How to build a battery in Australia: Lessons learned and how to think about your project Jaad Cabbabe, Sr. Manager, Business Development, Fluence

How to build a battery in Australia: Lessons learned and how to … › wordpress › wp... · 2019-06-20 · Results: Technical Lessons Learned •MASS Tool: AEMO’s MASS tool was

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: How to build a battery in Australia: Lessons learned and how to … › wordpress › wp... · 2019-06-20 · Results: Technical Lessons Learned •MASS Tool: AEMO’s MASS tool was

How to build a battery in Australia: Lessons learned and how to think about your projectJaad Cabbabe, Sr. Manager, Business Development, Fluence

Page 2: How to build a battery in Australia: Lessons learned and how to … › wordpress › wp... · 2019-06-20 · Results: Technical Lessons Learned •MASS Tool: AEMO’s MASS tool was

Fluence is the global leader in energy storage

18COUNTRIES

820+ TOTAL MW

11+YEARS

80+PROJECTS

Page 3: How to build a battery in Australia: Lessons learned and how to … › wordpress › wp... · 2019-06-20 · Results: Technical Lessons Learned •MASS Tool: AEMO’s MASS tool was

Created and backed by two industry powerhouses

EXPERIENCE

11+ years of experience in energy storage from two proven industry pioneers

• World’s leading storage provider• Deployed or been awarded 80+

projects, in 19 countries, 823+ MW

Fluence brings unmatched experience at scale from the partner you can trust

3

SCALE

Complete technology and service offerings delivered worldwide

• Proven technology platforms that address full spectrum of applications

• Delivery & integration in 160 countries

• Comprehensive services including financing

CAPABILITY

Deep experience in modern power markets, customer needs, and local market challenges

• Collaborate with customers to help solve energy challenges

• Avoid pitfalls of inexperienced packagers and integrators

• Strong financial backing and industry staying power

Page 4: How to build a battery in Australia: Lessons learned and how to … › wordpress › wp... · 2019-06-20 · Results: Technical Lessons Learned •MASS Tool: AEMO’s MASS tool was

Navigant Research Energy Storage Leadership Grid

© Fluence Energy LLC. All Rights Reserved.4

Page 5: How to build a battery in Australia: Lessons learned and how to … › wordpress › wp... · 2019-06-20 · Results: Technical Lessons Learned •MASS Tool: AEMO’s MASS tool was

Energy storage continues to gain momentum worldwide

CALIFORNIATARGET FOR 1,325MW BY 2020

HAWAIIISLANDED SYSTEM STORAGE PROCUREMENT

PUERTO RICOSTORAGE FOR RENEWABLES & MICROGRIDS

NEW YORKTARGET FOR 1,500 MW by 2025

UNITED KINGDOMSTORAGE FOR FREQUENCY

GERMANYSTORAGE FOR FREQUENCY

ITALYISLAND MICROGRIDS

CHILESTORAGE FOR ANCILLARY SERVICES

PHILIPPINESSTORAGE FOR SYSTEM SECURITY

JAPANWIND STORAGE, CHANGING MARKET STRUCTURE

AUSTRALIASUPPORTING TRANSMISSION STABILITY & RENEWABLES

KOREA200+MW INSTALLED

INDIASOLAR + STORAGE

MEXICOSTORAGE IN MARKET REFORM

DOMINICAN REPUBLICSTORAGE FOR FREQUENCY & RESILIENCY

Page 6: How to build a battery in Australia: Lessons learned and how to … › wordpress › wp... · 2019-06-20 · Results: Technical Lessons Learned •MASS Tool: AEMO’s MASS tool was

Transmission/Trading Enhancement

AusNet / Energy Australia Ballarat, VIC, Australia30 MW / 30 MWh

SERVICES• Local capacity• Peak/off-peak management• FCAS/Ancillary Services

IMPACT• Competitive selection • Maximizes transmission• Increases Security and Reliability

Page 7: How to build a battery in Australia: Lessons learned and how to … › wordpress › wp... · 2019-06-20 · Results: Technical Lessons Learned •MASS Tool: AEMO’s MASS tool was

