Government of Dubai

Dubai Technology and Media Free Zone Authority Zoning Authority – Development Control

Document no. ZA-DC-REG-01

Revision 1 Issue Date 29.10.08 Health, Safety and Environment Regulations

Page 1 of 104

Health Safety

Environment (HSE) Regulations

Page 2: Health Safety Environment (HSE ) Regulationsdcca.gov.ae/wp-content/uploads/circulars/za-dc-reg-01 health safety... · Health, Safety and Environment Regulations Revision 1 Issue Date

Government of Dubai

Dubai Technology and Media Free Zone Authority Zoning Authority – Development Control

Document no. ZA-DC-REG-01

Revision 1 Issue Date 29.10.08 Health, Safety and Environment Regulations

Page 2 of 104

CONTENTS Page No 1.0 Introduction 6 2.0 Applicability of Health, Safety and Environmental Regulations 7 Health, Safety and Environment Protection Policy 8 3.0 Zoning Authority – Development Control Enforcement Policy 9

4.0 Consultant’s responsibilities for Health and Safety 13

5.0 Main Contractor’s responsibilities for Health and Safety 15

6.0 Material Handling, Mechanical Plant and Equipment 18

6(a) Mechanical Handling Equipment, Plant 18 6(b) Access Roadways and Grades 18 6(c) Roll Over Protective Structures 18 6(d) Forklift trucks 18 6(e) Excavators 19 6(f) Operating Procedures of material handling equipment 19 6(g) Rigging equipment for material handling 19

6(g) (1) Alloy steel chains 20 6(g) (2) Wire ropes 20 6(g) (3) Natural and synthetic fiber 21 6(g) (4) Synthetic webbing 21 6(g) (5) Environmental condition 21

6(h) Hooks 22 6(i) Cranes, Hoists 22 6(j) Platforms for crane operators and signalers 22 6(k) Cabins for drivers 22 6(l) Drums and Pulleys 22 6(m) Brakes, Controls, Safety Devices etc 24 6(n) Safe Means of Access 24 6(o) Stability of lifting appliances 24 6(p) Tower crane 24 6(q) Restriction on the use of cranes 24 6(r) Poles or beams supporting pulley blocks or gin wheels 25 6(s) Rail mounted cranes 25 6(t) Competent persons for equipment operations 26 6(u) Examination of cranes 27 6(v) Precautions on raising and lowering loads 27 6(w) Scotch and Guy derrick cranes 27 6(x) Hoist 28

6(x) (1) Safety of hoist way, platforms and cages 28 6(x) (2) Safe Working Load and Marking of Hoist 28

Page 3: Health Safety Environment (HSE ) Regulationsdcca.gov.ae/wp-content/uploads/circulars/za-dc-reg-01 health safety... · Health, Safety and Environment Regulations Revision 1 Issue Date

Government of Dubai

Dubai Technology and Media Free Zone Authority Zoning Authority – Development Control

Document no. ZA-DC-REG-01

Revision 1 Issue Date 29.10.08 Health, Safety and Environment Regulations

Page 3 of 104

6(x) (3) Test and Examination of Hoist 28 6(x) (3) Carriage of persons and secureness of loads 29 6(x) (5) Hoist carrying persons 30 6(x) (6) Third party test certificate 30

6(y) Mobile Elevating Work Platforms, Suspended Cradles and

Platforms, Mast Climbing Work Platforms 31 6(y) (1) Third party examination and test 31 6(y) (2) Regular periodical inspections 31 6(y) (3) Marking and Identification 31

6(z) Temporary Lifting Equipments, Excavators used for object handling, Chain blocks suspended from roof joist, Tele handlers or cranes 32 6(z) (1) Third party examination and test 32 6(z) (2) Regular periodical inspections 32 6(z) (3) Marking and Identification 32

7.0 Excavation, Trenching, Shoring 33

7(a) Excavations 33 7(b) Stability of excavations 34 7(c) Fencing of excavations 34 7(d) Safeguarding edges of excavations 34 7(e) Trenching and shoring 35 7(f) Vehicles near edges of excavations 35 7(g) Tunnels and shafts 35 7(h) Tunnel area 36 7(i) Shafts 37 7(j) Cofferdams and caissons 37 7(k) Dangerous atmospheres 38 7(l) Ventilation 38 7(m) Internal combustion engines 38 7(n) Warning lights 39 7(o) Warning signs 39

8.0 Scaffolds, Work platforms 40

8(a) General requirements 40 8(b) Provision of scaffoldings 40 8(c) Supervision of work and inspection of materials 40 8(d) Construction and material 40 8(e) Defective material 41 8(f) Maintenance of scaffolds 41 8(g) Partly erected or dismantled scaffolds 41 8(h) Standards, Uprights, Ledgers and Putlogs 41 8(i) Ladders used as uprights in scaffolds 42 8(j) Stability of scaffolds 42 8(k) Slung scaffolds 43

Page 4: Health Safety Environment (HSE ) Regulationsdcca.gov.ae/wp-content/uploads/circulars/za-dc-reg-01 health safety... · Health, Safety and Environment Regulations Revision 1 Issue Date

Government of Dubai

Dubai Technology and Media Free Zone Authority Zoning Authority – Development Control

Document no. ZA-DC-REG-01

Revision 1 Issue Date 29.10.08 Health, Safety and Environment Regulations

Page 4 of 104

8(l) Cantilever, jib, figure and bracket scaffolds 44 8(m) Supports for scaffolds 44 8(n) Suspended scaffolds 45 8(o) Boatswain chairs, cages, skips etc 47 8(p) Trestle scaffold 47 8(q) Inspection of scaffolds 48 8(r) Scaffolds used by different contractors 48 8(s) Construction of working platform, gangways and runs 48

8(s) (1) Boards and planks in working platforms, gangways and runs 49 8(s) (2) Requirements of boards and planks 49 8(s) (3) Requirements of width of working platform 49 8(s) (4) Requirements of width of gangways and runs 50

8(t) Requirements of Guard rails and toe boards 50 8(u) Guard rails & toe boards not required on 51 8(v) Guard rails for Gangways, Runs, and Stairs 51 8(w) Requirements of foot holds on platforms, runs and stairs 51 8(x) Loads on scaffolds 52 8(y) Provision of fall and provision of safety nets 52

9.0 Construction and Maintenance of ladders 53

10.0 Openings, Corners, Edges and open joisting 54

11.0 Sloping and Fragile roof 54

12.0 Reversing vehicles 55

13.0 Protection from falling material 55

14.0 Construction of temporary structures 56

15.0 Provision of welfare facilities at construction sites 56

16.0 Personal Protective Equipments ( PPE) at Work 57

17.0 Fire Safety 57

18.0 First Aid 58

19.0 Regulations for the reduction of construction/ demolition noise 60

20.0 Control of Substances Hazardous to Health (COSHH) Regulations 61

21.0 Regulations for temporary labour camps at project sites 62

22.0 Regulations for usage of Liquefied Petroleum Gas (LPG) at site 68

Page 5: Health Safety Environment (HSE ) Regulationsdcca.gov.ae/wp-content/uploads/circulars/za-dc-reg-01 health safety... · Health, Safety and Environment Regulations Revision 1 Issue Date

Government of Dubai

Dubai Technology and Media Free Zone Authority Zoning Authority – Development Control

Document no. ZA-DC-REG-01

Revision 1 Issue Date 29.10.08 Health, Safety and Environment Regulations

Page 5 of 104

23.0 Regulations for welding and cutting operations 68

24.0 Reporting of Injuries, Dangerous Occurrences Regulations (RIDOR) 72

25.0 Information, Training, Instruction and Supervision of employees 76

26.0 Permit To Work System (PTW) 78

27.0 Confined Spaces 78

28.0 Temporary canteen/ kitchen on site 81

29.0 Dangerous Goods at Site 85 30.0 Heat Stress 85 31.0 Electrical Safety 86 32.0 Diesel Engine Exhaust Emissions at Site 91 33.0 Dust Control 92 34.0 Hazardous Waste Management at Site 92 35.0 Site Fencing and Access Control 94 36.0 Pre-Cast Concrete Construction 95 37.0 Cast-In-Place concrete construction 97

38.0 Form work, Shoring, Reinforcing steel, Masonry construction 98

39.0 Non-Ionizing Radiation 100 40.0 Accident Prevention Signs, Signals, Barricades and Tags 101 41.0 Cantilever Material Loading Platforms 103

Page 6: Health Safety Environment (HSE ) Regulationsdcca.gov.ae/wp-content/uploads/circulars/za-dc-reg-01 health safety... · Health, Safety and Environment Regulations Revision 1 Issue Date

Government of Dubai

Dubai Technology and Media Free Zone Authority Zoning Authority – Development Control

Document no. ZA-DC-REG-01

Revision 1 Issue Date 29.10.08 Health, Safety and Environment Regulations

Page 6 of 104

1.0 Introduction Construction activities are an important part of Dubai’s future. However all too

regular reports of deaths and injuries at construction sites highlight that these activities are very hazardous.

Zoning Authority is concerned about such accidents and determined to improve

safety standards across all projects under the jurisdiction of Zoning Authority. This Health, Safety and Environmental regulations contained within it are

intended to establish the future standard of operation for construction sites. These regulations have been developed from international practice.

The Health, Safety and Environment Regulations Manual have been framed to

regulate the working conditions of any workmen working under a contractor or sub-contractor involved in construction activities. Each employer shall provide a safe access, egress and safe place of work to all his employees engaged in construction work to protect them from accidents, occupational health hazards.

All the consultants, contractors working in Zoning Authority projects must adopt

its provisions and work to achieve an improved safety record for this important industry.

Page 7: Health Safety Environment (HSE ) Regulationsdcca.gov.ae/wp-content/uploads/circulars/za-dc-reg-01 health safety... · Health, Safety and Environment Regulations Revision 1 Issue Date

Government of Dubai

Dubai Technology and Media Free Zone Authority Zoning Authority – Development Control

Document no. ZA-DC-REG-01

Revision 1 Issue Date 29.10.08 Health, Safety and Environment Regulations

Page 7 of 104

2.0 Application of Health, Safety and Environment Regulations

These regulations shall apply to:

a) Building operations b) Works of engineering construction

Undertaken by way of trade or business or for the purpose of any residential or

industrial or commercial undertaking or by or on behalf of the private, public including government or any other public authority under the jurisdiction of Zoning Authority- Development Control

Page 8: Health Safety Environment (HSE ) Regulationsdcca.gov.ae/wp-content/uploads/circulars/za-dc-reg-01 health safety... · Health, Safety and Environment Regulations Revision 1 Issue Date

Government of Dubai

Dubai Technology and Media Free Zone Authority Zoning Authority – Development Control

Document no. ZA-DC-REG-01

Revision 1 Issue Date 29.10.08 Health, Safety and Environment Regulations

Page 8 of 104

Health, Safety and Environment Protection Policy

Our Vision: • Zoning Authority – Development Control will control its projects to world-

class standards of safety and will be recognized for completing projects without causing harm to people or the environment.

Our Belief: • It is a good business practice to guard against accidents and occupational

diseases.

• All accidents, which injure people, damage machinery and destroy materials, can be prevented by taking specific safety precautions.

• Consultants and contractors play a vital role for Health & Safety of their employees, visitors, general public.

• Consultants and Contractors are responsible for implementation of Health, Safety and Environment Regulations to provide a safest possible working environment to their employees, visitors and general public, who may affect during execution of projects.

• Instituting a Zero tolerance culture among employees, consultants and contractors will facilitate us to march towards our goal – Zero Accident.

Our Goal: • Provide safest possible working environment to employees of consultants,

contractors, client, visitors and general public who may affect during construction stage.

• Achieve a Zero Accident in all operations of the organization.

• Set an example in enforcing Health, Safety and Environment standards in construction industry in UAE.

Our Path: • Organization shall set periodic objectives to ensure continual improvement.

• Strong, fair and effective enforcement of all approved Health, Safety and Environment regulations.

• Health & Safety performance of all the contractors shall be periodically monitored.

For and on behalf of: Dubai Technology & Media Free Zone Authority Ali BuRuhaima Deputy Director General

Page 9: Health Safety Environment (HSE ) Regulationsdcca.gov.ae/wp-content/uploads/circulars/za-dc-reg-01 health safety... · Health, Safety and Environment Regulations Revision 1 Issue Date

Government of Dubai

Dubai Technology and Media Free Zone Authority Zoning Authority – Development Control

Document no. ZA-DC-REG-01

Revision 1 Issue Date 29.10.08 Health, Safety and Environment Regulations

Page 9 of 104

3.0 The Zoning Authority - Development Control’s Policy Statement on Enforcement of Regulations

3(a) The purpose and method of enforcement

The ultimate purpose of the Zoning Authority is to ensure that duty holders manage and control risks effectively, thus preventing harm.

1. The purpose of enforcement is to:

i. Ensure that duty holders (contractors) take action to deal immediately with serious risks.

ii. Promote and achieve sustained compliance with the regulations. iii. Ensure that duty holders who breach health and safety requirements,

and directors or managers, who fail in their responsibilities, may be held to account, which may include bringing alleged offenders before the courts.

2. The Zoning Authority has a range of tools at their disposal in seeking to

secure compliance with the regulations. Inspectors may offer duty holders information, and advice, both face to face and in writing. This may include warning a duty holder that in the opinion of the inspector, they are failing to comply with the regulations. Where appropriate, inspectors may also serve improvement and prohibition notices, withdraw approvals, issue formal cautions.

3. Giving information and advice, issuing improvement or prohibition notices

are the main means which inspectors use to achieve the broad aim of dealing with serious risks, securing compliance with health and safety regulations and preventing accidents. A prohibition notice stops work in order to prevent serious personal injury. Information on improvement and prohibition notices shall be made publicly available.

4. Every improvement notice contains a statement that in the opinion of an

inspector an offence has been committed. 5. Investigating the circumstances encountered during inspections or

following incidents or complaints is essential before taking any enforcement action.

Page 10: Health Safety Environment (HSE ) Regulationsdcca.gov.ae/wp-content/uploads/circulars/za-dc-reg-01 health safety... · Health, Safety and Environment Regulations Revision 1 Issue Date

Government of Dubai

Dubai Technology and Media Free Zone Authority Zoning Authority – Development Control

Document no. ZA-DC-REG-01

Revision 1 Issue Date 29.10.08 Health, Safety and Environment Regulations

Page 10 of 104

3(b) The principles of enforcement of regulations

Zoning Authority believes in strong, fair and effective enforcement of Health, Safety

and Environment regulations. It will follow the following principles.

3(b) (1) Proportionality:

Proportionality means relating enforcement action to the risks.

i. In practice, applying the principle of proportionality means that Zoning

Authority shall take particular account of how far the duty holder has fallen short of what the regulations requires and the extent of the risks to people arising from the breach.

ii. Where duty holders must control risks so far as is reasonably practicable,

Zoning Authority consider protective measures taken by duty holders, shall take account of the degree of risk on the one hand, and on the other the sacrifice, whether in money, time or trouble, involved in the measures necessary to avert the risk. Unless it can be shown that there is gross disproportion between these factors and that the risk is insignificant in relation to the cost, the duty holder must take measures and incur costs to reduce the risk.

iii. The Zoning Authority will expect relevant good practice to be followed.

Where relevant good practice in particular cases is not clearly established, health and safety regulations effectively requires duty holders to establish explicitly the significance of the risks to determine what action needs to be taken.

iv. Some irreducible risks may be so serious that they cannot be permitted

irrespective of the consequences.

3(b) (2) Consistency:

i. Consistency of approach does not mean uniformity. It means taking a

similar approach in similar circumstances to achieve similar ends.

Page 11: Health Safety Environment (HSE ) Regulationsdcca.gov.ae/wp-content/uploads/circulars/za-dc-reg-01 health safety... · Health, Safety and Environment Regulations Revision 1 Issue Date

Government of Dubai

Dubai Technology and Media Free Zone Authority Zoning Authority – Development Control

Document no. ZA-DC-REG-01

Revision 1 Issue Date 29.10.08 Health, Safety and Environment Regulations

Page 11 of 104

ii. Duty holders managing similar risks expect a consistent approach from Zoning Authority in the advice tendered the use of enforcement notices, approvals and in the response to incidents.

iii. Zoning Authority recognizes that in practice consistency is not a simple

matter. Zoning Authority – Development Control inspectors face with many variables including the degree of risk, the attitude and competence of management , any history of incidents or breaches involving the duty holders, previous enforcement action, and the seriousness of any breach, which includes any potential or actual harm arising from a breach of regulations. Decisions on enforcement action are discretionary by the enforcer.

iv. Zoning Authority shall have arrangements in place to promote consistency

in the exercise of discretion, including effective arrangements for liaison with other enforcing authorities.

3(b) (3) Transparency:

i. Transparency means helping duty holders to understand what is expected

of them and what they should expect from the Zoning Authority. It also means making clear to duty holders not only what they have to do but, where this is relevant, what they don’t. That means distinguishing between statutory requirements and advice or guidance about what is desirable but not compulsory.

ii. When inspectors offer duty holders information, or advice, face to face or in

writing, including any warning, inspectors will tell the duty holder what to do to comply with the regulations, and explain why. Inspectors will, if asked, write to confirm any advice.

iii. In the case of improvement notices the inspector will discuss the notice

and, if possible, resolve points of difference before serving it. The notice will say what needs to be done, why, and by when, and that in the inspector’s opinion a breach of the regulations has been committed.

iv. In the case of a prohibition notice the notice will explain why the prohibition

is necessary.

Page 12: Health Safety Environment (HSE ) Regulationsdcca.gov.ae/wp-content/uploads/circulars/za-dc-reg-01 health safety... · Health, Safety and Environment Regulations Revision 1 Issue Date

Government of Dubai

Dubai Technology and Media Free Zone Authority Zoning Authority – Development Control

Document no. ZA-DC-REG-01

Revision 1 Issue Date 29.10.08 Health, Safety and Environment Regulations

Page 12 of 104

3(b) (4) Accident Investigation:

i. Zoning Authority – Development Control shall carry out a site investigation

in order to determine:

� Causes behind the accident/ incident

� Whether action has been taken or needs to be taken to prevent a recurrence and to secure compliance with the regulations

� Lessons to be learnt and to influence the regulations

� What response is appropriate to a breach of regulations?

� The severity and scale of potential or actual harm

Page 13: Health Safety Environment (HSE ) Regulationsdcca.gov.ae/wp-content/uploads/circulars/za-dc-reg-01 health safety... · Health, Safety and Environment Regulations Revision 1 Issue Date

Government of Dubai

Dubai Technology and Media Free Zone Authority Zoning Authority – Development Control

Document no. ZA-DC-REG-01

Revision 1 Issue Date 29.10.08 Health, Safety and Environment Regulations

Page 13 of 104

4.0 The Designers (Consultants) responsibilities for Health and Safety

4(a)

All the designers have specific duties and responsibilities under this regulation. This regulation define the term designer widely so that it includes anyone who prepares designs, design details, specifications or bills of quantities relating to a structure or part of a structure. This regulation gives a brief explanation of what designers are required to do. This regulation is primarily for Architectural & Engineering Consultants. All the designers of the project have a duty to avoid foreseeable hazards associated with the construction work and subsequent maintenance and cleaning work, as far as is reasonably practicable. Where there are risks which cannot be eliminated designers have a duty to combat those remaining risks with measures that will protect workers and people affected by the works.

4(b) Designers have a responsibility to see that their work did not expose workers on site to

risks. Hazards should be avoided, and if this cannot be done, reduce the risks those hazards give rise to as so far as is reasonably practicable.

4(c) Designers should include in the design adequate information on factors affecting health

and safety on site and co-operate with the owner’s representative and other designers to enable them to comply with the regulations.

4(d) Designers must first identify the health and safety hazards associated with construction

of their design. Then, for the hazards which give rise to significant risk, they need to follow the hierarchy of risk control.

4(e) Project Health & Safety Plan

The site will operate under the main contractor’s approved health and safety plan even though designers (consultants) have responsibility to ensure compliance with the procedures mentioned in approved Health & Safety plan.

4(f) Handing Over of completed work

The handover of the completed work means a transfer of responsibility for health and safety in the building from the main contractor to the client. Whatever information is

Page 14: Health Safety Environment (HSE ) Regulationsdcca.gov.ae/wp-content/uploads/circulars/za-dc-reg-01 health safety... · Health, Safety and Environment Regulations Revision 1 Issue Date

Government of Dubai

Dubai Technology and Media Free Zone Authority Zoning Authority – Development Control

Document no. ZA-DC-REG-01

Revision 1 Issue Date 29.10.08 Health, Safety and Environment Regulations

Page 14 of 104

needed to operate the building safely should be collected together by the client representative and passed to the client as health and safety file.

4(g) The Health & Safety file The health and safety file should contain:

1) Up-to-date details of the work actually carried out. 2) Safety information on materials and components used in the work.

3) Information on safety aspects of cleaning, maintenance and repair.

4(h) Commissioning stage

The consultant shall make sure that all the hazards involved in commissioning stage should be taken care as services become live. Snagging and remedial works may be needed when the normal construction phase site supervision has left the site. The arrangements for the main contractor to ensure these works are properly managed should be clear.

4(i) Information for Extension, Alteration or Demolition work

Consultant should consider whether specific information needs to be provided for inclusion in the health and safety file to warn of health and safety issues that could arise in extension, alteration or demolition of the building. Reference and Further information: The Construction (Design & Management) Regulations UK

Page 15: Health Safety Environment (HSE ) Regulationsdcca.gov.ae/wp-content/uploads/circulars/za-dc-reg-01 health safety... · Health, Safety and Environment Regulations Revision 1 Issue Date

Government of Dubai

Dubai Technology and Media Free Zone Authority Zoning Authority – Development Control

Document no. ZA-DC-REG-01

Revision 1 Issue Date 29.10.08 Health, Safety and Environment Regulations

Page 15 of 104

5.0 The Contractor’s Responsibilities for Health and Safety

5(a) Contractor’s responsibilities

It should be the duty of every main contractor/ sub- contractor to comply with the

health, Safety and Environmental (HSE) regulations of Zoning Authority – Development Control along with other regulations/ guidelines in force in the Emirate of Dubai. It should be the duty of every main contractor / sub contractor to supervise their works for safe completion.

5(b) Requirement of Safety Officer

1) Every contractor, and every employer or workmen who undertakes operations

or works and who normally employs more than 150 persons thereon at anyone time shall specifically appoint in writing one full time Safety Officer qualified and experienced in construction safety, where the construction site with less than 150 persons thereon at anyone time, Site Engineer with experience shall be appointed as part-time Safety Officer.

