34
Copyright © 2014, Oracle and/or its affiliates. All rights reserved. JD Edwards EnterpriseOne Production Operations Supplier Manufacturing Accounting Quality Management Production Sales and Operations Planning Detailed Production Planning and Scheduling Production Method? Manage Demand Flow Manufacturing Manage Shop Floor Analyze Production Enhancement in Manage Quality Manufacturing Order/Rate Schedule Released Demand Flow Manufacturing Configure to Order; Process; Discrete; Repetitive; Blend Account for Manufacturing Activity Supplier - Outside Process Outside Operation Parts Returned From Supplier Engineer to Order (ETO) PMPN

JD Edwards EnterpriseOne · PDF fileJD Edwards EnterpriseOne Manage Manufacturing Orders Production ... JD Edwards EnterpriseOne Manage Items with Kanban Production

Embed Size (px)

Citation preview

Page 1: JD Edwards EnterpriseOne  · PDF fileJD Edwards EnterpriseOne Manage Manufacturing Orders Production ... JD Edwards EnterpriseOne Manage Items with Kanban Production

Copyright © 2014, Oracle and/or its affiliates. All rights reserved.

JD Edwards EnterpriseOne Production

Operations

Supplier

Manufacturing

Accounting

Quality

Management

Production

Sales and

Operations

Planning

Detailed

Production

Planning and

Scheduling

Production

Method?

Manage Demand

Flow

Manufacturing

Manage Shop

Floor

Analyze

Production

Enhancement in

Manage Quality

Manufacturing

Order/Rate Schedule

Released

Demand Flow Manufacturing

Configure to Order; Process;

Discrete; Repetitive; Blend

Account for

Manufacturing

Activity

Supplier - Outside

Process

Outside

Operation

Parts

Returned

From

Supplier

Engineer to Order

(ETO)

PMPN

Page 2: JD Edwards EnterpriseOne  · PDF fileJD Edwards EnterpriseOne Manage Manufacturing Orders Production ... JD Edwards EnterpriseOne Manage Items with Kanban Production

Copyright © 2014, Oracle and/or its affiliates. All rights reserved.

JD Edwards EnterpriseOne L2 Detailed Production Planning and Scheduling

Operations

Production

Sales and

Operations

Planning

Scheduling

Mode?

Manage Rate

Schedules

Manage

Manufacturing

Orders

Manage Items with

Kanban

Manufacturing

Order

Kanban

Repetitive

Manufacturing

Accounting and

Finance Data

Unaccounted

Transaction

Data

Validate

Resources

Availability?

Manage Materials

for Order

Manage Shop

Resources

Release

Manufacturing

Order/Rate

Schedule

Yes

No

Yes

Production

Method?

Manufacturing

Order/Rate

Schedule Released

Page 3: JD Edwards EnterpriseOne  · PDF fileJD Edwards EnterpriseOne Manage Manufacturing Orders Production ... JD Edwards EnterpriseOne Manage Items with Kanban Production

Copyright © 2014, Oracle and/or its affiliates. All rights reserved.

JD Edwards EnterpriseOne Manage Rate Schedules

Production

Scheduling

Mode?

Create Rate

Schedule

Repetitive

Select Rate

Schedule

Option to

Review?

Review Parts/

Ingredients List

Review Routing/

Process

Review Co/By -

Products Mix

Validate Rate

Schedule

Continue with

Rate Schedule

Processing

Page 4: JD Edwards EnterpriseOne  · PDF fileJD Edwards EnterpriseOne Manage Manufacturing Orders Production ... JD Edwards EnterpriseOne Manage Items with Kanban Production

Copyright © 2014, Oracle and/or its affiliates. All rights reserved.

JD Edwards EnterpriseOne Manage Manufacturing Orders

Production

Create Work Order

and Export

Convert Work

Order Header to

Flat File

Errors in Flat

File?

Run Inbound Work

Order Header Edit/

Update

Edit Work Order

Header Flat File

Purge Work Order

Header Batch FileNo

Yes

Create

Manufacturing

Order

Decision to Create Manufacturing Order

(from Manage Scheduling Issues in

Prepare Production Plan..)

Manufacturing

Supplies and

Demand

Create

Manufacturing

Order for

Prototype

Scheduling

Mode?

Manufacturing Orders Created

From Planning Process

Manufacturing Order Created from

Sales Order Entry

Recommended Changes to

Manufacturing Orders

"Prototype Manufacturing Order"

"Rework Order Created (from Disposition

Discrepant Material in Procure to Pay)"

Manufacturing Order

“Work Order Imported”

Validate

Manufacturing

Order?

Review

Manufacturing

Order Header

Yes

No

“Order

Scheduled”

Select Mode to

Process?

Process

Manufacturing

Order by Batch

Batch

Process

Manufacturing

Order Interactively

Interactive

Procurement

Supplies

Manufacturing

Accounting and

Finance Data

Purchase Order for

Outside Process

Order

Variance

File

Unaccounted

Material

Issues – Preflush

Items

"Order Processed"

Purchase Order for

Outside Process

Order Variance File

"Order Processed"

Exported Work

Order DataExtract To Finite

Scheduling System

What

Outbound

Tasks?

