INTERTEK CERTIFICATION INTERNATIONAL SDN BHD (188296-W) Report No.: R9281/12-2 Sime Darby Plantation Sdn Bhd (SOU 16 Kok Foh: ASA-03) Appendix Page 1 of 16 Intertek RSPO Report: June 2014 Appendix A: Qualifications of Lead Assessor and Assessment Team Mr Mohan Thavarajah (MT) – Lead Assessor/ Team Leader / Technical Expert (Palm Oil Mill, Environment, Social, HCV area, Land Use and Supply Chain) - Master in Management (Technology Management) , Bachelor of Engineering ( Mechanical engineering) and Post- Graduate Diploma in Financial Management (Singapore Institute of Management). Mr. Mohan Thavarajah is an IRCA Lead Auditor and Lead Tutor for ISO 9001 as well as other integrated management systems (ISO 14001 and OHSAS 18001). He holds a Masters in Management of Technology from University of Technology Malaysia (UTM) and a Bachelor of Engineering from National University of Singapore (NUS). He has more than 27 years experience in engineering, managerial, consultancy, training, and auditing in the industrial sector in Singapore, Malaysia, Indonesia, Thailand, Cambodia and other regional countries. Has successfully assisted corporations to establish, implement and maintain (Occupational Health Safety) OHSAS 18001 Management System, Environmental Management System (ISO14001), ISO22000 / HACCP Food Safety Management Systems and Quality Management System (ISO9001) by providing auditing, consultancy and training in the relevant areas for various manufacturing, engineering, plantation, service and government sectors. Currently he is the Intertek Regional Certification Manager. He was a CB Team member in the stakeholder consultation and development of the RSPO Cambodian Local Indicators. He was Lead Auditor / Auditor of the Intertek RSPO Assessment team which audited several RSPO certified Plantation Management Units since 2011 to the present in Malaysia and Cambodia. Mr. Chen Fai Kok (CFK) – Assessor / Technical Expert (Good Agriculture Practice and Integrated Pest Management) – Diploma in Agriculture Mr. Chen Fai Kok has over 30 years work experience in the plantation sector. He has held a Senior Management role in the estate field operations including GAP and IPM. He had also served as the Branch Chairman of the Incorporated Society of Planters (ISP) in several branches for over 20 years. He has successfully completed training in Estate Management and the Intertek In House RSPO P&C, MYNI and Cambodian LI Assessor courses. He is a member of the RSPO CB Assessment team which audited several RSPO certified Plantation Management Units in since 2009. Mr. Mohd Nazib bin Marwan (MNM) – Assessor / Technical Expert (Social) – Diploma of Mechanical Engineering; Polytechnic of Sultan Salahuddin Abdul Aziz Shah Mr Mohd Nazib Marwan has over 11 years work experience in occupational safety and health sector (since 2003). He has 5 years working experience as Factories and Machinery Inspector with Department of Occupational Safety & Health Malaysia (DOSH) and earlier he has been certified with Certificate for Safety and Health Officer from National Institute of Occupational Safety and Health (NIOSH). He has successfully completed the IRCA accredited Lead Auditor Course in ISO 9001:2008, OHSAS 18001: 2007 and the Intertek In -House training on RSPO P&C and MYNI Assessor courses. He is also an ISO 9001 Lead Auditor and OHSAS 18001 auditor with Intertek.

INTERTEK CERTIFICATION INTERNATIONAL SDN BHD · INTERTEK CERTIFICATION INTERNATIONAL SDN BHD (188296-W) Report No.: R9281/12-2 Sime Darby Plantation Sdn Bhd (SOU 16 Kok Foh: ASA-03)

  • Upload
    others

  • View
    36

  • Download
    0

Embed Size (px)

Citation preview

Page 1: INTERTEK CERTIFICATION INTERNATIONAL SDN BHD · INTERTEK CERTIFICATION INTERNATIONAL SDN BHD (188296-W) Report No.: R9281/12-2 Sime Darby Plantation Sdn Bhd (SOU 16 Kok Foh: ASA-03)

INTERTEK CERTIFICATION INTERNATIONAL SDN BHD (188296-W)

Report No.: R9281/12-2 Sime Darby Plantation Sdn Bhd (SOU 16 Kok Foh: ASA-03)

Appendix Page 1 of 16

Intertek RSPO Report: June 2014

Appendix A:

