment Room Ground System 4-15

4.4.1 Signal Reference Grid 4-154.4.2 Raised Floor as Reference Grid 4-154.4.3 Other Reference Grids 4-164.4.4 Spacing Variations 4-164.4.5 Entrance to Signal Reference Grid Area 4-174.4.6 Interconnection of Signal Reference Grids 4-174.4.7 Equipment Connections 4-194.4.8 Electronic Equipment Mounted in a Feed

Box or Vertex Box 4-194.4.9 Electronic Equipment Mounted Elsewhere

on an Antenna Structure 4-204.5 Power Ground System 4-21

4.5.1 Power Distribution Systems 4-214.5.2 Neutral Grounding 4-21

Page 6: GROUNDING STANDARD

vi

4.5.3 AC/DC Power System Grounds 4-214.5.4 Pipes, Tubes and Conduit 4-224.5.5 Cable Trays 4-224.5.6 Other Enclosures 4-234.5.7 Motors, Generators, Transformers, and Switchgear 4-23

5 Site Configurations 5-1

5.1 PCP Interconnections 5-15.2 Special Conditions for Irregular Buildings 5-25.3 Underground Cables 5-2

5.3.1 Underground Pipes or Conduit 5-25.3.2 External Cable Troughs 5-35.3.3 Underground Cables with Shields 5-35.3.4 Buried Guard Wire 5-3

5.4 Grounding for Filters and Surge Arresters 5-45.5 Ground Return Paths 5-4

5.5.1 Signal and Control Return Paths 5-45.5.2 Power Distribution Ground Paths 5-4

5.6 Fence Grounding 5-55.6.1 Reinforcing Wire 5-55.6.2 Grounding 5-5

5.7 Permafrost Conditions 5-5

6 Implementation Guidelines 6-1

6.1 Priority 6-16.2 Ground System File Requirements 6-26.3 Contractor Documentation Requirements 6-3

7 Inspection and Test Procedures 7-1

7.1 Soil Resistivity Test 7-17.2 Grounding Resistance Test 7-17.3 Inspections 7-57.4 Test Verification Procedures 7-6

7.4.1 Inspection 7-67.4.2 Analysis 7-67.4.3 Demonstration 7-67.4.4 Test 7-77.4.5 Sample Test 7-7

Page 7: GROUNDING STANDARD

vii

8 Trouble Correction Guide 8-1

8.1 Conducted or Radiated Interference 8-18.1.1 Trace the Source of Interference 8-18.1.2 Characterize the Interfering Waveform 8-18.1.3 Determine the Coupling Mechanism 8-2

8.1.3.1 Conductive Coupling 8-28.1.3.2 Radiative Coupling 8-28.1.3.3 Inductive and Capacitive Coupling 8-2

8.1.4 Reduce the Interference 8-38.1.4.1 Conductive Coupling Reduction 8-38.1.4.2 Radiative Coupling Reduction 8-48.1.4.3 Inductive Coupling Reduction 8-48.1.4.4 Capacitive Coupling Reduction 8-48.1.4.5 Transient Suppression Plate 8-5

8.2 Continued Lightning Damage 8-58.2.1 Interconnections 8-58.2.2 Desired Path Checks 8-58.2.3 Actual Path Checks 8-6

8.3 Multiple Shields 8-6

Appendix A Reference Equations and Procedures A-1

Appendix B List Of Abbreviations B-1

Distribution List DI-1

Page 8: GROUNDING STANDARD

viii

LIST OF FIGURES

FIGURE PAGE

1 Example of Interconnections in a Group of Structures 4-3

2 Lightning Protection for Buildings 4-7

3 Lightning Protection for a Protrusion on a Flat Roof 4-8

4 Example Lightning Protection Layout for Large Building 4-12

5 Measurement of Soil Resistivity 7-2

6 Perimeter Counterpoise Resistance Test Setup 7-3

A1 Protection Zone For a Single Rod A-1

A2 The Low Point Between Lightning Rods A-2

A3 Protection Zone Between the Masts A-3

LIST OF TABLES

TABLE PAGE

1 Test Verification Table 7-8

A1 Properties of Standard Size Annealed Copper Wire A-5

Page 9: GROUNDING STANDARD

1

SECTION 1

INTRODUCTION

1.1 BACKGROUND

The National Oceanic and Atmospheric Administration (NOAA), National Environmental Satellite, Data,and Information Service (NESDIS), operates and maintains several communication and data processingfacilities, through which it provides a range of weather related information to users. Some of these facilitiescontain many large satellite tracking antennas, with related electronics, spread over many acres of land.All facilities contain computer and communication systems spread over several rooms. Over the yearssince Congress directed its formation in 1961, continued improvements in technology have required thatNOAA/NESDIS obtain many additions and changes to the equipment used to fulfill it's mission. Thispiece-by-piece acquisition of equipment has resulted in a grounding system at NOAA/NESDIS facilitiesthat has also grown in a piece-by-piece fashion. This has resulted in varied installation practices anddocumentation procedures being applied to different parts of a facility and from one facility to another.

Recent lightning strikes at the Command and Data Acquisition (CDA) station at Wallops, Virginia, havehighlighted the need for an overall grounding standard that would apply to all NOAA/NESDIS facilities toprovide the maximum possible protection and safety for personnel and equipment.

1.2 SCOPE

This NOAA/NESDIS standard defines the requirements for the design, installation, modification, andtesting of grounding systems at all NESDIS facilities. It applies to all facility construction and modificationprojects requiring the design or modification of, or the addition to, grounding systems within any NESDISfacility.

The grounding systems at existing facilities need not necessarily be modified for the sole purpose ofcomplying with this standard. However, this document defines the ultimate grounding requirements towhich all existing and any new NESDIS facilities must eventually comply. If problems exist at a facilitywhich indicate a grounding system deficiency, if a normal facility upgrade includes work to the groundingsystem, or if new equipment is being installed, all work performed on the grounding system must complywith this standard, unless specific exemption is provided, in writing, by the Contracting Officer or hisTechnical Representative.

This document is based on the premise that safety is the prime requirement, for both personnel andequipment. No other requirement can be allowed to compromise it. Current technology, including fibre

Page 10: GROUNDING STANDARD

2

optics, balanced amplifiers and transmission lines, and waveguide theory as applied to ground planes, canprovide solutions to interference problems that do not compromise safety.

1.3 DOCUMENT ORGANIZATION

1.3.1 Section Organization

The following sections of this document are organized in order of increasing complexity of the equipmentand assemblies discussed in each section. Section 2 lists the references used in creating this document.Section 3 provides the requirements of the individual components to be used in the grounding systems anddefinitions of the special terms used herein. Section 4 shows how these components are to be assembledinto the grounding subsystems and section 5 defines how those subsystems are to be interconnectedthroughout the facility. Section 6 provides guidelines for upgrading the existing facilities to comply withthese requirements, section 7 defines the test procedures to be used after installation and to perform routinemaintenance checks, and section 8 provides a trouble shooting guide to assist in handling problems that mayarise during an upgrade process.

1.3.2 Verification Requirements

Many places in sections 3, 4 and 5 contain a number in brackets next to the word "shall". These areprovided to identify the items for which some form of verification is required. Verification could take theform of inspection, analysis, demonstration, test, or sample test. Verification of individual requirements maybe a part of the final acceptance tests or may be performed as a pre-test during the installation period, asidentified in section 7.4. Each numbered shall is referenced in table 1, where the specific verificationrequirements for each are tabulated. Section 7.4 also provides more detailed descriptions of the verificationrequirements and defines the code letters used in table 1.

Page 11: GROUNDING STANDARD

3

SECTION 2

REFERENCE DOCUMENTS

2.1 DOCUMENTS

The following documents provide theory, principles, and application steps and procedures in the areas ofgrounding, bonding, and shielding:

1. MIL-HDBK-419, Military Handbook dated 1-82: Grounding, Bonding, and Shielding forElectronic Equipment and Facilities

2. MIL-STD-188-124A, Military Standard dated 2-84: Grounding, Bonding, and Shielding forCommon Long Haul/Tactical Communications Systems, including Ground BasedCommunications-Electronics Facilities and Equipments

3. Federal Information Processing Standards Publications (FIPS PUB) No. 94, National Bureauof Standards dated 9-21-83: Guideline on Electrical Power for ADP Installations

4. National Fire Protection Association (NFPA) No. 70, National Electrical Code

5. NFPA No. 78, Lightning Protection Code

6. MIL-F-29046(TD), Flooring, Raised, General Specification For

Item 1 above is the primary reference for this document. Users requiring additional details or theory forthe procedures and practices defined herein should consult that document, unless another document isspecifically cited in this text. All the requirements in this standard are in agreement with reference 1, exceptfor the following:

The spacing of air terminals on flat roofs, paragraph 1.3.2.1.2 of volume 2, isnot self-consistent. This standard uses the equation derived for the spacingof air terminals and the coverage so provided, but not the specific spacingscited in parts "c" and "e" of the paragraph which are illustrated in figure 1-18.

2.2 SOURCES

Military Specifications, Standards, and Handbooks may be obtained from:

Page 12: GROUNDING STANDARD

4

Naval Publications and Forms CenterAttention Code 30645801 Tabor Ave.Philadelphia, PA 19120-5099

Federal Information Processing Standards Publications (FIPS PUB) may be obtained from:

National Technical Information ServiceU.S. Department of CommerceSpringfield, VA 22161

Publications of the National Fire Protection Association (NFPA) may be obtained from:

National Fire Protection Association, Inc.Batterymarch ParkQuincy, MA 02269

2.3 CONFLICT RESOLUTION

If any conflict is found between the requirements of this standard and the reference documents identifiedin section 2.1, the requirements of this standard take precedence. In the event of conflict between thisdocument and any specification or other document into which it is incorporated by reference, theContracting Officer's Technical Representative must decide the order of precedence.

Page 13: GROUNDING STANDARD

5

SECTION 3

BASIC REQUIREMENTS

3.1 APPLICATION

A grounding system must be installed at each NESDIS facility that houses or is intended to housecommunications, computing, or other electronic equipment. All electrical and electronic systems must beattached to the grounding system with low impedance connections, in accordance with the requirementsof the applicable paragraphs of this document. The ground system must also be connected to all metallicstructures, provided they can be accessed in a reasonable manner, and without damage to their strength.This design standard is to be applied to all such facilities and systems.

3.2 DEFINITION OF COMPONENTS USED

The following paragraphs identify and define the component parts to be used in the grounding system.

3.2.1 Vertical Ground Rods

All ground rods shall[1] be copper clad steel and shall[2] be 3/4 inch or larger diameter, and with a lengthof 10 to 40 feet. They are to be driven vertically into undisturbed earth, or earth that has been compactedand settled. The tops of the ground rods shall[3] be between 1 and 2 feet below final grade level.

3.2.2 Horizontal Ground Conductors

Horizontal ground conductors shall[1] consist of No. 4/0 AWG bare copper cables, a minimum of 16 feetin length, and shall[2] be buried a minimum of two feet below final grade. They shall[3] be runperpendicular to an interconnecting cable, such as the perimeter ground cable, or radially from a singleinterconnection point. Horizontal ground conductors are permitted only when the use of vertical groundrods is not feasible due to geological conditions or other subterranean obstructions at the site.

3.2.3 Perimeter Ground Cable

The perimeter ground cable shall[1] be a No. 4/0 AWG bare copper cable, buried all the way around theperimeter of one or more structures and with its two ends fused together to completely encircle thestructure(s). The actual route taken around a structure must be a compromise between the following needs:

1. To ensure that all precipitation soaks the soil around the cable, locate it 2 to 6 feet outside thedrip line of the structure. This includes keeping to a minimum those parts of the cable that are

Page 14: GROUNDING STANDARD

6

routed under roads, walkways, or other areas covered by material water can not penetrate.

2. To minimize the impedance of the cable, eliminate as many bends as possible. Whennecessary, bends should be of the smallest angle and the largest radius that is practical.

3. To keep the cable length as short as possible.

The contractor shall[2] submit a diagram for the approval of the Contracting Officer's TechnicalRepresentative, showing the compromises proposed.

The perimeter ground cable shall[3] be buried between 1 and 2 feet below final grade level. It shall[4] bebonded to any incidental, buried, metal structures that are within 6 feet of the perimeter ground cablethrough a No. 1/0 AWG bare copper cable, which must be routed in the shortest possible path from theperimeter ground cable to the metal structure.

3.2.4 Ground Terminal Plate

The ground terminal plate shall[1] be solid copper and a minimum of 1/4 inch by 2 inches by 6 inches. Thissize shall[2] be increased, if necessary, to allow connection of all the cables that may be required in thespecific application, plus at least 25 percent extra for future expansion. Each plate shall[3] be installed inan electrical service well large enough to allow easy connection of additional cables and easy access fortest purposes.

3.2.5 Interconnections

Unless otherwise specified in this document, all interconnections between the parts of the grounding systemshall[1] be made by No. 4/0 AWG or larger, bare copper cable, buried between 1 and 2 feet below finalgrade level.

3.2.6 Bonding

Unless otherwise specified, all connections required by this standard shall[1] be made through a fusionprocess, such as cadwelds, brazing, or other process which causes the conductors to be melted and fusedinto a solid homogeneous mass. This is the only method that may be used to join dissimilar metals. Eachsuch junction of dissimilar metals shall[2] be coated when necessary to prevent corrosion due to moisture.

When clamping is permitted, the connection shall[3] be easily accessible for inspection and test, byproviding an electrical service well, if necessary, to allow access below grade level. If connection isrequired between a pipe carrying a flammable substance, such as oil or natural gas on which fusion can notsafely be used, and the copper ground system; the pipe shall[4] be wrapped with a band of similar metal,that has been bonded previously to a copper cable, and clamped to the pipe. All clamped connections

Page 15: GROUNDING STANDARD

7

shall[5] be able to withstand a pull test of 200 lb minimum, except for clamps on waveguide. Conductiveadhesive may also be used, provided the current capacity of the joint shall[6] be not less than the currentcapacity of the smallest of the conductors being joined.

3.2.7 Air Terminals

Air terminals shall[1] be made of solid copper or bronze, shall[2] be no less than 1/2 inch in diameter, aminimum of 2 feet in length, and extend at least 1 foot above the object being protected. Air terminals over24 inches high shall[3] be rigidly supported at a point not less than one half their height.

3.2.8 Roof Conductors

Roof conductors shall[1] be routed around the perimeter of a flat roof or along any ridges on the roof.They shall[2] be No. 1/0 AWG copper cable, which shall[3] be insulated to prevent corrosion betweendissimilar metals when installed on a metal roof. Roof conductors shall[4] be installed in a rectangular gridlayout, inside the perimeter roof conductor, with a maximum spacing between any two parallel internal roofconductors, or between an internal roof conductor and a parallel portion of the perimeter roof conductor,equal to the spacing between the air terminals, along one axis of the rectangular grid, and three times thespacing between the air terminals, along the other axis of the rectangular grid. The roof conductors shall[5]be clamped or bonded at each crossover and to the perimeter roof conductor at each end and to the airterminal at that point. If necessary, due to a change in spacing between the air terminals for example, aninternal roof conductor may be terminated in a bond to another internal roof conductor.