String of Firsts in Australia

© Fluence Energy LLC. All Rights Reserved.7

• First project of its kind built by Australian EPC

• First standalone market facing battery-based energy storage asset in nation (i.e., not co-located)

• First commercial installation of latest generation Advancion platform

Page 8: How to build a battery in Australia: Lessons learned and how to … › wordpress › wp... · 2019-06-20 · Results: Technical Lessons Learned •MASS Tool: AEMO’s MASS tool was

Contracting Challenges

• Novel contracting model in deregulated market pioneered under significant time pressure:� Multiple funding partners;� Asset owner (AusNet)� Offtaker/Registrant (EA)

© Fluence Energy LLC. All Rights Reserved.8

• Performance guarantees were standard practice for Fluence, but new for Australian utility procurements � Energy storage projects require end-to-

end continuity on warranties and guarantees

Source: EnergyAustralia

Page 9: How to build a battery in Australia: Lessons learned and how to … › wordpress › wp... · 2019-06-20 · Results: Technical Lessons Learned •MASS Tool: AEMO’s MASS tool was

Commissioning Challenges

• GPS: Prior to Ballarat deployment, GPS standards did not consider the possibility of standalone energy storage assets

• Parallel: Due to tight timeframe, elements of registration had to be completed in parallel with financing/construction

• Technical Details: eg. Confusion regarding who sets system ramp rate

• Market First: First instance of R2 testing for a standalone battery, which required testing operation as both generator and load

© Fluence Energy LLC. All Rights Reserved.9

Page 10: How to build a battery in Australia: Lessons learned and how to … › wordpress › wp... · 2019-06-20 · Results: Technical Lessons Learned •MASS Tool: AEMO’s MASS tool was

Entering Operation – sub 10ms. Response timeBallarat system was put to work even before placed into commercial service, in response to contingency events, incl. lightning strike/outage at Ballarat

© Fluence Energy LLC. All Rights Reserved.10

Page 11: How to build a battery in Australia: Lessons learned and how to … › wordpress › wp... · 2019-06-20 · Results: Technical Lessons Learned •MASS Tool: AEMO’s MASS tool was

Entering Operation

In first 3 months of operation, the Ballarat system has been dispatched to provide FCAS over 1,400 times –averaging 15 interventions per day –injecting or absorbing power to compensate for excessive drops or rises in frequency on the Victorian grid

© Fluence Energy LLC. All Rights Reserved.11

Page 12: How to build a battery in Australia: Lessons learned and how to … › wordpress › wp... · 2019-06-20 · Results: Technical Lessons Learned •MASS Tool: AEMO’s MASS tool was

-40

-30

-20

-10

0

10

20

30

0

1000

2000

3000

4000

5000

6000

7000

8000

9000

10000

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48

Balla

rat B

ESS

Activ

ity (M

W)

Vict

oria

n Sc

hedu

led

dem

and

(MW

)

VIC1 Scheduled Demand Generation Load

Entering Operation

Ballarat system providing power injections daily into VIC/NEM based on EA dispatch, charging and providing load during low-demand periods

© Fluence Energy LLC. All Rights Reserved.12

Page 13: How to build a battery in Australia: Lessons learned and how to … › wordpress › wp... · 2019-06-20 · Results: Technical Lessons Learned •MASS Tool: AEMO’s MASS tool was

Results: Performance

Ballarat system providing power injections daily into VIC/NEM based on EA dispatch, charging and providing load during low-demand periods

© Fluence Energy LLC. All Rights Reserved.13 Source: EA, NemSight and AEMO market data, 1 January 2019 –20 May 2019 (~5 months)

Page 14: How to build a battery in Australia: Lessons learned and how to … › wordpress › wp... · 2019-06-20 · Results: Technical Lessons Learned •MASS Tool: AEMO’s MASS tool was

Results: Technical Lessons Learned

• MASS Tool: AEMO’s MASS tool was for FCAS with fixed ramp rates, but battery storage’s ramp rate can be set based on need (down to millisecond-range).

