VICINITY MAP - NO SCALE PROJECT LOCATION NO. REVISION BY DATE DESIGNED: DRAFTED: CHECKED: SCALE: PROJECT NO.: FILE NUMBER: SHEET NO.: DATE: A.01 SEPTEMBER 19, 2018 NO SCALE 038.005 038.005 LTL BAY LTL PROJECT NO. SHEET NO. A.01 038.005 LT LEON A S S O C I A T E S I N C 500 EAST LOCUST STREET SUITE 400 DES MOINES IOWA 50309 office 515-422-7016 www.ltleon.com CALL 811 / 1-800-292-8989 2 Working Days BEFORE YOU DIG DigSafeWait48.com IOWA ONE CALL IOWA DEPARTMENT OF NATURAL RESOURCES DEVELOPER ENGINEER 502 EAST NINTH STREET LAND AND WATERS BUREAU, CONSERVATION AND RECREATION DIVISION WALLACE STATE OFFICE BUILDING ATTN: NATE HOOGEVEEN, RIVER PROGRAMS COORDINATOR DES MOINES, IA 50319 PH: (515) 281-3134 FAX: (515) 281-8895/(515) 281-6794 EMAIL: [email protected] IOWA DEPARTMENT OF NATURAL RESOURCES CONSTRUCTION PLANS FOR LITTLETON DAM MITIGATION WAPSIPINICON RIVER DNR PROJECT NO. 10-03-10-01 SW 1/4 SECTION 9, TOWNSHIP 89N, RANGE 10W, BUCHANAN COUNTY, IOWA BUCHANAN COUNTY D.01 B.02 DETAILS - EXISTING DAM INDEX OF SHEETS B.01 DEMOLITION PLAN GENERAL NOTES A.01 COVER SHEET C.01 DETAILS F.03 LITTLETON VICINITY MAP - NO SCALE PROJECT LOCATION STATE STREET (COUNTY HIGHWAY D16) PERRY STREET RIVER ROAD BOULEVARD CENTRAL AVENUE WAPSIPINICON RIVER LITTLETON 20 INDEPENDENCE F.01 EROSION CONTROL PLAN F.02 GRADING PLAN - CUT SURFACE GRADING PLAN - FINISHED SURFACE PROFILE WATER ST. COUNTY ENGINEER INDEPENDENCE, IA 50644 BRIAN KEIERLEBER, ENGINEER BUCHANAN COUNTY 1511 1ST STREET E. PH: (319) 334-6031 EMAIL: [email protected] PH: (515) 422-0716 500 EAST LOCUST STREET, SUITE 400 LT LEON ASSOCIATES, INC. DES MOINES, IOWA 50309 EMAIL: [email protected] LUIS LEON, P.E. W.01-W.04 CROSS SECTIONS D.03 Pages or sheets covered by this seal: Signature Date I hereby certify that this engineering document was prepared by me or under my direct personal supervision and that I am a duly licensed Professional Engineer under the laws of the State of Iowa. L I C E N S E D P R O F E S S I O N A L E N G I N E E R I O W A LEON Iowa License Number 18685 Luis T. Leon, P.E. LUIS T. 18685 My license renewal date is December 31, 2019. W.05-W.06 TYPICAL CROSS SECTIONS D.02 SITE PLAN

IOWA DEPARTMENT OF NATURAL RESOURCES · 9/19/2018  · 1.5' 1.5' 4.0' 3.0' 10.0' 9.0' 4.0' 9.0' 8.5' 7.5' 4.0' 5.0' existing dam - plan view ~2.0'~ ~130.0'~ a' a c c' b' b d d' flow

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: IOWA DEPARTMENT OF NATURAL RESOURCES · 9/19/2018  · 1.5' 1.5' 4.0' 3.0' 10.0' 9.0' 4.0' 9.0' 8.5' 7.5' 4.0' 5.0' existing dam - plan view ~2.0'~ ~130.0'~ a' a c c' b' b d d' flow

VICINITY MAP - NO SCALE

PROJECTLOCATION

NO

.R

EV

IS

IO

NB

YD

AT

E

DE

SIG

NE

D:

DR

AF

TE

D:

CH

EC

KE

D:

SC

ALE

:

PR

OJE

CT

N

O.:

FILE

N

UM

BE

R:

SH

EE

T N

O.:

DA

TE

:

A.0

1

SE

PTE

MB

ER

19,

201

8N

O S

CA

LE

03

8.005

03

8.005

LT

L

BA

Y

LT

L

PROJECT NO. SHEET NO. A.01038.005

LT LEONA S S O C I A T E S I N C

500 EAST LOCUST STREET SUITE 400DES MOINES IOWA 50309

office 515-422-7016www.ltleon.com

CALL 811 / 1-800-292-8989

2 Working Days BEFORE YOU DIG

DigSafeWait48.com

IOWA

ONE CALL

IOWA DEPARTMENT OF NATURAL RESOURCES

DEVELOPER

ENGINEER

502 EAST NINTH STREET

LAND AND WATERS BUREAU, CONSERVATION AND RECREATION DIVISIONWALLACE STATE OFFICE BUILDING

ATTN: NATE HOOGEVEEN, RIVER PROGRAMS COORDINATOR

DES MOINES, IA 50319PH: (515) 281-3134

FAX: (515) 281-8895/(515) 281-6794EMAIL: [email protected]

IOWA DEPARTMENT OF NATURAL RESOURCESCONSTRUCTION PLANS FOR

LITTLETON DAM MITIGATIONWAPSIPINICON RIVER

DNR PROJECT NO. 10-03-10-01SW 1/4 SECTION 9, TOWNSHIP 89N, RANGE 10W, BUCHANAN COUNTY, IOWABUCHANAN

COUNTY

D.01

B.02 DETAILS - EXISTING DAM

INDEX OF SHEETS

B.01

DEMOLITION PLAN

GENERAL NOTES

A.01 COVER SHEET

C.01

DETAILS

F.03

LITTLETON

VICINITY MAP - NO SCALE

PROJECTLOCATION

STATE STREET (COUNTY HIGHWAY D16)

PE

RR

Y S

TRE

ET

RIVER ROAD BOULEVARD

CE

NTR

AL

AV

EN

UE

WAPSIPINICON RIVER

LITTLETON

20

INDEPENDENCE

F.01

EROSION CONTROL PLAN

F.02

GRADING PLAN - CUT SURFACE

GRADING PLAN - FINISHED SURFACE

PROFILE

WATER ST.

COUNTY ENGINEER

INDEPENDENCE, IA 50644

BRIAN KEIERLEBER, ENGINEER

BUCHANAN COUNTY

1511 1ST STREET E.

PH: (319) 334-6031EMAIL: [email protected]

PH: (515) 422-0716

500 EAST LOCUST STREET, SUITE 400

LT LEON ASSOCIATES, INC.

DES MOINES, IOWA 50309

EMAIL: [email protected]

LUIS LEON, P.E.

W.01-W.04CROSS SECTIONS

D.03

Pages or sheets covered by this seal:

Signature Date

I hereby certify that this engineering document wasprepared by me or under my direct personal supervisionand that I am a duly licensed Professional Engineerunder the laws of the State of Iowa.

LIC

EN

SE

D PROFESSIONAL ENG

INE

ER

IOW A

LEON

Iowa License Number 18685

Luis T. Leon, P.E.

LUIS T.

18685

My license renewal date is December 31, 2019.

W.05-W.06TYPICAL CROSS SECTIONS

D.02 SITE PLAN

AutoCAD SHX Text
NORTH
AutoCAD SHX Text
NORTH
pspeed
Stamp
pspeed
Stamp
Page 2: IOWA DEPARTMENT OF NATURAL RESOURCES · 9/19/2018  · 1.5' 1.5' 4.0' 3.0' 10.0' 9.0' 4.0' 9.0' 8.5' 7.5' 4.0' 5.0' existing dam - plan view ~2.0'~ ~130.0'~ a' a c c' b' b d d' flow

F

O

R

E

S

L

O

P

E

B

A

C

K

S

L

O

P

E

600'-0" IF SLOPE IS FLATTER THAN 5%

POST SPACING

1

VARIABLE (20'-0" FOR A NORMAL 10'-0" WIDE DITCH)

TYPICAL SILT FENCE DITCH CHECK

ATTACHMENT TO POST

FABRIC

WIRE OR

CABLE TIES

POST

INSERT 12 INCHES OF FABRIC A MINIMUM OF

6 INCHES DEEP (FABRIC MAY BE FOLDED

BELOW THE GROUND LINE)

1

TYPICAL SILT FENCE INSTALLATION ON

LONGITUDINAL SLOPES

PLAN VIEW

INSTALL PARELLEL TO

GROUND CONTOURS

INSTALL "J-HOOK" AT EACH END

OF AN INDIVIDUAL SECTION OF

SILT FENCE

GROUND CONTOURS

TYPICAL SILT FENCE INSTALLATION ON

LONGITUDINAL SLOPES

PROFILE VIEW

GROUND LINE

FABRIC

W

AT

ER

FLO

W

1

1

'T

' S

TE

EL

FE

NC

E P

OS

T

4'-0" M

IN

GROUND LINE

FABRIC 2

DETAILS OF SILT FENCE ON LONGITUDINAL

SLOPES

1

INSERT 12 INCHES OF FABRIC A MINIMUM OF

6 INCHES DEEP (FABRIC MAY BE FOLDED

BELOW THE GROUND LINE)

REDUCE POST SPACING TO 5'-0" AT WATER

CONCENTRATION AREAS, OR AS REQUIRED

TO ADEQUATELY SUPPORT FENCE

1

2

5'-0" MAXIMUM2" M

IN

5'-0" MAXIMUM

20" M

INIM

UM

8'-0" SPACING

200'-0" MAX LENGTH PER SECTION

2'-0" 3'-0"

NO

.R

EV

IS

IO

NB

YD

AT

E

DE

SIG

NE

D:

DR

AF

TE

D:

CH

EC

KE

D:

SC

ALE

:

PR

OJE

CT

N

O.:

FIL

E N

UM

BE

R:

SH

EE

T N

O.:

DA

TE

:

PROJECT NO.

