Harjit Presentation

Embed Size (px)

Citation preview

  • 8/8/2019 Harjit Presentation

    1/22

    SEMINAR SEMINAR

    TOTAL PRODUCTIVE MAINTENANCE INTOTAL PRODUCTIVE MAINTENANCE INMANUFACTURING INDUSTRIESMANUFACTURING INDUSTRIES

    Presented byPresented by Harjit Singh MangatHarjit Singh Mangat

    M-Tech ( Production Engg. )M-Tech ( Production Engg. )

    Roll No. PE-603Roll No. PE-603

  • 8/8/2019 Harjit Presentation

    2/22

    OVERVIEWOVERVIEW

    NEED FOR TPMNEED FOR TPM

    TECHNIQUES IN TPMTECHNIQUES IN TPM

    MAINTENANCE CONCEPTMAINTENANCE CONCEPT

    TPM-DEFINATIONTPM-DEFINATION

    WHAT DOES TPM MEANSWHAT DOES TPM MEANS

    EIGHT STRATEGIES OF TPMEIGHT STRATEGIES OF TPM

    COMPONENTS OF TPM COMPONENTS OF TPM

    CHANGE IN ATTITUDE FROMCHANGE IN ATTITUDE FROM

    USE OF 5Ss IN TPMUSE OF 5Ss IN TPM

    OUTCOME OF 5SsOUTCOME OF 5Ss

    TPM & 5Ss FOCUSES ONTPM & 5Ss FOCUSES ON

    IMPLEMENTATION TPMIMPLEMENTATION TPM

    LEVELS OF TPMLEVELS OF TPM

    BENEFITS OF TPMBENEFITS OF TPM

  • 8/8/2019 Harjit Presentation

    3/22

    THE NEED FOR TPM

    Think of productive equipment as our cars ortelephones

    They are ready to go when we need them They need not run all the time to be productive

    For this concept to function properly Machines

    Must be ready when we need them Must be shut down in such a fashion as to

    be ready the next time

  • 8/8/2019 Harjit Presentation

    4/22

    TECHNIQUES IN TPMTECHNIQUES IN TPM Just-in-Time (JIT)Just-in-Time

    (JIT) - let only the system that- let only the system that

    needs parts get them, and only in the quantityneeds parts get them, and only in the quantityneeded. needed.

    Poka yokePoka

    yoke -- Inhibits defects occurring at source & Inhibits defects occurring at source & Correcting divergences causing defects.Correcting divergences causing defects.

    Single Minute Exchange of Die (SMED)

    Single Minute Exchange of Die (SMED)Setup & Change-over time less than 10 minutesSetup & Change-over time less than 10 minutes

    Speed

    Speed - Speed means the rate at which a product is- Speed means the rate at which a product ismanufactured.manufactured.

  • 8/8/2019 Harjit Presentation

    5/22

    MAINTENANCE CONCEPTMAINTENANCE CONCEPT

    Undertaken to preserve proper functioning of aUndertaken to preserve proper functioning of aphysical system, so that it will continue to do what itphysical system, so that it will continue to do what itwas designed to do.was designed to do.

    Function and performance characteristicsFunction and performance characteristicshave-have-

    Output, unit costs and effectiveness of using energy.Output, unit costs and effectiveness of using energy.

    Protection of employees, end-product qualityProtection of employees, end-product quality

  • 8/8/2019 Harjit Presentation

    6/22

    Failures attract attention because they affectsFailures attract attention because they affects

    OutputOutput

    Safety and environmental healthSafety and environmental health

    Quality of end productQuality of end product

    Customer serviceCustomer service

    Competitiveness and unit costs.Competitiveness and unit costs.

    Severity and frequency of failureSeverity and frequency of failure dictate whichdictate whichfailure-management technique is worth applying.failure-management technique is worth applying.

  • 8/8/2019 Harjit Presentation

    7/22

    TOTAL PRODUCTIVE MAINTENANCETOTAL PRODUCTIVE MAINTENANCE TPMTPM involves operational and maintenance staff involves operational and maintenance staff

    working together as a team toworking together as a team to

    Reduce wastage & Minimizes downtimeReduce wastage & Minimizes downtime

    Improve end product quality.Improve end product quality.

