    BGA IRDA-WELDER User Manual

    Model:T-870A

    1

  • 8/3/2019 Irda-welder User Manual T-870a

    2/14

    IRDA-WELDER T870 User Manual

    Puhui technology (taian). CO., LTD.

    www.Tech168.cn

    CATALOGUE

    1. Features.2

    2. Technic Parameter..2

    3. Instrument Inventory3

    4. The main part function explaining.3

    Main body3

    Front panel4

    Back panel4

    Focusing support and lamp body 5

    Line board (PCB) support5

    5. Installation step6

    Lamp body and main body assembly6

    Connection infra-red lamp body ties6

    Connection infra-red lamp sensor plug6

    6. Operation method7

    Starting and starting front inspects8

    Sealing off/repair operation8

    Maintenance and overhaul10

    7. Matters needing attention 10

    Http://www.tech168.cn 2

    http://www.tech168.cn/http://www.tech168.cn/http://www.tech168.cn/
  • 8/3/2019 Irda-welder User Manual T-870a

    3/14

    IRDA-WELDER T870 User Manual

    8The maintenance pledged that 10

    Features

    1Adopt infrared weld technology which independent exploration.

    2Use infrared heat,easy to cut through,heat proportion piercing tradition weld

    machine with sirocco.

    3Easily operate.Just need one day training.Can operation this machine.

    4Don't need weld tools.This machine can weld all the component of 35-50cm.

    5This machine has 800W heating system.widely to240x180mm.

    6Infrared heating don't have sirocco flow. Don't impact perimeter small

    component.Can suitable for all of the component,especially Micro BGA

    component.

    7Definitely can satisfy the computer, the notebook, the electricity swims and so

    on the BGA sealing off/repairs to requestSpecially especially suits to the

    computer north and south bridge

    Technic parameter

    Work floor size 360X240mm

    Rated voltage and frequency AC220-230v 60/50Hz

    Complete machine power 1000W

    Infra-red lamp body power 150W

    Preheating chassis power 800W

    Infra-red lamp body heating size 70mm(50x50mm)

    Http://www.tech168.cn 3

    http://www.tech168.cn/http://www.tech168.cn/http://www.tech168.cn/
  • 8/3/2019 Irda-welder User Manual T-870a

    4/14

    IRDA-WELDER T870 User Manual

    Preheating chassis preheating size 240x180mm

    Infra-red lamp body temperature adjustable 200 -350

    Preheating chassis temperature adjustable 60 -200

    Instrument inventory

    Welding table main body 1

    Infra-red lamp body 1

    Temperature sensor 1

    Board support of the circuit 1

    Power line 1

    user's manualCompact disc 1

    The main part function explaining

    1Welding table main body

    Http://www.tech168.cn 4

    Focus the holderEnd cover

    http://www.tech168.cn/http://www.tech168.cn/http://www.tech168.cn/
  • 8/3/2019 Irda-welder User Manual T-870a

    5/14

    IRDA-WELDER T870 User Manual

    2 Front panel

    3Back panel

    Http://www.tech168.cn 5

    Preheating chassis

    temperature display monitorInfra-red lamp temperaturedisplay monitor

    Preheatingchassisswitch Infra-redlampswitchThetemperaturehypothesis

    pressesakey

    Lead the post

    Focus the knob

    Chassis (working bench )

    Preheat dish

    The infrared lamp has

    body

    Front panel

    Filter and cover

    Board support of the circuit

    PCB temp-sensor

    rack Lamp temp-sensor rack

    Infra-redlampadjustPCBtemp-sensor

    http://www.tech168.cn/http://www.tech168.cn/http://www.tech168.cn/
  • 8/3/2019 Irda-welder User Manual T-870a

    6/14

    IRDA-WELDER T870 User Manual

    4Focusing support and lamp body

    5Board support of the circuit

    Http://www.tech168.cn 6

    The power

    importing

    Connecting wire socket

    of the infrared lamp

    Power source switch

    Fuse

    Focus the knob Focus the holder

    Lamp body segment

    Lead the post

    PCBtemp-sensor

    Lamp temp-sensor rack

    Lamp temp-sensor rack

    http://www.tech168.cn/http://www.tech168.cn/http://www.tech168.cn/
  • 8/3/2019 Irda-welder User Manual T-870a

    7/14

    IRDA-WELDER T870 User Manual

    Installation step

    1 Lamp body and main body assembly

    Relax and focus the shelf and fasten the nut. Is it focus support to pick up, is it lead post aim at

    chassis corresponding nut , rotate and lead the post to make. Is it focus shelf fasten nut is it focus shelf

    to be regular to make to rotate

    .

    2Connection infra-red lamp body ties and infra-red lamp sensor plug

    Aim the connecting wire plug at inserting in the connecting wire socket of the infrared lamp

    Http://www.tech168.cn 7

    Lead the post and pack

    the direction intoRotate the direction

    Board support of the circuit

    fasten the nut

    Preheat dish

    Chassis (workingbench )

    Socket of the sensor

    http://www.tech168.cn/http://www.tech168.cn/http://www.tech168.cn/
  • 8/3/2019 Irda-welder User Manual T-870a

    8/14

    IRDA-WELDER T870 User Manual

    Rotate the fixed screw right.

