8
CMIA SUPPLEMENTAL APPLICATION INFORMATION Los Angeles County Metropolitan Transportation Authority Page I-405 NB HOV from I-10 to US-101 I-405 CARPOOL LANES I-10 TO US-101 (NORTHBOUND) DESCRIPTION OF CORRIDOR I-405 is a major regional transportation corridor serving as the backbone of the Southern California trans- portation network. I-405 (in the project area) serves commuters in San Fernando Valley to major urban centers of Los Angeles and Santa Monica, as well as Los Angeles International Airport. is section of I-405 is heavily congested. Existing traffic in the project area is mostly stop and go throughout the day. PROJECT DESCRIPTION is project will provide a continuous 10 miles HOV lane in LA County from I-10 to US-101 is project will ease congestion, improve mobility by moving twice as many people as a regular traffic lane, decrease commute times for all drivers, enhance traffic safety, reduce air pollution and promote ridesharing. Metro and the public support this project. PROJECT COST CMIA Request: $730,000,000 Non–CMIA Funding: $220,000,000 Total Cost: $950,000,000 PROJECT BENEFITS e project benefits of the I-405 Northbound HOV Lane include: Mobility Freeways: is segment will complete the last remaining gap of car-pool lanes in one of the most congested corridors in the nation. Approximately $260 million worth of 1-405 carpool lane gap closures are currently under construction. Regional Surface Transportation Improvements (RSTI): Sepulveda Blvd parallels the facility and will include center reversible lanes to augment I-405 Carpool and transit capacity during peak periods including bike lanes to enhance safety for cyclists and motorists and to increase multi-modal throughput. Connectivity Land-Use: e I-405 acts as a mobility conduit for north-south travel between the Westside-San Fernando Valley and the South Bay. e Westside sub region has the largest concentration of major activity centers in Los Angeles County and is the largest office market in Southern California. UCLA, Century City, Culver City, Sherman Oaks and LAX employment centers rely heavily on the 1-405 for access. Benefits Summary B/C Ratio 1.0 Vehicle Hours of Delay Saved: 7,094,000 Delay Savings: $36.9 million Current ADT: 279,000 ADT Forecast w/o Project: 377,000 ADT Forecast w/ Project: 391,000 Additional Jobs Created: 5,800 jobs

I-405 Carpool lanes I-10 to Us-101 (northboUnd)media.metro.net/projects_studies/cmia/images/I-405... · 2013-04-16 · include center reversible lanes to augment I-405 Carpool and

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: I-405 Carpool lanes I-10 to Us-101 (northboUnd)media.metro.net/projects_studies/cmia/images/I-405... · 2013-04-16 · include center reversible lanes to augment I-405 Carpool and

CMIA SUPPLEMENTAL APPLICATION INFORMATIONLos Angeles County Metropolitan Transportation Authority

Page �I-405 NB HOV from I-10 to US-101

I-405 Carpool lanes I-10 to Us-101 (northboUnd)

Description of corriDor

I-405 is a major regional transportation corridor serving as the backbone of the Southern California trans-portation network. I-405 (in the project area) serves commuters in San Fernando Valley to major urban centers of Los Angeles and Santa Monica, as well as Los Angeles International Airport. This section of I-405 is heavily congested. Existing traffic in the project area is mostly stop and go throughout the day.

project Description

This project will provide a continuous 10 miles HOV lane in LA County from I-10 to US-101 This project will ease congestion, improve mobility by moving twice as many people as a regular traffic lane, decrease commute times for all drivers, enhance traffic safety, reduce air pollution and promote ridesharing. Metro and the public support this project.

project cost

CMIA Request: $730,000,000

Non–CMIA Funding: $220,000,000

Total Cost: $950,000,000

project Benefits

The project benefits of the I-405 Northbound HOV Lane include:

Mobility

Freeways: This segment will complete the last remaining gap of car-pool lanes in one of the most congested corridors in the nation. Approximately $260 million worth of 1-405 carpool lane gap closures are currently under construction.