Qualifications of Lead Assessor and Assessment Team

Mr Mohan Thavarajah (MT) – Lead Assessor/ Team Leader / Technical Expert (Palm Oil Mill, Environment, Social, HCV area, Land Use and Supply Chain) - Master in Management (Technology Management) , Bachelor of Engineering ( Mechanical engineering) and Post-Graduate Diploma in Financial Management (Singapore Institute of Management). Mr. Mohan Thavarajah is an IRCA Lead Auditor and Lead Tutor for ISO 9001 as well as other integrated management systems (ISO 14001 and OHSAS 18001). He holds a Masters in Management of Technology from University of Technology Malaysia (UTM) and a Bachelor of Engineering from National University of Singapore (NUS). He has more than 27 years experience in engineering, managerial, consultancy, training, and auditing in the industrial sector in Singapore, Malaysia, Indonesia, Thailand, Cambodia and other regional countries. Has successfully assisted corporations to establish, implement and maintain (Occupational Health Safety) OHSAS 18001 Management System, Environmental Management System (ISO14001), ISO22000 / HACCP Food Safety Management Systems and Quality Management System (ISO9001) by providing auditing, consultancy and training in the relevant areas for various manufacturing, engineering, plantation, service and government sectors. Currently he is the Intertek Regional Certification Manager. He was a CB Team member in the stakeholder consultation and development of the RSPO Cambodian Local Indicators. He was Lead Auditor / Auditor of the Intertek RSPO Assessment team which audited several RSPO certified Plantation Management Units since 2011 to the present in Malaysia and Cambodia.

Mr. Chen Fai Kok (CFK) – Assessor / Technical Expert (Good Agriculture Practice and Integrated Pest Management) – Diploma in Agriculture Mr. Chen Fai Kok has over 30 years work experience in the plantation sector. He has held a Senior Management role in the estate field operations including GAP and IPM. He had also served as the Branch Chairman of the Incorporated Society of Planters (ISP) in several branches for over 20 years. He has successfully completed training in Estate Management and the Intertek In House RSPO P&C, MYNI and Cambodian LI Assessor courses. He is a member of the RSPO CB Assessment team which audited several RSPO certified Plantation Management Units in since 2009.

Mr. Mohd Nazib bin Marwan (MNM) – Assessor / Technical Expert (Social) – Diploma of Mechanical Engineering; Polytechnic of Sultan Salahuddin Abdul Aziz Shah Mr Mohd Nazib Marwan has over 11 years work experience in occupational safety and health sector (since 2003). He has 5 years working experience as Factories and Machinery Inspector with Department of Occupational Safety

& Health Malaysia (DOSH) and earlier he has been certified with Certificate for Safety and Health Officer from National Institute of Occupational Safety and Health (NIOSH). He has successfully completed the IRCA accredited

Lead Auditor Course in ISO 9001:2008, OHSAS 18001: 2007 and the Intertek In -House training on RSPO P&C and MYNI Assessor courses. He is also an ISO 9001 Lead Auditor and OHSAS 18001 auditor with Intertek.

Page 2: INTERTEK CERTIFICATION INTERNATIONAL SDN BHD · INTERTEK CERTIFICATION INTERNATIONAL SDN BHD (188296-W) Report No.: R9281/12-2 Sime Darby Plantation Sdn Bhd (SOU 16 Kok Foh: ASA-03)

INTERTEK CERTIFICATION INTERNATIONAL SDN BHD (188296-W)

Report No.: R9281/12-2 Sime Darby Plantation Sdn Bhd (SOU 16 Kok Foh: ASA-03)

Appendix Page 2 of 16

Intertek RSPO Report: June 2014

Appendix B:

Assessment Plan (Actual)

Assessors and Assessment Activity Date Time

Asssessment Team

9.00 – 1.00 pm Travel to SOU 16 Kok Foh, Bahau (N.Sembilan) and Gemas (Johor) 1.00 pm -2.00 pm Lunch Break

2.00 pm – 3.00 pm Opening Meeting and Briefing at SOU 16 Kok Foh– POM Office

3.00 pm – 6.00 pm Review of Documentation and Follow up Issues based the Previous Assessment

• Review of changes for compliance to revised P&C 2013

• Review of Time Bound Plan

• Verification for compliance with rules on partial certification 6.00 – 7.00 pm Break

20/05/2014 Day 1

7.00 –10.00 pm Team meeting and discussion

Assessors and Assessment Activity

Assessment Team

Date Time

Mohan Thavarajah (MT) Chen Fai Kok (CFK) Mohd Nazib Marwan

(MNM)

