Total (£)
Provision
URN
Provision name and
address
Provision category Ofsted
Judgement
Age range for
project
Special provision
fund investment in
additional places
Other investment
in additional
places
Special provision
fund additional
planned places
Other investment
additional planend
places
Total additional
planned places
Special provision
fund investment in
facilities
Other investment
in facilities
Total investment
in project
Type of SEN or disability that project is
designed to meet.
LAs should use this section of the table to set out more details about the aims of the project. Beyond this further information can be listed in
their strategic plan or directly on their local offer page.
102698 Perseid Special provision Outstanding Secondary
and post-16
£0 £1,800,000 0 28 28 £0 £0 £1,800,000 Severe and Complex Learning Difficulties
including with an additional diagnosios of
autism and/or physical/sensory difficulties
The aim of the project is to increase the pupils capacity in the upper school from 56 to 84 pupils, thus matching the previous expansion of
the lower school and ensuring primary age children can continue their education at Perseid School. The project aims to keep the existing
suiting of the school in key stages including a distinct 6th form area
102699 Cricket Green Special provision Outstanding Primary and
secondary
£1,474,291 £3,800,000 16 40 56 £0 £0 £5,274,291 Moderate and complex learning difficulties The aim of the project is to meet the gowing need for children with moderate learning difficulities and autism, partiularly in secondary age
children where most of the additional places are being provided, with the school being expanded to provide three classes per year at this
age. The school will also provide a nursery class for the first time. Lastly, the project provides the opportunity to rationalise accommodation
following previous more opportunistic expansions, including demolishing a life expired mobile building and adapting and expanding a
previous office building.
0 £0
0 £0
0 £0
The local authority is required to consult parents and carers to receive their allocation. Local authorities should use the box to the
right to confirm that they have consulted with parents and carers about their plan and projects and complete the 'Consultation form'
below.The local authority has consulted parents and carers
Consultation formConsultation for all projects: list the groups that the local authority has consulted with and the date of the conversation.
Local authorities are required to consult with parents and carers and should consult with other groups about how they plan to use their funding and set out information in the box below before they will
receive their allocation.
Project information form
Outcome including any changes as a result of the consultationTopic(s) of discussion
Provision
Group
Date and method of discussion
i.e. meeting or online
consultation
The council is proceeding with the proposal, but considering the landscaping of the buildings in more detail, and ensuring that as the school expands professionals time will not be reduced
The council is proceeding with the proposals for Cricket Green and Perseid but considering further requirements, with a survey with stakeholders forming a basis for this
Following closure of consultation, currently under consideration
Other investment the local authority plans to make in SEND
capital up until 2021 £5,600,000
£1,474,291 Total planned expenditure on projects: special provision fund
Total planned expenditure on projects: other funding up until 2021
Local authority's special provision fund allocation
Date of last update 10/05/2018
Input form for Local Authority to complete
Local authority Merton
Error: Exceeded funding: Other investment columns H and M should not exceed total amount in cell F7
£1,474,291
Additional Information about each projectInvestment in facilities (£)Investment in additional places (£) Number of additional places
Error: Exceeded funding: Special provision spend columns H and M should not exceed total amount in cell F6
The meeting discussed the merits of expanding Cricket Green School, with the council setting out the strategic need to provide more places, particularly
for children with MLD and ASD
The on-line survey was sent to all parents with children with an EHCP, headteachers and SENCOs with a Merton placement, and professionals. It
sought views on existing provision and future needs.
Cricket Green statutory consultation
including meeting with parents
Statutory consultation published on on-
line, from 1 to 28 March 2018. Public
meeting with parents on 12 March
2018
Kids First (charity in Merton for parents
with SEND children)
Meeting with parents on 8 February
2018 to outline the council's
immediate plans for SEN places
The presentation outlined the dramatic increase in SEN statements/EHCPs, and that the greatest rise was ASD and MLD. Although the council had
increased 'in house' provision in recent years there had still been a big increase in independent placements. The planned expansion of Perseid
secondary/post 16 expansion by a further 28 places and the upcoming statutory proposal for Cricket Green was discussed. Parents queried whether
this was sufficient and questioned more details on Cricket Green, which the council confirmed would be part of the statutory consultation.
All parents with SEND, professionals, all
schools in Merton
Online survey March to 12 May 2018
Click here if you would like toadd a new row