3.2.9 Down Conductors

The down conductors connect the roof conductors to the perimeter counterpoise. They shall[1] be No.1/0 AWG copper cable, which shall[2] be insulated to prevent corrosion between dissimilar metals, ifinstalled where contact is possible with metal siding or other metallic objects.

3.2.10 Chemical Treatment

When chemical treatment is required, magnesium sulphate, MgSO4, also known as epsom salts, shall[1]be used.

Chemical treatment of vertical ground rods is to be accomplished by digging a trench around the top ofeach vertical ground rod. The average dimensions for each trench shall[2] be an inner diameter of 18inches, a depth of 12 inches and a width of 12 inches. A service well for inspection purposes shall[3] beplaced around each ground rod treated with chemicals.

Chemical treatment of horizontal ground conductors is to be accomplished by digging a trench directlyabove each horizontal ground conductor. Each trench shall[4] average 6 inches deep, 1 foot wide, and

Page 16: GROUNDING STANDARD

8

16 feet long. A service well shall[5] be placed at the center of the horizontal ground grid where thehorizontal ground conductors are connected together to allow inspection of the conductors and themagnesium sulphate. The quantity of magnesium sulphate used shall[6] be sufficient to fill each trench atleast 75 percent.

Users are cautioned that the introduction of large quantities of a chemical substance into the environmentmay require an impact statement. If necessary, copper sulphate, CuSO4, or calcium chloride, CaCl2, maybe used provided their impact on the environment is less than that of the magnesium sulphate. Alternatively,a non-dispersive conductive gel may be used.

3.2.11 Signal Reference Grid

The signal reference grid is an approximation of an equipotential plane to provide a ground reference forall signal and control lines. A signal reference grid shall[1] be installed in all areas of any NESDIS facilitycontaining more than two racks or cabinets of communications or computer equipment. The grid shall[2]consist of a No. 1/0 AWG bare copper cable routed around the perimeter of the area where the grid isrequired, with its two ends bonded together. At intervals of not more than 2 feet, other conductors shall[3]be routed directly between opposite sides of the perimeter cable, fused to it, and connected to each otherat each intersection. Non-metallic conduit shall[4] be used to route the cables through walls or partitions.

The signal reference grid may be located under a raised (computer) floor, in or on a floor, or suspendedabove the equipment. Under some conditions, a raised floor may be made part of the signal reference grid.

The 2 foot conductor spacing defined above provides an adequate equipotential plane for frequencies upto approximately 50 MHz, sine wave, or 10 Mbps, digital. For areas where higher frequencies are ofinterest, closer spacing may be necessary, i.e., so the size of the opening is equal to or less than one eighthof a wavelength at the highest frequency of interest. However, due to the high relative difficulty in providingsuch closer spacing in an existing facility and the comparatively small area in which such frequencies areused, it is recommended that this not be done unless interference problems are shown to exist which involvesuch higher frequencies.

3.2.12 Electrical Service Well

An electrical service well is a hole in the ground to allow access to electrical connections for test andinspection as part of a long term maintenance plan. A well is required whenever a connection is madebelow grade level using a compression or clamping bond or as otherwise stated herein. The top of the wellshall[1] be level with, or above grade, and the bottom at least 6 inches below the level of the object to beinspected. The sides may be round, square, hexagonal, or octagonal. It shall[2] be made of a non-conductive material, and shall[3] be able to support the stresses that may reasonably be expected to beplaced on it, in its specific location. The well shall[4] have a removable cover of compatible strength.Cable entrance shall[5] be through holes in the wall of the well, large enough to accept a cable of at least

Page 17: GROUNDING STANDARD

9

2 inches in diameter. Each well shall[6] have at least 8 such holes, or break-out areas, so cables may enterwith minimum bending.

3.2.13 Cable Entrance Plate

The cable entrance plate is a metal plate, mounted in or on the wall of a building or antenna mountedequipment room, through which the waveguides, cables, metal pipes, and metal conduits which enter thatbuilding or equipment room must pass. When these items are run outside of equipment rooms, they willtend to pick-up voltages and currents from undesired sources. The purpose of the cable entrance plateis to keep these induced voltages or currents outside the equipment rooms, as much as is compatible withthe construction style of the structure involved. If the construction style of the wall to be penetratedprovides significant shielding of the internal space, the cable entrance plate shall[1] be made from a metalthat is compatible with such shielding materials and be bonded to them, continuously if possible, all aroundthe edges of the cable entrance plate. If the wall does not provide any significant shielding, the cableentrance plate is not required.

All waveguides, cables, metal pipes, and metal conduits that pass through a cable entrance plate shall[2]have their outer surfaces bonded to that plate, provided the outer surface is at a nominal ground potential.The bond shall[3] be continuous all around the perimeter of the item passing through the plate and shall[4]be made by welding, brazing, soldering, other exothermic process, by means of a feed-through connector,or as provided in section 4.3.4 of this standard. The procedure chosen for any specific case shall[5] bethe one that does not damage the item passing through the plate and which will produce the longest lastingand lowest resistance bond for the particular materials to be bonded.

The cable entrance plate shall[6] be sized so that there is at least 6 inches of clearance between the edgeof the plate and all of the items passing through it. The cable entrance plate may be part of a box, vault orother structure, used to facilitate installation and maintenance of cables where they enter a building.

3.3 DEFINITION OF SPECIAL TERMS

3.3.1 Zone of Protection

In this standard, the concept of a tall object protecting nearby, shorter objects from lightning discharges,is referred to as a zone of protection. Research has shown that the length (R) of the final step of the leaderin a lightning strike (R) is generally 100 feet or more. It can therefore be shown that the zone of protectionconcept is valid only when the height of the "tall object" is equal to or less than R feet above the level of theearth's surface, or above an effective ground plane, which extends at least R feet out from the base of thetall object. Objects greater than 100 feet high will only provide a zone of protection equal to that of a 100foot high object, if the final leader step is 100 feet. For the percentage of lightning strikes in which the finalleader step is greater than 100 feet, a taller object will provide a correspondingly greater zone of protection,proportional to the actual leader step length. At this time, no data exists on the probability that a lightning

Page 18: GROUNDING STANDARD

10

strike may have a final leader length of any specified value greater than the minimum. Therefore 100 feetis used throughout this standard.

The zone of protection provided by a single object, is defined as the space enclosed by a right circular conewith its axis coincident with the tall object and its apex at the top of the object. The sloping surface of thecone is formed by an arc with a radius of 100 feet, tangent to the earth's surface at one end, and passingthrough the top of the object at the other end. Where two or more protecting objects are used, the sameconcept is applied, however, in this instance, both ends of the arc defining the protected volume mustterminate at the top ends of the protecting objects, or at the 100 foot point, whichever is lower. The basicequations derived from this concept are given in appendix A and a full explanation, including the derivationof these equations is published in MITRE Technical Report No. MTR-89W00206 entitled CalculatingLightning Protection Zones.

3.3.2 Minimum Slope

The term minimum slope is defined as the angle between the edge of the cone defined in 3.3.1 and a verticalline at the point where the cone touches the tip of the air terminal, mast, etc. If the height of the protectingobject is H, and H is less than 100 feet, this slope is given by:

sin-1((100 - H)/100)

This provides a simple, conservative estimate of the zone of protection given by a single air terminal on itsown. The derivation of this equation will also be given in the above report.

3.3.3 Structure

In this standard, a structure is any object which supports or contains equipment used by NESDIS forcomputing or communicating.

3.3.4 Group of Structures

A group of structures is any two or more structures that are located so the straight line distance of closestapproach to each other is 20 feet or less, or when one or more structures is within, or partly within, thezone of protection of another.

3.3.5 Distance Measurements

Unless otherwise stated, all distances given in this document are to be measured along the route a cabletakes or is intended to take, not the straight line distance.

3.3.6 Conductor Sizes

Page 19: GROUNDING STANDARD

11

Whenever a conductor size is specified in this document, it means that it is the minimum size acceptable forthe specific application. A larger size conductor is always acceptable.

3.3.7 Parallel Connections

Many of the requirements in this standard specify the installation of cables or wires that create parallelconducting paths, from item to item, and structure to structure, at a site. Unless otherwise stated herein,combining the requirements of several paragraphs into one physical wire or cable is not permitted. Theneeds of each individual requirement must be met by a unique conductor. For example, the requiredconnections for the power ground system may not "share" the connections required for the equipment roomground system, nor may the requirement to connect the power system ground at a remote structure to thepower system ground at the primary structure, "share" any conductor with the requirement to interconnectthe perimeter counterpoise of each structure.

Page 20: GROUNDING STANDARD

12

SECTION 4

GROUNDING SYSTEM COMPOSITION

The grounding system at each NESDIS facility must consist of one or more of each of the following parts:

1. Perimeter counterpoise

2. Ground terminal plate

3. Lightning ground system

4. Equipment room ground system

5. Power ground system

6. Interconnections between these ground systems

4.1 PERIMETER COUNTERPOISE

The perimeter counterpoise (PCP) shall[1] consist of a perimeter ground cable and two or more verticalground rods. The ground rods shall[2] be evenly spaced along the perimeter ground cable at intervals ofbetween 1.5 and 2 times their length. The tops of the ground rods shall[3] be directly under the perimeterground cable and shall[4] be bonded directly to it. The ground rods shall[5] be long enough to maintaincontact with damp or moist soil year round, or else a waiver must be obtained.

4.1.1 Adjacent Structures

Structures within 20 feet of each other at their nearest points shall[1] share the same PCP, preferablyrouted around the combined perimeter of the structures without any internal cross-connections. However,such internal connections are not prohibited, provided the outer-most cable meets the requirements of thisstandard. It is therefore not necessary to remove any of an existing PCP when it is extended to include anew adjacent structure.

Structures separated by more than 20 feet, but with one inside the zone of protection of another, may beincluded within the same PCP. Alternatively, they may each have their own PCP, joined to each other bytwo interconnecting cables. If more than two structures exist with overlapping zones of protection, eachPCP shall[2] be joined to all adjacent PCP's.

Page 21: GROUNDING STANDARD

13

The requirements for interconnecting the PCP's are depicted in figure 1 and defined as follows:

1. The points of connection on the smaller of the two structures shall[3] be at the extreme endsof that section of its PCP that is closest to the larger structure. If the direct path from such anend point is obstructed, the connection may be made at an internal point where a more directrouting is possible. See note 3 of figure 1.

2. The points at which the joining cables are attached to each PCP shall[4] be separated by atleast the distance equal to the spacing between ground rods, or, if the spacing between the rodsis greater than the length of the side closest to the other structure, the connection points shall[5]be within 1 foot of each corner of the PCP.

3. The cable shall[6] be routed in a straight line over the shortest possible distance, unless anincrease of 10 percent or less in the cable length will allow the connection to be made to aground rod, instead of the perimeter ground cable.

4. If the PCP of one structure is rounded, or at an angle to the other structure, the minimum lengthconnection is only possible at the single point of closest approach. In this case, the two pointsof attachment shall[7] be separated from each other by a minimum of 6 feet. This separationshall[8] be increased until the incremental increase in the separation is less than the incrementalincrease in the length of the connecting cable.

5. If structure A must be joined to structure B because of an overlapping cone of protection andStructure A must be joined to structure C because of other connecting cables, then structureB shall[9] be joined to structure C.

6. Structures separated by distances greater than defined above must be treated as separatestructures or groups.

4.1.2 Resistance to True Ground

The resistance between the PCP for any structure, or group of structures, at a site, and true ground shall[1]be 5.0 ohm or less. This resistance must be measured, for each individual PCP in isolation, using the testprocedures provided in paragraph 7.2.

4.1.3 Achievement Methods

The required resistance between a PCP and true ground may be achieved by the following methods, inorder of preference:

1. Use rods longer than the 10 foot minimum, but not exceeding 40 feet in length.

Page 22: GROUNDING STANDARD

14

2. Use the vertical rods at the minimum spacing.

3. Add chemical treatment to the rods.

Page 23: GROUNDING STANDARD

15

page for figure 1

Page 24: GROUNDING STANDARD

16

4. Add vertical rods, outside the basic PCP, at the minimum spacing.

5. Use horizontal ground conductors, as well as, or instead of, the vertical ground rods.

6. Add chemical treatment to the horizontal ground conductors.

4.1.4 Selection Criteria

The following factors should be considered when determining the method to be used to achieve the requiredresistance to true ground.

1. The ground rod should make contact with the water table throughout the year.

2. At least 50 percent of the ground rod should be below the frost line.

3. Underground rock formations, if present, may limit the depth to which the rods can be driven.

4. If no other alternative provides the required resistance to true ground, the ground rod spacingmay be either or both wider or narrower than the standard spacing.

4.1.5 Structural Steel Columns and Other Building Metal

When the PCP dissipates the energy in a lightning strike, all the conductors connected to it are raised tosome high voltage, due to the finite impedance of the grounding system. Any item connected between oneof these conductors and any other conductor normally at ground potential, but not connected to the samePCP, will have this high voltage applied across it. This will cause a hazard to both personnel andequipment.

The procedure that provides the greatest safety is for all structural steel, and any other conducting itemsin the structure, such as water pipes, ducts, etc., and to conducting items buried in the vicinity of the PCP,be made a part of the ground system by connecting it to the PCP. If this preferred procedure is followed,any metallic object that is at a nominal ground potential and comes within 10 feet of any PCP or the cableswhich interconnect them, shall[1] be connected to that PCP or interconnect cable. In an old or sharedbuilding, it is often difficult to be sure of the routing and interconnections made by all the metallic objectsin and around the structure. This could result in some objects not being connected to the PCP due to theirexistence being unknown, a lack of access without interrupting operations, etc. Every effort should bemade to determine the safest action in any specific set of conditions. If this preferred procedure is notfollowed, the reasons shall[2] be documented and approved by the COTR.

When it is decided to make these interconnections, the cable used shall[3] be a No. 1/0 AWG bare coppercable, [4] bonded at each end, and [5] routed between the metal object and the PCP in the shortest

Page 25: GROUNDING STANDARD

17

possible manner.

4.2 GROUND TERMINAL PLATE

A ground terminal plate must be clamped to the PCP wherever needed to allow connections to other partsof the ground system that must be removed for test purposes.

4.2.1 Connection to the PCP

When required, this connection shall[1] be made by clamping the plate directly to a ground rod, or byclamping the plate to a short length of No. 4/0 bare copper cable, which is bonded to the ground rod. Thecable shall[2] be the minimum length necessary for access to disconnect and visually inspect the parts. Thatrod and the ground terminal plate shall[3] be in an electrical service well large enough to allow easyinspection and test, as well as the necessary access to make the connections to the ground terminal plate.

