Upload
noleta
View
17
Download
0
Tags:
Embed Size (px)
DESCRIPTION
Scottish Renewables Annual Conference March 2013 : Showcase Presentation, Neil Lochiel. Inverclyde’s ready for you……………… . Inverclyde Renewables Alliance Group : current membership Riverside Inverclyde - PowerPoint PPT Presentation
Citation preview
Scottish Renewables Annual Conference March 2013 :
Showcase Presentation, Neil Lochiel
Inverclyde’s ready for you……………… • Inverclyde Renewables Alliance Group : current membership
– Riverside Inverclyde– Scottish Enterprise– Inverclyde Council– Clydeport– 2020 Renewables– Mainstream Renewable Power– Jenda Energy– Ferguson Shipbuilders– James Watt College– JLES– Sanmina-SCI– Serco Marine Services– Sangamo– (Subocean Group)
• Recent guest speakers : Paddy O’Kane, Alan Mortimer, Terry Hogg, John Robertson
• Guests have included : Duncan McNeil MSP, Stuart McMillan MSP,
David Cairns MP, Iain McKenzie MP, Sandy Cumming
Ports, Infrastructure and Connectivity
From Inchgreen to Ocean Terminal
Inchgreen Key Features• 203,000 square metres
• Dry dock 304.8m x 47.5m
• Quayside 420m
• Hard standing area 60m x 95m
• Re-inforced module mat 100m x 80m
• Min/max water depth at low tide 8.2m (low tide)/11.3m (high tide)
• 15-70 tonne cranage
• “Extended Inchgreen” potential (of up to 367,000 square metres)
“Extended Inchgreen” to include JWD
Ports, Infrastructure and Connectivity
3 Key Sites1. Kelburn, Port Glasgow
• Ideal for light industrial use with great connectivity
• 6.45 acre development site
• ri has invested in major site infrastructure (including new access road and site platforming works)
• Phase 1 of speculative building construction will provide a total of 40,000 square feet on 3.63 acres
• Additional 2.82 acres of serviced development land is also available for bespoke design and build opportunities
• Phase 1 construction 2013
Ports, Infrastructure and Connectivity
3 Key Sites2. Cartsburn, Greenock
• Ideal for regional offices or HQ (on A8 dual carriageway)
• 3.7 acre development site
• ri has invested in major site infrastructure (including a new dedicated site entrance, drainage
connections and remediation)
• Site can accommodate up to 70,000 square feet of office development, including extensive dedicated car parking
• Customised design/build ownership or lease options available
• Availability 18-24 months from commitment
Ports, Infrastructure and Connectivity
3 Key Sites3. Custom House, Greenock
• Ideal for a multi-occupancy office space in a central heritage location
• Refurbishment works underway
• Waterfront location opposite Greenock Central railway station with its 3 trains per hour to Glasgow
• Variety of different sized rooms
• Ideal for companies looking for a presence in Scotland, handy for ITREZ and Glasgow Airport, and with very competitive rates compared to Glasgow city centre
• Customised design/build ownership or lease options available
•
Inverclyde• Ports, Infrastructure and connectivity
• Strong engineering, shipbuilding, manufacturing and IT heritage
• Skilled workforce
• Mass manufacturing capabilities
• Port with dry dock and deep water, ready to operate
• Can accommodate small office requirement through to high value, high volume jobs locations
• An ambitious Urban Regeneration Company with strong local partnerships and a track record of successful delivery
• RSA Grants potential of 15%, 25% and 35%, business size dependent