Item Balance

Extraction

WO Operation

Status Extraction

WO Extraction

WO Enquiry

Review

Required?

Review Parts/

Ingredients List

Review Routing/

Process

Review Co/By-

Products Mix

Select

Manufacturing

Order to Review

Review

Required

"Co/By Products

Selected"

"Routing/Process

Selected"

"Parts/Ingredients

List Selected"

Update

Manufacturing

Order Status

Was Review

Mandatory?

“Primary

Adjustments

Complete”

Yes

Review Not

Required

No

Page 5: JD Edwards EnterpriseOne  · PDF fileJD Edwards EnterpriseOne Manage Manufacturing Orders Production ... JD Edwards EnterpriseOne Manage Items with Kanban Production

Copyright © 2014, Oracle and/or its affiliates. All rights reserved.

JD Edwards EnterpriseOne Manage Items with Kanban

Production

Scheduling

Mode?

Monitor

Inventory

Replenishment

Required?

“Inventory

Level

Checked”No

Kanban –

Consumption

Processing

Kanban Source

Type?

Create Sales

Order for

Components/

Ingredients

Release

Procurement

Requirement

For Assembly/

Intermediate

Send Assembly/

Intermediate to

Supplier

Receive

Assembly/

Intermediate

from Supplier

Outsourced

Production

Release

Procurement

Requirement

Purchase Order

Receive Items/

Ingredients from

Supplier

Move Inventory

to Consuming

Location

Inventory

Release Work

Order/Rate

Schedule

Manufacture

Kanban's

Replenishment

Work Center

Kanban – Supply

Processing

"Kanban Ready For Completion/Check In"

Phase Type?

Check In Kanban

Complete Kanban

Phase Type 2

Phase Type 1

Item Source

Type?

Item Source

Type?

Source Type 1 Completion and Transfer Created

Source Type 2 Inventory Transferred

Source Type 3;No Pay on Consumption Receive and Transfer Created

Source Type 4

Source Type 3;Pay on Consumption with Receipts Routing

Source Type 3;Pay on Consumption; No Receipts Routing

Ship Confirm Components + Receive Assembly +Transfer

Item Enters Receipt Routing

No Inventory Transactions Created

Source Type 4

Source Type 3

Ship Confirm Components + Receive Assembly

Source Type 1 Completion Created

Order Receipt CreatedCheck in Two

Phase Kanban

"Actual Data

Summarized"

"Items Received Into

Replenishment Location and

Transferred To Consuming Location"

Manufacturing

Accounting and

Finance Data

Page 6: JD Edwards EnterpriseOne  · PDF fileJD Edwards EnterpriseOne Manage Manufacturing Orders Production ... JD Edwards EnterpriseOne Manage Items with Kanban Production

Copyright © 2014, Oracle and/or its affiliates. All rights reserved.

JD Edwards EnterpriseOne Manage Materials for Order

Production

Select

Appropriate

Adjustments?

Validate

Resource

Availability?

Review Part

Availability?

Yes

Material

Review Part

Availability

Yes

NoRun Shortage

Report?

Run Shortage

Report

Yes

Analyze

Material StorageNo

Shortage

Prevents

Manufacturing

Order/Rate

Schedule

Start?

Order or

Schedule?

Release

Manufacturing

Order/Rate

Schedule to

Start

No

Yes

Select

Manufacturing

Order to Adjust

Manufacturing

Order

Use Substitute

Items/Ingredients

on Parts List

Use Alternative Bill

of Material/

Ingredients List

Use Alternative

Location/Lot

Manage Shop

Resources

Expedite Items/

Ingredients

Select Rate

Schedule to Adjust

Rate Schedule Change Rate

Schedule Quantity

or Dates

Change

Manufacturing

Order Quantity or

Dates

Related Sales

Order Exists?

Set Sales Order

Hold Code

Notify Person

Consuming Part

Notify Master

Scheduler of

Schedule/

Quantity

Changes

Yes

No

Page 7: JD Edwards EnterpriseOne  · PDF fileJD Edwards EnterpriseOne Manage Manufacturing Orders Production ... JD Edwards EnterpriseOne Manage Items with Kanban Production

Copyright © 2014, Oracle and/or its affiliates. All rights reserved.

JD Edwards EnterpriseOne Manage Shop Resources

Production

Manage Materials

for Order

Validate

Resources

Availability?

Yes

Rate Schedule

or

Manufacturing

Order?

Review Line

Schedule

Workbench

Rate

Schedule

Corrective

Action

Required?

Select Rate

Option to

Adjust?

Adjust

Capacity

Required

Re-sequence Jobs

Split/Change Lines

Move to an

Alternate Line

Change Rate

Schedule Quantity

or Dates

Review Dispatch

List

Corrective

Action

Required?