4.2.2 Connections to Other Cables

At facilities with many structures, e.g., the CDA stations, it is necessary to interconnect the PCP's of thevarious structures, or groups of structures, and also to be able to isolate them from each other, so thatmaintenance measurements may be made. All such connections to the PCP's must be made via one ormore ground terminal plates.

At these sites, all down conductors shall[1] be bonded directly to the PCP, except if a down conductoris also an interconnect to a signal reference as required by subsection 4.4.6, item 4a. All other cables thatare routed to the PCP shall[2] be connected via the ground terminal plate. These cables shall[3] be routedto a common ground terminal plate, when the additional length of cable required, above the shortest, mostdirect route, is not more than 10 percent of its length. If this routing would increase the length of any cableby more than 10 percent, an additional ground terminal plate shall[4] be installed. The location of allground terminal plates shall[5] be such that the total number required is minimized.

At facilities with only one structure, or group of structures, e.g., Federal Building 4 at Suitland MD, no suchdisconnect is required and all connections may be made by bonding directly to the PCP.

4.3 LIGHTNING GROUND SYSTEM

A lightning ground system must be installed on each structure that is not entirely within the zone ofprotection of another structure. Structures that are partly within such a zone of protection may still requiresome parts of the lightning ground system, as designated herein. The lightning ground system must provideas direct as possible a path to ground for all lightning induced currents.

The lightning ground system consists of air terminals, roof conductors, and down conductors. The

Page 26: GROUNDING STANDARD

18

requirements that define how these components are incorporated into the system are given in the followingparagraphs and illustrated with various examples in figures 1, 2 and 3.

4.3.1 Air Terminal Mounting

When not within the zone of protection of another structure, air terminals shall[1] be permanently and rigidlyattached to the roof or upper walls of a building, or at the highest point(s) of a tower or antenna, so thatthe tips of the air terminals are at the desired height, or more, above the structure, or any other objectsmounted on the top of such structure.

Mounting to structural metal is permitted, provided all structural metal and all conductive items within 6 feetof any structural metal are bonded together to form part of the lightning protection system and, for antennas,that any bearings are bridged by suitable jumpers, as defined in subsection 4.3.3.3. Air terminals shall[2]be mounted so they do not interfere with the operation of antennas or lighting fixtures, but protrude aboveall objects by the designed amount. Examples of acceptable mounts for buildings are shown in figure 3.10-1 of NFPA 78, Lightning Protection Code.

If meeting all the requirements of section 4.3 would cause interference to, or degradation of, the normaloperation of any equipment at a facility, an additional structure shall[3] be built to provide the requiredlightning protection without the undesired effects.

4.3.1.1 Roof Mounting

The preferred method of attachment to buildings is to use lag bolts into masonry or concrete. Through boltsare also permitted. Either method must have at least 6 feet of clearance between all the conductive partsof the attachment device and any other conductive material that is not part of the lightning protectionsystem.

For sloping roofs, air terminals shall[1] be placed as close as possible to, and in any case within 2 feet of,each end, or each corner, of the peak of the roof. This is the minimum requirement. The air terminalspacing along the peak of the roof shall[2] be such that the maximum distance between them is no greaterthan 28 feet if the air terminals project 1 foot above the level of the roof peak, 40 feet for a 2 footprojection, or 48 feet for a 3 foot projection. This will provide sufficient protection, provided the slope,from the tip of the air terminals to the building edge, including any protrusions (e.g., dormer windows,chimney, vent pipe), is less than the minimum slope. If it is greater than the minimum slope, the moreaccurate calculation given below must be made, and the locations modified to comply with the results.

On flat roofed structures, air terminals shall[3] be mounted at each corner, along each edge of the roof, andin a square pattern over the rest of the roof. Air terminals at the edge and corners of the roof shall[4] bemounted as close as possible to the outermost edge or corner, and in any case, within 2 feet of that edgeor corner. The maximum length of the side of any such square pattern shall[5] be 20 feet if the air terminals

Page 27: GROUNDING STANDARD

19

project 1 foot above the level of the roof, 28 feet for a 2 foot projection, or 34 feet for a 3 foot projection.The minimum requirement shall[6] be two air terminals at diagonally opposite corners, projecting 1 footabove the roof line or anything mounted on the roof. This is adequate provided no wall of the structure isgreater than 14 feet long. Figures 2 and 3 show some general examples of these requirements.

Page 28: GROUNDING STANDARD

20

page for figure 2

Page 29: GROUNDING STANDARD

21

page for figure 3

Page 30: GROUNDING STANDARD

22

The above requirements are specific instances of the following general equation, which shall[7] be usedwhenever necessary to determine the protection range of any air terminal, provided only that H does notexceed 100 feet.

S = (200H - H2)1/2 Where:

S = The protection range, i.e. the horizontal distance from an air terminal to the point whereprotection is desired. This is normally the upper surface, such as the roof of a building, orthe highest point of an antenna or support pole where protection is required from a directlightning strike.

H = The height of the top of the air terminal above the roof or the highest surface on theprotruding object.

If a square pattern of air terminals does not economically cover the roof area, a rectangular pattern maybe used, provided the above equation is used to ensure the center of the rectangles are protected by theair terminal height and spacing to be used.

When there are other items on the roof which project above the roof surface, such as a stair well entrance,a chimney, or an air conditioner heat exchanger, the tops of these items shall[8] be the reference planeabove which the air terminals must protrude, as defined above. The additional height that these air terminalsare above the main roof surface may enable them to protect a larger area of the roof, adjacent to the roofmounted items. The protected area is defined by the above equation, applied to each surface in turn.

4.3.1.2 Towers and Masts

Air terminals on towers or masts shall[1] be mounted directly to the structural metal, or shall[2] be bondedto it by a No. 6 AWG bare copper cable in the shortest possible distance. Only one air terminal and onedown conductor is required per tower or mast, unless otherwise recommended by the manufacturer, orunless more are needed to protect equipment mounted on the tower or mast. If the structural metal of thetower or mast is not used as the down conductor, as provided in subsection 4.3.3.2, the down conductorand the cable bonding the air terminal to the structural metal shall[3] be one continuous conductor.

4.3.1.3 Antennas

Air terminals shall[1] be mounted so that the tip of at least one air terminal is the highest object on theantenna, for any direction in which the antenna can be oriented.

Page 31: GROUNDING STANDARD

23

4.3.1.4 Partial Protection

If one structure is partly, but not completely within the zone of protection of another structure, the need forsome of the air terminals may be eliminated on the partly protected structure. An air terminal may beeliminated only if the area of protection it would have provided is totally covered by other air terminals.If any air terminals are required on a structure, the interconnecting roof and down conductor must still beprovided, as specified below.

4.3.2 Roof Conductors

A continuous roof conductor shall[1] be routed around the perimeter of a flat roof and along the ridge ona ridged roof. There shall[2] be at least two current paths from each air terminal to ground. Any internalair terminals shall[3] be connected together by other roof conductors in a grid layout, with each end of theinternal roof conductors bonded to the perimeter roof conductor. The maximum size of the grid shall[4]be equal to the spacing of the air terminals, in one dimension, and three times the air terminal spacing in theother dimension. The conductors shall[5] be bonded or clamped at all crossover points.

As a last resort, isolated air terminals may be connected to the grid, or a down conductor, by a dead endcable no more than 16 feet long. This should only be necessary on structures with an irregular outline, andsuch usage must be kept to the minimum possible.

All the conductors shall[6] be run in as straight a line as possible, on the surface of the roof. There shall[7]be no turns of more than 90o, nor with less than an 8 inch radius at any point in any roof conductor run.If it is necessary to meet this requirement, the roof conductors shall[8] be run through walls, cornices,parapets, etc., using a non-conductive, non-flammable duct. All roof conductors shall[9] be securelyfastened to the object on which they are placed, at intervals of not more then 5 feet. The fasteners maybe attached by bolts, screws, nails, or adhesive and shall[10] withstand a 200 lb pull without loosening.They shall[11] be made of a material that is at least as equally resistant to corrosion as the conductor andwhich does not form an electrolytic couple with the conductor or any other metal with which it may beplaced in contact.

When two roof conductors meet in a crossover or a "T" type intersection, they shall[12] meet at a sharp90o angle, i.e., no bending of either conductor is required. (See figure 4)

4.3.3 Down Conductors

Down conductors shall[1] be run in as straight a line as possible and located so as to minimize the numberof bends required. There shall[2] be no turns of more than 90o, nor with less than an 8 inch radius at anypoint in any down conductor run. Where possible, the down conductors should be run on the surface ofthe structure, but may be run through walls, cornices, platforms, balconies, etc., to avoid sharp bends.When this is necessary, the conductor shall[3] be run in a non-conductive, non-flammable duct.

Page 32: GROUNDING STANDARD

24

The down conductors shall[4] be securely fastened to the object on which they are placed, at intervals ofnot more then 3 feet. The fasteners may be attached by bolts, screws, nails, or adhesive and shall[5]withstand a 200 lb pull without loosening. They shall[6] be made of a material that is at least as equallyresistant to corrosion as the conductor and which does not form an electrolytic couple with the conductoror any other metal with which it is to be placed in contact.

4.3.3.1 Down Conductors for Buildings

There shall[1] be a minimum of two down conductors on all buildings, unless the structural metal is usedas the down conductors. Down conductors shall[2] be located:

1. At the diagonally opposite corners of square or rectangular structures, and symmetricallydistributed around cylindrical structures

2. On irregularly shaped buildings, e.g., L, T, or E shapes, at the two corners separated by thegreatest distance

3. So that the down conductors may be conveniently attached to roof conductors and to the PCP

4. So that the down conductors are always routed downward, with a minimum of horizontal run

The spacing between down conductors shall[3] be a maximum of 100 feet, measured along the perimeterroof cable. The down conductors shall[4] be equally and symmetrically spaced along the perimeter of thestructure, except small variations are permitted to accommodate doors, windows, or conducting objectsthat should not be grounded. Buildings higher than 60 feet shall[5] have one additional down conductorfor each additional 60 feet, or fraction thereof, in height. Figures 2 and 4 also illustrate these downconductor requirements.

If the structural metal is used as the down conductors, each riser shall[6] be bonded to the PCP, in theshortest, most direct manner, using No. 4/0 AWG bare copper cable.

4.3.3.2 Down Conductors for Towers and Masts

The structural metal of towers or masts may be used as the down conductors, provided each joint in eachleg and major cross member can maintain electrical continuity under all conditions of use. If not, the jointsmay be bridged by minimum length No. 1/0 AWG or larger copper cable, bonded to the structure on eachside of each joint that requires bridging. Alternatively, a No. 1/0 AWG insulated copper cable shall[1] berun from top to bottom of the structure and extended to connect to the PCP for the structure. The downconductor shall[2] be bonded to the top and bottom of the structure.

If the tower or mast has a single support point, an additional No.1/0 AWG copper cable shall[3] be

Page 33: GROUNDING STANDARD

25

bonded to the structure, opposite the point where the down conductor is bonded to the structure, andconnected to the PCP in the shortest, most direct manner. If the tower has multiple legs, each shall[4] beconnected to the PCP in the same way. Circular towers shall[5] be connected to the PCP by a four No.1/0 AWG bare copper cables, spaced at 90 degrees around the circumference.

4.3.3.3 Down Conductors for Antennas

On antenna structures, the air terminals shall[1] be connected together by the shortest possible run of No1/0 AWG insulated copper cable which does not interfere with the performance of

Page 34: GROUNDING STANDARD

26

page for figure 4, page 1 of 2.

Page 35: GROUNDING STANDARD

27

NOTES:

1. Ground rod spacing is shown at 20 feet, equal to twice a 10 foot rod depth, asrequired for the PCP per subsection 4.1.

2. Air terminals set in a square grid pattern with the sides 34 feet long. This assumesan air terminal protrusion of 3 feet above the surface of the roof or items mountedon the roof.

3. The spacing of the roof conductors is shown at maximum, i.e., three times thespacing of the air terminals in one dimension and equal to the air terminal spacingin the other dimension.

4. Maximum down conductor spacing of 100 feet is shown. This is measured alongthe roof perimeter cable.

5. Transition between air terminal spacing of 34 feet and 20 feet. Coverage of theroof in this area should be checked by careful graphical layouts, or by applying theequations given in subsection 4.3.1.1. Note that "T" connections for roofconductors are permitted if necessary.

6. If a mast were to be erected beside this building, in the inside corner of the "L", soas to provide a zone of protection from lightning strikes, as shown by the dottedline, the air terminals shown with (6) beside them, would not be needed. Other airterminals, which are also located within the dotted circle, are still required becausepart of the area of the roof they protect falls outside of the dotted circle.

7. If the air terminals (6) are not required, then those portions of the roof conductorsshown with (7) beside them are also not required. All the other sections areneeded to provide at least two paths to ground from all air terminals, or else theyare part of the roof perimeter cable, which must be retained in full.

Figure 4. Example Lightning Protection Layout for Large Buildings(Concluded)

Page 36: GROUNDING STANDARD

28

the antenna, so that all air terminals have at least two paths to the PCP. Two down conductors shall[2]be bonded to these interconnecting cables, routed down the antenna structure, as far from each other aspossible, and connected to the PCP. Under no circumstances is any down conductor to enter the feedbox, vertex box, or other shelter housing electronic or electrical equipment that may be present on theantenna structure.

Alternatively, all, or any part, of these cables may be replaced by the structural metal of the antenna. Thisis acceptable, provided the cross section of the metal that may carry the lightning induced currents shall[3]be at least twice that of the copper that would otherwise be used. All bearings shall[4] be bridged by aminimum practical length No 4/0 AWG cable bonded to the structural metal on either side of each bearing.

There shall[5] be 4 No. 1/0 AWG cables bonded to the PCP and to the outer most structural metal of thebase (fixed) portion of the antenna structure and equally spaced around the antenna base. If downconductors are used, two of these shall[6] be a continuation of the down conductor. Antenna structuresthat have a central "maypole" type cable entrance, shall[7] have these four cables run radially from themaypole to the PCP, at 90o spacing.

4.3.4 Waveguide, Coaxial and Shielded Cable Grounding

Each waveguide, coaxial and shielded cable shall[1] be bonded to the PCP of any structure that it enters,and [2] as close as possible to the highest and lowest points that it reaches on any tower or antennastructure to which it is attached. The bonds shall[3] be made before the bend that directs the waveguideor cable away from the tower. If the run on a tower exceeds 200 feet, the waveguide or cable shall[4] bebonded to the tower at additional points so that the distance between any two bond points does not exceed200 feet. Each waveguide or cable entering a large antenna structure shall[5] also be bonded to thestructure at the point at which it enters the feed box, vertex box, or other equipment shelter mounted withinthe antenna structure. Paragraph 4.4.7 also applies.

