Îmbunătăţirea Şase Sigma şi managementul cunoaşterii,
o abordare integrată cu aplicaţii în industrie
Research group• Professor• Lecturers• Postdocs• PhD students (3 international
from EMMA programme)6σ KM
Research Objectives
6σ KM Integrated Models
Knowledge CapitalisationDeveloping Platforms for KM
Application to Industrial Processes
4
Research group
Presentation Outline
Problem Statement Literature Review on
- Six Sigma Quality Management- Knowledge and Knowledge Management- State of the Art in integrating KM and Six sigma
DMAIC-KM Model for Six Sigma Quality Management
Case studies: Six sigma projects
Ground FruitGround FruitLogic and Intuition
Low Hanging FruitLow Hanging FruitSeven Basic Tools
Bulk of FruitBulk of FruitProcess Characterization and Optimization
Process Entitlement
Sweet FruitSweet Fruit Design for Manufacturability
Problem Statement
Basics of Six Sigma QM
Requirements for Six Sigma Success
CRITICAL KNOWLEDGE
Identification of Scopes/Gaps
DMAIC Methodology with gate review (Stevens, 2006)
Knowledge within DMAIC
KNOWLEDGE
Proposed DMAIC-KM model
TASKS
KNOWLEDGE MANAGEMENT K- Creation
K- Capture K-Organization
K- Storage
K-Application
D
M
TOOLS USED
GATE REVIEW
A
I
C
TASKS TASKS TASKS TASKS
TOOLS USED
TOOLS USED
TOOLS USED
TOOLS USED
GATE REVIEW
GATE REVIEW
GATE REVIEW
GATE REVIEW
PROJECT PERFO
RMAN
CE EVALU
ATIO
N
K-Dissemination
Developed by Baral and Kifor, 2013
CS1. Improving the process performance with DMAIC-KM methodology
04/20/23 13
Application Procedure of DMAIC-KM methodology
ULBS
TAKATA
TASKS
KNOWLEDGE MANAGEMENT K- Creation
K- Capture K-Organization
K- Storage
K-Application
D
M
TOOLS USED
GATE REVIEW
A
I
C
TASKS TASKS TASKS TASKS
TOOLS USED
TOOLS USED
TOOLS USED
TOOLS USED
GATE REVIEW
GATE REVIEW
GATE REVIEW
GATE REVIEW
PROJECT PERFO
RMAN
CE EVALU
ATIO
N
K-Dissemination
Defining the Problem
Sewing Reserve Variations in Airbag Perimeter Seam
Execution of Six Sigma projects
ISO TOOLS
Project Performances Evaluation
Quantitative analysis (Process capability ,Cp and Cpk analysis,
Questionnaire Feed Back Analysis)
Qualitative analysis (Impact analysis through participant’s perception)
Sewing ReserveProcess Capability Analysis
Initial After improvement
Cp=0.7213, Cpk= 0.4039 Cp=1.5957, Cpk=1.3882
Findings from Discussion and Semi structured Interviews
TASKS
KNOWLEDGE MANAGEMENT K- Creation
K- Capture K-Organization
K- Storage
K-Application
D
M
TOOLS USED
GATE REVIEW
A
I
C
TASKS TASKS TASKS TASKS
TOOLS USED
TOOLS USED
TOOLS USED
TOOLS USED
GATE REVIEW
GATE REVIEW
GATE REVIEW
GATE REVIEW
PROJECT PERFO
RMAN
CE EVALU
ATION
K-Dissemination
Company Recognition
CS2. Six sigma projectEliminating the holes from knitted grey fabrics
Project Plan PreparationConsidering:
• Problem Solving steps• DMAIC Phases
• Tasksand
• Tools
Information
managem
ent
Lean enterprise
Integrated Management System
Hard to
ols
Visual
management
Time management Lea
ncu
ltu
re/
So
ft t
oo
ls
Knowledgemanagement
Management commitment
Lean SFM
Information
managem
ent
Information
managem
ent
Lean enterprise
Integrated Management System
Hard to
ols
Visual
management
Time management Lea
ncu
ltu
re/
So
ft t
oo
ls
Knowledgemanagement
Management commitment
Lean SFM
Lean enterprise
Integrated Management System
Hard to
ols
Visual
management
Time management Lea
ncu
ltu
re/
So
ft t
oo
ls
Knowledgemanagement
Management commitment
Lean SFM
Information
managem
ent
CS3. Lean implementation model: proposal of dynamic model
Key performance indicators in automotive
Cs4. QSPS – Quality System for Production Software– integrarea in ciclul de viaţă al produselor
Metoda SCPS / QSPS Structura
Sistem de bază: Metode şi principii clasice ale managementului calităţii şi de proiect, ale produselor software, metode de securitate şi management de risc
Metoda ideală
METODA CONCRETĂReguli , formulare, programe software
Cerinţe:
- ale managementului de proiect pentrusoftware- tehnice- de calitate- orgaziţionale- de securitate- ale industriei de autovehicule
Criterii:
- îmbunătăţirea comunicaţiei- economie de resurse, - transparenţă în stadiul proiectului- asigurarea calităţii- controlul proiectului - asigurarea finalizării proiectului
Caracteristici
- aprobarea metodei- standardizarea metodei- fiabilitatea metodei- adaptabilitatea metodei- utilitatea metodei- eficienţa metodei (timp şi dificultate în aplicare)
SCPS/QSPS – Conţinutul metodei
• Calitatea nu este niciodată un accident, ci este întotdeauna rezultatul unui efort inteligent
- John Ruskin-
• Mulţumesc pentru atenţia acordată !