ITO : URBAN RENEWALITO : URBAN RENEWALA UTTIPEC PROPOSAL

January 2010

1

© UTTIPEC, Delhi Development Authority, New DelhiJanuary 2010

Page 2: ITO-Urban Renewal Project

The image cannot be displayed. Your computer may not have enough memory to open the image, or the image may have been corrupted. Restart your computer, and then open the file again. If the red x still appears, you may have to delete the image and then insert it again.

CREDITS:

Delhi Development Authority: UTTIPEC WG 1-AChairman: Mr. Sanjiv Sahai, MD, DIMTSCo-Chairman: Mr. Ashok Kumar, Commr. (Plg.) DDAC ( )

Decision of Governing Body Meeting held under the Chairmanship of Hon’ble LG on 19.02.2010:

The Concept Proposal of Pilot Project for Indra PrasthaComplex (ITO) prepared by the core team of UTTIPEC Convener: Mr. Ashok Bhattacharjee, Jt. Dir.(Plg.)-I,

UTTIPEC Sr. Consultant: Ms. Romi (Paromita) Roy

Complex (ITO), prepared by the core team of UTTIPEC, assisted by M/s NilaA Associates and Traffic data analyzed by DIMTS, was presented by Sr. Consultant, UTTIPEC.The Governing Body appreciated the efforts of UTTIPEC

Consultant:in presenting a comprehensive proposal and Approved it in Principle with the direction for proceeding with the preparation of detailed Plans as per short and long term targets. All the concerned agencies are to participate in the process to work out the detailed feasibility of

NilaA Architecture & Urban Design

Nishant Lall, Architect & Urban Designer, Director, NilaASumanyu Vasist, Architect

in the process to work out the detailed feasibility of each component of the proposal. Priority is to be given to the immediate implementable projects to increase the connectivity to Metro Stations and the creation of public spaces through various retrofitting measures and t t d i

Copyright ©UTTIPEC DDA New Delhi Jan 2010

streetscape design.

22

Page 3: ITO-Urban Renewal Project

ITO Pilot Project: A UTTIPEC, DDA Proposal

Contents:

Foreword: Letter from Chief Secretary, Direction from LG 3

Context: Location, Opportunities and Constraints 4

Current Proposals: INTACH/ Mr.Chugh/ PWD/ BRT 22

P di Shift UTTIPEC D i P i i l 12Paradigm Shift: UTTIPEC Design Principles 12

ITO Metropolitan District: Master Plan ( MPD 2021) Vision 17

Design Proposal : Phase I 30Connecting to Public Transportation:Connecting to Public Transportation:

1) Skybridge and Feeder Transit Networks2) Street Retrofit for Feeders, HOV, NMV, BRT and Pedestrians.

Addressing Circulation, Congestion and Connectivity Concerns:1) New Connections to Metro Stations 2) Potential Decongestion Routes3) Proposed Street Hierarchy Network

Placemaking:1) Extension of Informal Activity Areas2) Introducing Round-the-clock Street Life 71

Design Proposal : Phase II 30Making Public Transit Accessible and Preferable:

1) C ti it C t l t R d l t d R d ifi ti l 500 M f MRTS C id

3

1) Connectivity as a Catalyst : Redevelopment and Redensification along 500 M of MRTS Corridors2) Future Redevelopment Criteria: Social & Physical – Sustainability Features 3) Other Key Interventions: Fronting on Nallah, Multimodal Station, Riverfront Revitalization…

3

Page 4: ITO-Urban Renewal Project

Letter from Chief SecretaryChief Secretary, GNCTD had sent a proposal to Hon'ble L.G. regarding the circulation and access issues around Vikas

Foreword

y, p p g gBhawan, suggesting DDA to take up the project. Under subsequent direction from LG, the development of ITO complex was taken up byDDA along with a brief report – suggesting a holistic approach to addressing the issues of ITO. It was also suggested to consider theproject as a Pilot Project scheme under sustainable transit oriented development – a subject presently under consideration underWorking Group 1-A.It has been proposed by the UTTIPEC DDA team that a comprehensive plan for the entire ITO complex be looked at - addressing issues

l d ffi i l i b d i l d i d h l ki di i f h LG Threlated to traffic circulation, urban design, landscape, streetscaping and other place making concepts as per direction of the LG. Thecomprehensive plan includes circulation planning, urban design, activity and movement corridors, three-dimensional views and otheranalysis – which aim to create a revitalized and renewed Vision for ITO as a cultural, civic, Government centre and lifestyle hub for thecity of Delhi.

Suggested: RelocationSuggested: Relocation of Hawkers by covering

the Nallah.

Suggested: RoadSuggested: Road widening by covering portion of Nallah.

44

Page 5: ITO-Urban Renewal Project

Direction from Lt.GovernorIn the Record Note of the meeting held under Hon’ble LG Delhi on

Foreword

held under Hon ble LG, Delhi on 2.6.2009 at 10.30 a.m. in Raj Niwas on "Principles, Applications & Implementation of Transit Oriented Development", the following decisions/ observations were made by the Hon’ble yLG:

• Transit Oriented Developmentappears to be the future objective for the development of the city to encourage the use of public g ptransportation and pedestrian movement - ensuring energy conservation and environmental upgradation. He desired that UTTIPEC take a leading role for i iti ti thinitiating the process.

• A pilot scheme should be taken up immediately for design and implementation along the principles and application procedures di d i th tidiscussed in the meeting.

• It was also pointed out that a lot of land area is currently in possession of various government bodies near Metro Stations and therefore may be considered for infilltherefore may be considered for infill TOD development and densification. Corresponding improvements in these central zones may also be explored.

Paradigm SHIFT...Paradigm SHIFT...

Page 6: ITO-Urban Renewal Project

Context, Challenges & Opportunities

6

Page 7: ITO-Urban Renewal Project

Challenge:• Due to the location of ITO and CP at

Regional ImportancePopulation in millions of NCR cities

• Due to the location of ITO and CP at the intersection of major E-W and N-S movements through the city, the area often becomes a “bottleneck point” for urban Mobility

Ghaziabad+ 3 million

for urban Mobility.