Connection to the waveguide or cable shall[6] use ground kits supplied by its manufacturer, if available.Otherwise connection to rigid waveguide shall[7] be made using a No. 6 AWG bare copper cable bondedto a lug mounted under a flange bolt, or by wrapping a copper ground strap around the waveguide andclamping them firmly together, but without distorting the waveguide shape. A minimum length pigtail shall[8]be left to the tower metal, entrance plate, or interconnecting cable. Connection to elliptical waveguide, orcoaxial or shielded cable, shall[9] be made by tightly wrapping a minimum of three turns of bare copperbraid, at least one inch wide, around the waveguide or cable, at a point where the outer sheath has beenremoved, exposing the outer conducting surface. This joint shall[10] then be clamped, taped, and sealed,leaving a minimum length pigtail of flattened braid to be bonded to the tower metal, entrance plate, orinterconnecting cable. Other acceptable grounding methods are given in MIL-HDBK-419, paragraphs1.3.3.3. and 1.3.3.4.

Individual connections shall[11] use a No. 6 AWG copper wire, if its length does not exceed 12 inches.

Page 37: GROUNDING STANDARD

29

If a longer length is needed, a No. 1/0 AWG copper cable shall[12] be used. Multiple waveguide orcables may be jumpered to the one No. 1/0 cable using No. 6 or larger wire. Waveguide or cablesentering an enclosure shall[13] pass through an entrance plate and be grounded to it. The plate shall[14]be grounded to the PCP for the structure by the shortest route, using a No. 1/0 AWG cable.

The general direction of the waveguide and cable grounding components on the outside of an enclosure,shall[15] always guide lightning induced currents towards the PCP, i.e., the placement of all connectionsand the routing of all cables must not attempt to route the current back on itself.

Waveguide and cables shall[16] also be grounded to the signal reference grid, using these procedures andthe requirements of paragraph 4.4.4. In some instances, this may require attaching two ground kits to acable within a few inches of each other. However, both are necessary and must be separately installed andconnected, one outside the wall and the other inside the equipment room.

If any cable has more than one shield, or if a shielded cable in run inside a metal pipe or metal conduit,these requirements apply only to the outermost item providing the shielding. The other shields may, butneed not, be connected as well, depending on the source and strength of the interference against which theyare intended to protect the conductors inside each shield.

4.4 EQUIPMENT ROOM GROUND SYSTEM

4.4.1 Signal Reference Grid

A signal reference grid shall[1] be formed by routing, on the sub-floor, a No. 1/0 AWG bare copper cablearound the perimeter of the entire equipment area. The cable shall[2] be continuous with both ends fusedtogether, forming a complete loop. At intervals of not more than 2 feet, No. 4 AWG conductors shall[3]be routed across the area, fused to the 1/0 perimeter cable at each end and fused or clamped at eachintersection. If the conductors pass through any walls or partitions they shall[4] be bonded to any metallicitems that are in the wall and within 6 feet, or the reference grid cable shall[5] be enclosed in non-metallicconduit. If routed under a raised floor the support pedestals shall[6] be grounded to the grid at intervalsof 10 feet or less, by bonding the grid cable to the pedestal column.

4.4.2 Raised Floor as Reference Grid

If desired, the raised floor supporting structure may be used in place of the above No. 4 AWG copper grid,provided the following conditions are met.

1. The pedestals and stringers are bolted together using spring washers or equivalent, and aremade of aluminum, or tin or zinc plated steel, so that low resistance, long life, pressureconnections can be made. The electrical resistance between an individual stringer and pedestal

Page 38: GROUNDING STANDARD

30

shall[1] be less than 0.1 milliohm. Clip nuts and sheet metal screws must not be used.(Reference MIL-F-29046(TD)).

2. The joint areas shall[2] be clean and free from oxidation. A light coating of a joint protectivecompound shall[3] be used to protect the joints against oxidation after installation.

3. The No. 1/0 AWG perimeter cable shall[4] be bonded to the outer row of support pedestalson all sides of the grid area. If any side is greater than 20 feet, intermediate cables of No. 4AWG shall[5] be routed across the sub-floor and bonded to the perimeter cable, at intervalsof no more than 20 feet. The routing shall[6] be along the line of a row of support pedestals,each of which shall[7] be bonded directly to the No. 4 AWG cable.

4. The ground connection from each piece of equipment in the room to the grid, and from the gridto the perimeter cable, shall[8] be made without joining dissimilar metals, except by a fusionprocess.

5. The raised flooring materials shall[9] conform to the requirements of MIL-F-29046, revision2.

4.4.3 Other Reference Grids

If an existing equipment area does not have a raised floor, the signal reference grid may be implementedin either of the following ways:

1. A grid shall[1] be formed using 1 inch wide by 1/16 inch copper strap with a center to centerspacing of not more than 2 feet, bonded at all intersections, laid on the existing floor andcovered with carpet or tile. Access shall[2] be provided through the covering to allow groundstraps to be connected to the equipment.

2. A grid shall[3] be formed using No. 4 AWG copper wire with a center to center spacing of notmore than 2 feet, bonded at all intersections, and suspended from the ceiling.

The perimeter wire around the grid area shall[4] be No. 1/0 AWG. If the spacing of the conductors is lessthan 2 feet, their size may be reduced proportionally, to a minimum of No. 14 AWG wire, or 1/8 inch by1/16 inch strap.

4.4.4 Spacing Variations

If the existing cabinets, racks, ducts, pipes, etc, in the equipment area, do not allow this spacing of theconductors, the following modifications are allowed:

Page 39: GROUNDING STANDARD

31

1. Each bay or group of cabinets or racks shall[1] have the conductor run in front, behind and ateach end of the bay and as close as possible to it. If possible, intermediate conductors shall[2]be run between the conductors at the front and rear of the racks of cabinets. If it can fit in theavailable space, the conductor shall[3] be the same size as the conductors in the grid. If not,any conductor of No. 14 AWG or larger may be used.

2. Each cabinet or rack that stands alone, shall[4] have the conductor run in front, behind and ateach side.

3. The desired 2 foot maximum grid spacing may be increased to fit around obstructions, but tothe minimum extent possible.

4.4.5 Entrance to Signal Reference Grid Area

All items at a nominal ground potential, except the neutral and ground wires of the power system, shall[1]be grounded to the signal reference grid at the point where they enter the area of the signal reference grid.This applies to all waveguides, coaxial cables, shielded cables, pipes, conduits, ducts, and cable trays,except items that are run inside of other grounded conductors. For example, a coaxial cable with twoshields, must have the outer shield grounded to the signal reference grid, but need not have its inner shieldgrounded at the same point, as long as the outer shield is not terminated there and the inner is then exposedto contact with other objects. Multiple shielded pairs in a cable with an overall shield, and shielded orcoaxial cables within a metal pipe or a metal conduit, could be treated in the same manner.

If the entrance point is closer to the perimeter cable than it is to other items that must be connected to theperimeter cable, the connection shall[2] be made directly from the item to the perimeter cable using No.6 AWG copper wire, if further away, the connection may be made via the closer item. If the item is oneof a group, all the items in the group may be bonded to each other with a No. 6 AWG copper wire, eachend of which shall[3] be bonded to the perimeter cable. Alternatively, each item may be bonded, by a No.6 AWG copper wire, to a No. 1/0 AWG jumper wire, which is in turn bonded to the perimeter cable. Thetotal length of wire between any one item and the perimeter cable shall[4] be no more than 20 percentlonger than the straight line distance from the item to the perimeter cable.

If power distribution equipment, which provides power to the equipment in the reference grid area, ismounted in, or immediately adjacent to, a signal reference grid, any distribution boxes, conduits, pipes, andany ground bus therein, shall[5] be connected to the grid by the shortest possible No. 6 AWG wire.

Items crossing from one signal reference grid area to another, shall[6] be bonded to each at the respectiveentrance points.

4.4.6 Interconnection of Signal Reference Grids

Page 40: GROUNDING STANDARD

32

If a building has more than one signal reference grid, they must be interconnected as follows:

1. Signal reference grids with less than 6 feet spacing between their adjacent sides shall[1] becombined into one grid with a single perimeter cable. Grids with larger spacing may also becombined, if desired.

2. Signal reference grids on different floors of the same building, if they overlap in the verticalplane, shall[2] be connected at the corners of the overlapping area, with a No. 1/0 AWGcopper cable, by the shortest possible route. Additional connections shall[3] be made, ifnecessary, so that the distance between the connecting points on either grid perimeter cableis not greater than 20 feet, provided such additional cables can be routed at least 6 feet awayfrom, and are no more than 20% longer than, the cables connected to the corners.

3. Signal reference grids on different floors of the same building, that do not overlap in the verticalplane, or on the same floor but separated by more than 6 feet, shall[4] be connected by at leasttwo No. 1/0 AWG copper cables, routed between the corners of each grid that are closest tothe other grid, by the shortest possible route. Additional connections shall[5] be made, ifnecessary, so that the distance between the connecting points on either grid perimeter cableis not greater than 20 feet, provided such additional cables can be routed at least 6 feet awayfrom, and are no more than 20% longer than, the cables connected to the corners.

4. The perimeter cable of each signal reference grid shall[6] be connected to the building PCP,by the shortest, most direct route, with No. 1/0 AWG copper cables using the followingguidelines:

a. Connections to the PCP shall[7] be made from each corner of the grid perimeter cable.Additional connections shall[8] be made, if needed, so that the distance between theconnecting points on the grid perimeter cable is 20 feet maximum.

b. If there is a large difference in the distances to the building perimeter cable when measuredfrom the different corners of the grid perimeter cable, the connections need be made onlyfrom the two sides of the grid perimeter cable that are closest to the building perimetercable.

c. If the grid perimeter cable is connected to another signal reference grid, which is betweenit and the building perimeter cable, and to which connection is made as required above,additional cables are not required in that direction to connect to the building perimetercable.

d. If any of these cables would come within 6 feet of a down conductor of the lightningprotection system, the cable from the grid perimeter cable shall[9] be routed directly to the

Page 41: GROUNDING STANDARD

33

down conductor and be bonded to it. If desired, the cables may be located so as tomaximize these junctions with the down conductors, provided the other requirements of thisparagraph are met.

5. If any reference grids are separated by too great a distance, or if the available routes for cableinterconnections are too few or too complex, so the above requirements seem unreasonable,they may be reduced to a single No. 1/0 AWG cable, provided a written waiver is obtainedfrom the Contracting Officer's Technical Representative.

If any of these interconnecting cables are located so that contact is possible with any other bareinterconnecting cable, or any other metallic items, that connection shall[10] be bonded or clamped to makea permanent connection.

4.4.7 Equipment Connections

Each equipment rack or cabinet shall[1] contain a ground bus clamped or bonded to it and to the signalreference grid at the closest point by a No. 6 AWG copper wire. All equipment chassis within the rackshall[2] be connected to the ground bus through a copper wire or braid of cross section equal to No. 12AWG copper cable. The chassis jumper shall[3] be just long enough to allow the access necessary formaintenance, and shall[4] be clamped to the outside of the chassis, whenever possible.

Any individual item of equipment in an equipment room shall[5] have its chassis directly connected to thesignal reference grid by a No. 12 AWG copper wire, or an equivalent strap or braid. This connectionshall[6] be as short as possible.

Interconnections between individual equipments in an equipment room, using waveguide, coaxial, orshielded cables, will normally have their outer conducting surfaces grounded through their connections tothe equipments to which they are attached. No additional grounding is required, provided the waveguideor cables do not leave the equipment room. The practice of leaving one end of the shield of a cable un-grounded, to prevent ground loops, etc., is permitted as a last resort, and only for shielded cables thatdo not leave the area of the reference grid.

The requirements of this subsection are in addition to the requirements in subsection 4.5.3.

4.4.8 Electronic Equipment Mounted in a Feed Box or Vertex Box

All mounting hardware, grounding lugs, etc., shall[1] be surface mounted on the inside or outside of the feedbox, or vertex box. Penetration of the wall of the box is not permitted.

All waveguide, coax, and shielded cables shall[2] be grounded to the outside of the feed box, or vertexbox, immediately prior to entry.

Page 42: GROUNDING STANDARD

34

All non-coaxial wires and cables which enter the feed or vertex box shall[3] have an external shield, or berun in conduit or pipe. This shield, conduit, or pipe, and the outer conductor of coax cables andwaveguides, shall[3] be bonded to the outer surface of the box so that the entire perimeter of the shield orouter conductor and the outer surface of the box form a continuous conducting surface. Feed throughconnectors may be used, if they can provide such bonds. If possible, these shields should be continuedinside the box to the equipment chassis they are intended to serve and then be terminated on, or bondedto, the outside wall of the chassis. If possible, this should be done through the body of a suitable connector,mounted on the equipment chassis, in which electrical contact is made between the connector shell and theoutside of the chassis.

All ground surfaces in the inside of the feed or vertex box shall[4] be made into an equipotential plane, bymounting equipment on common solid plates, multiple connections between the plates, bonding equipmentgrounds together using wide straps, etc. If a rack style is necessary to mount some equipment, it mustcomply with the following requirements:

1. The rack shall[5] be located as close as possible to an inside wall of the feed or vertex box.

2. It shall[6] be bonded to the inside surfaces of the feed or vertex box at a minimum of 6 places.Each area of contact between the rack and the feed or vertex box, shall[7] have a perimeterof at least one inch, including any intermediate item in the current path between the rack andthe surface of the box. If smaller items must be used, a bridging strap shall[8] be added witha perimeter of at least one inch.

3. A ground bus shall[9] be run at one side of the rear of the rack and bonded to it at top andbottom. The bus shall[10] be copper or brass with a minimum cross section of 1 inch by 1/8inch. It shall[11] be directly connected to the inside surface of the feed or vertex box by a No.1/0 AWG copper cable, or an additional 1 inch by 1/8 inch copper strap, routed in theshortest, most direct manner possible.

4. All equipment mounted in the rack shall[12] be connected to the ground bus by a copper wireor strap equivalent to a No. 6 AWG or larger, of the minimum length necessary to allow accessto the equipment for testing and maintenance.

All AC power cables shall[13] have the ground lead attached to the chassis of the equipment item usingthe power, preferably the outside of the chassis. The neutral conductors shall[14] be isolated from groundat all points except at the service disconnect point, reference subsections 4.5.2 and 4.5.3. Contactbetween the neutral and ground wires in any item of equipment is prohibited.

Since the AC power for blowers, heaters, and lights is required to be run on a separate distribution systemfrom the AC power for the technical equipment, reference subsection 4.5.1, each distribution systemshall[15] have a separate ground conductor. These ground conductors may be interconnected at any

Page 43: GROUNDING STANDARD

35

convenient points, e.g., power outlets or distribution boxes which are close to each other.

4.4.9 Electronic Equipment Mounted Elsewhere on an Antenna Structure

Equipment mounted in shelters which are located within the structure of a large antenna must meet all thegrounding requirements for equipment rooms and for cable entrance to a building, with the followingexceptions:

1. The cable shields and outer conductors, waveguides, pipes, etc., shall[1] be connected to thestructural metal of the antenna, immediately prior to entering the shelter.