SHEET NO.

LT LE

ONA

S S

O C

I A

T E

S

I N C

500

EAST

LOC

UST

STRE

ET S

UITE

400

DES

MOI

NES

IOWA

5

0309

offic

e 51

5-42

2-70

16ww

w.ltl

eon.c

om

038.005

DETAILS

B.01

PD

S

BA

Y

LT

L

NO

S

CA

LE

038.005

038.005

B.01

SE

PT

EM

BE

R 19, 2

018

LIT

TL

ET

ON

D

AM

M

IT

IG

AT

IO

N

WA

PS

IP

IN

IC

ON

R

IV

ER

LIT

TL

ET

ON

, IO

WA

DE

TA

IL

S

SILT FENCENOT TO SCALE3

BOULDER CLUSTER DETAILNOT TO SCALE1

FOOTER BOULDER SHALL BEBURIED 0.5' MIN. INTO CHANNEL

EXISTING GROUND

LOW FLOW WATER SURFACE=909.00

1.5' MIN. DEEP CLASS'E' RIPRAP BASE

STREAM BED

4.0' X 4.5' X 2.0' WEIR STONE

Page 3: IOWA DEPARTMENT OF NATURAL RESOURCES · 9/19/2018  · 1.5' 1.5' 4.0' 3.0' 10.0' 9.0' 4.0' 9.0' 8.5' 7.5' 4.0' 5.0' existing dam - plan view ~2.0'~ ~130.0'~ a' a c c' b' b d d' flow

1.5'

1.5'

4.0'

3.0'

10.0'

9.0'

4.0'

9.0'

8.5'

7.5'

4.0'

5.0'

EXISTING DAM - PLAN VIEW

~2.0'~

~130.0'~

A'

A

C C'

B'

B

D

D' FLOW

FLOW

4.0' 10.0'

9.0'

3.0'

SPILLWAY

FISH LADDER

NOTE : WIDTH OF DAM NOT TO SCALE

A-A' SECTION

~2.0'~

~6.0'~

2.3'

FLOW

FLOW

B-B' SECTION1.5'

7.0'

3.0'4.0'

5.5'

~1.0'~

9.0'

9.0'

C-C' SECTION9.0'

2.2'

4.0'

1.5'

10.0'

5.0'

2.5'

9.0'

4.0'

~6.0'~

3.0'

10.0'

5.0'

9.0'

4.0'

3.0'SPILLWAY

FISH LADDER

~130.0'~

D-D' SECTION

9.0'

2.2'

1.5' 7.5' 7.5' 5.0'

2.0'

7.0'

NO

.R

EV

IS

IO

NB

YD

AT

E

DE

SIG

NE

D:

DR

AF

TE

D:

CH

EC

KE

D:

SC

ALE

:

PR

OJE

CT

N

O.:

FIL

E N

UM

BE

R:

SH

EE

T N

O.:

DA

TE

:

PROJECT NO.

SHEET NO.

LT LE

ONA

S S

O C

I A

T E

S

I N C

500

EAST

LOC

UST

STRE

ET S

UITE

400

DES

MOI

NES

IOWA

5

0309

offic

e 51

5-42

2-70

16ww

w.ltl

eon.c

om

038.005

DETAILS - EXIST. DAM

B.02

PD

S

BA

Y

LT

L

NO

S

CA

LE

038.005

038.005

B.02

SE

PT

EM

BE

R 19, 2

018

LIT

TL

ET

ON

D

AM

M

IT

IG

AT

IO

N

WA

QP

SIP

IN

IC

ON

R

IV

ER

LIT

TL

ET

ON

, IO

WA

DE

TA

IL

S - E

XIS

TIN

G D

AM

NOTE: DIMENSIONS OF EXISTING DAM ARE APPROXIMATE AND INTENDEDFOR ESTIMATING CONCRETE QUANTITIES

AutoCAD SHX Text
NTS
AutoCAD SHX Text
NTS
AutoCAD SHX Text
NTS
AutoCAD SHX Text
NTS
AutoCAD SHX Text
NTS
Page 4: IOWA DEPARTMENT OF NATURAL RESOURCES · 9/19/2018  · 1.5' 1.5' 4.0' 3.0' 10.0' 9.0' 4.0' 9.0' 8.5' 7.5' 4.0' 5.0' existing dam - plan view ~2.0'~ ~130.0'~ a' a c c' b' b d d' flow

NO

.R

EV

IS

IO

NB

YD

AT

E

DE

SIG

NE

D:

DR

AF

TE

D:

CH

EC

KE

D:

SC

ALE

:

PR

OJE

CT

N

O.:

FIL

E N

UM

BE

R:

SH

EE

T N

O.:

DA

TE

:

PROJECT NO.

SHEET NO.

LT LE

ONA

S S

O C

I A

T E

S

I N C

500

EAST

LOC

UST

STRE

ET S

UITE

400

DES

MOI

NES

IOWA

5

0309

offic

e 51

5-42

2-70

16ww

w.ltl

eon.c

om

038.005

GENERAL NOTES

C.01

PD

S

BA

Y

LT

L

NO

S

CA

LE

038.005

038.005

C.0

1

SE

PT

EM

BE

R 19, 2

018

LIT

TL

ET

ON

D

AM

M

IT

IG

AT

IO

N

WA

PS

IP

IN

IC

ON

R

IV

ER

LIT

TL

ET

ON

, IO

WA

GE

NE

RA

L N

OT

ES

ELECTRIC & GAS:

ONE CALL1-800-292-8989

UTILITY CONTACTS

TELEPHONE:

260 FAIRVIEW AVENUEMIDAMERICAN ENERGY

P.O. BOX 600WATERLOO, IA 50704

541 YOUNG STREETFARMERS MUTUAL TELEPHONE COMPANY

JESUP, IOWA 50648(319) 827-1151

1-888-427-5632

GENERAL NOTES

1. PRIOR TO ANY EXCAVATION AT THE SITE, THE CONTRACTOR SHALL EXAMINE ANY APPLICABLEDRAWINGS AVAILABLE FROM THE OWNER AND/OR ENGINEER, AND CONSULT WITH OWNER'SPERSONNEL AND UTILITY COMPANY'S REPRESENTATIVES TO DETERMINE POSSIBLE UTILITYLOCATIONS AND DEPTHS. NO COMPENSATION WILL BE ALLOWED FOR DAMAGE RESULTING FROMFAILURE TO COMPLY WITH THIS REQUIREMENT.

2. ALL DEBRIS SPILLED ON THE PUBLIC R.O.W. SHALL BE PICKED UP BY THE CONTRACTOR AT THE ENDOF EACH WORK DAY.

3. ALL WORK SHALL BE IN ACCORDANCE WITH OSHA CODES AND STANDARDS. NOTHING INDICATED ONTHESE DRAWINGS SHALL RELIEVE THE CONTRACTOR FROM COMPLYING WITH ANY APPROPRIATESAFETY REGULATIONS.

4. FIELD VERIFY EXISTING GRADES AND LOCATION OF EXISTING UTILITIES, CONDUIT LINES, POLES,TREES, PAVING, BUILDINGS AND OTHER SITE STRUCTURES PRIOR TO DEMOLITION OR CONSTRUCTIONAND IMMEDIATELY INFORM THE ENGINEER OF ANY DISCREPANCIES.

5. CONTRACTOR SHALL PROTECT EXISTING UTILITIES, CONDUIT LINES, POLES, TREES, PAVING,BUILDINGS, SHORELINE, AND OTHER SITE STRUCTURES.

