Gambar 4.1
Hydrologist Hydrologist
Surveyor Hydrologi (1 OB)Surveyor Hydrologi (1 OB)
Geodetic EngineerGeodetic Engineer
Surveyor Topografi (4 OB)Surveyor Topografi (4 OB)
Bridge Engineer Bridge Engineer
CAD Operator (1 OB)CAD Operator (1 OB)
Cost Quality Engineer Cost Quality Engineer Geotechnical Engineer Geotechnical Engineer
Surveyor Soil/Mat (1 OB)Surveyor Soil/Mat (1 OB)
Team LeaderTeam Leader
Hamonangan AS
Surya Wardana Sutriono Hadi Carsa Kusumaatmaja Tasim
Efendi Rauppu.
Herlambang Susatya
Marthen Motulo.Tri Kartono.Fredy M.
ORGANISASI PELAKSANAAN PEKERJAAN
PERENCANAAN TEKNIS JEMBATAN LAHAR MALA, LAHAR NAHA (200 M)
Saleh.
Nasrul.
Agustinus Banti
LEMBAR ASSISTENSI
PEKERJAAN : : Perencanaan R/P Jalan Wil Manado, Minahasa, Bitung, TomohonTAHUN ANGGARAN : 2008KONSULTAN : CV. KARSA UTANA
NO HARI / TGL URAIAN PARAF KET
Manado, 2008
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
NO.
A
1
2
3
4
B
1
2
3
4
C
1
2
DAFTAR PERSONIL
NAMA KETNo POSISI / JABATAN
A TENAGA AHLI
1 Team Leader / Highway Engineer Ir.DONALD M.P.SUPIT
2 Geodetic Enginer Ir.TEGUH MULYADI
3 Hidrologi Engineer Ir.SEMMY S.W.RUMAMPUK
4 Soil Material Engineer Ir .BAMBANG GUSTRIARSO
5 Cost / Quantity Engineer Ir.SOEWOTO
B TENAGA TEKNIS PENDUKUNG
1 Surveyor Topografi.1 JENDRY MASINAMBOW, ST
2 Surveyor Topografi.2 JAMES ALEX TAMPI
3 Surveyor Hidrologi MARSON SASENGA, AMaTs
4 Surveyor Soil Material TOMMY TENGKER, AMaTs
5 Surveyor Inventarisasi Jalan Ir.FREDDY KURNIAWAN
6 Surveyor Lalu Lintas Ir.HENDRY SUJAPPRI
7 Surveyor Kondisi Jalan JOSEPH MONTOLALU
NO.
A
1
2
3
4
B
1
2
3
4
C
1
2
JADWAL PENUGASAN TENAGA AHLI DAN STAF
BULAN.1 BULAN.2 BULAN.3 BULAN.4OBNo POSISI / JABATAN
1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4
A TENAGA AHLI
1 Team Leader 1 4.00
2 Ahli Perencana Jalan 1 4.00
3 Ahli Geologi 1 4.00
4 Ahli Geodesi 1 4.00
5 Ahli Hidrologi 1 4.00
6 Ahli Kwantitas 1 4.00
7 Ahli Kontrak 1 2.00
8 Ahli Lingkungan 1 2.00
B TENAGA TEKNIS PENDUKUNG
1 Ass. Geologist 1 2.00
2 Ass. Geodesi 1 4.00
3 Ass. Surveyor 3 12.00
4 Operator Komputer (CAD) 2 8.00
C STAF PENDUKUNG
1 Operator Komputer 4 16.00
2 Administrasi 2 8.00
3 Office Boy 1 4.00
4 Driver 2 8.00
Jumlah (Org)
NO.
A
POSISI /
JABATAN
TENAGA AHLI
1
2
Team Leader
Highway Engineer
3 Soil & Material Engineer
4 Quantity & Cost Estimator
B
1
TENAGA TEKNIS PENDUKUNG
Surveyor 1
2
3
Surveyor 2
Surveyor 3
4 Operator Komputer + CAD
C
1
STAF PENDUKUNG
Sekretaris
2 Operator Komputer
RENCANA KERJA
BULAN KENo URAIAN KEGIATAN I 2 3 4 KETERANGAN
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
A Persiapan1 Mobilisasi dan Pendalaman KAK Tgl.SPMK ….Januari 20122 Koordinasi & Konsultasi3 Persiapan Survey Lapangan ( Formulir Survey,
Data Ruas Jalan, dll )
B Pengumpulan Data Lapangan1 Survai Pendahuluan (Reconnaissance Survey)2 Survai Topografi3 Survey DCP, Geoteknik dan Survey Material4 Survey Hidrologi dan Lingkungan
C Perencanaan Teknis Jalan
1 Perencanaan Perkerasan Jalan
2 Perencanaan Geometrik Jalan
3 Penggambaran4 Perhitungan Kuantitas & Biaya Pelaksanaan fisik
D Pelaporan1 Laporan Pendahuluan 2 Laporan Antara
3 Laporan Perhitungan Biaya ( EE )
4 Laporan Akhir5 Dokument Lelang
NO.