• Chicken & Egg: connection required for Registration, but Registration required for connection

• Fast Response: Strong response time by Ballarat system – both in terms of FCAS provision and peak power dispatch -> Better performance than the market pays for.

• Monetising Additional Services: Ballarat is capable of more (FFR, synthetic inertia, Volt/VAR), but no active markets = no money.

© Fluence Energy LLC. All Rights Reserved.14

Page 15: How to build a battery in Australia: Lessons learned and how to … › wordpress › wp... · 2019-06-20 · Results: Technical Lessons Learned •MASS Tool: AEMO’s MASS tool was

New Processes, New Guidelines• Registering an unmanned, standalone energy

storage system in the NEM

• Registering an asset owned by another entity

• R2 Test Plan for standalone asset (has informed subsequent releases of AEMO MASS tool)

• Collaboration with AEMO for an exemption to solve the “chicken and egg” for Registration/Connection

• AEMO produced guide to registering storage for FCAS informed by experience with Ballarat.

© Fluence Energy LLC. All Rights Reserved.15

Market First

New and Improved Process

Market First

New and Improved Process

Market First

Page 16: How to build a battery in Australia: Lessons learned and how to … › wordpress › wp... · 2019-06-20 · Results: Technical Lessons Learned •MASS Tool: AEMO’s MASS tool was

Learnings for other NEM-connected BESS assets.• Connections: Expertise to connect and configure storage

assets, as well as co-located and complex connections.

• GPS Compliance: Approval of a BESS and new type of NEM asset. More to come.

• Business Case / Right Sizing: Techno-economic optimization for multiple stakeholders.

• FCAS Registration: Specific body of knowledge and capability.

• Registration and R2 Testing: Specific body of knowledge and capability.

© Fluence Energy LLC. All Rights Reserved.16

Page 17: How to build a battery in Australia: Lessons learned and how to … › wordpress › wp... · 2019-06-20 · Results: Technical Lessons Learned •MASS Tool: AEMO’s MASS tool was

Are you Serious?

© Fluence Energy LLC. All Rights Reserved.17

• What is the job storage is going to do?• Sharp sense of MW/MWh requirements and operations• Balancing flexibility with specificity

Application(s)

• Have you got one?• What is your risk appetite?• Who is funding, how, and what is their risk appetite?• Contracting model

Business Case

• Do you have a connection point?• Are you ready and able to engage with AEMO and the

D/TNSPs? (time, cost, headaches)Connection

Page 18: How to build a battery in Australia: Lessons learned and how to … › wordpress › wp... · 2019-06-20 · Results: Technical Lessons Learned •MASS Tool: AEMO’s MASS tool was

Advanced Capabilities of Grid-connected Energy StorageNetwork Resilience

Provide fast primary and secondary frequency response and high ramp rates, including FFR, synthetic inertia, SIPS/WAPS and RoCoF response/ management.

Voltage management (Volt/VAR)

Frequency Regulation / FFR / Synthetic Inertia

Voltage Regulation

Transmission-level load balancing and post-contingent power and energy dispatch (“Spinning Reserve”)

Grid following and forming.

Load Balancing & Post Contingent Dispatch

Strengthen network in areas of low fault.

System Strength

Maximise Tx and interconnector utilisation.

Increase resilience and network services.

Virtual Transmission

Lines

• These capabilities are already here and are being deployed.• Regulatory change is needed to unlock value in these services.

Page 19: How to build a battery in Australia: Lessons learned and how to … › wordpress › wp... · 2019-06-20 · Results: Technical Lessons Learned •MASS Tool: AEMO’s MASS tool was

If that was too fast, check out our blog

© Fluence Energy LLC. All Rights Reserved.19

Page 20: How to build a battery in Australia: Lessons learned and how to … › wordpress › wp... · 2019-06-20 · Results: Technical Lessons Learned •MASS Tool: AEMO’s MASS tool was

Thank you

Jaad Cabbabe | Fluence, Senior Manager, BDm: +61 488 884 954| jaad.cabbabe @fluenceenergy.com