  • Jodhpur Discom Presentation beforeSh. Sudhansh Pant I.A.S.Chairman Discoms & Managing Director,J.V.V.N.L.,Jaipur.30.08.2011

  • WARM WELCOMESh. Sudhansh Pant I.A.S.

    Chairman Discoms & Managing Director,J.V.V.N.L.,Jaipur.

  • *Jodhpur Discom

    Zone wise

    JODHPUR DISCOM PROFILE

    S.No.DISTRICT COVEREDJODHPUR ZONEBIKANER ZONEJODHPUR DISCOM

    (1)AREA (SQ. km)117801647061.82 Lacs182507

    POPULATION AS PER CENSUS 20011186801882255872.01 Cr.20093605

    POPULATION DENSITY(PER SQ. KM)100.75127.12227.87110.0977222791

    TEHSIL COVERED39317070

    NO OF PANCHAYAT SAMITI44287272

    NO OF GRAM PANCHAYATS1604107126752675

    URBAN TOWNS25315656

    NO OF VILLAGES (As per census 2001)575867741253212532

    VILLAGE ELECTRIFIED UP TO 31.03.2011 (Including 206 Nos. UIV)521164571166811668

    VILLAGE ELECTRIFIED IN 2011-12 (Upto JULY ,11)0000

    % ELECTRIFICATION90.5095.3293.1193.1056495372

    (2)POWER NETWORK

    NO OF 400KV GSS3255

    NO OF 220KV GSS1792626

    NO OF 132KV GSS6847115115

    NO OF 33KV GSS (as on JULY. 2011)88651013961396

    LENGTH OF 33KV LINE (KM) (as on JULY., 11)1166167261838718387

    LENGTH OF 11KV LINE (KM) (as on JUNE 11)7395743367117324117324

    NO. OF 11/04.KV S/S (as on JUNE, 11)14634068046214386214386

    LENGTH OF LT LINE (KM) (as on JULY., 11)47096179446504065040

    NOS. SINGLE PHASE TRANSFORMERS ( JUNE,11)20941130423398333983

    A B CABLE IN KMS ( Upto JUNE, 11)20475140623453734537

    % T & D LOSSES FOR 11-12 (UPTO JULY,11)18.4821.8719.8220.89

    (3)Business Dimensions

    Revenue Sub-Divisions7451125125

    Total Active Consumers AS ON 30.06.20111393836102983224236682423668

    (a) Domestic108053286679319473251947325

    (b) Agriculture (Flat)3545465724202642026

    (c ) Agriculture (Metered)1270745033817741217741281475

    (D) Total Agriculture16252856910219438219438

    (e) PHED5707402197289728

    Annual Revenue (2010-11) (Rs. In Crores)1960.931143.183104.113104.1101

    Monthly Average Revenue (Rs. In Crores)163.4195.27258.68258.6758416667

    (4)FEEDER RENOVATION PROGRAM

    Total Rural Feeders Covered232610813407340722019

    218210683250325035278

    Villages getting 24 HRs. Supply489159571084810848

    14413157157

    Total 3 Phase Trans. To be installed as on 31.03.1062540237918633186331

    Total 3 Phase Trans. installed up to JULY.116129423759850538505325275

    BALANCE 3 Phase Trans. To be installed12463212781278012842

    (5)RGGVY15847

    Scheme costRGGVY31774.1111167.0642941.1742941.178372

    AREP603.53904.541508.071508.07119633

    No. of Unelectrifies/ Deelectrified villages coveredRGGVY9985271525152529931

    AREP60157217217

    No of villages electrifiedRGGVY53147010011001

    AREP55157212212

    (6)BPL Connections covered in Scheme (RGGVY)208974169695378669378669

    Nos.of BPL connections released (upto JULY.11)119183139053258236258236

    (7)AGRICULTURE

    Agriculture Connections IN 2010-11DN ISSUED4171329674677471

    DN DEPOSITED (Including Dep. As on 31.03.10)1468779672265422657

    CONN. RELEASED1290073082020820210

    BALANCE ( Deleting the Cancelled Appl.)157656521412142

    Agriculture Connections IN 2011-12DN ISSUED JULY,111403192662329723298

    DN DEPOSITED (Including Dep. As on 31.03.11) UPTO JULY,11796151411310213103

    CONN. RELEASED UP TO JYLY,111262119424562458

    BALANCE ( Deleting the Cancelled Appl.)656939471051610516

    No of SC AG released During 2011-12 up to JULY,1158477013541354

    (8)Mukhymantri sabke liye Vidyut Yojana

    Total Nos. of Groups Applied (UP TO JULY,11)1294035281646816468

    Total DN Issued to Groups (UPTO JULY,11)7784182996139613

    Total DN Deposited (UPTO JULY 11)5790152273127312

    Groups Electrified Upto 31.3.20115283139166746674

    Groups Electrified in 2011-12 (UPTO JULY, 11)30195396396

    TOTAL GROUP ELECTRIFIED5584148670707070

    No. of Cluster Sanctioned/Domestic Applications Covered366466832832

    2874372866026602

    No. of Cluster Connections Released/Domestic Connections Released2000200200

    1165011651165

    BALANCE GROUPS TO BE ELECRIFIED AGAINST DN DEPOSITED Deleting cancelled appl.)207122329329

    TOTAL DL CONNECTIONS RELEASED (UP TO JULY, 2011)3918097404892048920

    (9)APDRP DETAILS000

    TOTAL SCHEMES (NOS.)0077

    COST OF SANCTIONED SCHEMES (RS. IN CRORE)00359.29359.29

    EXPENDITURE INCURRED (RS. IN CRORE)00311.74311.74

    barmer cir

    BARMER CIRCLE PROFILE

    S.NO.DISTRICT COVEREDBARMERJAISALMER

    (1)AREA (SQ. km)2838738401

    POPULATION AS PER CENSUS 20011964835508247

    POPULATION DENSITY(PER SQ. KM)6913

    TEHSIL COVERED83

    NO OF PANCHAYAT SAMITI83

    NO OF GRAM PANCHAYATS402128

    URBAN TOWNS22

    NO OF VILLAGES (As per census 2001)1941637

    VILLAGE ELECTRIFIED UP TO 31.03.2010 (Including 206 Nos. UIV)1281562

    VILLAGE ELECTRIFIED IN 2010-11 (Upto DEC,10)1950

    % ELECTRIFICATION76.04%88.23%

    (2)POWER NETWORK

    NO OF 400KV GSS10

    NO OF 220KV GSS31

    NO OF 132KV GSS113

    NO OF 33KV GSS (as on DEC. 2010)15544

    LENGTH OF 33KV LINE (KM) (as on DEC., 10)26341653

    LENGTH OF 11KV LINE (KM) (as on DEC,10)156326875

    NO. OF 11/04.KV S/S (as on DEC.,10)265375604

    LENGTH OF LT LINE (KM) (DEC,. 10)61511088

    NOS. SINGLE PHASE TRANSFORMERS ( DEC,10)2939305

    A B CABLE IN KMS ( Upto DEC., 10)4317520

    % T & D LOSSES FOR 10-11 UPTO NOV.,1013.28

    (3)Business Dimensions

    Revenue Sub-Divisions14

    Total Active Consumers AS ON SEPTEMBER 1016099548107

    (a) Domestic11589838021

    (b) Agriculture (Flat)2875329

    (c ) Agriculture (Metered)230133358

    (D) Total Agriculture256103687

    (e) PHED1349351

    Annual Revenue (2009-10) (Rs. In Crores)286.42

    Monthly Average Revenue (Rs. In Crores)23.87

    (4)FEEDER RENOVATION PROGRAM

    Total Rural Feeders Covered478127

    377127

    Villages getting 24 HRs. Supply1264502

    1010

    Total 3 Phase Trans. To be installed as on 31.03.10145631785

    Total 3 Phase Trans. installed up to DEC.10126191785

    BALANCE 3 Phase Trans. To be installed19440

    (5)RGGVY

    Scheme costRGGVY20995.861338.78

    AREP603.53

    No. of Unelectrifies/ Deelectrified villages coveredRGGVY66898

    AREP60

    No of villages electrifiedRGGVY20798

    AREP55

    (6)BPL Connections covered in Scheme (RGGVY)6012410368

    Nos.of BPL connections released (upto JAN.11)72056770

    (7)AGRICULTURE

    Agriculture Connections IN 2009-10DN ISSUED45062174

    DN DEPOSITED (Including Dep. As on 31.03.09)47241497

    CONN. RELEASED3198757

    BALANCE ( Deleting the Cancelled Appl.)1514740

    Agriculture Connections IN 2010-11DN DEPOSITED Up to DEC.20101268659

    TOTAL TO BE RELEASED (incl. BALANCE of FY 2009-10 )27821399

    25831261

    BALANCE ( Deleting the Cancelled Appl.)188138

    No of SC AG released During 2010-11 up to JAN.11446141

    (8)Mukhymantri sabke liye Vidyut Yojana

    Total Nos. of Groups Applied5407502

    Total DN Issued to Groups1776214

    Total DN Deposited1588154

    Groups Electrified Upto 31.3.1047345

    Groups Electrified in 2010-11 (UPTO DEC. 10)2106

    TOTAL GROUP ELECTRIFIED68351

    No. of Cluster Sanctioned/Domestic Applications Covered1260

    8050

    No. of Cluster Connections Released/Domestic Connections Released230

    1890

    BALANCE GROUPS TO BE ELECRIFIED AGAINST DN DEPOSITED Deleting cancelled appl.)905103

    TOTAL DL CONNECTIONS RELEASED4529332

    (9)APDRP DETAILS

    TOTAL SCHEMES (NOS.)

    COST OF SANCTIONED SCHEMES (RS. IN CRORE)

    EXPENDITURE INCURRED (RS. IN CRORE)

    JALORE

    JALORE CIRCLE

    S.NO.DISTRICT COVEREDJALORE

    (1)AREA (SQ. km)10640

    POPULATION AS PER CENSUS 20011448940

    POPULATION DENSITY(PER SQ. KM)136

    TEHSIL COVERED7

    NO OF PANCHAYAT SAMITI8

    NO OF GRAM PANCHAYATS268

    URBAN TOWNS3

    NO OF VILLAGES (As per census 2001)706

    VILLAGE ELECTRIFIED UP TO 31.03.2010 (Including 206 Nos. UIV)706

    VILLAGE ELECTRIFIED IN 2010-11 (Upto DEC,10)0

    % ELECTRIFICATION100.00%

    (2)POWER NETWORK

    NO OF 400KV GSS0

    NO OF 220KV GSS2

    NO OF 132KV GSS14

    NO OF 33KV GSS (as on DEC. 2010)157

    LENGTH OF 33KV LINE (KM) (as on DEC., 10)1623

    LENGTH OF 11KV LINE (KM) (as on DEC,10)14947

    NO. OF 11/04.KV S/S (as on DEC.,10)38998

    LENGTH OF LT LINE (KM) (DEC,. 10)10047

    NOS. SINGLE PHASE TRANSFORMERS ( DEC,10)4282

    A B CABLE IN KMS ( Upto DEC., 10)3388

    % T & D LOSSES FOR 10-11 UPTO NOV.,101.82

    (3)Business Dimensions

    Revenue Sub-Divisions12

    Total Active Consumers AS ON SEPTEMBER 10196237

    (a) Domestic135919

    (b) Agriculture (Flat)18376

    (c ) Agriculture (Metered)27063

    (D) Total Agriculture45439

    (e) PHED800

    Annual Revenue (2009-10) (Rs. In Crores)203.84

    Monthly Average Revenue (Rs. In Crores)16.99

    (4)FEEDER RENOVATION PROGRAM

    Total Rural Feeders Covered480

    463

    Villages getting 24 HRs. Supply697

    17

    Total 3 Phase Trans. To be installed as on 31.03.1019078

    Total 3 Phase Trans. installed up to DEC.1018841

    BALANCE 3 Phase Trans. To be installed237

    (5)RGGVY

    Scheme costRGGVY2367.41

    AREP

    No. of Unelectrifies/ Deelectrified villages coveredRGGVY30

    AREP

    No of villages electrifiedRGGVY30

    AREP

    (6)BPL Connections covered in Scheme (RGGVY)54217

    Nos.of BPL connections released (upto JAN.11)33719

    (7)AGRICULTURE

    Agriculture Connections IN 2009-10DN ISSUED4498

    DN DEPOSITED (Including Dep. As on 31.03.09)4443

    CONN. RELEASED2816

    BALANCE ( Deleting the Cancelled Appl.)1515

    Agriculture Connections IN 2010-11DN DEPOSITED Up to DEC.2010866

    TOTAL TO BE RELEASED (incl. BALANCE of FY 2009-10 )2381

    2135

    BALANCE ( Deleting the Cancelled Appl.)203

    No of SC AG released During 2010-11 up to JAN.11252

    (8)Mukhymantri sabke liye Vidyut Yojana

    Total Nos. of Groups Applied1337

    Total DN Issued to Groups543

    Total DN Deposited543

    Groups Electrified Upto 31.3.10396

    Groups Electrified in 2010-11 (UPTO DEC. 10)1

    TOTAL GROUP ELECTRIFIED397

    No. of Cluster Sanctioned/Domestic Applications Covered3

    34

    No. of Cluster Connections Released/Domestic Connections Released125

    570

    BALANCE GROUPS TO BE ELECRIFIED AGAINST DN DEPOSITED Deleting cancelled appl.)146

    TOTAL DL CONNECTIONS RELEASED3729

    (9)APDRP DETAILS

    TOTAL SCHEMES (NOS.)