6. ALL DEMOLISHED ITEMS NOT TO BE SALVAGED SHALL BE LEGALLY DISPOSED OF OFF-SITE.7. CONSTRUCTION LIMITS ARE INDICATED ON THE PLANS. CONTRACTOR TO CONSULT WITH DNR ON:

STORAGE LOCATION OF MATERIALS, WORK AREA, JOB OFFICE AND EMPLOYEE PARKING. CONSULTWITH THE DNR IF CONSTRUCTION LIMITS NEED TO BE MODIFIED FROM THAT ILLUSTRATED ON THISPLAN.

8. THE CONTRACTOR WILL HOLD THE OWNER AND OWNER'S CONSULTANTS HARMLESS FROM ANY ANDALL CLAIMS OF ANY TYPE WHATSOEVER RESULTING FROM DAMAGES TO ADJOINING PUBLIC ORPRIVATE PROPERTY, INCLUDING REASONABLE ATTORNEY FEES INCURRED TO THE OWNER.

9. ALL EXCESS EXCAVATED GRAVEL AND SAND FROM CHANNEL SHALL BE USED TO FILL VOIDS IN ROCKARCH RAPIDS, PER DNR DIRECTION.

10. ADD CHOKE STONE AND COMPACT TO FILL VOIDS FOR EVERY 2 VERTICAL FEET OF BASE STONEINSTALLED.

11. CONTRACTOR SHALL RESTORE ALL DISTURBED AREAS OUTSIDE OF THE RIVER CHANNEL, INCLUDINGACCESS ROAD, STAGING AREA, AND OVERBANK AREAS. CONTRACTOR SHALL ROTOTILL SOILS TO A 6”DEPTH IN AREAS WHERE COMPACTION OCCURRED DUE TO CONSTRUCTION ACTIVITIES.CONTRACTOR SHALL SEED, FERTILIZE, AND MULCH ALL DISTURBED AREAS PER THE EROSIONCONTROL PLAN AND SPECIFICATIONS. CONTRACTOR SHALL COORDINATE INSTALLATION,SPECIFICATIONS, AND WARRANTY REQUIREMENTS WITH ENGINEER.

12. CONTRACTOR SHALL REPLACE ANY FENCE DISTURBED DURING CONSTRUCTION TO DNR'SSATISFACTION.

13. CONTRACTOR SHALL PROVIDE, INSTALL AND MAINTAIN EROSION CONTROL UNTIL ESTABLISHMENT OFPERMANENT GROUNDCOVER.

14. TRAFFIC CONTROL DEVICES, PROCEDURES, AND LAYOUTS SHALL CONFORM TO THE CURRENTEDITION OF THE MANUAL FOR UNIFORM TRAFFIC CONTROL DEVICES FOR STREETS AND HIGHWAYS(MUTCD).

15. CONTRACTOR SHALL CONTACT THE BUCHANAN COUNTY ENGINEER A MINIMUM OF 48 HOURS PRIORCONSTRUCTION.

16. DNR TO PROVIDE CONSTRUCTION STAKING.17. ALL BASE STONE AND WEIR STONE SHALL BE IOWA DOT CERTIFIED REVETMENT (RIPRAP) OR NATIVE

STONE WITH A MINIMUM SPECIFIC GRAVITY OF 2.65.18. WEIR ROCK PLACEMENT IS TO MEET A VERTICAL TOLERANCE OF 0.1'.19. QUANTITIES FOR EXCAVATION, SPOIL, AND BASE STONE MAY BE REDUCED IF BEDROCK IS

ENCOUNTERED. REMOVAL OF BEDROCK IS NOT PROPOSED. CONTACT DNR IF BEDROCK ISENCOUNTERED.

20. THE ENGINEER RESERVES THE RIGHT TO MAKE ADJUSTMENTS IN THE FIELD TO THE DIMENSIONS,STRUCTURE LOCATION, STRUCTURE DETAILS, AND ALL OTHER RELEVANT EROSION CONTROLPRACTICES NEEDED TO PRESERVE TREES AND OTHER HABITAT AND TO FIT SITE CONDITIONS.

21. IF ARCHEOLOGICAL SITES AND/OR CONTAMINATION (SITES) ARE LOCATED DURING CONSTRUCTION,THEN STOP WORK IMMEDIATELY AND CALL ENGINEER.

22. THE CONTRACTOR IS REQUIRED TO UTILIZE THE UTILITY ONE-CALL SERVICE AT (800) 292-8989 ATLEAST 48 HOURS PRIOR TO EXCAVATING ANYWHERE ON THE PROJECT.

23. ALL TOPOGRAPHIC AND HYDROGRAPHIC SURVEYS, INCLUDING CONTROL POINTS, WERE PROVIDED BYIOWA DNR.

WATER:

1351 IOWA SPEEDWAY DRIVECENTRAL IOWA WATER ASSOCIATION

NEWTON, IA 50208(641) 792-7011

PROJECT SEQUENCING

THE CONTRACTOR SHALL SUBMIT A CONSTRUCTION SEQUENCE PLAN 10 DAYS PRIOR TO CONSTRUCTION.THE PLAN SHALL INCLUDE METHODS TO CONTAIN AND MANAGE SEDIMENT WITHIN THE IMPOUNDMENTUPSTREAM OF THE DAM. ENGINEER SHALL APPROVE PLAN PRIOR TO DAM REMOVAL. SUGGESTIONS FORPROJECT SEQUENCING ARE AS FOLLOWS:1. IDENTIFY ALL SIGNIFICANT PROJECT BOUNDARIES, EASEMENTS, ARCHAEOLOGICAL SITES, ACCESS

POINTS, CONSTRUCTION LIMITS AND CONTRACTOR STAGING AREAS WITH THE ENGINEER.2. ESTABLISH HAUL ROUTES AND CONTRACTOR STAGING AREAS.3. STAKE OUT CONSTRUCTION LIMITS PRIOR TO CONSTRUCTION.4. INSTALL EROSION CONTROL MEASURES IN ACCORDANCE WITH THE EROSION CONTROL PLAN.5. CLEAR AS DIRECTED WITHIN THE CONSTRUCTION LIMITS AS NEEDED TO EXCAVATE AND PLACE FILL

MATERIAL WITHIN THE AREAS SHOWN ON THE PLANS. PROTECT TREES MARKED FOR PRESERVATION.6. REMOVE AND STOCKPILE TOPSOIL WITHIN THE AREAS OF PROPOSED GRADING. BEGIN WORK AT THE

UPSTREAM END OF THE PROJECT REACH AND WORK IN THE DOWNSTREAM DIRECTION.7. EXCAVATE TO THE LINES AND GRADES SHOWN ON GRADING PLAN.8. DEMOLISH EXISTING DAM PER DEMOLITION PLAN. CUT ALL EXPOSED STEEL REBAR FLUSH WITH THE

REMAINING SURFACES. CONTROLLED REMOVAL IS REQUIRED TO MANAGE SEDIMENT UPSTREAM OFTHE DAM.

9. LAYOUT THE PROPOSED CHANNEL CENTERLINE.10. CONSTRUCT BASE STONE, CHOKE STONE, WEIR STONE, BANKFULL BENCH AND EROSION CONTROL

MEASURES AS SHOWN ON THE PLANS AND DETAILS, PROCEEDING IN THE DOWNSTREAM DIRECTION.11. RESPREAD TOPSOIL, PLANT, SEED AND MULCH ALL DISTURBED AREAS IMMEDIATELY AFTER

CONSTRUCTION PER THE EROSION CONTROL PLAN.12. WALK THE PROJECT SITE WITH THE ENGINEER TO DEVELOP A FINAL CHECK-LIST OF ITEMS LEFT TO BE

COMPLETED.13. REPAIR/COMPLETE ITEMS IDENTIFIED ON THE FINAL CHECK-LIST.14. REMOVE ALL WASTE FROM THE PROJECT AREA AND RESTORE ALL STAGING AND STOCKPILE AREAS

TO THEIR ORIGINAL APPEARANCE. SEED, FERTILIZE, AND MULCH ALL DISTURBED AREAS PER THEEROSION CONTROL PLAN.

15. WALK THE PROJECT SITE WITH THE ENGINEER AND OWNER TO APPROVE PROJECT COMPLETENESS.

CONTROL POINTS

NOTE:1. BID ITEM #6 - BASE STONE, CLASS 'E' REVETMENT INCLUDES THE QUANTITY OFBASE STONE REQUIRED AFTER SUBTRACTING AN ESTIMATED 145 TONS OF SALVAGEDCONCRETE FROM THE DAM REMOVAL.

QUANTITIES

ITEM NUMBER DESCRIPTIONMOBILIZATION (LS)THIS ITEM INCLUDES PROVIDING AND REMOVING CONSTRUCTION EQUIPMENT TO THE SITE. THISITEM WILL BE PAID PER LUMP SUM.