Select Order to

Adjust?

Adjust

Capacity

Required

Revise Operation

Start and Due

Dates

Move Routing to

Alternate Work

Center

Attach Alternate

Routing to

Manufacturing

Order

Change

Manufacturing

Order Quantity or

Dates

Manufacturing

Order

Related Sales

Order Exists?

Set Sales Order

Hold CodeYes

No

Increase/

Decrease

Capacity

Select Method

of Adjustment

Adjust

Capacity

Available

Adjust

Capacity

Available

Revise Line/Cell

Standard Capacity

Revise Work

Center Resource

Units

Refresh Resource

Units

Run Capacity

Requirements

Planning

No

Action

Required

No

Action

Required

Continue

Managing

Resources?

Is Plan Viable?

Further

Adjustment

Possible?

Notify Master

Scheduler of

Schedule

Quantity

Changes

Release

Manufacturing

Order/Rate

Schedule

Shortages

Reviewed

Schedule/Quantity

Changed

No

No

Yes

Page 8: JD Edwards EnterpriseOne  · PDF fileJD Edwards EnterpriseOne Manage Manufacturing Orders Production ... JD Edwards EnterpriseOne Manage Items with Kanban Production

Copyright © 2014, Oracle and/or its affiliates. All rights reserved.

JD Edwards EnterpriseOne Release Manufacturing Order or Rate Schedule

Production

Print and Release

Work Order

Documentation

Manage Shop

Resources

Validate

Resources

Availability?

No

Create Manual

Shop Schedule

Collate/

Separate Shop

Paperwork

Communicate

Shop Schedule

No Documentation Required

Production

Method?

Manufacturing

Order/Rate Schedule

Released

Print Dispatch List

Print and Release

Pick List

Create

ADVANCED

WAREHOUSE

MANAGEMENT

Pick Request

Warehouse Pick

Requests and

Suggestions

Pick Request For Manufacturing

Pick List for Manufacturing

Print Shortage

Report

Print Shop Packet

Summary

Print

Manufacturing

Order Header

Print

Specifications

Page 9: JD Edwards EnterpriseOne  · PDF fileJD Edwards EnterpriseOne Manage Manufacturing Orders Production ... JD Edwards EnterpriseOne Manage Items with Kanban Production

Copyright © 2014, Oracle and/or its affiliates. All rights reserved.

JD Edwards EnterpriseOne L2 Manage Demand Flow Manufacturing

Production

Production

Method?

Set up Base Data

for Demand Flow

Manufacturing

Design Demand

Flow

Manufacturing

Line

Manage Kanban in

Demand Flow

Manufacturing

Environment

Plan Resources

Perform Daily

Planning and

Sequencing

Bring Line Live

Manage Shop

Floor

Demand Flow

Manufacturing

Plan Resources and

Simulate Utilization

Based on Daily Rate

Page 10: JD Edwards EnterpriseOne  · PDF fileJD Edwards EnterpriseOne Manage Manufacturing Orders Production ... JD Edwards EnterpriseOne Manage Items with Kanban Production

Copyright © 2014, Oracle and/or its affiliates. All rights reserved.

JD Edwards EnterpriseOne Set up Base Data for Demand Flow Manufacturing

Production

Manage Kanban in

Demand Flow

Manufacturing

Environment

Perform Daily

Planning and

Sequencing

Plan Resources

Design Demand

Flow

Manufacturing

Line

Setup Labor and

Machine

Resources for

Scenario

Setup Employee

Records for DFM

Setup Supplier

Records for DFM

Setup Customer

Records for DFM

Synchronize Item

RoutingAdd Bill of Material

Associate Work

Day Calendar with

Resource

Enter Sales Order

Lines

Production

Method?

Setup Scenarios,

and Define Active

Scenario, Line

Design and

Planning

Demand

Flow

Manufacturing

Associate Work

Day Calendar with

a Scenario

Associate Active

Scenario with

Default User

Integrated with

EnterpriseOne

Execution

System?

Define Standard

Unit of Measure

Conversions for

Scenario

Setup Branch

Specific

Information

Identify Item

Information

Define

Configurations for

Data Movement

Manage

Configuration

Details

Execute DFM Data

Import Export

Program

Setup Item

Specific Unit of

Measure

Conversion within

Scenario

No, Setup Data in

DFM System

Yes, Import Data

Page 11: JD Edwards EnterpriseOne  · PDF fileJD Edwards EnterpriseOne Manage Manufacturing Orders Production ... JD Edwards EnterpriseOne Manage Items with Kanban Production

Copyright © 2014, Oracle and/or its affiliates. All rights reserved.

JD Edwards EnterpriseOne Design Demand Flow Manufacturing Line

Production

Define Product

Synchronizatio

n or Sequence

of Events?

Define Processes

Required for

Setting up a Line

Design and

Properties

Product

Synchronizations

Define Feeder

Paths, Option

Paths or

Rework Paths?