    COST OF SANCTIONED SCHEMES (RS. IN CRORE)

    EXPENDITURE INCURRED (RS. IN CRORE)

    DISTT. WISE

    JODHPUR DISCOM PROFILE

    S.NO.DISTRICT COVEREDJODHPUR CITYJODHPUR DCPALISIROHIJALOREBARMERJAISALMERTOTAL JODHPUR ZONEBIKANERHNGH.SGGNR.Churu +PS LadnuBIKANER ZONEJODHPUR DISCOM

    (1)AREA (SQ. km)228501238751361064028387384011178013028980551257813784647061.82 Lacs182507

    POPULATION AS PER CENSUS 20113685688203853310371851830151260445367200811868018236774517796501969520210867282255872.01 Cr.20093605

    POPULATION DENSITY(PER SQ. KM)161165202172921710178221157153127228110

    TEHSIL COVERED795783398797317070

    NO OF PANCHAYAT SAMITI1010588344678728727223761

    NO OF GRAM PANCHAYATS339318149268402128160421925132028110712675267534645

    URBAN TOWNS13953222546101131565613022

    NO OF VILLAGES (As per census 2001)0106394946270619416375758875190530149806774125321253238763

    VILLAGE ELECTRIFIED UP TO 31.03.20110106294346270614765625211779180329279486457116681166818005

    VILLAGE ELECTRIFIED IN 2011-12 (Upto JULY ,11)0000000000000009165

    % ELECTRIFICATION----99.9199.37100.00100.0076.0488.2390.5089.0394.6597.1196.7395.3293.1193.11%137361

    (2)POWER NETWORK036171

    NO OF 400KV GSS1000113100125535101

    NO OF 220KV GSS6223311732229262644773

    NO OF 132KV GSS2210216144681889124711511543042

    NO OF 33KV GSS43296107501701685288619289107122510139613963067

    LENGTH OF 33KV LINE (KM)301307914236501748273917211166128519461365156467261838718387162154

    LENGTH OF 11KV LINE (KM)7582046886484618152031688373797395718082709779031028543367117324117324299515

    NO. OF 11/04.KV S/S2948428841538612215394272720262781463402557816695110621471168046214386214386

    LENGTH OF LT LINE (KM)170113317975948621021261631082470963766517830085992179446504065040

    NOS. SINGLE PHASE TRANSFORMERS075962988152244993917419209411491338248653304130423398333983

    A B CABLE IN KMS19870082474136037774964694204752051175038536408140623453734537

    % T & D LOSSES FOR 11-12 (UPTO JULY,11)19.1021.5418.3613.7516.3018.4823.3419.3616.8423.7321.8719.82

    (3)Business Dimensions

    Revenue Sub-Divisions1015231214741610131251125125

    Total Active Consumers AS ON 30.06.20111938362535125162752075182226951393836251169247902261818268943102983224236682423668

    (a) Domestic154418194920423013144940163241108053220158721016922363223140586679319473251947325

    (b) Agriculture (Flat)011285328618159272435454346700310565724202642026

    (c ) Agriculture (Metered)326261534129429142301591270741585716539842195215033817741217741281475

    (D) Total Agriculture32637438445804730132883162528193241653984211262656910219438219438

    (e) PHED194171512938001705570712964136011711402197289728

    Annual Revenue (2010-11) (Rs. In Crores)456.35420.64527.10227.63329.211960.93427.08197.91293.03225.161143.183104.113104.1101

    Monthly Average Revenue (Rs. In Crores)38.0335.0543.9218.9727.43163.4135.5916.4924.4218.7695.27258.68258.68

    (4)FEEDER RENOVATION PROGRAM0

    Total Rural Feeders Covered0777335129480478127232636822921427010813407340722019

    0687335129480424127218236822921425710683250325035278

    Villages getting 24 HRs. Supply0105891545569712645024891759162926239465957108481084825275

    0900005401440001313157157012842

    Total 3 Phase Trans. To be installed as on 31.03.10204381169550719078145631785625406064339750059325237918633186331

    Total 3 Phase Trans. installed up to JULY.111967511695507190781408017856129460643397500592932375985053

    BALANCE 3 Phase Trans. To be installed7630004830124600032321278

    (5)RGGVY015847

    Scheme costRGGVY--------2853.852981.291236.922367.4120995.861338.7831774.112333.903256.163498.462078.5411167.0642941.1742941.1744449.248372

    AREP603.53603.53222.85681.69904.541508.071508.07119633

    No. of Unelectrifies/ Deelectrified villages coveredRGGVY--------1732183066898998205132179115271525152529931

    AREP60604611115721721725768

    No of villages electrifiedRGGVY--------173158302079853118013215264701001100140580

    AREP55554611115721221239689

    (6)BPL Connections covered in Scheme (RGGVY)--------303652933424566542176012410368208974414813983534077543021696953786693786693057

    Nos.of BPL connections released (upto JULY.11)--------21198366588246365899363712911918330744314333894037936139053258236258236139025

    (7)AGRICULTURE

    Agriculture Connections IN 2010-11DN ISSUED4172225264155872827041711193713703687329674677467

    DN DEPOSITED (Including Dep. As on 31.03.10)35150104216522493290814421468737151707962158379672265422654

    CONN. RELEASED2442795813832219262612871290033591501936151273082020820208

    BALANCE ( Deleting the Cancelled Appl.)164863254229227155157629220516756521412141

    Agriculture Connections IN 2011-12DN ISSUED JULY,111609296789229482365767140313819179110062650926623297

    DN DEPOSITED (Including Dep. As on 31.03.11) UPTO JULY,111244453283220061753394796118731119842130751411310213102

    CONN. RELEASED UP TO JYLY,1127784748132173841262494159109432119424562456

    BALANCE ( Deleting the Cancelled Appl.)01649480781178115683106569137996073387539471051610516

    No of SC AG released During 2011-12 up to JULY,11031623165914624584220113563817701354S

    (8)Mukhymantri sabke liye Vidyut Yojana00

    Total Nos. of Groups Applied (UP TO JULY,11)0542423238133754075021294027679510556135281646816468

    Total DN Issued to Groups (UPTO JULY,11)039352173185925052377784126095105369182996139613

    Total DN Deposited (UPTO JULY 11)03080163227301631164579010408399300152273127312

    Groups Electrified Upto 31.3.20110298216322516145514552839098399300139166746674

    Groups Electrified in 2011-12 (UPTO JULY, 11)039001719103019500095396396

    TOTAL GROUP ELECTRIFIED03021163226871546145558410048399300148670707070

    No. of Cluster Sanctioned/Domestic Applications Covered020829031260366389193622466832832

    01599436034805028743112152288176372866026602

    No. of Cluster Connections Released/Domestic Connections Released03514312523020000000200200

    028611010570189011650000011651165

    BALANCE GROUPS TO BE ELECRIFIED AGAINST DN DEPOSITED Deleting cancelled appl.)05900428719207122000122329

    TOTAL DL CONNECTIONS RELEASED (UP TO JULY, 2011)0206771655241580796901110391806341780863175697404892048920

    (9)APDRP DETAILS

    TOTAL SCHEMES (NOS.)7

    COST OF SANCTIONED SCHEMES (RS. IN CRORE)359.29

    EXPENDITURE INCURRED (RS. IN CRORE)311.74

  • *DISCOM PROFILE

    Zone wise

    JODHPUR DISCOM PROFILE

    S.No.DISTRICT COVEREDJODHPUR ZONEBIKANER ZONEJODHPUR DISCOM

    (1)AREA (SQ. km)117801647061.82 Lacs182507

    POPULATION AS PER CENSUS 20011186801882255872.01 Cr.20093605

    POPULATION DENSITY(PER SQ. KM)100.75127.12227.87110.0977222791

    TEHSIL COVERED39317070

    NO OF PANCHAYAT SAMITI44287272

    NO OF GRAM PANCHAYATS1604107126752675

    URBAN TOWNS25315656

    NO OF VILLAGES (As per census 2001)575867741253212532

    VILLAGE ELECTRIFIED UP TO 31.03.2011 (Including 206 Nos. UIV)521164571166811668

    VILLAGE ELECTRIFIED IN 2011-12 (Upto JULY ,11)0000

    % ELECTRIFICATION90.5095.3293.1193.1056495372

    (2)POWER NETWORK

    NO OF 400KV GSS3255

    NO OF 220KV GSS1792626

    NO OF 132KV GSS6847115115

    NO OF 33KV GSS (as on JULY. 2011)88651013961396

    LENGTH OF 33KV LINE (KM) (as on JULY., 11)1166167261838718387

    LENGTH OF 11KV LINE (KM) (as on JUNE 11)7395743367117324117324

    NO. OF 11/04.KV S/S (as on JUNE, 11)14634068046214386214386

    LENGTH OF LT LINE (KM) (as on JULY., 11)47096179446504065040

    NOS. SINGLE PHASE TRANSFORMERS ( JUNE,11)20941130423398333983

    A B CABLE IN KMS ( Upto JUNE, 11)20475140623453734537

    % T & D LOSSES FOR 11-12 (UPTO JULY,11)18.4821.8719.8220.89

    (3)Business Dimensions

    Revenue Sub-Divisions7451125125

    Total Active Consumers AS ON 30.06.20111393836102983224236682423668

    (a) Domestic108053286679319473251947325

    (b) Agriculture (Flat)3545465724202642026

    (c ) Agriculture (Metered)1270745033817741217741281475

    (D) Total Agriculture16252856910219438219438

    (e) PHED5707402197289728

    Annual Revenue (2010-11) (Rs. In Crores)1960.931143.183104.113104.1101

    Monthly Average Revenue (Rs. In Crores)163.4195.27258.68258.6758416667

    (4)FEEDER RENOVATION PROGRAM

    Total Rural Feeders Covered232610813407340722019

    218210683250325035278

    Villages getting 24 HRs. Supply489159571084810848

    14413157157

    Total 3 Phase Trans. To be installed as on 31.03.1062540237918633186331

    Total 3 Phase Trans. installed up to JULY.116129423759850538505325275

    BALANCE 3 Phase Trans. To be installed12463212781278012842

    (5)RGGVY15847

    Scheme costRGGVY31774.1111167.0642941.1742941.178372

    AREP603.53904.541508.071508.07119633

    No. of Unelectrifies/ Deelectrified villages coveredRGGVY9985271525152529931

    AREP60157217217

    No of villages electrifiedRGGVY53147010011001

    AREP55157212212

    (6)BPL Connections covered in Scheme (RGGVY)208974169695378669378669

    Nos.of BPL connections released (upto JULY.11)119183139053258236258236

    (7)AGRICULTURE

    Agriculture Connections IN 2010-11DN ISSUED4171329674677471

    DN DEPOSITED (Including Dep. As on 31.03.10)1468779672265422657

    CONN. RELEASED1290073082020820210

    BALANCE ( Deleting the Cancelled Appl.)157656521412142

    Agriculture Connections IN 2011-12DN ISSUED JULY,111403192662329723298

    DN DEPOSITED (Including Dep. As on 31.03.11) UPTO JULY,11796151411310213103

    CONN. RELEASED UP TO JYLY,111262119424562458

    BALANCE ( Deleting the Cancelled Appl.)656939471051610516

    No of SC AG released During 2011-12 up to JULY,1158477013541354

    (8)Mukhymantri sabke liye Vidyut Yojana

    Total Nos. of Groups Applied (UP TO JULY,11)1294035281646816468

    Total DN Issued to Groups (UPTO JULY,11)7784182996139613

    Total DN Deposited (UPTO JULY 11)5790152273127312

    Groups Electrified Upto 31.3.20115283139166746674

    Groups Electrified in 2011-12 (UPTO JULY, 11)30195396396

    TOTAL GROUP ELECTRIFIED5584148670707070

    No. of Cluster Sanctioned/Domestic Applications Covered366466832832

    2874372866026602

    No. of Cluster Connections Released/Domestic Connections Released2000200200

    1165011651165

    BALANCE GROUPS TO BE ELECRIFIED AGAINST DN DEPOSITED Deleting cancelled appl.)207122329329