RohtakRohtak

Noida

Delhi

1 2 illi

+ 0.5 million+ 14 million

+ 1.2 million

FaridabadGurgaon

7

Gurgaon+ 1.7 million

+ 1 million

A Regional Fulcrum

Page 8: ITO-Urban Renewal Project

REGIONAL STRATEGY 01: High Speed Rail Connections to NCR subHigh Speed Rail Connections to NCR sub--citiescitiesNot explored further in this Study

High Speed Rail Network Benefits:• Economically centralized Polycentric cities can boom• Economically centralized Polycentric cities can boom.• Immigration to major Cities gets reduced as people can

travel to work centres in different cities quickly.

The image cannot be displayed. Your computer may not have enough memory to open the image, or the image may have been corrupted. Restart your computer, and then open the file again. If the red x still appears, you may have to delete the image and then insert it again.

Taiwan High-Speed Rail

China High-Speed Rail

8Source: Times of India, Nov 2009

Page 9: ITO-Urban Renewal Project

REGIONAL STRATEGY 02: More Connections across the YamunaMore Connections across the YamunaNot explored further in this Study

Benefits of Frequent Bridges in Centre City Bridges in Centre City Areas:

• Greater Connectivity, dispersal of traffic rather than concentration on a concentration on a few bottleneck bridges.

• Frequency of bridges allows narrower width, making them more making them more into multi-modal streets, rather than like freeways.

Shown Here:Shown Here:All world class cities have

their rivers channelized with frequent bridge-connections.

PortlandPortland

Portland has bridges every 500 M near city centre area.

London has bridges every 300 M in city

9Source: Times of India, 23 Nov 2009

every 300 M in city centre area, which increases to 1-1.5 KM in outer areas.LondonLondon

Page 10: ITO-Urban Renewal Project

REGIONAL STRATEGY 03: Prioritize Public Transport at all levelsPrioritize Public Transport at all levels

R i l P bli T t N t kSample:

Feeder Service Nerwork to a Metro StationI t t d M lti d l P bli T t N t kRegional Public Transport Network Feeder Service Nerwork to a Metro StationIntegrated Multimodal Public Transport Network

The image cannot be displayed. Your computer may not have enough memory to open the image, or the image may have been corrupted. Restart your computer, and then open the file again. If the red x still appears, you may have to delete the image and then insert it again.

MRTS Cannot Work without an Efficient Efficient

Feeder Feeder

10

SystemSystem:

Page 11: ITO-Urban Renewal Project

REGIONAL STRATEGY 03: Prioritize Public Transport at all levelsPrioritize Public Transport at all levels

More FrequentMore FrequentM ltimodal Connections Multimodal Connections across the Yamuna needed:

• To connect major Transport To connect major Transport Interchanges.

• To decongest existing bridges like Vikas Marg, etc.

11

Page 12: ITO-Urban Renewal Project

REGIONAL STRATEGY 03: Prioritize Public Transport at all levelsPrioritize Public Transport at all levels

Efficient Feeder:•• Efficient Feeder Efficient Feeder

ServicesServices needed to connect people to Metro & BRT Stations.

•• An efficient BRT systemAn efficient BRT systemis needed to

l h Mcomplement the Metro.

12

Page 13: ITO-Urban Renewal Project

Conflicts: Traffic flow from East Delhi to CPNorth South Corridor connecting Old Delhi to South Delhi

ITO Area is a major thoroughfare as well as destination for the city, and therefore functionally significant. About 80% of the traffic passing through this area is not destined to ITO.

• Heavy through Traffic• Absence of an Inter-connected Street Grid Network

13

• Absence of an Inter-connected Street Grid Network• Lack of Adequate Number of Bridges across Yamuna

– causes traffic to concentrate only on few Arterials… creating severe congestion points.

Page 14: ITO-Urban Renewal Project

Opportunities: Decongest two conflict points through rerouting & Loops

14

Page 15: ITO-Urban Renewal Project

Volume/ Capacity of Major Roads around ITO

Although V/C ratios shown here are quite 0 55 shown here are quite high on IP Marg - the Opening of the Anand Vihar Metro Line has shown a drastic fall in

1.25

0.55

0.55

shown a drastic fall in the traffic volume on Vikas Marg and IP Marg. Thi th t

0.77

0.430.80

0.84

0.30

This proves that introduction of High Speed Efficient Public Transportation is the

0.24

15

solution to traffic management problems of the city.

Page 16: ITO-Urban Renewal Project

Opportunity:• ITO complex is a

ITO Opportunity: ITO Opportunity: MultiMulti--Modal Gateway to New Delhi & CP Modal Gateway to New Delhi & CP -- from East Delhifrom East Delhi

• ITO complex is a major public transport interchange

• Public transit hubs that enables users to b

b

b b

b

that enables users to change various modes and direction at ITO

• Location of 2 metro

Rbbb

• Location of 2 metro stations, 1 ring railway station & the BRT Corridor, makes most of the area falls b most of the area falls under the 500mts MRTS corridor “influence zone”.

b

M

b

BM

16

B

A Regional Fulcrum

Page 17: ITO-Urban Renewal Project

Opportunities: Enhance the transit potential of the ITO district

Constraint:• ITO is always clogged

R

bb b

Tilak BridgeStation

• ITO is always clogged in one-lane direction –during peak hours.

Opportunity

M

b

b

Pragati Maidan Metro Station

b

b

Opportunity:• ITO complex is a

major public transport interchange L ti f 2 t • Location of 2 metro stations, 1 ring railway station & the BRT Corridor, makes

t f th f ll most of the area fall under the 500mts MRTS corridor “influence zone”.

M Underused – Pragati Maidan Metro Station Clogged Streets: Peak HoursIndraprasta Station

1717Interchange

Page 18: ITO-Urban Renewal Project

Indraprastha Metro Station~850 M = Unwalkable distance from Main ITO

Pragati Maidan Metro Station:Railway line a barrier to Connectivity

Challenge: ITO Complex: Challenge: ITO Complex: Inaccessible from Metro Stations!Inaccessible from Metro Stations!

A B

BA

18Lack of Connectivity

Page 19: ITO-Urban Renewal Project

ITO Area is Environmentally significant due to its proximity to the Yamuna.Presence of a Nallah corridor is an added Resource.

ChallengeChallenge:: The access points to the Yamuna are visually and functionally cut off from the main ITO area. The access points to the Yamuna are visually and functionally cut off from the main ITO area.

ITO Area is Environmentally significant due to its proximity to the Yamuna.Presence of a Nallah corridor is an added Resource.