2. A signal reference grid need not be installed in existing shelters if it can be shown that theexisting ground system complies with the requirements of this document in all other respects.

Page 44: GROUNDING STANDARD

36

4.5 POWER GROUND SYSTEM

This system provides personnel and equipment with protection against power fault currents and staticcharge buildup. It is part of the power distribution system, with the power distribution conductors and thepower ground system conductors run close and parallel to each other. Since the power ground conductorsare only to be connected to the neutral conductor at a single point, reference subsection 4.5.2, the powerground conductors will only carry current under fault, or lightning strike, conditions.

4.5.1 Power Distribution Systems

There shall[1] be separate power distribution systems for technical and utility power which must meet thefollowing requirements:

1. Utility power shall[2] be used for all lights, heaters, air conditioners, blowers, antennapositioning motors, and any other high current consumption parts of the antenna positioningsystem that are located at or near the antenna. It is desired that as much of the antennapositioning system as possible draw power from the utility bus, except for the remote controlequipment in the primary equipment building.

2. Technical power shall[3] be used for all signal processing equipment, such as receivers,down/up converters, transmitters, computers, disk and tape drives, displays, printers, etc, andthe parts of antenna positioning systems that are located in the primary equipment building.

3. Most convenience outlets are intended to power test equipment. They shall[4] be connectedto the technical buss and colored brown. Other outlets are required for cleaning equipment,etc. They shall[5] be connected to the utility buss and colored white.

4.5.2 Neutral Grounding

The neutral of all three-phase and single phase power distribution systems shall[1] be connected to theground system only at the main service disconnect for the station. This is the point where the load circuitsare switched to the incoming power lines from the utility, or the back-up power source. All return currentsof all power supply circuits are therefore only able to flow in the neutral conductor. The ground conductoris only used to carry fault currents. If any electrical equipment requires a ground conductor to carrycurrents under normal operating conditions, such as phase imbalance currents, a separate insulatedconductor shall[2] be used, isolated from all other conductors, except at the single point of connectionbetween the neutral and ground system, as defined above.

4.5.3 AC/DC Power System Grounds

Each item of equipment that uses AC power shall[1] have an insulated ground wire connected to it. If

Page 45: GROUNDING STANDARD

37

possible, this connection shall[2] be made to the outside of the chassis of the item. The wire size shall[3]conform to the requirements of the National Electric Code. This wire is in addition to the requirements ofsubsection 4.4.7.

DC powered items shall[4] have one side of the DC supply grounded, directly through a copper cable, ifpossible, or through a capacitor if necessary.

These ground wires shall[5] be routed with the active and neutral conductors back to their powerdistribution panels, where branch feeder cables may be commoned with other branch cables and fed bylarger distribution cables. The line, neutral and ground conductors in the technical power subsystem andthe line, neutral and ground conductors in the utility power subsystem must each remain separated from theother until they are brought back to the primary AC distribution panels at the main service disconnect pointfor the station. The ground conductors may be connected to each other whenever convenient, but this doesnot change the need for a separate ground conductor to be run with each group of line and neutralconductors. This applies to all power runs at the station. The presence of connections from each powerdistribution panel ground bus to the signal reference grid and to the ground terminal plate at each structurelocation, which are then interconnected throughout the site, does not compromise the above requirement.

The size of each ground wire shall[6] be calculated, in accordance with the National Electric Code, as ifeach power distribution run were an isolated cable, not connected in any others.

If any transformers are used in the power distribution system, the neutral conductor shall[7] always beconnected to the power ground conductor on the load side of the transformer and not on the source side.This will provide a ground reference for the neutral conductor at the source of each voltage, and a suitableconductor in which fault currents may flow, without allowing any significant current flow in the groundconductor under normal operating conditions.

4.5.4 Pipes, Tubes and Conduit

All metallic pipes, tubes and conduits, with their supports shall[1] be electrically continuous and shall[2] begrounded, at a minimum of one point, to the power ground system, using a No. 6 AWG copper wire, orlarger. All threaded connections shall[3] be treated with a conductive lubricant and tightened firmly.Gouging lock nuts shall[4] positively penetrate all paint or other finish. All runs greater than 10 feet shall[5]be grounded at both ends. Runs which enter an area where there is a signal reference grid shall[6] bebonded to that grid as specified in 4.4.5.

4.5.5 Cable Trays

All metallic cable trays and their supports shall[1] be electrically continuous and shall[2] be grounded atall ends. When run outside the building, they shall[3] be grounded in the same manner and at the samelocations as required for the cables they carry. When in an area with a signal reference grid, the cable tray

Page 46: GROUNDING STANDARD

38

shall[4] be grounded to the grid, as specified in 4.4.4. Other internal runs shall[5] be bonded to the powerground system at each end of their run, using a No. 6 AWG copper wire.

4.5.6 Other Enclosures

All metallic enclosures, including pipe, conduit, and boxes, that are part of the power distribution systemshall[1] be connected to the power system ground via the ground wires which are run inside the enclosures,and to any other object at ground potential that comes within 10 feet of the power distribution system. Ifthe enclosures are in an area where there is a signal reference grid, they shall[2] be connected to it by a No.6 AWG copper wire. Connections may be made by lug fasteners to the enclosure.

4.5.7 Motors, Generators, Transformers, and Switchgear

The frames of the equipment shall[1] be grounded in accordance with the National Electrical Code, exceptthat the cable size must be No. 4/0 AWG copper cable.

Page 47: GROUNDING STANDARD

39

SECTION 5

SITE CONFIGURATIONS

All NESDIS sites must have a ground system that consists of the necessary number of the subsystemsdescribed in the preceding sections. Compromises may be required for sites which are leased or whereoccupancy is shared with other organizations so that the overall safety of the facility is maintained. If so,the extent to which this standard applies must be closely examined by the Contracting Officer's TechnicalRepresentative or, if the work is undertaken as an internal NOAA/NESDIS project, by other cognizantengineering personnel designated by the project manager. The areas of concern are where the NESDISground system could interface with items controlled by others, e.g.:

1. Lightning protection on a shared roof.

2. Connection to structural metal, water pipes and other conducting items that extend throughoutthe structure.

3. Location of, and connection to, the PCP.

4. Cable routes for the down conductors.

5. Interconnection of grounds in the power supply system.

5.1 PCP INTERCONNECTIONS

The PCP of each structure, or group of structures, shall[1] be connected to a ground terminal plate of thePCP of the primary structure at the facility. This connection may be made directly, or by a daisy chain inwhich the PCP of a remote structure connects to the PCP of a structure that is closer to the primarystructure, which connects to a still closer PCP, etc., until connection is made to the PCP of the primarystructure. The total cable distance of such a daisy chain (measured along the shortest cable route throughthe intermediate PCPs) shall[2] be not more than 30 percent longer than a direct cable run, if less than 300feet, or not more than 50 percent longer if 300 feet or longer. The interconnecting cable shall[3] also beconnected to any other buried metallic objects that come within 10 feet, and are at a nominal groundpotential.

The connection between each PCP and each interconnecting cable shall[3] be made via a ground terminalplate, so that each PCP can be isolated, when required for test measurements. The interconnecting cablemay also be used as a buried guard wire, as defined in subsection 5.3.4, over all or part of it's route,provided all the requirements of this subsection and subsection 5.3.4 are met.

Page 48: GROUNDING STANDARD

40

5.2 SPECIAL CONDITIONS FOR IRREGULAR BUILDINGS

Many structures, especially those with an irregular shape, may pose difficult problems in the routing of roofconductors, down conductors and the PCP. In resolving such problems the designer should ensure thatthe path provided for lightning energies connects to a ground rod in the PCP in the most direct mannerpossible under the following guidelines:

1. The PCP shall[1] be routed on the outside of cluttering objects, such as sheds, tanks, orgenerators near building walls, to avoid excessive bends.

2. The PCP shall[2] be routed across the open end of an alley, i.e., the space between twoparallel wings of a building, and shall[3] be connected to a single conductor to branch into thealley along the straightest route possible.

3. If the distance from the building wall to the PCP is 10 feet or more, in either of these cases, aground rod shall[4] be driven between 2 and 6 feet from the drip line of the structure andbonded to the down conductor, which is then routed to the PCP or the inward directed branch.

4. If a building is no more than 100 feet high, and an alley, internal courtyard, air shaft, etc. is nowider (in its smaller dimension) than twice the building height, the alley, etc., may be treated asis it were a covered part of the roof. The building PCP, the roof perimeter cable, and theinternal roof conductors, may be continued across the opening, as if it were a solid part of theroof. The amount of droop allowed for all cables that pass over the opening shall[5] beapproved by the COTR. If this is done, all the requirements given in paragraph 4.3.2 are tobe met, except that the allowable spacing for the internal conductors shall[6] be a maximum ofthree times the air terminal spacing, in each dimension.

The vertical distance between the top of the air terminals and the height of any objects in thealley, courtyard, etc., shall[7] comply with the equation given in paragraph 4.3.1.1.

5.3 UNDERGROUND CABLES

All cables that are run between structures, except the ground system interconnect cables, are to be run incorrosion-resistant metal pipes or metal conduit, in metal covered cable troughs, or must have their ownshield, or buried guard wire, for protection against lightning effects and other interference.

5.3.1 Underground Pipes or Conduit

If metal pipes or metal conduit are used, they shall[1] be electrically continuous and shall[2] be bonded tothe PCP of all structures they enter, or pass within 10 feet of, and any other buried metal within 10 feet,

Page 49: GROUNDING STANDARD

41

by a No.1 AWG copper cable in the shortest, most direct manner. The connection to each PCP shall[3]be made via a ground terminal plate.

The connection at the point of entry into a structure shall[4] be made through a cable entrance plate. Thepipe or conduit shall[5] be bonded to the entrance plate so that the entire perimeter of the pipe or conduitand the outer surface of the entrance plate form a continuous conducting surface. The entrance plateshall[6] be bonded to the PCP for the structure by a No. 1 AWG copper cable, in the shortest, most directmanner, via a ground terminal plate.

5.3.2 External Cable Troughs

If cables are routed in metal cable troughs, the metal shall[1] be made electrically continuous and shall[2]be bonded to the PCP of all structures that the cables in them enter and any PCP that passes within 6 feetof the trough. Connection to the metal shall[3] be made to its outside surface by a No. 1/0 AWG coppercable in the shortest, most direct manner.

5.3.3 Underground Cables with Shields

All cables that run between structures and are not enclosed in metallic pipe or conduit must either have anouter shield to protect against the pick-up or radiation of interfering energy, or comply with paragraph 5.3.4below. If a cable is shielded, the shield shall[1] be bonded to the PCP of all structures that it enters, andto any PCP that passes within 10 feet of the cable, by No. 1 AWG copper cable.

The connection to the shield, at the point of entry into a structure, shall[2] be made via a cable entranceplate. The shield shall[3] be bonded, or joined by a feedthru connector, to the entrance plate so that theouter surfaces of the shield and the entrance plate form a continuous conducting surface. The entranceplate shall[4] be bonded to the PCP for the structure by a No. 1 AWG copper cable, in the shortest, mostdirect manner, via a ground terminal plate.

5.3.4 Buried Guard Wire

Unshielded buried cables, not in a metallic pipe or conduit, may be protected from lightning-inducedtransients by a buried guard wire. This wire shall[1] be a No. 1/0 AWG bare copper cable and shall[2]be run parallel to and at least 10 inches above the cables to be protected. For cable runs or ducts less than3 feet wide, only one guard wire is required. For wider cable runs or ducts, additional guard wires shall[3]be installed so the outermost wires are between 12 and 18 inches inside the edge of the duct or run, andthe spacing between the guard wires is between 12 and 36 inches.

The guard wires shall[4] be bonded to the PCP of the structure at each end of the run and to any otherPCP within 10 feet of the run. The guard wires shall[5] continue to the cable entry plate and be bondedto it. If the cable entry plate is shared with other cables, the guard wires can also be used as the wire that

Page 50: GROUNDING STANDARD

42

connects the plate to the PCP. The connection to each PCP shall[6] be made via a ground terminal plate.

This method of protection is not recommended for new construction as it does not provide shielding againstpick-up or radiation of other interfering signals.

5.4 GROUNDING FOR FILTERS AND SURGE ARRESTERS

Filters and surge arresters may be required on some or all wires and cables at a facility to reduce the effectsof power and lightning induced surges and interference to the signals carried on those wires and cables.Many such systems require several levels of protection, applied sequentially, and may use the cable runbetween each protection level as a series inductance to assist in the reduction of the transients.

The first level of protection from lightning induced transients shall[1] be located as close as possible to thepoint where the conductors enter the structure. The components selected shall[2] be housed in a metal boxgrounded to the PCP in the shortest, most direct manner possible. Any other interconnecting leads shall[3]be as short as possible and sized to minimize the added resistance and inductance in the transient path toground through the surge arrester.

Other levels of protection and interference filters shall[4] be connected to the appropriate ground circuit,i.e. the power ground for power circuits or the signal reference grid for signal circuits. All connectionsshall[5] be made in the shortest, most direct manner possible.

5.5 GROUND RETURN PATHS

5.5.1 Signal and Control Return Paths

Each signal and control cable shall[1] provide all the necessary return paths for the information carriedwithin it. These paths may be one or more conductors in a multi-conductor cable or the shields of coaxialcables, but may not be the shields of multiconductor cables. The ground system interconnections maynot be used to provide signal return paths .

The shields of multiconductor cables and the outer conductors of coaxial cables shall[2] always begrounded at both ends, unless they remain entirely within an area having a signal reference grid and all otherrequirements for connection to the signal reference grid are met.

5.5.2 Power Distribution Ground Paths

The power return path is the neutral conductor, under normal conditions. The ground conductor is onlyintended to carry currents under fault conditions. The power ground wire shall[1] be sized in accordancewith the National Electric Code, as it would apply if there were no other grounding systems at the facility.

Page 51: GROUNDING STANDARD

43

The power supply, power return, and power ground conductors shall[2] be routed together and separatedonly by the necessary insulating materials. This applies to each level of the power distribution system, fromthe main service disconnect to the most remote using device.

5.6 FENCE GROUNDING

Any metal fence at a facility is to be grounded to protect personnel from hazardous voltages that may becarried from a distant location. All such fences are to be constructed of galvanized steel in the chain linkstyle, with galvanized steel posts and top rail. No vinyl coating may be used.

5.6.1 Reinforcing Wire

A No. 6 AWG aluminum wire shall[1] be woven through the links of the fence along its entire length. Thisis called a reinforcing wire. It shall[2] be bonded or clamped to each of the support posts of the fence.Any splices that may be necessary shall[3] be made at the supporting posts.

5.6.2 Grounding

The fence shall[1] be grounded at intervals of between 100 feet for small sites to a maximum of 500 feetfor large sites. The ground connection shall[2] be made by driving a ground rod adjacent to a fence postand bonding them together via a No. 6 AWG copper wire. If desired, the bond may be made to the clampfor the reinforcing wire. Grounding shall[3] also be provided on each side of every gate and [4] at pointsapproximately 150 feet on either side of any place where high tension power lines cross the fence.