    TOTAL DL CONNECTIONS RELEASED (UP TO JULY, 2011)3918097404892048920

    (9)APDRP DETAILS000

    TOTAL SCHEMES (NOS.)0077

    COST OF SANCTIONED SCHEMES (RS. IN CRORE)00359.29359.29

    EXPENDITURE INCURRED (RS. IN CRORE)00311.74311.74

    barmer cir

    BARMER CIRCLE PROFILE

    S.NO.DISTRICT COVEREDBARMERJAISALMER

    (1)AREA (SQ. km)2838738401

    POPULATION AS PER CENSUS 20011964835508247

    POPULATION DENSITY(PER SQ. KM)6913

    TEHSIL COVERED83

    NO OF PANCHAYAT SAMITI83

    NO OF GRAM PANCHAYATS402128

    URBAN TOWNS22

    NO OF VILLAGES (As per census 2001)1941637

    VILLAGE ELECTRIFIED UP TO 31.03.2010 (Including 206 Nos. UIV)1281562

    VILLAGE ELECTRIFIED IN 2010-11 (Upto DEC,10)1950

    % ELECTRIFICATION76.04%88.23%

    (2)POWER NETWORK

    NO OF 400KV GSS10

    NO OF 220KV GSS31

    NO OF 132KV GSS113

    NO OF 33KV GSS (as on DEC. 2010)15544

    LENGTH OF 33KV LINE (KM) (as on DEC., 10)26341653

    LENGTH OF 11KV LINE (KM) (as on DEC,10)156326875

    NO. OF 11/04.KV S/S (as on DEC.,10)265375604

    LENGTH OF LT LINE (KM) (DEC,. 10)61511088

    NOS. SINGLE PHASE TRANSFORMERS ( DEC,10)2939305

    A B CABLE IN KMS ( Upto DEC., 10)4317520

    % T & D LOSSES FOR 10-11 UPTO NOV.,1013.28

    (3)Business Dimensions

    Revenue Sub-Divisions14

    Total Active Consumers AS ON SEPTEMBER 1016099548107

    (a) Domestic11589838021

    (b) Agriculture (Flat)2875329

    (c ) Agriculture (Metered)230133358

    (D) Total Agriculture256103687

    (e) PHED1349351

    Annual Revenue (2009-10) (Rs. In Crores)286.42

    Monthly Average Revenue (Rs. In Crores)23.87

    (4)FEEDER RENOVATION PROGRAM

    Total Rural Feeders Covered478127

    377127

    Villages getting 24 HRs. Supply1264502

    1010

    Total 3 Phase Trans. To be installed as on 31.03.10145631785

    Total 3 Phase Trans. installed up to DEC.10126191785

    BALANCE 3 Phase Trans. To be installed19440

    (5)RGGVY

    Scheme costRGGVY20995.861338.78

    AREP603.53

    No. of Unelectrifies/ Deelectrified villages coveredRGGVY66898

    AREP60

    No of villages electrifiedRGGVY20798

    AREP55

    (6)BPL Connections covered in Scheme (RGGVY)6012410368

    Nos.of BPL connections released (upto JAN.11)72056770

    (7)AGRICULTURE

    Agriculture Connections IN 2009-10DN ISSUED45062174

    DN DEPOSITED (Including Dep. As on 31.03.09)47241497

    CONN. RELEASED3198757

    BALANCE ( Deleting the Cancelled Appl.)1514740

    Agriculture Connections IN 2010-11DN DEPOSITED Up to DEC.20101268659

    TOTAL TO BE RELEASED (incl. BALANCE of FY 2009-10 )27821399

    25831261

    BALANCE ( Deleting the Cancelled Appl.)188138

    No of SC AG released During 2010-11 up to JAN.11446141

    (8)Mukhymantri sabke liye Vidyut Yojana

    Total Nos. of Groups Applied5407502

    Total DN Issued to Groups1776214

    Total DN Deposited1588154

    Groups Electrified Upto 31.3.1047345

    Groups Electrified in 2010-11 (UPTO DEC. 10)2106

    TOTAL GROUP ELECTRIFIED68351

    No. of Cluster Sanctioned/Domestic Applications Covered1260

    8050

    No. of Cluster Connections Released/Domestic Connections Released230

    1890

    BALANCE GROUPS TO BE ELECRIFIED AGAINST DN DEPOSITED Deleting cancelled appl.)905103

    TOTAL DL CONNECTIONS RELEASED4529332

    (9)APDRP DETAILS

    TOTAL SCHEMES (NOS.)

    COST OF SANCTIONED SCHEMES (RS. IN CRORE)

    EXPENDITURE INCURRED (RS. IN CRORE)

    JALORE

    JALORE CIRCLE

    S.NO.DISTRICT COVEREDJALORE

    (1)AREA (SQ. km)10640

    POPULATION AS PER CENSUS 20011448940

    POPULATION DENSITY(PER SQ. KM)136

    TEHSIL COVERED7

    NO OF PANCHAYAT SAMITI8

    NO OF GRAM PANCHAYATS268

    URBAN TOWNS3

    NO OF VILLAGES (As per census 2001)706

    VILLAGE ELECTRIFIED UP TO 31.03.2010 (Including 206 Nos. UIV)706

    VILLAGE ELECTRIFIED IN 2010-11 (Upto DEC,10)0

    % ELECTRIFICATION100.00%

    (2)POWER NETWORK

    NO OF 400KV GSS0

    NO OF 220KV GSS2

    NO OF 132KV GSS14

    NO OF 33KV GSS (as on DEC. 2010)157

    LENGTH OF 33KV LINE (KM) (as on DEC., 10)1623

    LENGTH OF 11KV LINE (KM) (as on DEC,10)14947

    NO. OF 11/04.KV S/S (as on DEC.,10)38998

    LENGTH OF LT LINE (KM) (DEC,. 10)10047

    NOS. SINGLE PHASE TRANSFORMERS ( DEC,10)4282

    A B CABLE IN KMS ( Upto DEC., 10)3388

    % T & D LOSSES FOR 10-11 UPTO NOV.,101.82

    (3)Business Dimensions

    Revenue Sub-Divisions12

    Total Active Consumers AS ON SEPTEMBER 10196237

    (a) Domestic135919

    (b) Agriculture (Flat)18376

    (c ) Agriculture (Metered)27063

    (D) Total Agriculture45439

    (e) PHED800

    Annual Revenue (2009-10) (Rs. In Crores)203.84

    Monthly Average Revenue (Rs. In Crores)16.99

    (4)FEEDER RENOVATION PROGRAM

    Total Rural Feeders Covered480

    463

    Villages getting 24 HRs. Supply697

    17

    Total 3 Phase Trans. To be installed as on 31.03.1019078

    Total 3 Phase Trans. installed up to DEC.1018841

    BALANCE 3 Phase Trans. To be installed237

    (5)RGGVY

    Scheme costRGGVY2367.41

    AREP

    No. of Unelectrifies/ Deelectrified villages coveredRGGVY30

    AREP

    No of villages electrifiedRGGVY30

    AREP

    (6)BPL Connections covered in Scheme (RGGVY)54217

    Nos.of BPL connections released (upto JAN.11)33719

    (7)AGRICULTURE

    Agriculture Connections IN 2009-10DN ISSUED4498

    DN DEPOSITED (Including Dep. As on 31.03.09)4443

    CONN. RELEASED2816

    BALANCE ( Deleting the Cancelled Appl.)1515

    Agriculture Connections IN 2010-11DN DEPOSITED Up to DEC.2010866

    TOTAL TO BE RELEASED (incl. BALANCE of FY 2009-10 )2381

    2135

    BALANCE ( Deleting the Cancelled Appl.)203

    No of SC AG released During 2010-11 up to JAN.11252

    (8)Mukhymantri sabke liye Vidyut Yojana

    Total Nos. of Groups Applied1337

    Total DN Issued to Groups543

    Total DN Deposited543

    Groups Electrified Upto 31.3.10396

    Groups Electrified in 2010-11 (UPTO DEC. 10)1

    TOTAL GROUP ELECTRIFIED397

    No. of Cluster Sanctioned/Domestic Applications Covered3

    34

    No. of Cluster Connections Released/Domestic Connections Released125

    570

    BALANCE GROUPS TO BE ELECRIFIED AGAINST DN DEPOSITED Deleting cancelled appl.)146

    TOTAL DL CONNECTIONS RELEASED3729

    (9)APDRP DETAILS

    TOTAL SCHEMES (NOS.)

    COST OF SANCTIONED SCHEMES (RS. IN CRORE)

    EXPENDITURE INCURRED (RS. IN CRORE)

    DISTT. WISE

    JODHPUR DISCOM PROFILE

    S.NO.DISTRICT COVEREDJODHPUR CITYJODHPUR DCPALISIROHIJALOREBARMERJAISALMERTOTAL JODHPUR ZONEBIKANERHNGH.SGGNR.Churu +PS LadnuBIKANER ZONEJODHPUR DISCOM

    (1)AREA (SQ. km)228501238751361064028387384011178013028980551257813784647061.82 Lacs182507

    POPULATION AS PER CENSUS 20113685688203853310371851830151260445367200811868018236774517796501969520210867282255872.01 Cr.20093605

    POPULATION DENSITY(PER SQ. KM)161165202172921710178221157153127228110

    TEHSIL COVERED795783398797317070

    NO OF PANCHAYAT SAMITI1010588344678728727223761

    NO OF GRAM PANCHAYATS339318149268402128160421925132028110712675267534645

    URBAN TOWNS13953222546101131565613022

    NO OF VILLAGES (As per census 2001)0106394946270619416375758875190530149806774125321253238763

    VILLAGE ELECTRIFIED UP TO 31.03.20110106294346270614765625211779180329279486457116681166818005

    VILLAGE ELECTRIFIED IN 2011-12 (Upto JULY ,11)0000000000000009165

    % ELECTRIFICATION----99.9199.37100.00100.0076.0488.2390.5089.0394.6597.1196.7395.3293.1193.11%137361

    (2)SYSTEM NETWORK036171

    NO OF 400KV GSS1000113100125535101

    NO OF 220KV GSS6223311732229262644773

    NO OF 132KV GSS2210216144681889124711511543042

    NO OF 33KV GSS43296107501701685288619289107122510139613963067

    LENGTH OF 33KV LINE (KM)301307914236501748273917211166128519461365156467261838718387162154

    LENGTH OF 11KV LINE (KM)7582046886484618152031688373797395718082709779031028543367117324117324299515

    NO. OF 11/04.KV S/S2948428841538612215394272720262781463402557816695110621471168046214386214386

    LENGTH OF LT LINE (KM)170113317975948621021261631082470963766517830085992179446504065040

    NOs. SINGLE PHASE TRANSFORMERS075962988152244993917419209411491338248653304130423398333983

    A B CABLE IN KMS19870082474136037774964694204752051175038536408140623453734537

    % T & D LOSSES FOR 11-12 (UPTO JULY,11)19.1021.5418.3613.7516.3018.4823.3419.3616.8423.7321.8719.82

    (3)Business Dimensions

    Revenue Sub-Divisions1015231214741610131251125125

    Total Active Consumers AS ON 30.06.20111938362535125162752075182226951393836251169247902261818268943102983224236682423668

    (a) Domestic154418194920423013144940163241108053220158721016922363223140586679319473251947325

    (b) Agriculture (Flat)011285328618159272435454346700310565724202642026

    (c ) Agriculture (Metered)326261534129429142301591270741585716539842195215033817741217741281475

    (D) Total Agriculture32637438445804730132883162528193241653984211262656910219438219438

    (e) PHED194171512938001705570712964136011711402197289728

    Annual Revenue (2010-11) (Rs. In Crores)456.35420.64527.10227.63329.211960.93427.08197.91293.03225.161143.183104.113104.1101

    Monthly Average Revenue (Rs. In Crores)38.0335.0543.9218.9727.43163.4135.5916.4924.4218.7695.27258.68258.68

    (4)FEEDER RENOVATION PROGRAM0

    Total Rural Feeders Covered0777335129480478127232636822921427010813407340722019

    0687335129480424127218236822921425710683250325035278

    Villages getting 24 HRs. Supply0105891545569712645024891759162926239465957108481084825275

    0900005401440001313157157012842

    Total 3 Phase Trans. To be installed as on 31.03.10204381169550719078145631785625406064339750059325237918633186331

    Total 3 Phase Trans. installed up to JULY.111967511695507190781408017856129460643397500592932375985053

    BALANCE 3 Phase Trans. To be installed7630004830124600032321278

    (5)RGGVY015847

    Scheme costRGGVY--------2853.852981.291236.922367.4120995.861338.7831774.112333.903256.163498.462078.5411167.0642941.1742941.1744449.248372

    AREP603.53603.53222.85681.69904.541508.071508.07119633

    No. of Unelectrifies/ Deelectrified villages coveredRGGVY--------1732183066898998205132179115271525152529931

    AREP60604611115721721725768

    No of villages electrifiedRGGVY--------173158302079853118013215264701001100140580