ChallengeChallenge:: The access points to the Yamuna are visually and functionally cut off from the main ITO area. The access points to the Yamuna are visually and functionally cut off from the main ITO area.

I G Stadium

Secretariat

River YamunaIP Power Station

I.P Metro Station

SPA

Pragati Maidan Metro Station

ITODelhi Police HQ

19Disconnection from Yamuna

Page 20: ITO-Urban Renewal Project

Opportunity:Opportunity: Major civic destination / centre for the city with several government offices, institutions, newspaper offices, museums and informal markets. Due to the presence of these uses, it attractspeople of various age groups and interests into this city sub-centre.

I G Stadium

Secretariat

SPA

ITO

IP Power StationMetro

Station

Supreme Court Sl

I.P Metro

Pragati MaidanSupreme Court Slum

20

Station

A Place for People?

Page 21: ITO-Urban Renewal Project

21

Inferences from Social Survey of Anna Nagar and Sanjay Colony:Demographics:• Average age of people in the ITO is 23 years; 50% people above 19 yrs of age• Male-Female Ratio is almost equal.

Work/ Commute:• Most people Work within <5km of ITO core area.• Time taken for commute to work is < 30 mins.• Most of them walk (43%) or take bus (50%) to work. • 4% Cycle to work.

Household:• Average household size is 4.5.• 76% families live in 1-room homes.• Household income for most is approx. Rs. 3000-5000 per month• Number of children per household is 2.6 average.• Most people live in kuccha homes.• There is provision of common toilets, but most people don’t like to pay or use them due to cleanliness issues.

Unit Sizes:• 75% unit size = 12-15 sq.

m.• No parking provision

required.• Approx. 500 homes.

Social Infrastructure + Amenities – to be based on population density, not area:

• Toilets should not be shared between more than 4-6 families.

Home design:

• Should have courtyards and other social interaction areas, also used for women and children.

A Socio-economic Survey was conducted for the TWO Slums in Indraprasta:

Anna NagarAnna Nagar

Sanjay ColonySanjay Colony

Page 22: ITO-Urban Renewal Project

Core Area: ITO Office Complex, Metro Connections & Under utilized land

Extended Study Area: Pragati Maidan, Tilak Bridge Station, IP Power Station & EW Corridor

I.P Metro Station

Metro Station Supreme Court

Pragati Maidan

IP Power Station

ITO

Delhi Police

I.P Metro Station

IP Power Station

Vikas Minar

Delhi Police HQ

River Yamuna

SPA

22View looking towards West Study Area

Page 23: ITO-Urban Renewal Project

Current Proposals:

InTACH InTACH

EM

PWD

BRT

2323

Action: PWD, MCDAction: PWD, MCD

Page 24: ITO-Urban Renewal Project

Previous Proposals: Intach bypass

24

Proposes to decongests Vikas Marg for Westbound traffic to Central Delhi through an underpass under Ring RoadConnecting Vikas Bridge traffic to Mathura Road direclty

24

Page 25: ITO-Urban Renewal Project

Previous Proposal: EM

25

25

Page 26: ITO-Urban Renewal Project

Previous East-West Corridor Proposal: PWDPrevious Proposals: EM

26

Proposes to decongest Vikas Marg for Westbound traffic to Central Delhi through an underpass under Ring RoadConnecting Vikas Bridge traffic to DDU Marg direclty

26

Page 27: ITO-Urban Renewal Project

Previous East-West Corridor Proposal: PWDCurrent Proposal: PWD for ITO Complex

27

Proposes a network of private-car based infrastructure including the East West Corridor through ITO

Page 28: ITO-Urban Renewal Project

Previous East-West Corridor Proposal: PWDCurrent Proposals: BRT Corridor

2828

Page 29: ITO-Urban Renewal Project

Previous East-West Corridor Proposal: PWDCurrent Proposals: BRT Corridor

Proposes BRT corridor along with pedestrian and NMV zones

2929

Page 30: ITO-Urban Renewal Project

Current Proposal: PWD for MCD Civic CenterInitial PWD proposal was based on car traffic andenhance the road infrastructure. The study wasfurther taken up by INTACH which has favored afurther taken up by INTACH which has favored astrengthening of existing network of streets alongwith pedestrian and nmv connectivityShahjahanabad

NDRS Jn

MCD Civic Center

30

ITO belowCP

30

Page 31: ITO-Urban Renewal Project

Previous Studies – Referred and Analyzed for this Report.

31

Page 32: ITO-Urban Renewal Project

PARADIGM SHIFT:

Design PrinciplesDesign Principles

3232

Page 33: ITO-Urban Renewal Project

Principle 1 Manage Congestion

Design Principles

Principle 1: Manage CongestionCongestion is a fact of life in successful urban places. By definition, a place that supports a great concentration of economic and social activities within a pedestrian-scaled environment is going to be congested.

Principle 2: Create Balanced/Active StreetsCity Centre streets must balance the needs of pedestrians, bicycles, transit and the automobile in creating an attractive and viable urban core. Downtown streets are for People first, Commercial second, and th h T ffi thi dthrough Traffic third.

Principle 3: Consider Streets as PlacesThe MPD 2021 envisions the Metropolitan City Centre and Indraprastha as a vital focus of city life, and as

i d ti ti O Cit C t t t th t i t t d i bli da primary destination. Our City Centre streets are the most important and pervasive public space and common ground.

Principle 4: Create Interactive StreetsU b S h hi h h bli lif f h i i dUrban Streets are the stages on which the public life of the community is acted out.Streets must be designed to enable interaction with people and uses at the edges. This creates a sense of liveliness as well as safety through “eyes on the street”.

Principle 5 Foster Pride of Place

33

Principle 5: Foster Pride of PlaceVisible caring and upkeep are critical to the vitality of urban street life.