CLEARING AND GRUBBING (LS)ITEM INCLUDES REMOVAL OF ALL VEGETATION, TREES, SHRUBS, STUMPS, AND MISCELLANEOUSDEBRIS ENCOUNTERED WITHIN THE PROJECT AREA AND AS NOTED IN THE CONTRACTDOCUMENTS. TREE PROTECTION IS INCIDENTAL TO THIS ITEM. CLEARING IS BASED ONCONSTRUCTION LIMITS AND SHOULD BE LIMITED TO ONLY THE AREAS NECESSARY TO COMPLETETHE PROJECT AND APPROVED BY THE ENGINEER. THIS ITEM WILL BE PAID PER LUMP SUM.

DAM REMOVAL (LS)CONTRACTOR TO REMOVE DAM AS SHOWN ON SHEET D.01. THIS ITEM WILL BE PAID PER LUMP SUM.SALVAGING CONCRETE FROM DAM REMOVAL (ESTIMATED 145 TONS) AND PLACING AS BASE STONE ISINCIDENTAL TO THIS BID ITEM. ITEM INCLUDES CUTTING REBAR FLUSH WITH SALVAGE MATERIALINTENDED TO BE RE-USED AS BASE STONE.

EROSION CONTROL (LS)REFER TO SHEET F.03 FOR LOCATIONS AND DETAILS. THIS ITEM WILL BE PAID PER LUMP SUM. ITEMINCLUDES INSTALLATION, MAINTENANCE, AND REMOVAL OF 85 LF OF SILT FENCE INSTALLED PERPLANS AND SPECIFICATIONS. ITEM INCLUDES INSTALLATION AND MAINTENANCE OF 120 SY OFROLLED EROSION CONTROL PRODUCT INSTALLED PER PLANS AND SPECIFICATIONS.

BASE STONE, CLASS 'E' REVETMENT (TON)REFER TO D.03, F.02 AND W SHEETS FOR LOCATIONS AND DETAILS. ITEM INCLUDES PROVIDING ANDPLACING REVETMENT.

6" MINUS CHOKE STONE (TON)REFER TO SHEETS D.03, F.02, AND W SHEETS FOR LOCATIONS AND DETAILS. ITEM INCLUDESPROVIDING AND PLACING CHOKE STONE FOR FILLING VOIDS OF REVETMENT IN THE ROCK ARCHRAPIDS STRUCTURE. FILL VOIDS EVERY 2 FOOT LAYER OF REVETMENT. CHOKE STONE SHALL MEETPROJECT SPECIFICATIONS.

WEIR STONE (3.5'X3.0'X1.5' MIN.) (TON)REFER TO SHEETS D.03, F.02, W.05, AND W.06 FOR LOCATIONS AND DETAILS. ITEM INCLUDESPROVIDING AND PLACING WEIR (OR DERRICK) STONES ALONG WITH BOULDER CLUSTERS.MEASUREMENT AND PAYMENT FOR THE WEIR STONES SHALL BE BASED ON THE PLAN QUANTITY.THIS PAYMENT SHALL BE FULL COMPENSATION FOR FURNISHING ALL MATERIALS, LABOR, ANDEQUIPMENT NECESSARY TO INSTALL THE WEIR STONES AND BOULDER CLUSTERS PER PLAN. BIDITEM ESTIMATE ASSUMES 1.5 TONS +/- 0.5 TONS PER WEIR STONE. CONTRACTOR SHALL PROVIDE10-15% OF THE WEIR STONE QUANTITY WITH STONES MEASURING 4.0'X5.0'X1.2' FEET FOR BOULDERCLUSTER STRUCTURES. WEIR STONES SHALL HAVE A SPECIFIC GRAVITY OF 2.65 OR GREATER ANDSHALL BE APPROVED BY ENGINEER PRIOR TO PLACEMENT.

STABILIZED CONSTRUCTION ENTRANCE (MACADAM STONE) (LS)ITEM INCLUDES PROVIDING, PLACING, AND REMOVING STABILIZED CONSTRUCTION ENTRANCE.ENGINEERING FABRIC AND MAINTENANCE OF STABILIZED CONSTRUCTION ENTRANCE ARECONSIDERED INCIDENTAL TO THIS ITEM.

1

2

3

4

6

7

8

10

9

SEEDING/FERTILIZING/MULCHING (LS)THE CONTRACTOR SHALL SEED, FERTILIZE AND MULCH ALL DISTURBED AREAS (APPROXIMATELY 0.2ACRES) PER EROSION CONTROL PLAN F.03 AND SPECIFICATIONS. THIS ITEM WILL BE PAID PER LUMPSUM. SEEDING, FERTILIZING, AND MULCHING SHALL COMPLY WITH SUDAS SECTION 9010.

EXCAVATION, EXPORT (CY)REFER TO SHEETS F.01, F.02, AND F.03 FOR LOCATIONS AND DETAILS. THIS ITEM WILL BE PAID ASDETERMINED BY ENGINEER PER TRUCK TICKETS. CONTRACTOR SHALL GRADE THE SITE AS DETAILEDIN THE PLANS. ANY SPOILS GENERATED AND NOT SPREAD ON-SITE SHALL BE EXPORTED TO ALOCATION DETERMINED BY THE CONTRACTOR. ANY SPOILS CONSISTING OF GRAVEL OR COBBLESHALL BE SALVAGED AND PLACED AS CHOKE STONE MATERIAL PER ENGINEER'S DIRECTION.

5

ESTIMATE REFERENCE INFORMATION

Page 5: IOWA DEPARTMENT OF NATURAL RESOURCES · 9/19/2018  · 1.5' 1.5' 4.0' 3.0' 10.0' 9.0' 4.0' 9.0' 8.5' 7.5' 4.0' 5.0' existing dam - plan view ~2.0'~ ~130.0'~ a' a c c' b' b d d' flow

EXISTINGGRAVEL

PARKING LOT

WAPSIPINICON RIVER

CONSERVATION EASEMENT

APPROXIMATE TOP OF EXISTING DAM

STAGING AND STORAGE AREA

STABILIZED CONSTRUCTION ENTRANCE

EXISTING GRAVEL DRIVE

WATER STREET

BENTON STREET

WAPSIPINICON RIVER

30' 90'

GRAPHIC SCALE

60'0

GRAPHIC SCALE

N

NO

.R

EV

IS

IO

NB

YD

AT

E

DE

SIG

NE

D:

DR

AF

TE

D:

CH

EC

KE

D:

SC

ALE

:

PR

OJE

CT

N

O.:

FIL

E N

UM

BE

R:

SH

EE

T N

O.:

DA

TE

:

PROJECT NO.

SHEET NO.

LT LE

ONA

S S

O C

I A

T E

S

I N C

500

EAST

LOC

UST

STRE

ET S

UITE

400

DES

MOI

NES

IOWA

5

0309

offic

e 51

5-42

2-70

16ww

w.ltl

eon.c

om

038.005

DEMOLITION PLAN

D.01

PD

S

BA

Y

LT

L

1:30

038.005

038.005

D.0

1

SE

PT

EM

BE

R 19, 2

018

LIT

TL

ET

ON

D

AM

M

IT

IG

AT

IO

N

WA

PS

IP

IN

IC

ON

R

IV

ER

LIT

TL

ET

ON

, IO

WA

DE

MO

LIT

IO

N P

LA

N

KEY NOTES

1 CLEAR AND GRUB TREES AND SHRUBS FOR CONSTRUCTION ACCESS ANDREQUIRED GRADING.

2 REMOVE FULL VERTICAL EXTENT OF EXISTING CONCRETE DAM AND RAILING.SEE SHEET B.02. SALVAGED CONCRETE FROM DAM TO BE REUSED AS BASESTONE. CONTRACTOR SHALL BREAK SALVAGED CONCRETE TO APPROXIMATEBASE STONE SIZE.

3 PROTECT EXISTING FENCE.

4 PROTECT EXISTING STRUCTURES AND RETAINING WALL.

5 PROTECT EXISTING PLAYGROUND EQUIPMENT.

DEMOLITION NOTES

1. MECHANICALLY REMOVE THE DAM STRUCTURE AND FILL MATERIAL (NOBLASTING IS PERMITTED) AFTER DAMMED RIVER IS DRAWN DOWN TO MINIMIZESEDIMENT TRANSPORT DOWNSTREAM.

2. SALVAGE BROKEN CONCRETE FROM DAM AND REUSE AS BASE STONE FOR ROCKARCH RAPIDS CONSTRUCTION. EXPOSED REBAR SHALL BE CUT FLUSH. PROVIDEMINIMUM 2' COVER OF CLASS 'E' RIPRAP OVER ANY RE-USED CONCRETE.

3. CONTRACTOR SHALL PROTECT EXISTING SCOUR HOLE DOWNSTREAM OF DAMAND SHALL NOT FILL OR DISCARD MATERIAL IN HOLE OR DOWNSTREAM OF THEDAM. CONTRACTOR SHALL REMOVE ANY MATERIAL PLACED IN SCOUR HOLE.