    AREP55554611115721221239689

    (6)BPL Connections covered in Scheme (RGGVY)--------303652933424566542176012410368208974414813983534077543021696953786693786693057

    Nos.of BPL connections released (upto JULY.11)--------21198366588246365899363712911918330744314333894037936139053258236258236139025

    (7)AGRICULTURE

    Agriculture Connections IN 2010-11DN ISSUED4172225264155872827041711193713703687329674677467

    DN DEPOSITED (Including Dep. As on 31.03.10)35150104216522493290814421468737151707962158379672265422654

    CONN. RELEASED2442795813832219262612871290033591501936151273082020820208

    BALANCE ( Deleting the Cancelled Appl.)164863254229227155157629220516756521412141

    Agriculture Connections IN 2011-12DN ISSUED JULY,111609296789229482365767140313819179110062650926623297

    DN DEPOSITED (Including Dep. As on 31.03.11) UPTO JULY,111244453283220061753394796118731119842130751411310213102

    CONN. RELEASED UP TO JYLY,1127784748132173841262494159109432119424562456

    BALANCE ( Deleting the Cancelled Appl.)01649480781178115683106569137996073387539471051610516

    No of SC AG released During 2011-12 up to JULY,11031623165914624584220113563817701354S

    (8)Mukhymantri sabke liye Vidyut Yojana00

    Total Nos. of Groups Applied (UP TO JULY,11)0542423238133754075021294027679510556135281646816468

    Total DN Issued to Groups (UPTO JULY,11)039352173185925052377784126095105369182996139613

    Total DN Deposited (UPTO JULY 11)03080163227301631164579010408399300152273127312

    Groups Electrified Upto 31.3.20110298216322516145514552839098399300139166746674

    Groups Electrified in 2011-12 (UPTO JULY, 11)039001719103019500095396396

    TOTAL GROUP ELECTRIFIED03021163226871546145558410048399300148670707070

    No. of Cluster Sanctioned/Domestic Applications Covered020829031260366389193622466832832

    01599436034805028743112152288176372866026602

    No. of Cluster Connections Released/Domestic Connections Released03514312523020000000200200

    028611010570189011650000011651165

    BALANCE GROUPS TO BE ELECRIFIED AGAINST DN DEPOSITED Deleting cancelled appl.)05900428719207122000122329

    TOTAL DL CONNECTIONS RELEASED (UP TO JULY, 2011)0206771655241580796901110391806341780863175697404892048920

    (9)APDRP DETAILS

    TOTAL SCHEMES (NOS.)7

    COST OF SANCTIONED SCHEMES (RS. IN CRORE)359.29

    EXPENDITURE INCURRED (RS. IN CRORE)311.74

    Zone wise

    JODHPUR DISCOM PROFILE

    S.No.DISTRICT COVEREDJODHPUR ZONEBIKANER ZONEJODHPUR DISCOM

    (1)AREA (SQ. km)117801647061.82 Lacs182507

    POPULATION AS PER CENSUS 20011186801882255872.01 Cr.20093605

    POPULATION DENSITY(PER SQ. KM)100.75127.12227.87110.0977222791

    TEHSIL COVERED39317070

    NO OF PANCHAYAT SAMITI44287272

    NO OF GRAM PANCHAYATS1604107126752675

    URBAN TOWNS25315656

    NO OF VILLAGES (As per census 2001)575867741253212532

    VILLAGE ELECTRIFIED UP TO 31.03.2011 (Including 206 Nos. UIV)521164571166811668

    VILLAGE ELECTRIFIED IN 2011-12 (Upto JULY ,11)0000

    % ELECTRIFICATION90.5095.3293.1193.1056495372

    (2)POWER NETWORK

    NO OF 400KV GSS3255

    NO OF 220KV GSS1792626

    NO OF 132KV GSS6847115115

    NO OF 33KV GSS (as on JULY. 2011)88651013961396

    LENGTH OF 33KV LINE (KM) (as on JULY., 11)1166167261838718387

    LENGTH OF 11KV LINE (KM) (as on JUNE 11)7395743367117324117324

    NO. OF 11/04.KV S/S (as on JUNE, 11)14634068046214386214386

    LENGTH OF LT LINE (KM) (as on JULY., 11)47096179446504065040

    NOS. SINGLE PHASE TRANSFORMERS ( JUNE,11)20941130423398333983

    A B CABLE IN KMS ( Upto JUNE, 11)20475140623453734537

    % T & D LOSSES FOR 11-12 (UPTO JULY,11)18.4821.8719.8220.89

    (3)Business Dimensions

    Revenue Sub-Divisions7451125125

    Total Active Consumers AS ON 30.06.20111393836102983224236682423668

    (a) Domestic108053286679319473251947325

    (b) Agriculture (Flat)3545465724202642026

    (c ) Agriculture (Metered)1270745033817741217741281475

    (D) Total Agriculture16252856910219438219438

    (e) PHED5707402197289728

    Annual Revenue (2010-11) (Rs. In Crores)1960.931143.183104.113104.1101

    Monthly Average Revenue (Rs. In Crores)163.4195.27258.68258.6758416667

    (4)FEEDER RENOVATION PROGRAM

    Total Rural Feeders Covered232610813407340722019

    218210683250325035278

    Villages getting 24 HRs. Supply489159571084810848

    14413157157

    Total 3 Phase Trans. To be installed as on 31.03.1062540237918633186331

    Total 3 Phase Trans. installed up to JULY.116129423759850538505325275

    BALANCE 3 Phase Trans. To be installed12463212781278012842

    (5)RGGVY15847

    Scheme costRGGVY31774.1111167.0642941.1742941.178372

    AREP603.53904.541508.071508.07119633

    No. of Unelectrifies/ Deelectrified villages coveredRGGVY9985271525152529931

    AREP60157217217

    No of villages electrifiedRGGVY53147010011001

    AREP55157212212

    (6)BPL Connections covered in Scheme (RGGVY)208974169695378669378669

    Nos.of BPL connections released (upto JULY.11)119183139053258236258236

    (7)AGRICULTURE

    Agriculture Connections IN 2010-11DN ISSUED4171329674677471

    DN DEPOSITED (Including Dep. As on 31.03.10)1468779672265422657

    CONN. RELEASED1290073082020820210

    BALANCE ( Deleting the Cancelled Appl.)157656521412142

    Agriculture Connections IN 2011-12DN ISSUED JULY,111403192662329723298

    DN DEPOSITED (Including Dep. As on 31.03.11) UPTO JULY,11796151411310213103

    CONN. RELEASED UP TO JYLY,111262119424562458

    BALANCE ( Deleting the Cancelled Appl.)656939471051610516

    No of SC AG released During 2011-12 up to JULY,1158477013541354

    (8)Mukhymantri sabke liye Vidyut Yojana

    Total Nos. of Groups Applied (UP TO JULY,11)1294035281646816468

    Total DN Issued to Groups (UPTO JULY,11)7784182996139613

    Total DN Deposited (UPTO JULY 11)5790152273127312

    Groups Electrified Upto 31.3.20115283139166746674

    Groups Electrified in 2011-12 (UPTO JULY, 11)30195396396

    TOTAL GROUP ELECTRIFIED5584148670707070

    No. of Cluster Sanctioned/Domestic Applications Covered366466832832

    2874372866026602

    No. of Cluster Connections Released/Domestic Connections Released2000200200

    1165011651165

    BALANCE GROUPS TO BE ELECRIFIED AGAINST DN DEPOSITED Deleting cancelled appl.)207122329329

    TOTAL DL CONNECTIONS RELEASED (UP TO JULY, 2011)3918097404892048920

    (9)APDRP DETAILS000

    TOTAL SCHEMES (NOS.)0077

    COST OF SANCTIONED SCHEMES (RS. IN CRORE)00359.29359.29

    EXPENDITURE INCURRED (RS. IN CRORE)00311.74311.74

    barmer cir

    BARMER CIRCLE PROFILE

    S.NO.DISTRICT COVEREDBARMERJAISALMER

    (1)AREA (SQ. km)2838738401

    POPULATION AS PER CENSUS 20011964835508247

    POPULATION DENSITY(PER SQ. KM)6913

    TEHSIL COVERED83

    NO OF PANCHAYAT SAMITI83

    NO OF GRAM PANCHAYATS402128

    URBAN TOWNS22

    NO OF VILLAGES (As per census 2001)1941637

    VILLAGE ELECTRIFIED UP TO 31.03.2010 (Including 206 Nos. UIV)1281562

    VILLAGE ELECTRIFIED IN 2010-11 (Upto DEC,10)1950

    % ELECTRIFICATION76.04%88.23%

    (2)POWER NETWORK

    NO OF 400KV GSS10

    NO OF 220KV GSS31

    NO OF 132KV GSS113

    NO OF 33KV GSS (as on DEC. 2010)15544

    LENGTH OF 33KV LINE (KM) (as on DEC., 10)26341653

    LENGTH OF 11KV LINE (KM) (as on DEC,10)156326875

    NO. OF 11/04.KV S/S (as on DEC.,10)265375604

    LENGTH OF LT LINE (KM) (DEC,. 10)61511088

    NOS. SINGLE PHASE TRANSFORMERS ( DEC,10)2939305

    A B CABLE IN KMS ( Upto DEC., 10)4317520

    % T & D LOSSES FOR 10-11 UPTO NOV.,1013.28

    (3)Business Dimensions

    Revenue Sub-Divisions14

    Total Active Consumers AS ON SEPTEMBER 1016099548107

    (a) Domestic11589838021

    (b) Agriculture (Flat)2875329

    (c ) Agriculture (Metered)230133358

    (D) Total Agriculture256103687

    (e) PHED1349351

    Annual Revenue (2009-10) (Rs. In Crores)286.42

    Monthly Average Revenue (Rs. In Crores)23.87

    (4)FEEDER RENOVATION PROGRAM

    Total Rural Feeders Covered478127

    377127

    Villages getting 24 HRs. Supply1264502

    1010

    Total 3 Phase Trans. To be installed as on 31.03.10145631785

    Total 3 Phase Trans. installed up to DEC.10126191785

    BALANCE 3 Phase Trans. To be installed19440

    (5)RGGVY

    Scheme costRGGVY20995.861338.78

    AREP603.53

    No. of Unelectrifies/ Deelectrified villages coveredRGGVY66898

    AREP60

    No of villages electrifiedRGGVY20798

    AREP55

    (6)BPL Connections covered in Scheme (RGGVY)6012410368

    Nos.of BPL connections released (upto JAN.11)72056770

    (7)AGRICULTURE

    Agriculture Connections IN 2009-10DN ISSUED45062174

    DN DEPOSITED (Including Dep. As on 31.03.09)47241497

    CONN. RELEASED3198757

    BALANCE ( Deleting the Cancelled Appl.)1514740

    Agriculture Connections IN 2010-11DN DEPOSITED Up to DEC.20101268659

    TOTAL TO BE RELEASED (incl. BALANCE of FY 2009-10 )27821399

    25831261

    BALANCE ( Deleting the Cancelled Appl.)188138

    No of SC AG released During 2010-11 up to JAN.11446141

    (8)Mukhymantri sabke liye Vidyut Yojana

    Total Nos. of Groups Applied5407502

    Total DN Issued to Groups1776214

    Total DN Deposited1588154

    Groups Electrified Upto 31.3.1047345

    Groups Electrified in 2010-11 (UPTO DEC. 10)2106

    TOTAL GROUP ELECTRIFIED68351

    No. of Cluster Sanctioned/Domestic Applications Covered1260

    8050

    No. of Cluster Connections Released/Domestic Connections Released230

    1890

    BALANCE GROUPS TO BE ELECRIFIED AGAINST DN DEPOSITED Deleting cancelled appl.)905103

    TOTAL DL CONNECTIONS RELEASED4529332

    (9)APDRP DETAILS

    TOTAL SCHEMES (NOS.)