Page 34: ITO-Urban Renewal Project

ITO Metropolitan District:MPD 2021 Overview

3434

Page 35: ITO-Urban Renewal Project

Opportunities: MPD Vision – Metropolitan Center and extension of CP

Legend:

35

Page 36: ITO-Urban Renewal Project

36

“The development of the Metropolitan City Centre in harmony with the existing urban form of the classical Connaught Circus and multi-storeyed buildings in its extensionis envisaged to bring in visual integration in the overall urban form. The areas included in the Metropolitan City Centre would be Connaught Place & Extension …….Gole Market, Mandi House, Pragati Maidan, Indraprastha Estate.An integrated plan incorporating urban design, landscape, traffic and transportation schemes, safe pedestrian walkways, parking areas, recreational and cultural areas etc. is to be prepared for its development.” (p31)

11.1.1 METROPOLITAN CITY CENTRE (p65)Connaught Place and ExtensionsThe various proposals are:(i) Detailed Urban Design and Landscape Schemes should be prepared to integrate MRTS stations, safe pedestrian walkways, parking areas, recreational and cultural areas, etc.(ii) The intermediate public transport such as monorail, battery operated / high capacity buses, sky buses should be introduced to increase the mobility within the City Centre.(iii) Activities such as viewing gallery, open-air theatres, amusement parks, mini-golf courses/sports activities, food plazas etc. should be introduced to make them more attractive even after working hours.(iv) The envelope, FAR, architectural features of the buildings in the Connaught Circus -Connaught Place should be retained as existing.(v) Continuity of the sidewalks should be maintained in terms of the width, surface treatment, curb cuts, tree and street furniture locations, for the pedestrians and disabled.(vi) Use of alternative renewable sources of energy should be encouraged for new buildings (especially those of commercial or institutional nature), traffic signals and public signage, etc.(a) … the existing height shall be maintained and FAR could be achieved by increasing proportionate ground coverage. (p35)

Opportunities: MPD Vision – Metropolitan Centre

Page 37: ITO-Urban Renewal Project

Circulation Proposal: CONNECTIVITYA.

37

Page 38: ITO-Urban Renewal Project

The image cannot be displayed. Your computer may not have enough memory to open the image, or the image may have been corrupted. Restart your computer, and then open the file again. If the red x still appears, you may have to delete the image and then insert it again.

PHASE -IPHASE -IConnecting to Public Transportation:

1) New Sky bridge

PHASE -IPHASE -I1) New Sky-bridge

2) Introducing Feeder Transit Networks

3) Street Retrofit for Feeders, HOV, NMV, BRT and PedestriansPedestrians.

38

6 months.Action: PWD, MCD, DIMTS6 months.Action: PWD, MCD, DIMTS

38

Page 39: ITO-Urban Renewal Project

11.

New Skybridge and RUBsNew Skybridge and RUBs

39

Page 40: ITO-Urban Renewal Project

PROPOSED PROPOSED NEWNEW Skybridge & UnderpassSkybridge & Underpass–– Direct 5Direct 5--min Walk Connection to ITOmin Walk Connection to ITONew SkybridgeNEW R il NEW Railway UnderpassesBridge over Nallah

Metro Station

40

Underpasses must be well lit and lined with retail uses or Hawkers.

Page 41: ITO-Urban Renewal Project

Proposed Direct Walk Connection from Pragati Maidan Metro Station.

Road Nalla Vikas Kuteer Railways  Railway Line Railway Housing Delhi Metro

LVL = ~203 M

LVL = ~213MLVL = ~206 M

yOffices

41

Page 42: ITO-Urban Renewal Project

22.

Introducing Feeder Transit NetworksIntroducing Feeder Transit Networks

42

Page 43: ITO-Urban Renewal Project

Possible Feeder Systems RequiredMRTS Possible Feeder Systems RequiredMRTS Systems

already in ITO:already in ITO:

NEVNeighborhood Electric

Vehicle

Pedicabs Rickshaw

6-8 per~7 lacs/vehicle

1.2-1.5m width oneway

1-3 per~1 lac/cab< 1m width

1-3 per~Rs.8,000<1m width

43

y

Page 44: ITO-Urban Renewal Project

B

R

B

Provide cheap, frequent & low-occupancy Feeders

PROPOSED PROPOSED FeederFeeder Network Network

M

R

M

M

M

M

The image cannot be displayed. Your computer may not have enough memory to open the image, or the image may have been corrupted. Restart your computer, and then open the file again. If the red x still appears, you may have to delete the image and then insert it again.

R Railway StationM

BB

F d S i h ld b

M

B

Metro Station

DTC Bus Depot

Feeder Services should be:• Run on a dedicated route/ track –

NOT SHARED TRACK.• Be low capacity & frequent (every 1

i t ) t d it ti &

B 44B

minute) - to reduce wait time & crowding.

• Should be zero emissions and noise.

44

Page 45: ITO-Urban Renewal Project

45

M

M

Dedicated HOV-lane Feeder track

Hop-on Hop-off!

Re. 2 per ride

Every 5 minutes.

Zero Emissions

M

R

B

B

B

M

M

45

Provide cheap, frequent & low-occupancy Feeders

Page 46: ITO-Urban Renewal Project

33.

Street Retrofit for Feeders, HOV, NMV, BRT and PedestriansStreet Retrofit for Feeders, HOV, NMV, BRT and Pedestrians

46

Page 47: ITO-Urban Renewal Project

B

R

The image cannot be displayed. Your computer may not have enough memory to open the image, or the image may have been corrupted. Restart your computer, and then open the file again. If the red x still appears, you may have to delete the image and then insert it again.

B

R • Streetscape Improvements for NMV & Pedestrians;

• Table-tops at all Slip Roads & Driveways

M

Driveways.

R

M

M

R

M

M

M

M

M

M

M

BB

M

St t I t d d ll i ti t t

B 47

Streetscape Improvements are needed on all existing streets –to make ITO area more Walk and NMV friendly.

Dedicated lane needed for non-stop feeder van circulation.B

47

Page 48: ITO-Urban Renewal Project

48

Retrofitting of I P Marg (45m R/W) Retrofitting of I P Marg (45m R/W)

As per UTTIPEC Guidelines, Slip Roads should preferably be removedat all junctions, as this area is highly dominated by pedestrians and public transport users.

Median must be minimum 1200 wide. 1.2M x 10M Median Refuge Islands are must at the 3 dotted locations; as per UTTIPEC Street Design Standards, pg. 85.

In case Slip Roads are retained at this junction, it must be table-toppedand fully signalized.

Min. 2.5 M Cycle/ NMV Tracks must be provided.Footpaths and Cycle tracks must be free of all obstructions.

