FORMULIR - FORMULIR
Hal - 1
FORM 1
SUMMARY OF DISBURSEMENT SCHEDULE OF CIVIL WORKS
8/17/2019 Lampiran Formulir-Formulir Pekerjaan Supervisi
2/39
FORMULIR - FORMULIR
Hal - 2
SUMMARY OF DISBURSEMENT SCHEDULE OF CONSULTING SERVICES
8/17/2019 Lampiran Formulir-Formulir Pekerjaan Supervisi
3/39
FORMULIR - FORMULIR
Hal - 3
CONTRACT PACKAGE CONTRACT TIME PROGRESS
NO. OF DATE OFCONTRACT SUM
(Incl. VAT)
CONST.
PERIOD
(DAYS)
ELAPSED
TO DATE
TO
PREVIOUSTO DATE
a. Original a. Original a. Original a. Original
Contract Contract b. Contract b. CCO
Change Order
b. Adenda b. Adenda c. Total date c. Total
1 2 3 4 5 6 7 8 9 10 11 12 13 14
NTP : Notice to Proceed Notice for Column 11
C.O.W : Commencement of Works A : Environmental Problem E : Capital Delay Prepared by Consultant
B : Equi pment Delay F : Management P roblem
C : Lab ou r/ Ma n P ow er G : Co nt ra ct Doc um en t P ro bl em
D : Material Delay H : Utilities
R : Rainfall
(…………………………)
Team Leader
NO.
LENGTH
KM
CAUSE
OF
DELAY
PROJECT SUMMARY
DISBURSEMENT
TO DATE
CERTIFIED CUMULATIVE
PAYMENT TO DATE
(Incl. Advance Payment)
REMARKS
CONTRACT PACKAGE CONTRACTOR
NAMA PROYEKPEMILIK PEKERJAANPAKETKONTRAKTOR
KONSULTAN SUPERVISI
:
::
::
8/17/2019 Lampiran Formulir-Formulir Pekerjaan Supervisi
4/39
FORMULIR - FORMULIR
8/17/2019 Lampiran Formulir-Formulir Pekerjaan Supervisi
5/39
FORMULIR - FORMULIR
8/17/2019 Lampiran Formulir-Formulir Pekerjaan Supervisi
6/39
FORMULIR - FORMULIR
8/17/2019 Lampiran Formulir-Formulir Pekerjaan Supervisi
7/39
FORMULIR - FORMULIR
8/17/2019 Lampiran Formulir-Formulir Pekerjaan Supervisi
8/39
FORMULIR - FORMULIR
8/17/2019 Lampiran Formulir-Formulir Pekerjaan Supervisi
9/39
FORMULIR - FORMULIR
8/17/2019 Lampiran Formulir-Formulir Pekerjaan Supervisi
10/39
FORMULIR - FORMULIR
8/17/2019 Lampiran Formulir-Formulir Pekerjaan Supervisi
11/39
FORMULIR - FORMULIR
8/17/2019 Lampiran Formulir-Formulir Pekerjaan Supervisi
12/39
FORMULIR - FORMULIR
8/17/2019 Lampiran Formulir-Formulir Pekerjaan Supervisi
13/39
FORMULIR - FORMULIR
8/17/2019 Lampiran Formulir-Formulir Pekerjaan Supervisi
14/39
FORMULIR - FORMULIR
8/17/2019 Lampiran Formulir-Formulir Pekerjaan Supervisi
15/39
FORMULIR - FORMULIR
8/17/2019 Lampiran Formulir-Formulir Pekerjaan Supervisi
16/39
FORMULIR - FORMULIR
8/17/2019 Lampiran Formulir-Formulir Pekerjaan Supervisi
17/39
FORMULIR - FORMULIR
Hal - 17
8/17/2019 Lampiran Formulir-Formulir Pekerjaan Supervisi
18/39
FORMULIR - FORMULIR
Hal - 18
8/17/2019 Lampiran Formulir-Formulir Pekerjaan Supervisi
19/39
FORMULIR - FORMULIR
8/17/2019 Lampiran Formulir-Formulir Pekerjaan Supervisi
20/39
FORMULIR - FORMULIR
8/17/2019 Lampiran Formulir-Formulir Pekerjaan Supervisi
21/39
FORMULIR - FORMULIR
8/17/2019 Lampiran Formulir-Formulir Pekerjaan Supervisi
22/39
FORMULIR - FORMULIR
8/17/2019 Lampiran Formulir-Formulir Pekerjaan Supervisi
23/39
FORMULIR - FORMULIR
8/17/2019 Lampiran Formulir-Formulir Pekerjaan Supervisi
24/39
FORMULIR - FORMULIR
