16
L2+ 24-Port Gigabit Managed Switch with Hardware Layer3 IPv4/IPv6 Static Routing GS-5220-16S8C GS-5220-16S8CR Quick Installation Guide

L2+ 24-Port Gigabit Managed Switch with Hardware Layer3 ... · Thank you for purchasing PLANET L2+ 24-port Gigabit Managed Switch with Layer3 IPv4/IPv6 Static Routing. The descriptions

  • Upload
    others

  • View
    7

  • Download
    0

Embed Size (px)

Citation preview

Page 1: L2+ 24-Port Gigabit Managed Switch with Hardware Layer3 ... · Thank you for purchasing PLANET L2+ 24-port Gigabit Managed Switch with Layer3 IPv4/IPv6 Static Routing. The descriptions

L2+ 24-Port Gigabit Managed Switch with

Hardware Layer3 IPv4/IPv6 Static Routing

GS-5220-16S8C

GS-5220-16S8CR

Quick Installation Guide

Page 2: L2+ 24-Port Gigabit Managed Switch with Hardware Layer3 ... · Thank you for purchasing PLANET L2+ 24-port Gigabit Managed Switch with Layer3 IPv4/IPv6 Static Routing. The descriptions

Table of Contents

1. Package Contents ....................................................................................... 3

2. Requirements ............................................................................................. 4

3. Terminal Setup ........................................................................................... 5

4. Logon to Console ........................................................................................ 6

5. ConfiguringIPAddress ................................................................................ 7

6. Starting Web Management .........................................................................10

7. SavingConfiguration ..................................................................................13

8. RecoveringBacktoDefaultConfiguration .....................................................14

9. WiringDCPowerInputs .............................................................................15

10. Customer Support .....................................................................................16

Page 3: L2+ 24-Port Gigabit Managed Switch with Hardware Layer3 ... · Thank you for purchasing PLANET L2+ 24-port Gigabit Managed Switch with Layer3 IPv4/IPv6 Static Routing. The descriptions

3

1. Package ContentsThankyouforpurchasingPLANETL2+24-portGigabitManagedSwitchwithLayer3IPv4/IPv6StaticRouting.Thedescriptionsofthesemodelsareasfollows:

GS-5220-16S8C L2+ 24-port 100/1000X SFP Slots with 8-port Shared TPManagedSwitch

GS-5220-16S8CR L2+ 24-port 100/1000X SFP Slots with 8-port Shared TPManagedSwitch+AC/DCRedundantPower

“Managed Switch” is mentioned in this Quick Installation Guide refers to theabovefourmodels.

Open the box of the Managed Switch and carefully unpack it. The box shouldcontainthefollowingitems:

z ManagedSwitchx1

z QuickInstallationGuidex1

z RJ-45toRS232Cablex1

z RubberFeetx4

z TwoRack-mountingBracketswithAttachmentScrewsx1

z PowerCordx1

z SFPDustCapx24

If any item is found missing or damaged, please contact your local reseller forreplacement.

Page 4: L2+ 24-Port Gigabit Managed Switch with Hardware Layer3 ... · Thank you for purchasing PLANET L2+ 24-port Gigabit Managed Switch with Layer3 IPv4/IPv6 Static Routing. The descriptions

4

2. Requirements z Workstations running Windows XP/2003/Vista/7/8/2008, MAC OS X or later,Linux,UNIX,orotherplatformsarecompatiblewithTCP/IPprotocols.

z WorkstationsareinstalledwithEthernetNIC(NetworkInterfaceCard)

z SerialPortConnection(Terminal)

The above Workstations come with COM Port (DB9) or USB-to-RS-232converter.

The aboveWorkstations have been installed with terminal emulator, such asHyperTerminalincludedinWindowsXP/2003.

Serial cable --oneend isattached to theRS-232serialport,while theotherendtotheconsoleportoftheManagedSwitch.

z EthernetPortConnection

Networkcables--Usestandardnetwork(UTP)cableswithRJ-45connectors.

The above PC is installed with Web browser and JAVA runtime environmentplug-in.

Note

It is recommended touse InternetExplore8.0or above toaccessthe Managed Switch. If theWeb interface of the Managed Switchis not accessible, please turn off the anti-virus software or firewallandthentryitagain.

Page 5: L2+ 24-Port Gigabit Managed Switch with Hardware Layer3 ... · Thank you for purchasing PLANET L2+ 24-port Gigabit Managed Switch with Layer3 IPv4/IPv6 Static Routing. The descriptions

5

3. Terminal SetupTo configure the system, connect a serial cable to a COM port on a PC or notebook computer and to RJ-45 type of serial (console) port of the ManagedSwitch.

Managed Switch

Serial Port115200,8,n,1

RJ-45 to RS-232 Cable

Console

115200,N,8,1PC / Workstation with

Terminal Emulation Software

Serial Port

Figure 3-1: GS-5220-16S8C/GS-5220-16S8CR Console Connectivity

A terminal program is required tomake the software connection to the ManagedSwitch. Windows' Hyper Terminal program may be a good choice. The HyperTerminalcanbeaccessedfromtheStart menu.

