    Preface

    This report is not an academic requirement but also gives students a practical vision ofoperations of company. It provided me an opportunity to perceive what is the difference

    between theoretical studies and activities.

    By the grace of God, I applied all the learning, which was taught to me by my honourable

    teachers ,and the books which I read. Some concepts and applicable at DG CementFactory while the others are not. Nevertheless, it gives me a greater practical knowledge

    about operations of cement industry. Maximum efforts have been given to make this

    report easier to understand for its readers.

    I hope that the reader will find this report useful and practicable.

  • 8/8/2019 intrnship report1

    2/23

    Executive Summary

    DG Khan Cement Factory is one of the computerized cement factories in Pakistan. Itproduces the cement by adopting dry process.

    Production Process

    These are three raw materials of Cement:

    Lime Stone

    Shale and

    Gypsum

    Limestone and shale is taken from quarry with the help of 7-Km long conveyor belt. The

    both raw material and mixed in raw mill, heated in kiln upto 1600 OC ground in cementmill along with gypsum almost 5%. The final product cement is prepared.

    Location:

    The company is located at Sattai Khofli, which is about 40 Km from city of Dera Ghazi

    Khan.

    Capacity:

    The company has two plants

    1.Existing

    2.Expansion

    Both the plants capacity is 2200 ton and 3300 ton clinker per day respectively.

    Quality Control

  • 8/8/2019 intrnship report1

    3/23

    The company believes on quality assurance not on quantity inspection. So they have gotISO 9002 certification. Following tests are performed at different stages of production

    process.

    1.Raw Materials

    Test on these material are performed

    2.Raw Mill

    Following Tests are applied

    a.Hydraulic Modulus

    b.Silica Modulus

    c.Limestone Factor

    3.Kiln

    Same tests are performed as in raw mill.

    4.Clinker

    Tests are performed to see the quality of clinker.

    5.Cement

    Following physical tests are performed:

    Expansion

    Fineness

  • 8/8/2019 intrnship report1

    4/23

    Strength

    6.Loading

    Tests are performed after loading.

    Aggregate Planning

    Aggregate planning is done to cope with demand by using both demand and capacity

    alternatives.

    Purchasing

    Purchasing of items is the duty of purchase department. Need is recognized when the

    indentor raises the demand notice. The purchase department identifies and selects thesupplier and order is placed. Placed order is checked by store department and indentor to

    accept the order.

    Inventory Control

    The store is responsible to manage and control the inventory of inputs. The inventory of

    outputs (cement) kept in silos. The received order is inspected by store department. And

    accepted material is stored in the store.

    Distribution

    The company has four sales offices in the following cities:

    Multan

    Lahore

    Karachi

    D. G. Khan

    These sales offices accumulate demand of their respective regions and send the orders to

    the head office Lahore.

    Introduction

    State Cement Corporation of Pakistan (S. C. C. P) was established in 1984 managed by

    the Federal Government. In the beginning, existing plant was purchased from U.B. E.industries of Japan. It had installed capacity of2700-ton clinker daily and started its

    production in April 1986.

  • 8/8/2019 intrnship report1

    5/23

    The main purpose for the establishment of plant was to fulfil the demand of Northern

    Marketing zone. In 1977 the annual demand for cement in Pakistan was about at 3.7

    million tons while the production was about 3.1 m. To fulfill 0.6 million gap, a new plantwas required. After a detailed investigation, they selected a place D. G. Khan City where

    large high quality material reserves were available at least or 100 years. The location is

    ideal because it is near to market as well as prior to raw material.

    The govt. privatized the SCCOP, first purchased by Segol Group of Industries and NishatGroup of Industries combinely. In 1992, the company purchased by Nishat Group ofIndustries solely.After privatization it name changed from SCCOP to D. G. Khan

    Cement Factory. Before the establishment of expansion plant (new plant) in 1997.

    The cement was brought to this and either from Maple Leaf Cement Factory Mianwaliand Zeal Pak Hyderabad and ACC Rohi. The new plant is the relief for Bhawalpur,

    Lodhran, Khanewal Muzafargurh, Bhawalnagar, Vehari. It was purchased from F. L.

    Smith of Denmark. Its design capacity of4000 ton clinker per day.