8/17/2019 Lampiran Formulir-Formulir Pekerjaan Supervisi
25/39
FORMULIR - FORMULIR
Hal - 25
8/17/2019 Lampiran Formulir-Formulir Pekerjaan Supervisi
26/39
FORMULIR - FORMULIR
8/17/2019 Lampiran Formulir-Formulir Pekerjaan Supervisi
27/39
FORMULIR - FORMULIR
1 LOKASI :
2 PEKERJAAN : Lean concreat / Footing / Pier / Abutment / Pierhead Beton K :
Diaphragma Beton K :
Plat Lantai Beton K :
Dinding Beton K :
Pile Cap Beton K :
3 REFERENSI Request No : Shop Drawing No :
Metode Pelaksanaan No : Gambar For Cons. No :
4 MATERIAL UTAMA Supplier :
5 FINISH PERMUKAAN Volume : M3 K :
Fairface Concrete Exposed Conventional Lain-lain
PEMERIKSAAN CATATAN KONTRAKTOR # 1 CATATAN FIELD TEAM # 2 CATATAN FIELD TEAM
- Bahan
- Perancah
- Dimensi
- Elevasi & Posisi As
- Form Oil
- Vertikalitas
- Sambungan
LAPORAN PEMERIKSAAN PEKERJAAN STRUKTUR BETON
T I N G
NAMA PROYEKPEMILIK PEKERJAANPAKETKONTRAKTORKONSULTAN SUPERVISIKONSULTAN MANEJEMEN KONSTRUKSI
::::::
8/17/2019 Lampiran Formulir-Formulir Pekerjaan Supervisi
28/39
FORMULIR - FORMULIR
- Kebersihan
- Bond Agent
- Utiliti
- Tenaga Kerja
- Vibrator
- Concrete Pump
- Penerangan
Tgl Tgl Tgl
Jam Jam Jam
Baik / Diterima / Disetujui X Tidak Baik / Ditolak 0 Belum Terpasang
Tanda Tangan Kontraktor Tanda Tangan Inspector Tanda Tangan Chief Inspector
Supervisor : ……………………….. PT. ………………………………. PT. ……………………………….
P E R S I A P A N
P E N G
E C O R A N
LAPORAN PEMERIKSAAN PEKERJAAN STRUKTUR BETON
NAMA PROYEKPEMILIK PEKERJAANPAKETKONTRAKTORKONSULTAN SUPERVISIKONSULTAN MANEJEMEN KONSTRUKSI
::::::
8/17/2019 Lampiran Formulir-Formulir Pekerjaan Supervisi
29/39
FORMULIR - FORMULIR
Hal - 29
8/17/2019 Lampiran Formulir-Formulir Pekerjaan Supervisi
30/39
FORMULIR - FORMULIR
8/17/2019 Lampiran Formulir-Formulir Pekerjaan Supervisi
31/39
FORMULIR - FORMULIR
8/17/2019 Lampiran Formulir-Formulir Pekerjaan Supervisi
32/39
FORMULIR - FORMULIR
8/17/2019 Lampiran Formulir-Formulir Pekerjaan Supervisi
33/39
FORMULIR - FORMULIR
8/17/2019 Lampiran Formulir-Formulir Pekerjaan Supervisi
34/39
FORMULIR - FORMULIR
PENGUJIAN KEPADATAN LAPIS SUBGRADE
RINGKASAN HASIL PENGUJIAN KEPADATAN SUMBER BORROW MAT SPESIFIKASI 4X
LAPIS SUBGRADE ……………………………. AASHTO T99-97
(AASHTO T233-96) - MDD : ………kN/m3
- OMC : ………%
LOKASI PENGUJIAN HASIL PENGUJIAN KESIMPULAN
DRY DENSITY MOIST CONT PERSEN DENSITY
kN/m3 % %KA ACCEPTED NOT ACCEPTED
TANGGALSEKSI STA KI
NAMA PROYEKPEMILIK PEKERJAANPAKETKONTRAKTORKONSULTAN SUPERVISIKONSULTAN MANEJEMEN KONSTRUKSI
::::::
8/17/2019 Lampiran Formulir-Formulir Pekerjaan Supervisi
35/39
FORMULIR - FORMULIR
LEMBAR PENGESAHAN
PENGUJIAN TARIK (STRAIN TEST)
DAN
PENGUJIAN LENTUR (BENDING TEST)
BESI BETON BJTD - 40
URAIAN NAMA / JABATAN TANDA TANGAN
DIAJUKANKONTRAKTOR
NAMA PROYEKPEMILIK PEKERJAANPAKETKONTRAKTORKONSULTAN SUPERVISIKONSULTAN MANEJEMEN KONSTRUKSI
::::::
8/17/2019 Lampiran Formulir-Formulir Pekerjaan Supervisi
36/39
FORMULIR - FORMULIR
LAPORAN HARIANTanggal : ………………………………….