1. Run terminal program on the OS.

2.When the following screen appears, make sure that the COM port should beconfiguredas:

z Baud:115200

z Databits:8

z Parity:None

z Stopbits:1

z Flowcontrol:None

Figure 3-2: Hyper Terminal COM Port Configuration

Page 6: L2+ 24-Port Gigabit Managed Switch with Hardware Layer3 ... · Thank you for purchasing PLANET L2+ 24-port Gigabit Managed Switch with Layer3 IPv4/IPv6 Static Routing. The descriptions

6

4. Logon to ConsoleOnce the terminal is connected to the device, power on theManaged Switch andtheterminalwilldisplay“runningtestingprocedures”.Then, the followingmessageasks to log-in user name and password. The factory default user name andpasswordareshownasfollowsandtheloginscreeninFigure4-1appears.

Username:adminPassword:admin

Figure 4-1: Managed Switch Console Login Screen

TheusercannowentercommandstomanagetheManagedSwitch.Foradetaileddescriptionofthecommands,pleaserefertothefollowingchapters.

Note

1.For security reason, please change and memorize the newpasswordafterthisfirstsetup.

2.Only accept command in lowercase letter under console inter-face.

Page 7: L2+ 24-Port Gigabit Managed Switch with Hardware Layer3 ... · Thank you for purchasing PLANET L2+ 24-port Gigabit Managed Switch with Layer3 IPv4/IPv6 Static Routing. The descriptions

7

5.ConfiguringIPAddressTheManagedSwitchisshippedwithdefaultIPaddressshownbelow.

IPAddress:192.168.0.100SubnetMask:255.255.255.0

TocheckthecurrentIPaddressormodifyanewIPaddressfortheSwitch,pleaseusetheproceduresasfollows:

DisplayofthecurrentIPAddress

1.Atthe“#”prompt,enter“show ip interface brief”.

2.ThescreendisplaysthecurrentIPaddressshowninFigure5-1.

Figure 5-1: IP Information Screen

Page 8: L2+ 24-Port Gigabit Managed Switch with Hardware Layer3 ... · Thank you for purchasing PLANET L2+ 24-port Gigabit Managed Switch with Layer3 IPv4/IPv6 Static Routing. The descriptions

8

ConfigurationoftheIPAddress

3.At the“#” prompt, enter the following commandandpress<Enter>as showninFigure5-2.

GS-5220-16S8C# configure terminalGS-5220-16S8C(config)# interface vlan 1GS-5220-16S8C(config-if-vlan)# ip address 192.168.1.100 255.255.255.0

ThepreviouscommandwouldapplythefollowingsettingsfortheManagedSwitch.

IPAddress:192.168.1.100SubnetMask:255.255.255.0

Figure 5-2: Configuring IP Address Screen

4.Repeatstep1tocheckiftheIPaddressischanged.

Page 9: L2+ 24-Port Gigabit Managed Switch with Hardware Layer3 ... · Thank you for purchasing PLANET L2+ 24-port Gigabit Managed Switch with Layer3 IPv4/IPv6 Static Routing. The descriptions

9

Storethecurrentswitchconfiguration

5.Atthe “#” prompt,enterthefollowingcommandandpress<Enter>.

# copy running-config startup-config

Figure 5-3: Saving Current Configuration Command Screen

If the IP is successfully configured, the Managed Switch will apply the new IPaddress setting immediately. You can access the Web interface of the ManagedSwitchthroughthenewIPaddress.

Note

If you are not familiar with the console command or the relatedparameter, enter “help” anytime in console to get the help description.

Page 10: L2+ 24-Port Gigabit Managed Switch with Hardware Layer3 ... · Thank you for purchasing PLANET L2+ 24-port Gigabit Managed Switch with Layer3 IPv4/IPv6 Static Routing. The descriptions

10

6. Starting Web ManagementThe following shows how to start up the Web Management of the ManagedSwitch. Note the Managed Switch is configured through an Ethernet connection.Please make sure the manager PC must be set on the same IP subnet address.

Forexample,thedefaultIPaddressoftheManagedSwitchis192.168.0.100 then themanager PC should be set at192.168.0.x (where x is a number between 1and254,except100)andthedefaultsubnetmaskis255.255.255.0.

PC / Workstationwith Web Browser

192.168.0.x

Managed Switch

RJ-45/UTP Cable

IP Address:192.168.0.100

Figure 6-1: IP Management Diagram

Logging in the Managed Switch

1.Use Internet Explorer 8.0 or above Web browser and enter IP addresshttp://192.168.0.100(thefactorydefaultIPaddressortheonethatyouhavejustchangedinconsole)toaccesstheWebinterface.