    Main objective is to achieveMain objective is to achieve

    Zero breakdowns, Zero defects,Zero breakdowns, Zero defects, Zero error, zerowork-related accident and zero loss .

  • 8/8/2019 Harjit Presentation

    8/22

    WHAT DOES TPM MEANSWHAT DOES TPM MEANS

    Total = EveryoneTotal = EveryoneProductive = No wasted activityProductive = No wasted activityMaintenance = As new activityMaintenance = As new activity

    Main issuesMain issues are: People, Equipment, Methods,are: People, Equipment, Methods,Losses/Wastes, Performance measurement.Losses/Wastes, Performance measurement.

    People issues -People issues - Attitude, Team working, Attitude, Team working,

    Training, ManagingTraining, Managing

    Equipment issues-Equipment issues- Condition, Layout, DesignCondition, Layout, Design ,,

    SparesSpares

  • 8/8/2019 Harjit Presentation

    9/22

    Method issues-Method issues- Cleaning, Storage, AccuracyCleaning, Storage, Accuracy

    Loss issues-Loss issues- Wasted time, Wasted effort,Wasted time, Wasted effort,Wasted MaterialsWasted Materials

    Six major losses-Six major losses- Equipment failureEquipment failure Set up and ChangeoversSet up and Changeovers Start-upsStart-ups Minor StopsMinor Stops

    SpeedsSpeeds Defects/rework Defects/rework

    Performance measures-Performance measures- What data you collect;What data you collect;

    How you collect data; How you use dataHow you collect data; How you use data

  • 8/8/2019 Harjit Presentation

    10/22

    EIGHT STRATEGIES OF TPM

    TPM

    F O C U S E D

    I M P R O V E M E N T S

    A U

    T O N O M O U S

    M A I N T E N A N C E

    T E C H N I C A L

    T R A I N I N G

    O

    F F I C E T P M

    P L A N N E D

    M A I N T E N A N C E

    Q U A L I T Y

    M A I N T E N A N C E

    EIGHT STRATEGIES OF TPM

    S A F E T Y

    & E N V I R O N M E N T

    M A N A G E M E N T

    E A R L Y E Q U I P M E N T

    M A N A G E M E N T

  • 8/8/2019 Harjit Presentation

    11/22

    MAIN COMPONENTS OF TPMMAIN COMPONENTS OF TPM

    Overall equipment-effectivenessOverall equipment-effectiveness

    OEE= Availability * Product rate* QualityOEE= Availability * Product rate* Quality

    Availability Availability = Actual running time/Ideal time= Actual running time/Ideal time

    Product rateProduct rate =Actual output/Actual running=Actual output/Actual runningtime *MPR time *MPR

    QualityQuality = Good output/Actual output= Good output/Actual output

  • 8/8/2019 Harjit Presentation

    12/22

    OVERALL EQUIPMENTEFFECTIVENESS

    AVAILABILITY PERFORMANCE

    RATE

    QUALITY RATE

    BREAKDOWN LOSS

    ADJUSTMENT LOSS

    REDUCED SPEED LOSS

    SETUP & ADJUSTMENTLOSS

    QUALITY DEFECT

    REWORK & STARTUPLOSS

  • 8/8/2019 Harjit Presentation

    13/22

    Autonomous-operator maintenance Autonomous-operator maintenance

    It looks into achieving a high degree of It looks into achieving a high degree of

    CleanlinessCleanliness

    Excellent lubricationExcellent lubricationProper fastening to prevent machine breakdown.Proper fastening to prevent machine breakdown.

    Companys small group activities,Companys small group activities, throughoutthroughoutentire organizationentire organization.

