45
03.12.2009 Dillinger Colloquium Constructional Steelwork 1 High Strength Steel for Steel Constructions Ronny Willms AG der Dillinger Hüttenwerke

High Strength Steel for Steel Constructions

  • Upload
    others

  • View
    8

  • Download
    0

Embed Size (px)

Citation preview

Page 1: High Strength Steel for Steel Constructions

03.12.2009 Dillinger Colloquium Constructional Steelwork 1

High Strength Steelfor Steel Constructions

Ronny WillmsAG der Dillinger Hüttenwerke

Page 2: High Strength Steel for Steel Constructions

03.12.2009 Dillinger Colloquium Constructional Steelwork 2

CONTENT

IntroductionDelivery Conditions

- AR- N / NE- Q + T- TM

Advantages of TM- Processing- EconomicsExamples

Page 3: High Strength Steel for Steel Constructions

03.12.2009 Dillinger Colloquium Constructional Steelwork 3

High strength steel – What´s that?

End of 1920: Introduction of the steel grade St52 (S355) for bridge-building (Prof. Klöppel)

→ St52 was called a high strength steelfor a long period

Now: S355 is a standard material for bridge-building→ Definition of „high strength“ depends on

the technical developement

Today´s Definition: high strength steel⇔

Steel with ReH > 355 MPa

Introduction

Page 4: High Strength Steel for Steel Constructions

03.12.2009 Dillinger Colloquium Constructional Steelwork 4

High strength steel

Weight reduction Economical processing

Introduction

Page 5: High Strength Steel for Steel Constructions

03.12.2009 Dillinger Colloquium Constructional Steelwork 5

Coking plant

Sintering plant

Blast furnaces

Desulphurisation

Steel mill

Converter

Vacuum treatment

Ingot casting

Continuous casting Rolling mill

Introduction

Page 6: High Strength Steel for Steel Constructions

03.12.2009 Dillinger Colloquium Constructional Steelwork 6

Coking plant

Sintering plant

Blast furnaces

Desulphurisation

Steel mill

Converter

Vacuum treatment

Ingot casting

Continuous casting Rolling mill

Introduction

Page 7: High Strength Steel for Steel Constructions

03.12.2009 Dillinger Colloquium Constructional Steelwork 7

DELIVERY CONDITIONS

AR NQ+TTM

Delivery Conditions

Page 8: High Strength Steel for Steel Constructions

03.12.2009 Dillinger Colloquium Constructional Steelwork 8

Delivery Conditions

Page 9: High Strength Steel for Steel Constructions

03.12.2009 Dillinger Colloquium Constructional Steelwork 9

hot rolling

Delivery Conditions

AR

Page 10: High Strength Steel for Steel Constructions

03.12.2009 Dillinger Colloquium Constructional Steelwork 10

Classical rolling

Normalising

Cooling on calm air

Transition area:α-Fe - γ-Fe

AR As Rolled

Delivery Conditions

T

t

Page 11: High Strength Steel for Steel Constructions

03.12.2009 Dillinger Colloquium Constructional Steelwork 11

hot-rolling + Normalising

Delivery Conditions

N

Page 12: High Strength Steel for Steel Constructions

03.12.2009 Dillinger Colloquium Constructional Steelwork 12

Classical rolling

Normalising

Cooling on calm air Cooling on

calm air

Transition area:α-Fe - γ-Fe

N NormalisingT

t

Delivery Conditions

Page 13: High Strength Steel for Steel Constructions

03.12.2009 Dillinger Colloquium Constructional Steelwork 13

Phase 1

t

Transition area:α-Fe - γ-Fe

Phase 2 (T > 900°C)

Waiting time

Definition: After an additional normalising inthe furnace, the properties of a normalised rolledplate must fulfil the mechanical requirementsof the standard.

