JAEA Report on Progress of Decontamination Efforts after Fukushima Daiichi Nuclear Disaster

Embed Size (px)

Citation preview

  • 8/2/2019 JAEA Report on Progress of Decontamination Efforts after Fukushima Daiichi Nuclear Disaster

    1/24

    JAEAActivities

    onDecontamination

    toward EnvironmentalRestorationofFukushima

    ShinichiNAKAYAMA

    JAPAN ATOMIC ENERGY AGENCY

  • 8/2/2019 JAEA Report on Progress of Decontamination Efforts after Fukushima Daiichi Nuclear Disaster

    2/24

    1.AssessmentsofRadiological

    ContaminationSituation

    monitoringandmapping

    2.DemonstrationofDecontamination

    schoolyardandswimmingpool

    decontaminationpilotprojects

    3.R&D on EnvironmentalRestoration

    monitoringsystemusingAUH

    computersimulationfordose

    reduction.

    4.CommunicationActivitiesforReliable

    Information

    JAEAActivitiesforEnvironmentRestoration

    1

  • 8/2/2019 JAEA Report on Progress of Decontamination Efforts after Fukushima Daiichi Nuclear Disaster

    3/24

    Further investigation of radionuclide distribution

    2Cs137depositiondistribution

    map

    Detailedmeasurementsandmappingofground

    surface depositiondistributionofradionuclides

    Widearearadiationdoseratedistribution

    measurementsand

    mapping

    using

    monitoring

    vehicles

    Theresultsprovidesthesourcetermfor

    predictivemodelsoffutureradioactivespread.

    Radiationdoseratedistributionmaps

    MeasurementusingsurveyvehiclesDoseratemeasurementateachmeshelements

    1. ASSESSMENTSOFRADIOLOGICALCONTAMINATIONSITUATION

    Surfacesurvey

    2

  • 8/2/2019 JAEA Report on Progress of Decontamination Efforts after Fukushima Daiichi Nuclear Disaster

    4/24

    (JAEA NSTC)(JAEA NSTC)

    1

    3

    1.ASSESSMENTSOFRADIOLOGICALCONTAMINATION SITUATION

    AircraftradiationmonitoringaroundFukushima

  • 8/2/2019 JAEA Report on Progress of Decontamination Efforts after Fukushima Daiichi Nuclear Disaster

    5/24

    (JAEA NSTC)(JAEA NSTC)

    1

    4

    1.ASSESSMENTSOFRADIOLOGICALCONTAMINATION SITUATION

    AircraftradiationmonitoringaroundFukushima

  • 8/2/2019 JAEA Report on Progress of Decontamination Efforts after Fukushima Daiichi Nuclear Disaster

    6/24

    2.DEMONSTRATIONofDECONTAMINATION

    Schoolandkindergartenplayground

    5

    Kindergarten

    Junior highschool

    First aid: Decrease the playground

    dose rate and store the removed soil

    in-situ.

    JAEA team; performed precise dose rate

    measurements,

    identified the cesium intrusion

    depth, and

    estimated the safety ofunderground trench storage of

    the removed soil. .

    Contaminated surface soil of 5-cm thick was removed

    and put into trenches in a corner of the schoolyard. Dose rate significantly reduced by factors of 10 to 20;

    School: (avg.) 2.5 0.15 Sv/h at 1 mH

    Kindergarten : (avg.) 2.8 0.22 Sv/h at 50 cmH

    The results underlies the government, MEXT, announcement to apply theremove-andtrench work as a tentative dose reduction to Fukushima schools.

  • 8/2/2019 JAEA Report on Progress of Decontamination Efforts after Fukushima Daiichi Nuclear Disaster

    7/24

    6

    2.DEMONSTRATIONofDECONTAMINATION

    Schoolswimmingpool

    Notafewoutdoorswimmingpools

    stillholdCsrichwater.

    Theflocculationmethodwas

    appliedfor

    purification

    of

    water.

    Radioactivesludgewascollected

    andstoredatatemporarystorage

    space.

    Auserfriendlyhandbook;Guide

    forDecontaminatingSchool

    SwimmingPools waspublished.

    Fosteredatrustful

    relationship

    withschoolofficials,municipality

    andresidentsthroughdialogue

    anddecontaminationwork.

    NationalFukushima

    Univ. JuniorHigh

    School

    Before Over 200 Bq/L - Cs

    After N.D.

    Kizuna(:

    bond)

    team

    and

    JAEA

    staffforschoolpooldecontamination

  • 8/2/2019 JAEA Report on Progress of Decontamination Efforts after Fukushima Daiichi Nuclear Disaster

    8/24

    Purpose

    Toacquiretechnicaldataandknowledge,andprovideintegratedexpertiseforthecominglargescaledecontaminationproject.

