15
Scottish Renewables Annual Conference March 2013 : Showcase Presentation, Neil Lochiel

Inverclyde’s ready for you………………

  • Upload
    noleta

  • View
    17

  • Download
    0

Embed Size (px)

DESCRIPTION

Scottish Renewables Annual Conference March 2013 : Showcase Presentation, Neil Lochiel. Inverclyde’s ready for you……………… . Inverclyde Renewables Alliance Group : current membership Riverside Inverclyde - PowerPoint PPT Presentation

Citation preview

Page 1: Inverclyde’s ready for you………………

Scottish Renewables Annual Conference March 2013 :

Showcase Presentation, Neil Lochiel

Page 2: Inverclyde’s ready for you………………
Page 3: Inverclyde’s ready for you………………

Inverclyde’s ready for you……………… • Inverclyde Renewables Alliance Group : current membership

– Riverside Inverclyde– Scottish Enterprise– Inverclyde Council– Clydeport– 2020 Renewables– Mainstream Renewable Power– Jenda Energy– Ferguson Shipbuilders– James Watt College– JLES– Sanmina-SCI– Serco Marine Services– Sangamo– (Subocean Group)

• Recent guest speakers : Paddy O’Kane, Alan Mortimer, Terry Hogg, John Robertson

• Guests have included : Duncan McNeil MSP, Stuart McMillan MSP,

David Cairns MP, Iain McKenzie MP, Sandy Cumming

Page 4: Inverclyde’s ready for you………………
Page 5: Inverclyde’s ready for you………………

Ports, Infrastructure and Connectivity

Page 6: Inverclyde’s ready for you………………

From Inchgreen to Ocean Terminal

Page 7: Inverclyde’s ready for you………………

Inchgreen Key Features• 203,000 square metres

• Dry dock 304.8m x 47.5m

• Quayside 420m

• Hard standing area 60m x 95m

• Re-inforced module mat 100m x 80m

• Min/max water depth at low tide 8.2m (low tide)/11.3m (high tide)

• 15-70 tonne cranage

• “Extended Inchgreen” potential (of up to 367,000 square metres)

Page 8: Inverclyde’s ready for you………………

“Extended Inchgreen” to include JWD

Page 9: Inverclyde’s ready for you………………

Ports, Infrastructure and Connectivity

Page 10: Inverclyde’s ready for you………………

3 Key Sites1. Kelburn, Port Glasgow

• Ideal for light industrial use with great connectivity

• 6.45 acre development site

• ri has invested in major site infrastructure (including new access road and site platforming works)

• Phase 1 of speculative building construction will provide a total of 40,000 square feet on 3.63 acres

• Additional 2.82 acres of serviced development land is also available for bespoke design and build opportunities

• Phase 1 construction 2013

Page 11: Inverclyde’s ready for you………………

Ports, Infrastructure and Connectivity

Page 12: Inverclyde’s ready for you………………

3 Key Sites2. Cartsburn, Greenock

• Ideal for regional offices or HQ (on A8 dual carriageway)

• 3.7 acre development site

• ri has invested in major site infrastructure (including a new dedicated site entrance, drainage

connections and remediation)

• Site can accommodate up to 70,000 square feet of office development, including extensive dedicated car parking

• Customised design/build ownership or lease options available

• Availability 18-24 months from commitment

Page 13: Inverclyde’s ready for you………………

Ports, Infrastructure and Connectivity

Page 14: Inverclyde’s ready for you………………

3 Key Sites3. Custom House, Greenock

• Ideal for a multi-occupancy office space in a central heritage location

• Refurbishment works underway

• Waterfront location opposite Greenock Central railway station with its 3 trains per hour to Glasgow

• Variety of different sized rooms

• Ideal for companies looking for a presence in Scotland, handy for ITREZ and Glasgow Airport, and with very competitive rates compared to Glasgow city centre

• Customised design/build ownership or lease options available

Page 15: Inverclyde’s ready for you………………

Inverclyde• Ports, Infrastructure and connectivity

• Strong engineering, shipbuilding, manufacturing and IT heritage

• Skilled workforce

• Mass manufacturing capabilities

• Port with dry dock and deep water, ready to operate

• Can accommodate small office requirement through to high value, high volume jobs locations

• An ambitious Urban Regeneration Company with strong local partnerships and a track record of successful delivery

• RSA Grants potential of 15%, 25% and 35%, business size dependent