PRESENTATION ON INDUSTRIAL
TRAING IN ,PINJORE
7/31/2019 hmt pinjor
2/36
HMT LIMITED-A PROFILE HMT was established in 1953 in technical
collaboration with M/sOerlikon of Switerzland.
Over the years diversified into Watches ,Tractors,Printing machinery ,Metal forming presses ,Diecasting & Processing machinery,CNC systems &Bearings.
Today ,HMT comprises five subsidiaries under theambit of a Holding Company ,also manages the TracterBusiness directly.
7/31/2019 hmt pinjor
3/36
MISSONS & GOALS To establish ourselves as one of worlds premier
companies in the engineering field having stronginternational competitiveness.
To achieve market leadership in India throughensuring customer satisfaction by supplyinginternationally competitive products.
To achieve sustained growth in the earnings of thegroup on behalves of shareholders.
7/31/2019 hmt pinjor
4/36
HMT TRACTORS LIMITED HMTs tractor project commenced its operation from
Pinjore in june 1971. This unit is the main unit todayfully integrated with foundry,manufacturing,assemblyand testing facilities for 20000 tractors & engines.Beside ,assembly unit at Hyderabad.
The tractor unit is certified with ISO 9001 Quality
Standards.
7/31/2019 hmt pinjor
5/36
HMTTRACTERS
MANUFACTURING UNITS
HMTPINJORE,HARYANA
HMT
HYDERABAD, A.D
MARKETINGDIVISION
7/31/2019 hmt pinjor
6/36
DIVISION OF PINJORE PLANTTraining Center
Machine Tool DivisionTractor Division.
7/31/2019 hmt pinjor
7/36
7/31/2019 hmt pinjor
8/36
ENGINE ASSEMBLY SHOP
7/31/2019 hmt pinjor
9/36
1.Crankcase is mounted on rolling
convey
7/31/2019 hmt pinjor
10/36
2.Crankcase cap is opened
7/31/2019 hmt pinjor
11/36
3.Main bearing is fitted and thrust
washer is fitted in cap.
7/31/2019 hmt pinjor
12/36
4.Crankshaft is mounted
7/31/2019 hmt pinjor
13/36
5.Camshaft is mounted
7/31/2019 hmt pinjor
14/36
6.Timing gears are fitted
7/31/2019 hmt pinjor
15/36
7.Piston & connecting rods are
assembled and fitted
7/31/2019 hmt pinjor
16/36
8.Lubrication pump &oil filter are
fitted
9. Gasket are placed and metal
covers are fitted
7/31/2019 hmt pinjor
17/36
10.Dual clutch is fitted.
7/31/2019 hmt pinjor
18/36
11.Cylinder head is fitted.
7/31/2019 hmt pinjor
19/36
. oo en pump e pu ey arefitted.
7/31/2019 hmt pinjor
20/36
13.Inlet manifold &exhaust flange
are fitted.
7/31/2019 hmt pinjor
21/36
14.Tapet &push rod are fitted.
7/31/2019 hmt pinjor
22/36
15.Rocker arm is fitted
n ec or s moun e over
7/31/2019 hmt pinjor
23/36
. n ec or s moun e overcylinder head & clamped to
injector pin.
7/31/2019 hmt pinjor
24/36
17.Dynamo &fuel filter is fitted.
7/31/2019 hmt pinjor
25/36
18.F.I.P. is fitted &its timing is set.
7/31/2019 hmt pinjor
26/36
TRACTER ASSEMBLY
7/31/2019 hmt pinjor
27/36
1.Gear box assembly
7/31/2019 hmt pinjor
28/36
2.M.T. Housing assembly
7/31/2019 hmt pinjor
29/36
3.Portal assembly & three point
linkage is fitted
7/31/2019 hmt pinjor
30/36
4.Engine mounting
7/31/2019 hmt pinjor
31/36
5.Front axle mounting
7/31/2019 hmt pinjor
32/36
6.Steering assembly
7/31/2019 hmt pinjor
33/36
7.Bracking system assembly
8.Washing zone&greasing zone
7/31/2019 hmt pinjor
34/36
9.Radiator & air cleaner mounting
10 Rear & front wheel mounting
7/31/2019 hmt pinjor
35/36
10.Rear & front wheel mounting
11.Bonnet & sheet metal
components are mounted.
7/31/2019 hmt pinjor
36/36