    Types of Cement

    The company has following types of cement:

    1.Ordinary Portland Cement

    2.Sulphate Resistance Cement

    3.Black Cement

    4.Heat Resistance Cement

    5.White Cement

    6.Slag Cement

    7.Quick Setting Cement

    8.Under Water Setting Cement

    9.Acid Resistant Cement

    Mission Statement

    The mission statement of D. G. Khan Cement Company is:

    D. G. Khan Cement Company committed to produce and supply high quality

    conforming the local and international standards adopting modern technique satisfying

    the customer requirements the most competitive prices.

    Production Process

  • 8/8/2019 intrnship report1

    6/23

    D. G. Khan Cement factory adopt true dry production process for the manufacturing of

    cement. This process consists of following steps.

    Drilling

    Drilling is done in the quarry with the help of drilling machine. They create a space forthe powder explosive.

    Blasting

    The powder explosive is blasted under a controlled process to get different smallsegments of limestone. The large segments are also converted into small segments whichis called crushing process.two hammer crushers are installed on quarry site having

    capacity of800ton/hr and 300 ton/hr.

    Transportation

  • 8/8/2019 intrnship report1

    7/23

    The small fragments are loaded on the 7-Km long 3 belts conveyor system running over

    rough terrain. This conveyor takes the new material from quarry to the factory site. The

    limestone and shale to stored in the open space.

    Grinding

    After storage, the stored limestone and shale are fed to the raw mill with the help of twohoppers according to predetermined mixed proportion. The roughly crushed material

    passed through 3 rollers. The mixture is dehydrated, sized, and fine particulars are

    separated.

    The cyclone extracts different gasses, which are emitted in this process. The collectedseparated mixture is called raw meal. It is stored in a silo of15000 ton. During the

    process water is also used with the purpose:

    To lower the gas volume

    To control the variation

    To maintain the temperature

    Clinker

    The raw meal is fed into kiln shell. The kiln shell has following particulars.

    Length of shell 45 m

    Diameter 3.5 to 6.5 m

    Slope 1.5o

    In this kiln shell following reactions take place.

    CaCo3 CaO + O2 (Calcium Oxide)

    CaCo + SI O2 CaoSio2 (Calcium Silicate)

    CaOSio2 + CaO 2 CaoSio2 (Dicalcium Silicate)

    2CaoSio2 + CaO 3CaoSio2 (Tricalcium Silicate)

    CaO + Al2 O2 CaO Al2 O3

    CaO Al2 O3 + CaO 2 CaO Al2 O3

    2 CaO Al2 O3 + CaO 3 CaO Al2 O3

  • 8/8/2019 intrnship report1

    8/23

    3 CaO Al2 O3 + CaO + Fe2 O3 C4AF*

    (Tetra Calcium Aluminum Fersite)

    The kiln shell can be divided into four portions.

    Firstly, the incoming raw meal is heated with the help of preheated air which comes fromthe cooler at the terminal end of the kiln. Heat is provided by the combustion of the

    furnace oil. The raw meal is moved on the sloped shell which have four zones of

    temperature.

    1.Calcination zone 1200 OC

    2.Transition zone 1250 OC

    3.Sintering zone 1300 OC

    4.Burning zone 1400 - 1500 OC

    After the position of burning zone the mixture is cooled down with the help of air fans of

    graze cooler. The heated is omitted which reduce the temperature of mixture. This heatedair is used to raise the temperature of raw meal entering into the kiln. The finished

    product is called clinker, which is stored in an open yard having capacity of 30000 tons.

  • 8/8/2019 intrnship report1

    9/23

    Grinding

    Now the clinker enters into Cement Mill. In this mill clinker is ground with gypsum.

    Almost 5% of gypsum is added. The main purpose of addition of gypsum is to increase

    the setting time.

    The final product cement is prepared. It is stored in the silo having capacity of 10,000 toneach.

    Packing

    In the packing unit, there are 4 rotary packers and each packer has 8 nozzles. The wholepacking process is automatic. Cement bags are loaded on the trucks and heavy trollers

    automatically. Each cement bag has 50 Kg weight. Sometimes heavy users ask for bulk

    quantity of cement without packing. It is loaded into the truck.

