Hanford Status Slides

Hanford Status Slides

  • Upload
    soleil

  • View
    54

  • Download
    2

Embed Size (px)

DESCRIPTION

Hanford Status Slides. Cask/Transportation System. Fabrication of Casks complete (5 total) Delivery of 3 (of 5) trailers complete MCO Loading System (MLS) shuttle fabrication complete and delivered for K West and K East MLS factory acceptance testing complete for K West and K East. - PowerPoint PPT Presentation

Citation preview

Page 1: Hanford Status Slides

Hanford Status Slides

Page 2: Hanford Status Slides

Cask/Transportation System

• Fabrication of Casks complete (5 total)

• Delivery of 3 (of 5) trailers complete

• MCO Loading System (MLS) shuttle fabrication complete and delivered for K West and K East

• MLS factory acceptance testing complete for K West and K East

Above: Cask and TrailerBelow: MCO Loading System

Page 3: Hanford Status Slides

Cask/Transportation System

• Fabrication of Casks complete (5 total)

• Delivery of 3 (of 5) trailers complete

• MCO Loading System (MLS) shuttle fabrication complete and delivered for K West and K East

• MLS factory acceptance testing complete for K West and K East

Above: Cask and TrailerBelow: MCO Loading System

Page 4: Hanford Status Slides

Canister Storage Building (CSB)

Above: Aerial view of the Canister Storage

Building in the 200 East Area.

Below: Inside the CanisterStorage building.

• Subproject 82% complete

• Building construction complete

• Startup testing in progress on 13 of 13 facility systems

• Completed installation of major MHM components

• MCO handling machine and storage tube installation resumes in FY99