2) The Safety Officer shall advise the contractor or employer on the requirements for safety and health of persons employed by the contractor.

3) The Safety Officer shall supervise on-site safety and promote the safe conduct of the work generally.

4) The Full time “Safety Officer” shall be for one site only.

5(c)

Competency of Safety Officer

The contractor/ employer should consider the following minimum qualification/ experience for appointing Full time Safety Officer.

1. Degree/ Diploma in Civil/ Mechanical Engineering or branch of engineering works undertaken.

2. Diploma in Safety Management 3. Membership of Occupational Safety and Health Institution. 4. Relevant experience in construction projects.

“Full time “or “part-time” safety officer should have adequate training in the field of construction safety / Industrial safety before being assigned safety responsibilities.

Page 16: Health Safety Environment (HSE ) Regulationsdcca.gov.ae/wp-content/uploads/circulars/za-dc-reg-01 health safety... · Health, Safety and Environment Regulations Revision 1 Issue Date

Government of Dubai

Dubai Technology and Media Free Zone Authority Zoning Authority – Development Control

Document no. ZA-DC-REG-01

Revision 1 Issue Date 29.10.08 Health, Safety and Environment Regulations

Page 16 of 104

5(d)

Notification of appointment of Safety Officer

1) The Contractor should submit the curriculum vitae of the full time Safety Officer along with “Project Safety Officer Approval Request Form” to Zoning Authority.

2) The contractor should submit the following mandatory attachments along with the “Project Safety Officer Approval Request Form”.

� Copies of attested educational certificates, � Copies of experience certificates, � Passport copies with valid visa page

3) Obtaining the approval of project full time safety officer is mandatory.

5(e) Project Health, Safety and Environment Plan

1) Project specific Health, Safety and Environment Plan should be submitted. 2) Obtaining approval of project specific Health, Safety and Environment plan is

mandatory requirement in order to obtain Building Permit.

5(f) Accident Prevention Program

Accident Prevention program shall include Safety Policy, Organization and responsibilities, systems, development of check list for various activities, site inspection and implementation. Such programs shall provide for frequent and regular inspection of the job sites, materials and equipments, to be made by competent persons designated by the employers/ contractors.

5(g) Machinery

The use of any machinery, tool, material or equipment which is not in compliance with any applicable requirement of these regulations is prohibited. Such machinery, tool, materials or equipment shall either be identified as unsafe by tagging or locking the controls to render them inoperable.

5(h) Instruction to employees

The contractor/ employer shall instruct each employee in the recognition and avoidance of unsafe conditions and the regulations applicable to his work environment to control or eliminate any hazards or other exposure to illness or injury.

Page 17: Health Safety Environment (HSE ) Regulationsdcca.gov.ae/wp-content/uploads/circulars/za-dc-reg-01 health safety... · Health, Safety and Environment Regulations Revision 1 Issue Date

Government of Dubai

Dubai Technology and Media Free Zone Authority Zoning Authority – Development Control

Document no. ZA-DC-REG-01

Revision 1 Issue Date 29.10.08 Health, Safety and Environment Regulations

Page 17 of 104

5(i) Training

Employees required to handle or use harmful substances shall be instructed, informed and trained regarding the safe handling.

5(j) Personal Protective Equipments

1) Employees required handling or using flammable liquids; gases or toxic

materials shall be instructed in the safe handling and use of these materials and made aware of the specific requirements contained in other parts of these regulations.

2) Every contractor or and every employer shall provide Personal Protective Equipments (PPE) to the employees, appropriate to their operations as detailed in these regulations at the expense of the employer/ contractor.

3) Contractor shall ensure usage of personal protective equipments by adequate supervision.

5(k) Site Storage

1) Contractors are responsible for allocating, developing and implementing safe storage procedures of all the materials on site to ensure safe handling, storage of materials on site.

2) The following details should be submitted to Zoning Authority – Development Control for obtaining approval for site allocation.

i. The details of storage rooms/ stores. ii. Type of material to be stored iii. Quantity of materials to be stored on site. iv. The location and details of flammable & combustible liquid storage v. The location and details of diesel generators on site. vi. The fire emergency evacuation plan of site with fire exits and

assembly points. vii. Fire fighting layout

5(l) Monthly Health, Safety and Environment Performance Report Contractor should submit the filled in “Monthly Health, Safety and Environment

Performance Report Form” by 10th of every month to Zoning Authority –

Development Control.

Reference and Further information:

The Construction (Design & Management) Regulations UK Dubai Municipality - Code of Construction Safety Practice

Page 18: Health Safety Environment (HSE ) Regulationsdcca.gov.ae/wp-content/uploads/circulars/za-dc-reg-01 health safety... · Health, Safety and Environment Regulations Revision 1 Issue Date

Government of Dubai

Dubai Technology and Media Free Zone Authority Zoning Authority – Development Control

Document no. ZA-DC-REG-01

Revision 1 Issue Date 29.10.08 Health, Safety and Environment Regulations

Page 18 of 104

6.0 Mechanical Plant and Equipment:

6(a)

Mechanical Handling Plant and Equipment

Heavy machinery, equipment, or parts thereof, which are suspended or held aloft by substantially blocked to prevent falling or shifting before employees are permitted to work under or between them. Bulldozer and scraper bladed, end loader buckets, dump bodies, and similar equipment, shall be either fully lowered or blocked when being repaired or when not in use. All controls shall be in a neutral position with the motors or engines stopped and brakes set. Whenever the equipment is parked, the parking brake shall be set. Equipment parked on inclines shall have the wheels chocked and the parking brake set.

6(b)

Access Roadways and Grades

Contractor shall move or cause to be moved construction equipment or vehicles upon any access roadway or grade unless the access roadway or grade is constructed and maintained to accommodate safely the movement of the equipment and vehicles involved.

6(c) Roll Over Protective Structures

1) Material handling equipment such as rubber–tired, self propelled scrapers,

rubber tired front end loader, dozers, wheel type tractors, loaders, crawler tractors, loaders, and motor graders in construction sites shall be equipped with rollover protective structures to minimize the possibility of the operator being crushed as a result of a rollover or upset.

2) No person other than trained operator shall operate the heavy equipment. 3) All bi-directional machines such as rollers, compactors, front-end loaders,

excavators, bulldozers and similar equipment shall be equipped with a horn, distinguishable from the surrounding noise level.

6(d)

Forklift trucks

1) The forklift trucks shall

i. Be of sound construction, adequate strength and free from patent

defects. ii. Be properly maintained iii. Be provided with overhead protection for the driver.

Page 19: Health Safety Environment (HSE ) Regulationsdcca.gov.ae/wp-content/uploads/circulars/za-dc-reg-01 health safety... · Health, Safety and Environment Regulations Revision 1 Issue Date

Government of Dubai

Dubai Technology and Media Free Zone Authority Zoning Authority – Development Control

Document no. ZA-DC-REG-01

Revision 1 Issue Date 29.10.08 Health, Safety and Environment Regulations

Page 19 of 104

iv. Be provided with an automatic reverse activated horn or buzzer and light.

2) No person other than the trained certified/ licensed person shall operate forklift trucks.

3) No attachment shall be incorporated on the forklift unless necessary

precautions are taken against the possible changes in the designed specifications such as load centre, maximum safe load, capacity etc.

4) All persons, drivers and banks-men shall be thoroughly conversant with the

factors which affect the stability of the forklift in operation.

6(e) Excavators

1) No excavator shall be used unless it has been thoroughly examined by a

responsible maintenance personnel during the preceding 12 months to ensure that equipment is safe.

2) The thorough examination shall be done after any substantial alteration or repair which could affect the safe working of the machine.

3) No person shall be allowed to work or stands near the operating boom or the tail swing of an excavator.

4) When the excavator is being adopted for use as crane, slings shall be secured to a correctly designed and manufactured lifting point.

5) No person shall stand under the load when using an excavator as a crane.

6(f)

Operating Procedures of material handling equipment

All the earthmoving and mechanical handling equipment shall be operated as per the manufacturer’s instruction taking adequate precautions at all stages of its operation.

6(g) Rigging Equipment for material handling

No chain, rope or lifting gear shall be used in raising or lowering or as a means of suspension unless it is safe.

Page 20: Health Safety Environment (HSE ) Regulationsdcca.gov.ae/wp-content/uploads/circulars/za-dc-reg-01 health safety... · Health, Safety and Environment Regulations Revision 1 Issue Date

Government of Dubai

Dubai Technology and Media Free Zone Authority Zoning Authority – Development Control

Document no. ZA-DC-REG-01

Revision 1 Issue Date 29.10.08 Health, Safety and Environment Regulations

Page 20 of 104

6(g) (1) Alloy Steel Chains

i. All the welded alloy steel chain slings shall have permanently

affixed identification stating size, grade, rated capacity and sling manufacturer name.

ii. Hooks, rings, welded or mechanical coupling links and other attachments when used with alloy steel chains shall have rated capacity at least equal to that of chain.

iii. Job or shop hooks and links or make shift fasteners, formed from bolts, rods etc. or other such attachments, shall not be used. (It is strictly prohibited).

iv. Rated capacity (working load limit) for alloy steel chain slings (Single/multi-leg) shall not exceed the values given by the manufacturer.

v. Whenever wear at any point of any chain link exceeds 10 percent reduction in diameter the chain shall not be used.

6(g)(2) Wire rope

i. The safe working load recommended by the manufacturer for

various sizes and classifications for wire ropes shall be followed. ii. Wire ropes shall not be secured by knots. iii. Each wire rope used in hoisting or, lowering or in pulling loads

shall consist of one continuous piece without knot or splice. iv. Wire rope shall not be used if in any length of eight diameters, the

total number of visible broken wires exceeds 10 percent of total number of wires, or if the rope shows other signs of excessive wear, corrosion, or defect.

v. Wire ropes shall not be used in lifting operations with upper end and lower end (eyes) made with temporary clips or clamps.

vi. All the wire rope slings shall be examined and tested by competent person of third party and certificate shall be obtained.

vii. All splices in rope slings shall be made in accordance with manufacturer’s recommendation.

viii. Spliced fiber rope slings shall not be used unless they have been spliced as per the manufacturer’s recommendation.

ix. Knots shall not be used in lieu of splices. x. Natural and synthetic fiber rope slings shall be immediately

removed from service if any of the following conditions are present.

� Abnormal wear. � Powdered fiber between strands � Broken or cut fibers. � Variations in the size or roundness of strands. � Distortion of hardware in the sling.

Page 21: Health Safety Environment (HSE ) Regulationsdcca.gov.ae/wp-content/uploads/circulars/za-dc-reg-01 health safety... · Health, Safety and Environment Regulations Revision 1 Issue Date

Government of Dubai

Dubai Technology and Media Free Zone Authority Zoning Authority – Development Control

Document no. ZA-DC-REG-01

Revision 1 Issue Date 29.10.08 Health, Safety and Environment Regulations

Page 21 of 104

6(g) (3) Natural rope and synthetic fiber

i. Synthetic webbing shall be of uniform thickness and width and

selvage edges shall not be split from the webbing width.

ii. Fittings shall be

� Of a minimum breaking strength equal to that of the sling, and

� Free of all sharp edges that could in any way damage the webbing.

iii. Stitching shall be the only method used to attach end fittings to

webbing and to form eyes. The thread shall be in an eyes pattern and contain a sufficient number of stitches to develop the full breaking strength of the sling.

iv. Manufacturer’s test certificate of all synthetic webbing slings shall

be maintained at workplace for inspection by ZADC.

6(g) (4)

Synthetic webbing

i. When synthetic webbing slings are used the following precautions

shall be taken

� Nylon web slings shall not be used where fumes, vapors, sprays, mists or liquid of acids or phenolics are present.

� Polyester and polypropylene web slings shall not be used where fumes, vapors, sprays, mists or liquids of caustics are present.

6(g) (5) Environmental Condition

i. Synthetic web slings shall be immediately removed from service if

any of the following conditions are present.

� Acid or caustic burns � Melting or charging of any part of the sling surface. � Snags, punctures, tears or cuts � Broken or worn stitches � Distortion of fittings

Page 22: Health Safety Environment (HSE ) Regulationsdcca.gov.ae/wp-content/uploads/circulars/za-dc-reg-01 health safety... · Health, Safety and Environment Regulations Revision 1 Issue Date

Government of Dubai

Dubai Technology and Media Free Zone Authority Zoning Authority – Development Control

Document no. ZA-DC-REG-01

Revision 1 Issue Date 29.10.08 Health, Safety and Environment Regulations

Page 22 of 104

6(h)

Hooks

1) Every hook used for raising or lowering or as means of suspension

shall either

i. Be provided with an efficient device to prevent the displacement of the sling or load from the hook, or

ii. Be of such shape as to reduce as far as possible the risk of such displacement.

6(i)

Cranes, Hoists

1) Every lifting appliance or machine and every part thereof including

all working gear and all other plant or equipment used for anchoring or fixing such appliances or machines shall

i. Be of good mechanical construction, sound material, and

adequate strength and free from patent defect. ii. Be properly maintained.

2) Every lifting appliance or machine shall be adequately and

securely supported.

3) Every part of stage, scaffold, framework or other structure and every mast, beam, pole or other article of plant or equipment supporting a lifting appliance or machine shall be of good construction and adequate strength and shall be of sound material and free from patent defects.

4) Every part of the framework or every crab or winch shall be of

metal.

5) Any anchoring or fixing arrangement provided in connection with the lifting appliances or machines shall be adequate and secured.

6) The following safety precautions shall be taken where lifting

appliance has traveling or slewing motion.

i. On every stage, gantry or other place where a lifting appliance having a traveling or slewing motion is in use, an unobstructed passageway not less those 600 millimeters wide shall be

Page 23: Health Safety Environment (HSE ) Regulationsdcca.gov.ae/wp-content/uploads/circulars/za-dc-reg-01 health safety... · Health, Safety and Environment Regulations Revision 1 Issue Date

Government of Dubai

Dubai Technology and Media Free Zone Authority Zoning Authority – Development Control

Document no. ZA-DC-REG-01

Revision 1 Issue Date 29.10.08 Health, Safety and Environment Regulations

Page 23 of 104

maintained between any part of the appliance liable so to move and any guard-rails, fencing or other nearby fixture.

ii. Provided that if at any time it is impracticable to maintain such a passageway at any place or point all reasonable steps shall be taken to prevent the access of any person to such place or point at such time.

6(J)

Platforms for crane operators and signalers

1) Where a platform is provided for the person or persons driving or

operating a crane or for any signaler, it shall be

i. Of sufficient area for the persons employed there on ii. Close planked or plated and iii. Provided with safe means of access and every side of every

such platform being a side thereof from which a person is liable to fall a distance of more than 2 meters shall be provided with a suitable guard rail of adequate strength to a height of at least 90 centimeters above the platform and toe-boards upto a height not less than 20 centimeters and so placed as to prevent as far as possible the fall of persons, materials and tools from such platform.

iv. The space between top of toe-board and the guard-rail shall not exceed 70 centimeters.

v. Guard-rails and toe-boards required by this regulation may be removed or remain unerected only for the time and to the extent necessary for the access of persons or the movement of material.

6(k)

Cabins for drivers

1) The driver of every power drivers lifting appliance shall be provided

with a suitable cabin and the cabin shall

i. Provide an unobstructed view for proper operation ii. Give weather protection iii. Allow access to the machinery for maintenance work.

6(l)

Drums and Pulleys

Page 24: Health Safety Environment (HSE ) Regulationsdcca.gov.ae/wp-content/uploads/circulars/za-dc-reg-01 health safety... · Health, Safety and Environment Regulations Revision 1 Issue Date

Government of Dubai

Dubai Technology and Media Free Zone Authority Zoning Authority – Development Control

Document no. ZA-DC-REG-01

Revision 1 Issue Date 29.10.08 Health, Safety and Environment Regulations

Page 24 of 104

1) Every drum or pulley round which the chain or wire rope of any lifting appliance is carried shall be of suitable diameter and construction for the chain or rope used.

2) Every chain or rope shall be properly anchored to the drum of a

lifting appliance, shall be properly secured and at least two turns shall remain on the drum in every operation position of the appliance.

6(m) Brakes, Controls, Safety Devices etc

1) All cranes, crabs, and winches shall be fitted with brakes capable

of holding and controlling their maximum loads.

2) Control handles, levers, switches shall be designed so that they cannot be operated accidentally and shall be marked to show what they are for and how they should be operated.

3) All cranes over one tone capacity shall be provided with automatic

safe load indicator with a visual warning to the crane driver/operator and an audible warning to those in the vicinity.

6(n) Safe Means of Access

Where any person engaged on the examination, repair or lubrication of any lifting appliance/ machine is liable to fall a distance of more than 2 meters, there shall be provided and maintained safe means of access to and egress from the place at which the person has to work with adequate hand holds and foot holds.

6(o)

Stability of lifting appliances

Appropriate precautions shall be taken to ensure the stability of lifting appliances used on soft or uneven surfaces or on a slope.

6(p) Tower Crane

1) Cranes shall be:

i. Anchored to the ground or other foundations. Rail tracks shall

not be used as anchorages.

Page 25: Health Safety Environment (HSE ) Regulationsdcca.gov.ae/wp-content/uploads/circulars/za-dc-reg-01 health safety... · Health, Safety and Environment Regulations Revision 1 Issue Date

Government of Dubai

Dubai Technology and Media Free Zone Authority Zoning Authority – Development Control

Document no. ZA-DC-REG-01

Revision 1 Issue Date 29.10.08 Health, Safety and Environment Regulations

Page 25 of 104

ii. Securely counter weighted or ballasted to prevent overturning when working.

iii. With a diagram of the counter weight or ballast indicating the

position and weights shall be affixed on the crane.

2) Anchorage and ballast materials shall be examined by a competent person on each occasion before the crane is erected.

3) Whenever a crane is erected or re-sited or any alterations to the

anchorages or ballast are made, the anchoring and ballasting shall be examined, before the crane is put to work, by applying a load 25% higher than the maximum rated load. A report of these tests shall be maintained at the construction site by the contractor.

4) No crane shall be used or erected under weather conditions likely

to endanger its stability. After such weather conditions, the anchorage and ballast materials shall be examined before the crane is used.

5) Any tower crane selected for use on the construction site shall be

positioned with adequate precautions against:

i. Other cranes nearby (overlapping of jibs can create a problem)

ii. The presence of overhead power lines.

iii. Other structures, buildings, houses, public access areas like highways, streets etc.

iv. Adverse weather condition.

v. Aerial obstruction for low flying aircraft/ helicopters be provided

warning lights.

6) Tower crane shall not be used as part of any scaffold or support for any access, storage or transfer feature or as a means of access by employees

6(q) Restriction on the use of cranes

1) The hoisting mechanism of a crane shall not be used for any

purpose other than raising or lowering a load vertically unless the operation is under the supervision of a person competent to ensure that it can be done safely and without damage to the crane.

2) Crane jibs shall not be worked at a radius greater than specified on

the test certificate.

Page 26: Health Safety Environment (HSE ) Regulationsdcca.gov.ae/wp-content/uploads/circulars/za-dc-reg-01 health safety... · Health, Safety and Environment Regulations Revision 1 Issue Date

Government of Dubai

Dubai Technology and Media Free Zone Authority Zoning Authority – Development Control

Document no. ZA-DC-REG-01

Revision 1 Issue Date 29.10.08 Health, Safety and Environment Regulations

Page 26 of 104

3) Tower crane’s boom should not cross the plot limit of the project without obtaining prior approval from ZADC.

6(r) Poles or beams supporting pulley blocks or gin wheels

1) No pulley block or gin wheel suspended from or supported by a

pole or beam should be used for raising or lowering materials unless it is effectively secured to the pole or beam and it is

i. Of adequate strength for the purpose of which it is being

used. ii. Adequately and properly secured against movement.

6(s)

Rail mounted cranes

1) All rails on which a crane should

i. Be supported on a surface sufficiently firm to prevent undue

movement of rails.

ii. Have an even running surface, be sufficiently and adequately supported and be of adequate section

iii. Be properly joined and securely fastened to sleepers or

bearers.

iv. Be laid in straight lines or in radial curves suitable for the free movement of the crane and

v. Be provided with adequate stops or buffers at each end of

the track.

2) The cranes should be provided with effective brakes on traveling motion.

3) Every traveling crane on rails should be provided with guards to

remove from the rails any loose material likely to cause danger.

6(t) Competent persons for equipment operations

1) A lifting appliance shall not be operated otherwise than by a

person trained and competent to operate that appliance except for the purpose of training.

Page 27: Health Safety Environment (HSE ) Regulationsdcca.gov.ae/wp-content/uploads/circulars/za-dc-reg-01 health safety... · Health, Safety and Environment Regulations Revision 1 Issue Date

Government of Dubai

Dubai Technology and Media Free Zone Authority Zoning Authority – Development Control

Document no. ZA-DC-REG-01

Revision 1 Issue Date 29.10.08 Health, Safety and Environment Regulations

Page 27 of 104

2) If a driver/ operator cannot see the load during the whole of the

lifting operation, there shall be a trained banks-man to give necessary signals to the operator.

3) Every signal given for the movement or stopping of a lifting

appliance shall be distinctive in character and such that the person to whom it is given is able to hear or see it easily.

6(u) Test and Examination of cranes

All cranes and lifting appliances shall be examined thoroughly once in 12 months by approved third party examiner and test certificate obtained. Thorough examination and test should be carried out by approved third party, after a major repair, alteration, extension or modification of crane.

6(v) Raising and lowering loads

1) The safe working loads shall be marked on each crane and other

lifting appliances. 2) If the lifting radius can be varied the crane shall be marked with the

safe working load at various radii and an indicator shall be fitted which shows the safe load at each operating radius.

3) Derricking cranes shall be marked with the maximum operating radius of the jib.

4) All cranes shall have clear identity marks. 5) Jib cranes shall be fitted with an automatic safe load indicator and

it shall be tested by an approved third party examiner/ company.

6(w) Scotch and Guy derrick cranes

1) When two cranes have to be used for one load, then

i. Each crane shall work within it’s safe load and shall remain

stable, thoroughly the lift and ii. The lift shall be supervised thoroughly by a competent

person.