    Computerized production process flow is attached at the end of the report.

    Quality Control

    Quality a Competitive Priority

    There are four competitive priorities

    1.cost

    2.time

    3.flexibility

    4.quality

    The product like cement cost priority is not best because of legal consideration and suffer

    heavy losses. Time can be used as competitive priority. On time delivery is most

    important but the sometimes demand is very high the company is unable to provided ontime delivery. The flexibility is less because cement is standardized product. The only

    one competitive priority is the main base which offer the competition. This is achieving

    the high quality. As it was mentioned in the mission statement of the organization.Provide the high quality cement at competitive prices. Because the prices of cement arefixed so quality is the only competitive weapon through which a company can compete

    the market. Keeping this in its view, D. G. Cement Factory applied for ISO 9000

    certificate.

    ISO 9002

  • 8/8/2019 intrnship report1

    10/23

    D. G. Khan cement factory is providing high quality cement for its beginning. After the

    establishment of expansion department. The company No. 1 in the cement industry

    Pakistan.

    To cope with the environment they apply for ISO 9002 certificate. The company hired

    Shakeel and Company Lahore as consultant to get ISO 9002 certificate. A committee isformed under the control of GM of the company Mr. Dr. Asif Bashir to be certified as

    ISO 9002.

    The company get the ISO 9002, certificate in the long run. The main aim to get the

    certificate is to provide the customers the quality cement and competitive prices.

    After getting the ISO 9002 certificate. The company reduce its inefficiencies in

    management as well as in production. It reduce in rework cost because of clear cutresponsibilities are awarded to employees. It also increase the reliability of employee

    upon the D. G. Cement.

    Modern equipped laboratory establishment

    Quality to check according to plan at each stage.

    Cement x-ray Spectrometer is used to check the quality of the product at different stage.It takes 5 minutes to assess the ingredients of the product. There are six tests for the

    quality assurance at different stages of the production process.

    Raw Material

    Raw material of cement can be categorized in three types:

    Limestone

    Shale

    Gypsum

    Lime Stone

    The sampling point of limestone after blasting the rocks. The fragments of the rocks aretaken and check its chemical composition. Several benches have been opened and

    abandoned if found to be lantern* low grade limestone. The main components oflimestone is calcium oxide (CaO). The following equation shows the %age of CaO

    Heat

    CaCO3 CaO + CO3

  • 8/8/2019 intrnship report1

    11/23

    100% 56% 44%

    The production department accept only those limestone having at least 52% of CaO.

    Shale or Clay

    Th second component of cement is shale. Shale can be found near the quarry. They take

    different samples of shale at different points to find out which shale has high quality.They utilize these shale first and then any other next.

    Gypsum

    Gypsum is another component of cement. It is 5% of the whole cement. It is mostly takenfrom outside supplier. Its quality is checked at the entering gate. If it is according to

    contsuit* then it is selected otherwise rejected to suppliers.

    Raw Mill

    When the mixture reach in raw mill, three sophisticated chemical tests are performed.

    They take different samples having different composition of two raw material (limestone& shale). Usually six samples of following composition is taken.

    Sample No. Limestone %age %age of Shale

    1. 77% 23%

    2. 78% 22%

  • 8/8/2019 intrnship report1

    12/23

    3. 79% 21%

    Hydraulic Modulus (HM)

    In hydraulic modulus the above taken samples are taken and put the %age values of

    composition of different compound in the following formula.

    HM = = 2.1-/+ 0.2

    CaO

    Si2O + Al2O3 + Fe2O3

    The standard values is 2.1 and + 0.2 variation is allowed. The above formula tell us by

    changing the composition CaO we can get the exact result.

    Silica Modulus

    The test is also performed similarly to the above by taking different ingredients. The

    formula is given below

    SM =

    SiO2

    Al2 O3 + Fe2O3

    The SiO2 is the main component of shale. By changing the composition we can get the

    standard result.

    Ume* Saturation Factor (LSF)

    This test is applied to find out the amount of CaO in the mixture. We can calculate the

    LSF factor by the following formula

    LSF = = 90 + 3

    CaO

    28Si2O + 1.2Al2O3 + 0.65FerO3

    90% of lime in mixture is a standard value while + 3 stands for variation.