9.00 am – 10.00 am

Meeting & Briefing at SOU 16 Kok Foh grouping (Palm Oil Mill Office)

10.00 am – 1.00 pm

Site assessment at SOU 16 Kok Foh grouping Palm Oil Mill (RSPO P&C: 1~8)

• P1 Transparency

• P2 Laws & regulations

• P3 Economic & Financial Viability

• P5 Environmental, Conservation & Mill including HCV

• P8 Continual Improvement

• SCC for POM

Site assessment at Kok Foh estate (RSPO P&C: 1~8)

• P4 Best Practices at Estates & Mill

• P7 New Plantings

• P8 Continual Improvement

Site assessment at Kok Foh estate (RSPO P&C: 1~8)

• P6 Employees, Individuals & Communities incl. Gender Issues

• P8 Continual Improvement

1.00 pm – 2.00 pm

Lunch

2.00 pm -6.00 pm

Site assessment at Muar River estate (RSPO P&C: 1~8)

• P1 Transparency

• P2 Laws & regulations

• P3 Economic & Financial Viability

• P5 Environmental, Conservation & Mill including HCV

• P8 Continual Improvement

Site assessment Muar River estate (RSPO P&C: 1~8)

• P4 Best Practices at Estates & Mill

• P7 New Plantings

• P8 Continual Improvement

Site assessment at Muar River estate (RSPO P&C: 1~8)

• P6 Employees, Individuals & Communities incl. Gender Issues

• P8 Continual Improvement

6.00 pm– 7.00 pm

Break

21/05/2014 Day 2

7 – 10 pm Team meeting and discussion

Assessors and Assessment Activity

Assessment Team

Date Time

Mohan Thavarajah (MT) Chen Fai Kok (CFK) Mohd Nazib Marwan

(MNM)

Page 3: INTERTEK CERTIFICATION INTERNATIONAL SDN BHD · INTERTEK CERTIFICATION INTERNATIONAL SDN BHD (188296-W) Report No.: R9281/12-2 Sime Darby Plantation Sdn Bhd (SOU 16 Kok Foh: ASA-03)

INTERTEK CERTIFICATION INTERNATIONAL SDN BHD (188296-W)

Report No.: R9281/12-2 Sime Darby Plantation Sdn Bhd (SOU 16 Kok Foh: ASA-03)

Appendix Page 3 of 16

Intertek RSPO Report: June 2014

9.00 am – 1.00 pm

Site assessment at Sg. Sabaling estate (RSPO P&C: 1~8)

• P1 Transparency

• P2 Laws & regulations

• P3 Economic & Financial Viability

• P5 Environmental, Conservation & Mill including HCV

• P8 Continual Improvement

Site assessment at Sg. Sabaling estate (RSPO P&C: 1~8)

• P4 Best Practices at Estates & Mill

• P7 New Plantings

• P8 Continual Improvement

Site assessment at Sg. Sabaling estate (RSPO P&C: 1~8)

• P6 Employees, Individuals & Communities incl. Gender Issues

• P8 Continual Improvement

1.00 pm – 2.00 pm

Lunch

2.00 pm -6.00 pm

Stakeholder / Consultations:

• Contractors • Suppliers • Transporters • NGOs • Government Department / Agencies • Local Community # Mandatory for each category to be audited

6.00 pm– 7.00 pm

Break

22/05/2014 Day 3

7 – 10 pm Team meeting and discussion

Assessors and Assessment Activity Date Time

Assessment Team

9.00 am – 10.00 am

Preparation of Closing Meeting

10.00 am – 11.00 am

Team Meeting and Discussions with SOU 16 Kok Foh grouping Management Representative

11.00 am – 12.00 pm

Closing Meeting & Briefing at Palm Oil Mill Office

23/05/2014 Day 4

12.00 pm Travel back to Kuala Lumpur

Page 4: INTERTEK CERTIFICATION INTERNATIONAL SDN BHD · INTERTEK CERTIFICATION INTERNATIONAL SDN BHD (188296-W) Report No.: R9281/12-2 Sime Darby Plantation Sdn Bhd (SOU 16 Kok Foh: ASA-03)

INTERTEK CERTIFICATION INTERNATIONAL SDN BHD (188296-W)

Report No.: R9281/12-2 Sime Darby Plantation Sdn Bhd (SOU 16 Kok Foh: ASA-03)