    COST OF SANCTIONED SCHEMES (RS. IN CRORE)

    EXPENDITURE INCURRED (RS. IN CRORE)

    JALORE

    JALORE CIRCLE

    S.NO.DISTRICT COVEREDJALORE

    (1)AREA (SQ. km)10640

    POPULATION AS PER CENSUS 20011448940

    POPULATION DENSITY(PER SQ. KM)136

    TEHSIL COVERED7

    NO OF PANCHAYAT SAMITI8

    NO OF GRAM PANCHAYATS268

    URBAN TOWNS3

    NO OF VILLAGES (As per census 2001)706

    VILLAGE ELECTRIFIED UP TO 31.03.2010 (Including 206 Nos. UIV)706

    VILLAGE ELECTRIFIED IN 2010-11 (Upto DEC,10)0

    % ELECTRIFICATION100.00%

    (2)POWER NETWORK

    NO OF 400KV GSS0

    NO OF 220KV GSS2

    NO OF 132KV GSS14

    NO OF 33KV GSS (as on DEC. 2010)157

    LENGTH OF 33KV LINE (KM) (as on DEC., 10)1623

    LENGTH OF 11KV LINE (KM) (as on DEC,10)14947

    NO. OF 11/04.KV S/S (as on DEC.,10)38998

    LENGTH OF LT LINE (KM) (DEC,. 10)10047

    NOS. SINGLE PHASE TRANSFORMERS ( DEC,10)4282

    A B CABLE IN KMS ( Upto DEC., 10)3388

    % T & D LOSSES FOR 10-11 UPTO NOV.,101.82

    (3)Business Dimensions

    Revenue Sub-Divisions12

    Total Active Consumers AS ON SEPTEMBER 10196237

    (a) Domestic135919

    (b) Agriculture (Flat)18376

    (c ) Agriculture (Metered)27063

    (D) Total Agriculture45439

    (e) PHED800

    Annual Revenue (2009-10) (Rs. In Crores)203.84

    Monthly Average Revenue (Rs. In Crores)16.99

    (4)FEEDER RENOVATION PROGRAM

    Total Rural Feeders Covered480

    463

    Villages getting 24 HRs. Supply697

    17

    Total 3 Phase Trans. To be installed as on 31.03.1019078

    Total 3 Phase Trans. installed up to DEC.1018841

    BALANCE 3 Phase Trans. To be installed237

    (5)RGGVY

    Scheme costRGGVY2367.41

    AREP

    No. of Unelectrifies/ Deelectrified villages coveredRGGVY30

    AREP

    No of villages electrifiedRGGVY30

    AREP

    (6)BPL Connections covered in Scheme (RGGVY)54217

    Nos.of BPL connections released (upto JAN.11)33719

    (7)AGRICULTURE

    Agriculture Connections IN 2009-10DN ISSUED4498

    DN DEPOSITED (Including Dep. As on 31.03.09)4443

    CONN. RELEASED2816

    BALANCE ( Deleting the Cancelled Appl.)1515

    Agriculture Connections IN 2010-11DN DEPOSITED Up to DEC.2010866

    TOTAL TO BE RELEASED (incl. BALANCE of FY 2009-10 )2381

    2135

    BALANCE ( Deleting the Cancelled Appl.)203

    No of SC AG released During 2010-11 up to JAN.11252

    (8)Mukhymantri sabke liye Vidyut Yojana

    Total Nos. of Groups Applied1337

    Total DN Issued to Groups543

    Total DN Deposited543

    Groups Electrified Upto 31.3.10396

    Groups Electrified in 2010-11 (UPTO DEC. 10)1

    TOTAL GROUP ELECTRIFIED397

    No. of Cluster Sanctioned/Domestic Applications Covered3

    34

    No. of Cluster Connections Released/Domestic Connections Released125

    570

    BALANCE GROUPS TO BE ELECRIFIED AGAINST DN DEPOSITED Deleting cancelled appl.)146

    TOTAL DL CONNECTIONS RELEASED3729

    (9)APDRP DETAILS

    TOTAL SCHEMES (NOS.)

    COST OF SANCTIONED SCHEMES (RS. IN CRORE)

    EXPENDITURE INCURRED (RS. IN CRORE)

    DISTT. WISE

    JODHPUR DISCOM PROFILE

    S.NO.DISTRICT COVEREDJODHPUR CITYJODHPUR DCPALISIROHIJALOREBARMERJAISALMERTOTAL JODHPUR ZONEBIKANERHNGH.SGGNR.Churu +PS LadnuBIKANER ZONEJODHPUR DISCOM

    (1)AREA (SQ. km)228501238751361064028387384011178013028980551257813784647061.82 Lacs182507

    POPULATION AS PER CENSUS 20113685688203853310371851830151260445367200811868018236774517796501969520210867282255872.01 Cr.20093605

    POPULATION DENSITY(PER SQ. KM)161165202172921710178221157153127228110

    TEHSIL COVERED795783398797317070

    NO OF PANCHAYAT SAMITI1010588344678728727223761

    NO OF GRAM PANCHAYATS339318149268402128160421925132028110712675267534645

    URBAN TOWNS13953222546101131565613022

    NO OF VILLAGES (As per census 2001)0106394946270619416375758875190530149806774125321253238763

    VILLAGE ELECTRIFIED UP TO 31.03.20110106294346270614765625211779180329279486457116681166818005

    VILLAGE ELECTRIFIED IN 2011-12 (Upto JULY ,11)0000000000000009165

    % ELECTRIFICATION----99.9199.37100.00100.0076.0488.2390.5089.0394.6597.1196.7395.3293.1193.11%137361

    (2)SYSTEM NETWORK036171

    NO OF 400KV GSS1000113100125535101

    NO OF 220KV GSS6223311732229262644773

    NO OF 132KV GSS2210216144681889124711511543042

    NO OF 33KV GSS43296107501701685288619289107122510139613963067

    LENGTH OF 33KV LINE (KM)301307914236501748273917211166128519461365156467261838718387162154

    LENGTH OF 11KV LINE (KM)7582046886484618152031688373797395718082709779031028543367117324117324299515

    NO. OF 11/04.KV S/S2948428841538612215394272720262781463402557816695110621471168046214386214386

    LENGTH OF LT LINE (KM)170113317975948621021261631082470963766517830085992179446504065040

    NOs. SINGLE PHASE TRANSFORMERS075962988152244993917419209411491338248653304130423398333983

    A B CABLE IN KMS19870082474136037774964694204752051175038536408140623453734537

    % T & D LOSSES FOR 11-12 (UPTO JULY,11)19.1021.5418.3613.7516.3018.4823.3419.3616.8423.7321.8719.82

    (3)Business Dimensions

    Revenue Sub-Divisions1015231214741610131251125125

    Total Active Consumers AS ON 30.06.20111938362535125162752075182226951393836251169247902261818268943102983224236682423668

    (a) Domestic154418194920423013144940163241108053220158721016922363223140586679319473251947325

    (b) Agriculture (Flat)011285328618159272435454346700310565724202642026

    (c ) Agriculture (Metered)326261534129429142301591270741585716539842195215033817741217741281475

    (D) Total Agriculture32637438445804730132883162528193241653984211262656910219438219438

    (e) PHED194171512938001705570712964136011711402197289728

    Annual Revenue (2010-11) (Rs. In Crores)456.35420.64527.10227.63329.211960.93427.08197.91293.03225.161143.183104.113104.1101

    Monthly Average Revenue (Rs. In Crores)38.0335.0543.9218.9727.43163.4135.5916.4924.4218.7695.27258.68258.68

    (4)FEEDER RENOVATION PROGRAM0

    Total Rural Feeders Covered0777335129480478127232636822921427010813407340722019

    0687335129480424127218236822921425710683250325035278

    Villages getting 24 HRs. Supply0105891545569712645024891759162926239465957108481084825275

    0900005401440001313157157012842

    Total 3 Phase Trans. To be installed as on 31.03.10204381169550719078145631785625406064339750059325237918633186331

    Total 3 Phase Trans. installed up to JULY.111967511695507190781408017856129460643397500592932375985053

    BALANCE 3 Phase Trans. To be installed7630004830124600032321278

    (5)RGGVY015847

    Scheme costRGGVY--------2853.852981.291236.922367.4120995.861338.7831774.112333.903256.163498.462078.5411167.0642941.1742941.1744449.248372

    AREP603.53603.53222.85681.69904.541508.071508.07119633

    No. of Unelectrifies/ Deelectrified villages coveredRGGVY--------1732183066898998205132179115271525152529931

    AREP60604611115721721725768

    No of villages electrifiedRGGVY--------173158302079853118013215264701001100140580

    AREP55554611115721221239689

    (6)BPL Connections covered in Scheme (RGGVY)--------303652933424566542176012410368208974414813983534077543021696953786693786693057

    Nos.of BPL connections released (upto JULY.11)--------21198366588246365899363712911918330744314333894037936139053258236258236139025

    (7)AGRICULTURE

    Agriculture Connections IN 2010-11DN ISSUED4172225264155872827041711193713703687329674677467

    DN DEPOSITED (Including Dep. As on 31.03.10)35150104216522493290814421468737151707962158379672265422654

    CONN. RELEASED2442795813832219262612871290033591501936151273082020820208

    BALANCE ( Deleting the Cancelled Appl.)164863254229227155157629220516756521412141

    Agriculture Connections IN 2011-12DN ISSUED JULY,111609296789229482365767140313819179110062650926623297

    DN DEPOSITED (Including Dep. As on 31.03.11) UPTO JULY,111244453283220061753394796118731119842130751411310213102

    CONN. RELEASED UP TO JYLY,1127784748132173841262494159109432119424562456

    BALANCE ( Deleting the Cancelled Appl.)01649480781178115683106569137996073387539471051610516

    No of SC AG released During 2011-12 up to JULY,11031623165914624584220113563817701354S

    (8)Mukhymantri sabke liye Vidyut Yojana00

    Total Nos. of Groups Applied (UP TO JULY,11)0542423238133754075021294027679510556135281646816468

    Total DN Issued to Groups (UPTO JULY,11)039352173185925052377784126095105369182996139613

    Total DN Deposited (UPTO JULY 11)03080163227301631164579010408399300152273127312

    Groups Electrified Upto 31.3.20110298216322516145514552839098399300139166746674

    Groups Electrified in 2011-12 (UPTO JULY, 11)039001719103019500095396396

    TOTAL GROUP ELECTRIFIED03021163226871546145558410048399300148670707070

    No. of Cluster Sanctioned/Domestic Applications Covered020829031260366389193622466832832

    01599436034805028743112152288176372866026602

    No. of Cluster Connections Released/Domestic Connections Released03514312523020000000200200

    028611010570189011650000011651165

    BALANCE GROUPS TO BE ELECRIFIED AGAINST DN DEPOSITED Deleting cancelled appl.)05900428719207122000122329

    TOTAL DL CONNECTIONS RELEASED (UP TO JULY, 2011)0206771655241580796901110391806341780863175697404892048920

    (9)APDRP DETAILS

    TOTAL SCHEMES (NOS.)7

    COST OF SANCTIONED SCHEMES (RS. IN CRORE)359.29

    EXPENDITURE INCURRED (RS. IN CRORE)311.74

  • Background performance of JODHPUR DISCOM*

    INDEX

    Senior / Circle Officers Meeting Formats & details of Presenting Officer

    Format No.ParticularsTo be presented by ZCEs in IDCF MeetingsTo be presented by the officer in Sr. Officer`s MeetingsTo be presented by the officers in circle Meetings

    GOR-10Performance at a glanceZCEs

    SOM-1Background performance of Circle -year wiseSE(O&M)AEN (O&M)

    SOM-2Electrification of Villages & Dhanies FY 08-09ZCEsSE(O&M)AEN (O&M)

    SOM-3Status of release of DL connections in Rural areas during FY 08-09ZCEsSE(O&M)AEN (O&M)

    SOM-4Status of release of BPL connections during 2008-09ZCEsSE(O&M)AEN (O&M)

    SOM-5Status of AG. DN deposited & connections Released during FY 08-09ZCEsSE(O&M)AEN (O&M)

    SOM-6Progress of feeder RenovationZCEsSE(O&M)AEN (O&M)

    SOM-7Villages getting 24 Hrs supply / withdrawn and restoration of supplyZCEsSE(O&M)AEN (O&M)

    SOM-8Action Taken report on Feeder Manager's Reports FY 08-09SE(O&M)AEN (O&M)

    SOM-9Zonal Feeder Vigilance Officers checkings & action taken on ZFVO reports during FY 08-09ZCEsZonal CesZonal Vigilance Officer

    SOM-10Energy audit reports of Rural feeders, Urban & Industrial areasZCEsSE(O&M)AEN (O&M)

    SOM-11Sub-division wise T&D Loss and ATC other than HT consumersZCEsSE(O&M)AEN (O&M)

    SOM-11AAction Taken report of selected Sub-division for performance improvementSE(O&M)AEN (O&M)

    SOM-12Urban Focus Programme : District H.Q. Muncipal Town wise T & D Losses other than HT FY 08-09ZCEsSE (O&M)AEN (O&M)

    SOM-13Urban Focus Programme : Villages having More than 5000 population & T & D Losses Other than HT consumers FY 08-09SE(O&M)AEN (O&M)

    SOM-14Sub division Wise Revenue analysis FY 2008-09SE(O&M)AEN (O&M)

    SOM-15Monitoring of the Reduction of O/S >10000, >20000, >50000, >1Lac on regular consumersSE(O&M)AEN (O&M)

    SOM-16Analysis of rate of burning of distribution transformers in rural area FY 08-09ZCEsSE(O&M)AEN (O&M)

    SOM-17Analysis of Power Transformers Failure & ATR by M&P wing for FY 08-09ZCEsSE(M&P)XEN(M&P)

    SOM-18Progress of 11kV Feeder Metering as on reporting monthZCEsSE(M&P)XEN(M&P)

    SOM-19Theft of 3 & 1 Phase transformers, Conductors, Oil and other materialZCEsASP vig.XEN (Vig.)