    Checkthe

    availability

    and

    efficacy

    of

    proven

    and

    new

    techniques

    Investigatecost,workperiod,workforce,wastegenerated,andworkers

    radiationexposure

    Establishwastemanagementincludingvolumereductionofwastesand

    treatmentof

    the

    secondary

    waste

    Workerssafetyandradiationprotection

    Establishoptimalradiationmonitoring

    Recordthepubliccommunication

    DecontaminationPilot

    Projects

    at

    Model

    Sites;

    Project1:AreasincludingSpecific SpotsrecommendedforEvacuation(2

    sites)

    Project2:AreasincludingDeliberateEvacuationArea&Restricted

    Area(19

    sites

    in

    11

    municipalities)

    2.DEMONSTRATIONofDECONTAMINATION

    DemonstrationPilotProjects

    7

  • 8/2/2019 JAEA Report on Progress of Decontamination Efforts after Fukushima Daiichi Nuclear Disaster

    9/24

    2.DEMONSTRATIONofDECONTAMINATION

    DecontaminationPilotProject 1

    City

    of

    Date

    and

    City

    of

    Minami

    Soma

    ModelareainDatecity

    ModelareainMinamiSomacity

    8

  • 8/2/2019 JAEA Report on Progress of Decontamination Efforts after Fukushima Daiichi Nuclear Disaster

    10/24

  • 8/2/2019 JAEA Report on Progress of Decontamination Efforts after Fukushima Daiichi Nuclear Disaster

    11/24

    10

    2.DEMONSTRATIONofDECONTAMINATION

    DecontaminationPilotProjects:Building

  • 8/2/2019 JAEA Report on Progress of Decontamination Efforts after Fukushima Daiichi Nuclear Disaster

    12/24

    11

    2.DEMONSTRATIONofDECONTAMINATION

    DecontaminationPilotProject:Concrete,Asphalt

    highpressurewater

    roadcleaner

    blasting

    Iceblasting

    Ironshot

    blasting

    surfacestripping

  • 8/2/2019 JAEA Report on Progress of Decontamination Efforts after Fukushima Daiichi Nuclear Disaster

    13/24

    12

    2.DEMONSTRATIONofDECONTAMINATION

    DecontaminationPilotProject:Farmland

    plow

    fixation

    topsoilremoval

    turfstripping

  • 8/2/2019 JAEA Report on Progress of Decontamination Efforts after Fukushima Daiichi Nuclear Disaster

    14/24

    13

    2.DEMONSTRATIONofDECONTAMINATION

    DecontaminationPilotProject:Trees,Forest

    weeding

    removalofleafmold

    clipping waterhorsing

    clipping clipping

    waterremovalofleafmoldcuring

  • 8/2/2019 JAEA Report on Progress of Decontamination Efforts after Fukushima Daiichi Nuclear Disaster

    15/24

    14

    2.DEMONSTRATIONofDECONTAMINATION

    Volumereductionofradioactivewaste

    watertreatment

    flocculationprecipitation

    column

    adsoption

    chipping pruningandsticks

  • 8/2/2019 JAEA Report on Progress of Decontamination Efforts after Fukushima Daiichi Nuclear Disaster

    16/24

    2.DEMONSTRATIONofDECONTAMINATION

    Temporarystorageforradioactivewaste:moundtype

    15

    Drainpipe

    Impermeable layer

    or liner sheet

    Protective layer

    Supplemental

    layer for water

    collection

    Impermeable layer

    or liner sheet

    Tank for checking of

    radioactivity concentration

    of seeping water

    Embankment or sandbags

    for shielding

    Flexible container bags

    Gas discharge

  • 8/2/2019 JAEA Report on Progress of Decontamination Efforts after Fukushima Daiichi Nuclear Disaster

    17/24

    2.DEMONSTRATIONofDECONTAMINATION

    Temporarystorageforradioactivewaste

    16

    Drainpipe

    Impermeable layer

    or liner sheet

    Protective layer

    Supplemental

    layer for water

    collection

    Tank for checking of

    radioactivity concentration

    of seeping water Embankment or sandbags

    for shielding

    Impermeable layer

    or liner sheet

    Flexible container bags

    Rock

    Sandbags

    Embankment for

    shielding

    Protective layer

    Supplemental layer for

    water collection

    Impermeable layer

    or liner sheet

    Impermeable layer

    or liner sheet

    Tank for checking of

    radioactivity concentration

    of seeping water

    Rock

    Dam

    Impermeable layer

    or liner sheet

    Protective layer

    Supplemental

    layer for water

    collection

    Embankment or sandbags

    for shielding

    Tank for checking of

    radioactivity concentration

    of seeping water

    Impermeable layer

    or liner sheet

    Flexible container bags

    Flexible container bags

    Drainpipe

    Impermeable layer

    or liner sheet

    Protective layer

    Supplemental

    layer for water

    collection

    Tank for checking of

    radioactivity concentration

    of seeping water

    Embankment or sandbags

    for shielding

    Impermeable layer

    or liner sheet

    Gas discharge

  • 8/2/2019 JAEA Report on Progress of Decontamination Efforts after Fukushima Daiichi Nuclear Disaster

