LAPORAN PENGUJIAN NILAI CBR LAPANGAN DENGAN DCP (DYNAMIC CONE PENETROMETER) JALAN SLAMET RIYADI UNGARAN BARAT Oleh: M. HAMZAH FANSURI (5113412002) SAFRUDIN KHUZAENI N. (5113412026) ARIF SETIAWAN ARIAV (5113412027) LILIS KISWANTO (5113412029) UNIVERSITAS NEGERI SEMARANG PROGRAM STUDI TEKNIK SIPIL,S1 SEMARANG 2014

Laporan DCP Jalan Slamet Riyadi semarang

Embed Size (px)

DESCRIPTION

PENGUJIAN NILAI CBR LAPANGAN DENGAN DCP (DYNAMIC CONE PENETROMETER)JALAN SLAMET RIYADI UNGARAN BARAT

Citation preview

  • LAPORAN

    PENGUJIAN NILAI CBR LAPANGAN DENGAN DCP

    (DYNAMIC CONE PENETROMETER)

    JALAN SLAMET RIYADI UNGARAN BARAT

    Oleh:

    M. HAMZAH FANSURI (5113412002)

    SAFRUDIN KHUZAENI N. (5113412026)

    ARIF SETIAWAN ARIAV (5113412027)

    LILIS KISWANTO (5113412029)

    UNIVERSITAS NEGERI SEMARANG

    PROGRAM STUDI TEKNIK SIPIL,S1

    SEMARANG

    2014

  • PENGUJIAN NILAI CBR LAPANGAN DENGAN DCP

    (DYNAMIC CONE PENETROMETER)

    JALAN SLAMET RIYADI UNGARAN BARAT

    LAPORAN

    Diajukan kepada

    Dosen Pengajar Desain Perkerasan Jalan

    untuk memenuhi salah satu persyaratan

    dalam menyelesaikan tugas

    Desain Perkerasan Jalan

    Oleh:

    M. HAMZAH FANSURI (5113412002)

    SAFRUDIN KHUZAENI N. (5113412026)

    ARIF SETIAWAN ARIAV (5113412027)

    LILIS KISWANTO (5113412029)

    UNIVERSITAS NEGERI SEMARANG

    PROGRAM STUDI TEKNIK SIPIL

    SEMARANG

    2014

  • 1

    A. PENDAHULUAN

    Pengujian dengan alat Dynamic Cone Penetrometer (DCP) ini pada

    dasarnya sama dengan cone penetrometer (CP) yaitu sama-sama mencari nilai

    CBR dari suatu lapisan tanah langsung di lapangan. Hanya saja pada alat Cone

    Penetrometer dilengakapi dengan poving ring dan arloji pembacaan, sedangkan

    pada alat Dynamic Cone Penetrometer adalah melalui ukuran(satuan) dengan

    menggunakan mistar.

    Percobaan dengan alat cone penetrometer digunakan untuk mengetahui

    CBR tanah asli. Sedangkan percobaan alat dengan DCP ini hanya untuk mendapat

    kekuatan tanah timbunan pada pembuatan badan jalan, alat ini dipakai pada

    pekerjaan tanah karena mudah dipindahkan ke semua titik yang diperlukan tetapi

    letak lapisan yang diperiksa tidak sedalam pemeriksaan tanah dengan alat sondir.

    Hasil yang diperoleh pada percobaan ini dapat dihubungkan dengan nilai CBR

    (perbandingan antara beban penetrasi suatu lapisan tanah atau perkerasan terhadap

    beban standart dengan kedalaman dan kecepatan penetrasi yang sama)

    B. TUJUAN

    Setelah mengikuti materi ini mahasiswa diharapkan dapat :

    1. Melakukan pengujian dengan alat DCP secara baik dan benar.

    2. Menentukan nilai CBR lapangan dari hasil pengujian DCP

    C. DASAR TEORI

    Pengujian cara dinamis ini dikembangkan oleh TRLL (Transport andRoad

    Research Laboratory), Crowthorne, Inggris dan mulaidiperkenalkan di Indonesia

    sejak tahun 1985/1986. Pengujian inidimaksudkan untuk menentukan nilai CBR

    (California Bearing Ratio)tanah dasar, timbunan, dan atau suatu sistem

    perkerasan. Pengujian iniakan memberikan data kekuatan tanah sampai

    kedalaman + 70 cm di bawah permukaan lapisan tanah yang ada atau permukaan

    tanah dasar. Pengujian ini dilakukan dengan mencatat data masuknya konus

  • 2

    yangtertentu dimensi dan sudutnya, ke dalam tanah untuk setiap

    pukulandari palu/hammer yang berat dan tinggi jatuh tertentu pula.