    SOM-20PROGRESS OF VIGILANCE CHECKING up to Reporting Month FY 2008-09ZCEsASP vig.XEN (Vig.)

    SOM-21Status of Consumers Grievances Redressal in ChhaupalsZCEsSE(O&M)AEN (O&M)

    SOM-22Progress of Various Capital Works (10 point progress)SE(O&M)AEN (O&M)

    SOM-23Installation of small DTs in Urban areas for Agriculture consumersSE(O&M)AEN (O&M)

    SOM-24Renovation of 11 kV feeders having industrial load as urban focus programme (G-Type)SE(O&M)AEN (O&M)

    SOM-25Status of defective meterZCEsSE(M&P)XEN(M&P)

    GOR-7Compliance of Honble CM Visits & Budget AnnouncementsZCEs

    Background- som 1 (2)

    Jodhpur Vidyut Vitran Nigam Limited

    Background performance of JODHPUR DISCOM

    Reporting Month:-July,11

    S.N.ActivityUnit2003-042004-052005-062006-072007-082008-092009-102010-112011-12 up to July 11

    123456789101112

    1Total ConsumersNos185164419196432017671211423122540802461433264422728040612847672

    2RegularNos158511615844861659525173800618743042077773223809323859842423668

    3PDCNos266528335157358146376225379776383660406134418077424004

    Energy Available721958236090027904579936111026312650513423648440

    4Energy SaleLac unit4263347385526546077772209805169586510720538840

    5Growth in sale Vs last year%11.1411.1215.4318.8111.5019.0611.8312.02

    Energy Available to HTLac unit78978395986912071122071246512389139654910

    Energy Sale to HTLac unit78978395986912071122071246512389139654910

    64298739658015878386871549779811411612027143530

    347363899042785487066000268051834769324033930

    6% T&D loss other than HT consumers%45.9847.2946.6237.8631.1530.4226.8522.4822.05

    6A% T&D loss with HT consumers%40.9542.4741.5132.8127.3326.9824.2220.1419.82

    6A% T&D loss with HT consumers%40.9542.4741.5132.8127.3326.9824.2220.1419.82

    7Reduction in losses V/s last year%1.52-0.95-8.70-5.48-0.35-2.76-4.08

    8AssessmentLac Rs137372154510186530207087228988248138277344310411113737

    9Growth in assessment V/s last year%12.4820.7211.0210.588.3611.7711.92

    10RealisationLac Rs13437714925717974420692722255024016926203731210499097

    11% Realisation%97.8296.6096.3699.9297.1996.7994.48100.5587.13

    12ATC%42.2344.4243.6432.8629.3729.3228.4019.7030.14

    13Out standingLac Rs170082213329871298893563043510583205616570759

    Note : - Where HT metered consumer not on dedicated feeder, energy supplied in respect to HT consumers deducted as Units billed of Consumers on H.T. metering plus 2 % of energy billed.

    ATC= (100 - (100- % energy loss) X % realisation / 100 )

    Signature of presenting officer, name, seal

    Background- som 1

    Jodhpur Vidyut Vitran Nigam Limited

    Background performance of JODHPUR DISCOM

    Reporting Month:-July,11

    S.N.ActivityUnit2003-042004-052005-062006-072007-082008-092009-102010-112011-12 up to July 11

    123456789101112

    1Total ConsumersNos185164419196432017671211423122540802461433264422728040612847672

    2RegularNos158511615844861659525173800618743042077773223809323859842423668

    3PDCNos266528335157358146376225379776383660406134418077424004

    4Energy AvailableLac unit721958236090027904579936111026312650513423648440

    5Energy SaleLac unit4263347385526546077772209805169586510720538840

    6Growth in sale Vs last year%11.1411.1215.4318.8111.5019.0611.8312.02

    7% T&D loss other than HT consumers%45.9847.2946.6237.8631.1530.4226.8522.4822.05

    7A% T&D loss with HT consumers%40.9542.4741.5132.8127.3326.9824.2220.1419.82

    8Reduction in losses V/s last year%1.52-0.96-8.70-5.48-0.35-2.76-4.08-0.14

    9AssessmentLac Rs137372154510186530207087228988248138277344310411113737

    10Growth in assessment V/s last year%12.4820.7211.0210.588.3611.7711.928.99

    11RealisationLac Rs13437714925717974420692722255024016926203731210499097

    12% Realisation%97.8296.6096.3699.9297.1996.7994.48100.5587.13

    13ATC%42.2444.4343.6432.8629.3729.3328.4019.7030.14

    14Out standingLac Rs170082213329871298893563043510583205616570759

    Note : - Where HT metered consumer not on dedicated feeder, energy supplied in respect to HT consumers deducted as Units billed of Consumers on H.T. metering plus 2 % of energy billed.

    ATC= (100 - (100- % energy loss) X % realisation / 100 )

    Signature of presenting officer, name, seal

    RGGVY som-2 old

    Jodhpur Vidyut Vitran Nigam Limited: JODHPUR

    SOM-2

    Electrification of Villages & Dhanies FY 08-09

    Reporting MonthJUNE.08

    Sr.noDistrict & CircleElectrification of DhaniesElectrification of Villages

    IN MMSLVIN RGGVYIN RGGVY

    No. of DhaniesSanctionedElectirfiedTargetsElectirfiedTargetsWork done

    During the Monthup to the MonthDuring the Monthup to the MonthDuring the Monthup to the Month

    1234567891011

    1City Circle

    2Distt. Circle25933501111000000

    Jodhpur Distt.25933501111000000

    3Jalore Distt./Circle4465233521614654000

    Pali Distt.163000173002100

    Sirohi Distt.05000000000

    4Pali Circle1635000173002100

    Barmer Distt599207611000000

    Jsm. Distt.660006900000

    5Barmer Circle6652076116900000

    Jodhpur Zone3867659507440346542100

    6Bikaner Distt./Circle17617610102400900

    7Hngh.Distt./Circle5319110002500

    8Sggnr.Distt./Circle3524390003500

    Churu Distt.3454001400000

    0000100000

    9Churu circle3454001500000

    Bikaner Zone609223142039006900

    Total Discom4476882649444246549000

    Zix RGGVY-2

    _______ Vidyut Vitran Nigam Limited

    SOM-2

    Electrification of Villages & Dhanies FY 08-09

    To be presented by SE (O&M)Reporting Month

    Sr.noDistrictElectrification of DhaniesElectrification of Villages

    IN MMSLVIN RGGVYIN RGGVY

    Eligible Dhanies ( 5000 populationIndustrial areas

    Total (nos)>20% Loss feeders (Nos)% defects {(4/3)*100}No of feeders getting < 18 hrs domestic supply% defects {(6/3)*100}Total (Nos)No of DTsNo of DTs having T&D loss > 10% other than HT*% defects {10/9)*100}Total Nos of Industrial AreasNo of Ind. Areas in which T&D loss > 3%% defects {(13/12)*100}

    1234567891011121314

    1City Circle

    2Distt. Circle

    Total JU Distt.

    3Jalore Distt/Circle

    Pali Distt.

    Sirohi Distt.

    3Pali Circle

    Barmer Distt

    Jsm. Distt.

    4Barmer Circle

    Jodhpur Zone

    5Bikaner Distt./circle

    6Hngh.Distt./circle

    7Sggnr.Distt./circle

    Churu DisttSignature of presenting officer, name, seal

    P.S. Ladnu

    8Churu ircle

    Bikaner Zone

    Total Discom

    Sub_Div LT T&D-11

    SOM-11

    Jodhpur Vidyut Vitran Nigam Limited

    Sub-division wise T&D Loss and ATC other than HT consumers

    To be presented by SE(O&M)Up to Reporting Month:-

    Sr. NoName of Sub-division, Division, circleLast Year (upto reporting month)This Year (upto reporting month)

    Energy Supplied (in LU)Energy Sold (in LU)% T&D loss% Realisation% ATCEnergy Supplied (in LU)Energy Sold (in LU)% T&D loss% Realisation% ATC

    123456789101112

    Circle Total

    Note : - Where HT metered consumer not on dedicated feeder, energy supplied in respect to HT consumers deducted as Units billed of Consumers on H.T. metering plus 2 % of energy billed.

    ATC= (100 - (100- % energy loss) X % realisation / 100 )

    Signature of presenting officer, name, seal

    Sub-division-11A

    JODHPUR VIDYUT VITRAN NIGAM LIMITED

    Action Taken report of selected Sub-division for performance improvement

    To be presented by SE (O&M)SOM-11A

    Reporting month

    S noActivityProgress/Report/Action taken

    1234567

    1Name of Sub-division :Name of AEN :

    2Total No of consumersDomesticNDSAGindustrialothers

    Total no of consumers ( )

    3Energy drawl in UnitsEnergy drawl in UnitsEnergy sold other than HT consumersEnergy sold of HT consumersEnergy loss other than HT consumersEnergy loss with HT consumers

    Rural area other than 5000 population villages

    Urban areas ( MTs/City)

    Urban areas ( > 5000 villages)

    Total

    4Action Taken for reduction of T&D losses

    4aVigilance effortsNo of checkingTheft detectedAssessmentAmount realisedFIR lodged

    O&M wing

    Vig wing

    FIR lodged

    4bSustainability of FRP/Urban FocusNo of cable cutsNo of DTs damagedNO of damage of single phase transformersNo of meters found tamperedNo of FIR lodged

    No of instances detected

    4cNo of feeders checked by Feeder ManagerNo of defaults detectedNo of cases pending for action on Feeder manager's report

    Signature of presenting officer, name, seal

    UFP LT-som12

    SOM-12

    Jodhpur Vidyut Vitran Nigam Limited

    Urban Focus Programme : District H.Q.,Muncipal Town wise T & D Losses other than HT

    To be presented by SEs (O&M)Reporting Month:-

    Sr. No.Name of Sub-division/ DivisionName of M.Town/Distt.H.Q.No. of Consumerup to reporting month Last yearup to reporting month This year

    Energy Supplied (in LU)Energy Sold (in LU)% LossEnergy Supplied (in LU)Energy Sold (in LU)% Loss

    12345678910

    0.000.00

    0.000.00

    0.000.00

    0.000.00

    0.000.00

    0.000.00

    Total0.000.00

    Signature of presenting officer, name, seal

    UFP 5K- som13

    SOM-13

    Jodhpur Vidyut Vitran Nigam Limited

    Urban Focus Programme : Villages having More than 5000 population & T & D Losses Other than HT consumers

    To be presented by SE(O&M)Reporting Month:-

    Sr. No.Name of Sub-division/ DivisionNo of Villages having more than 5000 populationTotal No. of Consumerup to reporting month Last yearup to reporting month This year

    Energy Supplied (in LU)Energy Sold (in LU)% LossEnergy Supplied (in LU)Energy Sold (in LU)% Loss

    12345678910

    0.000.00

    0.000.00

    0.000.00

    0.000.00

    0.000.00

    0.000.00

    Total0.000.00

    Signature of presenting officer, name, seal

    SD Revenue-14

    SOM-14

    Jodhpur Vidyut Vitran Nigam Limited

    Sub division Wise Revenue analysis FY 2008-09

    To be presented by SE (O&M)Reporting Month

    S.No.Name of Sub-Div/Div/CircleAssessment in Lacs Rs.Realisation in Lacs Rs.% RealisationOutstanding in Lacs Rs.

    during the Month last yearduring the Month this yearUpto the Month last yearUpto the Month this yearduring the Month last yearduring the Month this yearUpto the Month last yearUpto the Month this yearduring the Month last yearduring the Month this yearUpto the Month last yearUpto the Month this yearAs on 31 st Mar-08at the end of reporting month

    12345678910111213141516

    1CITY CIRCLE

    2DISTT. CIRCLE

    3JALORE

    4PALI

    5BARMER

    JODHPUR ZONE

    6BIKANER

    7HANMUNGARH

    8SGGNR.

    9CHURU

    BIKANER ZONE

    TOTAL DISCOM

    Signature of presenting officer, name, seal

    SD Revenue-14 A

    SOM-14(A)

    Jodhpur Vidyut Vitran Nigam Limited

    Sub division Wise Revenue analysis FY 2008-09 (other than HT)

    To be presented by SE (O&M)Reporting Month

    S.No.Name of Sub-Div/Div/CircleAssessment in Lacs Rs.Realisation in Lacs Rs.% RealisationOutstanding in Lacs Rs.

    during the Month last yearduring the Month this yearUpto the Month last yearUpto the Month this yearduring the Month last yearduring the Month this yearUpto the Month last yearUpto the Month this yearduring the Month last yearduring the Month this yearUpto the Month last yearUpto the Month this yearAs on 31 st Mar-08at the end of reporting month

    12345678910111213141516

    1CITY CIRCLE

    2DISTT. CIRCLE

    3JALORE

    4PALI

    5BARMER

    JODHPUR ZONE

    6BIKANER

    7HANMUNGARH

    8SGGNR.

