1 Las Positas and Modoc Roads Multiuse Path Construction Update Contractor places steel rebars to construct the concrete barrier along Las Positas Road The Las Positas and Modoc Roads Multiuse Path Project (Project) provides a 2.6 mile-long separated pathway for bicyclists, runners, and pedestrians of all ages and abilities along Las Positas and Modoc Roads. This path provides critical local and regional connections. Construction began in late September 2020, with an estimated 18-month construction duration, which also includes the planting of replacement trees and landscaping. The City’s contractor, Rasmussen, is continuing to work on the steel rebar and wall forms for the concrete barriers along Las Positas Road. The barrier rail improvements will separate the multiuse path from vehicular traffic, providing safety benefits for all trail users. Rasmussen has also began working on the box culvert along Las Positas Road, which is needed in order to construct the trail over two existing 36-inch storm drain pipe outlets (see photos on Page 4).

Las Positas and Modoc Roads Multiuse Path Construction Update

  • Upload
    others

  • View
    7

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Las Positas and Modoc Roads Multiuse Path Construction Update

1

Las Positas and Modoc Roads Multiuse Path Construction Update

Contractor places steel rebars to construct the concrete barrier along Las Positas Road

The Las Positas and Modoc Roads Multiuse Path Project (Project) provides a 2.6 mile-long separated pathway for bicyclists, runners, and pedestrians of all ages and abilities along Las Positas and Modoc Roads. This path provides critical local and regional connections. Construction began in late September 2020, with an estimated 18-month construction duration, which also includes the planting of replacement trees and landscaping. The City’s contractor, Rasmussen, is continuing to work on the steel rebar and wall forms for the concrete barriers along Las Positas Road. The barrier rail improvements will separate the multiuse path from vehicular traffic, providing safety benefits for all trail users. Rasmussen has also began working on the box culvert along Las Positas Road, which is needed in order to construct the trail over two existing 36-inch storm drain pipe outlets (see photos on Page 4).

Page 2: Las Positas and Modoc Roads Multiuse Path Construction Update

2

On Monday, June 21st, the Waterline Replacement Project along Modoc Road will resume construction on the pavement restoration work. Tierra’s subcontractor will perform limited asphalt grinding and overlay work over the waterline trench to restore the pavement per City standard requirements. The paving work will occur primarily between Tuesday, June 22 to Thursday, June 24, along Modoc Road from Calle De Los Amigos to approximately 800 feet East of Veronica Springs Road. Traffic control and temporary striping changes to the Las Positas corridor between Modoc Road and Cliff Drive will continue to remain in place. The public is reminded that the speed limit is reduced to 35-mph, and traffic has shifted to allow enough buffer for construction work to occur safely. Drivers must temporarily share the road with cyclists and proceed cautiously within the Las Positas corridor during construction. The City thanks the public for their continued cooperation and patience during construction of this important Vision Zero Project. For more information, please visit the Project website: https://www.santabarbaraca.gov/gov/depts/pw/stmain/traffic/bikepath/default.asp

Page 3: Las Positas and Modoc Roads Multiuse Path Construction Update

3

Construction Photos

Contractor poured the the concrete barrier along Las Positas Road between Modoc Road and Meadows Lane (Please note that these barriers are still in construction and not yet complete).

Figure 1: llustration of roadway section on the upper portion of Las Positas Road

Page 4: Las Positas and Modoc Roads Multiuse Path Construction Update

4

Contractor begins construction of a box culvert in order for the trail to go over the existing storm drain outlet

Page 5: Las Positas and Modoc Roads Multiuse Path Construction Update

5

Concrete barrier construction continues