Cooling on calm air

N Normalising rollingT

Delivery Conditions

Page 14: High Strength Steel for Steel Constructions

03.12.2009 Dillinger Colloquium Constructional Steelwork 14

hot-rolling Quenching + Tempering

Delivery Conditions

Q+T

Page 15: High Strength Steel for Steel Constructions

03.12.2009 Dillinger Colloquium Constructional Steelwork 15

Classical rolling

Quenching

Tempering

core

surface

Q+T Quenching + TemperingT

t

Delivery Conditions

Page 16: High Strength Steel for Steel Constructions

03.12.2009 Dillinger Colloquium Constructional Steelwork 16

Q+T Effect of quenching

Carbon solvedin the lattice Austenite

Ferrite + Cementite(Carbon can leave

the lattice)

fastcooling:

Martensite

[°C]1390

910

slowcooling:

Ferrite+

Perlite

Martensite(Carbon staysin the lattice,

distorted structure)

Delivery Conditions

Page 17: High Strength Steel for Steel Constructions

03.12.2009 Dillinger Colloquium Constructional Steelwork 17

Q+T Effect of tempering

-120 -100 -80 -60 -40 -20 00

50

100

150

200

250

A4

A3

A2

A1

quenchedCha

rpy-

V [J

]

Temperature [°C]

Delivery Conditions

Page 18: High Strength Steel for Steel Constructions

03.12.2009 Dillinger Colloquium Constructional Steelwork 18

Q+T Effect of tempering

700

800

900

1000

1100

1200

1300

1400

A2 A4A3A1quenched

Yield point Ultimate stength

Stre

ngth

[MP

a]

Temper-Parameter

Delivery Conditions

Page 19: High Strength Steel for Steel Constructions

03.12.2009 Dillinger Colloquium Constructional Steelwork 19

Q+T Typical applications

Delivery Conditions

Page 20: High Strength Steel for Steel Constructions

03.12.2009 Dillinger Colloquium Constructional Steelwork 20

ThermoMechanical rolling

Delivery Conditions

TM

Page 21: High Strength Steel for Steel Constructions

03.12.2009 Dillinger Colloquium Constructional Steelwork 21

Phase 1

Cooling on calm air

Phase 2 (T > 900°C)

Waiting time

Phase 3 (T > 700°C)

Waiting time

Accelerated coolingwith water (ACC)

TM Thermomechanical rolling

Delivery Conditions

T

t

Page 22: High Strength Steel for Steel Constructions

03.12.2009 Dillinger Colloquium Constructional Steelwork 22

TEM

PER

ATU

RE

TIME

Heating

Tempering

γ (coarse) γ (fine)recrystallised

Grain refinement

Final rolling

Accelerated cooling

αγ (fine)formed

Cooling on air

TM Thermomechanical rolling

Delivery Conditions

Page 23: High Strength Steel for Steel Constructions

03.12.2009 Dillinger Colloquium Constructional Steelwork 23

TM Fine grain

TM High toughness

TM Low carbon content

TM Low preheating temperatures

Excellent WELDABILITY

Advantages of TM-steel - Processing

PROPERTIES OF TM-steel:

Page 24: High Strength Steel for Steel Constructions

03.12.2009 Dillinger Colloquium Constructional Steelwork 24

TM Fine grain

Grain size ↓

Hall-Petch:

Strength ↑

Toughness ↑

Excellent weldability+

TM (ACC)Normalised TM (air)

Advantages of TM-steel - Processing

Page 25: High Strength Steel for Steel Constructions

03.12.2009 Dillinger Colloquium Constructional Steelwork 25

TM High toughness / High safety

-120 -100 -80 -60 -40 -20 0 200

50

100

150

200

250

300

350 S355J2+N S460ML S690QL

Cha

rpy-

V [J

]

Temperature [°C]

Advantages of TM-steel - Processing

Page 26: High Strength Steel for Steel Constructions

03.12.2009 Dillinger Colloquium Constructional Steelwork 26

TM High toughness / High safety

-120 -100 -80 -60 -40 -20 0 200

50

100

150

200

250

300

350 S355J2+N S460ML S690QL

Cha

rpy-

V [J

]

Temperature [°C]

Welding leads to

toughness

reduction

High toughnessin the base

material reducesthe risk of brittle

fracture and gives saftey!