Drawing Source: Oasis Designs for PWD, Jan 2010

Page 49: ITO-Urban Renewal Project

Current I P Marg (45m R/W) Current I P Marg (45m R/W)

EXISTING

• Non segregated bus lane (inefficient)• Non-segregated bus lane (inefficient)• Wide footpaths, often encroached.• No Cycle lanes

M t i d V hi l l t id t S d f t ffi

49

• Motorized Vehicle lanes too wide w.r.t. Speed of traffic.

Page 50: ITO-Urban Renewal Project

Retrofitting I P Marg for Feeder/ HOV Service (45m R/W) Retrofitting I P Marg for Feeder/ HOV Service (45m R/W)

PROPOSAL: PH-1

HOVHOV

50

New Dedicated Left HOV-Lane:To Feeders, Buses & Para-transit

HOVHOV

Page 51: ITO-Urban Renewal Project

Retrofitting I P Marg for Feeder Service (45m R/W) Retrofitting I P Marg for Feeder Service (45m R/W)

PROPOSAL: PH-2

HOVHOV BRT/ LRTBRT/ LRT

51

New Dedicated Left HOV-Lane:To Feeders, Buses & Para-transit

HOVHOV BRT/ LRTBRT/ LRT

Page 52: ITO-Urban Renewal Project

52

Once BRT Lanes are introduced, HOV Lanes may be use for CARPOOL during Peak Hours only.Once BRT Lanes are introduced, HOV Lanes may be use for CARPOOL during Peak Hours only.

“HOV + Carpool Lane” - DURING PEAK HOURS ONLY

4

52

Page 53: ITO-Urban Renewal Project

B

R

Current BRT RouteCurrent BRT Route

M

R

M

M

M

M

M

B

B 53

53

Page 54: ITO-Urban Renewal Project

B

R

• Provide mode-separated dedicated Bus and local

Proposal:Proposal:

M

dedicated Bus and local HOV Lanes on all major arterials (30 M & above)

• Take Buses & HOVs out b

b

b

bb

R

M

M of Congestion by providing dedicated lanes in roads above 30 M.(MPD 2021)

b b b

b

b

bb

bb

b

M

Mb

bb

b

M

Bb

b

b

B 54

54

Page 55: ITO-Urban Renewal Project

55

Service Lane: Underutilized or Privatized !

Retrofitting Ring Road for Feeder Service (90m R/W) Retrofitting Ring Road for Feeder Service (90m R/W)

HOV Lane

New Dedicated Left HOV-Lane for Feeders & Para-transit

EXISTING

PROPOSED

Page 56: ITO-Urban Renewal Project

Addressing Circulation, Congestion and ConnectivityConnectivity Concerns:yy

4) Connectivity + Potential Decongestion Routes

5) Proposed Street Hierarchy Network

5656

6-12 months.Action: PWD, MCD, DIMTS6-12 months.Action: PWD, MCD, DIMTS

Page 57: ITO-Urban Renewal Project

A Collector and Culdesac based Street

Principle 01 : Connectivity

Network causes all traffic to “collect” and concentrate on a few major streets.

a. An interconnected Street Hierarchical Network allows people to make short trips on foot, p ,cycle/rickshaw or even car, along smaller neighborhood roads - while larger city level through-trips are mainly limited to the Arterial Roadsmainly limited to the Arterial Roads.

Collector Streets should therefore be replaced by Connector Streets.

57 design principles Graphic Source: Calthorpe Associates

y

Page 58: ITO-Urban Renewal Project

E-W & N-S Link between Old Delhi and New Delhibetween Old Delhi and New Delhi

58

Page 59: ITO-Urban Renewal Project

Collector roads

59

Page 60: ITO-Urban Renewal Project

Absence of Connector road network in core areanetwork in core area

- Makes connections to MRTS Makes connections to MRTS Stations difficultStations difficult

60

Page 61: ITO-Urban Renewal Project

Restore Missing Links:Restore Missing Links:

Connecting to Metro + Railway Stations

Providing Alternative Routes gaway from A-W point

61

Page 62: ITO-Urban Renewal Project

NEW E-W Connection – bypassing IP MargNEW E-W Connection – bypassing IP MargNew SkybridgeNEW Railway NEW Railway UnderpassesBridge over NallahFlyover Extn. OR, Underpass

Metro

62

Page 63: ITO-Urban Renewal Project

55.

Connectivity + Potential Decongestion RoutesConnectivity Potential Decongestion Routes

63

Page 64: ITO-Urban Renewal Project

B

R

• Provide direct shortest

PROPOSED PROPOSED NEWNEW Pedestrian + NMV Connections:Pedestrian + NMV Connections:

M

Walking Route to/ from Metro + Railway Stations.

P id D ti

R

M

M • Provide Decongestion Routes & Greater Connectivity.

M

M

M

B

Existing Ped. routesProposed Ped. routesLong term proposed routes

B

64

Page 65: ITO-Urban Renewal Project

CURRENT CURRENT WestboundWestbound TrafficTraffic Provide options to take detours & short-cuts…

76

126

10

64

Page 66: ITO-Urban Renewal Project

PROPOSED PROPOSED PROPOSED PROPOSED Provide options to take detours & short-cuts… OD Survey Inferences

76

OD Survey Inferences:• As per OD Surveys in the PWD report –

Approx. 24% traffic from the Vikas Marg (coming from East Delhi) can be di t d AWAY FROM A W P i t

106

8diverted AWAY FROM A-W Point –through this detour.

• The vehicles coming from East Delhi and going towards Pragati Maidan and S th d S th t D lhi t ill t

6

South and Southwest Delhi, etc. will get diverted on to the proposed by-pass road and will decongest the A-W point intersection.

• The capacity of the by pass road is 4

• The capacity of the by-pass road is limited due to Width. So it is thought to have a time bound directional flow on to the by pass road during peak hours only.

Page 67: ITO-Urban Renewal Project

67

Page 68: ITO-Urban Renewal Project

CURRENT CURRENT EastboundEastbound TrafficTraffic (3) Provide options to take detours & short-cuts…

76

126

10

64

Page 69: ITO-Urban Renewal Project

To Geeta Colony; North East DelhiTo Geeta Colony; North East Delhi

PROPOSED PROPOSED PROPOSED PROPOSED (3) Provide options to take detours & short-cuts…

To East DelhiTo East Delhi

Page 70: ITO-Urban Renewal Project

4

70

Page 71: ITO-Urban Renewal Project

Current Road along Nallah… leading towards A-W point

BEFOREBEFORE 44

Page 72: ITO-Urban Renewal Project

Proposed Road with bridge over Nallah… leading to Pragati Maidan Metro Station

AFTERAFTER 44

Page 73: ITO-Urban Renewal Project

73

11

Page 74: ITO-Urban Renewal Project

BEFORE BEFORE 11

Page 75: ITO-Urban Renewal Project

AFTERAFTER 11

Page 76: ITO-Urban Renewal Project

NEWNEW or Enhanced Connections or Enhanced Connections –– Creating a NetworkCreating a NetworkSetback Removal for Road Widening.