Page 28: Health Safety Environment (HSE ) Regulationsdcca.gov.ae/wp-content/uploads/circulars/za-dc-reg-01 health safety... · Health, Safety and Environment Regulations Revision 1 Issue Date

Government of Dubai

Dubai Technology and Media Free Zone Authority Zoning Authority – Development Control

Document no. ZA-DC-REG-01

Revision 1 Issue Date 29.10.08 Health, Safety and Environment Regulations

Page 28 of 104

2) The jib or a scotch derrick crane shall not be erected between the back stays of the crane.

3) No load which lies in the angle between the back stays of a scotch

derrick crane shall be moved by that crane.

4) Appropriate measures shall be taken to prevent the foot of the king post of any scotch derrick crane from being lifted out of its socket or support whilst in use.

5) Where the guys of a guy derrick crane cannot be fixed at

approximately equal inclinations to the mast and so that the angles between adjacent pairs of guys are approximately equal other measures shall be taken to ensure the stability of the crane.

6(x) Hoist 6(x) (1) Safety of hoist way, platforms and cages

i. Hoist ways shall be enclosed however access is provided

or whenever persons could be struck by the platform or other moving parts.

ii. Gates shall be fitted in the enclosure at all landing places

and shall normally be at least 2 meter high, but gates not be less than 91 centimeters is sufficient where there is no risk of falling down hoist way or coming into contact with moving parts. Gates shall be kept closed except for the movement of persons and materials.

iii. In every hoist, devices shall be provided to support the

hoist platform or cage in case of failure of rope or hoisting gear.

iv. Every hoist shall be provided and maintained efficient

automatic devices which will ensure that the platform or cage does not over-run the highest point to which it is for the time being constructed to travel.

v. Where a hoist is operated by means of a winch, winch

shall be so constructed that the brake is applied when the control lever, handle or switch is not held in the operating position.

Page 29: Health Safety Environment (HSE ) Regulationsdcca.gov.ae/wp-content/uploads/circulars/za-dc-reg-01 health safety... · Health, Safety and Environment Regulations Revision 1 Issue Date

Government of Dubai

Dubai Technology and Media Free Zone Authority Zoning Authority – Development Control

Document no. ZA-DC-REG-01

Revision 1 Issue Date 29.10.08 Health, Safety and Environment Regulations

Page 29 of 104

6(x) (2)

Safe Working Load and Marking of Hoist

i. The Safe Working Load (SWL) should be plainly marked on every hoist

platform/cage.

ii. No load greater than safe working load should be carried except for the purposes of testing.

iii. No person should ride on the platform.

iv. Hoist used for carrying persons, notices stating the number of persons

permitted shall be exhibited. No greater number of persons shall be allowed or carried.

6(x) (3)

Test and Examination of Hoist

i. No hoist shall be used unless

� Thoroughly examined before use on a construction site and also

after alteration or repair. � Thorough examination shall be done every 6 months. � The thorough examination and test shall be done by an approved

third party competent company /examiner.

6(x)(4)

Carriage of persons and secureness of loads

i. Where persons have to be raised or lowered or carried to their work place

by a power driven lifting appliance, a hoist or an approved suspended scaffold shall be used wherever possible.

ii. Where this is not possible, aerial cable ways or cranes with buckets or

skips shall be used, provided cages/skip/buckets.

� Are properly constructed and maintained � Have 910 mm deep. � Not loaded with materials such as tools and material liable to

interface with his handhold or foothold. � Are prevented from spinning or tipping.

iii. Every part of a load shall be securely suspended or supported and

adequately secured to prevent danger from slipping or displacement.

Page 30: Health Safety Environment (HSE ) Regulationsdcca.gov.ae/wp-content/uploads/circulars/za-dc-reg-01 health safety... · Health, Safety and Environment Regulations Revision 1 Issue Date

Government of Dubai

Dubai Technology and Media Free Zone Authority Zoning Authority – Development Control

Document no. ZA-DC-REG-01

Revision 1 Issue Date 29.10.08 Health, Safety and Environment Regulations

Page 30 of 104

iv. Every container or receptacle used for raising or lowering stone, bricks, tiles or other objects shall be so enclosed, constructed or designed as to prevent accidental fall of such objects.

v. Goods or loose material shall not be placed directly on a platform of a hoist

unless it is enclosed or other precautions are taken to prevent fall of such goods or materials.

vi. No load shall be left suspended from a lifting appliance.

6(x)(5)

Hoist carrying persons

i. No person shall be carried by the hoist unless it is provided with a cage.

ii. Hoist carrying persons shall be constructed with cage gate with interlocking

arrangements to prevent the occupants falling out or from being trapped between any part of the cage and fixed structure or moving part or from being struck by articles or materials falling down the hoist way.

iii. Every hoist enclosures shall be fitted with interlocking gates at landing

places.

iv. Every hoist used for carrying persons shall be provided with an over-run device at the top of the hoist way.

6(x)(6) Third party test certificate

i. All the hoists carrying passengers shall be thoroughly examined, tested by

competent third-party once in 6 months

ii. Certificate of through examination, test by third-party shall be available at site for Zoning Authority – Development Control inspection.

Page 31: Health Safety Environment (HSE ) Regulationsdcca.gov.ae/wp-content/uploads/circulars/za-dc-reg-01 health safety... · Health, Safety and Environment Regulations Revision 1 Issue Date

Government of Dubai

Dubai Technology and Media Free Zone Authority Zoning Authority – Development Control

Document no. ZA-DC-REG-01

Revision 1 Issue Date 29.10.08 Health, Safety and Environment Regulations

Page 31 of 104

6(y)

Mobile Elevating Work Platforms, Suspended Cradles and Platforms, Mast Climbing Work Platforms 6(y)(1) Third Party Examination and Testing Mobile Elevating Work Platform (MEWP’s), Mast Climbing Work Platforms (MCWP’s), Suspended cradles and platforms should be thoroughly examined and tested at least once in six (6) months by approved third party and certificate of test should be obtained for inspection by ZADC Inspectors. Mobile Elevated Work Platforms (MEWP’s), Mast Climbing Work Platforms (MCWP’s), Suspended cradles and platforms should be thoroughly examined and where necessary tested in accordance with the manufacturer’s written instructions, after every major repair or modification. 6(y)(2) Regular Periodical Inspections Daily pre-use inspections should be carried out competent person before using Mobile Elevated Work Platforms (MEWP’s), Mast Climbing Work Platforms (MCWP’s), Suspended cradles and platforms. 6(y) (3) Markings and Identifications Mobile Elevating Work Platforms, Mast Climbing Work Platforms, Suspended cradles and platforms should be marked with distinguishable mark, its safe working load (SWL) and number of maximum persons. 6(z) Temporary Lifting Equipments, Excavators used for object handling, Chain blocks suspended from roof joist, Tele handlers or cranes 6(z) (1) Third Party Examination and Testing Temporary Lifting Equipments, Excavators used for object handling, Chain blocks suspended from roof joist, Tele handlers or cranes should be thoroughly examined and tested at least once in a year by approved third party and certificate of test should be obtained for inspection by ZADC Inspectors.

Page 32: Health Safety Environment (HSE ) Regulationsdcca.gov.ae/wp-content/uploads/circulars/za-dc-reg-01 health safety... · Health, Safety and Environment Regulations Revision 1 Issue Date

Government of Dubai

Dubai Technology and Media Free Zone Authority Zoning Authority – Development Control

Document no. ZA-DC-REG-01

Revision 1 Issue Date 29.10.08 Health, Safety and Environment Regulations

Page 32 of 104

Temporary Lifting Equipments, Excavators used for object handling, Chain blocks suspended from roof joist, Tele handlers or cranes should be thoroughly examined and where necessary tested in accordance with the manufacturer’s written instructions, after every major repair or modification. 6(z) (2) Regular Periodical Inspections Daily pre-use inspections should be carried out by competent person before using Temporary Lifting Equipments, Excavators used for object handling, and Chain blocks suspended from roof joist, Tele handlers or cranes. 6(z) (3) Markings and Identifications Temporary Lifting Equipments, Excavators used for object handling, Chain blocks suspended from roof joist, Tele handlers or cranes should be marked with distinguishable mark, its safe working load (SWL).

Reference and Further information: The lifting Operations & Lifting Equipments Regulations (LOLER) UK The Construction (Lifting operations) Regulations UK Code of Construction Safety Practice, Dubai Municipality

Page 33: Health Safety Environment (HSE ) Regulationsdcca.gov.ae/wp-content/uploads/circulars/za-dc-reg-01 health safety... · Health, Safety and Environment Regulations Revision 1 Issue Date

Government of Dubai

Dubai Technology and Media Free Zone Authority Zoning Authority – Development Control

Document no. ZA-DC-REG-01

Revision 1 Issue Date 29.10.08 Health, Safety and Environment Regulations

Page 33 of 104

7.0 Excavation, Trenching, Shoring 7(a) Excavations

1) No person shall be permitted under loads being handled by power

shovels, derricks, or hoists. To avoid accident due to any spillage, employees shall be required to stand away from any vehicle being loaded.

2) Prior to opening an excavation, effort shall be made to identify the

presence of underground services/installations i.e. sewer, telephone, water, fuel, electric lines etc and necessary precautions shall be taken.

3) A No Objection Certificate shall be obtained from concerned

service authorities.

4) The walls and faces of all excavations in which employees are exposed to danger from a fall or dislodgement of earth, rock or other material shall be guarded by shoring system, battering of the ground or some other equivalent means.

5) The determination of the angle of repose and design of the

supporting system shall be based on evaluation of factors such as depth of cut, soil, loading, system of de-watering, vibrations, traffic and other sources.

6) Timber sheeting or other support for any part of an excavation,

shaft, earthwork, or tunnel shall be

� Of good quality material � Inspected before use � Constructed and properly maintained.

7) All struts and braces shall be properly and adequately secured.

8) Diversion ditches, or other suitable means shall be used to prevent

surface water from entering an excavation and to provide adequate drainage of the area adjacent to the excavation. Water shall not be allowed to accumulate in an excavation.

9) In any excavation or trench, a ladder shall be provided for access

or escape in case of collapse or flooding.

Page 34: Health Safety Environment (HSE ) Regulationsdcca.gov.ae/wp-content/uploads/circulars/za-dc-reg-01 health safety... · Health, Safety and Environment Regulations Revision 1 Issue Date

Government of Dubai

Dubai Technology and Media Free Zone Authority Zoning Authority – Development Control

Document no. ZA-DC-REG-01

Revision 1 Issue Date 29.10.08 Health, Safety and Environment Regulations

Page 34 of 104

7(b) Stability of excavations

No excavation, shaft, earthwork or tunneling which is likely to reduce the stability of

any part of any structure, shall be commenced or continued unless adequate steps such as shoring, bracing are taken to prevent danger to any person employed from

collapse of the structure.

7(c) Fencing of excavations

Every accessible part of an excavation, shaft, pit or opening in the ground near to

which employed persons are working, shall be provided with a suitable barrier

placed close to the edge or covered.

7(d) Safeguarding edges of excavations

Material shall not be placed or stacked near the edge of any excavation, shaft, pit or opening in the ground. No load or plant or equipment shall be placed or moved near the edge of any excavation, shaft, pit or opening in the ground where it is likely to cause a collapse of the side of the excavation, shaft, pit or opening thereby endangering any person.

Where employees or equipment are required or permitted to cross over

excavations, walkways or bridges with standard guard-rails shall be provided.

7(e) Trenching and shoring

1) Banks more than 1.5 meters high or trenches more than 1.5

meters in depth needing protection due to condition of ground, shall be shored, laid back to a stable slope or stabilized by some other equivalent means of protection.

2) When employees are required to be in trenches 1.2 meters deep

or more, an adequate means of exit, such as a ladder or steps shall be provided and located so as to require no more than 8 meters of lateral travel.

3) Bracing or shoring of trenches shall be carried along with the

excavation. No bracing should be used for access to any part of the trench and access should only be permitted by rope ladders.

4) Portable trench boxes of sliding trench shield may be used for the

protection of personnel in lieu of a shoring system or sloping.

Page 35: Health Safety Environment (HSE ) Regulationsdcca.gov.ae/wp-content/uploads/circulars/za-dc-reg-01 health safety... · Health, Safety and Environment Regulations Revision 1 Issue Date

Government of Dubai

Dubai Technology and Media Free Zone Authority Zoning Authority – Development Control

Document no. ZA-DC-REG-01

Revision 1 Issue Date 29.10.08 Health, Safety and Environment Regulations

Page 35 of 104

7(f) Vehicles near edges of excavations

Where any vehicle is used for tipping material into any excavation or pit or over the

edge of any embankment or earthwork, adequate measures such as stop logs, barricades shall be provided to prevent such vehicle from getting within an unstable

distance of the edge. A rigid PVC water filled barriers or concrete barriers of standard height should be

provided on the edges of the excavations to prevent vehicles and people falling into excavations.

Sufficient number of flagmen should be deployed to guide/ warn the vehicular

traffic, if excavation has an impact on traffic movement. 7(g)

Tunnels and shafts

1) Safe means of access shall be provided and maintained to all working places.

2) When ladders and stairways are provided in shafts and steep

inclines, they shall meet the following requirements

3) No ladder standing on a base shall be used unless

� It has a level and firm footing and is not standing on loose bricks.

� It is secured to prevent undue swaying or sagging and � It is equally and properly supported on each side.

4) If a ladder, standing on the ground cannot be fixed to prevent

slipping, then someone shall hold it at the base when it is being used.

5) No ladder shall be used unless

� It extends to a height of at least 1.0 meter above the place of

landing or the highest rung to be reached or � There is other hand hold and � There is sufficient space at each rung to provide adequate foot

hold.

6) Portable ladders shall be used at such a pitch that the horizontal distance from the top support to the foot of the ladder is about one quarter of the working length of ladder.

7) No ladder shall be used in a horizontal position as platforms,

runways or scaffolds. Portable metal ladders shall not be used for electrical work or where they may contact electrical conductors.

Page 36: Health Safety Environment (HSE ) Regulationsdcca.gov.ae/wp-content/uploads/circulars/za-dc-reg-01 health safety... · Health, Safety and Environment Regulations Revision 1 Issue Date

Government of Dubai

Dubai Technology and Media Free Zone Authority Zoning Authority – Development Control

Document no. ZA-DC-REG-01

Revision 1 Issue Date 29.10.08 Health, Safety and Environment Regulations

Page 36 of 104

8) No folding step-ladder shall be used unless; it has a level and firm

footing.

9) When using extension ladder, the overlap of any two adjacent sections shall be closed length of ladder less than 5m – 1.5 rungs, 5m-6m - 2.5 rungs, over 6m- 3.5 rungs.

10) No ladder or rung of ladder rising a vertical distance of over 6

meters shall be used unless it is provided with intermediate landing place at every 6 meters distance.

11) The landing place shall be of adequate dimension and be provided

with guards rails to a height of 1.15 meters with toe-boards of 150 mm high.

12) The intermediate railing is to be provided between toe-boards and

guard-rail.

13) Where a ladder passes through an opening in the floor of a landing place, the opening shall be as small as is reasonably practicable.

14) Access to unattended underground openings shall be guarded by

gates or doors. Conduits, trenches and manholes shall meet the following requirements.

15) Each operation shall have a check-in and check-out system that

will provide positive identification of every employee underground.

16) Evacuation plans and procedures shall be developed and made

known to employees. Emergency hoisting facilities shall be readily available at shafts more than 5 meters in depth.

17) Sufficient lighting to permit safe operations along the tunnel and

within the shaft areas, and at any workplace occupied by the employees, shall be provided and maintained.

18) Adequate precautions shall be taken against fire hazards.

19) Personal protective clothing and equipment shall be provided to

the employees and be worn. 7(h) Tunnel area

1) The contractor shall examine and test the roof, face and walls of

the work area at the start of each shift and frequently thereafter.

Page 37: Health Safety Environment (HSE ) Regulationsdcca.gov.ae/wp-content/uploads/circulars/za-dc-reg-01 health safety... · Health, Safety and Environment Regulations Revision 1 Issue Date

Government of Dubai

Dubai Technology and Media Free Zone Authority Zoning Authority – Development Control

Document no. ZA-DC-REG-01

Revision 1 Issue Date 29.10.08 Health, Safety and Environment Regulations

Page 37 of 104

2) Loose ground shall be taken down or supported. Ground conditions along haulage ways and travel ways shall be examined periodically.

3) Damaged or dislodged tunnel supports, whether steel sets or

timber, shall be repaired or replaced.

7(i) Shafts

1) Small diameter shafts, which employees are required to enter shall

be provided with steel casing, concrete pipe, timber or other material of the required strength to support the surrounding earth.

2) Casings or bracing shall be provided the full depth of the shaft and

extended at least 0.3 meter above the ground level.

3) All well or shafts over 1.5 meters in depth shall be retained with lagging, spillage or casing.

7(j) Cofferdams and caissons

1) Every cofferdams or caissons and every part thereof shall be

i. Of good construction ii. Of sound material and free from patent defects iii. Properly maintained

2) In any cofferdam or caissons, there shall be adequate means, for

persons to reach places of safety in the event of an in-rush of water.

3) No cofferdam or caisson shall be constructed or placed in position

or altered or dismantled except under the immediate supervision of a competent person.

4) All material for the construction or fixing of a cofferdam or caisson

shall be inspected by competent person. Unsuitable or defective material shall not be used.

5) No person shall be employed in a cofferdam or caisson unless it

has been inspected by a competent person at least once on the same or preceding day.

6) Thorough examination shall be done whenever

i. Explosive charges have been fired.

Page 38: Health Safety Environment (HSE ) Regulationsdcca.gov.ae/wp-content/uploads/circulars/za-dc-reg-01 health safety... · Health, Safety and Environment Regulations Revision 1 Issue Date

Government of Dubai

Dubai Technology and Media Free Zone Authority Zoning Authority – Development Control

Document no. ZA-DC-REG-01

Revision 1 Issue Date 29.10.08 Health, Safety and Environment Regulations

Page 38 of 104

ii. Any damage has occurred.

7(k) Dangerous atmospheres

1) Instruments shall be provided by the contractor/ sub contractor to

test the atmosphere in any excavation, pit, hole, tunnel, shaft, caissons or other enclosed or confined space or every approach and the atmosphere shall be tested for oxygen deficiency, carbon monoxide, nitrogen dioxide, flammable or toxic gases, dusts, mists and fumes to assure that the quality and quantity of air is maintained. The periodicity of test shall depend upon the individual situations to ensure safe working condition.

2) A record shall be maintained.

7(l) Ventilation

1) Effective steps shall be taken to secure and maintain the adequate

ventilation of every working place in any excavation, pit, hole, tunnel, shaft, caisson or other enclosed or confined space and of every approach.

2) If the air in any of the working places or approaches is suspended

to be poisonous or asphyxiating, no person shall be employed in or allowed to enter until the place is free from danger.

7(m) Internal combustion engines

1) No stationary internal combustion engine shall be used in any

enclosed or confined space unless specific provision is made for conduiting the exhaust gases from the engine into the open air or the places are adequately ventilated.

2) Whenever any dangerous gas, fumes, dusts are given off during

an operation or process, in addition to control measures, employees shall be provided with respiratory protective equipment and shall be worn by employees.

3) Oxygen/Acetylene gas cylinders shall not be taken into confined

spaces but must be hosed from open surface.

Page 39: Health Safety Environment (HSE ) Regulationsdcca.gov.ae/wp-content/uploads/circulars/za-dc-reg-01 health safety... · Health, Safety and Environment Regulations Revision 1 Issue Date

Government of Dubai

Dubai Technology and Media Free Zone Authority Zoning Authority – Development Control

Document no. ZA-DC-REG-01

Revision 1 Issue Date 29.10.08 Health, Safety and Environment Regulations

Page 39 of 104

7(n) Warning lights Suitable flashing lights should be provided around the excavation or trench at every

10 linear meters interval. 7(o) Warning Signs Suitable and sufficient number of warning signs should be provided near the

excavations to warn the people. Reference and Further information: Occupational Safety and Health Administration (OSHA) USA Standard # 1926.650,

1926.651, 1926.652 Code of Construction Safety Practice, Dubai Municipality

Page 40: Health Safety Environment (HSE ) Regulationsdcca.gov.ae/wp-content/uploads/circulars/za-dc-reg-01 health safety... · Health, Safety and Environment Regulations Revision 1 Issue Date

Government of Dubai

Dubai Technology and Media Free Zone Authority Zoning Authority – Development Control

Document no. ZA-DC-REG-01

Revision 1 Issue Date 29.10.08 Health, Safety and Environment Regulations

Page 40 of 104

8.0 Regulations of Scaffolds, Work platforms 8(a) General requirements

1) There shall be suitable and sufficient safe access to and egress from every place at which any person at any time works.

2) No building, wall, chimney, bridge, tunnel, road, gallery, stairway, ramps,

floor, platform, staging or other structure, whether of a permanent or temporary character, shall be constructed, situated or maintained in any construction site in such a manner as to cause risk of bodily injury.

8(b) Provision of scaffoldings

Where work cannot safely be done on or from the ground or from part of a building or other permanent structure, there shall be provided, placed and kept in position for use properly maintained either scaffolds or where appropriate ladders or other means of support, all of which shall be sufficient and suitable for the purpose.

8(c) Supervision of Work and Inspection of Material

No scaffold shall be erected or be substantially added to or altered or be dismantled except under the immediate supervision of a competent workmen possessing adequate experience of such work. All material for any scaffold shall be inspected by a competent person on each occasion before being taken into use. Contractors shall appoint such competent person and shall arrange for their

training as necessary.

8(d) Construction and Material

1) Every scaffold and every part thereof shall be of good construction, of

suitable and sound material and of adequate strength for the purpose for which it is used, satisfying international standards. The contractor/ sub-contractor shall be responsible for the design and safety of scaffold system.

2) Sufficient material shall be provided for and shall be used in the

construction of scaffolds. 3) Scaffold construction should take into consideration the type of work, load-

height and also weather conditions.

Page 41: Health Safety Environment (HSE ) Regulationsdcca.gov.ae/wp-content/uploads/circulars/za-dc-reg-01 health safety... · Health, Safety and Environment Regulations Revision 1 Issue Date

Government of Dubai

Dubai Technology and Media Free Zone Authority Zoning Authority – Development Control

Document no. ZA-DC-REG-01

Revision 1 Issue Date 29.10.08 Health, Safety and Environment Regulations

Page 41 of 104

4) Scaffolds, trestles, ladders, folding step ladders shall not be so painted or treated that defects cannot easily be seen.