    D. PERALATAN DAN BAHAN

    1. Satu set alat DCP

    2. Palu/hammer geser dengan berat 8 kg dan tinggi jatuh 575 mm.

    3. Batang baja berdiameter 16 mm primer dan sekunder

    4. Konus bersudut 60o atau 30o dengan diameter tengahsebesar 2 cm

    5. Batang baja berskala 1-100 cm

    Keterangan :

    1. Pemegang

    2. Penumbuk

    3. Stang Penghantar

    4. Kepala Penumbuk

    5. Stang Penetrasi

    6. Konus

    7. Mistar Skala Penetrasi

    8. Mur Pengatur Skala Mistar

  • 3

    E. LANGKAH KERJA

    1. Pilih titik pengujian yang akan dilakukan pengujian.

    Biasanyadilakukan secara zig zag pada arah dan jarak tertentu.

    2. Letakkan alat pada posisi titik pengujian secara vertikal tegak

    lurusterhadap permukaan tanah. Bila terjadi penyimpangan sedikit

    sajaakan menyebabkan kesalahan pengukuran yang relatif besar.

    3. Atur batang berskala sehingga menunjukkan angka 0 dan catatdalam

    centi meter.

    4. Naikkan palu geser sampai menyentuh bagian bawah pegangan,lalu

    lepaskan sehingga palu jatuh secara bebas menumbuk anvilatau

    landasan penumbuk sambil menjaga agar posisi alat tidak menjadi

    miring. Tumbukan ini akan menyebabkan konusmenembus lapisan

    yang akan diuji.

    5. Catat jumlah pukulan dan kedalaman penetrasinya ke

    dalamformulir/blanko percobaan.

    6. Hentikan pengujian jika jumlah pukulan telah mencapai 40 kaliatau

    kedalaman penetrasi antara 70 s/d 90 cm.

    7. Cabut batang dan konus yang telah masuk ke dalam tanah dengancara

    menumbukkan palu geser ke atas hingga menyentuh plat alas

    pemegang alat.

    F. DATA PERCOBAAN DAN PERHITUNGAN

    1. Catat jumlah tumbukan pada kolom n (tumbukan ke n),dan bacaan

    penetrasi pada kolom D (dalam mm). Plotkan bacaantersebut pada

    grafik Kedalaman (D) terhadap Jumlah TumbukanKumulatif (n).

    2. Hitung D, yaitu selisih pembacaan penetrasi dalam mm,dan SPP

    yaitu Skala Penetrasi dalam cm/tumbukan.

    3. Tarik garis antara titik-titik pada grafik, dan dengan bantuan penggaris

    segitiga, sejajarkan garis yang didapat dengangaris-garis nilai CBR

    pada pojok kanan bawah form pengisian.

  • 4

    G. KESELAMATAN KERJA

    1. Jaga posisi alat saat melakukan tumbukan agar selalu tetap pada posisi

    vertikal tegak lurus terhadap permukaan tanah.

    2. Pastikan posisi tangan tidak berada di dekat anvil/landasan penumbuk.

    H. PERAWATAN

    1. Bersihkan peralatan (terutama pada batang baja dan konus)setiap kali

    selesai digunakan.

    2. Masukkan kembali peralatan ke dalam kantongnya setelahselesai

    digunakan agar terhindar dari air dan cuaca yang dapatmenyebabkan

    karat.