    9CHURU

    BIKANER ZONE

    TOTAL DISCOM

    Signature of presenting officer, name, seal

    O-S-som15

    SOM-15

    Jodhpur Vidyut Vitran Nigam Limited

    Monitoring of the Reduction of O/S >10000, >20000, >50000, >1Lac on regular consumers

    To be presented by circle SE (O&M)Reporting Month( Amount in Lacs )

    Sr. no.Name of Sub-division / DivisionRs.10,000/- to 20,000/- (AEN)Rs.20,000/- to 50,000/- (XEN)Rs.50,001/- to 1,00,000/-(SE)More than Rs. 1,00,000/- (ZCE)Total

    No.of Cases at the end of last monthNo.of Cases at the end of repo. monthDues in lacs RsNo.of Cases at the end of last monthNo.of Cases at the end of repo. monthAmt. in lacsNo.of Cases at the end of last monthNo.of Cases at the end of repo. monthAmt. in lacsNo.of Cases at the end of last monthNo.of Cases at the end of repo. monthAmt. in lacsNo.of Cases at the end of last monthNo.of Cases at the end of repo. monthAmt. in lacs

    12345678910111213141516171819

    1CITY CIRCLE

    2DISTT. CIRCLE

    3JALORE

    4PALI

    5BARMER

    JODHPUR ZONE

    6BIKANER

    7HANMUNGARH

    8SGGNR.

    9CHURU

    BIKANER ZONESignature of presenting officer, name, seal

    TOTAL DISCOM

    DT Fail-som 16

    SOM-16

    Jodhpur Vidyut Vitran Nigam Limited

    Analysis of rate of burning of distribution transformers in rural area Fy 08-09

    To be presented by SE(O&M)Reporting MonthJUNE 08

    Name of Sub-division/ DivisionThree phase transformersSingle phase transformers

    S. NO.No of three Ph transformers Installed as on 31.03.08No of DT Failed up to the reporting month% of DT FailureNo of single Ph transformers Installed as on 31.03.08No of DT Failed up to the reporting month% of DT Failure

    Last yearThis yearLast yearThis yearLast yearThis yearLast yearThis year

    123456789101112

    1City Circle236941660.600.93

    2Distt. Circle278484555950.590.71322932630.330.65

    Total JU Distt.302174966610.590.73322932630.330.65

    3Jalore221323885380.690.81226516270.240.40

    Pali Distt.121931812210.500.60282732490.380.58

    Sirohi Distt.65991171490.610.75909590.180.33

    3Pali Circle187922983700.540.66373637580.330.52

    Barmer Distt17444172990.330.192312470.060.10

    Jsm. Distt.390861460.560.39297000.000.00

    4Barmer Circle213522331450.370.232609470.050.09

    Jodhpur Zone92493141517140.550.6211839891550.250.44

    5Bikaner147163402680.860.61700000.000.00

    6Hngh.111642351500.620.45330538720.380.73

    7Sggnr.92181831750.670.63325262620.640.64

    Churu Distt94042271800.850.6424035150.070.21

    P.S. Ladnu124624140.680.37325550.510.51

    8Churu ircle106502511940.830.61272810200.120.24

    Bikaner Zone4574810097870.750.5799851101540.370.51

    Total Discom138241242425010.620.60218241993090.300.47

    Pow Tr Fail- som 17

    Jodhpur Vidyut Vitran Nigam Limited

    RevisedSOM-17

    Analysis of Power Transformers Failure & ATR by M&P wing for FY 08-09

    To be presented by SE (M&P)Reporting MonthJUNE 08

    S NoCirclePower TransformersNo of Transformers checked by M&P wingNo of S/s at which defaults detectedNo of Power transformers burnt where defects remained un-attemptedwhere draft charge sheet served to AEN & XEN

    Installed as on 31st Mar 08 (Nos)Failed up to the reporting month (Nos)% Failed up to the monthNo of S/s at which all defects rectifiedNo of Balance S/s

    Last yearThis yearLast yearThis year

    1234567891011

    1City Circle61211.210.550000

    2Distt. Circle264140.140.510000

    Total JU Distt.325350.340.510000

    3Jalore154250.481.080000

    Pali Distt.1170100.280000

    Sirohi Distt.66120.521.010000

    4Pali Circle183130.190.550000

    Barmer Distt144100.240.000000

    Jsm. Distt.380201.750000

    5Barmer Circle182120.190.370000

    Jodhpur Zone8447150.30.590000

    6Bikaner170230.410.5910000

    7Hngh.91110.380.379000

    8Sggnr.127200.530.0015000

    Churu Distt105521.630.6310000

    P.S. Ladnu10100.370.000000

    9Churu ircle115621.80.5810000

    Bikaner Zone5031160.750.4044000

    Total Discom134718210.470.5244000

    Fed met- som18

    Jodhpur Vidyut Vitran Nigam Limited

    SOM-18

    Progress of 11kV Feeder Metering as on reporting month

    To be presented by SE(M&P)Reporting MonthJUNE 2008

    S NoCircleTotal No of 11 kV FeedersMetering Equipments Installed as on 31.03.08Metering Equipments Installed in FY - 2008-09Total Metering Equipments Installed at the end of reporting monthBalance for Installation of metering equipments (5-9)No of defective (out of col. 9)

    As on 31.03.08Add up to the monthTotal (3+4)During the monthUpto the monthCTPTsMeters

    123456789101112

    1City Circle184018418400184004

    2Distt. Circle9750975952213965105236

    3Jalore Circle56905695690056905833

    4Pali Circle61506156141161501411

    5Barmer Circle67406746551365816670

    Jodhpur Zone301703017297441729912619184

    6Bikaner Circle5070507502225043041

    7HNGH. Circle30123324301113022200

    8SGGNR. Circle356035635600356000

    9Churu Circle3660366366003660150

    Bikaner Zone15302315531525331528251541

    DISCOM45472345704499720451951206125

    ASP Vig-19

    JODHPUR VIDYUT VITRAN NIGAM LIMITEDSOM-19

    Theft of 3 & 1 Phase transformers, Conductors, Oil and other material

    Presented by ASP vig.Reporting MonthJUNE 2008

    S NoCircleThree phase transformers theft casesSingle Phase transformers theft casesOil Theft casesConductor Theft cases

    During the monthupto the monthDuring the monthupto the monthDuring the monthupto the monthDuring the monthupto the month

    No. of casesFIR LodgedNo. of casesFIR LodgedNo. of casesFIR LodgedNo. of casesFIR LodgedNo. of casesFIR LodgedNo. of casesFIR LodgedNo. of casesFIR LodgedNo. of casesFIR Lodged

    123456789101112131415161718

    1CITY CIRCLE0000000000000000

    2DISTT. CIRCLE0033008800110077

    3JALORE0000000000000000

    3PALI0066002020001515004040

    4BARMER0011114311110000

    JODHPUR ZONE001010113231111717004747

    5BIKANER0000000000000000

    6HNGH.0000000000110000

    7SGGNR.0000000000000000

    8CHURU0000338800003131

    BIKANER ZONE0000338800113131

    DISCOM001010444039111818315048

    Vig- som 20

    SOM-20

    JODHPUR VIDYUT VITRAN NIGAM LIMITED

    PROGRESS OF VIGILANCE CHECKINGS up to Reporting Month FY 2008-09

    To be Presented by: ASP Vig.Reporting MonthJUNE 2008

    SnoName Circle/Zone/CVS & TotalTarget of Checking FY 07-07 (One Month)Monthly targets of CheckingTotal CheckingTheft DetectedAssessment in Lac Rs.Realisation in Lac Rs.Complaint / FIRChallan This Year

    Last YrThis YrLast YrThis YrLast YrThis YrLast YrThis YrLast YrThis Yr

    123456789101112131415

    1CITY CIRCLE13004103556211223.0614.1813.646.80010

    2DISTT.CIRCLE1770177310451117.1814.076.677.04381

    3JALORE1130547357293214.5211.335.703.411270

    4PALI230040789756628.7343.277.3110.52260

    5BARMER1600670408554225.1512.3714.567.35260

    JODHPUR ZONE81002211232724735978.6495.2247.8835.128481

    6BIKANER220036250313830011.3318.477.1410.48660

    7HNGH.14953624992513609.2916.184.2210.4973300

    8SGGNR.1825110193280756534.6329.6118.5715.151720

    9CHURU14952434251172577.3716.792.475.101341

    BIKANER ZONE7015206823591313148262.6281.0532.441.22109421

    CVS/ZONAL/M&P/APTPS80953892420215.6154.866.3039.060180

    DISCOM151954374507515842043156.87231.1386.58115.401171082

    Grivances som-21

    SOM-21

    Jodhpur Vidyut Vitran Nigam Limited

    Status of Consumers Grievances Redressal in Chaupals

    To be presented by SE (O&M)Reporting MonthMAY 08

    Name of Sub-division/Division/Circle33/11 kV s/sProgress of Chaupals organised during the monthProgress of Chaupals organised upto the month

    No of chaupals heldGrievances receivedRedressalNo of chaupals heldGrievances receivedRedressal

    Related to billsOthersRelated to billsOthersRelated to billsOthersRelated to billsOthers

    1234567891011

    City Circle36

    Distt. Circle20530129591295449159114159109

    Total JU Distt.24130129591295449159114159109

    Jalore119691387713877118206166206166

    Pali Distt.80621108911059126208180208180

    Sirohi Distt.38254218842188467620776207

    Pali Circle11887152277152247172284387284387

    Barmer Distt121222415520131713028727234

    Jsm. Distt.326827822451219812137

    Barmer Circle1532832182281531164248539371

    Jodhpur Zone63121445159544753145569111526881033

    Bikaner135162772772548274827

    Hngh.6518253525353260586058

    Sggnr.85276264626456124153124153

    Churu Distt7920133513354125822582

    P.S. Ladnu8204044110110

    Churu ircle8722133913394526922692

    Bikaner Zone37283127145127145158258330258330

    Total Discom100329757874057467661394914829461363

    Capital-22

    JodhpurVdyut Vitran Nigam Limited

    Progress of Various Capital Works (10 point progress)

    SOM-22

    To be presented by SE (O&M)Up to Reporting month:

    S NoSub-Div/Div/Circle1.Providing of interconnections as perthe sanction issued from SE (Plan)2a. Providing 33 KV breakers.2b.Providing of 11 kV breakers on all 33 KV sub-stations3.Laying of Neutral wire in kmsLaying of neutral wire.4.Laying of Rabbit Conductor upto first tapping point in kms.5.SIP renovation programme i.e. one consumer one transformer (Rural areas).6.Water Works renovation programme (Rural areas)7.Replacement of 25 KVA, 3 phase new transformers by 10/16 KVA where single connection exists8.Replacement of one phase 10/25 KVA transformers by one phase 5 MVA transformer9.Providing of additional poles in long span lines.10.Guarding of road crossing.

    Identified targetwork completedIdentified targetwork completedIdentified targetwork completedIdentified targetwork completedIdentified targetwork completedIdentified targetwork completedIdentified targetwork completedIdentified targetwork completedIdentified targetwork completedIdentified targetwork completedIdentified targetwork completed

    123456789101112131415161718192021222324

    1City Circle

    2Distt. Circle

    3Jalore Circle

    4Pali Circle

    5Barmer Circle

    Jodhpur Zone

    6Bikaner Circle

    7HNGH. Circle

    8SGGNR. Circle

    9Churu Circle

    Bikaner Zone

    DISCOM

    Total

    Identified targets: Work to be carried out/ balance / incomplete / sanctioned as on 31.03.08 in (Nos.)

    Note: Action on the point 7 may be keep pending till sufficient availability of DTs

    Copy to : SE Plan

    Signature of presenting officer, name, seal

    DT urban 23

    Jodhpur Vidyut Vitran Nigam Limited

    Installation of small DTs in Urban areas for Agriculture consumers

    To be presented by SE (O&M)Reporting Month :SOM - 23

    Nos.Name of sub-division.div/CircleName of City/MTsNo of Ag. ConsumersNo of small DTs with meterslikely date of completion

    To be installedInstalled during the monthInstalled up to the month

    12346789

    City Circle

    Distt. Circle

    Total JU Distt.0000

    Jalore

    Pali Distt.

    Sirohi Distt.

    Pali Circle0000

    Barmer Distt

    Jsm. Distt.

    Barmer Circle0000

    Jodhpur Zone0000

    Bikaner

    Hngh.

    Sggnr.