5) Metal parts used for scaffolds shall be of suitable quality and be in good

condition and free from corrosion or other patent defect likely to affect their strength materially.

8(e) Defective Material:

1) No defective material or defective part shall be used for a scaffold. 2) No rope or bond which is defective whether through contact with acid or

other corrosion substance or otherwise shall be used.

3) All material and parts of scaffolds shall when not in use is kept under good

condition and apart from any materials or parts unsuitable for scaffolds.

8(f) Maintenance of Scaffolds:

Every scaffold shall be properly maintained and every part shall be kept so fixed, secured or placed in position as to prevent so far as is practicable accidental displacement.

8(g)

Partly Erected or Dismantled Scaffolds:

1) No scaffold or part of a scaffold shall be partly erected or dismantled and remain in such a condition that it is capable of being used unless

The scaffold as so erected or dismantled complies with these regulations

• A prominent warning notice indicating that the scaffold part is not to be used near any point at which the scaffold is liable to be approached for the purpose of use or

• Access to the scaffold or part, as the case may be, is as far as reasonably practicable, effectively blocked.

8(h)

Standards, Uprights, Ledgers and Putlogs

1) Standards or uprights of scaffolds shall

i. Where practicable be either vertical or slightly inclined towards the building or other structure.

Page 42: Health Safety Environment (HSE ) Regulationsdcca.gov.ae/wp-content/uploads/circulars/za-dc-reg-01 health safety... · Health, Safety and Environment Regulations Revision 1 Issue Date

Government of Dubai

Dubai Technology and Media Free Zone Authority Zoning Authority – Development Control

Document no. ZA-DC-REG-01

Revision 1 Issue Date 29.10.08 Health, Safety and Environment Regulations

Page 42 of 104

ii. Be fixed sufficiently close together to secure the stability of the scaffold having regard to all the circumstances.

2) The foot or base of any standard or upright shall be placed on an

adequate base plate in a manner to prevent slipping or sinking or its displacement shall be prevented in some other sufficient way.

3)

Timber sole plates of at least 219 mm wide and 25 mm thick should be laid to support the base plate for standards. The sole plate area should not be less than 1000 cm

2 or for soft material 1700 cm

2

4) Ledgers shall be as nearly as possible horizontal and shall be secured fastened to the standards or uprights by efficient means e.g.: right angle couplers.

5) Put logs or transoms or other supports on which platform rests shall be

securely fastened to the ledgers or to the standards or uprights, or their movement shall be prevented by other efficient means. Where one end of a putlog is supported by a wall, that end shall extend into or on to the wall sufficiently to provide a supporting surface of sufficient area.

6) The distance between two consecutive putlogs and transoms or other

supports on which a platform rests shall be fixed with due regard to the anticipated load and the nature of the platform flooring. The distance with single planking shall not as a general rule exceed 1 meters with planks of 32 mm in thickness, 1.5 meters with planks of 38 mm in thickness, 2.6 meters with planks of 50mm in thickness.

8(i) Ladders used as Uprights in Scaffolds

Ladders serving as uprights in scaffolds

� Be of adequate strength � Be placed so that the two stiles or sides of each ladder are evenly

supported or suspended and � Be secured to prevent slipping

Ladder scaffolds shall be used only if the work is of such a light nature and the material required for the work is such that type of scaffold can be used safely.

8(j) Stability of Scaffolds

1) Every scaffold shall

Page 43: Health Safety Environment (HSE ) Regulationsdcca.gov.ae/wp-content/uploads/circulars/za-dc-reg-01 health safety... · Health, Safety and Environment Regulations Revision 1 Issue Date

Government of Dubai

Dubai Technology and Media Free Zone Authority Zoning Authority – Development Control

Document no. ZA-DC-REG-01

Revision 1 Issue Date 29.10.08 Health, Safety and Environment Regulations

Page 43 of 104

i. Be securely supported or suspended ii. Where necessary be sufficiently and properly strutted or

braced to prevent collapse. iii. Be rigidly connected with the building or other structure unless

the scaffold is so designed and constructed as to ensure stability without such connection.

2) Every structure and appliance used as a support for a scaffold shall

i. Be of sound construction ii. Have a firm footing or be firmly supported iii. Where necessary be sufficiently and properly strutted or

braced to prevent collapse and to ensure stability. 3) Every scaffold which can be moved on wheels or skids (not being a

suspended scaffold or slung scaffold) shall be

i. Constructed with due regard to the stability and if necessary, for stability, be adequately weighted at the base.

ii. Used only on a firm and even surface not so slopping as to involve risk of stability of the scaffold or any load thereon.

iii. Adequately secured to prevent movement when any person is working upon it or upon any ladder or other plant of equipment, being a ladder, plant or equipment which is supported by the scaffold and

iv. Moved only by application of force at or near the base

4) Loose bricks, drain pipes, other unstable material shall not be used for the construction or support of scaffolds. Bricks or small blocks may, if they provided a firm support, be used to support a platform not more than 0.6 meters above the ground or floor.

8(k) Slung Scaffolds

1) No chain, wire rope, lifting gear, metal tube or other means of

suspension for slung scaffolds shall be used unless the following requirements are observed.

i. It is suitable and of adequate strength for the purpose for

which it is used. ii. It is properly and securely fastened to safe anchorage points

and to the scaffold ledgers or other main supporting members.

iii. It is so placed as to ensure stability of the scaffold. iv. It is as nearly vertical as, is reasonably practicable v. It is kept taut.

Page 44: Health Safety Environment (HSE ) Regulationsdcca.gov.ae/wp-content/uploads/circulars/za-dc-reg-01 health safety... · Health, Safety and Environment Regulations Revision 1 Issue Date

Government of Dubai

Dubai Technology and Media Free Zone Authority Zoning Authority – Development Control

Document no. ZA-DC-REG-01

Revision 1 Issue Date 29.10.08 Health, Safety and Environment Regulations

Page 44 of 104

2) No rope other than wire rope shall be used for the suspension of slung scaffold.

3) Where chains or wire ropes are used for the suspension of slung

scaffold, steps shall be taken to prevent such chains or wire ropes coming into contact at points of suspension with edges where this would cause danger.

4) Every slung scaffold shall be secured to prevent undue horizontal

movement while it is used as a working platform.

5) The platform shall be close-boarded and evenly set with each board adequately supported.

6) The frame work for the platform shall be constructed from ledgers and

transoms fixed by right angle couplers.

7) Toe boards of 150 mm (6 inches) above platform level and guard rails 1.05 meter above platform level shall be provided on all sides of the platform.

8(l) Cantilever, Jib, Figure and Bracket Scaffolds

1) No cantilever scaffold or jib scaffold shall be used unless it is

adequately supported, fixed and anchored, has outriggers of adequately length and strength and it where necessary sufficiently and properly strutted or braced to ensure rigidity and stability.

2) No figure scaffold or bracket scaffold supported or held by dogs, spikes

or similar fixings liable to pull out of the stone-work, brick work or other surface in which they are gripped or fixed shall be used.

8(m) Support for Scaffolds etc

1) No part of a building or other structure shall be used as support for a

scaffold, ladder, folding step-ladder or crawling ladder or for part of such equipment, unless the part of the building or other structure is of sound material and sufficiently stable and of sufficient strength to afford safe support.

2) Gutters shall not be used as such supports unless they and their

fixings are suitable and are of adequate strength and in the case of overhanging eaves gutters shall not be so used unless in addition they have been specially designed as walkways.

Page 45: Health Safety Environment (HSE ) Regulationsdcca.gov.ae/wp-content/uploads/circulars/za-dc-reg-01 health safety... · Health, Safety and Environment Regulations Revision 1 Issue Date

Government of Dubai

Dubai Technology and Media Free Zone Authority Zoning Authority – Development Control

Document no. ZA-DC-REG-01

Revision 1 Issue Date 29.10.08 Health, Safety and Environment Regulations

Page 45 of 104

8(n) Suspended Scaffolds

The requirements of this regulation, in addition to regulations relating to lifting

appliances, chains, ropes and lifting gear used in connection therewith, shall be observed in respect of every suspended scaffold and plant or equipment which is permanent, or not, of a building, would be a suspended scaffold not raised or lowered by a power driven lifting appliance. No such suspended scaffold, plant or equipment shall be used unless it complies with the requirements of this regulation.

1) Every suspended scaffold shall be provided with adequate and suitable

chains or ropes and winches or other lifting appliances or similar devices and shall be suspended from suitable outriggers, joists, runways, rail tracks or other equally safe anchorage.

2) The winches or other lifting appliances or similar devices of a

suspended scaffold shall be

i. Provided with a brake or similar devices which comes into operation when the operating handle or lever is released.

ii. Adequately protected against the effects of weather, dust or material likely to cause damage.

3) The outriggers for a suspended scaffold shall be

i. Of adequate length and strength and properly installed and

supported ii. Installed horizontally and provided with adequate stops at

their outer ends. iii. Properly spaced having regard to the construction of the

scaffold and of the runway, joist or rail track on which the scaffold is carried.

4) Where counterweights are used with outriggers, this counterweights

shall be securely attached to the outriggers and shall be not less than three times weight which would counter balance the weight suspended from the outrigger including the weight of the runway, joist, or rail track, the suspended scaffold and persons and other load thereon.

5) The points of suspension every suspended scaffold shall be an

adequate horizontal distance from the face of the building or other structure.

6) Every runway, joist and rail track supporting a suspended scaffold shall

be

i. Of suitable and sound material ii. Of adequate strength for the purpose for which it is used iii. Free from patent defect

Page 46: Health Safety Environment (HSE ) Regulationsdcca.gov.ae/wp-content/uploads/circulars/za-dc-reg-01 health safety... · Health, Safety and Environment Regulations Revision 1 Issue Date

Government of Dubai

Dubai Technology and Media Free Zone Authority Zoning Authority – Development Control

Document no. ZA-DC-REG-01

Revision 1 Issue Date 29.10.08 Health, Safety and Environment Regulations

Page 46 of 104

iv. Provided with adequate stops at each end and v. Properly secured to the building or other structured or where

outriggers are used, to the outriggers.

7) The suspension ropes or chains of a suspended scaffold shall be

i. Securely attached to the outriggers or other supports and to the platform framework or to any lifting appliance or other device attached thereto, as the case may be and kept in tension.

ii. Where winches are used with suspended scaffolds the suspension ropes shall be of such a length that the lowest position at which the scaffold is intended to be used there are not less than two turns of rope remaining on each winch drum and the length of each rope shall be clearly marked on its winch.

8) Every part of a suspended scaffold and all plant and equipment used

for the purpose shall be

i. Of good construction ii. Suitable and sound material iii. Where constructed of metal, free from corrosion.

9) Adequate arrangements shall be made to prevent undue tipping, tilting

and swinging of a suspended scaffold, and to ensure it to prevent undue horizontal movement while it is being used as a working platform.

10) No rope other than a wire rope shall be used for raising, lowering and

suspension of a suspended scaffold.

11) If a suspended scaffold is carried on fiber ropes and pulley blocks, rope shall be spaced not more than 3.20 meters apart.

12) The platform of every suspended scaffold shall be:

i. Closely boarded, planked or plated and ii. Of adequately width to afford adequate working space at every

Working point and shall, in any event iii. At least 600 millimeters wide, if used as a footing only and not

for the deposit of any material. iv. At least 800 millimeters wide if used for the men and deposit of

material. v. Acceptable to 430 mm wide if it is cradle of light weight. vi. Not be used for the support of any higher scaffold. vii. So arranged or secured that at each working position the

space between the face of the building or structure and the platform is as small as reasonably practicable. Where

Page 47: Health Safety Environment (HSE ) Regulationsdcca.gov.ae/wp-content/uploads/circulars/za-dc-reg-01 health safety... · Health, Safety and Environment Regulations Revision 1 Issue Date

Government of Dubai

Dubai Technology and Media Free Zone Authority Zoning Authority – Development Control

Document no. ZA-DC-REG-01

Revision 1 Issue Date 29.10.08 Health, Safety and Environment Regulations

Page 47 of 104

workmen sit at the edge of the platform to work there may be a space not exceeding 300 millimeter.

8(o) Boatswain’s Chairs, Cages, Skips etc. (Not Power operated)

1) No boatswain’s chair, cage, skip or similar plant or equipment, not

power driven appliance, shall be used unless i. It is of good construction, suitable and sound material, and

adequate strength, free from patent defect and properly maintained.

ii. The outriggers or other supports are of adequate strength and properly installed and supported.

iii. Chairs, ropes and lifting gears are firmly secured to the outriggers and to the chair, skip etc.

iv. Suitable means are provided to prevent any occupant falling out. v. It is free of materials or articles liable to interface with the

occupant’s handhold or foothold or otherwise endanger him. vi. Suitable measures are taken to prevent spinning or tipping in a

manner dangerous to any occupant. vii. In the case of any skip or other receptacle it is at least 0.91 meters

deep. viii. It’s installation and use should be supervised by competent

person. ix. Boatswain’s chair, cage, skip or similar plant or equipment not

power operated, shall be used as a working place only when the work would not take long enough to make use of a suspended scaffold reasonably practicable.

8(p) Trestle scaffold

1) All trestles and support used for the construction of any trestles

scaffold shall be

i. Of good construction, suitable and sound material. ii. Of adequate strength for the purpose for which they are used

and free from patent defects. iii. Properly maintained.

2) A trestle scaffold shall not be used:

i. If the scaffold is so situated that a person would be

liable to fall from it’s working platform a distance of more than 4.5 meters or

ii. If constructed with more than one tier where folding supports are used.

Page 48: Health Safety Environment (HSE ) Regulationsdcca.gov.ae/wp-content/uploads/circulars/za-dc-reg-01 health safety... · Health, Safety and Environment Regulations Revision 1 Issue Date

Government of Dubai

Dubai Technology and Media Free Zone Authority Zoning Authority – Development Control

Document no. ZA-DC-REG-01

Revision 1 Issue Date 29.10.08 Health, Safety and Environment Regulations

Page 48 of 104

3) No trestle scaffold shall be erected on a scaffold platform unless:

i. The width of the said platform is such as to leave sufficient clear space for the transport of material along the platform and

ii. The trestles or supports are firmly attached to the platform and adequately braced to prevent displacement.

8(q) Inspection of Scaffolds, Boatswain’s Chair etc

1) No scaffold, or boatswain’s chair etc shall be used unless:

i. It has been inspected during the previous 7 days by a

competent person. ii. It has been inspected after a rough weather conditions

likely to have affected it’s strength or stability or to have displaced any part

iii. The details of each inspection are recorded. Records are not required for scaffolds under 2 meters in height or for ladder or trestle scaffolds.

8(r) Scaffolds used by workmen of different contractors

Where a scaffold or part of a scaffold is to be used by employees of the contractor or sub-contractor or any employer, the main contractor as well as other sub-contractors/ employers shall ensure that any scaffolding used by their employees are sound and safe in position.

8(s) Construction of Working Platform, Gangways and Runs

1) Every working platform, gangway and run from any part of which a person

is liable to fall a distance of more than 2 meters and being struck by materials falling through the platform shall be

i. Closely boarded, planked or plated and ii. Secured so that the gap between adjacent boards, planks or plates

does not exceed 25 millimeters.

2) No gangway or run with the slope, exceeding vertical to 1.5 horizontal shall be used.

Page 49: Health Safety Environment (HSE ) Regulationsdcca.gov.ae/wp-content/uploads/circulars/za-dc-reg-01 health safety... · Health, Safety and Environment Regulations Revision 1 Issue Date

Government of Dubai

Dubai Technology and Media Free Zone Authority Zoning Authority – Development Control

Document no. ZA-DC-REG-01

Revision 1 Issue Date 29.10.08 Health, Safety and Environment Regulations

Page 49 of 104

3) Gangways or runs must be fitted with stepping laths if the surface is slippery or if the slope is steeper.

8(s) (1) Boards and Planks in Working Platforms, Gangways and Runs

1) Every board or plank forming part of a working platform, gangway or run

shall

� Afford adequate security having regard to the distance between putlog and other supports.

� Be not less than 200 millimeters wide and 50 millimeters thick. � Not project beyond its end support by more than 4 times the

thickness of the board unless it is effectively secured to prevent tipping.

� Be provided with adequate beveled pieces to minimize tipping

8(s) (2) Board or planks

i. Every board or plank should

� Rest securely and evenly on it’s supports � Have at least 3 supports unless it is strong and thick enough not to

have excessive sagging.

ii. Working platforms shall extend, wherever practicable, at least 600 millimeters beyond the end wall or working face where work is to be carried out.

8(s) (3) Width of Working Platform

1) Every working platform from which a person is liable to fall a distance of

more than 2 meter shall

i. Be 600 millimeters wide (3 boards) when used for persons only and not for materials.

ii. Be 800 millimeters wide (4 boards) when used for persons and for the deposit of materials. There must be 430 mm passage left for persons. If barrows are to be used, the passage must be increased to 600mm.

iii. Be 1.05 meters wide (5 boards) if used to carry a trestle or any other higher platform.

iv. Be 1.30 meters wide (6 boards) if used to dress or roughly shape stone.

Page 50: Health Safety Environment (HSE ) Regulationsdcca.gov.ae/wp-content/uploads/circulars/za-dc-reg-01 health safety... · Health, Safety and Environment Regulations Revision 1 Issue Date

Government of Dubai

Dubai Technology and Media Free Zone Authority Zoning Authority – Development Control

Document no. ZA-DC-REG-01

Revision 1 Issue Date 29.10.08 Health, Safety and Environment Regulations

Page 50 of 104

v. Be 1.50 meters wide (7 boards) if used for the support for any higher platform and used to dress or roughly shaped stone.

2) 430 millimeters wide platform are however permitted

i. On ladder scaffolds, folding trestle scaffolds, slung scaffolds in the

vicinity of a roof and suspended scaffolds when the work is light and of short duration.

ii. For work on spherical or cylindrical metal structure

3) The space between the edge of the working platform and face of the building shall be as small as practicable. Where workmen sit on the edge of the platform to do their work, a space not exceeding 300mm shall be permitted.

8(s)(4) Width of Gangways and Runs:

Every gangway or run shall

i. Be 430mm wide if used for the passage of persons only. ii. Be 600mm wide if used for passage of materials.

8(t) Guard-rails and Toe-boards at working platforms and places:

1) Every side of a working platform or working place from where a person is

liable to fall a distance of more than 2 meters shall be provided with

i. Guard rail (top rail) to a height of 1.15 meters above the platform or place.

ii. An intermediate guard rail at not more than 765 mm height. iii. Toe board of at least 150mm high

2) Guard rails and toe boards may be removed for access purposes, but must

be replaced as soon as possible afterwards.

3) On the side of a suspended scaffold next to the wall or working face

i. The guard rails need not extent to a height of more than 700 mm above the platform, if the work is impractical with a guard rail at a greater height.

ii. Where workers sit on the edge of the platform, guard rail and toe boards need not be fitted, if ropes or chains provide a safe handhold.

Page 51: Health Safety Environment (HSE ) Regulationsdcca.gov.ae/wp-content/uploads/circulars/za-dc-reg-01 health safety... · Health, Safety and Environment Regulations Revision 1 Issue Date

Government of Dubai

Dubai Technology and Media Free Zone Authority Zoning Authority – Development Control

Document no. ZA-DC-REG-01

Revision 1 Issue Date 29.10.08 Health, Safety and Environment Regulations

Page 51 of 104

8(u) Guard-rails and toe-boards are not required on

1) Ladder scaffoldings if a secure handhold is provided along the full length of

the platform.

2) Platform used for only a short period for riveting, bolting or jointing steel or pre-cast concrete framing if

i. There is a adequate handhold ii. Width is at least 800mm iii. There are no loose materials. iv. The platforms at a concave face or a cylindrical or

spherical structure if other steps are taken to prevent falls of more than 2 meters.

8(v) Guard-Rails for Gangways, Runs and Stairs

1) Stairs shall be provided throughout their length with hand-rails and

continued beyond the end of the stairs.

2) Every side of the gangway, run or stairs shall be provided with

i. A guard rail to a height of 1.15 meters. ii. A toe-board of at least 150 mm high except in case of stairs. iii. Intermediate railing at a height not more than 765 mm above the

toe-board.

3) Guard-rails and toe-boards are not required on temporary gangways used in erecting any framework forming part of a building or other permanent structure for work of short duration.

4) Guard-rails and toe-boards may be removed for access purposes but must

be replaced as soon as possible afterwards.

5) Where persons are required to work or pass under the scaffold, scaffolds shall be provided with a screen between the toe-board and the guard-rail extending along the entire opening.

8(w) Platform, gangways, runs and stairs, etc to afford Safe Foothold

a) All platform, gangway, run or stair shall be

� Free from slippery conditions by cleaning, sanding.

Page 52: Health Safety Environment (HSE ) Regulationsdcca.gov.ae/wp-content/uploads/circulars/za-dc-reg-01 health safety... · Health, Safety and Environment Regulations Revision 1 Issue Date

Government of Dubai

Dubai Technology and Media Free Zone Authority Zoning Authority – Development Control

Document no. ZA-DC-REG-01

Revision 1 Issue Date 29.10.08 Health, Safety and Environment Regulations

Page 52 of 104

� Kept free from all rubbish and projecting nails.

8(x) Loads on scaffolds

a) A scaffold shall not be overloaded and the load shall be evenly distributed. b) Material or loads shall be moved or deposited without imposing any violent

shock. c) Material shall not be kept upon a scaffold unless needed for work within a

reasonable time.

8(y) Prevention of falls and provision of Safety Nets

a) In addition to the requirements stated in the previous regulation, protection

against falls shall be provided by the use of safety nets.

Keeping of records:

• The reports on inspection of scaffolds shall be kept on the site of the operations or works and shall be available to the Zoning Authority for inspection.

• The inspection of scaffolds shall be done by competent persons appointed by the contractor.

Scaffold inspection reports should contain:

� Name and title of contractor � Address of the site � Date of work commencement � Location and description of scaffold, plant or equipment inspected. � Date of inspection � Result of inspection � Name and signature of the person who made the inspection.