Define Feeder

Paths

Use Graphical

Tool to

Concatenate

Processes into

Feeder Path

Review and Edit

Feeder Paths in

Tabular Format

Select Feeder

Path or Define

New Feeder Path

Feeder

Path

Define Option

Paths

Use Graphical

Tool to

Concatenate

Processes into

Option Path

Review and Edit

Option Paths in

Tabular Format

Select Option Path

or Define New

Option Path

Define Rework

Paths

Use Graphical

Tool to

Concatenate

Processes and

Paths into Rework

Path

Review and Edit

Rework Paths in

Tabular Format

Select Rework

Path or Define

New Rework Path

Option

Path

Rework

Path

No

Setup Product

Synchronizations

Define?Source of

Events (SOE)

Define Standard

Tasks

Standard

Tasks

Define Standard

Sequence of

Events (Optional)

Add Tasks to

Standard

Sequence of

Events

Print Standard

Sequence of

Events

Define Sequence

of Events

Add Tasks to

Sequence of

Events (Manually,

Copy Existing,

Copy Standard)

Print Sequence of

EventsSequence of Events

Standard Sequence of

Events (SSOE)

Assign Consumed

Components to

Task Based on

MBOM

Define in

Graphical or

Tabular

Format?

Use Graphical

Tool to

Concatenate

Processes and

Paths into Product

Synchronization

Use Tabular Tool

to Concatenate

Processes and

Paths into Product

Synchronization

Tabular

Graphical

Calculate

Planned

Throughout,

Output, and

Scrap Percents

for Each

Process

Define or Override

the Specific Yield,

Rework, Scrap

Percentage of

Process for the

Path

Print Table Listing

Processes

Included in

Product

Synchronization

Enter Planned Volumes,

Extend Independent

Demand, Calculate

Dependent Demand, and

Assign Product

Synchronization

Define Process

Map and

Associate with

Volume Design

Setup Process

Maps and Derive

Work Content

Define New

Volume Design by

Determining

Volume for Mixed

Model Family

Create Volume

Design?

Yes

No

Create Mixed

Model Family

Definition and

Associate with

Branch/Plant

Set Up Base Data

for Demand Flow

Manufacturing

Action to Take? Define Process Maps

Process Maps

Based on

Actual Times?

Enter Resources

and Resource

Time for Labor and

Machine

Resources

Yes

Break up

Processes into

Cells to

Accommodate

Multiple Products

with Different

Processing Times

No

Define Names for

Cells and

Associated Work

Center with Cell

Action to Take?

Review Which

Products Share

Common

Processes

Review Labor and

Machine Times for

Each Product and

Process

Export Line Design

Data, Step 1

Augment Line

Design for Execution

Setup Line for Line

Design Creation

Manage Kanban in

Demand Flow

Manufacturing

Environment

Perform Daily

Planning and

Sequencing

Plan Resources

Export Line Design

Data, Step 2

Add Line Design

and Calculate Tact

Time, Actual Time

Weighted and

Number of

Calculate Total

Product Cycle

Time

Setup and

Calculate

Operational

Definition

Calculate and Maintain Operational Definitions

Revise and

Recalculate

Operational

Definition Manually

Calculate In-

Process Kanban

(IPKs)

Print Operational

Definition Header

Records

Print Operation

Definition Detail

Records

Calculate

Line Design

Manage

Kanban

Review Labor and

Machine Times

Review

Products

Perform Daily

Planning and Sequencing

Plan Resources and

Simulate Utilization Based

On Demand at Capacity

Page 12: JD Edwards EnterpriseOne  · PDF fileJD Edwards EnterpriseOne Manage Manufacturing Orders Production ... JD Edwards EnterpriseOne Manage Items with Kanban Production

Copyright © 2014, Oracle and/or its affiliates. All rights reserved.

JD Edwards EnterpriseOne Manage Kanban in Demand Flow Manufacturing Environment

Production

Set Up Base Data

for Demand Flow

Manufacturing

Design Demand

Flow

Manufacturing

Line

Setup?

Search for Existing

Kanban Constants

to Edit, Copy or

Delete

Search for Existing

Kanban Locations

to Edit or Delete

Kanban Location

Master

Kanban

Constants

Add New Kanban

Constants by

Branch/Plant

Add New Kanban

Locations

Search for Existing

Pull Chains to Edit,

Copy or Delete

Add New Pull

Chains for Material

Replenishment

Import Component

Demand and

Kanban

Information from

Volume Design

Revise Kanban

Demand?

Search for Existing

Kanban Demand

by Process Map

Edit and Calculate

Kanban Demand,

Explode BOM and

Save

Yes

Search for Existing

Pull Chains to Edit,

Copy or Delete

No

Add New Pull

Chain Definitions

for Material

Replenishment

Search for

Process Map,

Filter Components,

and Select to

Assign Pull Chain

Assign Pull Chain,

Pull Sequence and

Demand Quality to

Component

Calculate Kanban

Size

Search for Existing

Kanban Sizes to

Review and

Approve

Review and

Approve Kanban

Sizes and Print

Kanban Labels

Revise DFM

Kanban

Masters?

