Construction will start in October 2016 and will continue through the fall of 2017. Location: The Kennedy Street Revitalization Project will extend from Georgia Avenue to North Capitol Street. The project falls within Ward 4 neighborhoods of Brightwood Park and South Manor Park. Design and construction components of the Kennedy Street Revitalization Project include: New brick and paver sidewalks from Georgia Avenue to North Capitol Street New ADA compliant wheel chair ramps at crosswalks and business locations New granite curbs Upgraded street lighting Improved corridor amenities - benches, bike lockers and trash receptacles Reconstruction of signalized intersections - Missouri/ Kansas/ Kennedy - 2 nd Street/ Missouri Avenue, N.W. New trees and landscaping New drainage and storm water structures DC Water Green Infrastructure (GI) improvements, 100 block of Kennedy Street Repaving of Kennedy Street Traffic calming at 4 th Street and 8 th Street Storm water Best Management Practices such as: Permeable sidewalk pavers Landscape planters Bioretention areas Pervious pavement KENNEDY STREET REVITALIZATION PROJECT FACT SHEET For more information please contact: Kyle Ruef Construction Manager: [email protected] Kimberly Manning Community Outreach Coordinator: [email protected] 202-800-8838 | www.kennedystreetproject.com

KENNEDY STREET REVITALIZATION - ddot · Location: The Kennedy Street Revitalization Project will extend ... • Ladrillo y pavimentadora aceras de la Avenida de Georgia North Capitol

  • Upload
    dangque

  • View
    227

  • Download
    0

Embed Size (px)

Citation preview

Construction will start in October 2016 and will continue through the fall of 2017. 

Location: The Kennedy Street Revitalization Project will extend from Georgia Avenue to North Capitol Street. The project falls within Ward 4 neighborhoods of Brightwood Park and South Manor Park.

Design and construction components of the Kennedy Street Revitalization Project include:• New brick and paver sidewalks from Georgia Avenue

to North Capitol Street• New ADA compliant wheel chair ramps at crosswalks

and business locations• New granite curbs• Upgraded street lighting• Improved corridor amenities - benches, bike lockers

and trash receptacles

• Reconstruction of signalized intersections - Missouri/ Kansas/ Kennedy - 2nd Street/ Missouri Avenue, N.W.

• New trees and landscaping• New drainage and storm water structures• DC Water Green Infrastructure (GI) improvements,

100 block of Kennedy Street• Repaving of Kennedy Street• Traffic calming at 4th Street and 8th Street

Storm water Best Management Practices such as:• Permeable sidewalk pavers• Landscape planters• Bioretention areas• Pervious pavement

KENNEDY STREET REVITALIZATIONPROJECT FACT SHEET

For more information please contact:Kyle RuefConstruction Manager: [email protected] ManningCommunity Outreach Coordinator: [email protected] | www.kennedystreetproject.com

La construcción comenzará en Octubre de 2016 y continuará hasta el Otoño de 2017.

Localizado: El Proyecto de Revitalización de la calle Kennedy se extenderse desde Avenida Georgia a la calle Capitol Norte. El proyecto se embarca el Ward 4 barrios de Brightwood Parque y Sur Manor Parque.

El Diseño y construcción compone, El proyecto de Revitalización de la calle Kennedy incluyen:• Ladrillo y pavimentadora aceras de la Avenida de Georgia

North Capitol Street • Nuevas rampas de sillas de ruedas compatible con ADA en

los cruces peatonales y lugares de negocios• Nuevos bordillos de granito • Mejorar el alumbrado publico• Mejorar la instalaciones de corredores – bancos, armarios

para bicicletas y receptáculo de basura

• Reconstrucción de intersecciones señalizadas - Missouri/ Kansas/ Kennedy - Calle 2nd/ Missouri Avenue, N.W.

• Nuevos árboles y paisajes • Nuevo drenaje de la estructura para el agua de tormentas• Infraestructura Verde DC Agua (GI) mejoras,

cuadra 100 de la calle Kennedy• Repaving (asfalto) de la Kennedy Street • Para calmar el tráfico en la calle 4th y 8th de la calle

Agua mejores prácticas de gestión de tormenta, tales como:• Aceras permeables con adoquines• Paisaje macetas • Áreas de bioretención • Pavimento permeable