4. SALVAGE EXISTING DAM SIGNS AND POSTS. PROVIDE TO DNR.

LEGEND

EXISTING CONTOUR

EXISTING PARKING LOT

CONSTRUCTION LIMITS

CONSERVATION EASEMENT

PROPERTY LINE

EXISTING DAM

STABILIZED CONSTRUCTIONENTRANCE

STAGING & STORAGE AREA

AutoCAD SHX Text
900
Page 6: IOWA DEPARTMENT OF NATURAL RESOURCES · 9/19/2018  · 1.5' 1.5' 4.0' 3.0' 10.0' 9.0' 4.0' 9.0' 8.5' 7.5' 4.0' 5.0' existing dam - plan view ~2.0'~ ~130.0'~ a' a c c' b' b d d' flow

OWNER:PARKER, STUART E TRUST

OWNER:PARKER, STUART E TRUST

OWNER:PARKER, STUART E TRUST

OWNER:PARKER, STUART E TRUST

OWNER:COVENTRY, RANDY & SHERRY

OWNER:FISHER, MICHAEL D & DEBORAH K

OWNER:MOUNT, JENNIFER L

OWNER:

COOK, CRAIG A & BRENDA

OWNER:BICKERT, STANLEYE & IRENE E

OWNER:COOPER,MARIE E

OWNER:POISEL, STEPHEN L &AMANDA L

OWNER:LUCIER, SCOTT D & SUSAN M

WAPSIPIN

ICO

N RIVER

CP 103N: 3660053.090E: 5317713.617ELEV: 914.588

CP 102N: 3659989.122E: 5318009.482ELEV: 917.049

CP 101N: 3659998.778E: 5318116.377ELEV: 921.679

CP 100N: 3659894.991E: 5318143.866ELEV: 909.979

CONSTRUCTION LIMITS

CONSERVATIONEASEMENT

WA

TER

STR

EE

T

BENTON STREET

EXISTING GRAVELPARKING LOTPROPOSED ROCK

ARCH RAPIDS. SEESHEET F.02 FOR LOW

FLOW CHANNEL.

WEIR #1

WEIR #2

WEIR #3

WEIR #4

WEIR #5BOULDERCLUSTERS

STAGING ANDSTORAGE AREA

STABLIZED CONSTRUCTION ENTRANCE

PROTECT EXISTINGRETAINING WALL

PROPOSED WEIRSTONES ALONG EDGEOF BANKFULL BENCH.

PLACE WEIR STONES ON SLOPE PERENGINEER'S DIRECTION.

NO

.R

EV

IS

IO

NB

YD

AT

E

DE

SIG

NE

D:

DR

AF

TE

D:

CH

EC

KE

D:

SC

AL

E:

PR

OJE

CT

N

O.:

FIL

E N

UM

BE

R:

SH

EE

T N

O.:

DA

TE

:

PROJECT NO.

SHEET NO.

LT LE

ONA

S S

O C

I A

T E

S

I N C

500

EAST

LOC

UST

STRE

ET S

UITE

400

DES

MOI

NES

IOWA

5

0309

offic

e 51

5-42

2-70

16ww

w.ltl

eon.c

om

038.005

SITE PLAN

D.02

PD

S

BA

Y

LT

L

1:5

0

03

8.0

05

03

8.0

05

D.0

2

SE

PT

EM

BE

R 1

9, 2

01

8

LIT

TL

ET

ON

D

AM

M

IT

IG

AT

IO

N

WA

PS

IP

IN

IC

ON

R

IV

ER

LIT

TL

ET

ON

, IO

WA

SIT

E P

LA

N

150'100'0

GRAPHIC SCALE

50'

N

CONTROL POINT

CLASS 'E' RIPRAP

PROPOSED WEIR STONES

LEGEND

PROFILE ALIGNMENT

LOW FLOW TROUGH

CONSERVATION EASEMENT

PROPERTY LINE

CONSTRUCTION LIMITS

PROPOSED BOULDER CLUSTER

STABILIZED CONSTRUCTIONENTRANCE

STAGING & STORAGE AREA

Page 7: IOWA DEPARTMENT OF NATURAL RESOURCES · 9/19/2018  · 1.5' 1.5' 4.0' 3.0' 10.0' 9.0' 4.0' 9.0' 8.5' 7.5' 4.0' 5.0' existing dam - plan view ~2.0'~ ~130.0'~ a' a c c' b' b d d' flow

PROPOSED CHANNELBED ELEVATION

(THALWEG)

REMOVE EXISTING DAM

APPROXIMATE SEDIMENT

3%4:1

PROPOSED LOWFLOW WATER

SURFACE

EXISTING CHANNELBED ELEVATION(THALWEG)

CUT RIVERBOTTOM (THALWEG)

3.0'

WEIR # 5CREST ELEV=909.46

TROUGHELEV=908.96

WEIR # 3CREST ELEV=911.06

TROUGHELEV=910.56

WEIR # 2CREST ELEV=911.86

TROUGHELEV=911.36

WEIR # 1CREST ELEV=912.66

TROUGHELEV=912.16

WEIR # 4CREST ELEV=910.26

TROUGHELEV=909.76

AVAILABLE AREA FOR REUSEOF SALVAGED DAM MATERIAL

CLASS 'E'RIPRAP BASE

BOULDER CLUSTERCREST ELEV=909.00

EXISTING CHANNELBED ELEVATION

(THALWEG)

1.5%

WEIR #1SEE SHEET F.02 AND W.05FOR ELEVATIONS AND LOCATIONS

WEIR #5

PROPOSED GRADE @BANKFULL SHELF ℄

CUT EXISTINGGRADE

EXISTING WALLAPPROXIMATELOCATION

EXISTING GRADE @BANKFULL SHELF ℄

CUT GRADE @BANKFULL SHELF ℄

NO

.R

EV

IS

IO

NB

YD

AT

E

DE

SIG

NE

D:

DR

AF

TE

D:

CH

EC

KE

D:

SC

ALE

:

PR

OJE

CT

N

O.:

FIL

E N

UM

BE

R:

SH

EE

T N

O.:

DA

TE

:

PROJECT NO.

SHEET NO.

LT LE

ONA

S S

O C

I A

T E

S

I N C

500

EAST

LOC

UST

STRE

ET S

UITE

400

DES

MOI

NES

IOWA

5

0309

offic

e 51

5-42

2-70

16ww

w.ltl

eon.c

om

038.005

PROFILE

D.03

PD

S

BA

Y

LT

L

1:10

H

1:2 V

038.005

038.005

D.0

3

SE

PT

EM

BE

R 19, 2

018

LIT

TL

ET

ON

R

IF

FL

E C

ON

ST

RU

CT

IO

N &

F

IS

H

PA

SS

AG

E R

ES

TO

RA

TIO

N

LIT

TL

ET

ON

, IO

WA

PR

OF

IL

E

SCALE: 1"=10' HORIZONTAL1"=2' VERTICAL

PROPOSED THALWEG PROFILE

BANKFULL BENCH PROFILESCALE: 1"=10' HORIZONTAL

1"=2' VERTICAL

CUT AREA

CLASS 'E' RIPRAP

AVAILABLE AREA FORREUSE OF SALVAGEDDAM MATERIAL

PROPOSED WEIR STONES

LEGEND

PROPOSED GRADE

EXISTING GRADE

PROPOSED LOW-FLOWWATER SURFACE

PROPOSED BOTTOMOF EXCAVATION

DAM REMOVAL

Page 8: IOWA DEPARTMENT OF NATURAL RESOURCES · 9/19/2018  · 1.5' 1.5' 4.0' 3.0' 10.0' 9.0' 4.0' 9.0' 8.5' 7.5' 4.0' 5.0' existing dam - plan view ~2.0'~ ~130.0'~ a' a c c' b' b d d' flow

LUCIER, SCOTT D & SUSAN M

-0+

02.0

0

0+08

.00

0+18

.00

0+28

.00

0+38

.00

0+48

.00

0+58

.00

0+68

.00

0+78

.00

0+88

.00

0+98

.00 1+

08.0

0

1+18

.00

1+28

.00

1+38

.00

1+48

.00

1+58

.00

1+68

.00

1+78

.00

1+88

.00

1+98

.00

PROPOSED THALWEG

BANKFULL BENCH CENTERLINE

EXISTING GRAVELPARKING LOT

WAPSIPINICON RIVER

20' 60'0

GRAPHIC SCALE

40'

N

NO

.R

EV

IS

IO

NB

YD

AT

E

DE

SIG

NE

D:

DR

AF

TE

D:

CH

EC

KE

D:

SC

ALE

:

PR

OJE

CT

N

O.:

FIL

E N

UM

BE

R:

SH

EE

T N

O.:

DA

TE

:

PROJECT NO.

SHEET NO.