Search for Kanban

Master, Select and

Make Revisions

Print Kanban

LabelsYes

No

Define Kanban

Messages?

Search for Existing

Kanban Messages

to Edit or Delete

Add Label

Message to

Kanban

Yes

Execute Print

Kanban Label

Program

Bring Line Live

Export Kanban

Locations and

Master Records

Page 13: JD Edwards EnterpriseOne  · PDF fileJD Edwards EnterpriseOne Manage Manufacturing Orders Production ... JD Edwards EnterpriseOne Manage Items with Kanban Production

Copyright © 2014, Oracle and/or its affiliates. All rights reserved.

JD Edwards EnterpriseOne Perform Daily Planning and Sequencing

Production

Set Up Base Data

for Demand Flow

Manufacturing

Design Demand

Flow

Manufacturing

Line

Define Daily

Production Plan

Based on Demand

Generate

Production

Sequence

Edit or Clear

Sequence Number

and Quantity

Plan Resources

Print Daily Plan

Information Based

on User Define

Data Selection

Print Sequence

Records You

Generated for

Daily Plan

Enter Finished

Good Order That

Becomes Demand

for Daily Plan

Plan Resources and

Simulate Utilization

Based on Daily Rate

Page 14: JD Edwards EnterpriseOne  · PDF fileJD Edwards EnterpriseOne Manage Manufacturing Orders Production ... JD Edwards EnterpriseOne Manage Items with Kanban Production

Copyright © 2014, Oracle and/or its affiliates. All rights reserved.

JD Edwards EnterpriseOne Plan Resources

Production

Set Up Base Data

for Demand Flow

Manufacturing

Design Demand

Flow

Manufacturing

Line

Perform Daily

Planning and

Sequencing

Create Resource

Design

Retrieve Process

Map and Edit

Resource

Information

Create Effective

Date Range

Header for

Resource Design

Setup Effective

Data Ranges for

Resource Design

Plan Resources and

Simulate Utilization

Based on Daily Rate

Create Resource

Planning

Scenarios

Iteratively to

Determine Most

Effective Use

Are Simulation

Results

Satisfactory?

Change Resource

Design Values

Adjust Demand to

Eliminate Overuse

of Resource

No

No

Achieve

Satisfactory

Simulation of

Resource

Utilization

Yes Bring Line Live

Page 15: JD Edwards EnterpriseOne  · PDF fileJD Edwards EnterpriseOne Manage Manufacturing Orders Production ... JD Edwards EnterpriseOne Manage Items with Kanban Production

JD Edwards EnterpriseOne L2 Manage Shop Floor

Copyright © 2014, Oracle and/or its affiliates. All rights reserved.

Production

Supplier

Quality

Management

Warehouse

Import

Transactions from

Other Systems

Record Scrap

Issue Material

Report Order

Completions

Report Test

Results

Report Time

Report

Transactions by

Operations

Report

Transactions by

Work Center

Method of

Reporting

Work?

Import Transactions

Report Individual

Transactions by Order

Report by Operation

Report by Work Center

No Additional Reporting RequiredPerform Work

Activity

Production

Method?

Engineer to Order;

Configure to Order;

Process; Discrete;

Repetitive; Blend

Manage Demand

Flow

Manufacturing

Is Order

Complete?

Close OrderAnalyze

Production

Order Complete;

Manual Close

Order Complete;

Automatic Close

Vendor

Performed

Operation?

No

Order

Not Complete

Send Material to

SupplierYes

Receive Purchased

Materials

"Outside Processing

Material Sent

from Receiving"

Manage Quality

Supplier - Outside

Process

Page 16: JD Edwards EnterpriseOne  · PDF fileJD Edwards EnterpriseOne Manage Manufacturing Orders Production ... JD Edwards EnterpriseOne Manage Items with Kanban Production

JD Edwards EnterpriseOne Import Transactions from Other Systems

Copyright © 2014, Oracle and/or its affiliates. All rights reserved.

Production

Method of

Reporting

Work?

Type of

Transaction?

Import

Transactions

"Import Test Results"

"Import Time Transactions"

"Import Super Backflush Transactions"

"Import Material Issue Transactions"

"Import Kanban Transactions"

"Import Completed Transactions"

Report and Export

Transaction

Convert

Transaction Data

to Flat File

Errors in Flat

File?

Run Inbound

Transaction Edit/

Update

Edit Inbound

Transaction

Purge Inbound

Transactions

No

Yes

Page 17: JD Edwards EnterpriseOne  · PDF fileJD Edwards EnterpriseOne Manage Manufacturing Orders Production ... JD Edwards EnterpriseOne Manage Items with Kanban Production

JD Edwards EnterpriseOne Record Scrap

Copyright © 2014, Oracle and/or its affiliates. All rights reserved.