    Operation method

    Http://www.tech168.cn 8

    The infrared lamp has body

    Board support of the circuitChassis (workingbench )

    The power

    importingsocket of the sensor

    Connecting wire socket

    of the infrared lamp

    Board of the circuit

    PCB temp-sensor rack

    PCBtemp-sensor

    http://www.tech168.cn/http://www.tech168.cn/http://www.tech168.cn/
  • 8/3/2019 Irda-welder User Manual T-870a

    9/14

    IRDA-WELDER T870 User Manual

    North repair computer time bridge scene

    Infra-red lamp sensor laying aside position

    Http://www.tech168.cn 9

    http://www.tech168.cn/http://www.tech168.cn/http://www.tech168.cn/
  • 8/3/2019 Irda-welder User Manual T-870a

    10/14

    IRDA-WELDER T870 User Manual

    Sealing off computer motherboard CPU plug

    The sealing off computer motherboard GAP platoon inserts

    Http://www.tech168.cn 10

    http://www.tech168.cn/http://www.tech168.cn/http://www.tech168.cn/
  • 8/3/2019 Irda-welder User Manual T-870a

    11/14

    IRDA-WELDER T870 User Manual

    Sealing off computer motherboard expansion slot plug

    1Starting and starting front inspects

    Starting front inspects the infra-red lamp body, the temperature sensor and

    the power line first whether connects good

    Turns on the power switch.Self-checking uses (on kneading board display

    monitor demonstrates for the previous use when setting value) again through after.

    The front panel has two switches, controls the preheating chassis, the infra-

    red lamp body work separately; Presses the front panel IR PRE-HEAT PIATE;

    ;, may 60-200 ; in, the adjustment preheating chassis preheating

    temperature, presses the switch is ON;, then the preheating chassis starts to work,

    presses the switch is OFF;, then preheating chassis knock off; Presses the front

    panel IR HEAT LAMP; ;may200-350 ; in, adjusts the infra-red lamp body

    the operating temperature, presses the switch is ON;, then the infra-red lamp body

    starts to work, presses the switch is OFF;,then infra-red lamp body knock off.

    2Sealing off/repair operation1 PCB board laying aside

    Will elect well the PCB board alignment carrier on notch, will lay aside on the

    PCB board support, will fasten the PCB board carrier handwheel, fixed good PCB

    board; About moves the carrier slide rails, selects the appropriate working position.

    2 Before sealing off/repair adjustment and preparatory work

    Adjusts the PCB board position, causes to need the sealing off/repair the chip

    center vertical alignment infra-red lamp body facula center; The adjustment lamp

    body altitude, maintains the lamp holder and the sealing off thing is highly 20-30mm

    is suitable;

    Lays aside the infra-red lamp the temperature sensor nearby the chip the

    suitable position, all around spreads the welding flux in the chip with sensor (to weld

    Http://www.tech168.cn 11

    http://www.tech168.cn/http://www.tech168.cn/http://www.tech168.cn/
  • 8/3/2019 Irda-welder User Manual T-870a

    12/14

    IRDA-WELDER T870 User Manual

    treasure or burnt oil), does this may cause the sensor to measure the temperature is

    more accurate, simultaneously is helpful the solder to help welds the function, BGA

    welds the plate to be able to be completer, can prevent effectively welds the plate to

    stick and questions and so on tin wool.

    When the chip spreads has the waterproof solid sealing compound, certainly

    must first open the preheating chassis melt rubber, after lets rubber being heated

    soften or the pulverization, cleans up first; Also available sol hydrosol and so on other

    measures.According to sol temperature which the factory provides, carries on sol

    processing, the melt rubber temperature is not suitable excessively high, generally

    for 120-140 ; for suitable, preheat interval 3 - 5 minutes or longer.

    3 Sealing off/repair process

    According to product technological requirement or PCB board size, adjustment

    preheating chassis preheating temperature 60-200; adjustable), may open the

    preheating chassis ahead of time, one 3 - 5 minutes, the preheating chassis can

    stabilize in the temperature range which supposes in advanceAccording to the chip size and the welding technological requirement, selects the

    suitable infrared lamp the heating temperature 200-350 adjustable), can satisfy the

    sealing off/repair technological requirement then.