Setback R l f N Removal for New Pedestrian Connections.

Metro

76

Page 77: ITO-Urban Renewal Project

55.

Proposed Street Hierarchy: Circulation NetworkProposed Street Hierarchy: Circulation Network

77

Page 78: ITO-Urban Renewal Project

New Street Hierarchy: Design for Walkability & Transit Use.Transit Use.

Major Arterial

Arterial (Boulevard)

Arterial (Avenue)

Collector (Connector)

PROPOSED PROPOSED

Pedestrian/ NMV Paseo

PROPOSED PROPOSED

Page 79: ITO-Urban Renewal Project

An Arterial:

An Arterial: could be a BOULEVARD Collectors: could be AVENUES

Page 80: ITO-Urban Renewal Project

Placemaking: ROUND-THE-CLOCK SAFETY B.

80

Page 81: ITO-Urban Renewal Project

The image cannot be displayed. Your computer may not have enough memory to open the image, or the image may have been corrupted. Restart your computer, and then open the file again. If the red x still appears, you may have to delete the image and then insert it again.

Placemaking:

7) Extension of Informal Activity Areas7) Extension of Informal Activity Areas

8) Introducing Round-the-clock Street Life

8181

6 months.Action: DDA + Land Owning Agencies6 months.Action: DDA + Land Owning Agencies

Page 82: ITO-Urban Renewal Project

To ensure 24x7 safety:To ensure 24x7 safety:

Principle 02 : Eyes on the Street

b. Create “eyes on the street” – by removing setbacks and boundary walls and building to the edge of the street ROW. This would allow people from inside to look out on to the pavement, thus discouraging misbehaviour shady corners peeing misbehaviour, shady corners, peeing, etc.)

c. Require commercial facades to have minimum 30% transparencyminimum 30% transparency.

d. Provide adequate Street Lighting for pedestrians and bicycles.

C t i l/ h ki t

Eyes on the street

e. Create commercial/ hawking zones at regular intervals (10 minute walk from every home in the city) to encourage walkability, increase street activity and

82design principles

y, yprovide safety. (e.g. Mumbai, Shanghai)

Page 83: ITO-Urban Renewal Project

66.

Extension of Informal Activity AreasExtension of Informal Activity Areas

83

Page 84: ITO-Urban Renewal Project

84

KEY

CURRENT MAJOR PUBLIC ACTIVITY ZONES

Pedestrian Network & Informal Activity Locations

84

Page 85: ITO-Urban Renewal Project

85INFORMAL PUBLIC ACTIVITY SOUTH OF VIKAS MARG

Opportunities: Extend Informal Activities along new Streets & Reclaimed Plazas from Setbacks.

Page 86: ITO-Urban Renewal Project

86

River Yamuna

IP Power Station

I.P Metro Station

Metro Station

ITO

SPA

Supreme Court

VikasMinar

Delhi Police HQ

I.P Metro Station

Pragati Maidan

Enhance existing activity corridors to Metro

55

Page 87: ITO-Urban Renewal Project

BEFORE BEFORE 55

Page 88: ITO-Urban Renewal Project

BEFORE BEFORE 55

Page 89: ITO-Urban Renewal Project

89INFORMAL PUBLIC ACTIVITY NORTH OF VIKAS MARG

Page 90: ITO-Urban Renewal Project

BEFORE BEFORE 11

Page 91: ITO-Urban Renewal Project

AFTERAFTER 11

Page 92: ITO-Urban Renewal Project

AFTERAFTER 11

Page 93: ITO-Urban Renewal Project

77.

Introducing Round-the-clock Street LifeIntroducing Round the clock Street Life

93

Page 94: ITO-Urban Renewal Project

Current walking experience at ITO

94UTTIPEC

Page 95: ITO-Urban Renewal Project

RECLAIM SETBACKSRECLAIM SETBACKS – for pedestrians & cycles, and street-interactive uses….

95UTTIPEC

Page 96: ITO-Urban Renewal Project

Current walking experience at ITO

P bli R/WP i P Public R/WPrivate Property

96UTTIPEC

Page 97: ITO-Urban Renewal Project

Convert private “Setback” space to public ROW:

P bli R/WP i P Public R/WPrivate Property

Push parking to the back

97UTTIPEC

with “car-lifts”

Page 98: ITO-Urban Renewal Project

Convert private “Setback” space to public ROW:

P bli R/WP i P Public R/WPrivate Property

Push parking to the back Push back property line.

98UTTIPEC

with “car-lifts” Create more spacefor pedestrians.

Page 99: ITO-Urban Renewal Project

Retrofit Streets: for Safety & Mixed Use

P bli R/WP i P Public R/WPrivate Property

Create safety, space,Push parking to the back

99UTTIPEC

Active street frontage,‘eyes on the street’

with “car-lifts”

Page 100: ITO-Urban Renewal Project

BEFORE 33

In front of ITO Building…

Page 101: ITO-Urban Renewal Project

AFTER 33

In front of ITO Building…

Page 102: ITO-Urban Renewal Project

Building/ compound entries remain “gated” & “lockable”

102UTTIPEC

Page 103: ITO-Urban Renewal Project

BEFORE 22

In front of Police Headquarters…

Page 104: ITO-Urban Renewal Project

AFTER 22

In front of Police Headquarters…

Page 105: ITO-Urban Renewal Project

PlacemakingPlacemakingSetback Removal for Road Widening.

Setback R l f N Removal for New Pedestrian Connections.

Setback Setback Removal for New Semi-formal Active Uses.

