Houston Ship Channel, Bayport to Morgan’s Point and Bayport Flare

Weeks Marine, Inc.

Chuck Broussard

Weeks Marine, Inc. November 2018

Page 2: Houston Ship Channel, Bayport to Morgan’s Point and ......Houston Ship Channel, Bayport to Morgan’s Point and Bayport Flare. Weeks Marine, Inc. Chuck Broussard. Weeks Marine, Inc

Project Overview

Weeks Marine, Inc. November 2018

• 700,000 cubic yards hydraulic dredging sections 1-6 with placement at Atkinson Marsh

• 680,000 cubic yards mechanical dredging Bayport Flare

Page 3: Houston Ship Channel, Bayport to Morgan’s Point and ......Houston Ship Channel, Bayport to Morgan’s Point and Bayport Flare. Weeks Marine, Inc. Chuck Broussard. Weeks Marine, Inc

Section 7 Mechanical Dredging

Weeks Marine, Inc. November 2018

• 28 nautical miles • 54 nautical mile round trip

Page 4: Houston Ship Channel, Bayport to Morgan’s Point and ......Houston Ship Channel, Bayport to Morgan’s Point and Bayport Flare. Weeks Marine, Inc. Chuck Broussard. Weeks Marine, Inc

Bayport Flare – Mechanical Dredge

Section 7

680,400 cubic yards

48.5 ‘ dredge depth

2’ allowable overdepth

ODMDS placement

Weeks Marine, Inc. November 2018

Page 5: Houston Ship Channel, Bayport to Morgan’s Point and ......Houston Ship Channel, Bayport to Morgan’s Point and Bayport Flare. Weeks Marine, Inc. Chuck Broussard. Weeks Marine, Inc

HSC – Bayport Flare

• HSC Section 7 – Bayport Flare

• Mechanical dredge with scow to dredge the Bayport Flare.

• Material consists of shoals that have occurred since the last dredging event.

• Dredging of the Bayport Flare shall be accomplished last in the Order of work.

• Material from Bayport Flare shall be transported and deposited in the ODMDS. No material shall flow beyond the ODMDS limits. An accumulation of material that changes elevation

exceeding 1.0 feet along the limits of the ODMDS or 5.0 feet within the ODMDS is prohibited.

Weeks Marine, Inc. November 2018

Page 6: Houston Ship Channel, Bayport to Morgan’s Point and ......Houston Ship Channel, Bayport to Morgan’s Point and Bayport Flare. Weeks Marine, Inc. Chuck Broussard. Weeks Marine, Inc

HSC – Dredge Equipment

Weeks 5061,035 Ton ABS

Ocean Class 158.5’ x 60’ x 11.5’3,000 hp (Tier 3 Compliant)36 yard bucket capacity

Weeks Marine, Inc. November 2018

Page 7: Houston Ship Channel, Bayport to Morgan’s Point and ......Houston Ship Channel, Bayport to Morgan’s Point and Bayport Flare. Weeks Marine, Inc. Chuck Broussard. Weeks Marine, Inc

HSC – Scow Barges

Weeks Marine, Inc. November 2018

Page 8: Houston Ship Channel, Bayport to Morgan’s Point and ......Houston Ship Channel, Bayport to Morgan’s Point and Bayport Flare. Weeks Marine, Inc. Chuck Broussard. Weeks Marine, Inc

HSC – ODMDS

A

B

Discharge Zone A - BODMDS

Weeks Marine, Inc. November 2018

Page 9: Houston Ship Channel, Bayport to Morgan’s Point and ......Houston Ship Channel, Bayport to Morgan’s Point and Bayport Flare. Weeks Marine, Inc. Chuck Broussard. Weeks Marine, Inc

HSC – Scow Transport

Weeks Marine, Inc. November 2018