    18/24

    3.R&DonENVIRONMENTALRESTORATION

    AutonomousUnmannedHelicopter(AUH)

    Monitoring

    System

    17

    Airdoserate (1mhigh)canbemeasuredfromanaltitudeof30m

  • 8/2/2019 JAEA Report on Progress of Decontamination Efforts after Fukushima Daiichi Nuclear Disaster

    19/24

    3.R&DonENVIRONMENTALRESTORATION

    MeasurementofradiationdistributionbyPlastic

    Scintillation

    Fibers

    (PSFs)

    18

    PSFs data

    Survey Meter

    0

    2

    4

    6

    8

    10

    0.0

    0.5

    1.0

    1.5

    2.0

    2.5

    3.0

    0 2 4 6 8 10 12

    uSv/h)

    PSF(cp

    s)

    Position (m)

    No. 3

    Two-dimensional measurement

    Rolling and contoured surface, due to the

    bendable nature.

    Underwater surface such as brook bed andpond settlement, due to the waterproofness.

    19PSFsbundled

  • 8/2/2019 JAEA Report on Progress of Decontamination Efforts after Fukushima Daiichi Nuclear Disaster

    20/24

  • 8/2/2019 JAEA Report on Progress of Decontamination Efforts after Fukushima Daiichi Nuclear Disaster

    21/24

    20

    3.R&DonENVIRONMENTALRESTORATION

    Surfacecleaningbyhighpressurewater

    decre

    ase

    water pressure, MPa

    decrease, %

    countsperminute

    before after

    after

    waterpurification

  • 8/2/2019 JAEA Report on Progress of Decontamination Efforts after Fukushima Daiichi Nuclear Disaster

    22/24

    JAEAtechnicalstaffaredispatchedtoFukushimaprefectureschools(fromkindergartenstojuniorhighschools)upontheirrequest

    Afterbriefings

    on

    radiation,

    JAEA

    staff

    memberstalkfacetofacewithparentsandteachers,answeringtheirquestionsonradiationanditshealtheffects.

    132sessionshavebeenheldsinceJuly,and

    atotal

    of

    142

    sessions

    are

    scheduled

    as

    of

    December4.

    Briefingmaterials

    4.COMMUNICATIONSandINSTRUCTIONS

    Questionandanswersessiononradiationandhealth

    21

  • 8/2/2019 JAEA Report on Progress of Decontamination Efforts after Fukushima Daiichi Nuclear Disaster

    23/24

    About

    100

    persons

    are

    measured

    per

    day About7,300havebeenmeasuredbylastNovember,

    andatotalof 8,000personsarescheduledbythe

    endofDecember,2011.

    15minuteto1hourQ&Aper person is welcomed

    aftereach

    measurement

    EnergyspectrummeasuredMeasurementbyWholeBodyCounter

    JAEAhasmeasuresinternalexposureofpeoplewithinthe

    restrictedareaanddeliberateevacuationareausingthe

    WholeBodyCounter(WBC)inTokaiLaboratory

    4.COMMUNICATIONSandINSTRUCTIONS

    WBCmeasurementforFukushimapref.residents

    22

  • 8/2/2019 JAEA Report on Progress of Decontamination Efforts after Fukushima Daiichi Nuclear Disaster

    24/24

    JAEAdispatchesitsexpertstoofficial

    trainingcourseofdecontamination

    works plannedby

    Fukushima

    pref.,

    as

    supervisorstoensuringsafetyand

    enhancingtheskillsofworkersand

    operatorsengagingindecontamination

    works.Participantscompletedarecertifiedby

    thegovernorof

    Fukushima.

    Completioncertificate

    Curriculumoftrainingsession

    3,000workers

    and

    operators(equivalentto

    halfofconstructorsin

    Fukushima)willbe

    anticipated

    by

    the

    end

    ofFY2011.

    4.COMMUNICATIONSandINSTRUCTIONS

    Dispatchofsupervisorstotrainingsessions

    on

    Certified

    Decontamination

    Workers/Operators

    23

    Day1 Day2

    Opening 5.Safety

    management

    during

    decontamination

    works

    1.Overviewofthe

    accident

    2.Fundamental

    knowledgeon

    radiation

    6.Radiation

    effectsonhuman

    health

    3.Radiationsafety

    management

    7.Demonstration

    andpractice

    4.

    Decontamination

    method

    8.Exam.

    Closing