  • 8/8/2019 Harjit Presentation

    14/22

    MUST CHANGE IN ATTITUDE FROMMUST CHANGE IN ATTITUDE FROM

    Its not my job Its not my job

    They dont so why should we They dont so why should we

    Dont tell me Dont tell me

    Its nothing to do with me Its nothing to do with me

    Just get it going Just get it going

    Itll do Itll do

  • 8/8/2019 Harjit Presentation

    15/22

    USE OF 5Ss IN TPMUSE OF 5Ss IN TPM 11 stst S (Shift)S (Shift) -Shift unnecessary items to store or-Shift unnecessary items to store or

    skip them if obsolete (no use anymore)skip them if obsolete (no use anymore) 22 ndnd S (Shine)-S (Shine)- Sweep and shine the workplaceSweep and shine the workplace

    33 rdrd S (Sort)S (Sort) - Secure a place for everything and- Secure a place for everything andstore everything in its place i.e tools, consumablesstore everything in its place i.e tools, consumables

    44thth

    S (Standardize)-S (Standardize)- Show that you can doShow that you can doeverything in a standardized wayeverything in a standardized way

    55 thth S (Stick to rules)-S (Stick to rules)- Seek to eliminate rootSeek to eliminate root

    causes of problemscauses of problems

  • 8/8/2019 Harjit Presentation

    16/22

    OUTCOME OF 5SsOUTCOME OF 5Ss Greater efficiency & operator involvementGreater efficiency & operator involvement

    Reduced failures & defectsReduced failures & defects

    Less accidentsLess accidents

    Increases Overall plants productivityIncreases Overall plants productivity

    Improves Rate of throughputImproves Rate of throughput

    Better End-product quality and servicesBetter End-product quality and services

  • 8/8/2019 Harjit Presentation

    17/22

    TPM AND 5Ss FOCUSES ON-TPM AND 5Ss FOCUSES ON- Cleaning and restoring conditionCleaning and restoring condition

    Monitoring and inspectingMonitoring and inspecting

    Lubricating and repairingLubricating and repairing

    Improving and organizingImproving and organizing

    TrainingTraining

    MeasuringMeasuring

  • 8/8/2019 Harjit Presentation

    18/22

    IMPLEMENTATION - TPMIMPLEMENTATION - TPM Operators should know well

    What maintenance tasks are theirs. What are appropriate for skilled crew.

    TPM starts with 5Ss

    Cleaning and organizing workplace helps team touncover problems

    Making problems visible is the first step of improvement

  • 8/8/2019 Harjit Presentation

    19/22

    LEVELS IN TPMLEVELS IN TPM

    Entire workforceEntire workforce must first be convinced that top-must first be convinced that top-level management is committed to the programme.level management is committed to the programme.

    Senior management teamSenior management team sets company-wide PMsets company-wide PMpolicies.policies.

    Middle managementMiddle management oversees the departmentaloversees the departmentalpolices.polices.

    Shop-floor managementShop-floor management sets the PM goalssets the PM goalsaccording to team groups activities.according to team groups activities.

  • 8/8/2019 Harjit Presentation

    20/22

    TPM coordinatorTPM coordinator is hired whose responsibility is tois hired whose responsibility is tomake TPM understandable to the workforce.make TPM understandable to the workforce.

    After coordinator is convinced a After coordinator is convinced a study and actionstudy and actionteamteam is formed.is formed.

    Operation & maintenance staff, supervisors,Operation & maintenance staff, supervisors,schedulers and top managementschedulers and top management -all be in team.-all be in team.

    Action teams Action teams have responsibility for assigning smallhave responsibility for assigning smallprojects for problems & indicating remedial processesprojects for problems & indicating remedial processes

  • 8/8/2019 Harjit Presentation

    21/22

    BENEFITSBENEFITS Use cross-functional teams consisting of operators,Use cross-functional teams consisting of operators,

    maintainers, engineers and managers.maintainers, engineers and managers. Improve individual employee and equipmentImprove individual employee and equipment

    performances.performances.

    Improved proceduresImproved procedures forfor -- change-over and set-upschange-over and set-ups

    Increased enthusiasmIncreased enthusiasm

    Increases involvement of the workforceIncreases involvement of the workforce

    More cooperative teamwork More cooperative teamwork

  • 8/8/2019 Harjit Presentation

    22/22

    THANKSTHANKS