    Kiln

    When the raw meal is fed to the kiln, it is also checked chemically by taking different

    samples. Some test of hydraulic modulus, silica modulus and lime saturation factor isapplied to raw meal as well. The main purpose of the raw meal test is to find out the

    temperature required to heating purpose of raw meal.

  • 8/8/2019 intrnship report1

    13/23

    Clinker

    When the raw meal passes through kiln shell and take a form of clinker. A sample is

    taken manually at this moment and then it is analyzed chemically with the help of cement

    x-ray spectrometer. Clinker is a hasd* granular material. They grand into powder formand analyze. If the result is not according to standard they dispose it otherwise mixed in

    high quality clinker.

    Cement

    When the 5% gypsum is added to ground clinker, the final product is cement. They takethe sample of cement to find out the right %age of gypsum in cement. As well as the

    fineness of cement.

    Following tests are performed for quality assurance of cement:

    1.Expansion

    2.Setting Time

    3.Fineness

    4.Strength

    Expansion

    The expansion test check that upto what extent the cement is expanded after addition ofwater. It is a complex test. According to world standard the expansion of cement should

  • 8/8/2019 intrnship report1

    14/23

    not be more that 10-mm. The company mostly test shows the expansion of 0.5 to 5.5 mm.

    Which is obviously excellent.

    Setting Time

    The setting time shows the time taken by cement to become solid.

    There are two types of setting time.

    Initial Setting Time

    Initial setting time is the time when we can penetrate the specific middle exact half

    position of the cement block.

    Final Setting Time

    It is the time when we cant penetrate the specific needle into cement block.

    We can compare initial and final setting time of D. G. Cement with the world standards.

    Setting time DG Cement World Standard

    Initial Setting Time 150 minutes at least 45 minutes

    Final Setting Time 200 minutes at least 10 hours

    Fineness Test / Blaine Test

    Blaine test measures the small size of the particles in specific weights. The world

    standard for the fineness test is that the should not be less than 2250 cm2/gm while in D GCement it is 2800 Cm2/gm.

    Strength Test

    The strength test check the strength of cement after passing different number of days.

    The world standard and their standard are given below:

    Strength Unit Company Std. World Standard

    3 days PSI 3800-4400 2200

    7 days PSI 4800-5400 340028 days PSI 6000-7000 5000

    Loading

  • 8/8/2019 intrnship report1

    15/23

  • 8/8/2019 intrnship report1

    16/23

    Existing Plant 2700 tons

    Expansion Plant 4000 tons.

    During peak seasons both the plants are working above their allocated capacity while

    during off season it works slow their allocated capacity. It is harmful for the plant to runit above their recommended capacity.

    Distribution Requirement Planning

    All the dealers are allotted the dealership number. They booked their orders in one of the

    sales office. For all orders, dealers have to pay the amount in advance. The sales officeclerk accumulates all these orders and sends to the head office in two ways. Either he

    filled customer order form or telephone.

    The Head office (Lahore) make the distribution requirement planning. How much amount

    of dispatch needed for coming days. Usually dispatch lot size is dependent on two things.

    1.Quota imposed in distribution

    2.Non-quota distribution

    Head office informs the GM for daily dispatch all the dispatch process is done on

    automatic machines. 40% of excise duty is paid on each bag. All the transportation cost

    paid by dealer.

    Although the lead-time is one day but it takes more than one day because of any

    disturbance in market and operation.

    Aggregate Planning

    D. G. Khan Cement Factory has a family of cement types which consists of three cements

    ordinary port land cement, black cement and sulphate resistance cement. They make their

    aggregate plan keeping in view the demand of cement and capacity of plant. There are

    two types of alternatives:

    1.Demand alternative (Reactive Alternatives)

    2.Capacity alternative (Aggressive Alternatives)

    D. G. Khan cement factory apply both the alternatives to aggregate planning. We discuss

    these alternatives one by one.

  • 8/8/2019 intrnship report1

    17/23

    Demand Alternatives (Reactive Alternatives)

    This alternative is apply to cope with demand of the cement. In summer, the demand of

    cement is very high. To cope with this demand, they hire extra unskilled and semiskilledlabor. They also offer overtime to highly specialized and skilled person. Mostly unskilled

    labor is taken from subcontractors.