Reference and Further information: Occupational Health and Safety Administration (OSHA) USA Standard # 1926.450,

1926.451, 1926.452 Code of Construction Safety Practice, Dubai Municipality

Page 53: Health Safety Environment (HSE ) Regulationsdcca.gov.ae/wp-content/uploads/circulars/za-dc-reg-01 health safety... · Health, Safety and Environment Regulations Revision 1 Issue Date

Government of Dubai

Dubai Technology and Media Free Zone Authority Zoning Authority – Development Control

Document no. ZA-DC-REG-01

Revision 1 Issue Date 29.10.08 Health, Safety and Environment Regulations

Page 53 of 104

9.0 Construction and Maintenance of Ladders and Folding Step Ladders

9(a)

1) Every ladder and folding step ladder (other than the roof ladder and crawling boards) shall be

i. Of good construction, of suitable and sound material ii. Maintained properly

2) No ladder shall be used in which a rung is missing or is defective.

3) Every rung of a ladder shall be properly fixed to the stiles or sides.

4) No ladder shall be used in which any rung depends for its support solely on

nails, spikes or other similar fixing.

9(b) Use of Ladders and Folding Step Ladders

1) No ladder standing on a base shall be used unless

i. It is securely fixed near to its upper resting place or in the case

of a vertical ladder, near to its upper end. ii. It has a level and firm footing and is not standing on loose

blocks/ bricks. iii. It is secured to prevent undue swaying or sagging and iv. It is equally and properly supported on each stile or side.

2) If a ladder, standing on the ground cannot be fixed to prevent slipping, then

someone shall hold it at the base when it is being used 3) No ladder shall be used unless

i. It extends to a height of at least 1.0 meter above the place of

landing or the highest rung to be reached or ii. There is other hand hold and iii. There is sufficient space at each rung to provide adequate foot

hold.

4) Portable ladders shall be used at such a pitch that the horizontal distance from the top support to the foot of the ladder is about one quarter of the working length of the ladder.

5) No ladder shall be used in a horizontal position as platforms, runways or scaffolds, portable metal ladders shall not be used for electrical work or where they may contact electrical conductors.

6) No folding step-ladder shall be used unless; it has been a level and firm footing.

Page 54: Health Safety Environment (HSE ) Regulationsdcca.gov.ae/wp-content/uploads/circulars/za-dc-reg-01 health safety... · Health, Safety and Environment Regulations Revision 1 Issue Date

Government of Dubai

Dubai Technology and Media Free Zone Authority Zoning Authority – Development Control

Document no. ZA-DC-REG-01

Revision 1 Issue Date 29.10.08 Health, Safety and Environment Regulations

Page 54 of 104

7) When using extension ladder, the overlap of any two adjacent sections shall be closed length of ladder less than 5 m-1.5 rungs, (5m-6m)- 2.5 rungs, over 6m-3.5 rungs.

8) No ladder or run of ladder rising a vertical distance of over 6 meters shall be used it is provided with intermediate landing place at every 6 meters distance.

9) The landing place shall be of adequate dimension and be provided with guard rails to a height of 1.15 meters with toe-boards of 150mm high.

10) The intermediate railing is to be provided between toe-boards and guard-rail.

11) Where a ladder passes through an opening in the floor of a landing place, the opening shall be as small as is reasonably practicable.

Reference and Further information: Occupational Safety and Health Administration (OSHA) USA Standard # 1926.1050,

1926.1051, 1926.1052, 1926.1053 Code of Construction Safety Practice, Dubai Municipality

10.0 Openings, Corners, Breaks, Edges & Open Joisting:

a) Every opening, corner, break or edge being an opening in or of a roof, floor, wall, platform, gangway or run or other part, through which any person is liable to fall a distance of more than 2 meters or fall into liquid or other material shall be provided with

� A standard guard-rail of 1.15 meters high � Toe-board of 150 millimeters high � Intermediate railing at 765 millimeters � Or suitable strong covers or barriers securely fixed.

b) Guard-rails and covers may be removed to provide access for men and

material but it must be replaced as soon as practicable. c) Holes, edges etc created in structures by demolition work, do not required

guard-rails, toe-boards or covers provided they are not left unattended.

11.0 Sloping and Fragile Roof:

a) Risk Assessment should be carried out before staring the work on sloping and fragile roof.

b) A safe system of work should be established and implemented by main contractor

c) A full time competent supervision should be maintained at all times during work on sloping and fragile roof.

d) Suitable and sufficient edge protections should be provided to prevent falling of workers while working on sloping and fragile roof.

Reference and Further Information: HSE-Working on Roof Information sheet INDG 284

Page 55: Health Safety Environment (HSE ) Regulationsdcca.gov.ae/wp-content/uploads/circulars/za-dc-reg-01 health safety... · Health, Safety and Environment Regulations Revision 1 Issue Date

Government of Dubai

Dubai Technology and Media Free Zone Authority Zoning Authority – Development Control

Document no. ZA-DC-REG-01

Revision 1 Issue Date 29.10.08 Health, Safety and Environment Regulations

Page 55 of 104

12.0 Reversing Vehicles at site

a) This regulation requires contractors to provide and maintain systems of work which are, so far as is reasonably practicable, safe. This also requires employers to take all reasonably practicable precautions to ensure the safety of their workers and members of the public. This regulation requires the organization of traffic routes to ensure safety and their maintenance in an adequate condition. This regulation also requires contractors to assess all risks to the health and safety of their employees and anyone else who may be affected by their work activity. This risk assessment will identify what measures they need to take to comply with the regulations. This Regulation also requires contractors to provide their employees with adequate health and safety training. This means that contractor should look critically at how people can be put at risk and consider how reversing can be done safely and then take any reasonably practicable measures to reduce the risk of injury.

MOVE TOWARDS GUIDE towards the body.

Reference and Further Information: Management of Health and Safety at Work Approved Code of Practice (UK) HSE-Workplace Transport Safety Information Sheet (UK)

13.0 Protection from Falling Material:

a) At any place on the site of the operations or works or adjoining streets, pedestrian way or place where any person including public, is employed or otherwise moving, preventive steps shall be taken to protect persons from being struck by any falling material or article.

b) Scaffold materials, tools or other objects and materials including waste

material shall not be thrown, tipped or shot down from a height where they are liable to cause injury. The material shall be lowered down with adequate safety precautions.

c) Where any part of building or other structure is being demolished or broken

off adequate steps shall be taken to protect employees as well as public from falling or flying debris.

d) Adequate preventive/ protective measures shall be taken to prevent

spillage/ falling of cement, cement mortar, concrete, paint, water or any other loose materials on/in neighboring buildings/ structures/ plots.

Page 56: Health Safety Environment (HSE ) Regulationsdcca.gov.ae/wp-content/uploads/circulars/za-dc-reg-01 health safety... · Health, Safety and Environment Regulations Revision 1 Issue Date

Government of Dubai

Dubai Technology and Media Free Zone Authority Zoning Authority – Development Control

Document no. ZA-DC-REG-01

Revision 1 Issue Date 29.10.08 Health, Safety and Environment Regulations

Page 56 of 104

14.0 Construction of Temporary Structures: 14(a)

1) Any temporary structure erected for the purpose of operation or works at

site (not being scaffold or other structure) shall be

i. Of good construction and adequate strength and stability ii. Of sound material, free from patent defects. iii. Properly maintained

2) The design and erection of false work should take into consideration

i. Estimation of load ii. Erection process- material, foundation load, construction details iii. Inspection- checking at each stage iv. Procedure for dismantling

14(b)

Avoidance of Danger from Collapse of Structure:

1) All practicable precautions shall be taken by the use of temporary guys,

stays, supports and fixings where necessary to prevent danger to any person employed or public through the collapse of any part of a building or other structure during any state of weakness or instability.

2) Where any work is done which may affect the foundations or the stability of

an adjacent structure, shoring or other safeguards shall be provided.

15.0 Provision of welfare facilities at construction sites:

a) Whoever has overall (Main contractor) control of the construction site is

responsible for ensuring that the suitable and sufficient welfare facilities (sanitation, rest areas, washing facility, drinking water) should be provided and maintained in good hygienic condition at all times.

b) The detailed layout of welfare facilities such as sanitation, rest areas, washing facility, drinking water facility on site should be submitted to Zoning Authority – Development Control along with other required information (Refer: 5(k)) in order to obtain approval for site allocation.

Reference and Further information: Construction (Health, Safety and Welfare) Regulations 1996 UK Provision of Welfare facilities at fixed construction sites (Rev 1) HSE Books 1998

Page 57: Health Safety Environment (HSE ) Regulationsdcca.gov.ae/wp-content/uploads/circulars/za-dc-reg-01 health safety... · Health, Safety and Environment Regulations Revision 1 Issue Date

Government of Dubai

Dubai Technology and Media Free Zone Authority Zoning Authority – Development Control

Document no. ZA-DC-REG-01

Revision 1 Issue Date 29.10.08 Health, Safety and Environment Regulations

Page 57 of 104

16.0 Personal Protective Equipments (PPE) at Work

a) Employers/ main contractors have basic duties concerning the provision and use of personal protective equipment (PPE) at work and this regulation explains what contractor need to do to meet the requirements of the Personal Protective Equipment at work.

b) Personal Protective Equipment is to be supplied and used at work wherever there are risks to health and safety that cannot be adequately controlled in other ways.

c) Contractors should properly assess the Personal Protective Equipments

before use to ensure it’s suitability for the different hazards.

d) All the Personal Protective Equipments (PPE) should conform to international standards.

e) Personal Protective Equipments should be supplied to employees free of

cost

f) Contractor should provide information and instructions to workers on how

to use Personal Protective Equipments safely. Reference and Further information: Occupational Safety and Health Administration (OSHA) USA Standard # 1926.95

17.0 Fire Safety Regulations

a) Main contractor should carry out fire risk assessment and take adequate safety precautions to prevent fire at project site.

b) Main contractor should ensure suitable and sufficient fire fighting system is

available and maintained in good working condition at all times to suppress the fire.

c) Main contractor should ensure that all those on site reach safe assembly

point as soon as possible.

d) Main contractor should provide suitable and sufficient number of emergency escape arrangements so that all those on site reach safe assembly point as soon as possible.

e) Contractor should have emergency plans to ensure that everyone on site

reaches safe assembly points if there is a fire. Small and low-risk sites only require very simple plans, but higher risk sites will need more careful and detailed consideration.

Page 58: Health Safety Environment (HSE ) Regulationsdcca.gov.ae/wp-content/uploads/circulars/za-dc-reg-01 health safety... · Health, Safety and Environment Regulations Revision 1 Issue Date

Government of Dubai

Dubai Technology and Media Free Zone Authority Zoning Authority – Development Control

Document no. ZA-DC-REG-01

Revision 1 Issue Date 29.10.08 Health, Safety and Environment Regulations

Page 58 of 104

g) An emergency plan should:

i. be available before work starts ii. be up to date and appropriate for the circumstances concerned; iii. make clear who does what during a fire

h) On larger high-risk sites fire drills may be appropriate. On smaller sites

i. You should know what you need to do if there is a fire; ii. Managers need to make sure that everyone on their sites knows

what to do; iii. Regular checks should be made to ensure that fire precautions are

in place.

i) Fire action notices should be clearly displayed where everyone on site will see them, for example at fire points, site entrances or canteen areas.

Reference and Further information:

Occupational Safety and Health Administration (OSHA) USA Standard # 1926.150,

1926.151

18.0 First-aid Regulations

18(a)

1) In every site, there shall be a first-aid box or cupboard provided, maintained and readily accessible during all working hours with the minimum prescribed contents as given in Table (1) in HSE Guidelines.

2) Where the number of workers is more than 150, but less than 250, one more additional unit (complete set) shall be kept in the premises.

3) Each first-aid box or cupboard should be placed in a clearly identified and readily accessible location.

4) Boxes and kits should be checked frequently to ensure they are fully stocked and all items are in a usable condition.

5) The first-aid box or cupboard should protect the contents from dampness and dust.

6) Where there are 250 or more workers at work, a first-aid room of size 100 sq. feet contains the prescribed equipment and material under the charge of a qualified first-aider possessing a certificate approved by ministry of health, U.A.E.

7) Suitable and sufficient information signs should be placed at appropriate places on site to identify the nearest access to first aid facility incase of an emergency.

Page 59: Health Safety Environment (HSE ) Regulationsdcca.gov.ae/wp-content/uploads/circulars/za-dc-reg-01 health safety... · Health, Safety and Environment Regulations Revision 1 Issue Date

Government of Dubai

Dubai Technology and Media Free Zone Authority Zoning Authority – Development Control

Document no. ZA-DC-REG-01

Revision 1 Issue Date 29.10.08 Health, Safety and Environment Regulations

Page 59 of 104

18(b) The first-aid room should:

1) be readily available and used only for rendering of first-aid contain the

items listed in 18(d) in addition to the first-aid materials 2) The name of the first-aider should be exhibited in the premises. 3) The employer should ensure that adequate facilities are available to call

physician or ambulance or contact any other agency or to transport the injured person from the workplace.

4) The copy of the certificate of first- aider shall be displayed in first aid room.

18(c) The contractor should keep a record of:

1) Name of the injured 2) Date and time 3) Type or nature of injury or illness 4) First-aid or treatment given 5) References to Hospital made if any.

18(d) FIRST AID ROOM SHOULD CONTAIN THE FOLLOWING IN ADDITION

TO THE FIRST AID BOX OR CUPBOARD CONTENTS

1) A Stretcher 2) Wheel Chair 3) A sink with hot and cold running water 4) Drinking water 5) Paper Towels, soap and nail brushes 6) Smooth topped impermeable work surfaces 7) Clean garments for use by first-aider 8) Clinical thermometer 9) One wash bottle 10) A couch with pillow and blankets frequently cleaned 11) Dressing Trolley (2 shelves with castor wheels) 12) Kidney Tray Medium size - 2 Nos. 13) Splints of different size.

Reference and Further information: Dubai Municipality Guidelines on First Aid Requirements

Page 60: Health Safety Environment (HSE ) Regulationsdcca.gov.ae/wp-content/uploads/circulars/za-dc-reg-01 health safety... · Health, Safety and Environment Regulations Revision 1 Issue Date

Government of Dubai

Dubai Technology and Media Free Zone Authority Zoning Authority – Development Control

Document no. ZA-DC-REG-01

Revision 1 Issue Date 29.10.08 Health, Safety and Environment Regulations

Page 60 of 104

19.0 Regulations for the Reduction of Construction/ Demolition Noise

a) Noise from any construction or demolition site must comply with

the requirements of Article 42, of Administrative Order No. 211/91. Continuous noise levels should not exceed 55 dBA during the period 7:00 A.M - 8:00 P.M and 45 dBA during the period 8:00 P.M - 7:00 A.M.

b) Contractor must consider noise reduction in the site layout, planning and execution phases.

c) Access roads to the site should be positioned such that vehicular movements cause minimum disturbances to residential buildings.

d) Heavy vehicle movements to and from the site must only be made during the scheduled normal working hours unless approval has been granted by the Zoning Authority.

e) Where possible, any heavy equipment with an internal combustion engine should not be left standing with its engine operating in a street adjacent to a residential area.

f) Work must not extend beyond the hours listed in regulation 19(a) without the prior approval of ZADC. In cases where work is approved to be extended beyond the normal working hours specified in regulation 19(a) and the noise of this activity will impact in a residential area, then the affected premises should be notified of the intended work, its duration and times of occurrence.

g) Work that creates the most noise should be scheduled to minimize the impact on residential premises.

h) Construction materials shall be properly handled so that the minimum noise is generated. Materials should be handled gently and if possible cushions should be provided to reduce impact noise.

i) In noise sensitive areas acoustic treatment shall be provided to equipment and other noise sources where practicable.

NORMAL WORKING HOURS 6:00 A.M to 7:00 P.M - Saturday to Thursday 7:00 A.M to 8:00 P.M - Friday and Public Holiday

Reference and Further information: Occupational Safety and Health Administration (OSHA) USA Standard # 1926.51 Dubai Municipality Guidelines

Page 61: Health Safety Environment (HSE ) Regulationsdcca.gov.ae/wp-content/uploads/circulars/za-dc-reg-01 health safety... · Health, Safety and Environment Regulations Revision 1 Issue Date

Government of Dubai

Dubai Technology and Media Free Zone Authority Zoning Authority – Development Control

Document no. ZA-DC-REG-01

Revision 1 Issue Date 29.10.08 Health, Safety and Environment Regulations

Page 61 of 104

20.0 Control of Substances Hazardous to Health

(COSHH) Regulations e to the Regulations

2

This a) This regulation requires employers to control exposure to hazardous

substances to prevent ill health. Contractors have to protect both employees and others who may be exposed by complying with the Control of Substances Hazardous to Health Regulations (COSHH). Contractors should assess risks, implement measures needed to control exposure and establish good working practices.

b) Risk to health from hazardous substances used should be assessed

properly and adequate measures should be implemented to prevent or control employees being exposed to hazardous substances.

c) Where preventing exposure is not reasonably practicable, then

substances hazardous to health should be adequately controlled. d) Emergency plans and procedures should be in place to deal with

accidents, incidents and emergencies involving hazardous substances. e) All the employees should be properly informed, trained before using

the substances hazardous to health. f) Adequate competent supervision should be maintained at all times by

main contractor to ensure safe usage of substances hazardous to health.

Reference and Further information: Control of Substances Hazardous to Health (COSHH) Regulations 2002 UK

Page 62: Health Safety Environment (HSE ) Regulationsdcca.gov.ae/wp-content/uploads/circulars/za-dc-reg-01 health safety... · Health, Safety and Environment Regulations Revision 1 Issue Date

Government of Dubai

Dubai Technology and Media Free Zone Authority Zoning Authority – Development Control

Document no. ZA-DC-REG-01

Revision 1 Issue Date 29.10.08 Health, Safety and Environment Regulations

Page 62 of 104

21.0 Regulations for temporary labour Camps at project sites

21.0(a)

Establishment of labour camp on project site is strictly prohibited without obtaining prior approval from Zoning Authority – Development Control. 21.0 (a)(1) "Site" All sites used for camps shall be adequately drained. They shall not be located within 200 feet of swamps, pools, sink holes, or other surface collections of water unless such quiescent water surfaces can be subjected to mosquito control measures. The camp shall be located so the drainage from and through the camp will not endanger any domestic or public water supply. All sites shall be graded, ditched, and rendered free from depressions in which water may become a nuisance. All sites shall be adequate in size to prevent overcrowding of necessary structures. 21.0 (a)(2) The grounds and open areas surrounding the shelters shall be maintained in a clean and sanitary condition free from rubbish, debris, waste paper, garbage, or other refuse.

21.0(b) "Shelter" 21.0(b)(1) Every shelter in the camp shall be constructed in a manner which will provide protection against the elements. 21.0(b)(2) Each room used for sleeping purposes shall contain at least 50 square feet of floor space for each occupant. At least a 7-foot ceiling shall be provided. 21.0(b)(3) Beds, cots, or bunks, and suitable storage facilities such as wall lockers for clothing and personal articles shall be provided in every room used for sleeping purposes. Such beds or similar facilities shall be spaced not closer than 36 inches both laterally and end to end, and shall be elevated at least 12 inches from the floor. If double-deck bunks are used, they shall be spaced not less than 48 inches both

Page 63: Health Safety Environment (HSE ) Regulationsdcca.gov.ae/wp-content/uploads/circulars/za-dc-reg-01 health safety... · Health, Safety and Environment Regulations Revision 1 Issue Date

Government of Dubai

Dubai Technology and Media Free Zone Authority Zoning Authority – Development Control

Document no. ZA-DC-REG-01

Revision 1 Issue Date 29.10.08 Health, Safety and Environment Regulations

Page 63 of 104

laterally and end to end. The minimum clear space between the lower and upper bunk shall be not less than 27 inches. Triple-deck bunks are prohibited. 21.0(b)(4) The floors of each shelter shall be constructed of wood, asphalt, or concrete. Wooden floors shall be of smooth and tight construction. The floors shall be kept in good repair. 21.0(b)(5) All wooden floors shall be elevated not less than 1 foot above the ground level at all points to prevent dampness and to permit free circulation of air beneath. 21.0(b)(6) All living quarters shall be provided with windows the total of which shall be not less than one-tenth of the floor area. At least one-half of each window shall be so constructed that it can be opened for purposes of ventilation. 21.0(b)(7) All exterior openings shall be effectively screened with mesh material. All screen doors shall be equipped with self-closing devices. 21.0(b)(8) In a room where workers live and sleep a minimum of 50 square feet per person shall be provided. Sanitary facilities shall be provided for storing and preparing food. 21.0(b)(9) All heating, cooking, and water heating equipment shall be installed in accordance with DM regulations governing such installations. If a camp is used during hot weather, adequate air conditioning equipment shall be provided. 21.0(c)

"Water supply" 21.0(c)(1) An adequate and convenient water supply, approved by the appropriate DM health authority, shall be provided in each camp for drinking, cooking, bathing, and laundry purposes. 21.0(c)(2)

Page 64: Health Safety Environment (HSE ) Regulationsdcca.gov.ae/wp-content/uploads/circulars/za-dc-reg-01 health safety... · Health, Safety and Environment Regulations Revision 1 Issue Date

Government of Dubai

Dubai Technology and Media Free Zone Authority Zoning Authority – Development Control

Document no. ZA-DC-REG-01

Revision 1 Issue Date 29.10.08 Health, Safety and Environment Regulations

Page 64 of 104

A water supply shall be deemed adequate if it is capable of delivering 35 gallons per person per day to the campsite at a peak rate of 2 1/2 times the average hourly demand. 21.0(c)(3) The distribution lines shall be capable of supplying water at normal operating pressures to all fixtures for simultaneous operation. Water outlets shall be distributed throughout the camp in such a manner that no shelter is more than 100 feet from a yard hydrant if water is not piped to the shelters. 21.0(d) "Toilet facilities" 21.0(d)(1) Toilet facilities adequate for the capacity of the camp shall be provided. 21.0(d)(2) Each toilet room shall be located so as to be accessible without any individual passing through any sleeping room. Toilet rooms shall have a window not less than 6 square feet in area opening directly to the outside area or otherwise be satisfactorily ventilated. All outside openings shall be screened with mesh material. No fixture, water closet, chemical toilet, or urinal shall be located in a room used for other than toilet purposes. 21.0(d)(3) A toilet room shall be located within 200 feet of the door of each sleeping room. No toilet room shall be closer than 100 feet to any sleeping room, dining room, lunch area, or kitchen. 21.0(d)(4) Urinals shall be provided on the basis of one unit or 2 linear feet of urinal trough for each 25 men. The floor from the wall and for a distance not less than 15 inches measured from the outward edge of the urinals shall be constructed of materials impervious to moisture. Where water under pressure is available, urinals shall be provided with adequate water flush. Urinal troughs shall drain freely into the pit or vault and the construction of this drain shall be such as to exclude flies and rodents from the pit. 21.0(d)(5) Every water closet installed shall be located in a toilet room. 21.0(d)(6)

Page 65: Health Safety Environment (HSE ) Regulationsdcca.gov.ae/wp-content/uploads/circulars/za-dc-reg-01 health safety... · Health, Safety and Environment Regulations Revision 1 Issue Date

Government of Dubai

Dubai Technology and Media Free Zone Authority Zoning Authority – Development Control

Document no. ZA-DC-REG-01

Revision 1 Issue Date 29.10.08 Health, Safety and Environment Regulations

Page 65 of 104

Each toilet room shall be lighted naturally or artificially by a safe type of lighting at all hours of the day and night. 21.0(d)(7) Toilet rooms shall be kept in a sanitary condition. They shall be cleaned at least daily. 21.0(e) "Sewage disposal facilities" In camps where public sewers are available, all sewer lines and floor drains from buildings shall be connected thereto.