Metro

Informal Activity Areas

105

Page 106: ITO-Urban Renewal Project

106

Parking

Page 107: ITO-Urban Renewal Project

Current Parking Zones at ITO

107

Page 108: ITO-Urban Renewal Project

Current Parking Zones at ITO

108PedestriansCurrent Parking

Page 109: ITO-Urban Renewal Project

Parking Zones – Currently Proposed

109PedestriansCurrent Parking

Page 110: ITO-Urban Renewal Project

Parking Zones at ITO – Future Proposal

110PedestriansCurrent ParkingProposed Parkg

Page 111: ITO-Urban Renewal Project

Auto-rickshaw Stands

111KEY

BUS STOPSRICKSHAW STANDSRAIL AND METRO

Page 112: ITO-Urban Renewal Project

112KEY

BUS STOPSPEDESTRIAN MOVEMENTSRAIL AND METROBUILDING ENTRIES

Page 113: ITO-Urban Renewal Project

Development Concept: VISIONC.

113

Page 114: ITO-Urban Renewal Project

PHASE -IIPHASE -IIUrban Renewal of ITO District :

8) Connectivity as a Catalyst :Redevelopment and Redensification along 500 M

PHASE IIPHASE II

Redevelopment and Redensification along 500 M of MRTS Corridors

9) Future Redevelopment Criteria: Social & Physical – Sustainability Featuresy y

10) Other Key Interventions… Multimodal Station, Riverfront Revitalization…

114114

Action: DDA - guidelines, coordinationAction: DDA - guidelines, coordination

Page 115: ITO-Urban Renewal Project

To ensure preferable public A

Principle 03 : Transit Oriented Development

transport use:

A. To Retrofit Streets for equal or

B

A. To Retrofit Streets for equal or higher priority for Public Transit and Pedestrians.

B. Provide transit-oriented mixed landuse patterns and redensify city

Car-dominated street, uncomfortable for pedestrians.Car-dominated street, uncomfortable for pedestrians. Street with equal priority & comfort for all users.Street with equal priority & comfort for all users.

landuse patterns and redensify city within 10 minutes walk of MRTS stops.

C. Provide dedicated lanes for BRT, HOVs (high occupancy vehicles)

Segregated Uses, Random density Mixed Uses, Transit-Density Pyramid

C

HOVs (high occupancy vehicles) and carpool during peak hours.

4

115 design principles

Page 116: ITO-Urban Renewal Project

116

Suitability Analysis: Land holdings and Potential Redevelopment/ Regeneration Areas.

Page 117: ITO-Urban Renewal Project

117

Approximate Land Holdings in the Intervention Areas

IP Thermal Power Station > 20 acres

DTC Bus Depot 7- 7.5 acresPragati Maidan

Railway Land/MRTS 12-15 acres

DDA Land 6-8 acres

m

m

Page 118: ITO-Urban Renewal Project

118

Railway/MRTS Land

118

Page 119: ITO-Urban Renewal Project

119

DDA Land : Vikas Kutir

Page 120: ITO-Urban Renewal Project

120

Existing Slums – Anna Nagar & Sanjay Colony

Page 121: ITO-Urban Renewal Project

121

DTC Ring Road Depot/ Offices

Page 122: ITO-Urban Renewal Project

122

Defunct: Indraprasta Power Station

Page 123: ITO-Urban Renewal Project

123

Metro Corridor- Potential transit oriented district

123

Page 124: ITO-Urban Renewal Project

8.

Connectivity as a Catalyst:

Redevelopment & Redensification along Redevelopment & Redensification along 500 M of MRTS Corridors

124

Page 125: ITO-Urban Renewal Project

125

River Yamuna

IP Power Station

Metro Station

ITO

SPA

Supreme Court

VikasMinar

Delhi Police HQ

I.P Metro Station

Context

Metro Station

Metro Station

Page 126: ITO-Urban Renewal Project

Potential Redevelopment Areas

126

Page 127: ITO-Urban Renewal Project

Slum Rehabilitation and Phased Redevelopment

127

Page 128: ITO-Urban Renewal Project

New Affordable Housing – Integrated with Bus Depot or other uses

128

FAR + densityFAR + density bonuses should be given to Railways, DMRC and DTC – as per MPD Redevelopment Regulations – but only in lieu ofin lieu of provision of land for street connectivity and construction of civic amenities.

Page 129: ITO-Urban Renewal Project

Complete Strip TOD Development

129

Page 130: ITO-Urban Renewal Project

The image cannot be displayed. Your computer may not have enough memory to open the image, or the image may have been corrupted. Restart your computer, and then open the file again. If the red x still appears, you may have to delete the image and then insert it again.

5

6

4

32

1

130

Various “People Places”. . .

Page 131: ITO-Urban Renewal Project

10.

Other Key InterventionsOther Key Interventions…

• Turning our Front on the Nallah

• Integrated Multimodal Station: Tilak Bridge & Metro & BRT

• IP Power Station Recreation Zone

131

Page 132: ITO-Urban Renewal Project

Turning our “Front” on the Nallah…Turning our “Front” on the Nallah…

Page 133: ITO-Urban Renewal Project

BEFORE 66

Backed-on Nallah… behind WHO Building – (NOT) leading to Indraprasta Metro StationBacked-on Nallah… behind WHO Building – (NOT) leading to Indraprasta Metro Station

Page 134: ITO-Urban Renewal Project

AFTER 66

Fronted on Nallah… behind WHO Building – Leading to Indraprasta Metro StationFronted on Nallah… behind WHO Building – Leading to Indraprasta Metro Station

Page 135: ITO-Urban Renewal Project

Integrated Multimodal Station: Tilak Bridge & Metro & BRT

Page 136: ITO-Urban Renewal Project

DDA, Vikas Minar

Tilak Bridge Station offers an opportunity to tap more passengers on the Ring Rail System and could also be seen as an important transit node

Pragati Maidan Metro

Police HQ

136

Page 137: ITO-Urban Renewal Project

Tilak Bridge Station can be moved south to enhance linkages to Metro corridor. The integrated transit stop would act as a transit gateway to the district

Page 138: ITO-Urban Renewal Project

The new multi modal station would provide opportunities to connect Pragati Maidan and ITO complex into one urban district providing seamless pedestrian realm

Page 139: ITO-Urban Renewal Project

Road Nalla Vikas Kuteer Railways Offices

Railway Line Railway Housing Delhi Metro

LVL = ~203 M

LVL = ~213MLVL = ~206 M

The new multi modal station can generate commercial use at a prime location as well as railway related use.