Appendix Page 4 of 16

Intertek RSPO Report: June 2014

Appendix C-1: Location Map of Sime Darby SOU 16 Kok Foh,

Bahau (Negeri Sembilan) and Gemas (Johor), Malaysia. Scale 1: 100 km

SOU 16 Kok Foh

Page 5: INTERTEK CERTIFICATION INTERNATIONAL SDN BHD · INTERTEK CERTIFICATION INTERNATIONAL SDN BHD (188296-W) Report No.: R9281/12-2 Sime Darby Plantation Sdn Bhd (SOU 16 Kok Foh: ASA-03)

INTERTEK CERTIFICATION INTERNATIONAL SDN BHD (188296-W)

Report No.: R9281/12-2 Sime Darby Plantation Sdn Bhd (SOU 16 Kok Foh: ASA-03)

Appendix Page 5 of 16

Intertek RSPO Report: June 2014

Appendix C-2:

Location Map of Sime Darby SOU 16 Kok Foh, Bahau (Negeri Sembilan) and Gemas (Johor), Malaysia. Scale 1:10 km

SOU 16 Kok Foh

Page 6: INTERTEK CERTIFICATION INTERNATIONAL SDN BHD · INTERTEK CERTIFICATION INTERNATIONAL SDN BHD (188296-W) Report No.: R9281/12-2 Sime Darby Plantation Sdn Bhd (SOU 16 Kok Foh: ASA-03)

INTERTEK CERTIFICATION INTERNATIONAL SDN BHD (188296-W)

Report No.: R9281/12-2 Sime Darby Plantation Sdn Bhd (SOU 16 Kok Foh: ASA-03)

Appendix Page 6 of 16

Intertek RSPO Report: June 2014

Appendix C-3 Location Map of Koh Foh estate

Page 7: INTERTEK CERTIFICATION INTERNATIONAL SDN BHD · INTERTEK CERTIFICATION INTERNATIONAL SDN BHD (188296-W) Report No.: R9281/12-2 Sime Darby Plantation Sdn Bhd (SOU 16 Kok Foh: ASA-03)

INTERTEK CERTIFICATION INTERNATIONAL SDN BHD (188296-W)

Report No.: R9281/12-2 Sime Darby Plantation Sdn Bhd (SOU 16 Kok Foh: ASA-03)

Appendix Page 7 of 16

Intertek RSPO Report: June 2014

Appendix C-4

Location Map of Sg. Senarut estate

Page 8: INTERTEK CERTIFICATION INTERNATIONAL SDN BHD · INTERTEK CERTIFICATION INTERNATIONAL SDN BHD (188296-W) Report No.: R9281/12-2 Sime Darby Plantation Sdn Bhd (SOU 16 Kok Foh: ASA-03)

INTERTEK CERTIFICATION INTERNATIONAL SDN BHD (188296-W)

Report No.: R9281/12-2 Sime Darby Plantation Sdn Bhd (SOU 16 Kok Foh: ASA-03)

Appendix Page 8 of 16

Intertek RSPO Report: June 2014

Appendix C-5

Location Map of Muar River estate

Page 9: INTERTEK CERTIFICATION INTERNATIONAL SDN BHD · INTERTEK CERTIFICATION INTERNATIONAL SDN BHD (188296-W) Report No.: R9281/12-2 Sime Darby Plantation Sdn Bhd (SOU 16 Kok Foh: ASA-03)

INTERTEK CERTIFICATION INTERNATIONAL SDN BHD (188296-W)

Report No.: R9281/12-2 Sime Darby Plantation Sdn Bhd (SOU 16 Kok Foh: ASA-03)

Appendix Page 9 of 16

Intertek RSPO Report: June 2014

Appendix C-6

Location Map of Pertang estate

Page 10: INTERTEK CERTIFICATION INTERNATIONAL SDN BHD · INTERTEK CERTIFICATION INTERNATIONAL SDN BHD (188296-W) Report No.: R9281/12-2 Sime Darby Plantation Sdn Bhd (SOU 16 Kok Foh: ASA-03)

INTERTEK CERTIFICATION INTERNATIONAL SDN BHD (188296-W)

Report No.: R9281/12-2 Sime Darby Plantation Sdn Bhd (SOU 16 Kok Foh: ASA-03)