    The Company allows vacation schedule in winter, the month of Ramazan and rainy days.

    The plant is shut for repairing and maintenance work.

    The company always keeps the anticipation inventory to meet the unexpected demand

    e.g. in the peak season both the silo are filled most of the time to cope with any mishaps

    sometimes the bricks of the kiln shell were broken and work was stopped at least 3 days.

    During these 3 days anticipated inventory cope with the demand.

    The company also gives relaxation to their workers during the peak season. Schedules are

    formed to give the employee more rest.

    Capacity Alternatives (Aggressive Alternatives)

    The company uses these alternatives during the slack. When the demand is less than theircapacity. How to utilize their idle capacity? The answer is to apply the aggressive or

    capacity alternatives. Aggressive alternatives allocation that attempt to modify demand

    and resource requirement.

    In the slack season the demand of ordinary postcard cement is low the company change

    the production OPC to sulphate resistance cement and supply into the Karachi.

    Another method is also used to enhance the demand by lowering the prices. When the

    price of cement will reduce the demand will increase.

    Inventory Management

    We can divide inventory management broadly in two ways.

    1.Inventory Management of Output (Cement)

    2.Inventory Management of Inputs

    D. G. Cement factory has no inventory in bags. They keep the cement in the 10000 tons

    capacity silos.

    The main problem of inventory management of inputs. Each and every department is

    responsible for its inventory. Each department has to raise the demand notice to the

  • 8/8/2019 intrnship report1

    18/23

    purchase department. The store department provides them the required. In the case of

    shortage, the purchase refer it to purchase department.

    Types of Inventory in Store Department

    The store department provides the inventory of inputs to each department. Its mainpurpose is to control and manage the inventory.

    The store department categorizes its inventory of two types as:

    1.Immediately consumable goods (Fast Moving Goods)

    2.Non-consumable goods (Slow Moving Goods)

    Immediately Consumable Goods

    Immediately consumable goods are those goods which lose their quality and quantitywith the usage of items e.g. explosive, stationary, soap, towel, oil etc.

    Non-consumable Goods

    Non consumable goods are those goods which do not lose their quantity and quality with

    the usage and time. These are everlasting items e.g. spare parts, machinery, either moving

    equipment or plant assets.

    Functions of Store Department

    The store department performs two basic functions:

    Management of Inventory

    Controlling of Inventory

    Management of Inventory

    The store department perform follwing functions for management of inventory.

    1.the inward card is issued when the truck passes through factory gate.

    2.Inspection of quantity of material done on the gate. Inspection note is sent

    to the concerning department. The manager or incharge who raise the

    order called indentor write the remarks upon it after checking the quality.It is the duty of indentor to write the acceptance and rejection note upon it.

    3.All accepted material is stored by store department and write material

    receiving report.

  • 8/8/2019 intrnship report1

    19/23

    One of copy of material receiving report is sent to following departments.

    1.Finance department

    2.Store department

    3.Purchase department

    4.MIS department

    5.Supplier

    All the received items are written in the records books.

    Control of Inventory

    The store department controls the inventory both manually and by computer. Twosystems are introduced for physical control of inventory.

    Computer Records

    The second system for controlling of inventory is computer records. All the transactions

    are updated in the computer.

    The store department manages and controls 22000 inventory items for all the

    departments. In any of stock out (the inventory level down the minimum level) store

    department is responsible for the replenishment. He order to the purchasing department

    for purchasing of goods.

    Matching the tow systems

    Both the systems records are matched at the end of accounting period in order to check

    the correctness of records.

    In any disturbance in the records the physical inspection is also done.

    The possible causes for disturbance of balance for an item may be the following.

    1.Misplacement of inventory

    2.Mistake in records calculating

    3.Due to theft

    In order to reduce the theft, the department due the physical inspection after every these

    months. It also reveals some other problems with the inventory.