ProductionRecord

Component Scrap

Manufacturing

Accounting and

Finance Data

Unaccounted Component Scrap Quantity

Page 18: JD Edwards EnterpriseOne  · PDF fileJD Edwards EnterpriseOne Manage Manufacturing Orders Production ... JD Edwards EnterpriseOne Manage Items with Kanban Production

JD Edwards EnterpriseOne Issue Material

Copyright © 2014, Oracle and/or its affiliates. All rights reserved.

Warehouse

Production and

Distribution

Planning

ProductionSelect Order/Rate

for Issue

Review Items to

be Issued

Override

Default Lot/

Location?

Enter Quantity by

Lot/Location

Yes

Adjust

Transaction

Quantity as

Needed

No

Warehouse Pick

Requests and

Suggestions

Reprint

Manufacturing

Order Parts List

Pick List

For

Manufacturing

Pick Request

For

Manufacturing

Pick MaterialsGo To: Procurement and Materials Management,

Manage Materials; Pick Processing

Deliver New

Parts List

to Requester

Additional Item/

Ingredients

Needed?

Process IssueNo

Add Item/

Ingredient to

Issue Screen

Added Item/

Ingredient

Allowed at

Time of

Issue?

Yes

Yes

Requests Parts

List Change

from Planner

No

Add Item/

Ingredients to

Parts List

“Transaction

Continued”

Manufacturing

Accounting and

Finance Data

Pay on

Consumption

Code?

Move Purchase

Order Out of

Receipt Routing

Receipt

Routing

Receive Purchase

Order

PO

Rejects

Inventory

Move Material

to Point of Use

Purchase Order

Receipts Ready to

Match

Purchase Order

Receipt Ready

to Match

Data StorePO Receipt

Ready to

Post to GL

MaterialsMaterial For

Manufacturing Orders

Page 19: JD Edwards EnterpriseOne  · PDF fileJD Edwards EnterpriseOne Manage Manufacturing Orders Production ... JD Edwards EnterpriseOne Manage Items with Kanban Production

JD Edwards EnterpriseOne Report Order Completions

Copyright © 2014, Oracle and/or its affiliates. All rights reserved.

Production

Standalone Work

Order Completions

Enter/Revise

Completion and/or

Scrap Quantity

"Order Selected for

Completion or Scrap"

Type?

Automatic

Adjust Issue

Quantities?Issue MaterialBackflush Standard Quantity

Adjust Backflush Quantity

Update Sales

Detail with

Completion

Data

Sales OrderUpdated Sales

Detail Line for

Make to Order Item

Generate

Putaway

Request

Warehouse Putaway

Requests and

Suggestions

Putaway Request

From Manufacturing

Order Receipt

Update

Receipts

Routing

Receipt Routing

OperationsManufactured Item In

Receipts Routing

Type?

Optional

Report Completion

of Planned co/by

Products

Report Completion

of Unplanned co/

by Products

Complete Quantity

to Location/Lot

Online Back Order

Release

Report Test

Results

Report Test

Results

Issue Material

No Additional

Transaction Required

Product Meets

Requirements?

Is Receipts

Routing Used?

Where is

Material

Stored?

Mark or

Separate

Discrepant

Material

Move to receipts

Routing

Operations

Move Product to

Warehouse

Send Material to

Warehouse

Dispose of

Discrepant

Material

Move Product to

Consuming

LocationMaterials

End

End

Manufacturing

Accounting and

Finance Data

Product Discrepant and

Completed to

Inventory for Disposition

"Discrepant

Material

Identified"

Yes

Manufactured Item in

Receipts Routing

(Handle Produced Materials)

Product

Meets

Requirements

No

Material to be

Stored in Warehouse

Material to be

Stored at

Consuming Location

Manufacturing Completion to be Put Away

Product

Discrepant and

Scrapped

"Discrepant Quantity

Noted and Material Disposed"

Unaccounted

Completion

Quantity

"Completion Recorded"

Discrepant Material

Page 20: JD Edwards EnterpriseOne  · PDF fileJD Edwards EnterpriseOne Manage Manufacturing Orders Production ... JD Edwards EnterpriseOne Manage Items with Kanban Production

JD Edwards EnterpriseOne Report Test Results

Copyright © 2014, Oracle and/or its affiliates. All rights reserved.

Production

Record Test

Results in Quality

Management

Enter Test Results“Manufacturing Order Selected for Entry”

Copy Test Results

Page 21: JD Edwards EnterpriseOne  · PDF fileJD Edwards EnterpriseOne Manage Manufacturing Orders Production ... JD Edwards EnterpriseOne Manage Items with Kanban Production

JD Edwards EnterpriseOne Report Time

Copyright © 2014, Oracle and/or its affiliates. All rights reserved.

Production

Enter Hours and

Quantity

Key Hours and

Quantities into

Form

Record Test

Results?No

Report Test

Results

Yes “Test Results

Entered”

Update Time

Entry

Immediately?