Appendix Page 10 of 16

Intertek RSPO Report: June 2014

Appendix C-7

Location Map of Sg. Gemas estate

Page 11: INTERTEK CERTIFICATION INTERNATIONAL SDN BHD · INTERTEK CERTIFICATION INTERNATIONAL SDN BHD (188296-W) Report No.: R9281/12-2 Sime Darby Plantation Sdn Bhd (SOU 16 Kok Foh: ASA-03)

INTERTEK CERTIFICATION INTERNATIONAL SDN BHD (188296-W)

Report No.: R9281/12-2 Sime Darby Plantation Sdn Bhd (SOU 16 Kok Foh: ASA-03)

Appendix Page 11 of 16

Intertek RSPO Report: June 2014

Appendix C-8

Location Map of Bukit Pilah estate

Page 12: INTERTEK CERTIFICATION INTERNATIONAL SDN BHD · INTERTEK CERTIFICATION INTERNATIONAL SDN BHD (188296-W) Report No.: R9281/12-2 Sime Darby Plantation Sdn Bhd (SOU 16 Kok Foh: ASA-03)

INTERTEK CERTIFICATION INTERNATIONAL SDN BHD (188296-W)

Report No.: R9281/12-2 Sime Darby Plantation Sdn Bhd (SOU 16 Kok Foh: ASA-03)

Appendix Page 12 of 16

Intertek RSPO Report: June 2014

Appendix C-9

Location Map of St. Helier estate

Page 13: INTERTEK CERTIFICATION INTERNATIONAL SDN BHD · INTERTEK CERTIFICATION INTERNATIONAL SDN BHD (188296-W) Report No.: R9281/12-2 Sime Darby Plantation Sdn Bhd (SOU 16 Kok Foh: ASA-03)

INTERTEK CERTIFICATION INTERNATIONAL SDN BHD (188296-W)

Report No.: R9281/12-2 Sime Darby Plantation Sdn Bhd (SOU 16 Kok Foh: ASA-03)

Appendix Page 13 of 16

Intertek RSPO Report: June 2014

Appendix C-10

Location Map of Sg. Sabaling estate

Page 14: INTERTEK CERTIFICATION INTERNATIONAL SDN BHD · INTERTEK CERTIFICATION INTERNATIONAL SDN BHD (188296-W) Report No.: R9281/12-2 Sime Darby Plantation Sdn Bhd (SOU 16 Kok Foh: ASA-03)

INTERTEK CERTIFICATION INTERNATIONAL SDN BHD (188296-W)

Report No.: R9281/12-2 Sime Darby Plantation Sdn Bhd (SOU 16 Kok Foh: ASA-03)

Appendix Page 14 of 16

Intertek RSPO Report: June 2014

Appendix D:

Photographs of Assessment findings at SOU 16 Kok Foh

Muar River Estate: F 14A- Slope about 5° but no water conservation terraces had been constructed.

Muar River Estate: F 13A- water for cleaning and washing was in the tank on left, mixture for spraying was in the tank on right.

Sg Sabaling Estate: F 04D- Spraying operator getting ready to work.

Sg Sabaling Estate: F 04D- First aid kit on site with the spraying gang.

Linesite housing for workers Housing environment and cleanliness

Page 15: INTERTEK CERTIFICATION INTERNATIONAL SDN BHD · INTERTEK CERTIFICATION INTERNATIONAL SDN BHD (188296-W) Report No.: R9281/12-2 Sime Darby Plantation Sdn Bhd (SOU 16 Kok Foh: ASA-03)

INTERTEK CERTIFICATION INTERNATIONAL SDN BHD (188296-W)

Report No.: R9281/12-2 Sime Darby Plantation Sdn Bhd (SOU 16 Kok Foh: ASA-03)

Appendix Page 15 of 16

Intertek RSPO Report: June 2014

Appendix E:

Time Bound Plan as submitted by SDPSB

Page 16: INTERTEK CERTIFICATION INTERNATIONAL SDN BHD · INTERTEK CERTIFICATION INTERNATIONAL SDN BHD (188296-W) Report No.: R9281/12-2 Sime Darby Plantation Sdn Bhd (SOU 16 Kok Foh: ASA-03)

INTERTEK CERTIFICATION INTERNATIONAL SDN BHD (188296-W)

Report No.: R9281/12-2 Sime Darby Plantation Sdn Bhd (SOU 16 Kok Foh: ASA-03)

Appendix Page 16 of 16

Intertek RSPO Report: June 2014

---End of Report---