    I. HASIL PRAKTIKUM

    PENGUJIAN PENETROMETER KONUS DINAMIS (DCP)

    PROYEK :DESAIN PERKERASAN JALAN DIKERJAKAN : KELOMPOK 1 & 2

    LOKASI :JALAN SLAMET RIYADI, KAB. SEMARANG DIHITUNG : KELOMPOK 1 & 2

    STA/KM :1

    TANGGAL :21-5-2014

    UKURAN KONUS :60

    BANYAK KUMULATIF PENETRASI KUMULATIF DCP CBR

    TUMBUKAN TUMBUKAN PENETRASI

    (mm) (mm) (mm/tumbukan) (%)

    0 0 0 0

    60.630 2.971

    2 2 89 89

    2 4 175 175

    2 6 275 275

    2 8 462 462

    2 10 600 600

    2 12 705 705

    2 14 825 825

    2 16 970 970

  • 5

    Menghitung DCP

    DCP = (Penetrasi Awal-Penetrasi Akhir)/Kumulatif Tumbukan

    = (970-0)/16

    = 60.630 mm/tumbukan

    Menghitung CBR

    Ukuran konus 60o

    Log10 (CBR) = 2.8135-1.313 Log10(mm/tumbukan)

    Log10 (CBR) = 2.8135-1.313 Log10 x 60.63

    = 2.971 %

    y = -62.275x + 42.533

    R = 0.9928

    -1000

    -800

    -600

    -400

    -200

    0

    200

    0 5 10 15 20 25 30

    KOMULATIF PENETRASI (mm)

    KOMULATIF TUMBUKAN

  • 6

    PENGUJIAN PENETROMETER KONUS DINAMIS (DCP)

    PROYEK : DESAIN PERKERASAN JALAN DIKERJAKAN : KELOMPOK 1 & 2

    LOKASI :JALAN SLAMET RIYADI, KAB. SEMARANG DIHITUNG : KELOMPOK 1 & 2

    STA/KM :2

    TANGGAL :21-5-2014

    UKURAN KONUS :60

    BANYAK KUMULATIF PENETRASI KUMULATIF DCP CBR

    TUMBUKAN TUMBUKAN PENETRASI

    (mm) (mm) (mm/tumbukan) (%)

    0 0 0 0

    24.500 9.762

    2 2 100 100

    2 4 200 200

    2 6 405 405

    2 8 438 438

    2 10 450 450

    2 12 455 455

    2 14 464 464

    2 16 470 470

    2 18 480 480

    2 20 490 490

    Menghitung DCP

    DCP = (Penetrasi Awal-Penetrasi Akhir)/Kumulatif Tumbukan

    = (490-0)/20

    = 24.500 mm/tumbukan

    Menghitung CBR

    Ukuran konus 60o

    Log10 (CBR) = 2.8135-1.313 Log10(mm/tumbukan)

    Log10 (CBR) = 2.8135-1.313 Log10 x 24.50

    = 9.762 %

  • 7

    y = -22.341x - 135.86

    R = 0.7266

    -700

    -600

    -500

    -400

    -300

    -200

    -100

    0

    0 5 10 15 20 25 30

    KOMULATIF PENETRASI (mm)

    KOMULATIF TUMBUKAN

  • 8

    PENGUJIAN PENETROMETER KONUS DINAMIS (DCP)

    PROYEK :DESAIN PERKERASAN JALAN DIKERJAKAN :KELOMPOK 1 & 2

    LOKASI :JALAN SLAMET RIYADI, KAB. SEMARANG DIHITUNG :KELOMPOK 1 & 2

    STA/KM :3

    TANGGAL :21-4-2014

    UKURAN KONUS :60

    BANYAK KUMULATIF PENETRASI KUMULATIF DCP CBR

    TUMBUKAN TUMBUKAN PENETRASI

    (mm) (mm) (mm/tumbukan) (%)

    0 0 0 0

    20.830 12.080

    2 2 20 20

    2 4 30 30

    2 6 45 45

    2 8 50 50

    2 10 65 65

    2 12 78 78

    2 14 97 97

    2 16 125 125

    2 18 151 151

    2 20 193 193

    2 22 229 229

    2 24 283 283

    2 26 310 310

    2 28 342 342

    2 30 425 425

    2 32 478 478

    2 34 525 525

    2 36 552 552

    2 38 597 597

    2 40 677 677

    2 42 768 768

    2 44 849 849

    2 46 928 928

    2 48 1000 1000

  • 9

    Menghitung DCP

    DCP = (Penetrasi Awal-Penetrasi Akhir)/Kumulatif Tumbukan

    = (1000-0)/48

    = 20.830 mm/tumbukan

    Menghitung CBR

    Ukuran konus 60o

    Log10 (CBR) = 2.8135-1.313 Log10(mm/tumbukan)