Regional Surface Transportation Improvements (RSTI): Sepulveda Blvd parallels the facility and will include center reversible lanes to augment I-405 Carpool and transit capacity during peak periods including bike lanes to enhance safety for cyclists and motorists and to increase multi-modal throughput.

connectivity

Land-Use: The I-405 acts as a mobility conduit for north-south travel between the Westside-San Fernando Valley and the South Bay. The Westside sub region has the largest concentration of major activity centers in Los Angeles County and is the largest office market in Southern California. UCLA, Century City, Culver City, Sherman Oaks and LAX employment centers rely heavily on the 1-405 for access.

Benefits Summary B/C Ratio 1.0Vehicle Hours of Delay Saved: 7,094,000Delay Savings: $36.9 millionCurrent ADT: 279,000ADT Forecast w/o Project: 377,000ADT Forecast w/ Project: 391,000Additional Jobs Created: 5,800 jobs

Page 2: I-405 Carpool lanes I-10 to Us-101 (northboUnd)media.metro.net/projects_studies/cmia/images/I-405... · 2013-04-16 · include center reversible lanes to augment I-405 Carpool and

CMIA SUPPLEMENTAL APPLICATION INFORMATIONLos Angeles County Metropolitan Transportation Authority

Page �I-405 NB HOV from I-10 to US-101

The “Platinum Triangle” of Westwood, Century City and Beverly Hills attract more than 150,000 employees and visitors daily. The Westside Cities COG and the City of LA are developing a “livable boulevards” concept from the SCAG 2% strategy to increase transit-oriented mixed-use development along these corridors. The Westside of Los Angeles County has some of the highest residential and employment densities, real estate prices and office rates in the County.

The completion of the carpool lanes and the integration of the multi-modal and ITS improvements just described will work in concert with the planned mixed-use development to optimize the mobility improve-ments on this facility and the corridor.

Air Quality and Greenhouse Gas emissions

The I-405 HOV Project is included in Metro’s 25 Year Long Range Transportation Plan. The plan models the collective benefits of the county’s multi-modal transportation system investments to determine the overall air quality improvements and emissions reductions.

The I-405 HOV Project combined with Metro’s multi-modal investments will result in air quality and green-house gas emissions reductions of approximately 50% by the year 2025. This is significant as Los Angeles has one of the worst air quality rankings in the nation and, as the most populous county in the nation, is a significant greenhouse gas emitter. The I-405 HOV Project will be leveraged with other multi-modal invest-ments including transit-oriented mixed-use development in this highly congested corridor to ensure that Los Angeles achieves a more sustainable transportation system.

Multi-modal corridor improvements investments

Signal Synchronization/ITS: The last 11 remaining un-synchronized signalized intersections will be fully integrated with both the City of Culver City and Los Angeles traffic control system in time for this facility to commence construction and will provide congestion relief during construction.

Transit: The 2 Metro Rapid (Bus Rapid Transit) Lines, 6 Commuter and Local Bus Lines and the LAX Van-Nuys Flyaway are currently moving in excess of 50,000 riders underscoring the latent demand for higher capacity transit service along this corridor. These riders will greatly benefit from reduced travel times and reliability including shorter commutes, more reliable service and potentially more service. Transit operators will also benefit from reduced energy consumption and potentially increased ridership as their services that utilize this facility become more attractive to discretionary commuters.

Mitigating the project risks

Metro was authorized, through state legislation last year (SB 1026 (Kuehl)) to procure this project as a Design/Build. This technique should save time and a significant amount of dollars.

Economic Development Benefits

Construction of the I-405 Northbound HOV Lane from I-10 to US-101 will bring substantial economic ben-efits to Los Angeles County and the state. The reduction in congestion-related costs it will facilitate will make the region more competitive relative to the rest of the country and the world. Economic projections made using the REMI model indicate this project will provide the following regional benefits in the year 2030:

The creation of an additional 5,800 jobs;

An increase of $1.2 billion (2007 dollars) in Gross Regional Product;

An increase of $540 million (2007 dollars) in real, disposable personal income;

A $220 million (2007 dollars) boost in regional exports.