139

Page 140: ITO-Urban Renewal Project

140

IP Power Station Relaxation Zone …IP Power Station Relaxation Zone …

Page 141: ITO-Urban Renewal Project

Renovated Bankside Power Station ( Tate Museum) to New City Hall/ Civic ParkQueen Elizabeth Walk – 2km , London

PublicPublicSpace

TransitTransitHub Govt.

141141

Page 142: ITO-Urban Renewal Project

Indraprastha Thermal Power Station land abuts Yamuna waterfront which could be converted in destination leisure and recreation zone

142

Page 143: ITO-Urban Renewal Project

143

Active waterfront Use

PublicSpace

Govt.

TransitHub

IndraprastaStation

Yamuna Waterfront

Yamuna Waterfront

SecretariatSecretariat

Page 144: ITO-Urban Renewal Project

144

Sustainability Criteria

Page 145: ITO-Urban Renewal Project

145

Inferences from Social Survey of Anna Nagar and Sanjay Colony:Demographics:• Average age of people in the ITO is 23 years; 50% people above 19 yrs of age• Male-Female Ratio is almost equal.

Work/ Commute:• Most people Work within <5km of ITO core area.• Time taken for commute to work is < 30 mins.• Most of them walk (43%) or take bus (50%) to work. • 4% Cycle to work.

Household:• Average household size is 4.5.• 76% families live in 1-room homes.• Household income for most is approx. Rs. 3000-5000 per month• Number of children per household is 2.6 average.• Most people live in kuccha homes.• There is provision of common toilets, but most people don’t like to pay or use them due to cleanliness issues.

Unit Sizes:• 75% unit size = 12-15 sq.

m.• No parking provision

required.• Approx. 500 homes.

Social Infrastructure + Amenities – to be based on population density, not area:

• Toilets should not be shared between more than 4-6 families.

Home design:

• Should have courtyards and other social interaction areas, also used for women and children.

Anna NagarAnna Nagar

Sanjay ColonySanjay Colony

Social Sustainability Criteria

Pragati MaidanStation

Pragati MaidanStation

Page 146: ITO-Urban Renewal Project

Target PopulationApt/ Unit

sizeLeasing

Housing Solution

Demand SupplyPrice of

UnitLoan-

SubsidySavings/ Mortgage

Social Inclusion Criteria: Social Inclusion Criteria: Provide homes to demographic groups with no parking requirementProvide homes to demographic groups with no parking requirement

Examples of Uses requiring no Parking size Solution Unit Subsidy Mortgage

▪ Middle to high incomefamilies

3 room & above Ownership

Private developer

driven housing

Low to medium income

requiring no Parking Provision and Good Public Transport Connections:

Only ~45% of total

demand?

Adequate supply rate?

Low to medium income families with the ability obtain a

mortgage

2/ 3 room OwnershipPrivate

developer driven housing

Low to medium income Private

Connections:

Affordable/ Low-Income Housing

▪ young couples/ singles with an ability

obtain a mortgage

2/3 room OwnershipPrivate

developer driven housing

Low to medium income 1/2 room(serviced Private

gHome for the Aged.Youth HostelsService Apartments for young

▪Low to medium income

Singles with short term housing needs

(serviced apartments,

studios, etc)

RentalPrivate

developer driven housing

? No formal supply

Low to medium income Mainly Govt., Inadequate

y gprofessionals.Govt. Housing for low-income employees.Working women’s hostel▪ families with small

personal savings1/2 room Rental Also privately

produced.? Inadequate

supply

Low income families with uncertain income/

contracted or daily Shared room

Short-term Rental

Govt. produced & managed ? Inadequate

supply

Working women’s hostel.Small-unit rental housing

146

contracted or daily wage workers, etc.

room Rental & managed. supply

▪Low income singles/

families with negligible income

Shared Night

Shelter

Daily Rentals

Govt. produced & managed. ? Inadequate

supply

Page 147: ITO-Urban Renewal Project

Physical: Urban design CriteriaUrban design Criteria – Guideline CODE is to be prepared

Note: Numbers and diagrams • Numbers and diagrams shown here are for illustrative purposes only.

• Detailed Density Studies are 4.0 to be conducted based on

mix of income groups, dwelling unit types and other supportive uses.

Currently allowable Maximum FAR in influence zones

~ 300 du/ha~ 500 du/ha

Currently allowable Maximum FAR in influence zones

147

Page 148: ITO-Urban Renewal Project

148

Environmental Sustainability Criteria: AIR – WATER – ENERGY – WASTE

DECENTRALIZED INFRASTRUCTURE: Whole Systems Thinking…• As per MPD 2021: All new buildings in the City Centre Area must be Energy Efficient.

• Energy efficiency and re-use of waste heat, water and waste should be prioritized at a district level, for the proposed new development.

• Some strategies include:

• Use of rat-trap bonds in building construction

• Orientation to ensure minimum 4-6 hours of daylight on the longest winter day.

• Reuse of grey water for sanitation and irrigation.

• Local Storm & Natural Waste water management

• DECENTRALIZED Infrastructure (as desired in MPD 2021) is feasible only at high population densities and mixed use districts.

Graphic Source: Arup, Shanghai

Page 149: ITO-Urban Renewal Project

Environmental Sustainability Criteria: NOISE

MPD 2021:Noise is emerging as a major pollutant and irritant as well as a constant source of disturbance and health hazards.Against a permissible level of 50-60 dB (A), the sound level in Indian cities often exceeds 80 dB (A)often exceeds 80 dB (A).

HOW MUCH IS TOO MUCH ?• Damage to health begins at 75 db.• Hearing damage begins at 90 db and can be permanent with one exposure of

149

120 db or more.• The average decibel levels exposed to 70-86 db; where damage to physical,

psychological and communicative health begins

Page 150: ITO-Urban Renewal Project

CREDITS:

Delhi Development Authority: UTTIPEC WG 1-AChairman: Mr. Sanjiv Sahai, MD, DIMTSC C C ( )Co-Chairman: Mr. Ashok Kumar, Commr. (Plg.) DDAConvener: Mr. Ashok Bhattacharjee, Jt. Dir.(Plg.)-I,

UTTIPEC Sr. Consultant: Ms. Romi (Paromita) Roy

Consultant:

NilaA Architecture & Urban Design

Nishant Lall, Architect & Urban Designer, Director, NilaASumanyu Vasist, Architect

Copyright ©UTTIPEC DDA New Delhi Jan 2010