Page 11: L2+ 24-Port Gigabit Managed Switch with Hardware Layer3 ... · Thank you for purchasing PLANET L2+ 24-port Gigabit Managed Switch with Layer3 IPv4/IPv6 Static Routing. The descriptions

11

2.When the followingdialogboxappears,pleaseenter thedefaultusernameandpassword“admin” (or the password youhave changed via console). The loginscreeninFigure6-2appears.

DefaultIPAddress:192.168.0.100DefaultUsername:adminDefaultPassword:admin

Figure 6-2: Login Screen

3.Afterenteringthepassword,themainscreenappearsasFigure6-3shows.

Figure 6-3: Web Main Screen of Managed Switch

Page 12: L2+ 24-Port Gigabit Managed Switch with Hardware Layer3 ... · Thank you for purchasing PLANET L2+ 24-port Gigabit Managed Switch with Layer3 IPv4/IPv6 Static Routing. The descriptions

12

TheSwitchMenuontheleftoftheWebpageletyouaccessallthecommandsandstatisticstheManagedSwitchprovides.

Figure 6-4: Switch Menu

Note

If youarenot familiarwithSwitch functionsor the relatedparam-eter,press“Help icon” anytime on the Web page to get the help description.

Now, you can use the Web management interface to continue the Switchmanagement or manage the Switch by console interface.

Please refer to the user’s manual for more.

Page 13: L2+ 24-Port Gigabit Managed Switch with Hardware Layer3 ... · Thank you for purchasing PLANET L2+ 24-port Gigabit Managed Switch with Layer3 IPv4/IPv6 Static Routing. The descriptions

13

7.SavingConfigurationIn the Managed Switch, the running configuration file stores in the RAM. In thecurrentversion,therunningconfigurationsequenceofrunning-configcanbesavedfrom the RAM to FLASH by executing save startup config command, so that therunning configuration sequence becomes the startup configuration file, which iscalledconfigurationsave.

To save all applied changes and set the current configuration as a startupconfiguration. The startup-configuration file will be loaded automatically across asystem reboot.

1.ClickSystem,Save Startup Config.

2. Press the “Save Configuration” button.

Page 14: L2+ 24-Port Gigabit Managed Switch with Hardware Layer3 ... · Thank you for purchasing PLANET L2+ 24-port Gigabit Managed Switch with Layer3 IPv4/IPv6 Static Routing. The descriptions

14

8.RecoveringBacktoDefaultConfiguration IP address has been changed or admin password has been forgotten –To reset the IP address to the default IP address “192.168.0.100” or reset the login password to default value, press the hardware reset button on the front panel for about 10 seconds. After the device is rebooted, you can login themanagement Web interface within the same subnet of 192.168.0.xx.

Reset

PWRReset

18 20 22 242 4 6 8 10 12 14 16

17 19 21 231 3 5 7 9 11 13 15

FAN

Fault

GS-5220-16S8C LNK ACT 1000 10/100

24-Port 100/1000X SFP Managed SwitchAlert

Figure 8-2: GS-5220-16S8C Series Reset Button

Page 15: L2+ 24-Port Gigabit Managed Switch with Hardware Layer3 ... · Thank you for purchasing PLANET L2+ 24-port Gigabit Managed Switch with Layer3 IPv4/IPv6 Static Routing. The descriptions

15

9.WiringDCPowerInputs DC Power ConnectorThe rear panels of theGS-5220-16S8CR contain a power switch and aDC powerconnector,whichacceptsDCpowerinputvoltagefrom36Vto60VDC.ConnectthepowercabletotheManagedSwitchattheinputterminalblock.Thesizeofthetwoscrews in the terminal block is M3.5.

ON

OFF

DC POWER

DC Input Range36~60V

V+Ensure the power switchin the “OFF” position before connect the DC wire.

CAUTION

Figure 9-1: Rear Panel of GS-5220-16S8CR

Warning

Before connecting the DC power cable to the input terminal block of the GS-5220-16S8CR, ensure that the power switch is in the“OFF” positionandtheDCpowerisOFF.

Note

Thewiregaugefortheterminalblockshouldbeintherangeof12~24AWG.TheDCInputrangeisfrom36Vto60VDC.

Page 16: L2+ 24-Port Gigabit Managed Switch with Hardware Layer3 ... · Thank you for purchasing PLANET L2+ 24-port Gigabit Managed Switch with Layer3 IPv4/IPv6 Static Routing. The descriptions

16

10. Customer SupportThank you for purchasing PLANET products. You can browse our online FAQresourceandUser’sManualonPLANETWebsitefirsttocheckifitcouldsolveyourissue.Ifyouneedmoresupportinformation,pleasecontactPLANETswitchsupportteam.

PLANETonlineFAQ:http://www.planet.com.tw/en/support/faq.php?type=1

Switchsupportteammailaddress:[email protected]

GS-5220-16S8C/GS-5220-16S8CRUser’sManualhttp://www.planet.com.tw/en/support/download.php?type1=1&model=48563&type=3

Copyright © PLANET Technology Corp. 2014.Contents are subject to revision without prior notice.PLANET is a registered trademark of PLANET Technology Corp. All other trademarks belong to their respective owners.