Page 3: I-405 Carpool lanes I-10 to Us-101 (northboUnd)media.metro.net/projects_studies/cmia/images/I-405... · 2013-04-16 · include center reversible lanes to augment I-405 Carpool and

CMIA SUPPLEMENTAL APPLICATION INFORMATIONLos Angeles County Metropolitan Transportation Authority

Page �I-405 NB HOV from I-10 to US-101

corridor Management Approach

Caltrans and Metro are in the process of developing a corridor management plan (CMP) on all corridors for which improvements are submitted for funding from the Corridor Mobility Improvement Account Program (CMIA) to ensure a coordinated, multi-modal, congestion management approach.

Caltrans District 7 is committed to prepare CMPs using a multi-disciplinary and multi-function approach, including but not limited to, representatives from district traffic operations, planning, and maintenance. Participation of other functions such as design, program-project management, and environmental is recom-mended based on the corridor. Regional agencies, congestion management agencies and modal operators will be involved through all stages of plan development. This effort will be coordinated with Metro’s ITS program (see CMP description and ITS project description for more details).

Page 4: I-405 Carpool lanes I-10 to Us-101 (northboUnd)media.metro.net/projects_studies/cmia/images/I-405... · 2013-04-16 · include center reversible lanes to augment I-405 Carpool and

Orange

Ventrua

PacificOcean

San Bern

Los Angeles

[

I-405 NB

HO

V

I-405 SB

HO

V

BEFORE

I-405 NBH

OV

NB

HO

V

HO

V

I-405 SB

AFTERH

OV

[

Existing HOV Lanes

Corridor Management Plan

I-405 Carpool Lane I-10 to US-101 Northbound Project Limits

Freeway and Major Arterials

SCAG SmartGrowth Areas

Proposed Interchange Improvements

Proposed HOV

Metro Green Line

Metrolink Station

Metro Green Line Station

Metrolink Commuter Rail

MTA Bus Lines\Muni Lines

Metro Rapid (Bus Rapid Transit)

ITS Features

CCTV - Closed Circuit TV

CMS - Changeable Message Sign

HAR - Highway Advisory Radio

METER - Ramp Meter

Regional Activity Centers

RWIS - Roadside Weather Information SystemTMS - Transportation Management Systems

Pacific Coast Highway

Woodman

North Hollywood

Universal City

Hollywood/Highland

Hollywood/Vine

Wilshire/Western

Aviation/LAX

El Segundo

Crenshaw

PROJECT #4: I-405 Carpool Lane NB

Project Description

- Construct (1) HOV Lane Northbound- Widen Undercrossing Structures (various locations)- Replace Overcrossing Structures (various locations)- ITS Elements (Various Locations)- Continues HOV Gap Closure

Project Cost

CMIA Request: $730,000,000 Non-CMIA Match: $220,000,000 Total Cost: $950,000,000

Benefits Summary

- B/C Ratio: 1.0- Vehicle Hours of Delay Saved: 7,094,000- Delay Savings: $36.9 million- Current ADT: 279,000- ADT Forecast w/o Project: 377,000- ADT Forecast w/ Project: 391,000- Additional Jobs Created 5,800 jobs

Reseda

BurbankAirport

Sun Valley

405

10

2

101

5

170

134

105

90

1

27

42

107

LOSANGELES

MANHATTANBEACH

GARDENA

EL SEGUNDO HAWTHORNE

INGLEWOOD

CULVERCITY

SANTAMONICA

MALIBU

WEST HOLLYWOOD

BEVERLYHILLS

BURBANK

LosAngelesCo.