Tanggal : ……………………… Catatan Cuaca :
No. Jenis Pekerjaan Volume Satuan Keterangan
No. Jenis Peralatan Volume Satuan Keterangan
No. Jenis Material Volume Satuan Keterangan
NAMA PROYEKPEMILIK PEKERJAANPAKETKONTRAKTORKONSULTAN SUPERVISIKONSULTAN MANEJEMEN KONSTRUKSI
::::::
8/17/2019 Lampiran Formulir-Formulir Pekerjaan Supervisi
37/39
FORMULIR - FORMULIR
Hal - 37
8/17/2019 Lampiran Formulir-Formulir Pekerjaan Supervisi
38/39
8/17/2019 Lampiran Formulir-Formulir Pekerjaan Supervisi
39/39
FORMULIR - FORMULIR
Hal - 39
VOLUM E HARGA TOTAL
NO. KONTRAK SATUAN HARGA
ITEM (Rp.) (Rp.) VOLUME % PAY ITEM % PRESTASI VOLUME % PAY ITEM % PRESTASI VOLUME % PAY ITEM % PRESTASI
1 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 UMUM1,19 Pemeliharaan dan Perlindungan Lalu Lintas
1. 20( 1) Labor at or ium
1.20(2) Mobilisasi ( yang tidak tercakup pada 1.20 ( 1 )
1,26 Pekerjaan dan penanganan aliran air yang sudah ada
2 P EM BER SI HA N T EM PAT KERJA
2 ,0 1 P embe rs ih an Te mp at Ke rj a
3 PEMBONGKARAN
4 PEKERJAAN TANAH
4.03(2) Gal ian Biasa un tuk Dibuang
4 .0 5(1) B or row Mat er ia l
4,09 Urugan Material Berbutir ( Granular Backfill)
4 ,12 Pasangan Ba tu Kosong ( B lind ing Stone )
5 GALIAN STRUKTUR
5.01(1) Penggalian struktur sampai kedalaman 2m
5.01(2) Penggalian struktur sampai kedalaman lebih 2m tapi tidak lebih dari 4m
5.01(3) Penggalian struktur sampai kedalaman lebioh dari 4m
5.01(4) Tambahan Biaya Galian pada tempat yang mengandung air tanah
6 DRAINASE
6.05(2) Pipa Gorong - Gorong Beton bertulang Dia.40 cm Tipe A
6 .05(3)a Saluran t ipe DS - 8
6 .05(3)b Saluran t ipe DS - 8A
6.06(4) Bak Kontrol Beton dan Penutup Tipe DC - 1
6.07(4) Saluran Pasangan Batu Mortar Tipe DS - 7
6.08(1) Pipa Drainase Dia.15 cm dengan perlengkapan sambungan dan penyangga
6.08(2) Pipa Drainase Dia.20 cm dgn perlengkapan samb.dan penyang.
6 .08(4) Deck Dra in beserta assosorisnya Tipe 1
6 .07(2) Box Cul lve rt ( 120 x 120 cm )
7 SUBGRADE
8 L AP IS AN PO NDAS I AGREG AT ( SUB. BASE )
9 PERKERASAN
9.10(4) Persiapan Aspal Concrete Course dan Tack coat
10 STRUKTUR BETON
10.03(1 ) PCI Girder,Ben tang 16 m
10.03(6 ) PCI Girder ,Bentang 30 m
10.03(7 ) PCI Girder ,Bentang 35 m
10.03(8 ) PCI Girder, Bentang 40 m
10.03(9) Plat Pracetak ( concrete plate )
10.03(12) Precast Planter Concrete Box
10.05(5) Penyediaan Tiang Pancang Beton Bulat Pretensioned,Dia. 60 cm
10.05(6) Pemancangan TP. Bulat Pretensined, Dia.60 cm
10.05(7) Penyediaan dan Pemanc. TP beton Pretensioned. Pile Test Dia.60 cm
10.05(8)a Pemotongan dan Beton Pengisi TP Beton Pretensioned Dia.60 cm
10.05(8)b
10.05(9) Tambahan biaya utk 10.05(2) dan 10.05(6) daerah ada air
10.05(10) PDA Test TP beton bulat Pretensioned
10.05(11) Test Pembebanan statis ( Loading Test ) TP Pretensioned
10.05(12) Pengeboran Awal untuk Tiang Pancang
1 0, 08 P embo ra n P erco ba an
Disetujui Diperiksa Diajujan,
KONSULTAN MANAJEMEN KONSTRUKSI KONSULTAN SUPERVISI KONTRAKTOR
………………………………………………
( ……………………………………………..) ( ……………………………………………..) ( ……………………………………………..)
RESIDENT ENGINEER GENERAL SUPERINTENDANT
2
U R A I A N SAT
LAPORAN KEMAJUAN MINGGUAN
BOBOT (%) S/D MINGGU LALU MINGGU INI
KEMAJUAN (PROGRES)
S/D MINGGU INI
NAMA PROYEKPEMILIK PEKERJAANPAKETKONTRAKTORKONSULTAN SUPERVISIKONSULTAN MANEJEMEN KONSTRUKSI
::::::