No

Submit Hours and

Quantities Update

Update Hours and

Quantities

Yes

Manufacturing

Accounting and

Finance Data

Unprocessed

Time

Transactions

Unaccounted Time Transactions

Unprocessed Time Transactions

Page 22: JD Edwards EnterpriseOne  · PDF fileJD Edwards EnterpriseOne Manage Manufacturing Orders Production ... JD Edwards EnterpriseOne Manage Items with Kanban Production

JD Edwards EnterpriseOne Report Transactions by Operation by Order

Copyright © 2014, Oracle and/or its affiliates. All rights reserved.

Production

Report Operation

Completion and

Scrap

Enter Operation

Completion

Information

Reporting Test

Results?

Report Test

Results

Yes

Report Test

Results

“Test

Results

Entered”

NoLast

Operation?

Report Order

Completion

Yes

Report Order

Completion

“Completion

Recorded”

NoIssuing

Material?

Issue Material

Yes

Issue Material

“Material

Issued”

NoRecording

Time?

Report Time

Yes

Report Time

“Time and Quantity

Transactions Recorded”

No Next Step?

Return to

Super

Backflush

Method of

Reporting

Work?

Report by

Operation

Report

Transactions by

Work Center

Return to Completions Workbench

Page 23: JD Edwards EnterpriseOne  · PDF fileJD Edwards EnterpriseOne Manage Manufacturing Orders Production ... JD Edwards EnterpriseOne Manage Items with Kanban Production

JD Edwards EnterpriseOne Report Transactions by Work Center

Copyright © 2014, Oracle and/or its affiliates. All rights reserved.

Production

Method of

Reporting

Work?

Repetitive Order

Completion

Report by

Work Center

Report Order

Completion

Report Test

Results

Report Time

Issue Material

Report

Transactions by

Operation by

Order

"Order

Completions

Selected"

"Manual

Issues

Selected"

"Test

Result Entry

Selected"

"Time

Transactions

Selected"

Report Order

Completion

Report Test

Results

Report Time

Issue Material

"Completion

Recorded"

"Materials

Issued"

"Test

Results

Recorded"

"Time and Quantity

Transactions

Recorded"

Page 24: JD Edwards EnterpriseOne  · PDF fileJD Edwards EnterpriseOne Manage Manufacturing Orders Production ... JD Edwards EnterpriseOne Manage Items with Kanban Production

JD Edwards EnterpriseOne Close Order

Copyright © 2014, Oracle and/or its affiliates. All rights reserved.

Production

Is Order

Complete?

Set Order to Close

Status

Order Complete;

Manual Close

Analyze

Production

Locate Order to

Update

Enter Value to

Selected Work

Order

Update Work

Order

If Status is

Closed?

Update Work

Order to Other

Status

Page 25: JD Edwards EnterpriseOne  · PDF fileJD Edwards EnterpriseOne Manage Manufacturing Orders Production ... JD Edwards EnterpriseOne Manage Items with Kanban Production

Copyright © 2014, Oracle and/or its affiliates. All rights reserved.

JD Edwards EnterpriseOne L2 Analyze Production

Production

Manufacturing

Accounting

Manage Shop

Floor

Which

Mode of

Analysis?

Review Production

Report

Review Production

Inquiry

Report

Online Enquiry

Account for

Manufacturing

Activity

PMPN WorkbenchPMPN Mode

ETO WorkbenchETO Mode

Page 26: JD Edwards EnterpriseOne  · PDF fileJD Edwards EnterpriseOne Manage Manufacturing Orders Production ... JD Edwards EnterpriseOne Manage Items with Kanban Production

Copyright © 2014, Oracle and/or its affiliates. All rights reserved.

JD Edwards EnterpriseOne Review Production Report

Production

Manufacturing

Accounting

Which Mode of

Analysis?

Which Make

Product

Reports

Required?

Report

Create Order

Processing Report

Create WO Time

And Quantity

Journal Report

Create Dispatch

List Report

Create Component

Shortages Report

Create All

Shortages Report

Create Supply

Demand Report

Create Work Order

Summary Report

Method of

Report

Review?

Print Report

Review Report

Interactively

Account for

Manufacturing

Activity

Page 27: JD Edwards EnterpriseOne  · PDF fileJD Edwards EnterpriseOne Manage Manufacturing Orders Production ... JD Edwards EnterpriseOne Manage Items with Kanban Production

Copyright © 2014, Oracle and/or its affiliates. All rights reserved.

JD Edwards EnterpriseOne Review Production Inquiry

Production

Manufacturing

Accounting

Account for

Manufacturing

Activity

Review Order

Hours Status

Review Parts

Availability

Review Parts list

Inquiry

Review Part

Usability

Review Shortage

Workbench

Review Supply

and Demand

Inquiry

Review Summary

Availability

Review Parts List

Comparison

Review Parts List

To BOM

Comparison

Review Shop Floor

Workbench

Review Dispatch

List - P31220

Review Lot

Availability

Review Product

Cost Inquiry

Review Process

Order Inquiry

Review Production

Status

Review Production

History

Review Order

Quantity Status

Review Line

Scheduling

Workbench

Review Line

Schedule Review

Review Line

Sequencing

Workbench

Review Line

Dispatch List

Review Work

Center Schedule

Review

Review Item

Ledger

Review Trace/

Track Inquiry

Which Mode of

Analysis?