LT LE

ONA

S S

O C

I A

T E

S

I N C

500

EAST

LOC

UST

STRE

ET S

UITE

400

DES

MOI

NES

IOWA

5

0309

offic

e 51

5-42

2-70

16ww

w.ltl

eon.c

om

038.005

GRADING PLAN-CUT

F.01

PD

S

BA

Y

LT

L

1:20

038.005

038.005

F.0

1

SE

PT

EM

BE

R 19, 2

018

LIT

TL

ET

ON

D

AM

M

IT

IG

AT

IO

N

WA

PS

IP

IN

IC

ON

R

IV

ER

LIT

TL

ET

ON

, IO

WA

GR

AD

IN

G P

LA

N - C

UT

S

UR

FA

CE

NOTE:1. PROPOSED CONTOURS SHOW CUT SURFACE PRIOR TO PLACING ROCK.2. CUT SURFACE ASSUMES NO BEDROCK WILL BE ENCOUNTERED. SEE GENERAL NOTES #20 ON SHEET C.01.

PROPOSED CUT CONTOUR

EXISTING CONTOUR

LEGEND

CONSERVATION EASEMENT

EXISTING PARKING LOT

PROPERTY LINE

CONSTRUCTION LIMITS

PROFILE ALIGNMENT

AutoCAD SHX Text
900
AutoCAD SHX Text
900
Page 9: IOWA DEPARTMENT OF NATURAL RESOURCES · 9/19/2018  · 1.5' 1.5' 4.0' 3.0' 10.0' 9.0' 4.0' 9.0' 8.5' 7.5' 4.0' 5.0' existing dam - plan view ~2.0'~ ~130.0'~ a' a c c' b' b d d' flow

LUCIER, SCOTT D & SUSAN M

-0+

02.0

0

0+08

.00

0+18

.00

0+28

.00

0+38

.00

0+48

.00

0+58

.00

0+68

.00

0+78

.00

0+88

.00

0+98

.00 1+

08.0

0

1+18

.00

1+28

.00

1+38

.00

1+48

.00

1+58

.00

1+68

.00

1+78

.00

1+88

.00

1+98

.00

PROPOSED THALWEG

BANKFULL BENCH CENTERLINE

CROSS SECTIONS (SEE SHEETS W.01 - W.06)

WEIR #1

BANKFULL BENCH (TYP.)

BOULDER CLUSTERS, TYP.SEE DETAIL ON SHEET B.01

LOW FLOW TROUGH

BEGIN DAM MITIGATION PROJECTSTA. 1+98.00

END DAM MITIGATION PROJECTSTA. 0+04.00

3%

EXISTING GRAVELPARKING LOT

PROPOSED CONTOURS

PROTECT EXISTING RETAINING WALL

EXISTING STRUCTURE/HOUSE -APPROXIMATE LOCATION

A

WEIR #5

B

C

D

E

F

G

H

I

WEIR #2WEIR #3

WEIR #4

WAPSIPINICON RIVER

20' 60'0

GRAPHIC SCALE

40'

N

NO

.R

EV

IS

IO

NB

YD

AT

E

DE

SIG

NE

D:

DR

AF

TE

D:

CH

EC

KE

D:

SC

ALE

:

PR

OJE

CT

N

O.:

FIL

E N

UM

BE

R:

SH

EE

T N

O.:

DA

TE

:

PROJECT NO.

SHEET NO.

LT LE

ONA

S S

O C

I A

T E

S

I N C

500

EAST

LOC

UST

STRE

ET S

UITE

400

DES

MOI

NES

IOWA

5

0309

offic

e 51

5-42

2-70

16ww

w.ltl

eon.c

om

038.005

GRADING PLAN-FINISH

F.02

PD

S

BA

Y

LT

L

1:20

038.005

038.005

F.0

2

SE

PT

EM

BE

R 19, 2

018

LIT

TL

ET

ON

D

AM

M

IT

IG

AT

IO

N

WA

PS

IP

IN

IC

ON

R

IV

ER

LIT

TL

ET

ON

, IO

WA

GR

AD

IN

G P

LA

N - F

IN

IS

HE

D S

UR

FA

CE

NOTE: SEE W.05 & W.06 FOR TYPICAL WEIR CROSS SECTIONS.

CLASS 'E' RIPRAP

BANKFULL BENCH AREA(CLASS 'E' RIPRAP)

PROPOSED WEIR STONES

PROPOSED CONTOUR

EXISTING CONTOUR

LEGEND

PROFILE ALIGNMENT

LOW FLOW TROUGH

CONSERVATION EASEMENT

PROPERTY LINE

CONSTRUCTION LIMITS

PROPOSED BOULDER CLUSTER

AutoCAD SHX Text
900
AutoCAD SHX Text
900
Page 10: IOWA DEPARTMENT OF NATURAL RESOURCES · 9/19/2018  · 1.5' 1.5' 4.0' 3.0' 10.0' 9.0' 4.0' 9.0' 8.5' 7.5' 4.0' 5.0' existing dam - plan view ~2.0'~ ~130.0'~ a' a c c' b' b d d' flow

CONSTRUCTION LIMITS

STABILIZED CONSTRUCTION ENTRANCE

X

EXISTING GRAVEL

EXISTINGGRAVEL

PARKING LOT

WAPSIPINICON RIVER

CONSERVATION EASEMENT

SILT FENCE, TYP.

STAGING AND STORAGE AREA

WAPSIPINICON RIVER

ROLLED EROSION CONTROL PRODUCT, TYP.

30' 90'

GRAPHIC SCALE

60'0

GRAPHIC SCALE

N

NO

.R

EV

IS

IO

NB

YD

AT

E

DE

SIG

NE

D:

DR

AF

TE

D:

CH

EC

KE

D:

SC

ALE

:

PR

OJE

CT

N

O.:

FIL

E N

UM

BE

R:

SH

EE

T N

O.:

DA

TE

:

PROJECT NO.

SHEET NO.

LT LE

ONA

S S

O C

I A

T E

S

I N C

500

EAST

LOC

UST

STRE

ET S

UITE

400

DES

MOI

NES

IOWA

5

0309

offic

e 51

5-42

2-70

16ww

w.ltl

eon.c

om

038.005

EROSION CONTROL

F.03

PD

S

BA

Y

LT

L

1:30

038.005

038.005

F.0

3

SE

PT

EM

BE

R 19, 2

018

LIT

TL

ET

ON

D

AM

M

IT

IG

AT

IO

N

WA

PS

IP

IN

IC

ON

R

IV

ER

LIT

TL

ET

ON

, IO

WA

ER

OS

IO

N C

ON

TR

OL

P

LA

N

SILT FENCE

X

PROPOSED WEIR STONES

LEGEND

EROSION CONTROL NOTES

1. DISTURB THE LEAST AREA POSSIBLE TO COMPLETE THE SCOPEOF THE PROJECT.

2. ALL SEDIMENT AND EROSION CONTROL PRACTICES WILL BEINSPECTED AT LEAST ONCE EVERY SEVEN (7) CALENDAR DAYS .ANY NECESSARY REPAIRS OR CLEANUP TO MAINTAIN THEEFFECTIVENESS OF THE BEST MANAGEMENT PRACTICES SHALLBE MADE IMMEDIATELY.

3. INSPECTIONS ARE THE RESPONSIBILITY OF THE CONTRACTOR.4. SOIL STABILIZATION WILL BE INITIATED ON ALL DISTURBED

AREAS WHERE CONSTRUCTION ACTIVITY WILL NOT OCCUR FORA PERIOD OF MORE THAN 21 CALENDAR DAYS OR WITHIN 14DAYS AFTER CONSTRUCTION ACTIVITY HAS PERMANENTLY ORTEMPORARILY CEASED. THIS SEQUENCE SHALL REPEAT ASGROUND COVER IS REMOVED BY SUBSEQUENT CONSTRUCTIONACTIVITY.

5. APPLY FREQUENT WATERING TO GROUND SURFACE, ASREQUIRED TO CONTROL DUST.

6. MAINTENANCE OF ALL TEMPORARY AND PERMANENT EROSIONCONTROL MEASURES IS THE RESPONSIBILITY OF THECONTRACTOR AND/OR SUBCONTRACTORS. CLEANING OFCONTROL DEVICES SHALL BEGIN WHEN THEY HAVE LOST 50%OF THEIR CAPACITY.

7. LOCATION OF SOLID WASTE CONTAINER AND PORTABLERESTROOM TO BE SPECIFIED BY CONTRACTOR AND APPROVEDBY ENGINEER.

8. WHERE CONSTRUCTION VEHICLE ACCESS ROUTES INTERSECTPAVED PUBLIC ROADS, PROVISIONS SHALL BE MADE TOMINIMIZE THE TRANSPORT OF SEDIMENT BY VEHICULARTRACKING ONTO THE PAVED SURFACE. WHERE SEDIMENT ISTRANSPORTED ONTO A PUBLIC ROAD SURFACE, THE ROADSHALL BE CLEANED THOROUGHLY AT THE END OF EACH DAY.SEDIMENT SHALL BE REMOVED FROM THE ROADS BYSHOVELING OR SWEEPING AND TRANSPORTED TO A SEDIMENTCONTROL DISPOSAL AREA. STREET WASHING SHALL BEALLOWED ONLY AFTER SEDIMENT IS REMOVED IN THISMANNER.

