Upload
sat062001
View
232
Download
0
Embed Size (px)
Citation preview
8/3/2019 Irda-welder User Manual T-870a
1/14
BGA IRDA-WELDER User Manual
Model:T-870A
1
8/3/2019 Irda-welder User Manual T-870a
2/14
IRDA-WELDER T870 User Manual
Puhui technology (taian). CO., LTD.
www.Tech168.cn
CATALOGUE
1. Features.2
2. Technic Parameter..2
3. Instrument Inventory3
4. The main part function explaining.3
Main body3
Front panel4
Back panel4
Focusing support and lamp body 5
Line board (PCB) support5
5. Installation step6
Lamp body and main body assembly6
Connection infra-red lamp body ties6
Connection infra-red lamp sensor plug6
6. Operation method7
Starting and starting front inspects8
Sealing off/repair operation8
Maintenance and overhaul10
7. Matters needing attention 10
Http://www.tech168.cn 2
http://www.tech168.cn/http://www.tech168.cn/http://www.tech168.cn/8/3/2019 Irda-welder User Manual T-870a
3/14
IRDA-WELDER T870 User Manual
8The maintenance pledged that 10
Features
1Adopt infrared weld technology which independent exploration.
2Use infrared heat,easy to cut through,heat proportion piercing tradition weld
machine with sirocco.
3Easily operate.Just need one day training.Can operation this machine.
4Don't need weld tools.This machine can weld all the component of 35-50cm.
5This machine has 800W heating system.widely to240x180mm.
6Infrared heating don't have sirocco flow. Don't impact perimeter small
component.Can suitable for all of the component,especially Micro BGA
component.
7Definitely can satisfy the computer, the notebook, the electricity swims and so
on the BGA sealing off/repairs to requestSpecially especially suits to the
computer north and south bridge
Technic parameter
Work floor size 360X240mm
Rated voltage and frequency AC220-230v 60/50Hz
Complete machine power 1000W
Infra-red lamp body power 150W
Preheating chassis power 800W
Infra-red lamp body heating size 70mm(50x50mm)
Http://www.tech168.cn 3
http://www.tech168.cn/http://www.tech168.cn/http://www.tech168.cn/8/3/2019 Irda-welder User Manual T-870a
4/14
IRDA-WELDER T870 User Manual
Preheating chassis preheating size 240x180mm
Infra-red lamp body temperature adjustable 200 -350
Preheating chassis temperature adjustable 60 -200
Instrument inventory
Welding table main body 1
Infra-red lamp body 1
Temperature sensor 1
Board support of the circuit 1
Power line 1
user's manualCompact disc 1
The main part function explaining
1Welding table main body
Http://www.tech168.cn 4
Focus the holderEnd cover
http://www.tech168.cn/http://www.tech168.cn/http://www.tech168.cn/8/3/2019 Irda-welder User Manual T-870a
5/14
IRDA-WELDER T870 User Manual
2 Front panel
3Back panel
Http://www.tech168.cn 5
Preheating chassis
temperature display monitorInfra-red lamp temperaturedisplay monitor
Preheatingchassisswitch Infra-redlampswitchThetemperaturehypothesis
pressesakey
Lead the post
Focus the knob
Chassis (working bench )
Preheat dish
The infrared lamp has
body
Front panel
Filter and cover
Board support of the circuit
PCB temp-sensor
rack Lamp temp-sensor rack
Infra-redlampadjustPCBtemp-sensor
http://www.tech168.cn/http://www.tech168.cn/http://www.tech168.cn/8/3/2019 Irda-welder User Manual T-870a
6/14
IRDA-WELDER T870 User Manual
4Focusing support and lamp body
5Board support of the circuit
Http://www.tech168.cn 6
The power
importing
Connecting wire socket
of the infrared lamp
Power source switch
Fuse
Focus the knob Focus the holder
Lamp body segment
Lead the post
PCBtemp-sensor
Lamp temp-sensor rack
Lamp temp-sensor rack
http://www.tech168.cn/http://www.tech168.cn/http://www.tech168.cn/8/3/2019 Irda-welder User Manual T-870a
7/14
IRDA-WELDER T870 User Manual
Installation step
1 Lamp body and main body assembly
Relax and focus the shelf and fasten the nut. Is it focus support to pick up, is it lead post aim at
chassis corresponding nut , rotate and lead the post to make. Is it focus shelf fasten nut is it focus shelf
to be regular to make to rotate
.
2Connection infra-red lamp body ties and infra-red lamp sensor plug
Aim the connecting wire plug at inserting in the connecting wire socket of the infrared lamp
Http://www.tech168.cn 7
Lead the post and pack
the direction intoRotate the direction
Board support of the circuit
fasten the nut
Preheat dish
Chassis (workingbench )
Socket of the sensor
http://www.tech168.cn/http://www.tech168.cn/http://www.tech168.cn/8/3/2019 Irda-welder User Manual T-870a
8/14
IRDA-WELDER T870 User Manual
Rotate the fixed screw right.