Advantages of TM-steel - Processing

Page 27: High Strength Steel for Steel Constructions

03.12.2009 Dillinger Colloquium Constructional Steelwork 27

Example: Ilverich Rhine Bridge (Germany)DI-MC 460 with a thickness up to 100 mmCharpy tested at - 80°C

TM High toughness / High safety

Advantages of TM-steel - Processing

Page 28: High Strength Steel for Steel Constructions

03.12.2009 Dillinger Colloquium Constructional Steelwork 28

S 460 NL S 460 ML

acc. EN 10025-3

Auxiliary Data

acc. EN 10025-4

Auxiliary Data

C < 0,20 0,17 < 0,16 0,09 Si < 0,60 0,45 < 0,60 0,30 Mn 1,00 - 1,70 1,65 < 1,70 1,50 P < 0,030 0,015 < 0,030 0,011 S < 0,025 0,010 < 0,025 0,005

Nb < 0,05 - < 0,05 < 0,04 V < 0,20 0,17 < 0,12 < 0,05

Mo < 0,10 - < 0,20 - Ni < 0,80 0,29 < 0,45 0,25 CE 0,50 0,39

Pcm 0,29 0,20 CET 0,34 0,28

Carbon equivalents: CE = C + Mn/6 + (Cr + Mo + V)/5 + (Ni+Cu)/15 Pcm = C +Si/30 + (Mn + Cu + Cr)/20 + Ni/60 + Mo/15 + V/10 + 5B CET = C + (Mn + Mo)/10 + (Cr + Cu)/20 + Ni/40

TM Low carbon content

Plate thickness 50 mm

Advantages of TM-steel - Processing

Page 29: High Strength Steel for Steel Constructions

03.12.2009 Dillinger Colloquium Constructional Steelwork 29

TM Low preheating temperatures

EN 1011-2Recommendations for arc welding of ferritic steels

( ) 328Q32CET53HD6235dtanh160CET697T 35.0

p −×−×+×+⎟⎠⎞

⎜⎝⎛×+×=

Tp - Preheating temperature [°C]CET - Carbon equivalent [%]: CET = C + (Mn + Mo)/10 + (Cr + Cu)/20 + Ni/40d - Plate thickness [mm]HD - Hydrogen content [cm³/100 g]Q - Heat input [kJ/mm]

Preheating is necessary to avoid: excessive hardening

Preheating is necessary to avoid: cold cracking

Advantages of TM-steel - Processing

Page 30: High Strength Steel for Steel Constructions

03.12.2009 Dillinger Colloquium Constructional Steelwork 30

TM Low preheating temperatures

0 20 40 60 800

2

4

6

8

10

75°C

50°C

25°C

typischer Bereichfür H2 Gehalte

S355M S460M

Plate thickness [mm]

Hyd

roge

nco

nten

tof w

eldi

ngco

nsum

able

[cm

3 /100

g]H

ydrogencontentof w

eldingconsum

able[cm

3/100g]

0 20 40 60 800

2

4

6

8

10

100°C

75°C

50°C

25°C

typischer Bereichfür H2 Gehalte

Plate thickness [mm]

Calculated with Q = 2.5 kJ/mm (submerged arc welding) and for typical CET´s

Advantages of TM-steel - Processing

Page 31: High Strength Steel for Steel Constructions

03.12.2009 Dillinger Colloquium Constructional Steelwork 31

TM Cost efficiency – Low preheating

Reducing preheating

temperatures

Avoiding

preheating

1.

2.

Gas consumption ↓Heating time ↓

No installationsNo setting up time

No gas

Advantages of TM-steel - Economics

Page 32: High Strength Steel for Steel Constructions

03.12.2009 Dillinger Colloquium Constructional Steelwork 32

Reducing preheating

temperatures

Avoiding

preheating

1.

2.

Gas consumption ↓Heating time ↓

No installationsNo setting up time

No gas

Often underestimated,but worth to think about

TM Cost efficiency – Low preheating

Advantages of TM-steel - Economics

Page 33: High Strength Steel for Steel Constructions

03.12.2009 Dillinger Colloquium Constructional Steelwork 33

Reducing preheating

temperatures

Avoiding

preheating

1.

2.