21.0(f) "Laundry, hand washing, and bathing facilities" 21.0(f)(1) Laundry, hand washing, and bathing facilities shall be provided in the following ratio: 21.0(f)(1)(i) Hand wash basin per six persons in shared facilities should be provided. 21.0(f)(1)(ii) Shower head for every 10 persons should be provided. 21.0(f)(1)(iii) Laundry tray or tub for every 30 persons should be provided. 21.0(f)(2) Floors shall be of smooth finish but not slippery materials, they shall be impervious to moisture. Floor drains shall be provided in all shower baths, shower rooms, or laundry rooms to remove waste water and facilitate cleaning. All junctions of the curbing and the floor shall be covered. The walls and partitions of shower rooms shall be smooth and impervious to the height of splash. 21.0(f)(3) An adequate supply of hot and cold running water shall be provided for bathing and laundry purposes. Facilities for heating water shall be provided.

Page 66: Health Safety Environment (HSE ) Regulationsdcca.gov.ae/wp-content/uploads/circulars/za-dc-reg-01 health safety... · Health, Safety and Environment Regulations Revision 1 Issue Date

Government of Dubai

Dubai Technology and Media Free Zone Authority Zoning Authority – Development Control

Document no. ZA-DC-REG-01

Revision 1 Issue Date 29.10.08 Health, Safety and Environment Regulations

Page 66 of 104

21.0 (f)(4) Facilities for drying clothes shall be provided.

21.0 (g) "Lighting" Where electric service is available, each habitable room in a camp shall be provided with at least one ceiling-type light fixture and at least one separate floor- or wall-type convenience outlet. Laundry and toilet rooms and rooms where people congregate shall contain at least one ceiling- or wall-type fixture. Light levels in toilet and storage rooms shall be at least 20 foot-candles 30 inches from the floor. Other rooms, including kitchens and living quarters, shall be at least 30 foot-candles 30 inches from the floor.

21.0(h) "Refuse disposal" 21.0 (h)(1) Fly-tight, rodent-tight, impervious, cleanable or single service containers, approved by Dubai Municipality health authority shall be provided for the storage of garbage. At least one such container shall be provided for each shelter and shall be located within 100 feet of each shelter on a wooden, metal, or concrete stand. 21.0 (h)(2) Garbage containers shall be kept clean. 21.0 (h)(3) Garbage containers shall be emptied when full, but not less than twice a week. 21.0 (i) "Construction and operation of dining hall" 21.0 (i)(1) In all camps where central dining operations are permitted or provided, the food handling facilities shall comply with the requirements of the Dubai Municipality. 21.0 (i)(2) A properly constructed dining hall shall be adequate in size, separate from the sleeping quarters of any of the workers, shall be provided in connection with all food handling facilities. There shall be no direct opening from living or sleeping quarters into a dining hall.

Page 67: Health Safety Environment (HSE ) Regulationsdcca.gov.ae/wp-content/uploads/circulars/za-dc-reg-01 health safety... · Health, Safety and Environment Regulations Revision 1 Issue Date

Government of Dubai

Dubai Technology and Media Free Zone Authority Zoning Authority – Development Control

Document no. ZA-DC-REG-01

Revision 1 Issue Date 29.10.08 Health, Safety and Environment Regulations

Page 67 of 104

21.0(i)(3) No person with any communicable disease shall be employed or permitted to work in the preparation, cooking, serving, or other handling of food, foodstuffs, or materials used therein, in any dining room operated in connection with a camp or regularly used by persons living in a camp.

21.0(j) "Insect and rodent control" Effective measures shall be taken to prevent infestation by and harborage of insect vectors or pests.

21.0 (k) "First aid" 21.0 (k)(1) Adequate first aid facilities approved by a health authority shall be maintained and made available in every labor camp for the emergency treatment of injured persons. 21.0(k)(2) Such facilities shall be in charge of a person trained to administer first aid and shall be readily accessible for use at all times. 21.0(l) Fire Prevention All the necessary fire preventive and protection measures shall be in place as per Dubai Civil Defense requirements. Fire fighting layout should be approved by Dubai Civil Defense.

Reference and Further information: Occupational Safety and Health Administration (OSHA) USA Standard # 1910.142

Page 68: Health Safety Environment (HSE ) Regulationsdcca.gov.ae/wp-content/uploads/circulars/za-dc-reg-01 health safety... · Health, Safety and Environment Regulations Revision 1 Issue Date

Government of Dubai

Dubai Technology and Media Free Zone Authority Zoning Authority – Development Control

Document no. ZA-DC-REG-01

Revision 1 Issue Date 29.10.08 Health, Safety and Environment Regulations

Page 68 of 104

22.0 Regulations for Usage of Liquefied Petroleum Gas (LPG) at Site

22.0(a)

Liquefied Petroleum Gas (LPG) cylinders should be handled, stored and used

safely to prevent accident at project sites. 22.0(b) All the hose pipes, regulators and flash back arrestors shall be in good working

condition.

Reference and Further information: Occupational Safety and Health Administration (OSHA) USA Standard # 1926.153

23.0 Regulations for Welding and Cutting Operations

23(a) Welding and Cutting Operations

All welding and cutting equipment should be of the approved type and maintained in good condition. All personnel working with welding equipment shall be trained, competent and be provided with personal protective equipment. The following precautions shall be taken during welding and cutting operations.

23(b) Basic Precautions

1) Before starting to weld or cut, the work area shall be inspected to

ensure that sparks or molten metal will not fall on combustible materials.

2) Cylinders should be stored in a safe and designated location. 3) All storage area should have no smoking signs posted. 4) A dedicated storage facility for the storage of industrial gas

cylinders should be available. A means of segregating the oxygen cylinders from any other gas cylinders should be an integral part of the design.

5) Cylinders should be in an up right position with safety caps on main valve while storing, transporting and using.

6) Special measures should be taken to ensure equipment is inspected at regular intervals.

Page 69: Health Safety Environment (HSE ) Regulationsdcca.gov.ae/wp-content/uploads/circulars/za-dc-reg-01 health safety... · Health, Safety and Environment Regulations Revision 1 Issue Date

Government of Dubai

Dubai Technology and Media Free Zone Authority Zoning Authority – Development Control

Document no. ZA-DC-REG-01

Revision 1 Issue Date 29.10.08 Health, Safety and Environment Regulations

Page 69 of 104

7) Precautions shall be taken to ensure employees are trained and required Personal Protective Equipments (PPE) must be worn (Welding Mask, face shield, goggles, leather gloves, leather apron, etc.)

8) No welding or burning should be done in a hazardous area without obtaining written authorization from the responsible competent person. (Hot Work Permit system).

9) It should be made sure that suitable fire extinguishing equipment is in the work area.

10) No welding or burning shall be carried out on barrels, tanks, piping or other system which have contained either combustible or unknown products without first obtaining approval from the responsible authority and testing for explosive, combustible or poisonous gases or liquids.

11) Whenever it is necessary to work after normal day light hours, lighting equipment should be provided which should provide an intensity of illumination that will permit work to be carried out in a safe and professional manner without risk of personal injury or damage to the material.

23(c) Welding and Cutting Operations

1) Welding or cutting operations should not be undertaken either by torch or

electrodes, under the following conditions.

i. In closed vessels or pipes. ii. In open vessels containing or having contained substances which

may evaporate or gasify when subjected to heat or other, thus forming highly explosive mixtures.

2) The oxygen – acetylene bit, gauges and other accessories should not be

lubricated or smudged with oil, grease and other flammable substances which can easily catch fire upon contact with compressed oxygen.

3) Welding equipment should not be tampered.

4) The oxygen and acetylene hose lines should be properly connected to the

safety valves by means of a regulator and to the cutting torch by a hose clamps.

5) All the Oxygen and acetylene gas cylinder regulators must be fitted with

Flash Back Arrestors to prevent back fire incase of fire in hose pipe line system.

6) High and low pressure gauges should be in good working condition.

7) Regulators should be fitted to the cylinder valves by means of non

inflammable packing able to guarantee perfect sealing.

Page 70: Health Safety Environment (HSE ) Regulationsdcca.gov.ae/wp-content/uploads/circulars/za-dc-reg-01 health safety... · Health, Safety and Environment Regulations Revision 1 Issue Date

Government of Dubai

Dubai Technology and Media Free Zone Authority Zoning Authority – Development Control

Document no. ZA-DC-REG-01

Revision 1 Issue Date 29.10.08 Health, Safety and Environment Regulations

Page 70 of 104

23(d) Oxygen and Acetylene Gas Equipments

Cylinders shall be transported, stored and used securely fixed in the upright position. They must never be rolled on their sides, dropped or man-handled with the gauges fitted. When not in use, they shall be stored in a specially designated area with the safety caps on main valve.

23(e) Flash Back Arrestors

All the oxy – acetylene gas cylinder regulators must be fitted with respective Flash Back Arrestors to prevent flash back of fire in case of fire in hose pipe line system. Flash back arrestor is a mandatory requirement.

23(f) Storage of Cylinders

1) Cylinders shall be stored in a safe, dry, well ventilated place and

reserved for that purpose. All cylinders must be chained or otherwise secured in upright position to prevent rusting. Cylinders stored in the open shall be protected from ground contact, extreme of weather and direct sun rays.

2) Cylinder storage must be planned so that cylinders shall be used in the order in which they are received from the supplier. Empty and full cylinders must be stored separately and empty cylinders plainly marked to avoid confusion.

3) Empty cylinders must be kept separately according to the type of gas content.

4) Cylinder storage rooms must be ventilated sufficiently so that explosive concentration of gas cannot accumulate. Smoking or any other source of ignition must be prohibited.

5) When the job is finished the cylinders valves must be closed. 6) The operators must make sure that, the safety pin of the acetylene

cylinders is inserted at all times to close the flow of gas in case of emergency.

7) Valves caps shall be in place when cylinders are not in use. 8) Cylinders shall be transported securely and upright in trolleys.

They shall never be rolled 9) Oxygen cylinders shall be stored separately from acetylene

cylinders.

23(g)

Electric Welding

1. As the machine is fed by three phase alternating current ( 50 Hz’s ) the following precautions against the various potential risks of an electric nature should be taken

Page 71: Health Safety Environment (HSE ) Regulationsdcca.gov.ae/wp-content/uploads/circulars/za-dc-reg-01 health safety... · Health, Safety and Environment Regulations Revision 1 Issue Date

Government of Dubai

Dubai Technology and Media Free Zone Authority Zoning Authority – Development Control

Document no. ZA-DC-REG-01

Revision 1 Issue Date 29.10.08 Health, Safety and Environment Regulations

Page 71 of 104

� Machine should be protected from damp and water and from

infiltration of foreign bodies. � Machines with dented protective covers shall not be used until they

have been inspected for safe operation or repaired. � Ensure proper connection between cables and terminals. � Provide an efficient earthing system and connect the welding set to

it. � The cables feeding the current to electric welding set must be of a

size suitable for the strength of current they carry. Reference and Further information: Occupational Safety and Health Administration (OSHA) USA Standard # 1926.350

Page 72: Health Safety Environment (HSE ) Regulationsdcca.gov.ae/wp-content/uploads/circulars/za-dc-reg-01 health safety... · Health, Safety and Environment Regulations Revision 1 Issue Date

Government of Dubai

Dubai Technology and Media Free Zone Authority Zoning Authority – Development Control

Document no. ZA-DC-REG-01

Revision 1 Issue Date 29.10.08 Health, Safety and Environment Regulations

Page 72 of 104

24.0 Reporting of Injuries, and Dangerous

Occurrences Regulations (RIDOR) REPORTIN oINJURIES, DISEASES and DA

Reporting accidents and ill health at work is a legal requirement. The information enables the Zoning Authority – Development Control to identify where and how risks arise and to investigate serious accidents. ZADC can then help contractor and give advice on how to reduce injury, ill health and accidental loss.

2

24(a) Contractor should submit a detailed accident report in following cases

24(a)(1) Death or major injury

If there is an accident connected with work and:

i. Main Contractor’s or sub contractor’s employee working in project site premises is killed or suffers a major injury or a member of the public is killed or taken to hospital

ii. Contractor must notify the Zoning Authority - Development

Control without delay by (e.g. telephone, mobile). ZADC will ask for brief details about project site, the injured person and the accident to reach the site for investigation.

iii. Within 48 hours from the time of accident, main contractor should

submit a completed “Site Accident Report Form” to Zoning Authority – Development Control

24(a)(2) Over-three-day injury

i. If there is an accident connected with work and main contractor’s or sub contractor’s employee, working on project site premises, suffers an over-three day injury, main contractor must submit a completed “Site Accident Report Form” to the Zoning Authority within 4 days from the date of accident.

ii. An over-three-day injury is one which is not major but results in the injured person being away from work or unable to do the full range of their normal duties for more than three days (including any days

Page 73: Health Safety Environment (HSE ) Regulationsdcca.gov.ae/wp-content/uploads/circulars/za-dc-reg-01 health safety... · Health, Safety and Environment Regulations Revision 1 Issue Date

Government of Dubai

Dubai Technology and Media Free Zone Authority Zoning Authority – Development Control

Document no. ZA-DC-REG-01

Revision 1 Issue Date 29.10.08 Health, Safety and Environment Regulations

Page 73 of 104

they wouldn’t normally be expected to work such as weekends, rest days or holidays) not counting the day of the injury itself.

24(a)(3) Dangerous occurrence

i. If something happens which does not result in a reportable injury, but which clearly could have done, it may be a dangerous occurrence which should be reported immediately (e.g. by telephone) to the Zoning Authority – Development Control.

ii. Within 48 hours from the time of dangerous occurrence, main contractor should submit a completed “Site Accident Report Form” to Zoning Authority – Development Control

24(b) Contractor should report to the Zoning Authority – Development

Control via any of the following method

1) by telephone:

a. 04 – 3900 500 b. 04 – 3900 501

c. 04 – 3900 704

d. 04 – 3694 282

2) by fax:

a. 04 – 3664 666 b. 04 – 3664 668

3) by mobile:

Concerned Project Safety Inspector/Engineer 4) by e-mail:

[email protected]

Page 74: Health Safety Environment (HSE ) Regulationsdcca.gov.ae/wp-content/uploads/circulars/za-dc-reg-01 health safety... · Health, Safety and Environment Regulations Revision 1 Issue Date

Government of Dubai

Dubai Technology and Media Free Zone Authority Zoning Authority – Development Control

Document no. ZA-DC-REG-01

Revision 1 Issue Date 29.10.08 Health, Safety and Environment Regulations

Page 74 of 104

24(c) Record keeping of accident

Main Contractor should keep a record of any reportable injury or dangerous occurrence for three years after the date on which it happened. This must include:

1) The date and method of reporting 2) The date, time and place of the event 3) Personal details of those involved; and 4) A brief description of the nature of the event.

24(d)

Definition of major injuries

Reportable major injuries are:

1) Fracture other than to fingers, thumbs or toes 2) Amputation 3) Dislocation of the shoulder, hip, knee or spine 4) loss of sight (temporary or permanent) 5) Chemical or hot metal burn to the eye or any penetrating injury to the

eye 6) Injury resulting from an electric shock or electrical burn leading to

unconsciousness or requiring resuscitation or admittance to hospital for more than 24 hours

7) Any other injury: leading to hypothermia, heat-induced illness or unconsciousness; or requiring resuscitation; or requiring admittance to hospital for more than 24 hours

8) Unconsciousness caused by asphyxia or exposure to a harmful substance or biological agent acute illness requiring medical treatment, or loss of consciousness arising from absorption of any substance by inhalation, ingestion or through the skin

9) Acute illness requiring medical treatment where there is reason to believe that this resulted from exposure to a biological agent or its toxins or infected material.

Page 75: Health Safety Environment (HSE ) Regulationsdcca.gov.ae/wp-content/uploads/circulars/za-dc-reg-01 health safety... · Health, Safety and Environment Regulations Revision 1 Issue Date

Government of Dubai

Dubai Technology and Media Free Zone Authority Zoning Authority – Development Control

Document no. ZA-DC-REG-01

Revision 1 Issue Date 29.10.08 Health, Safety and Environment Regulations

Page 75 of 104

24(e)

Definition of Dangerous Occurrences

Reportable dangerous occurrences are:

(This list summarizes each of the dangerous occurrences)

1) collapse, overturning or failure of load-bearing parts of lifts and lifting equipment

2) explosion, collapse or bursting of any closed vessel or associated pipe work

3) plant or equipment coming into contact with overhead power lines 4) electrical short circuit or overload causing fire or explosion 5) any unintentional explosion, misfire, failure of demolition to cause the

intended collapse, projection of material beyond a site boundary, injury caused by an explosion

6) failure of industrial radiography or irradiation equipment to de-energize or return to its safe position after the intended exposure period

7) collapse or partial collapse of a scaffold over five meters high, or erected near water where there could be a risk of drowning after a fall

8) dangerous occurrence at a pipeline 9) failure of any load-bearing fairground equipment 10) a road tanker carrying a dangerous substance overturns, suffers

serious damage, catches fire or the substance is released 11) a dangerous substance being conveyed by road is involved in a fire or

released 12) unintended collapse of: any building or structure under construction,

alteration or demolition where over five tones of material falls; a wall or floor in a place of work; any false-work

13) explosion or fire causing suspension of normal work for over 24 hours 14) sudden, uncontrolled release in a building of:

i. 100 kg or more of a flammable liquid; ii. kg or more of a flammable liquid above its boiling point; or iii. kg or more of a flammable gas; or iv. 500 kg of these substances if the release is in the open air

15) Accidental release of any substance which may damage health.

References and Further information:

Reporting of Injuries, Diseases and Dangerous Occurrences Regulations (RIDDOR) 1992 (UK)

Page 76: Health Safety Environment (HSE ) Regulationsdcca.gov.ae/wp-content/uploads/circulars/za-dc-reg-01 health safety... · Health, Safety and Environment Regulations Revision 1 Issue Date

Government of Dubai

Dubai Technology and Media Free Zone Authority Zoning Authority – Development Control

Document no. ZA-DC-REG-01

Revision 1 Issue Date 29.10.08 Health, Safety and Environment Regulations

Page 76 of 104

25.0 Information, Training and Instruction and Supervision of employees Regulations

25(a) All the employees of contractor must be informed about risks and hazards

associated with their nature of activities prior to placing them on job.

25(b) Health & Safety Training

1) The contractor should set out a training program for its personnel to

provide them with the skills and knowledge required to perform their job efficiently and safely.

2) Training should be conducted by using either internal resources or by local external organizations.

25(c) Safety Induction Training for new employees

25(c) (1) Every employee, upon his joining and prior to commencement of any work, should attend the Safety Induction Training. General safety rules & regulations which are required to be followed at project sites and at least following subjects should be covered in Safety Induction Training for all new employees.

i. Usage of Personal Protective Equipments ( PPE ) ii. Safe usage of Scaffolding iii. Basic fire fighting iv. Safe manual lifting. v. LPG handling, storage and usage procedures vi. Oxy – Acetylene gas storage, handling and usage procedures vii. Working at height safely. viii. Safe handling and lifting of materials with cranes. ix. House keeping at work place x. Safe use of ladders xi. Safety in welding & cutting works xii. Working safely near the edges of roof/floor/shaft openings/Lift

openings. xiii. General site safety rules & regulations xiv. Disciplinary action procedures xv. Accident Reporting Procedures xvi. Emergency Evacuation Procedures and assembly points xvii. Electrical Safety

Page 77: Health Safety Environment (HSE ) Regulationsdcca.gov.ae/wp-content/uploads/circulars/za-dc-reg-01 health safety... · Health, Safety and Environment Regulations Revision 1 Issue Date

Government of Dubai

Dubai Technology and Media Free Zone Authority Zoning Authority – Development Control

Document no. ZA-DC-REG-01

Revision 1 Issue Date 29.10.08 Health, Safety and Environment Regulations

Page 77 of 104

25(c) (2) Frequency of Training

Safety Induction Training should be provided to employee at the time of joining the project site.

25(c) (3) Record Keeping

Records of all the Induction Training attendance sheets shall be maintained at site for inspection by Zoning Authority- Development Control.

25(d) Tool Box Talk Meetings

Main contractor should make sure that Tool Box Talk (TBT) meetings are conducted at workplace by respective Supervisor / Foreman/ Engineer to deliver the safety procedures or instructions about the particular activity before commencing to make them aware of hazards associated with particular activity and safety measures to be taken.

25(d) (1)

Frequency of Tool Box Talk Meetings

Tool Box Talk Meetings should be conducted at project site at least once in a week. Tool Box Talk Meeting should be conducted before commencing the work. Acknowledgement (Signature) should be obtained from all the attendees on Tool Box Talk Attendance sheet after conducting the Tool Box Talk Meeting.

25(d) (2) Record Keeping

Records of all the Tool Box Talks attendance sheets shall be maintained at site for inspection by Zoning Authority- Development Control.

25(e) Supervision

All the work activities should be supervised by competent persons at all times.

Page 78: Health Safety Environment (HSE ) Regulationsdcca.gov.ae/wp-content/uploads/circulars/za-dc-reg-01 health safety... · Health, Safety and Environment Regulations Revision 1 Issue Date

Government of Dubai

Dubai Technology and Media Free Zone Authority Zoning Authority – Development Control

Document no. ZA-DC-REG-01

Revision 1 Issue Date 29.10.08 Health, Safety and Environment Regulations

Page 78 of 104

26.0 Permit to Work System (PTW)

a) Contractor should implement the Permit to Work System (PTW) for following activities to ensure that control measures prescribed in the risk assessment sheets are taken up without any exception before starting those activities.