Operation method
Http://www.tech168.cn 8
The infrared lamp has body
Board support of the circuitChassis (workingbench )
The power
importingsocket of the sensor
Connecting wire socket
of the infrared lamp
Board of the circuit
PCB temp-sensor rack
PCBtemp-sensor
http://www.tech168.cn/http://www.tech168.cn/http://www.tech168.cn/8/3/2019 Irda-welder User Manual T-870a
9/14
IRDA-WELDER T870 User Manual
North repair computer time bridge scene
Infra-red lamp sensor laying aside position
Http://www.tech168.cn 9
http://www.tech168.cn/http://www.tech168.cn/http://www.tech168.cn/8/3/2019 Irda-welder User Manual T-870a
10/14
IRDA-WELDER T870 User Manual
Sealing off computer motherboard CPU plug
The sealing off computer motherboard GAP platoon inserts
Http://www.tech168.cn 10
http://www.tech168.cn/http://www.tech168.cn/http://www.tech168.cn/8/3/2019 Irda-welder User Manual T-870a
11/14
IRDA-WELDER T870 User Manual
Sealing off computer motherboard expansion slot plug
1Starting and starting front inspects
Starting front inspects the infra-red lamp body, the temperature sensor and
the power line first whether connects good
Turns on the power switch.Self-checking uses (on kneading board display
monitor demonstrates for the previous use when setting value) again through after.
The front panel has two switches, controls the preheating chassis, the infra-
red lamp body work separately; Presses the front panel IR PRE-HEAT PIATE;
;, may 60-200 ; in, the adjustment preheating chassis preheating
temperature, presses the switch is ON;, then the preheating chassis starts to work,
presses the switch is OFF;, then preheating chassis knock off; Presses the front
panel IR HEAT LAMP; ;may200-350 ; in, adjusts the infra-red lamp body
the operating temperature, presses the switch is ON;, then the infra-red lamp body
starts to work, presses the switch is OFF;,then infra-red lamp body knock off.
2Sealing off/repair operation1 PCB board laying aside
Will elect well the PCB board alignment carrier on notch, will lay aside on the
PCB board support, will fasten the PCB board carrier handwheel, fixed good PCB
board; About moves the carrier slide rails, selects the appropriate working position.
2 Before sealing off/repair adjustment and preparatory work
Adjusts the PCB board position, causes to need the sealing off/repair the chip
center vertical alignment infra-red lamp body facula center; The adjustment lamp
body altitude, maintains the lamp holder and the sealing off thing is highly 20-30mm
is suitable;
Lays aside the infra-red lamp the temperature sensor nearby the chip the
suitable position, all around spreads the welding flux in the chip with sensor (to weld
Http://www.tech168.cn 11
http://www.tech168.cn/http://www.tech168.cn/http://www.tech168.cn/8/3/2019 Irda-welder User Manual T-870a
12/14
IRDA-WELDER T870 User Manual
treasure or burnt oil), does this may cause the sensor to measure the temperature is
more accurate, simultaneously is helpful the solder to help welds the function, BGA
welds the plate to be able to be completer, can prevent effectively welds the plate to
stick and questions and so on tin wool.
When the chip spreads has the waterproof solid sealing compound, certainly
must first open the preheating chassis melt rubber, after lets rubber being heated
soften or the pulverization, cleans up first; Also available sol hydrosol and so on other
measures.According to sol temperature which the factory provides, carries on sol
processing, the melt rubber temperature is not suitable excessively high, generally
for 120-140 ; for suitable, preheat interval 3 - 5 minutes or longer.
3 Sealing off/repair process
According to product technological requirement or PCB board size, adjustment
preheating chassis preheating temperature 60-200; adjustable), may open the
preheating chassis ahead of time, one 3 - 5 minutes, the preheating chassis can
stabilize in the temperature range which supposes in advanceAccording to the chip size and the welding technological requirement, selects the
suitable infrared lamp the heating temperature 200-350 adjustable), can satisfy the
sealing off/repair technological requirement then.