LA 405PM 28.8

LA 405PM 39.0

SANTA MONICAMOUNTAINS

PICO

VICTORY

SLAUSON

HA

W

VANOWEN

ROSCOE

WE

ST

ER

N

OLYMPIC

WIL

SHIR

E

LA

BR

EA

TA

MP

A

RE

SE

DA

PR

AIR

IE

BURBANK

BEVERLY

MAGNOLIA

CENTURY

LA

CIE

NE

GA

AV

IAT

ION

SHERMAN

WIN

NE

TK

A

VIN

ELA

ND

ING

LE

WO

OD

3RD

TO

PA

NG

AC

AN

YO

N

LINC

OLN

SE

PU

LV

ED

A

HIG

HLA

ND

SANTA

MO

NIC

A

VENICE

Valley College

Universal StudiosCity Walk

LAX

Sta. MonicaAirport

Van NuysAirport

Bob HopeAirport

North Hollywood

DowntownBurbank

Burbank StudiosCenter

Sepulveds DamRecreation Area

Cal StateNorthridgeUniversity

UCLA

LoyolaMarymountUniversity

DowntownVan Nuys

Pierce College

Warner Center

Hollywood Hills

Sherman-OaksCenter

The GettyMuseum

Hollywood Park/Race Track

SantaMonica

Century City

Beverly HillsWest Hollywood

Culver City

Marina del ReyFox Hills

Corridor Mobility Improvement Account Program

January 9, 2007

I-405 CarpoolLane I-10 to US-101(Northbound) Metro Red Line Station

Metro Red Line

Metro Orange Line Station

Metro Orange Line

5

1

4

2

3

Currently in construction

Existing South Bound HOV Lane

Proposed CMIA Project

N

0 1 2 3 4 Miles5

ITS

METROLINK Ventura Co. Line

METRO ORANGE LINE

ME

TR

O R

ED

LIN

E

ME

TR

O G

RE

EN

LIN

E

11

Page 5: I-405 Carpool lanes I-10 to Us-101 (northboUnd)media.metro.net/projects_studies/cmia/images/I-405... · 2013-04-16 · include center reversible lanes to augment I-405 Carpool and

CORRIDOR MOBILITY IMPROVEMENT ACCOUNT PROGRAMBENEFIT/COST ANALYSIS: PROJECT INPUT SHEET

Region/District: 7 County: Los Angeles Route: Rte 405 EA: 120300

Describe Project: I-405 Carpool Lane I-10 to US-101 (Northbound) Post mile: 28.8/39.0 PPNO: 0851G

PROJECT DATA HIGHWAY ACCIDENT DATA

Type of Project Enter "X" Actual 3-Year Accident Data for Facility*Hwy Capacity Expansion x Count (No.)Operational Improvement Fatal Accidents 8Transp MGMT System (TMS) Injury Accidents 1368Other (describe: ) Property Damage Only (PDO) Accidents 3489

Project Location Statewide Average for Highway Classification(1 = So. Cal., 2 = No. Cal., or 3 = rural) 1 w/o Project w/ Project

Accident Rate (per mil. veh-miles) 1.54Length of Construction Period 4 years % Fatal Accidents 0.20%

% Injury Accidents 38.0%Duration of Peak Period (AM+PM) 10 hours

HIGHWAY DESIGN AND TRAFFIC DATA TOTAL PROJECT COSTS (in escalated dollars)Highway Design From Project Nomination Fact Sheet:

w/o Project w/ Project HOVNumber of General Traffic Lanes 5 5 Restriction Fiscal Year:Number of HOV Lanes 0 1 2 Prior $ 220,000,000Highway Free-Flow Speed (in mph) 65 65 (2 or 3 ) 2007-2008 $ 730,000,000Project Length (in miles) 10 10 2008-2009 $

2009-2010 $2010-2011 $

Average Daily Traffic* w/o Project w/ Project 2011-2012 $Current 279,000 2012-2013 $Forecast (20 years after construction) 377,000 391,000

Average Hourly HOV Traffic (if HOV lanes) 1,500 1,500Percent Trucks (include RVs, if applicable) 4.5% 4.5%Truck Speed (if passing lane project)

COMMENTS: * Input Sheet data adjusted for Regional Model inputs. Reflects only delay savings.