    Churu Distt

    P.S. Ladnu

    Churu ircle0000

    Bikaner Zone0000

    Total Discom0000

    Signature of presenting officer, name, seal

    G-Type 24

    Jodhpur Vidyut Vitran Nigam Limited

    Renovation of 11 kV feeders having Intensive Industrial load as urban focus programme ( G-Type )

    To be presented by SE (O&M)Reporting Month :SOM - 24

    Nos.Name of sub-division.div/CircleName of feedersFeeder codeName of locatilty feededConsumers on the feederWork Completed / likely date of completion

    IndustrialAg.Others

    123456789

    Total

    Signature of presenting officer, name, seal

    GOR 7

    JODHPUR DISCOM : JODHPUR

    GoR - 7

    ekuuh; eq[;ea=h egksn;k }kjk dh xbZ ?kks"k.kkvksa dh fdz;kfUofr fLFkfr

    -lftys dk uke?kks"k.kk dk LFkkufnukad?kks"k.kk@vk'oklu dk fooj.kfdz;kfUofr@dh xbZZ dk;Zokgh dk fooj.kfdz;kfUofr dh fLFkfr

    ;fn gka rks fdz;kfUofr dh frfFk;fn ugha rks fdz;kfUofr dh laHkkfor frfFk

    12345678

    1tks/kiqjtks/kiqj15&8&07twu 2008 rd izns'ktks/kiqj esa 777Nhtr de gksus

    ds 3500 xkWoksa dksxkzeh.k QhMjksa dkds dkj.k 1112

    Nhtr de gksus ijlq/kkj dk;Z iw.kZxkWoksa dks 24?kaVs

    24 ?kaVs fo|qr vkiwfrZfo|qr vkiwfrZ dh

    fd;k tkuk aAtk jgh gS A

    2tks/kiqjtks/kiqj2008lkykokl tks/kiqj16 [kEHksa [kM+s dj

    esa 33@11 ds-oh-ykbZu [kspuss dk

    lc&LVs'ku fuekZ.kdk;Z izkjEHk

    dh ?ksk"k.kk A

    3tkykSj&&&&

    4ckM+esjckykssrjk15&12&0733@11ds-oh- fcBwtk ,oanksuks mipkSfd;kW31 tqykbZ 2008 rd

    ikVksnhLohd`r gks pqdh gS Adk;Z iw.kZ dj

    mipkSfd;ksa ds fuekZ.kfdz;kfUor fd;k tkosxk

    dh ?kks"k.kk dh xbZ A

    5ckM+esjflokuk04&05&08ftys esa fofHkUu l~Fkkuksadk;Z Lohd`rlkeku miyC/k gksus ds

    ij 04 33 ds-oh-gks pqdk gS Ackn gh lEHkkfor frFkh

    1- lSyk?kskf"kr dh tk ldrh gS

    2- djekokl

    3- pkS/kfj;ksa dh

  • *

  • *

  • *

  • *AG,DL & BPL CONNECTIONS

  • Status of AG. DN deposited & connections Released (2011-12)*

    Name GOR-D

    GOR-D

    1 TO 11 For The Month of July, 2011

    Jodhpur Discom

    GOR-D-01

    Progress of Distribution Companies ( JODHPUR DISCOM)

    Status of AG. DN deposited & connections Released Revised

    Upto the Month:-July.2011July,11GOR-D-01

    Sr. No.Name of DistrictNo of DN issued During 2011-12DN depositedAg. Connections released During 2011-12 out of Colmn. 8% Connection Released of Col.8Cancelled after D.N. Deposited During 2011-12Balance Pending for connection

    Pending As on 31.03.11During 2011-12Total

    GENERAL CATEGORYOTHERSDuring the monthUpto the month

    123456678811910

    1Jodhpur557152260936496221796244546378031.90161649796

    2Pali93136967635546953211478.835480241

    3Sirohi6802128922541315788327485.773781177

    4Jalore2769179294822980017772006501326.58931781269

    5Barmer1794571236522790815261753741739.87121568250

    6Jaisalmer7244376715594239394628421.32031033

    Jodhpur Zone124691563140321577261063857962667126415.8812965691766

    7Bikaner2729106337922923621581187311949426.3701379634

    8HMH170586179120551191411191815914.210960201

    9SGNR768238100613058418427010912.950733364

    10Churu14137832196664201225129124443233.460859537

    11Nagaur (Ps.Ladnu)17118121516000.0001612

    Churu Cir.14307842214674221240130724443233.460875549

    Bikaner Zone663221718803565160045765141451119423.23039471748

    Total Discom191013734228352142421010961131031118245818.76129105163514

    Note:-D.N. issued Figures of Bikaner and Churu Circles as per their RE formats of July, 2011.

    GOR-D-2

    JODHPUR DISCOM

    Status of release of DL connections during FY 2011-12Tentative

    Upto the Month :-July,11GOR-D-02

    S.NoName of Distt./CircleApplication for DL connections pendingApplication for DL connections pendingconnections released During 2011-12Cancelled up the monthPending at the end of Reporting month

    As on 31.03.11Received during FY 2011-12RuralUrbanTotalRuralUrbanTotal released

    RuralUrbanRuralUrbanDuring the monthup to the monthDuring the monthup to the monthDuring the monthup to the month% ReleasedRuralUrbanRuralUrbanBPL DURING monthAPL DURING monthBPL DURING 2011-12APL DURING 2011-12

    12345634567896789101112

    1City Circle Jod.021101847020582058003321704332170482.800003540000

    2Distt. Circle Jod.176201244018212216383362197421154265951862210445120.83575331679811711919963143951

    Total JU Distt.1762033540182059216382394240322115426542718902542615526.28575331679847111919963143951

    3Pali Distt.38585105027115588851665105501251396827810131529498154.3613186935995830125103968

    4Sirohi Distt.653101109739617504972247369917113341482125858.11493378412303690917

    5Jalore Distt.62511262572367882349393165943252117294711354642.068563047151691544404272825

    6Barmer Distt3753925619284543946771040177515259411632663129207.3334319365303653082074002194

    7Jsm. Distt.35761520291357644340190127518053077.671053439258000127

    Total Barmer Cir.41115408192874543043115344196515272112150663632277.363532439969623

    Jodhpur Zone694971480146424722841396202903414844151231056404459001916722.03315118965865196958142630114113982

    8Bikaner73606492737835100971484115811921460106892298235220.372588612584019201460

    9Hanumangarh2226313327710485503136168647193078248871967394961.36388402037450071903078

    10Sriganganagar337120441021328747315329005658257735812251016380250.4014035934932480658772500

    11Churu37518152343130760942122821650819252521144760306940.385031133666865050801925

    12Nagaur (Ladanu)127221421176169319718901276432914915679243.687349774401270643

    Total Churu Cir.502383627641483778723191010663525682811293916386141.025761174643909063502568

    Bikaner Zone1798020021288046943086066963755622049683993428131971396439.97239222418785219102204779606

    Total Discom874773482275229416114999128981278977048248062049832590973313127.1755434138465041605816467121823588

    Note:- Bikaner Zone Information not Received

    GOR-D-03

    Progress of Distribution Companies ( JODHPUR DISCOM)

    Status of release of BPL connections FY 2011-12

    Upto the Month:-July,11GOR-D-03

    Sr. NoName of DistrictBPL families as per Notification of GoR 2002Total BPL/Kutir Jyoti connections released as on 31.03.11Progress of release of BPL Connections FY 2011-12BPL AS ONRURAL DURING MONTH

    TargetReleasedBalanceTOTAL GoR-D-2APLBPL

    During the monthUpto the monthMMSLVYOTHER

    12345678

    1Jodhpur35658279280119314-31428242211541992119

    2Pali53140482330000482331251012510

    3Sirohi297091355200001355236903690

    4Jalore58655429770154427-42743404594325115154

    5Barmer74843225285091530840050515229285150207308

    6Jaisalmer15931104330000104330000

    Jodhpur Zone2679361656515091558111414977416679248443293934581

    7Bikaner848424084100004084119201920

    8Hanumangarh43386367611101900110193676171907190

    9SGNGR6345646530924807791714660765806580

    10Churu656505087200005087250805080

    11Nagaur (Ps. Ladnu)328833170000331712701270

    Total Churu Cir.689385418900005418963506350

    Bikaner Zone26062217832120267077201901783982204022040

    Total Discom5285583439727118258112186996434519070483296138581

    * Recently sanctioned by REC

    ** Pending for sanction with REC183368

    APRIL,102023

    852

    GOR-D-04(a) Dist. Wise

    Progress of Distribution Companies ( JODHPUR DISCOM)

    RGGVY Financial Status

    Upto the Month:-July,11GOR-D-04 (a)

    S.No.Name of Distrcit/DiscomNo. of SchemesSanctioned Cost (Rs. Lacs)Amount Released (in Lacs Rs.)Utilisation (in Lacs Rs.) (Tentavive)% Utilised

    1234567

    A. Sanctioned Before to Feb-08

    1HN.Garh (AREP)1222.85133.72211.95158.50

    2SG.Nagar (AREP)1681.69409.01520.84127.34

    3Jaisalmer (AREP)1603.53181.06593.00327.52

    4Jaisalmer11338.781144.251377.01120.34

    5Bikaner12333.901851.602047.76110.59

    6Sirohi11236.92963.30998.34103.64

    7Jalore12367.411805.321856.00102.81

    8Jodhpur12853.852385.922454.84102.89

    9Churu11962.481457.311583.14108.63

    10Nagaur(P.S Ladnu)1116.0687.5780.0091.36

    Jodhpur Discom(A)1013717.4710419.0611722.88112.51

    B. Sanctioned After Feb-08

    1Hanumangarh13256.161634.391533.7693.84

    2Sriganganagar13498.462042.10913.3944.73

    3Pali (PGCIL)12981.292496.622787.00111.63

    4Barmer (PGCIL)120995.8612420.3712055.0097.06

    Jodhpur Discom(B)430731.7718593.4817289.1592.99

    G.Total (A+B)1444449.2429012.5429012.03100.00

    1Jodhpur12853.852385.922454.84102.89

    2Pali12981.292496.622787111.63

    3Sirohi11236.92963.3998.34103.64

    4Jalore12367.411805.321856102.81

    5Barmer120995.8612420.371205597.06

    6Jaisalmer21942.311325.311970.01148.65

    Jodhpur Zone732377.6421396.8422121.19103.39

    7Bikaner12333.91851.62047.76110.59

    8Hanumangarh23479.011768.111745.7198.73

    9SGNGR24180.152451.111434.2358.51

    10Churu11962.481457.311583.14108.63

    11Nagaur (Ps. Ladnu)1116.0687.578091.36

    Total Churu Cir.22078.541544.881663.14107.65

    Bikaner Zone712071.67615.76890.8490.48

    Total Discom1444449.2429012.5429012.03100.00

    GOR-D-04(b) Dist. Wise

    Progress of Distribution Companies ( JODHPUR DISCOM)

    Coverage & Progress under AREP & RGGVY Progress

    Upto the Month:-July,11GOR-D-04 (b)

    S.No.Name of DiscomNo. of SchemesCoverage ( Nos)Progress As on Month (Nos)% Achievement

    Electrification of Villages (DE/UE)Intensive ElectrificationConn. To BPLGen.DhaniesElectrification of Villages (DE/UE)Intensive ElectrificationConn. To BPLGen.DhaniesElectrification of Villages (DE/UE)Intensive ElectrificationConn. To BPLGen.Dhanies

    123456789101112131415161718

    A. Sanctioned Before to Feb-08

    1HN.Garh (AREP)14605163760460313322730100.000.00607.17604.520.00

    2SG.Nagar (AREP)1111012964701110400031620100.000.003100.78488.720.00

    3Jaisalmer (AREP)16002561237055035326091.670.0013.6726.350.00

    4Jaisalmer19834810112839869983227094690662100.0092.5370.1582.2389.86

    5Bikaner120558741481109513718055830744155603787.8095.0674.12142.09100.00

    6Sirohi1844724666899151844782461122350100.00100.0033.43124.8298.04

    7Jalore13066754217195821630524365892794016100.0078.5667.49142.68100.00

    10Jodhpur117388530365396731251738702119856399125100.0098.3169.81142.16100.00

    9Churu11184351488244787683135298319538754.5598.5868.561305.80100.00

    8Nagaur(P.S Ladnu)1097281426090962638505390.0098.9793.751943.46100.00

    Jodhpur Discom(A)10742387421604492562394707364814897516079538695.2894.1768.96173.7297.97

    B. Sanctioned After Feb-08

    1Hanumangarh1132157639319317042132525283002481532100.0033.3171.98782.8176.19

    2Sriganganagar1179250544133217253715262034940170902684.9224.7579.1778.6770.27

    3Pali (PGCIL)12191529334805517315913366583134713071.4399.78124.97389.1675.14

    4Barmer (PGCIL)1668123060124587313782071679363160262230.9913.5815.57272.881.60

    Jodhpur Discom(B)41000622617291038823163050622251092618927821050.6035.7463.19229.9612.88

    G.Total (A+B)1417421010038895413138520241213587325823625007359669.6358.1566.39190.3429.45

    Note:-Figures shown in shaded of column No. 6 (Coverage of Conn. to BPL) have been changed due to actual survey.

    1Jodhpur117388530365396731251738702119856399125100.0098.3169.81142.16100.