A
POSISI /
JABATAN
NAMA
KET
TENAGA AHLI
1
2
Team Leader
Ir. Philips .F. Lohonauman
Highway Engineer
Ir. Philips .F. Lohonauman
3 Soil & Material Engineer
Ir. Rahmat Setiadi
4 Quantity & Cost Estimator
Ir. Rahmat Setiadi
B TENAGA TEKNIS PENDUKUNG
1
2
3
Surveyor 1
Muh. Yunus Nassa
Surveyor 2
Ir. Daryono
Surveyor 3
Ahlidar.R
4 Operator Komputer + CAD
Risat N. Lengkey,ST
C
1
STAF PENDUKUNG
Sekretaris
Srie Astuti Suwondo
2 Operator Komputer
Srie Astuti Suwondo
Keterangan :: Garis Pengendalian/Pengawasan: Garis Koordinasi Satu Arah:Garis Koordinasi Dua Arah
ProjectOfficer ProjectOfficer
Ass. Ahli Jalan RayaAss. Ahli Jalan Raya Ass Ahli JembatanAss Ahli Jembatan Surveyor / TeknisiSurveyor / Teknisi Op Komputer ( Inputing Data )Op Komputer ( Inputing Data )
Team LeaderTeam Leader
Ir.Agus Suroso, MSc
Ir.Toni KiswartonoIr. Kadiar Yunas, MTPaul Sumampouw,
STIr. Paulus Worotican
Ir. Adi NugrohoIr. Widya AntariksaIr. Letty Angkouw
Agustinus.G.Sumampouw, ST
Ir. Johny RumenganThomas Patandungan,
BERonald Stefanus, STEnrico Moniaga, ST
Frankie Mokoginta, STAntonius.D.Angkouw, ST
Charles NangoiDeborah Najoan, ST
Debby Rachmadjanto, ST
ORGANISASI PELAKSANAAN PEKERJAAN
SURVEY IRMS DAN BMS
KepalaSNVT Perencanaan Dan Pengawasan Jalan Dan Jembatan
(P2JJ) Sulawesi Utara
KepalaSNVT Perencanaan Dan Pengawasan Jalan Dan Jembatan
(P2JJ) Sulawesi Utara
Pengguna JasaKonsultan
Konsultan PerencanaKonsultan Perencana
PT. Palma Sejati
SekretarisSekretaris
Operator Komputer
Pesuruh
NO. POSISI / JABATAN NAMA
A TENAGA AHLI
1 Team Leader Ir. Philips .F. Lohonauman
2 Highway Engineer Ir. Philips .F. Lohonauman
3 Soil & Material Engineer Ir. Rahmat Setiadi
4 Quantity & Cost Estimator Ir. Rahmat Setiadi
B
1 Surveyor 1 Muh. Yunus Nassa
2 Surveyor 2 Ir. Daryono
3 Surveyor 3 Ahlidar.R
4 Operator Komputer + CAD Risat N. Lengkey,ST
C STAF PENDUKUNG
1 Sekretaris Srie Astuti Suwondo
2 Operator Komputer Srie Astuti Suwondo
TENAGA TEKNIS PENDUKUNG
R C I Kondisi Visual Type Permukaan Tipikal
8 – 10 Sangat rata dan halus
7 – 8 Sangat baik, umumnya rata.
6 – 7 Baik Hotmix Lama Nacas/Lasbutag baru
5 – 6
4 – 5
3 – 4
2 – 3
< 2
HotMix ( AC dan HRS ) yang baru dibuat/ditingkatkan dengan beberapa lapisan aspal.
HotMix setelah dipakai beberapa tahun atau lapisan tipis HotMix diatas penetrasi Macadam.
Cukup, sedikit/tak ada lubang, permukaan tidak rata.
Penetrasi Macadam, Nacas baru atau Lasbutag berumur beberapa tahun
Jelek, kadang-kadang berlubang, tidak rata.
Penetrasi Macadam berumur 2-3
tahun,Nacas lama, jalan kerikil tak
terawat
Rusak, bergelombang banyak lubang.
Penetrasi Macadam lama, Nacas lama, jalan kerikil tak terawat.
Rusak berat, banyak lubang dan seluruh daerah perkerasan hancur.
Semua type perkerasan yang sudah lama tidak terpelihara
Tidak dapat dilalui kecuali oleh Jeep 4 WD
Jalan tanah dengan drainase jelek, semua type permukaan jalan yang diabaikan sama sekali