    Power Grid failure: a reasonbehind blackout

    Er. Ishu SethiPast: Uiet, Panjab university, chandigarh

    [email protected]

  • 7/28/2019 july 2012 indian blackout

    2/37

    July 30 , 0233 hrs. IST

    Power outage in NorthernIndia

    8 states plunged into darkness

  • 7/28/2019 july 2012 indian blackout

    3/37

  • 7/28/2019 july 2012 indian blackout

    4/37

  • 7/28/2019 july 2012 indian blackout

    5/37

  • 7/28/2019 july 2012 indian blackout

    6/37

  • 7/28/2019 july 2012 indian blackout

    7/37

  • 7/28/2019 july 2012 indian blackout

    8/37

  • 7/28/2019 july 2012 indian blackout

    9/37

  • 7/28/2019 july 2012 indian blackout

    10/37

    July 31 , 1302 hrs. IST

    Power outage in Northern , Eastern & North eastern India

    Nearly half of India's population affected

    22 out of 28 states in India, without power

  • 7/28/2019 july 2012 indian blackout

    11/37

  • 7/28/2019 july 2012 indian blackout

    12/37

    Reasons behind the failure

    Overdrawing of power by states namely Uttar Pradesh,Punjab, Haryana than the scheduled Quota

    Overloading of Gwalior-Agra transmission linePeople

    Low water level in Bakhra Dam

    Sir Rajnikant charging his laptop

  • 7/28/2019 july 2012 indian blackout

    13/37

    Reasons behind the failure

    Overdrawing of power by states namely Uttar Pradesh,Punjab, Haryana than the scheduled Quota

    Overloading of Gwalior-Agra transmission linePeople

    Low water level in Bakhra Dam

    Sir Rajnikant charging his laptop

  • 7/28/2019 july 2012 indian blackout

    14/37

    Reasons behind the failure

    Overdrawing of power by states namely Uttar Pradesh,Punjab, Haryana than the scheduled Quota

    Overloading of Gwalior-Agra transmission linePeople

    Low water level in Bakhra Dam

    Sir Rajnikant charging his laptop

  • 7/28/2019 july 2012 indian blackout

    15/37

    Suspected Reasons

    Overdrawing of power by states namely Uttar Pradesh,Punjab, Haryana than the scheduled Quota

    Overloading of Gwalior-Agra transmission line

  • 7/28/2019 july 2012 indian blackout

    16/37

  • 7/28/2019 july 2012 indian blackout

    17/37

    Power overdrawl (July 30 0200 hrs.)

    State % Over drawl

    Punjab 11.87

    Haryana 21.03

    UP 12.94

    www.powermin.nic.inwww.cercind.gov.in

  • 7/28/2019 july 2012 indian blackout

    18/37

    Power drawl (July 30 0230 hrs.)

    State Schedule(MW)

    Actual(MW)

    OD (+) / UD (-)(MW)

    Punjab 4769 5092 323

    Rajasthan 1717 1379 -338

    Haryana 2586 3103 517

    Delhi 2987 2715 -272

    Uttarakhand 475 636 161

    HP 88 -93 -181

    UP 5475 6331 856

    JK 683 -1 -683

    Chandigarh 295 234 -61www.cercind.gov.in

  • 7/28/2019 july 2012 indian blackout

    19/37

    Power overdrawl (July 30 0230 hrs.)

    State % Over drawl

    Punjab 6.77

    Haryana 19.99

    UP 15.63

  • 7/28/2019 july 2012 indian blackout

    20/37

    Violating grid discipline and overdrawingmay be regular phenomenon

    Preventive measure

    Isolate some lines.

    Borrow power from other Grids

  • 7/28/2019 july 2012 indian blackout

    21/37

    Borrow power fromother grids

  • 7/28/2019 july 2012 indian blackout

    22/37

    Antecedent conditions (30 July)

    www.cercind.gov.in

  • 7/28/2019 july 2012 indian blackout

    23/37

    Overloading of Gwalior-Agra

    transmission line

    line overloading. (limit-691 MW, powerflowed- 1400 MW

    Preventive action

    Divert load to available parallel lines.

  • 7/28/2019 july 2012 indian blackout

    24/37

    How the Grid FailedSecond circuit of Bina-Gwalior-Agra line isclosed since July 28 for

    up gradation to 765 kVlevel

    * The closure of this ckt. At a timewhen demand is high was themistake done by powergrid

    1. Line tripping's initially dueto load encroachment and

    then due to power swings

    3. Not enough loadshedding seen. Once the

    freq. fell below 47.5 Hz , itled to automatic tripping

    of generators, ultimatelywhole grid collapsed

    2.Huge gap b/wdemand and supply

    once the NR gird gotseparated from WR and

    ER grid.

  • 7/28/2019 july 2012 indian blackout

    25/37

    Power Swing

    For large disturbances, Angular separation betweengenerators goes on increasing.

    Wrong operation of distance relay, undesired tripping oftransmission lines , leading to cascading outages.

  • 7/28/2019 july 2012 indian blackout

    26/37

    Angular separation

    www.cercind.gov.in

  • 7/28/2019 july 2012 indian blackout

    27/37

    Frequency profile (30 July)

    www.cercind.gov.in

  • 7/28/2019 july 2012 indian blackout

    28/37

    Non operation of Under freq. relays

    Northern Region has 10000 MW loadshedding envisaged through Under

    frequency relays, df/dt relays.

    Rapid frequency decline shows nonoperation of UFL

    Matter of serious concern

  • 7/28/2019 july 2012 indian blackout

    29/37

    Both states, Power Grid to be blamedfor blackout

    States overdraw power beyond theirscheduled quota.

    Power Grid ordered closure of secondcircuit of Agra Gwalior line.

    Up gradation should have been doneduring the lean season and not when

    power demand is at its peak

  • 7/28/2019 july 2012 indian blackout

    30/37

    Excessive Overdrawing

    Overloading

    Power Swing

    Grid Collapse

    What welearnt

  • 7/28/2019 july 2012 indian blackout

    31/37

    Northern Grid Hit by Underdrawl

    (5 feb, 2013)

    31 main transmission lines tripped due to high voltage.

    demand dipped from 29,000 MW to 18,000 MW

    www.hindustantimes.com

  • 7/28/2019 july 2012 indian blackout

    32/37

    Northern Grid Hit by Underdrawl

    (5 feb, 2013)

    grid frequency reached 50.67 Hz at 0300 hrs.

    Ironically, states such as UP, Punjab and Haryana, wereagain to be blamed for the high voltage

    www.hindustantimes.com

  • 7/28/2019 july 2012 indian blackout

    33/37

    What could be done

    Strict action must be taken against stateswhich disobey the GRID discipline.

    Replace traditional distance relay withModern distance relays.

  • 7/28/2019 july 2012 indian blackout

    34/37

  • 7/28/2019 july 2012 indian blackout

    35/37

    SMART GRID

    Convergence of Information Technology (IT),communication technology and electrical infrastructure

    Gather information about behaviors of suppliers andconsumers, in an automated fashion

    SMART METERS- variable billing Improved efficiency, reliability and sustainability of the

    production and distribution of electricity

  • 7/28/2019 july 2012 indian blackout

    36/37

  • 7/28/2019 july 2012 indian blackout

    37/37

    Thank you !

    A presentation by Ishu Sethi