9. ALL TEMPORARY EROSION AND SEDIMENT CONTROLMEASURES SHALL BE REMOVED WITHIN 30 DAYS AFTER FINALSITE STABILIZATION OR AFTER THE TEMPORARY MEASURESARE NO LONGER NEEDED, UNLESS OTHERWISE AUTHORIZED BYTHE IMPLEMENTING AGENCY. TRAPPED SEDIMENT AND THEDISTURBED SOIL AREAS RESULTING FROM THE DISPOSITION OFTEMPORARY MEASURES SHALL BE PERMANENTLY STABILIZEDTO PREVENT FURTHER EROSION AND SEDIMENT.

10. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANYIMPROVEMENTS TO THE ROAD CONDITIONS, GATES, ANDFENCES REQUIRED FOR ACCESS DURING CONSTRUCTION.

11. DURING CONSTRUCTION THE CONTRACTOR SHALL BERESPONSIBLE FOR INSTALLING ADDITIONAL EROSION CONTROLMEASURES NOT SHOWN ON THE PLANS BUT NECESSARY TOCONTROL EXCESS SEDIMENT.

12. CONTRACTOR SHALL REFUEL EQUIPMENT AT A LOCATIONAWAY FROM THE RIVER CHANNEL AND APPROVED BY THEENGINEER.

13. SEED, FERTILIZE, AND MULCH ALL DISTURBED AREA OUTSIDEOF THE CHANNEL USING EROSION CONTROL MIX PER THESPECIFICATIONS.

PROPOSED BOULDER CLUSTER

PROPOSED CONTOUR

EXISTING CONTOUR

PROFILE ALIGNMENT

CONSERVATION EASEMENT

PROPERTY LINE

CONSTRUCTION LIMITS

STABILIZED CONSTRUCTION ENTRANCE

STAGING & STORAGE AREA

ROLLED EROSION CONTROL PRODUCT

AutoCAD SHX Text
900
AutoCAD SHX Text
900
Page 11: IOWA DEPARTMENT OF NATURAL RESOURCES · 9/19/2018  · 1.5' 1.5' 4.0' 3.0' 10.0' 9.0' 4.0' 9.0' 8.5' 7.5' 4.0' 5.0' existing dam - plan view ~2.0'~ ~130.0'~ a' a c c' b' b d d' flow

0+08.00

PROPOSED BANKFULL BENCH CENTERLINE

0+18.00

PROPOSED BANKFULL BENCH CENTERLINE

0+28.00

PROPOSED BANKFULL BENCH CENTERLINE

0+38.00

PROPOSED BANKFULL BENCH CENTERLINE

0+48.00

PROPOSED BANKFULL BENCH CENTERLINE

-0+02.00

NO

.R

EV

IS

IO

NB

YD

AT

E

DE

SIG

NE

D:

DR

AF

TE

D:

CH

EC

KE

D:

SC

ALE

:

PR

OJE

CT

N

O.:

FIL

E N

UM

BE

R:

SH

EE

T N

O.:

DA

TE

:

PROJECT NO.

SHEET NO.

LT LE

ONA

S S

O C

I A

T E

S

I N C

500

EAST

LOC

UST

STRE

ET S

UITE

400

DES

MOI

NES

IOWA

5

0309

offic

e 51

5-42

2-70

16ww

w.ltl

eon.c

om

038.005

CROSS SECTIONS

W.01

PD

S

BA

Y

LT

L

1:20

H 1

:4

V

038.005

038.005

W.01

SE

PT

EM

BE

R 19, 2

018

LIT

TL

ET

ON

D

AM

M

IT

IG

AT

IO

N

WA

PS

IP

IN

IC

ON

R

IV

ER

LIT

TL

ET

ON

, IO

WA

CR

OS

S S

EC

TIO

NS

922.00

922.00

918.00

914.00

910.00

906.00

918.00

914.00

910.00

906.00

918.00

914.00

910.00

906.00

922.00

918.00

914.00

910.00

906.00

922.00

918.00

914.00

910.00

906.00

922.00

918.00

914.00

910.00

906.00

922.00

0.00-20.00-40.00-60.00-80.00-100.00-120.00 20.00 40.00 60.00 80.00 100.00 120.00 0.00-20.00-40.00-60.00-80.00-100.00-120.00 20.00 40.00 60.00 80.00 100.00 120.00

NOTE:1. CROSS SECTION VIEWS ARE LOOKING DOWNSTREAM.2. CROSS SECTION CENTERLINES (0.00) ARE LOCATED AT THE PROPOSED THALWEG

SCALE: 1" = 20' HORIZONTAL1" = 4' VERTICAL

EXISTING SURFACE

PROPOSED FINAL SURFACE

LEGEND

CUT SURFACE

CLASS 'E' RIPRAP

Page 12: IOWA DEPARTMENT OF NATURAL RESOURCES · 9/19/2018  · 1.5' 1.5' 4.0' 3.0' 10.0' 9.0' 4.0' 9.0' 8.5' 7.5' 4.0' 5.0' existing dam - plan view ~2.0'~ ~130.0'~ a' a c c' b' b d d' flow

0+68.00

PROPOSED BANKFULL BENCH CENTERLINE

0+78.00

PROPOSED BANKFULL BENCH CENTERLINE

0+88.00

PROPOSED BANKFULL BENCH CENTERLINE

0+98.00

PROPOSED BANKFULL BENCH CENTERLINE

1+08.00

PROPOSED BANKFULL BENCH CENTERLINE

0+58.00

PROPOSED BANKFULL BENCH CENTERLINE

NO

.R

EV

IS

IO

NB

YD

AT

E

DE

SIG

NE

D:

DR

AF

TE

D:

CH

EC

KE

D:

SC

ALE

:

PR

OJE

CT

N

O.:

FIL

E N

UM

BE

R:

SH

EE

T N

O.:

DA

TE

:

PROJECT NO.

SHEET NO.

LT LE

ONA

S S

O C

I A

T E

S

I N C

500

EAST

LOC

UST

STRE

ET S

UITE

400

DES

MOI

NES

IOWA

5

0309

offic

e 51

5-42

2-70

16ww

w.ltl

eon.c

om

038.005

CROSS SECTIONS

W.02

PD

S

BA

Y

LT

L

1:20

H 1

:4

V

038.005

038.005

W.02

SE

PT

EM

BE

R 19, 2

018

LIT

TL

ET

ON

D

AM

M

IT

IG

AT

IO

N

WA

PS

IP

IN

IC

ON

R

IV

ER

LIT

TL

ET

ON

, IO

WA

CR

OS

S S

EC

TIO

NS

922.00

922.00

918.00

914.00

910.00

906.00

918.00

914.00

910.00

906.00

918.00

914.00

910.00

906.00

922.00

918.00

914.00

910.00

906.00

922.00

918.00

914.00

910.00

906.00

922.00

918.00

914.00

910.00

906.00

922.00

0.00-20.00-40.00-60.00-80.00-100.00-120.00 20.00 40.00 60.00 80.00 100.00 120.00 0.00-20.00-40.00-60.00-80.00-100.00-120.00 20.00 40.00 60.00 80.00 100.00 120.00SCALE: 1" = 20' HORIZONTAL

1" = 4' VERTICAL

EXISTING SURFACE

PROPOSED FINAL SURFACE

LEGEND

CUT SURFACE

CLASS 'E' RIPRAP

NOTE:1. CROSS SECTION VIEWS ARE LOOKING DOWNSTREAM.2. CROSS SECTION CENTERLINES (0.00) ARE LOCATED AT THE PROPOSED THALWEG

Page 13: IOWA DEPARTMENT OF NATURAL RESOURCES · 9/19/2018  · 1.5' 1.5' 4.0' 3.0' 10.0' 9.0' 4.0' 9.0' 8.5' 7.5' 4.0' 5.0' existing dam - plan view ~2.0'~ ~130.0'~ a' a c c' b' b d d' flow

1+28.00

PROPOSED BANKFULL BENCH CENTERLINE

1+38.00

PROPOSED BANKFULL BENCH CENTERLINE

1+48.00

PROPOSED BANKFULL BENCH CENTERLINE

1+58.00

PROPOSED BANKFULL BENCH CENTERLINE

1+68.00

PROPOSED BANKFULL BENCH CENTERLINE

1+18.00

PROPOSED BANKFULL BENCH CENTERLINE

NO

.R

EV

IS

IO

NB

YD

AT

E

DE

SIG

NE

D:

DR

AF

TE

D:

CH

EC

KE

D:

SC

ALE

:

PR

OJE

CT

N

O.:

FIL

E N

UM

BE

R:

SH

EE

T N

O.:

DA

TE

:

PROJECT NO.

SHEET NO.