Fences shall[5] be connected to any other metallic object, at nominal ground potential, that passes within10 feet of the fence.

5.7 PERMAFROST CONDITIONS

At facilities with permafrost, such as Fairbanks, Alaska, it becomes impossible to achieve the desiredresistance to ground as specified in paragraph 4.1.2 above. Under these conditions it is much moreimportant to ensure that the low impedance continuity of all the interconnections of the grounding systemsspecified in this document is maintained at all times. When a lightning strike or power fault occur, theabsolute voltage of the "ground" system will be higher than if there were no permafrost, but the differentialvoltage between any two items within the facility will be the same as at other sites. Therefore the hazardto personnel and equipment will be totally dependant on these interconnections, without the back-upprovided by conduction through low resistance soil that applies to facilities where there is no permafrost.

All clamp connections in the grounding systems and a representative sample of the bonded connectionsshall[1] be visually inspected during the warm season each year.

Page 52: GROUNDING STANDARD

44

SECTION 6IMPLEMENTATION GUIDELINES

6.1 PRIORITY

At all times in an up-grade process, care must be taken to ensure the changes being implemented do notcreate a hazard to personnel or equipment. This is most likely to occur if things which were connectedtogether are separated, or an item is connected to a ground system component when it is not fully knownwhat else is connected to that item. The following general order of priority should be followed:

1. If grounding related problems are known to have occurred in the past at any part of the facility,e.g., significant AC power currents flowing in ground conductors under non-fault conditions,interference that was difficult to eliminate, or installation of some equipment producing anunexpected effect on other equipment, the exact connections of all the grounding and shieldingconductors in or near the effected areas should be carefully checked and compared to therequirements of this standard. All differences should be identified and the steps necessary tocomply with this standard should be determined. The source of any AC power currentsflowing in the ground conductors must be found and eliminated before any other step is taken.If the other steps cannot all be made continuously, the configuration of the connections at thebreak points should be checked for possible bad effects on other equipments or systems. Ifthe effects of any of the steps cannot be predicted with reasonable confidence, those stepsshould be made so they can be reversed as easily as possible. If unexpected results occur, theprocedures given in section 8 of this standard should be used to provide information foranalysis and correction of the problem.

2. The lightning protection system for all existing structures should be checked as soon as possibleand any discrepancy with this standard in the routing of down conductors corrected. If astructure has no lightning protection system and it is, for example, within the zone of protectionof another structure if the lightning striking distance were 200 feet, it may be made a lowpriority item with relatively little risk.CAUTION: Lightning is an unpredictable phenomenon, the absence of strikes in the past is noguarantee for the future; nor is there any way to determine the chance a lightning strike will havea striking distance of twice the minimum.

3. Any structure without a PCP that complies with this standard should have one installed andtested. Down conductors and cable entrances should be connected immediately.

4. Other connections to the PCP should not be made until a safety check has been run. Thisshould include an analysis of the possible lightning voltages and voltage differences that may beinduced, possible ground loops, and AC power fault analysis. If no indication of problems

Page 53: GROUNDING STANDARD

45

arise, start at the main equipment room and bring it to compliance with this document, thenproceed to other areas in order of increasing distance from the main equipment room.

5. The equipment areas should be checked and the configuration of their ground systemsdetermined. Even if there is no indication of a problem in this area, the designer should beaware that adding and interconnecting other parts of the ground system, as specified in thisdocument, may cause interference problems that can be solved by implementing signalreference grids for the equipment areas.

6. Construct the other parts of the ground system, so they may be connected in the orderindicated by the above analysis. Note that some of the additional items required may be putin place but will have no effect on other items until they are actually connected. Make atemporary connection from them to the rest of the ground system and check for problemsbefore making the connections permanent. If problems do occur, re-connect to the oldconfiguration, so normal operation can be maintained, and construct additional parts of theground system that may alleviate the problem.

7. Connect structures that are physically close to each other before ones that are separated bylarge distances, unless specific problems, such as ground loops, power or signal routing,indicate otherwise. If a temporary connection produces problems, first check the expectedeffects of implementing other portions of this ground standard, to see if they could solve theproblem. If not, other possible solutions given herein should be tried, or others may be derivedfrom the principles given in Volume 1 of MIL-HDBK-419.

6.2 GROUND SYSTEM FILE REQUIREMENTS

Each NESDIS facility will create and maintain a file of documents showing the grounding history andcurrent status for that facility. This file will contain the following information:

1. An overall facility diagram showing all ground system interconnects in sufficient detail to allowtheir easy location. This diagram will be maintained to reflect the current condition of thefacility. A list of all changes to the ground system will also be maintained, giving a descriptionof the change and the dates on which they were made.

2. Detail drawings of the parts of the ground systems. This should include the drawings, tables,and descriptions necessary to give the location of, and method of access to, all clamped jointson the facility.

3. An historical record of all tests and inspections made to, and all maintenance work performedon, the ground systems at the facility. The test data must be in sufficient detail to allow accurate

Page 54: GROUNDING STANDARD

46

repetition of any test at any time.

4. A copy of this standard, maintained with all revisions.

6.3 CONTRACTOR DOCUMENTATION REQUIREMENTS

As part of any contract which includes this standard as a referenced document, the contractor must providea detailed record of additions, deletions, repairs, etc., to the ground systems that were made under thecontract to each facility. If the contract requires work at more than one facility, the contractor must providea separate record for the work done at each facility. This must include descriptions, drawings, testprocedures, test results, and any other information necessary to provide a complete understanding of theground systems' status and any changes to the maintenance requirements. Three copies of all documentsmust be provided in paper form, plus a disk copy, in WordPerfect file format, of all items that can behandled by this word processing program. If provided by the Contracting Officer's TechnicalRepresentative, the contractor may be required to up-date existing NESDIS documents.

SECTION 7

INSPECTION AND TEST PROCEDURES

7.1 SOIL RESISTIVITY TEST

The soil resistivity measurements, required by other paragraphs of this standard, are to be made using amegger earth tester as described below and illustrated in figure 5.

Four probes, spaced at intervals of 20 to 30 feet and designated P1, P2, C1, and C2, are to be insertedinto the ground to a depth of not more than 1/20th of the spacing. The test set is to be connected to theprobes according to the manufacturer's instructions, and a resistance reading made. The power linefrequency should not be used to make this measurement, as stray currents may affect the results. Convertthe probe spacing actually used to centimeters (1 foot = 30.5 centimeters). The soil resistivity in ohm-cmis found by multiplying the measured resistance by the probe spacing in centimeters and multiplying theresult by 6.28. For example, if the resistance measurement was 2 ohms with a probe spacing of 25 feet,then the resistivity is:

p = 2 x 25 x 30.5 x 6.28 = 9577 ohm-cm.

The test must be performed under normal weather conditions, i.e., close to the average for the month inwhich the test is made. If the test is performed during unusually dry or rainy periods, the results of the test

Page 55: GROUNDING STANDARD

47

will not be valid.

If no previous resistivity results are available, this test should be done at 100 - 200 feet intervals over thesite area. The interval is to be measured between the centers of the test probe line and adjacent tests areto be done with the probe lines at approximate right angles. A diagram of the test locations must be madeby the personnel performing the tests. Sufficient detail and locating dimensions must be included so thatthe tests may be re-run if and when desired.

7.2 GROUNDING RESISTANCE TEST

A resistance test shall be performed on each PCP at all NESDIS facilities, using the fall-of-potentialmethod. This test shall be performed following installation, every 3 months during the next 12 months, andapproximately every 9 months thereafter.

All ground terminal plates at the PCP to be tested are to be disconnected. All necessary ground terminalplates at other PCP's at the facility are to be disconnected also, so that the PCP to be tested is isolatedfrom the other PCP's at the facility. These disconnections must be made only when actually necessary toisolate a specific PCP for testing, and must be reconnected as soon as possible thereafter, so they canprotect the facility as intended.

page for figure 5

page for figure 6

The electrical center of the PCP must be determined. For PCP's with uniform spacing of ground rods andno large difference in the soil resistivity in the immediate area, the electrical center is the same as thegeometric center of the PCP. If the spacing is not uniform, the PCP must be divided into convenientsubsections and the theoretical resistance to true ground of each subsection calculated independently.Equations and procedures for this calculation are given in MIL-HDBK-419, volume 2, paragraph 1.2.2.3,and, if necessary for more complex arrangements, volume 1, paragraph 2.6. The distances of eachsubsection from the geometric center should be weighted by their relative resistance to true ground, andthe weighted geometric center calculated. The choice of axes, their reference point, and orientation to therest of the facility, for the distances used in these calculations, is purely a matter of convenience. Thismethod will provide a reasonable approximation of the electrical center for that configuration. Note thatthe resistance to true ground of multiple interconnected ground rods is never a linear function of the numberof rods. Therefore, there must be a relatively large difference in the ground rod spacing to make itnecessary to make the weighted calculations.

A megger earth tester is to be used with the test set up as shown in figure 6. Probes C1 and P1 may beconnected to any convenient point on the PCP. This point must be located such that probe C2 can belocated at a distance, X, from the point where probes C1 and P1 are connected, so that the distance X +

Page 56: GROUNDING STANDARD

48

Y is equal to at least 5 times the longest dimension, D, of the PCP under test. Y is the distance from thepoint where C1 and P1 are connected to the PCP and its electrical center. Probe C2 must be located ona straight line running through the electrical center of the PCP and the point where C1 and P1 areconnected. If possible, probe C2 should also be located so that there is no buried metal between it andthe point where P1 and C1 are connected to the PCP, nor for a distance equal to 0.5X on either side ofa straight line joining C1 and C2. If the desired orientation is not possible, the best possible compromiseshould be used. Refer to MIL-HDBK-419, subsection 2.7.1 for further information, if required.

Probe C2 must remain fixed while at least seven resistance measurements are taken with probe P2 atdistances of 0.3X, 0.4X, 0.5X, 0.6X, 0.7X, 0.8X, and 0.9X along a straight line from probe C1 to probeC2. Probe C2 should be driven about 1 foot into the ground and probe P2 should be driven approximatelythe same distance as C2. The data obtained is to be plotted as resistance versus distance. Additionalmeasurements may be made at other fractions of X, if necessary to obtain a suitable plot. The trueresistance of the PCP is obtained from the plot at the point where the distance from the point of connectionto the PCP is equal to 0.62X - 0.38Y.

Reconnect all ground terminal plates to the PCP's as soon as possible after the test is completed.

A full record must be made of each grounding resistance test by the testing personnel, including thedistances to all probes, the layout of all known buried metal within a distance equal to X from the probes,including the PCP under test, the equipment used, all the readings taken, and the resistance obtained.

If any resistance reading shows significant change from previous readings, allowing for the expectedseasonal variations, the following checks shall be made to determine the cause and the necessary correctiveaction:

1. Check for new construction in the vicinity.

2. Inspect rods for dried out or slagged soil around them.

3. Inspect bonds between the rods and the cables.

4. Check cable continuity.

5. Check soil resistivity.

7.3 INSPECTIONS

The following inspections shall be performed on the ground systems of all NESDIS facilities at intervals ofapproximately 9 months.

Page 57: GROUNDING STANDARD

49

1. Visually inspect and verify that all clamped bonds between the ground conductors aresufficiently tight, thoroughly clean, and show no signs of corrosion.

2. Inspect air terminals for corrosion or melting. Replace terminals that show any signs of theseconditions.

3. Inspect all bonds between roof conductors, down conductors, and air terminals fordegradation. If degradation is present, the joint must be cleaned and rebonded. If the joint isbeyond repair, the materials may be replaced with the same types and sizes (or larger) ofmaterials.

4. Ensure that any additions to the structure are protected by the lightning ground system. Recordany modifications to the lightning ground system on the facility drawings.

5. With the power on and using a clamp-on ammeter, measure the stray current levels in thepower ground system at several points through out the facility. The current levels should notexceed 0.1 ampere. If the current exceeds 0.1 ampere the neutral wire is likely to beconnected to the green wire ground at a point other than the service disconnect.

6. Using a clamp-on ammeter, measure the stray current levels in the signal ground system atseveral points throughout the facility. The current levels should not exceed 0.1 ampere. If thecurrent exceeds 0.1 ampere the neutral wire is most likely connected to the ground wire at apoint other than the service disconnect.

7. If the electrical power can be temporarily turned off, ensure that the neutral wire is notgrounded anywhere except at the service disconnect. This should be done by turning off theelectrical power, disconnecting the neutral wire in the power supply cable from the neutraldistribution bus in the local power distribution box, and checking the continuity between theneutral bus and the grounding bus. A low resistance (less than 10 ohms) indicates the neutralis probably connected to the ground some where other than at the service disconnect. Thisconnection must be located and removed.

7.4 TEST VERIFICATION PROCEDURES

The Test Verification Table, given in table 1, lists all occurrences of shall[#] in the text of the preceding requirements, in the order of their appearance. Opposite each item is given the verificationmethod to be used to show compliance. Only those requirements that apply to a specific contract needto be incorporated into the test procedures for that contract.

The letter "P" in the first position indicates this is part of the Pre-Acceptance Testing requirements, i.e., to

Page 58: GROUNDING STANDARD

50

be performed during the installation process and not as part of the final acceptance tests. However, an allinclusive "check-off" step in the test procedure for the final acceptance tests must be used to indicate thatall the "P" requirements have been met prior to the start of the formal test procedure. Compliance with the"P" requirements may be shown by progress inspections made during the performance of the contractworks, submission of design calculations, providing other documents giving proof of compliance, ormethods approved by the Contracting Officer's Technical Representative. The letter "F" in the first positionindicates that a formal showing of compliance for that requirement, must be included in the final acceptancetests.

The letter in the second position may be either I, A, D, T, or S, standing for Inspection, Analysis,Demonstration, Test, and Sample test, respectively. The meanings of these designations are defined below.

7.4.1 Inspection

This method requires visual examination to prove compliance and may include simple measurements ofdistance, such as 5/8 inch diameter rod, 20 feet maximum spacing.

7.4.2 Analysis

This method is based on proving by induction or deduction that the requirements have been met. This reliesupon a technical analysis and evaluation of data that relates indirectly to the requirement, i.e. equations,graphs, diagrams, simulations, etc. All submittals based on this method must be approved by theContracting Officer's Technical Representative.

7.4.3 Demonstration

This method requires observation of the result(s) of a action, or series of actions, without the need forspecial test equipment.

7.4.4 Test

This method requires the use of special test equipment to either simulate an input to, or measure the resultproduced by, the system under test, or to both simulate and measure.

7.4.5 Sample Test

This method is used when there is a large number of items that must meet the same requirement, the samemethod has been used to create and install each item, and no significant variation is expected between theitems. The term "large number" is relative to the quantities of other items is the system under test. A ratioof at least 10:1 is required to be considered as large.