Prepared by: Phone No: E-Mail:

CONTACT: Mahmoud Mahdavi 916-653-9525 [email protected] FAX: 916-653-1447

Transportation Economics, DOTP, Caltrans1/16/2007

Page 6: I-405 Carpool lanes I-10 to Us-101 (northboUnd)media.metro.net/projects_studies/cmia/images/I-405... · 2013-04-16 · include center reversible lanes to augment I-405 Carpool and

California Transportation Commission CMIA Guidelines

Fax Number

Project Delivery Milestones (month/year): Design Build Delivery Method - Tentative Milestone Schedule

Project Study Report (PSR) complete Jan/2001

Notice of Preparation Dec/2001

Begin Circulation of Draft Environmental Document Jan/2007

Final Approval of Environmental Document (EIR/EIS) July/2007

Preliminary Engineering Jul/2008

Right-of-way Engineering Sept/2008

Final Right-of-way certfication Mar/2011

Design/Build Contract Award Mar/2009

Final Design/Construction Start Apr/2009

Construction contract acceptance To be Determined

NOTE:

Contact Person MTA: Suah Pak, CT Dist 7: Ed Andraos

(213) 922-6358 \ (213) 897-4611Phone Number (213) 922-3011 \ (213) 897-7722

Additional funding is expected to be funded with Prop 1B CMIA category and currently programmed with TCRP and SAFETEA-LU

Location - Project Limits - Description and Scope of Work (Provide a project location map on a separate sheet and attach to this form)

Project Information:

Email Address [email protected] \ [email protected]

Implementing Agency (by component)

PA&ED: PS&E:

A copy of the CTC CMIA Guidelines and a template of the Project Fact Sheet are available at: http://www.dot.ca.gov/hq/transprog/ and at: http://www.catc.ca.gov/

CALTRANS

CALTRANS

CALTRANS

CALTRANS

The CTC Corridor Mobility Improvement Account (CMIA) Program Guidelines should have been read and understood prior to preparation of the CMIA Fact Sheet.

Route 405 is a major regional transportation corridor serving as the backbone of the Southern California transportation network. Route 405 (in the project area) serves commuters in San Fernando Valley to major urban centers of Los Angeles and Santa Monica, as well as Los Angeles International Airport. This section of Route 405 is heavily congested with Average Daily Traffic (ADT) of 331,000. Existing traffic in the project area is mostly stop and go throughout the day. The purpose of this project is to improve overall operating conditions of the facility by relieving congestion. This project will ease congestion, improve mobility by moving twice as many people as a regular traffic lane, decrease commute times for all drivers, enhance traffic safety, reduce air pollution and promote ridesharing. This project will provide a continuous HOV lane in LA County. The Los Angeles County Metropolitan Transportation Authority and the Public support this project.

Project Title I-405 Carpool Lane I-10 to US101 (Northbound)

Expected Source(s) of Additional Funding Necessary to Complete Project - as Identified Under ‘Additional Need’

Los Angeles - From Rte 10 to Rte 101 - Construct one HOV lane Northbound on Interstate 405 from Rte 10 to Rte 101.

Description of Major Project Benefits

27,28,30,36

Assembly:

LOS ANGELES 7 0851G

41,42,47,53

* NOTE: PPNO & EA assigned by Caltrans. Region/MPO/TIP ID assigned by RTPA/MPO. Route/Corridor & Post Mile Back/Ahead used for State Highway System.28.8 39

Legislative Districts

CON:

Senate: Congressional:

R/W:

Post Mile Back *

120300

CaltransDistrict PPNO * EA * Region/MPO/ TIP ID*

CORRIDOR MANAGEMENT IMPROVEMENT ACCOUNT

Project Nomination Fact Sheet I-405 Carpool Lane I-10 to US101 (Northbound)

Fact Sheet Date: 01/09/07Nominating Agency: MTA and Caltrans District 7

County Post Mile Ahead *

405

Route / Corridor *

1

Page 7: I-405 Carpool lanes I-10 to Us-101 (northboUnd)media.metro.net/projects_studies/cmia/images/I-405... · 2013-04-16 · include center reversible lanes to augment I-405 Carpool and