  • 8/8/2019 intrnship report1

    20/23

    Purchasing

    The purchasing of or different items done by the purchase department of the D. G. KhanCement Factory. The purchase department not only purchase for the factory as well as for

    the sales offices. Usually the department purchases machinery furnace oil, officeequipment, supplies, paper sacks, explosive etc:

    The purchase department acquire the things through the acquisition process.

    The Acquisition Process

    The acquisition process consist of following steps.

    Need Recognition

    Need for the acquisition of raw material arises when the production department asks tothe store department of some particular item. The store department is unable to fulfil the

    need. So he recommends to the purchase department.

    Production

    Department

    Needs a calculator

    Store Department

    Calculator is not available

    Need to Purchase calculator

    Supplier Selection

    Purchase

    Department

  • 8/8/2019 intrnship report1

    21/23

    In the supplier selection stage, Different suppliers are identified. Suppliers are of two

    types.

    1.Permanent Suppliers

    2.Random Supplier

    The company has permanent contractor to the different items. Contracts are of long termin nature. So they dont need any frequently selection of random supplier. The company

    selected the supplier do to following characteristics.

    Past experience

    Past performance

    Financial strength

    Quality of material supplied

    Price charges

    Nature of relationship with the supplier

    One of these factors can change the decision.

    Placing the order

    The purchase department has authority to buy the items. The purchase is done once the

    particulars given by the store department. The following particulars are given in theindent form:

    Name of the department

    Description of the item needed

    Last purchase date

    Quality of item

    Quantity of item

    The order placement is dependent upon the requirement of item. Different purchases

    procedure are adopted depending upon

    Urgency

    Availability

    Importance

  • 8/8/2019 intrnship report1

    22/23

    There are three types of purchase processes:

    Regular Purchase

    Spot Purchase

    Importance

    Regular Purchase

    Regular purchase is the purchase of those items which they are required after the certain

    period with regularity. It exhibits the follwing characteristics.

    Such items are very expensive

    Such items are not needed urgently

    These are consumable goods.

    The order is placed in the newspaper in the form of tender notice. The terms andcondition are mentioned in the tender notice. The supplier get the tender form from the

    nearest sales office (mentioned in the newspaper) on submission of fee. In this tender

    notice all the description of item is mentioned. The supplier fills the form and submits todepartment with a security fee. The supplier is selected on the basis of low bid of the

    supplier. In case, the company accepts the tender notice of supplier who give maximum

    discount.

    Sometimes the indentor is also considered for the selection of supplier which negotiatewith the supplier in term of quality of item.

    After the supplier has been identified and selected the company will issue purchase order

    to the supplier.

    Spot Purchase

    Sometimes, different items are purchased on the spot. These items are urgently needed,having more alternative and payment made in cash e.g. towels, tube lights, stationary,

    bullets, bed sheets and spoons, dishes etc. Spot purchase is done through spot purchase

    committee which is consists of

    Indentor or end user

    Purchase department representative

    Commercial

  • 8/8/2019 intrnship report1

    23/23

    The spot committee visits different suppliers evaluate the items in terms of price, quality

    and delivery date. The committee make the payment to the supplier on the spot. One

    month is needed for the spot purchase to be completed.

    Import

    The company imports those items which are not available here or having low quality.

    Import is a long and complex process, it takes six months for an import purchase to be

    completed mostly earth moving machinery, fire bricks and spare parts are imported.

    Track the order

    Track the order means routine follow ups of orders to anticipate late deliveries orprobable deviations from requested order quantities. Different modes are used or tracking

    the orders e.g. telephone, letter, fax. The company usually tracks the order when some

    delay will stop the production.

    Receiving the order

    When the order is received from the supplier, the indentor checks the quality of the

    incoming materials. The indentor writes the remarks about items either it is accepted orrejected. Acceptance or rejection note is issued by the store department. If the materials

    are accepted the store department issues material receiving report. One copy of the

    material receiving report is issued to each of the following department.

    Supplier

    Finance Department

    MIS Department

    Store Department

    Purchase Department

    The rejection of items is informed to the purchase department and they return to the

    supplier. The purchase department also maintain and updates their records of differentsupplier on punctuality, quality, quantity deviations and price. All these information help

    for future evaluation of supplier.

    When the finance department has received the material receiving report from the storedepartment supplier as paid and entries are passed in their records.