Page 59: GROUNDING STANDARD

51

Table 1. Test Verification Table

REQUIREMENTSECTION #/SHALL # TEST LEVEL/METHOD

3.2.1 Vertical Ground Rods[1] Type PI[2] Size PI[3] DepthPI

3.2.2 Horizontal Ground Conductors[1] Type PI[2] DepthPI[3] Orientation PI

3.2.3 Perimeter Ground Cable[1] Size PI[2] Proposed compromise PA[3] DepthPI[4] Metal connections PI

3.2.4 Ground Terminal Plate[1] Type PI[2] Capacity FI[3] Access FI

3.2.5 Interconnections[1] Size PI

3.2.6 Bonding[1] Fusion PI[2] Coating PI[3] Clamp access FI[4] Flammables FI[5] Pull FT[6] Capacity PA

Page 60: GROUNDING STANDARD

52

3.2.7 Air Terminals[1] Type PI[2] Size FI[3] Support FI

3.2.8 Roof Conductors[1] RouteFI[2] Size FI[3] Insulation FI[4] Grid FI[5] Bonding FI

3.2.9 Down Conductors[1] Size FI[2] Insulation FI

3.2.10 Chemical Treatment[1] MgSO4 PI[2] Rod trench PI[3] Service well FI[4] Horizontal trench PI[5] Service well FI[6] Fill percent PA

3.2.11 Signal Reference Grid[1] For two or more racks PI[2] Perimeter cable FI[3] Internal conductors FI[4] Conduit FI

3.2.12 Electrical Service Well[1] Size FI[2] Non-conductive PI[3] Support stresses PA[4] Cover FI[5] Hole size for cables PI[6] Quantity PA

4.1 Perimeter Counterpoise

Page 61: GROUNDING STANDARD

53

[1] Components PI[2] Rod spacing PI[3] Rod location PI[4] Bonding PI[5] Damp soil PA

4.1.1 Adjacent Structures[1] PCP sharing PA[2] Overlapping zones PA[3] Small structure connection PA[4] Cable spacing PI[5] Corner connections PI[6] Cable routing PI[7] Minimum separation PA[8] Incremental separation PA[9] Other connection PA

4.1.2 Resistance to True Ground[1] Five ohms or less FT

4.1.5 Structural Steel Columns and Other Building Metal[1] Within 10 feet a must PI[2] Documentation PA[3] Cable size PI[4] Bonded PI[5] Routing PI

4.2.1 Connection to the PCP[1] Clamp connection FI[2] Cable length FI[3] Electrical service well FI

4.2.2 Connection to Other Cables[1] Down conductors PI[2] Other cables FI[3] Common routing FA[4] Separate routing FA[5] Quantity minimized FA

4.3.1 Air Terminal Mounting[1] Location FI

Page 62: GROUNDING STANDARD

54

[2] Non-interference FA[3] Separate structure PA

4.3.1.1 Roof Mounting[1] Sloping roof location FI[2] Sloping roof spacing FI[3] Flat roof location FI[4] Edge/corner distance FI[5] Square size FI[6] Minimum requirement FI[7] Coverage equation FA[8] Reference plane FI

4.3.1.2 Towers and Masts[1] Direct mount PI[2] Cable bond PI[3] Down conductor connection PI

4.3.1.3 Antennas[1] Location PA

4.3.2 Roof Conductors[1] Routing FI[2] Two paths FI[3] Internal grid FI[4] Grid size FI[5] Crossovers FI[6] Straight line runs FI[7] Turns FI[8] Conduit FI[9] Fastening FI[10] 200 lb pull FS[11] Corrosion resistance PI[12] "T" intersection FI

4.3.3 Down Conductors[1] Straight line runs FI[2] Turns FI[3] Duct FI[4] Fastening FI[5] 200 lb pull FS

Page 63: GROUNDING STANDARD

55

[6] Corrosion resistance PI

4.3.3.1 Down Conductors for Buildings[1] Minimum FI[2] Location rules FI[3] Maximum spacing FI[4] Equal spacing FI[5] High buildings FI[6] Riser bonding PI

4.3.3.2 Down Conductors for Towers or Masts[1] Route FI[2] Bonding FI[3] 2nd point grounding FI

4.3.3.2 continued[4] Multiple leg grounding FI[5] Circular tower grounding FI

4.3.3.3 Down Conductors for Antennas[1] Air terminal connection FI[2] Route FI[3] Structural metal size PA[4] Bridge bearings FI[5] PCP connections PI[6] Down conductor continuation FI[7] Maypole case FI

4.3.4 Waveguide, Coaxial and Shielded Cable Grounding[1] PCP bonds FI[2] Tower/antenna bonds FI[3] Bond location FI[4] 200 feet spacing FI[5] Entrance bonds FI[6] Ground kits PI[7] Rigid grounding FI[8] Pigtail FI[9] Elliptical grounding FI[10] Covering FI[11] No. 6 AWG FI[12] No. 1/0 AWG FI

Page 64: GROUNDING STANDARD

56

[13] Entrance plate FI[14] Entrance plate grounding FI[15] Routing FI[16] Signal reference connection FI

4.4.1 Signal Reference Grid[1] Perimeter FI[2] Loop FI[3] Internal conductors FI[4] Bonding FI[5] Conduit FI[6] Pedestal connection FI

4.4.2 Raised Floor as Reference Grid[1] Resistance FS[2] Clean joints FI[3] Protect joints FI[4] Outer cable FI[5] Intermediate cable FI[6] Routing FI[7] Pedestal connection FI[8] Equipment to grid connection FI[9] Flooring materials PI

4.4.3 Other Reference Grids[1] Copper strap FI[2] Access FI[3] Copper wire FI[4] Perimeter wire FI

4.4.4 Spacing Variations[1] Rack surrounds FI[2] Intermediate conductors FI[3] Conductor size FI[4] Single cabinet or rack FI

4.4.5 Entrance to Signal Reference Grid Area[1] Connection of grounded items FI[2] Bond routing FI[3] Group bonding FI[4] Percent increase FA

Page 65: GROUNDING STANDARD

57

[5] Power distribution FI[6] Multiple connections FI

4.4.6 Interconnection of Signal Reference Grids[1] Combining grids FI[2] Overlapping grids FI[3] Connection spacing FI[4] Other grids FI[5] Connection spacing FI[6] PCP connection route FI[7] Connection from grid FI[8] Connection spacing FI[9] Down conductor connection FI[10] Insulated cable FI

4.4.7 Equipment Connections[1] Ground bus to grid FI[2] Ground bus to equipment FI[3] Length FI[4] Clamp FI[5] Single items FI[6] Length FI

4.4.8 Electronic Equipment Mounted in a Feed Box or Vertex Box[1] Surface mounting FI[2] External grounding FI[3] Shielding FI[4] Equipotential plane FI[5] Rack location FI[6] Rack to box connection FI[7] Contact perimeter FI[8] Bridging strap FI[9] Bus routing FI[10] Bus type FI[11] Bus to box connection FI[12] Equipment connection FI[13] AC ground FI[14] AC neutral FI[15] Utility and technical grounds FI

4.4.9 Electronic Equipment Mounted Elsewhere on an Antenna Structure

Page 66: GROUNDING STANDARD

58

[1] Grounding connection FI

4.5.1 Power Distribution System[1] Utility and technical power PI[2] Utility power use PI[3] Technical power use PI[4] Technical outlets PI[5] Utility outlets PI

4.5.2 Neutral Grounding[1] Only at disconnect FT[2] Separate conductor FI

4.5.3 AC/DC Power System Grounds[1] Ground connection FI[2] Outside of chassis FI[3] Conform to NEC PA[4] DC ground FI[5] Routing FI [6] Size calculation FA

4.5.4 Pipes, Tubes and Conduit[1] Continuous PI[2] Grounded FI[3] Threaded connections FI[4] Lock nuts PI[5] Long runs FI[6] Reference grid FI[7] Transformer grounds PI

4.5.5. Cable Trays[1] Continuous FI[2] Grounded all ends FI[3] External FI[4] Reference grid FI[5] Other internal FI

4.5.6 Other Enclosures[1] Power distribution enclosures FI[2] Connection to reference grid FI

Page 67: GROUNDING STANDARD

59

4.5.7 Motors, Generators, Transformers, and Switchgear[1] Frame grounding FI

5.1 PCP Interconnections[1] Connect to primary PCP PI[2] Daisy chain length PA[3] Ground terminal plate PI

5.2 Special Conditions for Irregular Buildings[1] Outside clutter PI[2] Across an alley PI[3] Alley branch PI[4] Ground rods for down conductors PI[5] Cable droop FA[6] Conductor spacing FI[7] Protection zone FA

5.3.1 Underground Pipes or Conduit[1] Continuous PI[2] Bond to PCP PI[3] Ground terminal plate FI[4] Cable entrance plate FI[5] Bonding FI[6] Plate to PCP PI

5.3.2 External Cable Troughs[1] Continuous FI[2] Bonding to PCP FI[3] Routing FI

5.3.3 Underground Cables with Shields[1] Bonding to PCP FI[2] Via cable entrance plate FI[3] Continuous bond FI[4] Plate to PCP FI

5.3.4 Buried Guard Wire[1] Type PI[2] Routing PI[3] Additional wires PI

Page 68: GROUNDING STANDARD

60

[4] Bonding to PCP FI[5] Bond to cable entrance plate FI[6] Via ground terminal plate FI

5.4 Grounding for Filters and Surge Arresters[1] Location FI[2] Housing FI[3] Leads FI[4] Lower levels FI[5] Connections FI

5.5.1 Signal and Control Return Paths[1] Self contained PA[2] Ground connections PI

5.5.2 Power Distribution Ground Paths[1] Size PA[2] Wires routed together PI

5.6.1 Reinforcing Wire[1] Wire PI[2] Clamping PI[3] Splices PI

5.6.2 Grounding[1] Intervals PI[2] Connection PI[3] Gates PI[4] Power lines PI

5.6 Permafrost Conditions[1] Inspection PI

SECTION 8

TROUBLE CORRECTION GUIDE

8.1 CONDUCTED OR RADIATED INTERFERENCE

Page 69: GROUNDING STANDARD

61

If the installation of any part of this ground standard causes an unacceptable increase in conducted orradiated interference into any circuit, the following procedure should be followed.

Due to the frequencies and circuit distances used at the NOAA facilities, the most probable interferencecoupling mechanisms are conduction and radiation. Capacitive and inductive coupling, the other twopossible mechanisms, are much less likely to occur, except if the power line is the source of theinterference. In this case, the coupling mechanism will most likely be inductive.

8.1.1 Trace the Source of Interference

Starting from the place where the interference is noticed, check back up the victim signal path to find thepoint where the interference enters that path. Use voltage, current, magnetic, or electrostatic probes andan oscilloscope or spectrum analyzer so the waveform can be first characterized, then identified when foundelsewhere. (Uncalibrated probes are adequate for this type of work and may be bought cheaply, or beof a home made type.) If it is necessary to search for a source that emits the interfering energy in a non-conducting manner, any item carrying that energy that is greater than 0.1 wavelength long can be asignificant antenna. Its efficiency increases with increasing size.

8.1.2 Characterize the Interfering Waveform

If the interfering waveform is a sine wave, record its frequency and amplitude. If not, determine maximumamplitude (A) of the waveform, the time between repetitions of the waveform, the width of the pulses atthe half amplitude points, and the shortest rise, or fall, time, measured between the 10 and 90 percentpoints. These measurements can be used to calculate the characteristic frequencies and amplitudes of thewaveform.

1. The fundamental frequency = F = 1 / (waveform repetition rate)

2. The first corner frequency = FC1 = 1 / B * (pulse width)

3. The second corner frequency = FC2 = 1 / B * (rise, or fall time)

4. The amplitude of F = 2 * A * (pulse width) / (waveform repetition rate)

The envelope of the maximum amplitudes that could be produced by this signal is defined as equal to theamplitude of F up to FC1, then decreasing at 20 dB per decade to FC2, and then decreasing at 40 dB perdecade until the noise floor is reached.

The source of the interfering waveform is often obvious from the waveform shape. If not, the waveformcharacteristics will make it easier to determine the waveshape on the source side of components that couldselectively filter the interfering waveform, thereby changing its shape, e.g. increased high frequency

Page 70: GROUNDING STANDARD

62

attenuation due to propagation down a long coaxial cable.

8.1.3 Determine the Coupling Mechanism

Choose the most probable mechanism on the basis of the following guide lines.

8.1.3.1 Conductive Coupling

This requires at least two points where the source and victim circuits are physically interconnected by lowimpedance paths. Low impedance refers to the impedance at the interfering frequency and with referenceto the actual impedance of the source circuit. Make sure all impedances are included in this evaluation.If necessary, draw a circuit diagram, showing every wire in the path and assign an impedance to each one,at the frequencies of the interfering waveform.

8.1.3.2 Radiative Coupling

If there are not two or more points of physical connection between the source and victim circuits, estimateor measure the distance between the two circuits and compare it to the wavelength(s) of the interferingsignal. If the distance is greater than one wavelength for most of the length of the victim circuit, the couplingmechanism is probably radiative. If the distance is less than one wavelength, but more than 1/Bwavelengths, radiation is a possible mechanism, with the probability reduced as the separation distance isreduced.

8.1.3.3 Inductive and Capacitive Coupling

If the distance between the source and victim signals is less than one wavelength, measure or calculate theimpedance of the source circuit. If it is less than 377 ohms, the impedance of free space, the couplingmechanism is probably inductive, if more, it is probably capacitive. These probabilities increase inproportion to the difference between the circuit impedance and 377 ohms.

The following checks may be made to determine if the coupling mechanism is inductive or capacitive.

1. If the coupling is affected by the insertion of non-conducting, non-magnetic material betweenthe source and victim circuits, or by movement of this type of material in the vicinity of thecircuits, the coupling is capacitive, if not, it is inductive.

2. If grounding or un-grounding any shielding (conducting) material between, or close to thesource or victim circuits, creates an effect, the coupling is capacitive, otherwise it is inductive.

8.1.4 Reduce the Interference

Page 71: GROUNDING STANDARD

63

Before implementing any of the following steps, determine the amount by which the interference must bereduced, and estimate the amount of reduction that could be expected by the proposed step. If these arenot at least close, re-examine the available options.

8.1.4.1 Conductive Coupling Reduction

The connections between the source and victim circuits must be reduced to one, at the frequencies of theinterference. This could be done by one or more of the following:

1. Change the victim circuit to a balanced configuration.

2. Insert an optical isolator into the source or victim circuit.

3. Replace the source or the victim circuit with a fibre optic link.

4. Replace part of the connection between the source and victim circuits with two diodes in anti-parallel. This will provide effective isolation between the two circuits, provided the voltage ofthe interfering signal is not so large as to exceed the forward bias of the diodes. High powerdiodes should be used and their exact location chosen with care, to minimize the chance thatthe diodes could be destroyed by the high currents that may flow under lightning strike orpower fault conditions.