Which

Production

Inquiries

Required?

Online

Enquiry

Discuss Results

with Appropriate

Personnel

PMPN Workbench

Page 28: JD Edwards EnterpriseOne  · PDF fileJD Edwards EnterpriseOne Manage Manufacturing Orders Production ... JD Edwards EnterpriseOne Manage Items with Kanban Production

Copyright © 2014, Oracle and/or its affiliates. All rights reserved.

JD Edwards EnterpriseOne L2 Enhancement in Manage Quality

Quality

Management

Production

Establish

Quality Criteria

and Standards

Establish

Quality Controls

Conduct Quality

TestsMonitor Quality

Correct Product

or ProcessAnalyze Quality

Manage Shop

Floor

Page 29: JD Edwards EnterpriseOne  · PDF fileJD Edwards EnterpriseOne Manage Manufacturing Orders Production ... JD Edwards EnterpriseOne Manage Items with Kanban Production

Copyright © 2014, Oracle and/or its affiliates. All rights reserved.

JD Edwards EnterpriseOne Analyze Quality

Quality

Management

Review Product

Test Report

Review Test

Results Inquiry

Review Certificate

of Analysis

Review

Nonconforming

Product

Review Tested

Lots Search

Review Test

Results

Workbench

Review Trace Test

Results

Monitor QualitySelect Report

or Inquiry?

Discuss Results

with Appropriate

Personal

Correct Product or

Process

Copy Tests

Results

Page 30: JD Edwards EnterpriseOne  · PDF fileJD Edwards EnterpriseOne Manage Manufacturing Orders Production ... JD Edwards EnterpriseOne Manage Items with Kanban Production

Copyright © 2014, Oracle and/or its affiliates. All rights reserved.

JD Edwards EnterpriseOne L2 Account for Manufacturing Activity

Production

Manufacturing

Accounting

Analyze

Production

Record

Manufacturing

Journal Entries

Automatic

Close Desired?

Run Automatic

Closing Cycle

No Automatic Close Used

Close

Orders

Automatically

Page 31: JD Edwards EnterpriseOne  · PDF fileJD Edwards EnterpriseOne Manage Manufacturing Orders Production ... JD Edwards EnterpriseOne Manage Items with Kanban Production

Copyright © 2014, Oracle and/or its affiliates. All rights reserved.

JD Edwards EnterpriseOne Record Manufacturing Journal Entries

Production

Manufacturing

Accounting

Create Journal

Entries for In-

Process

Manufacturing

Orders and Rate

Schedules

Create Journal

Entries for

Completed

Manufacturing

Orders and Rate

Schedules

Run Journal

Entries for

Manufacturing

Vacancies - Proof

Run Journal

Entries for

Manufacturing

Variances - Final

Automatic

Close Desired?

Data Store

Review

Manufacturing

Variances

Analyze

Production

Journal Entries for

Manufacturing Activity

Journal Entries for

Manufacturing Activity

Journal Entries for

Manufacturing Activity

Page 32: JD Edwards EnterpriseOne  · PDF fileJD Edwards EnterpriseOne Manage Manufacturing Orders Production ... JD Edwards EnterpriseOne Manage Items with Kanban Production

Copyright © 2014, Oracle and/or its affiliates. All rights reserved.

JD Edwards EnterpriseOne Run Automatic Closing Cycle

Manufacturing

Accounting

Automatic

Close Desired?

Type of Order

to Close?

Mark

Manufacturing

Order for Final

Accounting

Close Rate

Schedules

Mark

Manufacturing

Order for

Automatic Close

EndClose

Orders

Automatically

Close

Manufacturing

Order

Close

Rate

Schedule

Page 33: JD Edwards EnterpriseOne  · PDF fileJD Edwards EnterpriseOne Manage Manufacturing Orders Production ... JD Edwards EnterpriseOne Manage Items with Kanban Production

Copyright © 2014, Oracle and/or its affiliates. All rights reserved.

JD Edwards EnterpriseOne L2 Engineer to Order (ETO)

Production

Production

Method?Create Project Define Tasks

Define Task

DependenciesSchedule ProjectETO

Create Orders for

a ProjectPerform PRP

Execute Project Close Project

Manage Shop

Floor

Project

Commitment

Page 34: JD Edwards EnterpriseOne  · PDF fileJD Edwards EnterpriseOne Manage Manufacturing Orders Production ... JD Edwards EnterpriseOne Manage Items with Kanban Production

Copyright © 2014, Oracle and/or its affiliates. All rights reserved.

JD Edwards EnterpriseOne L2 PMPN

Production

Production

Method?Create PMPN Demand Type?

Create Forecast

for PMPN

Create Sales

Order for PMPN

Process MRP

Process MRP

Messages for

Each PMPN

Manage Shop

Floor