    Log10 (CBR) = 2.8135-1.313 Log10 x 20.83

    = 12.080 %

    y = -20.393x + 136.75

    R = 0.9349

    -1000

    -800

    -600

    -400

    -200

    0

    200

    0 5 10 15 20 25 30 35 40 45 50

    KOMULATIF PENETRASI (mm)

    KOMULATIF TUMBUKAN

  • 10

    PENGUJIAN PENETROMETER KONUS DINAMIS (DCP)

    PROYEK :DESAIN PERKERASAN JALAN DIKERJAKAN :KELOMPOK 1 & 2

    LOKASI :JALAN SLAMET RIYADI, KAB. SEMARANG DIHITUNG :KELOMPOK 1 & 2

    STA/KM :4

    TANGGAL :21-5-2014

    UKURAN KONUS :60

    BANYAK KUMULATIF PENETRASI KUMULATIF DCP CBR

    TUMBUKAN TUMBUKAN PENETRASI

    (mm) (mm) (mm/tumbukan) (%)

    0 0 0 0

    13.730 20.890

    2 2 10 10

    2 4 30 30

    2 6 45 45

    2 8 68 68

    2 10 95 95

    2 12 115 115

    2 14 141 141

    2 16 179 179

    2 18 213 213

    2 20 242 242

    2 22 260 260

    2 24 293 293

    2 26 316 316

    2 28 340 340

    2 30 363 363

    2 32 405 405

    2 34 463 463

    2 36 504 504

    2 38 539 539

    2 40 549 549

  • 11

    Menghitung DCP

    DCP = (Penetrasi Awal-Penetrasi Akhir)/Kumulatif Tumbukan

    = (549-0)/40

    = 13.730 mm/tumbukan

    Menghitung CBR

    Ukuran konus 60o

    Log10 (CBR) = 2.8135-1.313 Log10(mm/tumbukan)

    Log10 (CBR) = 2.8135-1.313 Log10 x 13.73

    = 20.890 %

    y = -14.306x + 39.926

    R = 0.9881

    -600

    -500

    -400

    -300

    -200

    -100

    0

    100

    0 10 20 30 40 50

    KOMULATIF PENETRASI (mm)

    KOMULATIF TUMBUKAN

  • 12

    PENGUJIAN PENETROMETER KONUS DINAMIS (DCP)

    PROYEK :DESAIN PERKERASAN JALAN DIKERJAKAN :KELOMPOK 1 & 2

    LOKASI :JALAN SLAMET RIYADI, KAB. SEMARANG DIHITUNG :KELOMPOK 1 & 2

    STA/KM :5

    TANGGAL :21-5-2013

    UKURAN KONUS :60

    BANYAK KUMULATIF PENETRASI KUMULATIF DCP CBR

    TUMBUKAN TUMBUKAN PENETRASI

    (mm) (mm) (mm/tumbukan) (%)

    0 0 0 0

    34.640 6.190

    2 2 45 45

    2 4 83 83

    2 6 133 133

    2 8 165 165

    2 10 210 210

    2 12 320 320

    2 14 410 410

    2 16 490 490

    2 18 520 520

    2 20 635 635

    2 22 705 705

    2 24 778 778

    2 26 870 870

    2 28 970 970

    Menghitung DCP

    DCP = (Penetrasi Awal-Penetrasi Akhir)/Kumulatif Tumbukan

    = (970-0)/28

    = 34.640 mm/tumbukan

    Menghitung CBR

    Ukuran konus 60o

    Log10 (CBR) = 2.8135-1.313 Log10(mm/tumbukan)