LT LE

ONA

S S

O C

I A

T E

S

I N C

500

EAST

LOC

UST

STRE

ET S

UITE

400

DES

MOI

NES

IOWA

5

0309

offic

e 51

5-42

2-70

16ww

w.ltl

eon.c

om

038.005

CROSS SECTIONS

W.03

PD

S

BA

Y

LT

L

1:20

H 1

:4

V

038.005

038.005

W.03

SE

PT

EM

BE

R 19, 2

018

LIT

TL

ET

ON

D

AM

M

IT

IG

AT

IO

N

WA

PS

IP

IN

IC

ON

R

IV

ER

LIT

TL

ET

ON

, IO

WA

CR

OS

S S

EC

TIO

NS

922.00

922.00

918.00

914.00

910.00

906.00

918.00

914.00

910.00

906.00

918.00

914.00

910.00

906.00

922.00

918.00

914.00

910.00

906.00

922.00

918.00

914.00

910.00

906.00

922.00

918.00

914.00

910.00

906.00

922.00

0.00-20.00-40.00-60.00-80.00-100.00-120.00 20.00 40.00 60.00 80.00 100.00 120.00 0.00-20.00-40.00-60.00-80.00-100.00-120.00 20.00 40.00 60.00 80.00 100.00 120.00SCALE: 1" = 20' HORIZONTAL

1" = 4' VERTICAL

EXISTING SURFACE

PROPOSED FINAL SURFACE

LEGEND

CUT SURFACE

CLASS 'E' RIPRAP

NOTE:1. CROSS SECTION VIEWS ARE LOOKING DOWNSTREAM.2. CROSS SECTION CENTERLINES (0.00) ARE LOCATED AT THE PROPOSED THALWEG

Page 14: IOWA DEPARTMENT OF NATURAL RESOURCES · 9/19/2018  · 1.5' 1.5' 4.0' 3.0' 10.0' 9.0' 4.0' 9.0' 8.5' 7.5' 4.0' 5.0' existing dam - plan view ~2.0'~ ~130.0'~ a' a c c' b' b d d' flow

1+78.00

PROPOSED BANKFULL BENCH CENTERLINE

1+98.00

PROPOSED BANKFULL BENCH CENTERLINE

1+88.00

PROPOSED BANKFULL BENCH CENTERLINE

NO

.R

EV

IS

IO

NB

YD

AT

E

DE

SIG

NE

D:

DR

AF

TE

D:

CH

EC

KE

D:

SC

ALE

:

PR

OJE

CT

N

O.:

FIL

E N

UM

BE

R:

SH

EE

T N

O.:

DA

TE

:

PROJECT NO.

SHEET NO.

LT LE

ONA

S S

O C

I A

T E

S

I N C

500

EAST

LOC

UST

STRE

ET S

UITE

400

DES

MOI

NES

IOWA

5

0309

offic

e 51

5-42

2-70

16ww

w.ltl

eon.c

om

038.005

CROSS SECTIONS

W.04

PD

S

BA

Y

LT

L

1:20

H 1

:4

V

038.005

038.005

W.04

SE

PT

EM

BE

R 19, 2

018

LIT

TL

ET

ON

D

AM

M

IT

IG

AT

IO

N

WA

PS

IP

IN

IC

ON

R

IV

ER

LIT

TL

ET

ON

, IO

WA

CR

OS

S S

EC

TIO

NS

922.00

922.00

918.00

914.00

910.00

906.00

918.00

914.00

910.00

906.00

918.00

914.00

910.00

906.00

922.00

0.00-20.00-40.00-60.00-80.00-100.00-120.00 20.00 40.00 60.00 80.00 100.00 120.00

0.00-20.00-40.00-60.00-80.00-100.00-120.00 20.00 40.00 60.00 80.00 100.00 120.00

SCALE: 1" = 20' HORIZONTAL1" = 4' VERTICAL

EXISTING SURFACE

PROPOSED FINAL SURFACE

LEGEND

CUT SURFACE

CLASS 'E' RIPRAP

NOTE:1. CROSS SECTION VIEWS ARE LOOKING DOWNSTREAM.2. CROSS SECTION CENTERLINES (0.00) ARE LOCATED AT THE PROPOSED THALWEG

Page 15: IOWA DEPARTMENT OF NATURAL RESOURCES · 9/19/2018  · 1.5' 1.5' 4.0' 3.0' 10.0' 9.0' 4.0' 9.0' 8.5' 7.5' 4.0' 5.0' existing dam - plan view ~2.0'~ ~130.0'~ a' a c c' b' b d d' flow

GAP WEIR STONES 1 FOOT, PER INSPECTOR APPROVAL

BURY WEIR STONES OUTSIDE TROUGH AREA

CONTINUE WEIR STONES INTO BANKFULL BENCH

ADD CHOKE STONE TO FILL VOIDS FOR EVERY2 VERTICAL FEET OF BASE STONE INSTALLED

CLASS 'E' RIPRAP

PROPOSED GRADE

EXISTING GRADE

A B

CD

EF

G

H I

GAP WEIR STONES 1 FOOT

BURY WEIR STONES OUTSIDE TROUGH AREA

CONTINUE WEIR STONES INTO BANKFULL BENCH

CLASS 'E' RIPRAP

PROPOSED GRADE

EXISTING GRADE

A B

CD

EF

G

H

I

ADD CHOKE STONE TO FILL VOIDS FOR EVERY2 VERTICAL FEET OF BASE STONE INSTALLED

NO

.R

EV

IS

IO

NB

YD

AT

E

DE

SIG

NE

D:

DR

AF

TE

D:

CH

EC

KE

D:

SC

ALE

:

PR

OJE

CT

N

O.:

FIL

E N

UM

BE

R:

SH

EE

T N

O.:

DA

TE

:

PROJECT NO.

SHEET NO.

LT LE

ONA

S S

O C

I A

T E

S

I N C

500

EAST

LOC

UST

STRE

ET S

UITE

400

DES

MOI

NES

IOWA

5

0309

offic

e 51

5-42

2-70

16ww

w.ltl

eon.c

om

038.005

TYP. CROSS SECTIONS

W.05

PD

S

BA

Y

LT

L

NO

S

CA

LE

038.005

038.005

W.05

SE

PT

EM

BE

R 19, 2

018

LIT

TL

ET

ON

D

AM

M

IT

IG

AT

IO

N

WA

PS

IP

IN

IC

ON

R

IV

ER

LIT

TL

ET

ON

, IO

WA

TY

PIC

AL

C

RO

SS

S

EC

TIO

NS

NOTE: CROSS SECTION VIEWS ARE LOOKING DOWNSTREAM.

EXISTING SURFACE

PROPOSED FINAL SURFACE

LEGEND

CUT SURFACE

CLASS 'E' RIPRAP

WEIR STONE

TYPICAL WEIR SECTION - WEIR #1, #2, #3NOT TO SCALE1

TYPICAL WEIR SECTION - WEIR #4, #5NOT TO SCALE2

Page 16: IOWA DEPARTMENT OF NATURAL RESOURCES · 9/19/2018  · 1.5' 1.5' 4.0' 3.0' 10.0' 9.0' 4.0' 9.0' 8.5' 7.5' 4.0' 5.0' existing dam - plan view ~2.0'~ ~130.0'~ a' a c c' b' b d d' flow

ADD CHOKE STONE TO FILL VOIDS FOR EVERY2 VERTICAL FEET OF BASE STONE INSTALLED

CLASS 'E' RIPRAP

PROPOSED GRADE

EXISTING GRADE

PROPOSED BANKFULL SHELF CENTERLINE

CUT ELEVATION

BOULDER CLUSTERSPLACE PER DNR INSPECTOR DIRECTION

INSTALL FOOTER STONES WHEN NECESSARYPER DNR INSPECTOR DIRECTION

NO

.R

EV

IS

IO

NB

YD

AT

E

DE

SIG

NE

D:

DR

AF

TE

D:

CH

EC

KE

D:

SC

ALE

:

PR

OJE

CT

N

O.:

FIL

E N

UM

BE

R:

SH

EE

T N

O.:

DA

TE

:

PROJECT NO.

SHEET NO.

LT LE

ONA

S S

O C

I A

T E

S

I N C

500

EAST

LOC

UST

STRE

ET S

UITE

400

DES

MOI

NES

IOWA

5

0309

offic

e 51

5-42

2-70

16ww

w.ltl

eon.c

om

038.005

TYP. CROSS SECTIONS

W.06

PD

S

BA

Y

LT

L

NO

S

CA

LE

038.005

038.005

W.06

SE

PT

EM

BE

R 19, 2

018

LIT

TL

ET

ON

D

AM

M

IT

IG

AT

IO

N

WA

PS

IP

IN

IC

ON

R

IV

ER

LIT

TL

ET

ON

, IO

WA

TY

PIC

AL

C

RO

SS

S

EC

TIO

NS

NOTE: CROSS SECTION VIEWS ARE LOOKING DOWNSTREAM.

EXISTING SURFACE

PROPOSED FINAL SURFACE

LEGEND

CUT SURFACE

CLASS 'E' RIPRAP

WEIR STONE

TYPICAL CROSS SECTION - BOULDER CLUSTERSNOT TO SCALE3