    The common experience is: According to the repair chip size, adjusts the infra-

    red lamp suitably the output temperature 220; adjustable) and chassis preheating

    temperature (60-200 ; adjustable);

    When the sealing off/repair is smaller than the 20x20mm chip, may adjust the

    infra-red lamp temperature to 220-240; about, if the chip has not spread the

    waterproof solid sealing compound, or the PCB board is small cannot distort, but

    does not operate the preheating chassis preheating; Otherwise first preheating 120-

    140 degree is suitable;

    Opens in a big way, when 30x30mm chip, according to the craft and the user

    experience, may adjust the infra-red lamp 240-260; about, preheating chassis 140-

    200 ;, first preheating 3 - 5 minutes, after and so on the chassis stable are

    supposing in advance the temperature, may complete the sealing off/repair process

    very conveniently; This time the infrared light is strongest, the chip elevates

    temperature quickly, pays attention to the control specially, prevented the sensor

    displacement, the temperature measurement does not permit, the chip being heated

    time too is long, the elevation of temperature too is high, hot bad chip.The disassemblage operating process is generally: The fixed PCB board,

    adjusts the PCB board the position, adjusts the chip which the infra-red lamp the

    heartfelt alignment disassembles, adjusts the infra-red lamp, lays aside the infra-red

    lamp highly the temperature sensor, spreads the welding flux, the hypothesis

    preheating chassis preheating temperature and the infra-red lamp operating

    temperature, the opening preheating chassis, after 3-5 minute or a longer spot,

    preheating temperature control nearby the setting value, the opening infra-red lamp

    heating chip, achieved supposes the temperature or the chip tin plate in advance

    melts, takes down the chip after the real suction pen or the tweezers, closes the

    infra-red lamp and the pre-heating platen switch, and so on main engine full cooling,

    closes the power source.

    Http://www.tech168.cn 12

    http://www.tech168.cn/http://www.tech168.cn/http://www.tech168.cn/
  • 8/3/2019 Irda-welder User Manual T-870a

    13/14

    IRDA-WELDER T870 User Manual

    Returns to the operating process which welds is generally: Operating

    process basically with disassemblage process.The similarity is: Cleans up first welds

    the plate and plants the tin ball, the preheating PCB board, the correct laying aside

    chip, the craft temperature which returns according to the tin ball welds carries on,

    the backflow welding, cooling preheating.

    May again enhance temperature 20-30 degree regarding the non-lead solder

    component

    4 In the sealing off/repair process matters needing attention and the

    correlation showed that,

    When sealing off/repair quite big PCB board chip, for instance: The computer

    board, must certainly carry on the imposite fully the preheating seasoning, may the

    technological requirement which provides according to the factory carry on, also may

    depend on the experience to process; Only then processes appropriately, can

    prevent effectively when sealing off/repair chip, the PCB board distortion and

    produces from this faulty soldered joint, chip rake.In the sealing off/repair process, the infra-red lamp shines in the region, all

    plastic plug-in unit, carries on the cover using the aluminum tin foil, prevented high

    temperature infrared dries the distortion or the harm.But is not wraps completely.

    Returns to PCB board which welds/repairs, after and so on cooling, after cleans

    first, dryly, carries on the test; If is not good, may again return welds.Again not good

    repetition entire process.

    Around the work, on according to has not put the PCB board in the situation,

    may not the long time opening infra-red lamp, be able to reduce the lamp the service

    life; Forbid strictlys shining the counter-optical very strong reflection with the infra-red

    lamp long time, can affect the lamp seriously the life.

    3Maintenance and overhaul

    1 Complete machine maintenance:

    After the machine uses period of time, to the focusing frame, the guide pillar, the

    PCB board support and so on the slipper, regularly with fat cleaning, the

    maintenance lubricates and guards against rust the goal.

    2 Preheating chassis and infra-red lamp body maintenance:

    The preheating chassis and the infra-red lamp body, specially the infra-red lamp

    high insightful protection slide, regularly with dehydrated alcohol cleaning, the

    elimination welding flux condensate, maintains the infrared hot radiationunobstructed.

    3 Infra-red lamp replacement:

    When replaces the infra-red lamp, with the special-purpose inside caliper gauge or

    the long mouth pliers, will fix the slide first the spring inside caliper, the slide, spring

    inside caliper one time takes down; Again takes down the fixed infra-red lamp the

    spring inside caliper, then with the bamboo slip or the wooden bat outside lamp

    chimney air vent place, goes against the infra-red lamp gently, draws out the lamp

    holder to replace the new infra-red lamp; Installs again according to the opposite

    order then.

    Http://www.tech168.cn 13

    http://www.tech168.cn/http://www.tech168.cn/http://www.tech168.cn/
  • 8/3/2019 Irda-welder User Manual T-870a

    14/14

    IRDA-WELDER T870 User Manual

    Matters needing attention

    1Matters needing attention: After the work finished, do not have to turn off light

    immediately the source, causes the ventilator full cooling lamp body, the extension

    service life.2The maintenance vent ventilates unimpededly, the lamp body is pure.Uses the

    dehydrated alcohol clean lamp holder slide regularly!

    3The guide pillar, the focusing support at the right moment uses the fat to clean,

    maintenance lubrication.

    4Careful, high temperature operation, attention security.

    5Long-time does not use, should cramp out the power source plug!

    The maintenance pledged that

    The complete machine maintains for a year, the lifelong service.Infra-red lamp

    design life 1000 hours, guaranteed usable three months, long-term factory price

    supply fitting.Provides the immediate network online Q/A and the technical advisory

    work service.

    Statement Between user operating manual and actual product different

    place, take actual product as!

    Http://www.tech168.cn 14

    http://www.tech168.cn/http://www.tech168.cn/http://www.tech168.cn/