CMIA Guidelines

Date: 9-Jan-07County CT District

LOS ANGELES 7Project Title:

* NOTE: PPNO and EA assigned by Caltrans. Region/MPO/TIP ID assigned by RTPA/MPO

Proposed Total Project Cost ProjectComponent Prior 04/05 05/06 06/07 07/08 08/09 09/10+ Total

E&P (PA&ED) 15,000 15,000PS&E 60,000 60,000R/W SUP (CT) * 15,000 15,000CON SUP (CT) * 28,000 28,000R/W 82,000 82,000CON 130,000 620,000 750,000TOTAL 90,000 0 130,000 0 730,000 0 0 950,000

Component Prior 04/05 05/06 06/07 07/08 08/09 09/10+ TotalE&P (PA&ED) 0PS&E 0R/W SUP (CT) * 0CON SUP (CT) * 28,000 28,000R/W 82,000 82,000CON 620,000 620,000TOTAL 0 0 0 0 730,000 0 0 730,000* NOTE: R/W SUP and CON SUP to be used only for projects implemented by Caltrans

Existing Non-STIP Funding Component Prior 04/05 05/06 06/07 07/08 08/09 09/10+ Total

E&P (PA&ED) 0PS&E 0R/W SUP (CT) * 0CON SUP (CT) * 0R/W 0CON 0TOTAL 0 0 0 0 0 0 0 0

Proposed Non-STIP Funding - TCRPComponent Prior 04/05 05/06 06/07 07/08 08/09 09/10+ Total

E&P (PA&ED) 15,000 15,000PS&E 60,000 60,000R/W SUP (CT) * 15,000 15,000CON SUP (CT) * 0R/W 0CON 0TOTAL 90,000 0 0 0 0 0 0 90,000

Existing Non-STIP Funding Component Prior 04/05 05/06 06/07 07/08 08/09 09/10+ Total

E&P (PA&ED) 0PS&E 0R/W SUP (CT) * 0CON SUP (CT) * 0R/W 0CON 0TOTAL 0 0 0 0 0 0 0 0

Proposed Non-STIP Funding - SAFETEA-LU Funds EarmarkedComponent Prior 04/05 05/06 06/07 07/08 08/09 09/10+ Total

CORRIDOR MANAGEMENT IMPROVEMENT ACCOUNTProject Nomination Fact Sheet - Project Cost and Funding Plan

(dollars in thousands and escalated)Shaded fields are automatically calculated. Please do not fill these fields.

0851G 0PPNO * EA* Region/MPO/TIP ID *

120300

Corridor Management Improvement Account (CMIA) Program

I-405 Carpool Lane I-10 to US101 (Northbound)

1

Page 8: I-405 Carpool lanes I-10 to Us-101 (northboUnd)media.metro.net/projects_studies/cmia/images/I-405... · 2013-04-16 · include center reversible lanes to augment I-405 Carpool and

CMIA Guidelines

Date: 9-Jan-07County CT District

LOS ANGELES 7Project Title:

* NOTE: PPNO and EA assigned by Caltrans. Region/MPO/TIP ID assigned by RTPA/MPO

CORRIDOR MANAGEMENT IMPROVEMENT ACCOUNTProject Nomination Fact Sheet - Project Cost and Funding Plan

(dollars in thousands and escalated)Shaded fields are automatically calculated. Please do not fill these fields.

0851G 0PPNO * EA* Region/MPO/TIP ID *

120300I-405 Carpool Lane I-10 to US101 (Northbound)

E&P (PA&ED) 0PS&E 0R/W SUP (CT) * 0CON SUP (CT) * 0R/W 0CON 130,000 130,000TOTAL 0 0 130,000 0 0 0 0 130,000

Additional Funding Needs (funding needs not yet committed)Component Prior 04/05 05/06 06/07 07/08 08/09 09/10+ Total

E&P (PA&ED) 0PS&E 0R/W SUP (CT) * 0CON SUP (CT) * 0R/W 0CON 0TOTAL 0 0 0 0 0 0 0 0