1) Entry into and working in confined spaces 2) All forms of Hot Works, such as welding, gas cutting, burning etc 3) Working near live electro mechanical equipment 4) Digging the earth to carry out any form of excavation 5) Working inside shafts ( Working platform approval)

27.0 Confined Spaces Regulations

27(a) Risk Assessment

1) Contractor must carry out a suitable and sufficient assessment of

the risks for all work activities for the purpose of deciding what measures are necessary for safety. Contractor should appoint competent people to help manage the risks and ensure that employees are adequately trained and instructed.

2) Avoid entry to confined spaces, e.g. by doing the work from outside if possible.

3) If entry to a confined space is unavoidable, follow a safe system of work, and

4) Adequate emergency arrangements should be in place before the work starts.

27(b) Safe systems of work

1) If entry into a confined space cannot be avoided a safe system of

work for working inside the space should be in place. 2) Safe system of work, including the precautions identified, should

be developed and put into practice. 3) Everyone involved should be properly trained and instructed to

make sure they know what to do and how to do it safely.

27(c) Isolation

Page 79: Health Safety Environment (HSE ) Regulationsdcca.gov.ae/wp-content/uploads/circulars/za-dc-reg-01 health safety... · Health, Safety and Environment Regulations Revision 1 Issue Date

Government of Dubai

Dubai Technology and Media Free Zone Authority Zoning Authority – Development Control

Document no. ZA-DC-REG-01

Revision 1 Issue Date 29.10.08 Health, Safety and Environment Regulations

Page 79 of 104

1) Mechanical and electrical isolation of equipment is essential if it could otherwise operate, or be operated, inadvertently. If gas, fume or vapor could enter the confined space, physical isolation of pipe work etc needs to be made. In all cases a check should be made to ensure isolation is effective.

2) Cleaning should be carried out to ensure fumes do not develop

from residues etc while the work is being done.

27(d) Provision of ventilation

1) Mechanical ventilation shall be necessary to ensure an adequate

supply of fresh air. This is essential where portable gas cylinders and diesel-fuelled equipment are used inside the space because of the dangers from build-up of engine exhaust.

2) Warning: carbon monoxide in the exhaust from petrol-fuelled

engines is so dangerous that use of such equipment in confined spaces should never be allowed.

27(e) Testing the air

1) This should be necessary to check that it is free from both toxic and

flammable vapors and that it is fit to breathe. Testing should be carried out by a competent person using a suitable gas detector which is correctly calibrated. Where the risk assessment indicates that conditions may change, or as a further precaution, continuous monitoring of the air may be necessary.

27(f) Provision of special tools and lighting

1) Non-sparking tools and specially protected lighting are essential where

flammable or potentially explosive atmospheres are likely. In certain confined spaces (e.g. inside metal tanks) suitable precautions to prevent electric shock include use of extra low voltage equipment (typically less than 25 V) and, where necessary, residual current devices.

27(g) Provision of breathing apparatus

1) If the air inside the space cannot be made fit to breathe because of

gas, fume or vapors present, or lack of oxygen. Never try to ‘sweeten’ the air in a confined space with oxygen as this can greatly increase the risk of a fire or explosion.

Page 80: Health Safety Environment (HSE ) Regulationsdcca.gov.ae/wp-content/uploads/circulars/za-dc-reg-01 health safety... · Health, Safety and Environment Regulations Revision 1 Issue Date

Government of Dubai

Dubai Technology and Media Free Zone Authority Zoning Authority – Development Control

Document no. ZA-DC-REG-01

Revision 1 Issue Date 29.10.08 Health, Safety and Environment Regulations

Page 80 of 104

27(h) Preparation of emergency arrangements

1) Emergency arrangements should be in place to cope up with

emergencies.

27(i) Provision of rescue harnesses

1) Lifelines attached to harnesses should run back to a point outside the

confined space.

27(j) Communications

1) An adequate communications system should be in place to enable

communication between people inside and outside the confined space and to summon help in an emergency.

2) It is necessary to station someone outside to keep watch and to

communicate with anyone inside, raise the alarm quickly in an emergency, and take charge of the rescue procedures

27(k) ‘Permit-to-work’

1) A permit-to-work ensures a formal check should be undertaken to

ensure all the elements of a safe system of work are in place before people are allowed to enter or work in the confined space.

27(l) Emergency procedures

1) Effective arrangements for raising the alarm and carrying out rescue

operations in an emergency should be provided.

27(m) First-aid procedures

1) Trained first aiders should be available to make proper use of any

necessary first-aid equipment provided.

Reference and Further information: The Confined Spaces Regulations (UK)

Page 81: Health Safety Environment (HSE ) Regulationsdcca.gov.ae/wp-content/uploads/circulars/za-dc-reg-01 health safety... · Health, Safety and Environment Regulations Revision 1 Issue Date

Government of Dubai

Dubai Technology and Media Free Zone Authority Zoning Authority – Development Control

Document no. ZA-DC-REG-01

Revision 1 Issue Date 29.10.08 Health, Safety and Environment Regulations

Page 81 of 104

28.0 Regulations for Temporary Canteen on project site

28(a) Operating Canteen is strictly prohibited on construction sites without obtaining

approval from Zoning Authority.

28(b) Canteen Permit Canteen owner/ catering company should submit a filled in “Temporary Site

Canteen Application Form” to Zoning Authority – Development Control in order to obtain canteen permit for construction of temporary canteen on site.

28(c) Completion certificate

i. Once the canteen is fully erected prior to operation, owner of the catering company should submit filled in “Temporary Site Canteen Application Form” to Zoning Authority – Development Control in order to issue completion certificate

ii. Operation of canteen without obtaining completion certificate from ZADC is

a serious violation of regulations.

28(d) Installation and repair work on gas appliances

Installation and repair of equipment using natural gas or LPG in canteens or catering units should be done by competent persons approved by Dubai Civil Defense only.

28(e) Maintenance and inspection by users

Gas appliances, flues, pipe work and safety devices should be maintained in a safe condition. They should be inspected by a competent responsible person after any maintenance in accordance with regulations of Dubai Civil Defense and Zoning Authority – Development Control.

Page 82: Health Safety Environment (HSE ) Regulationsdcca.gov.ae/wp-content/uploads/circulars/za-dc-reg-01 health safety... · Health, Safety and Environment Regulations Revision 1 Issue Date

Government of Dubai

Dubai Technology and Media Free Zone Authority Zoning Authority – Development Control

Document no. ZA-DC-REG-01

Revision 1 Issue Date 29.10.08 Health, Safety and Environment Regulations

Page 82 of 104

28(f) Frequency of Inspections

All the LPG appliances and distribution pipeline system, emergency shut off valves, solenoid valves, regulators, and LPG leak detection system should be inspected by a competent responsible person on daily basis. Records of daily inspections must be maintained for inspection by Zoning Authority – Development Control

28(g) Use of gas and routine tasks on equipment

All canteen staff that uses gas equipment should be trained in its proper use and on daily visual inspection for obvious faults. This will include such things as damaged pipe work and connections, inoperative flame supervision devices (these shut off the gas supply automatically if the flame disappears), missing restraints on equipment needing them for stability and smells of escaping gas. All staff should be familiar with necessary procedures in such situations. Routine tasks such as connecting and disconnecting plug-in gas connections to appliances when moving for cleaning or changing LPG cylinders or hoses should be carried out by company who are competent and approved by Dubai Civil Defense. It should be noted that the installation of an appliance with a plug-in gas connection should only be carried out by a competent person.

28(h) Ventilation

The rate of ventilation should be at least 3 ACH (Air Changes per Hour) inside the canteen.

28(i) Isolation of gas supplies to LPG appliance

Each fixed appliance should have a single manual means of isolation valves for servicing or cleaning purposes and for emergency situations. Pipes shall be located to leave a space of at least 25 mm between the pipe and the wall in order to assist cleaning.

28(j) Attention should be given on following factors that will increase the risk

include:

1) evidence that ventilation system is not used or is unreliable; 2) small room volume; 3) obvious poor design/maintenance of ventilation system 4) lack of user awareness of the effect of using gas appliances without

adequate ventilation

Page 83: Health Safety Environment (HSE ) Regulationsdcca.gov.ae/wp-content/uploads/circulars/za-dc-reg-01 health safety... · Health, Safety and Environment Regulations Revision 1 Issue Date

Government of Dubai

Dubai Technology and Media Free Zone Authority Zoning Authority – Development Control

Document no. ZA-DC-REG-01

Revision 1 Issue Date 29.10.08 Health, Safety and Environment Regulations

Page 83 of 104

5) poor general ventilation to dilute any spillage of products 6) extensive use of gas-fired appliances for long periods 7) ageing system/installation;

28(k) Importance should be given to following factors that will reduce risk

include:

1) good natural ventilation 2) satisfactory fume removal through ventilation ductwork by natural

draught alone 3) well maintained ventilation system 4) good user awareness of risks and proper, documented procedures for

using additional ventilation 5) minimal use of gas-fired appliances 6) modern ventilation system 7) large room size 8) clear, permanent notices warning that appliances must not be used

without the ventilation system in operation

28(l) Storage of LPG cylinders

1) LPG cylinders should be stored in upright position in specially designed,

manufactured steel enclosure outside the canteen in well ventilated area. 2) The enclosure should have lockable arrangement. 3) Storage of LPG cylinders inside the canteen is strictly prohibited.

28(m) LPG Leak Detection and Emergency Cut Off System

LPG leak detectors should be installed to detect the leak and give an audible alarm and should be linked with an automatic gas shut-off system. This should be fail-safe and require manual intervention to restore the gas supply. They should only be regarded as a secondary back up. The primary safeguard remains provision of adequate ventilation to ensure canteen is free from gas accumulation.

28(n) Hazard Communication / Warning Signs

Suitable and sufficient number of warning signs should be posted in appropriate places inside and outside the canteen facility to communicate/ warn the hazards.

Page 84: Health Safety Environment (HSE ) Regulationsdcca.gov.ae/wp-content/uploads/circulars/za-dc-reg-01 health safety... · Health, Safety and Environment Regulations Revision 1 Issue Date

Government of Dubai

Dubai Technology and Media Free Zone Authority Zoning Authority – Development Control

Document no. ZA-DC-REG-01

Revision 1 Issue Date 29.10.08 Health, Safety and Environment Regulations

Page 84 of 104

28(o) Fire prevention and fire fighting Suitable and sufficient number of fire extinguishers to be installed and maintained in good working condition as per the approval of Zoning Authority – Development Control 28(p) Electrical safety All the electrical distribution boards (DB’s) and wiring should conform to DEWA standards to prevent over loading, short circuits and electrical shock hazards. 28(q) Hygienic conditions Good hygienic condition should be maintained at all times inside and outside the canteen. 28(r) Waste Management Canteen waste should be disposed off at regular intervals in designated skips/ bins. Reference and Further information:

Gas Safety (Installation and Use) Regulations 1998 UK BS-6173:2001 Specifications for installation of gas fired catering appliances Precautions at manually ignited gas fired catering equipment HSE Books 1995

Page 85: Health Safety Environment (HSE ) Regulationsdcca.gov.ae/wp-content/uploads/circulars/za-dc-reg-01 health safety... · Health, Safety and Environment Regulations Revision 1 Issue Date

Government of Dubai

Dubai Technology and Media Free Zone Authority Zoning Authority – Development Control

Document no. ZA-DC-REG-01

Revision 1 Issue Date 29.10.08 Health, Safety and Environment Regulations

Page 85 of 104

29.0 Dangerous Goods at site

a) The storage of flammable and combustible liquids should not be in proximity to heating or an ignition source, e.g.: light switch, welders, stove, heating appliance, or similar ignition sources.

b) Packages shall be kept closed when not in use. Any action to open a package of flammable liquid or decant from it should be carried out in a well-ventilated area and away from potential ignition sources.

c) The transfer of a flammable liquid from storage to the point of use shall be carried out in a manner that minimizes the possibility of spillage or fire.

d) Liquids shall not be stored or used where they may jeopardize escape from building in the event of fire.

e) Persons who handle Flammable and Combustible liquids shall be aware of the hazards involved.

f) Any spillage shall be cleaned up immediately and the materials used in the clean up shall be disposed of safely and in accordance with Dubai Municipality guidelines.

g) Any materials that might interact dangerously if mixed shall be kept apart so that the possibility of interaction is minimized, e.g.: fuel.

h) Packages used shall not be pressurized as a means to transfer the contents unless specifically designed for this duty.

Reference and Further information:

Dubai Municipality Environmental Guidelines

30.0 Heat Stress at Work

a) Main contractor should assess the risk of heat stress and implement the measures to prevent heat stress at work.

b) Contractor’s employees must be made aware of how to work safely in heat,

the factors that can lead to heat stress, and how to reduce the risk of it occurring.

Reference and Further information: DM Guidelines on Heat Stress British Occupational Hygiene Society Technical guide line No 12 The thermal Environment (Second edition)

Page 86: Health Safety Environment (HSE ) Regulationsdcca.gov.ae/wp-content/uploads/circulars/za-dc-reg-01 health safety... · Health, Safety and Environment Regulations Revision 1 Issue Date

Government of Dubai

Dubai Technology and Media Free Zone Authority Zoning Authority – Development Control

Document no. ZA-DC-REG-01

Revision 1 Issue Date 29.10.08 Health, Safety and Environment Regulations

Page 86 of 104

31.0 Electrical Safety Regulations E

This regulation addresses electrical safety requirements that are necessary for the practical safeguarding of employees involved in construction work. Mounting: Electric equipment shall be firmly secured to the surface on which it is mounted. Wooden plugs driven into holes in masonry, concrete, plaster, or similar materials shall not be used. Cooling: Electrical equipment which depends upon the natural circulation of air and convection principles for cooling of exposed surfaces shall be installed so that room air flow over such surfaces is not prevented by walls or by adjacent installed equipment. For equipment designed for floor mounting, clearance between top surfaces and adjacent surfaces shall be provided to dissipate rising warm air. Electrical equipment provided with ventilating openings shall be installed so that walls or other obstructions do not prevent the free circulation of air through the equipment 31(a) Use and identification of grounded and grounding conductors 31a) (1) Identification of conductors: A conductor used as a grounded conductor shall be identifiable and distinguishable from all other conductors. 31(a) (2) Use of grounding terminals and devices: A grounding terminal or grounding-type device on a receptacle, cord connector, or attachment plug shall not be used for purposes other than grounding. 31(b) Assured equipment grounding

Conductor program: The employer shall establish and implement an assured equipment grounding conductor program on construction sites covering all cord sets, receptacles which are not a part of the building or structure, and equipment connected by cord and plug which are available for use or used by employees.

31(b) (1) The employer shall designate one or more competent persons to implement the program. 31(b) (2) Each cord set, attachment cap, plug and receptacle of cord sets, and any equipment connected by cord and plug, except cord sets and receptacles which are fixed and not exposed to damage, shall be visually inspected before each day's

Page 87: Health Safety Environment (HSE ) Regulationsdcca.gov.ae/wp-content/uploads/circulars/za-dc-reg-01 health safety... · Health, Safety and Environment Regulations Revision 1 Issue Date

Government of Dubai

Dubai Technology and Media Free Zone Authority Zoning Authority – Development Control

Document no. ZA-DC-REG-01

Revision 1 Issue Date 29.10.08 Health, Safety and Environment Regulations

Page 87 of 104

use for external defects, such as deformed or missing pins or insulation damage, and for indications of possible internal damage. Equipment found damaged or defective shall not be used until repaired. 31(b) (3) The following tests shall be performed on all cord sets, receptacles which are not a part of the permanent wiring of the building or structure, and cord- and plug-connected equipment required to be grounded: (1) All equipment grounding conductors shall be tested for continuity and shall be Electrically continuous. 31(c) Warning signs 31(c) (1) Signs warning of high voltage shall be posted where unauthorized employees might come in contact with live parts. 31(d) Arcing or suddenly moving parts. Fuses and circuit breakers shall be so located or shielded that employees will not be burned or otherwise injured by their operation. 31(e) Circuit breakers

31(e) (1) Circuit breakers shall clearly indicate whether they are in the open (off) or closed (on) position. 31(e) (2) where circuit breaker handles on switchboards are operated vertically rather than horizontally or rotationally, the up position of the handle shall be the closed (on) position. 31(f) Grounding connections

31(f) (1) Grounded system For a grounded system, a grounding electrode conductor shall be used to connect both the equipment grounding conductor and the grounded circuit conductor to the grounding electrode. Both the equipment grounding conductor and the grounding electrode conductor shall be connected to the grounded circuit conductor on the supply side of the service disconnecting means, or on the supply side of the

Page 88: Health Safety Environment (HSE ) Regulationsdcca.gov.ae/wp-content/uploads/circulars/za-dc-reg-01 health safety... · Health, Safety and Environment Regulations Revision 1 Issue Date

Government of Dubai

Dubai Technology and Media Free Zone Authority Zoning Authority – Development Control

Document no. ZA-DC-REG-01

Revision 1 Issue Date 29.10.08 Health, Safety and Environment Regulations

Page 88 of 104

system disconnecting means or over-current devices if the system is separately derived. 31(f) (2) Grounding path The path to ground from circuits, equipment, and enclosures shall be permanent and continuous. 31(f) (3) Fixed equipment Exposed non-current-carrying metal parts of fixed equipment which may become energized shall be grounded 31(g) Grounding conductor A conductor used for grounding fixed or movable equipment shall have capacity to conduct safely any fault current which may be imposed on it. 31(h) Bonding If bonding conductors are used to assure electrical continuity, they shall have the capacity to conduct any fault current which may be imposed. 31(i) Temporary lights shall not be suspended by their electric cords unless cords and lights are designed for this means of suspension. 31(i) (1) Portable electric lighting used in wet and/or other conductive locations, as for example, drums, tanks, and vessels, shall be operated at 12 volts or less. However, 120-volt lights may be used if protected by a ground-fault circuit interrupter. 31(i)(2) Flexible cords and cables shall be protected from damage. Sharp corners and projections shall be avoided.

Page 89: Health Safety Environment (HSE ) Regulationsdcca.gov.ae/wp-content/uploads/circulars/za-dc-reg-01 health safety... · Health, Safety and Environment Regulations Revision 1 Issue Date

Government of Dubai

Dubai Technology and Media Free Zone Authority Zoning Authority – Development Control

Document no. ZA-DC-REG-01

Revision 1 Issue Date 29.10.08 Health, Safety and Environment Regulations

Page 89 of 104

31(j) Switchboards and panel boards Flexible cords and cables may pass through Switchboards that have any exposed live parts doorways or other pinch points, if protection shall be located in permanently dry locations is provided to avoid damage and accessible only to qualified persons. 31(j) (1) Extension cord sets used with portable electric tools and appliances shall be of three-wire type and shall be designed for hard or extra-hard usage. Flexible cords used with temporary and portable lights shall be designed for hard or extra-hard usage. 31(k) Guarding For temporary locations over 400 volts the equipment shall be enclosed with fence or barriers or other effective means to prevent access of other than authorized and qualified personnel. 31(l) Switches and circuit breakers Switches, circuit breakers, and switchboards installed in wet locations shall be enclosed in conductors used for general wiring shall be insulated. The conductor insulation shall be of a type that is suitable for the voltage, operating temperature, and location of use. Insulated conductors shall be distinguishable by appropriate color or other means as being grounded conductors, ungrounded conductors, or equipment grounding conductors. 31(m) Flexible cords and cables Flexible cords and cables shall be suitable for conditions of use and location. Flexible cords and cables shall be used only for:

1) Wiring of fixtures; 2) Connection of portable lamps or appliances; 3) Elevator cables; 4) Wiring of cranes and hoists; 5) Connection of stationary equipment to facilitate their frequent

interchange; 6) Prevention of the transmission of noise or vibration; or 7) Appliances where the fastening means and mechanical connections

are designed to permit removal for maintenance and repair.

Page 90: Health Safety Environment (HSE ) Regulationsdcca.gov.ae/wp-content/uploads/circulars/za-dc-reg-01 health safety... · Health, Safety and Environment Regulations Revision 1 Issue Date

Government of Dubai

Dubai Technology and Media Free Zone Authority Zoning Authority – Development Control

Document no. ZA-DC-REG-01

Revision 1 Issue Date 29.10.08 Health, Safety and Environment Regulations

Page 90 of 104

31(n) Lighting fixtures, lamp holders, lamps, and receptacles 31(n) (1) Live parts. Fixtures, lamp holders, lamps, rosettes, and receptacles shall have no live parts normally exposed to employee contact. 31(o) Protection of employees 31(o) (1) No employer shall permit an employee could contact the electric power circuit in the course of work, unless the employee is protected against electric shock by de-energizing the circuit and grounding it or by guarding it effectively by insulation or other means. 31(o)(2) In work areas where the exact location of underground electric power lines is unknown, employees using jack-hammers, bars, or other hand tools which may contact a line shall be provided with insulated protective gloves. (o)(3) Before work is begun the employer shall ascertain by inquiry or direct observation, or by instruments, whether any part of an energized electric power circuit, exposed or concealed, is so located that the performance of the work may bring any person, tool, or machine into physical or electrical contact with the electric power circuit. The employer shall post and maintain proper warning signs where such a circuit exists. The employer shall advise employees of the location of such lines, the hazards involved, and the protective measures to be taken. 31(p) Passageways and open spaces 31(p) (1) Barriers or other means of guarding shall be provided to ensure that workspace for electrical equipment will not be used as a passageway during periods when energized parts of electrical equipment are exposed. 31(p) (2) Working spaces, walkways, and similar locations shall be kept clear of cords so as not to create a hazard to employees. 31(q) Lockout and tagging of circuits 31(q) (1) Controls. Controls that are to be deactivated during the course of work on Energized or de-energized equipment or circuits shall be tagged. 31(q) (2) Equipment and circuits: Equipment or circuits that are de-energized shall be rendered inoperative and shall have tags attached at all points where such equipment or circuits can be energized. 31(q) (3) Tags. Tags shall be placed to identify plainly the equipment or circuits being worked on.