5. Install one or more filters to block the interfering frequencies (This could be done by addinga balun, thinner wire, longer wire, coiled wire, increasing the size of a current loop, installingferrite beads, or waveguide stubs, instead of lumped inductors and capacitors in a physical boxcalled a filter.)

The added inductance which can be achieved by physically separating the desired and undesired currentpaths, can provide significant reduction to the interference. Since this is an inductive effect, it will be greaterat higher frequencies than at lower frequencies. However, even at 60 Hz, between 10 and 20 dB changein the interference level can be achieved by this method. The relevant parameter is the total impedancearound the loop it is desired the interfering current should take, as compared to the total impedance aroundthe undesired loop.

When conductors are run close to each other and carry a current in opposite directions, their mutualinductance causes a reduction of the total inductance of the loop as compared to the sum of the inductancesof the individual conductors, when considered in isolation. Equations which can be used to calculate theinductance of a single loop and of a long straight wire in isolation are included in appendix A to thisstandard. They will provide reasonable approximations to allow comparisons to be made of the relativeimpedances of the circuit loops to be expected at NESDIS facilities.

8.1.4.2 Radiative Coupling Reduction

Page 72: GROUNDING STANDARD

64

Radiative coupling can be reduced by applying the following to the source or the victim circuit, or both.

1. Absorb the energy with lossy dielectric or magnetic materials.

2. Reflect or divert the energy with a metallic enclosure.

3. Convert the signal to light pulses and transmit it through fibre optics.

4. Reduce the size of that portion of the circuit which is acting like an antenna.

5. Reorient the source or victim circuits so the radiation is not as well coupled between them, i.e.run cables at right angles, instead of parallel to each other.

Item 2 is probably the most effective way to reduce radiative coupling at reasonable cost in the normalconditions expected at a NESDIS facility, e.g. change a coaxial cable from a type with a braided shield toa type with a solid shield.

8.1.4.3 Inductive Coupling Reduction

Inductive coupling is caused by the mutual inductance between the source and victim circuits. This requiresa loop of current flow in both circuits, and is proportional to the size of the source and victim loops andinversely proportional to the distance between them. This coupling can usually be reduced by identifyingexactly which conductors make up the actual source and victim current loops, and reducing their size asmuch as possible, or increasing the spacing between them, over all or a significant part of their routes. Ifnecessary, either or both the source and victim loops could have their conductors twisted, so the inductivecoupling would act in opposite directions at different portions of the loop.

8.1.4.4 Capacitive Coupling Reduction

Capacitive coupling can be reduced by either reducing the capacitance between the source and victimcircuits, or by inserting a capacitive shield between the two circuits. The capacitance between twoconducting surfaces is proportional to their opposing surface areas and inversely proportional to thedistance between them. If the circuits can be re-routed to reduce their capacitance to a sufficiently lowvalue, this is the preferred solution. If not, a shield must be inserted between the circuits. To functionproperly, a capacitive shield must be grounded at one point only. The location of that grounding point iscritical, as it must effectively bypass all noise sources to the ground side of the load in the victim circuit.This frequently requires a shield around one or more signal wires that is only grounded at one end.

This type of connection is contrary to the basic safety requirement of this standard, as it permits possiblehigh voltage differences to develop between two nominally grounded conductors that are near each other,under power fault or lightning strike conditions. However, this is permitted, provided the entire shield is

Page 73: GROUNDING STANDARD

65

inside an area with a ground plane or signal reference grid. In this case it is assumed that the othergrounding paths throughout the area are sufficient to keep the voltage difference to a non-hazardous level.

8.1.4.5 Transient Suppression Plate

It is possible that the reinforcing mesh in a concrete floor, whether grounded or not, may be energized bystray radiation, which may then be coupled to the conductors routed over it. If this occurs, a capacitivebypass might be used to reduce the level of this interference. Such a bypass could consist of a copperplate, approximately 4 feet by 4 feet by 1/16 inch, or larger, which would be laid directly on the concretefloor, and be bonded to the power system ground and the signal reference grid. An example is given inFIPS PUB 94, September, 1983, pages 46-49.

8.2 CONTINUED LIGHTNING DAMAGE

Users of this standard should be aware that the requirements for locating air terminals specified herein isbased on a theory, not known physical fact. The theory is consistent with the observational andexperimental evidence currently available.

8.2.1 Interconnections

The lightning protection requirements incorporated in this standard are based on the principle that if allobjects in the area of a lightning strike are connected together, the lightning can induce voltages and currentsthat will cause the entire group of interconnected objects to rise to a voltage far above the true groundpotential. However, this will not cause any hazard to equipment or personnel, if everything in the vicinityis raised to the same voltage, with no significant potential differences possible between any two objects.

If lightning damage does continue to occur, the most probable cause is that some object or objects thatshould have been connected together, were not so connected, or at least not through a low enoughimpedance. The best method of correcting this type of problem is therefore to look for ways in whichadditional interconnections can be made, or ways in which the impedance of the existing interconnectionscan be reduced.

8.2.2 Desired Path Checks

Check all along the desired lightning path for any of the following:

1. Any bend more than 90o or with a radius less than 8".

2. Any connection, particularly between dissimilar metals, with an impedance greater than a fewmilliohms.

Page 74: GROUNDING STANDARD

66

3. If there is a path to re-route the down conductors to provide a more direct path from the pointof the lightning strike to true ground. This could require less bends, or bends with smallerangles or larger radii.

8.2.3 Actual Path Checks

If the actual path taken by the lightning strike can be determined, look for any of the following:

1. The point, if any, where the strike energy left the desired path. If this exists, determine whatre-routing of the desired path, or connection from it to any other possible path is necessary.

2. Any place where the desired path comes close to the actual path taken by the lightning energywithout a physical connection between them. Energy may be coupled into the undesired pathby the mutual inductance or capacitance between these conductors. If the close part of theseconductors is 10 feet or more in length, they should be bonded together at both ends of theirclose parallel run. Alternatively, the conductor in the undesired path may be enclosed in a pipewhich must be bonded to the desired path at each end of the close parallel run.

3. If the actual lightning strike did not occur to an air terminal, the requirements for the layout of,and connection to, air terminals, in section 4.3 of this standard must be re-examined.

8.3 MULTIPLE SHIELDS

If necessary, conductors may be protected from interference by running shields within shields. This conceptincludes an outer shield of pipe or conduit, or running a guard wire above already shielded cables. Thebenefit of such a system is enhanced if the several shields are ended at separate locations along the lengthof the conductor, provided the effect of the shield can be maintained.

For example, a cable of multiple shielded pairs may have an outer shield around the entire cable and be runin a metal pipe. If the source of the interference against which these shields are intended to protect isoutside the structures in which the shielded pairs terminate, the pipe could be terminated at the cableentrance plate of the structures. The outer cable shield could then be terminated at its entrance point to thecabinet housing the equipment to which the pairs connect, and the shields for the individual pairs could beterminated within that equipment, or at the point of entry into its chassis.

The best protection will be achieved when the shield being terminated can be bonded to the outside of anenclosure. This will tend to make any currents flowing on the outside of the shield also flow on the outsideof the enclosure, isolating them from all items within the enclosure.

Page 75: GROUNDING STANDARD

67

Page 76: GROUNDING STANDARD

A-11

Figure A1. Protection Zone For a Single Rod

APPENDIX A

REFERENCE EQUATIONS AND PROCEDURES

A.1 CALCULATIONS TO DEFINE LIGHTNING PROTECTION ZONES

The following equations are taken from MITRE Technical Report MTR89W00206 in which the derivationsare given. They are included here for easy reference.

A.1.1 Protection Zone of a Single Object

The zone of protection provided by a single, isolated, grounded object, such as a single lightning rod ormast, projecting above the surface of a smooth earth, is given by:

S = (2.R.H - H2)1/2 (1)

Where:

S = Radius of the base of thecone

R = Radius of curvature of thecone's surface

= The minimum strikingdistance

H = Height of the object abovesurface of the earth (but notgreater than the distance R)

This relationship, between "S" and "H" can also be applied at any location within the zone of protection,provided both "S" and "H" are referenced to the point where the curve is horizontal. This is necessarybecause of the simple geometrical relationships used to derive this equation.

A.1.2 Rapid Approximation

If a tangent to the arc is drawn at the top of the mast, the slope of that tangent is given by:

Page 77: GROUNDING STANDARD

A-22

SIN-1((R - H)/R) (2)

Any object within a straight sided cone with this apex angle, must be within the zone of protection createdby the mast. Note that the slope is measured from the vertical, not from the horizontal.

Page 78: GROUNDING STANDARD

A-33

Figure A2. The Low Point Between Lightning Rods

A.1.3 Finding The Low Point Between Two Lightning Rods

The following equations may be used to calculate the height of the low point between two masts or lightningrods, or with reference to any two other points on the arc.

In figure 2:

R = Striking distance.

H1 = Height of first mast.

H2 = Height of second mast, # H1.

H = H1 - H2

S1 = Distance from first mast towhere the protection curve ishorizontal.

S2 = Distance from second mastto where the protectioncurve is horizontal.

X = S1 + S2

A = The minimum height of the curve between the masts.

A = H2 - R + R.sin{cos-1((X2 + H2)1/2/2R) + tan-1(H/X)} (3)

S2 = (2R(H2 - A) - (H2 - A)2)1/2 (4)

If the two known points are both on the same side of the low point, both the above equations apply, except:

H2 = The height of the object to be protected.

S2 = The distance from the low point to the nearest point on the protected object.

X = S1 - S2

For this type of calculation, the distance from the low point to the second mast and the height of the second

Page 79: GROUNDING STANDARD

A-44

mast are both unknowns with an infinite number of interrelated solutions. One must be chosen by otherconsiderations, e.g., a mast of minimum height (= A) or a need for clearance past the end of the protectedobject.

Page 80: GROUNDING STANDARD

A-55

Figure A3. Protection Zone Between the Masts

A.1.4 Protection Zone for Two or More Masts

For the case of two protecting masts,and referring to figure A3, most of theprotection zone is defined as for onemast by calculating for each mastseparately. However, between themasts, the protection zone is found bythe following:

1. Given H1, H2 and X, equation(3) gives A.

2. Given H1 and A, and with H =H1 - A, equation (1) gives S1.If H1 = H2, then S1 = S2. If not:

3. Equation (4) will give S2. S1, S2 and A define the lowest point on the protection curve directly between the masts.

4. To find the height, B, of some other point on the protection curve, again apply equation (1) anddefine H as B - A.

5. To find the height of the protection zone at some distance at right angles to the plane containing thetwo lightning rods, again use equation (1) with A or B in place of H.

A similar sequence may also be applied to three or more irregularly spaced rods. Determine the locationof the low point between each pair of the rods. Some of the pairs can be ignored if they obviously producea protection zone that is over-shadowed by another pair. The size of the protection zone around theoutside of the group of rods is found as above. For the area inside the lines joining the rods together, thelow points of all the pairs should be determined and a virtual rod inserted at each low point and of the sameheight as each low point. Recalculate where the low points would be if these were the protecting rods.Repeat as necessary until the low points so calculated are close enough together to be considered the samepoint.

A.1.5 Calculating Mast Heights

When the object to be protected is known, to find the masts heights needed, use:

H = R - (R2 - S2)1/2

Page 81: GROUNDING STANDARD

A-66

Here, H is the difference in height between the tops of the object to be protected and the mast, at adistance S that will provide that protection. The actual mast height will be the height of the object to beprotected plus H.

Page 82: GROUNDING STANDARD

A-77

A.2 INDUCTANCE OF COPPER WIRES

In most cases the wires and cables interconnecting the facilities at a station can be approximated as a seriesof straight wires and loops. If the return current flows in a conductor close to the conductor carrying theout going current, the loop equation should be used. If there is enough separation so the magnetic field ofthe wires do not significantly interact with each other, the inductance should be calculated by adding theresults for the individual wires, each calculated separately.

The total inductance for any specific circuit may be found by breaking it into a number of subsections thatcan be approximated by straight isolated wires and/or loops, whose average dimensions can be determined.Each subsection should be calculated separately and the results added together for the overall circuitinductance.

The following equations are for lengths measured in centimeters, if inches are used, multiply the results by2.54.

A.2.1 Inductance of an Isolated Straight Wire

The inductance of a single straight round copper wire, isolated from other wires is given by:

L = 0.002a {2.303 log (4a/d) - 1 + *}

where:

L = Inductance in microhenrysa = length of wire in cmd = diameter of wire in cm* = skin effect correction factor from table A1 (varies between 0.25 to 0.0)

A.2.2 Inductance of a Single Loop

The inductance of a single rectangular loop of round copper wire:

L = 0.00921 {(a+b) log (4ab/d) - a log (a + g) - b log (b + g)}+ 0.004 {* (a + b) + 2 (g + d/2) - 2 (a + b)}

where:

Page 83: GROUNDING STANDARD

A-88

L = Inductance in microhenrysa = length of rectangle in cmb = width of rectangle in cmd = diameter of wire in cmg = (a2 + b2)1/2

* = skin effect correction factor, as above

Page 84: GROUNDING STANDARD

A-99

Table A1. Properties of Standard Size Annealed Copper Wires

AWG Diameter Skin Effect Correction Factor (*) DC ResistanceSize mils cm 10 kHz 100 kHz 1 MHz 10 MHz S/1000 ft S/km

4/0 460.0 1.17 0.060 0.018 0.004 0.002 0.049 0.161

2/0 364.8 0.93 0.070 0.022 0.007 0.002 0.078 0.256

1/0 324.9 0.83 0.080 0.024 0.009 0.002 0.098 0.322

2 257.6 0.65 0.100 0.030 0.010 0.003 0.156 0.512

4 204.3 0.52 0.120 0.040 0.011 0.004 0.248 0.814

6 162.0 0.41 0.150 0.050 0.015 0.005 0.395 1.296

8 128.5 0.33 0.190 0.065 0.020 0.006 0.628 2.060

10 101.9 0.26 0.220 0.085 0.025 0.008 0.999 3.278

12 80.8 0.21 0.230 0.095 0.030 0.010 1.588 5.210

14 64.1 0.16 0.240 0.018 0.040 0.014 2.525 8.284

Notes:1. Values derived from MIL-HDBK-419, volume 2, pages 5-2 and 5-8.2. For 60 Hz, * = 0.25 for all the above wire sizes.3. For frequencies above 10 MHz, * is essentially zero.

Page 85: GROUNDING STANDARD

B-11

APPENDIX B

LIST OF ABBREVIATIONS

AC Alternating currentADP Automatic data processingAWG American wire gauge

CDA Command and data acquisition

DC Direct current

FIPS Federal information processing standards

MHz Megahertz

NOAA National Oceanic and Atmospheric AdministrationNESDIS National Environmental Satellite, Data, and Information ServiceNFPA National Fire Protection Association

PCP Perimeter counterpoise