Gas consumption ↓Heating time ↓

No installationsNo setting up time

No gas

Often underestimated,but worth to think about

Biggest potentialfor saving costs

TM Cost efficiency – Low preheating

Advantages of TM-steel - Economics

Page 34: High Strength Steel for Steel Constructions

03.12.2009 Dillinger Colloquium Constructional Steelwork 34

S355NL

S355ML

changingdeliverycondition

t1

t2

t1 = t2

TM Cost efficiency – Low preheating

Advantages of TM-steel - Economics

Possibility to avoid preheating!• no gas consumption• no set-up times• higher capacity in the work shop

0,2 0,3 0,4 0,5-50

0

50

100

150

200

250

T p C

ET [°

C]

Carbon equivalent CET [%]

EN 1011-2:TpCET = 750 x CET – 1500.01% CET ca. 7.5°C

Page 35: High Strength Steel for Steel Constructions

03.12.2009 Dillinger Colloquium Constructional Steelwork 35

Sauertal Bridge (Germany)

Box-girder-bridgeLength: 1195 mWidth: 27 m11 Spans: 75 – 150 mTonnage: 13,000 tGrade: S355J2+N

3000 t > 25 mm thickness

TM Cost efficiency – Low preheating

Advantages of TM-steel - Economics

Page 36: High Strength Steel for Steel Constructions

03.12.2009 Dillinger Colloquium Constructional Steelwork 36

Alternative:

S355J2+N > S355MNo preheating

150,000 €C = A - BBENEFIT

75,000 €B = 3,000 x 25 €/tB) Additional costs S355M (25 €/t)

225,000 €A = 30,000 h x 15 % x 50 €/hA) Saving preheating times

Conditions:

30,000 h welding time15 % for preheating50 €/h labour costs

TM Cost efficiency – Low preheating

Advantages of TM-steel - Economics

Page 37: High Strength Steel for Steel Constructions

03.12.2009 Dillinger Colloquium Constructional Steelwork 37

TM Cost efficiency – Low preheating

Advantages of TM-steel - Economics

Low preheating temperatures are not only a matter of costs!Also in terms of job safety, low preheating temperatures are beneficial!

NO HOT SURFACES / NO HANDLING WITH GAS / BETTER WORKING CONDITIONS

Page 38: High Strength Steel for Steel Constructions

03.12.2009 Dillinger Colloquium Constructional Steelwork 38

TM Cost efficiency – High strength TM

S460NL

S355NL fy = 315 Mpa

increasingyield

strength

t

t

A

A,B ~ t2

Wel

ding

cos

tsPlate thickness

~ t²

• Weight reduction• Bigger assembling units possible• Less holding times in the workshop• Less welding consumables• Reduction of welding time• Reduction of testing time

t1

t2

t2 < t1

Advantages of TM-steel - Economics

Page 39: High Strength Steel for Steel Constructions

03.12.2009 Dillinger Colloquium Constructional Steelwork 39

S460NL73 mm

73 mm

S355NL fy = 315 Mpa100 mm

S460ML

increasingyield

strength

changingdeliverycondition

TM Cost efficiency – High strength TM

Advantages of TM-steel - Economics

• Weight reduction (ca. 30%)• Bigger assembling units possible• Less holding times in the workshop• Less welding consumables• Reduction of welding time• Reduction of testing time

• Avoiding/Reducing preheating• Better weldability• High toughness reserves

=> High safety

Page 40: High Strength Steel for Steel Constructions

03.12.2009 Dillinger Colloquium Constructional Steelwork 40

Strength

ToughnessDeliverycondition

Choosing the right steel

Page 41: High Strength Steel for Steel Constructions

03.12.2009 Dillinger Colloquium Constructional Steelwork 41

Strength

ToughnessDeliverycondition

Choosing the right steel

Page 42: High Strength Steel for Steel Constructions

03.12.2009 Dillinger Colloquium Constructional Steelwork 42

- TM-Steel S460ML

- constant yieldstrength up to120 mm

Airbus-Hangar (Frankfurt / M.)

Reference Projects

Page 43: High Strength Steel for Steel Constructions

03.12.2009 Dillinger Colloquium Constructional Steelwork 43

- TM-Steel S460M

- thicknessup to 100 mm

- constant yieldstrength

World Financial Center (Shanghai)

Reference Projects

Page 44: High Strength Steel for Steel Constructions

03.12.2009 Dillinger Colloquium Constructional Steelwork 44

Reference Projects

Øresund Bridge (Denmark-Sweden)

- TM-Steel

- S460M/MLup to 80 mm

Page 45: High Strength Steel for Steel Constructions

03.12.2009 Dillinger Colloquium Constructional Steelwork 45

Thank youfor your