Power Grid failure: a reasonbehind blackout
Er. Ishu SethiPast: Uiet, Panjab university, chandigarh
7/28/2019 july 2012 indian blackout
2/37
July 30 , 0233 hrs. IST
Power outage in NorthernIndia
8 states plunged into darkness
7/28/2019 july 2012 indian blackout
3/37
7/28/2019 july 2012 indian blackout
4/37
7/28/2019 july 2012 indian blackout
5/37
7/28/2019 july 2012 indian blackout
6/37
7/28/2019 july 2012 indian blackout
7/37
7/28/2019 july 2012 indian blackout
8/37
7/28/2019 july 2012 indian blackout
9/37
7/28/2019 july 2012 indian blackout
10/37
July 31 , 1302 hrs. IST
Power outage in Northern , Eastern & North eastern India
Nearly half of India's population affected
22 out of 28 states in India, without power
7/28/2019 july 2012 indian blackout
11/37
7/28/2019 july 2012 indian blackout
12/37
Reasons behind the failure
Overdrawing of power by states namely Uttar Pradesh,Punjab, Haryana than the scheduled Quota
Overloading of Gwalior-Agra transmission linePeople
Low water level in Bakhra Dam
Sir Rajnikant charging his laptop
7/28/2019 july 2012 indian blackout
13/37
Reasons behind the failure
Overdrawing of power by states namely Uttar Pradesh,Punjab, Haryana than the scheduled Quota
Overloading of Gwalior-Agra transmission linePeople
Low water level in Bakhra Dam
Sir Rajnikant charging his laptop
7/28/2019 july 2012 indian blackout
14/37
Reasons behind the failure
Overdrawing of power by states namely Uttar Pradesh,Punjab, Haryana than the scheduled Quota
Overloading of Gwalior-Agra transmission linePeople
Low water level in Bakhra Dam
Sir Rajnikant charging his laptop
7/28/2019 july 2012 indian blackout
15/37
Suspected Reasons
Overdrawing of power by states namely Uttar Pradesh,Punjab, Haryana than the scheduled Quota
Overloading of Gwalior-Agra transmission line
7/28/2019 july 2012 indian blackout
16/37
7/28/2019 july 2012 indian blackout
17/37
Power overdrawl (July 30 0200 hrs.)
State % Over drawl
Punjab 11.87
Haryana 21.03
UP 12.94
www.powermin.nic.inwww.cercind.gov.in
7/28/2019 july 2012 indian blackout
18/37
Power drawl (July 30 0230 hrs.)
State Schedule(MW)
Actual(MW)
OD (+) / UD (-)(MW)
Punjab 4769 5092 323
Rajasthan 1717 1379 -338
Haryana 2586 3103 517
Delhi 2987 2715 -272
Uttarakhand 475 636 161
HP 88 -93 -181
UP 5475 6331 856
JK 683 -1 -683
Chandigarh 295 234 -61www.cercind.gov.in
7/28/2019 july 2012 indian blackout
19/37
Power overdrawl (July 30 0230 hrs.)
State % Over drawl
Punjab 6.77
Haryana 19.99
UP 15.63
7/28/2019 july 2012 indian blackout
20/37
Violating grid discipline and overdrawingmay be regular phenomenon
Preventive measure
Isolate some lines.
Borrow power from other Grids
7/28/2019 july 2012 indian blackout
21/37
Borrow power fromother grids
7/28/2019 july 2012 indian blackout
22/37
Antecedent conditions (30 July)
www.cercind.gov.in
7/28/2019 july 2012 indian blackout
23/37
Overloading of Gwalior-Agra
transmission line
line overloading. (limit-691 MW, powerflowed- 1400 MW
Preventive action
Divert load to available parallel lines.
7/28/2019 july 2012 indian blackout
24/37
How the Grid FailedSecond circuit of Bina-Gwalior-Agra line isclosed since July 28 for
up gradation to 765 kVlevel
* The closure of this ckt. At a timewhen demand is high was themistake done by powergrid
1. Line tripping's initially dueto load encroachment and
then due to power swings
3. Not enough loadshedding seen. Once the
freq. fell below 47.5 Hz , itled to automatic tripping
of generators, ultimatelywhole grid collapsed
2.Huge gap b/wdemand and supply
once the NR gird gotseparated from WR and
ER grid.
7/28/2019 july 2012 indian blackout
25/37
Power Swing
For large disturbances, Angular separation betweengenerators goes on increasing.
Wrong operation of distance relay, undesired tripping oftransmission lines , leading to cascading outages.
7/28/2019 july 2012 indian blackout
26/37
Angular separation
www.cercind.gov.in
7/28/2019 july 2012 indian blackout
27/37
Frequency profile (30 July)
www.cercind.gov.in
7/28/2019 july 2012 indian blackout
28/37
Non operation of Under freq. relays
Northern Region has 10000 MW loadshedding envisaged through Under
frequency relays, df/dt relays.
Rapid frequency decline shows nonoperation of UFL
Matter of serious concern
7/28/2019 july 2012 indian blackout
29/37
Both states, Power Grid to be blamedfor blackout
States overdraw power beyond theirscheduled quota.
Power Grid ordered closure of secondcircuit of Agra Gwalior line.
Up gradation should have been doneduring the lean season and not when
power demand is at its peak
7/28/2019 july 2012 indian blackout
30/37
Excessive Overdrawing
Overloading
Power Swing
Grid Collapse
What welearnt
7/28/2019 july 2012 indian blackout
31/37
Northern Grid Hit by Underdrawl
(5 feb, 2013)
31 main transmission lines tripped due to high voltage.
demand dipped from 29,000 MW to 18,000 MW
www.hindustantimes.com
7/28/2019 july 2012 indian blackout
32/37
Northern Grid Hit by Underdrawl
(5 feb, 2013)
grid frequency reached 50.67 Hz at 0300 hrs.
Ironically, states such as UP, Punjab and Haryana, wereagain to be blamed for the high voltage
www.hindustantimes.com
7/28/2019 july 2012 indian blackout
33/37
What could be done
Strict action must be taken against stateswhich disobey the GRID discipline.
Replace traditional distance relay withModern distance relays.
7/28/2019 july 2012 indian blackout
34/37
7/28/2019 july 2012 indian blackout
35/37
SMART GRID
Convergence of Information Technology (IT),communication technology and electrical infrastructure
Gather information about behaviors of suppliers andconsumers, in an automated fashion
SMART METERS- variable billing Improved efficiency, reliability and sustainability of the
production and distribution of electricity