    Log10 (CBR) = 2.8135-1.313 Log10 x 34.64

    = 6.190 %

  • 13

    y = -35.184x + 70.308

    R = 0.985

    -1000

    -800

    -600

    -400

    -200

    0

    200

    0 5 10 15 20 25 30 35

    KOMULATIF PENETRASI (mm)

    KOMULATIF TUMBUKAN

  • 14

    PENGUJIAN PENETROMETER KONUS DINAMIS (DCP)

    PROYEK :DESAIN PERKERASAN JALAN DIKERJAKAN :KELOMPOK 1 & 2

    LOKASI :JALAN SLAMET RIYADI, KAB. SEMARANG DIHITUNG :KELOMPOK 1 & 2

    STA/KM :6

    TANGGAL :21-5-2014

    UKURAN KONUS :60

    BANYAK KUMULATIF PENETRASI KUMULATIF DCP CBR

    TUMBUKAN TUMBUKAN PENETRASI

    (mm) (mm) (mm/tumbukan) (%)

    0 0 0 0

    8.940 36.690

    2 2 53 53

    2 4 90 90

    2 6 110 110

    2 8 118 118

    2 10 125 125

    2 12 137 137

    2 14 150 150

    2 16 170 170

    2 18 188 188

    2 20 198 198

    2 22 205 205

    2 24 210 210

    2 26 225 225

    2 28 255 255

    2 30 273 273

    2 32 287 287

    2 34 310 310

    2 36 320 320

    2 38 330 330

    2 40 346 346

    2 42 355 355

    2 44 367 367

    2 46 390 390

    2 48 429 429

  • 15

    Menghitung DCP

    DCP = (Penetrasi Awal-Penetrasi Akhir)/Kumulatif Tumbukan

    = (429-0)/48

    = 8.940 mm/tumbukan

    Menghitung CBR

    Ukuran konus 60o

    Log10 (CBR) = 2.8135-1.313 Log10(mm/tumbukan)

    Log10 (CBR) = 2.8135-1.313 Log10 x 8.94

    = 36.690 %

    y = -7.6323x - 42.465

    R = 0.9864

    -500

    -400

    -300

    -200

    -100

    0

    0 10 20 30 40 50 60 70 80

    KOMULATIF PENETRASI (mm)

    KOMULATIF TUMBUKAN

  • 16

    J. REKAPITULASI HASIL CBR

    No. Titik CBR Prosentase

    1 2.971 6 6/6 x 100% =100%

    5 6.190 5 5/6 x 100% =83%

    2 9.762 4 4/6 x 100% =67%

    3 12.080 3 3/6 x 100% =50%

    4 20.890 2 2/6 x 100% =33%

    6 36.690 1 1/6 x 100% =17%

    0%

    10%

    20%

    30%

    40%

    50%

    60%

    70%

    80%

    90%

    100%

    0 10 20 30 40

    Nilai CBR

  • 17

    Nilai CBR = 0.0009x2 - 0.0613x + 1.1649

    0.9 = 0.0009x2 - 0.0613x + 1.1649

    0.9 - 1.1649 = 0.0009x2 - 0.0613x

    -0.265 = 0.0009x2 - 0.0613x

    0 = 0.0009x2 - 0.0613x + 0.265

    x = 4.64

    Jadi, nilai CBR 90% adalah 4.64

    K. KESIMPULAN

    Dari percobaan di atas dapat ditarik kesimpulan:

    1. Dynamic Cone Penetrometer merupakan alat yang sederhana dalam

    pengoprasiannya untuk mendapatkan harga CBR.

    2. Dari Dynamic Cone Penetrometer ini dapat diketahui nilai CBR langsung

    lapangan melalui grafik standar yang ada.

    3. Dari hasil praktikum didapatkan bahwa nilai CBR 90% adalah 4.64

    y = 0.0009x2 - 0.0613x + 1.1649

    R = 0.9886

    0%

    10%

    20%

    30%

    40%

    50%

    60%

    70%

    80%

    90%

    100%

    0 10 20 30 40

    Nilai CBR

  • 18

    DAFTAR PUSTAKA

    _____ . Cara uji CBR dengan Dynamic Cone Penetrometer (DCP). Departemen

    Pekerjaan Umum