The common experience is: According to the repair chip size, adjusts the infra-
red lamp suitably the output temperature 220; adjustable) and chassis preheating
temperature (60-200 ; adjustable);
When the sealing off/repair is smaller than the 20x20mm chip, may adjust the
infra-red lamp temperature to 220-240; about, if the chip has not spread the
waterproof solid sealing compound, or the PCB board is small cannot distort, but
does not operate the preheating chassis preheating; Otherwise first preheating 120-
140 degree is suitable;
Opens in a big way, when 30x30mm chip, according to the craft and the user
experience, may adjust the infra-red lamp 240-260; about, preheating chassis 140-
200 ;, first preheating 3 - 5 minutes, after and so on the chassis stable are
supposing in advance the temperature, may complete the sealing off/repair process
very conveniently; This time the infrared light is strongest, the chip elevates
temperature quickly, pays attention to the control specially, prevented the sensor
displacement, the temperature measurement does not permit, the chip being heated
time too is long, the elevation of temperature too is high, hot bad chip.The disassemblage operating process is generally: The fixed PCB board,
adjusts the PCB board the position, adjusts the chip which the infra-red lamp the
heartfelt alignment disassembles, adjusts the infra-red lamp, lays aside the infra-red
lamp highly the temperature sensor, spreads the welding flux, the hypothesis
preheating chassis preheating temperature and the infra-red lamp operating
temperature, the opening preheating chassis, after 3-5 minute or a longer spot,
preheating temperature control nearby the setting value, the opening infra-red lamp
heating chip, achieved supposes the temperature or the chip tin plate in advance
melts, takes down the chip after the real suction pen or the tweezers, closes the
infra-red lamp and the pre-heating platen switch, and so on main engine full cooling,
closes the power source.
Http://www.tech168.cn 12
http://www.tech168.cn/http://www.tech168.cn/http://www.tech168.cn/8/3/2019 Irda-welder User Manual T-870a
13/14
IRDA-WELDER T870 User Manual
Returns to the operating process which welds is generally: Operating
process basically with disassemblage process.The similarity is: Cleans up first welds
the plate and plants the tin ball, the preheating PCB board, the correct laying aside
chip, the craft temperature which returns according to the tin ball welds carries on,
the backflow welding, cooling preheating.
May again enhance temperature 20-30 degree regarding the non-lead solder
component
4 In the sealing off/repair process matters needing attention and the
correlation showed that,
When sealing off/repair quite big PCB board chip, for instance: The computer
board, must certainly carry on the imposite fully the preheating seasoning, may the
technological requirement which provides according to the factory carry on, also may
depend on the experience to process; Only then processes appropriately, can
prevent effectively when sealing off/repair chip, the PCB board distortion and
produces from this faulty soldered joint, chip rake.In the sealing off/repair process, the infra-red lamp shines in the region, all
plastic plug-in unit, carries on the cover using the aluminum tin foil, prevented high
temperature infrared dries the distortion or the harm.But is not wraps completely.
Returns to PCB board which welds/repairs, after and so on cooling, after cleans
first, dryly, carries on the test; If is not good, may again return welds.Again not good
repetition entire process.
Around the work, on according to has not put the PCB board in the situation,
may not the long time opening infra-red lamp, be able to reduce the lamp the service
life; Forbid strictlys shining the counter-optical very strong reflection with the infra-red
lamp long time, can affect the lamp seriously the life.
3Maintenance and overhaul
1 Complete machine maintenance:
After the machine uses period of time, to the focusing frame, the guide pillar, the
PCB board support and so on the slipper, regularly with fat cleaning, the
maintenance lubricates and guards against rust the goal.
2 Preheating chassis and infra-red lamp body maintenance:
The preheating chassis and the infra-red lamp body, specially the infra-red lamp
high insightful protection slide, regularly with dehydrated alcohol cleaning, the
elimination welding flux condensate, maintains the infrared hot radiationunobstructed.
3 Infra-red lamp replacement:
When replaces the infra-red lamp, with the special-purpose inside caliper gauge or
the long mouth pliers, will fix the slide first the spring inside caliper, the slide, spring
inside caliper one time takes down; Again takes down the fixed infra-red lamp the
spring inside caliper, then with the bamboo slip or the wooden bat outside lamp
chimney air vent place, goes against the infra-red lamp gently, draws out the lamp
holder to replace the new infra-red lamp; Installs again according to the opposite
order then.
Http://www.tech168.cn 13
http://www.tech168.cn/http://www.tech168.cn/http://www.tech168.cn/8/3/2019 Irda-welder User Manual T-870a
14/14
IRDA-WELDER T870 User Manual
Matters needing attention
1Matters needing attention: After the work finished, do not have to turn off light
immediately the source, causes the ventilator full cooling lamp body, the extension
service life.2The maintenance vent ventilates unimpededly, the lamp body is pure.Uses the
dehydrated alcohol clean lamp holder slide regularly!
3The guide pillar, the focusing support at the right moment uses the fat to clean,
maintenance lubrication.
4Careful, high temperature operation, attention security.
5Long-time does not use, should cramp out the power source plug!
The maintenance pledged that
The complete machine maintains for a year, the lifelong service.Infra-red lamp
design life 1000 hours, guaranteed usable three months, long-term factory price
supply fitting.Provides the immediate network online Q/A and the technical advisory
work service.
Statement Between user operating manual and actual product different
place, take actual product as!
Http://www.tech168.cn 14
http://www.tech168.cn/http://www.tech168.cn/http://www.tech168.cn/