3
Power – London Power Tunnels ‘Choosing CostainSupporting future energy use in London Ageing cable network and increasing energy demand in London Client: National Grid Awarded Value: £220m Duration: 2012-2018 The Project 32 km of tunnels 14 shafts & Head Houses 64 km of 400kV cable 2 major substations

London Power Tunnels - Ioanna Papanikolaou

Embed Size (px)

Citation preview

Power – London Power Tunnels

‘Choosing Costain’

Supporting future energy use in

London

Ageing cable network and increasing energy demand in London

Client: National Grid

Awarded Value: £220m

Duration: 2012-2018

The Project

•32 km of tunnels•14 shafts & Head Houses•64 km of 400kV cable•2 major substations

‘Choosing Costain’

Placement Activities

Trainee TBM Shift Engineer•Trapezoidal rings

•TACS

Surface Operations

Health and safety•Site Inductions

•Weekly and Monthly Inspections

•RAMS, WASPS

•Occupational Health

•COSHH

•HAVS Monitoring

2

Environment•Environmental Inspections

•Waste Management

•Water Discharge Monitoring

‘Choosing Costain’

Key Learning Points

Key Benefits

Site Engineer Duties

Tunnelling Operations

Surveying Equipment

ICE Progress

3

Core Competencies

•SHE•Teamwork •Leadership •Communication Skills •Problem Solving