Reference and Further information: Occupational Safety and Health Administration (USA) standards # 1926.400, 1926.402, 1926.403, 1926.404 Electrical Safety on Construction sites HSG 141 HSE Books 1995

Page 91: Health Safety Environment (HSE ) Regulationsdcca.gov.ae/wp-content/uploads/circulars/za-dc-reg-01 health safety... · Health, Safety and Environment Regulations Revision 1 Issue Date

Government of Dubai

Dubai Technology and Media Free Zone Authority Zoning Authority – Development Control

Document no. ZA-DC-REG-01

Revision 1 Issue Date 29.10.08 Health, Safety and Environment Regulations

Page 91 of 104

32.0 Diesel Engine Exhaust Emissions

32(a)

Contractor should make a suitable and sufficient assessment of the risks to employee’s health if they are exposed to diesel fumes. They should then take the necessary steps to prevent or adequately control exposure in the workplace.

32(b)

Where exposure cannot be prevented, contractor should consider the use of a combination of specific control measures including:

1) Work place air extraction fans. 2) Tailpipe exhaust extraction systems 3) The use of filters attached to tailpipes; 4) Catalytic converters; and more general control measures 5) Turning off engines when not required; 6) Job rotation; 7) Providing suitable personal protective equipment (suitable gloves

should be worn when handling hot and cold diesel fuel).

32(c)

Contractor should provide respiratory protective equipment only as a last resort when other means of controls are not suitable.

32(d)

In addition to the control measures described in the preceding clause, Contractor should also ensure that:

1) Any engineering controls used are properly maintained and checked regularly

2) Where necessary, employee’s exposure to diesel fumes is monitored 3) Employees must be provided with the necessary information on the

risks of exposure to diesel fumes; 4) Employees should be provided with instruction and training on the

safe use of the control measures and any personal protective equipment.

32(e)

The highest point of diesel emission chimney/pipe of diesel generator should be at least 2 meters above the ground level.

Page 92: Health Safety Environment (HSE ) Regulationsdcca.gov.ae/wp-content/uploads/circulars/za-dc-reg-01 health safety... · Health, Safety and Environment Regulations Revision 1 Issue Date

Government of Dubai

Dubai Technology and Media Free Zone Authority Zoning Authority – Development Control

Document no. ZA-DC-REG-01

Revision 1 Issue Date 29.10.08 Health, Safety and Environment Regulations

Page 92 of 104

33.0 Dust Control at Site

33(a) Exposure of employees to inhalation, ingestion, skin absorption, or contact with any material or substance at a concentration above those specified in the "Threshold Limit Values of Airborne Contaminants, should be avoided. 33(b) To achieve compliance with 33(a), administrative or engineering controls must first be implemented whenever feasible. When such controls are not feasible to achieve full compliance, protective equipment or other protective measures shall be used to keep the exposure of employees to air contaminants within the limits prescribed in this section. Any equipment and technical measures used for this purpose must first be approved for each particular use by a competent technically qualified person. 33(c) Dust emission beyond fencing Dust coming out of fencing is strictly prohibited. If dust cannot be prevented from coming out of fencing, suitable measures should be implemented like covering the external face of building with dust arresting nets.

Reference and Further information: Occupational Safety and Health Administration (OSHA) USA Standard # 1926.55

34.0 Hazardous Waste Management at site 34(a) All the construction sites should be provided with enough number of skips and skips should be removed at regular intervals. All sites shall earmark or allocate a separate area for the storage of scrap materials, wastes before they are disposed off suitably. 34(b) When disposing of scrap containers the following should be observed:

i. Residue should be minimized. ii. Emptied before puncturing, cutting or applying pressure to crush

such container to avoid risk of explosion or fire. iii. Puncture or crush and render the container unreusable when

selling it as scrap.

Page 93: Health Safety Environment (HSE ) Regulationsdcca.gov.ae/wp-content/uploads/circulars/za-dc-reg-01 health safety... · Health, Safety and Environment Regulations Revision 1 Issue Date

Government of Dubai

Dubai Technology and Media Free Zone Authority Zoning Authority – Development Control

Document no. ZA-DC-REG-01

Revision 1 Issue Date 29.10.08 Health, Safety and Environment Regulations

Page 93 of 104

iv. Bring only clean containers to licensed scrap dealer or -to recycling plants such as a steel smelting plant.

v. Contractor must have DM- EPSS approval to dispose of contaminated steel drums for metal recycling.

vi. Apply in writing to DM- EPSS whenever contaminated containers are going to be disposed of and obtain the required approval in accordance with the EPS Technical Guideline No. 26 – the guideline for the disposal of hazardous wastes.

34(c) Off-site disposal of contaminated containers by any means shall have prior written consent from DM-EPSS. No person shall be allowed to dispose of contaminated containers into Dubai Municipality landfill site or elsewhere without obtaining prior written permit.

34(d) Only persons or establishment that holds a written approval from Dubai Municipality shall be allowed to deal with, buy and sell, or dispose of used contaminated containers. 34(e) Waste water Waste water from toilet and washrooms shall be connected either to drainage or to septic tank and soak pits as per the design approved by the Zoning Authority Development Control

Reference and Further information:

Dubai Municipality Environment Guidelines TEL: 2064244/ 2064245 FAX: 2270160

Page 94: Health Safety Environment (HSE ) Regulationsdcca.gov.ae/wp-content/uploads/circulars/za-dc-reg-01 health safety... · Health, Safety and Environment Regulations Revision 1 Issue Date

Government of Dubai

Dubai Technology and Media Free Zone Authority Zoning Authority – Development Control

Document no. ZA-DC-REG-01

Revision 1 Issue Date 29.10.08 Health, Safety and Environment Regulations

Page 94 of 104

35.0 Site Fencing and Access Control on site 35(a) Under the requirements of these regulations poor security arrangements that fail to prevent unauthorized persons from gaining access to a site, premises or a workplace where construction work is taking place, are probably a violation of regulations. 35(b) It shall be the duty of every employer (contractor) to conduct his undertaking in such a way as to ensure, so far as is reasonably practicable, that persons not in his employment who may be affected thereby are not exposed to risks to their health and safety.

35(c) Perimeter Fencing or Hoarding

1. Two meters high close boarded wooden perimeter fence, or hoarding should be provided.

2. Gaps in the fencing or hoardings should not be allowed. 3. There should not be any gaps between ground level and bottom of

the fencing to prevent risk to health and safety of small children when they gain access to site through gaps.

35(d) Gates or Access points

1. The number of gates or access points through the fence should be kept to a minimum in order that effective control can be maintained over those persons wanting to get onto site. This must, however, be balanced by the need for emergency exits in the case of fire or other circumstances.

35(e) Requirements of security guard on site

1. All the entrance gates should be permanently manned, with site staff or employees from a security company.

Page 95: Health Safety Environment (HSE ) Regulationsdcca.gov.ae/wp-content/uploads/circulars/za-dc-reg-01 health safety... · Health, Safety and Environment Regulations Revision 1 Issue Date

Government of Dubai

Dubai Technology and Media Free Zone Authority Zoning Authority – Development Control

Document no. ZA-DC-REG-01

Revision 1 Issue Date 29.10.08 Health, Safety and Environment Regulations

Page 95 of 104

36.0 Regulations for pre cast - Concrete Construction

Scope, application, and definitions applicable to these regulations 36(a) Scope and application These regulations sets forth requirements to protect all construction employees from the hazards associated with concrete and masonry construction operations performed in workplaces. 36(b) Definitions applicable to these regulations (b)(1) Bull float means a tool used to spread out and smooth concrete. (b)(2) Formwork means the total system of support for freshly placed or partially cured concrete, including the mold or sheeting (form) that is in contact with the concrete as well as all supporting members including shores, reshores, hardware, braces, and related hardware. (b)(3) Limited access zone means an area alongside a masonry wall, which is under construction, and which is clearly demarcated to limit access by employees. (b)(4) Pre-cast concrete means concrete members (such as walls, panels, slabs, columns, and beams) which have been formed, cast, and cured prior to final placement in a structure. (b)(5) Reshoring means the construction operation in which shoring equipment (also called reshores or reshoring equipment) is placed, as the original forms and shores are removed, in order to support partially cured concrete and construction loads. (b)(6) Shore means a supporting member that resists a compressive force imposed by a load. 36(c) General requirements

36(c) (1) Construction loads. No construction loads should be placed on a concrete structure or portion of a concrete structure unless the employer determines, based on information received from a person who is qualified in structural design, that the structure or portion of the structure is capable of supporting the loads. 36(c) (2) Reinforcing steel All protruding reinforcing steel, onto and into which employees could fall, should be guarded to eliminate the hazard of impalement.

Page 96: Health Safety Environment (HSE ) Regulationsdcca.gov.ae/wp-content/uploads/circulars/za-dc-reg-01 health safety... · Health, Safety and Environment Regulations Revision 1 Issue Date

Government of Dubai

Dubai Technology and Media Free Zone Authority Zoning Authority – Development Control

Document no. ZA-DC-REG-01

Revision 1 Issue Date 29.10.08 Health, Safety and Environment Regulations

Page 96 of 104

36(c) (3) Post-tensioning operations

i. No employee (except those essential to the post-tensioning operations) shall be permitted to be behind the jack during tensioning operations.

ii. Signs and barriers shall be erected to limit employee access to the post-tensioning area during tensioning operations.

36(d) Working under loads 36(d) (1) No employee shall be permitted to work under concrete buckets while buckets are being elevated or lowered into position. 36(d) (2) To the extent practical elevated concrete buckets shall be routed so that no employees, or the fewest number of employees, are exposed to the hazards associated with falling concrete buckets. 36(e) Personal protective equipment No employee shall be permitted to apply a cement, sand, and water mixture through a pneumatic hose unless the employee is wearing protective head and face equipment.

Reference and Further information: Occupational Safety and Health Administration (OSHA) USA Standard # 1926.700, 1926.701,

1926.702

Page 97: Health Safety Environment (HSE ) Regulationsdcca.gov.ae/wp-content/uploads/circulars/za-dc-reg-01 health safety... · Health, Safety and Environment Regulations Revision 1 Issue Date

Government of Dubai

Dubai Technology and Media Free Zone Authority Zoning Authority – Development Control

Document no. ZA-DC-REG-01

Revision 1 Issue Date 29.10.08 Health, Safety and Environment Regulations

Page 97 of 104

37.0 Regulations for cast-in-place concrete construction Requirements for equipment and tools 37(a) Concrete mixers Concrete mixers with one cubic meter or larger loading skips shall be equipped with the following: 37(a) (1) A mechanical device to clear the skip of materials; and 37(a) (2) Guardrails installed on each side of the skip. 37(b) Power concrete trowels Powered and rotating type concrete troweling machines that are manually guided shall be equipped with a control switch that will automatically shut off the power whenever the hands of the operator are removed from the equipment handles. 37(c) Concrete buggies Concrete buggy handles shall not extend beyond the wheels on either side of the buggy. 37(d) Concrete pumping systems. 37(d)(1) Concrete pumping systems using discharge pipes shall be provided with pipe supports designed for 100 percent overload. 37(d)(2) Compressed air hoses used on concrete pumping system shall be provided with positive fail-safe joint connectors to prevent separation of sections when pressurized. 37(e) Concrete buckets. 37(e) (1) Concrete buckets equipped with hydraulic or pneumatic gates should have positive safety latches or similar safety devices installed to prevent premature or accidental dumping.

Page 98: Health Safety Environment (HSE ) Regulationsdcca.gov.ae/wp-content/uploads/circulars/za-dc-reg-01 health safety... · Health, Safety and Environment Regulations Revision 1 Issue Date

Government of Dubai

Dubai Technology and Media Free Zone Authority Zoning Authority – Development Control

Document no. ZA-DC-REG-01

Revision 1 Issue Date 29.10.08 Health, Safety and Environment Regulations

Page 98 of 104

37(e) (2) Concrete buckets should be designed to prevent concrete from hanging up on top and the sides. 37(e) (3) Concrete buckets, which will be used to lift concrete with mechanical equipments (cranes) should be thoroughly examined and tested by approved third party at least once in 6 months. 37(e) (4) Certificate of test should be kept at site for inspection by Zoning Authority – Development Control inspectors 37(e) (5) Riding concrete buckets. No employee should be permitted to ride concrete buckets. 37(f) Masonry saws 37(f) (1) Masonry saw shall be guarded with that the equipment meets the requirements a semicircular enclosure over the blade.

Reference and Further information: Occupational Safety and Health Administration (OSHA) USA Standard # 1926.703

38.0 Regulations of Form work, Shoring, Reinforcing steel, Masonry Construction 38(a) General requirements for formwork (a)(1) Formwork shall be designed, fabricated, erected, supported, braced and maintained so that it will be capable of supporting without failure all vertical and lateral loads that may reasonably be anticipated to be applied to the formwork. Formwork should be designed, fabricated, erected, supported, braced and maintained properly. 38(b) Shoring and re-shoring . (b)(1) All Shoring equipment (including equipment used in reshoring operations) shall be inspected prior to erection. (b)(2) Erected shoring equipment shall be inspected immediately prior to, during, and immediately after concrete placement. (b)(3) The sills for shoring shall be sound.

Page 99: Health Safety Environment (HSE ) Regulationsdcca.gov.ae/wp-content/uploads/circulars/za-dc-reg-01 health safety... · Health, Safety and Environment Regulations Revision 1 Issue Date

Government of Dubai

Dubai Technology and Media Free Zone Authority Zoning Authority – Development Control

Document no. ZA-DC-REG-01

Revision 1 Issue Date 29.10.08 Health, Safety and Environment Regulations

Page 99 of 104

(b)(4) All base plates, shore heads, extension devices, and adjustment screws shall be in firm contact, and secured when necessary, with the foundation and the form. (b)(5) Eccentric loads on shore heads and similar members shall be prohibited unless these members have been designed for such loading. 38(c) Reinforcing steel . (c)(1) Reinforcing steel for walls, piers, columns, and similar vertical structures shall be adequately supported to prevent overturning and to prevent collapse. (c)(2) Employers shall take measures to prevent unrolled wire mesh from recoiling. Such measures may include, but are not limited to, securing each end of the roll or turning over the roll 38(d) Removal of formwork (d)(1) Forms and shores (except those used for slabs on grade and slip forms) shall not be removed until the employer determines that the concrete has gained sufficient strength to support its weight and superimposed loads. Such determination shall be based on compliance with one of the following: (d)(1)(i) The plans and specifications stipulate conditions for removal of forms and shores, and such conditions have been followed, or (d)(1)(ii) The concrete has been properly tested with an appropriate international standard test method designed to indicate the concrete compressive strength, and the test results indicate that the concrete has gained sufficient strength to support its weight and superimposed loads. (d)(1)(iii) Adequate safety measures shall be taken to prevent falling of form work on during removal. The area shall be made limited access zone. (d)(2) Reshoring shall not be removed until the concrete being supported has attained adequate strength to support its weight and all loads in place upon it.

38(e) Requirements for masonry construction

38(e) (1) a limited access zone shall be established whenever a masonry wall is being constructed. The limited access zone shall conform to the following. 38(e) (2) the limited access zone shall be established prior to the start of construction of the wall. 38(e)(3)The limited access zone shall be equal to the height of the wall to reconstructed plus four feet, and shall run the entire length of the wall. 38(e) (4) the limited access zone shall be established on the side of the wall which will be unscaffolded. 38(e) (5) the limited access zone shall be restricted to entry by employees actively engaged in constructing the wall. No other employees shall be permitted to enter.

Reference and Further information: Occupational Safety and Health Administration (OSHA) USA Standard # 1926.700, 1926.701,

1926.702

Page 100: Health Safety Environment (HSE ) Regulationsdcca.gov.ae/wp-content/uploads/circulars/za-dc-reg-01 health safety... · Health, Safety and Environment Regulations Revision 1 Issue Date

Government of Dubai

Dubai Technology and Media Free Zone Authority Zoning Authority – Development Control

Document no. ZA-DC-REG-01

Revision 1 Issue Date 29.10.08 Health, Safety and Environment Regulations

Page 100 of 104

39.0 Non-Ionizing radiation. 39(a) Only qualified and trained employees shall be assigned to install, adjust, and operate laser equipment.

39(b) Proof of qualification of the laser equipment operator shall be available and in possession of the operator at all times. 39(c) Employees, when working in areas in which a potential exposure to direct or reflected laser light greater than 0.005 watts (5 mill watts) exists, shall be provided with anti laser eye protection devices. 39(d) Areas in which lasers are used shall be posted with standard laser warning placards.

39(e) Beam shutters or caps shall be utilized, or the laser turned off, when laser transmission is not actually required. When the laser is left unattended for a substantial period of time, such as during lunch hour, overnight, or at change of shifts, the laser shall be turned off 39(f) Only mechanical or electronic means shall be used as a detector for guiding the internal alignment of the laser.

39(g) The laser beam shall not be directed at employees. 39(h) When there is dust or fog in the air, the operation of laser systems shall be prohibited where practicable, in any event, employees shall be kept out of range of the area of source and target during such weather conditions. 39(i) Laser equipment shall bear a label to indicate maximum output. 39(j) Employees shall not be exposed to anthophyllite, or actinolite dust

Reference and Further information: Occupational Safety and Health Administration (OSHA) USA Standard # 1926.54

Page 101: Health Safety Environment (HSE ) Regulationsdcca.gov.ae/wp-content/uploads/circulars/za-dc-reg-01 health safety... · Health, Safety and Environment Regulations Revision 1 Issue Date

Government of Dubai

Dubai Technology and Media Free Zone Authority Zoning Authority – Development Control

Document no. ZA-DC-REG-01

Revision 1 Issue Date 29.10.08 Health, Safety and Environment Regulations

Page 101 of 104

40.0 Accident Prevention Signs, Signals, Barricades and Tags

40(a) General. Signs and symbols required by this subpart shall be visible at all times when work is being performed, and shall be removed or covered promptly when the hazards no longer exist. 40(b) Danger signs. 38(b)(1) Danger signs shall be used only where an immediate hazard exists. 40(b)(2) Danger signs shall have red as the predominating color for the upper panel, black outline on the borders, and a white lower panel for additional sign wording. 40(c) Caution signs. 40(c)(1) Caution signs shall be used only to warn against potential hazards or to caution against unsafe practices. 40(c)(2) Caution signs shall have yellow as the predominating color; black upper panel and borders: yellow lettering of "caution" on the black panel; and the lower yellow panel for additional sign wording. Black lettering shall be used for additional wording. 40(c)(3) Standard color of the background shall be yellow; and the panel, black with yellow letters. Any letters used against the yellow background shall be black. 40(d) Exit signs. Exit signs, when required, shall be lettered in legible red letters, not less than 6 inches high, on a white field and the principal stroke of the letters shall be at least three-fourths inch in width. 40(e) Safety instruction signs. Safety instruction signs, when used, shall be white with green upper panel with white letters to convey the principal message. Any additional wording on the sign shall be black letters on the white background.

Page 102: Health Safety Environment (HSE ) Regulationsdcca.gov.ae/wp-content/uploads/circulars/za-dc-reg-01 health safety... · Health, Safety and Environment Regulations Revision 1 Issue Date

Government of Dubai

Dubai Technology and Media Free Zone Authority Zoning Authority – Development Control

Document no. ZA-DC-REG-01

Revision 1 Issue Date 29.10.08 Health, Safety and Environment Regulations

Page 102 of 104

40(f) Directional signs. Directional signs, other than automotive traffic signs specified in paragraph (g) of this regulation, shall be white with a black panel and a white directional symbol. Any additional wording on the sign shall be black letters on the white background. 40(g) Traffic signs. 40(g)(1) Construction areas shall be posted with legible traffic signs at points of hazard. 40(g)(2) All traffic control signs or devices used for protection of construction workers shall conform to Dubai Municipality & Dubai Traffic Department standards. 40(h) Accident prevention tags. 40(h)(1) Accident prevention tags shall be used as a temporary means of warning employees of an existing hazard, such as defective tools, equipment, etc. They shall not be used in place of, or as a substitute for, accident prevention signs.

Definitions applicable to above regulations: Barricade means an obstruction to deter the passage of persons or vehicles. Signs are the warnings of hazard, temporarily or permanently affixed or placed, at locations where hazards exist. Signals are moving signs, provided by workers, such as flag men, or by devices, such as flashing lights, to warn of possible or existing hazards. Tags are temporary signs, usually attached to a piece of equipment or part of a structure, to warn of existing or immediate hazards.

Reference and Further information: Occupational Safety and Health Administration (OSHA) USA Standard # 1926.200, 1926.203

Page 103: Health Safety Environment (HSE ) Regulationsdcca.gov.ae/wp-content/uploads/circulars/za-dc-reg-01 health safety... · Health, Safety and Environment Regulations Revision 1 Issue Date

Government of Dubai

Dubai Technology and Media Free Zone Authority Zoning Authority – Development Control

Document no. ZA-DC-REG-01

Revision 1 Issue Date 29.10.08 Health, Safety and Environment Regulations

Page 103 of 104

41.0 Cantilever Material Loading Platforms 41(a)

Design 41(a) (1) Any temporary cantilever material loading platform used for the purpose of material

loading, unloading operations at site should be designed properly by taking structural calculations in to consideration.

41(a) (2)

Cantilever material loading platforms for the purpose of material loading or unloading should be designed by a competent Structural Engineer only.

41(b)

Material 41(b) (1)

Cantilever material loading platforms should be constructed with adequate strength

steel. Material should be free from patent defects. 41(b) (2) Usage of timber/ wood as construction material of cantilever material loading

platform is strictly prohibited. 41(c)

Third party examination and testing 41(c) (1) Cantilever material loading platforms should be examined and tested by approved

third party and certificates of test certificates should be obtained. 41(c) (2) The examination and testing should be carried out after erection before use. Re-

examination and testing should be carried out whenever cantilever platforms are repaired or altered or change in location of use takes place.

41(d)

Periodical Inspection 41(d) (1)

Page 104: Health Safety Environment (HSE ) Regulationsdcca.gov.ae/wp-content/uploads/circulars/za-dc-reg-01 health safety... · Health, Safety and Environment Regulations Revision 1 Issue Date

Government of Dubai

Dubai Technology and Media Free Zone Authority Zoning Authority – Development Control

Document no. ZA-DC-REG-01

Revision 1 Issue Date 29.10.08 Health, Safety and Environment Regulations

Page 104 of 104

Cantilever material loading platforms should be inspected at regular intervals and maintained to ensure a safe operation of intended purpose. 41(d) (2) Records of periodical inspections should be maintained at site for inspection by Zoning Authority – Development Control Inspector.

41(e) Falling of material 41(e) (1) Suitable and sufficient measures should be in place to prevent falling of material from platforms

41(f) Falling of persons 41(f) (1) Adequate measures should be taken to prevent falling of persons from the platforms. Further information: HSE Guidelines of Zoning Authority – Development Control