44
Loomis Armored US - Jones Lang LaSalle 3635 Southside Industrial Parkway - Atlanta, GA March 2012 - July 2012

Loomis armoredpr book

Embed Size (px)

Citation preview

Page 1: Loomis armoredpr book

Loomis Armored US - Jones Lang LaSalle

3635 Southside Industrial Parkway - Atlanta, GAMarch 2012 - July 2012

Loo

mis A

rmo

red U

S - Jon

es Lang LaSalle

36

35

Sou

thsid

e Ind

ustrial P

arkway - A

tlanta, G

A

Page 2: Loomis armoredpr book
Page 3: Loomis armoredpr book

Loomis Armored US Jones Lang LaSalle ARCO Design/Build

ARCO Design/Build would liketo thank both Loomis ArmoredUS and Jones Lang LaSalle for

the amazing opportunity to beyour partner for this important

project. We can't thankeveryone enough for their hard

work and dedication

Page 4: Loomis armoredpr book
Page 5: Loomis armoredpr book

Prior to construction,the facility waslargely openwarehouse spacewith a singlemezzanine located inthe middle of thefacility. Constructionbegan with thedemolition of thisstructure whileworking to protectthe integrity of theslab and exteriorstructure.

Page 6: Loomis armoredpr book

While work on the mezzanine proceeded,the slab was removed and additionalmaterial was excavated in preparation forthe future vault floor slabs

Page 7: Loomis armoredpr book
Page 8: Loomis armoredpr book

Mezzaninedemolitionwasperformedover recycledtires to avoiddamage tothe existingfloor slab

Page 9: Loomis armoredpr book
Page 10: Loomis armoredpr book

Future vault slabpreparations

Page 11: Loomis armoredpr book
Page 12: Loomis armoredpr book

Bullet resistantpanels beginerection

Metal framing not farbehind

Page 13: Loomis armoredpr book
Page 14: Loomis armoredpr book

Pouring andfinishing ofthe floor slabfor futurevault areas

Page 15: Loomis armoredpr book
Page 16: Loomis armoredpr book
Page 17: Loomis armoredpr book

Bullet-resistant door

installation

Page 18: Loomis armoredpr book

Overhead HVAC

Page 19: Loomis armoredpr book

Office framing incash management

Page 20: Loomis armoredpr book
Page 21: Loomis armoredpr book
Page 22: Loomis armoredpr book
Page 23: Loomis armoredpr book

Interior concreteramp

Page 24: Loomis armoredpr book

Security mesh

Page 25: Loomis armoredpr book
Page 26: Loomis armoredpr book
Page 27: Loomis armoredpr book
Page 28: Loomis armoredpr book

Entry vestibules

Page 29: Loomis armoredpr book

Truck Drive

Page 30: Loomis armoredpr book
Page 31: Loomis armoredpr book

Cash Management

Page 32: Loomis armoredpr book

Future Vault Space

Page 33: Loomis armoredpr book
Page 34: Loomis armoredpr book
Page 35: Loomis armoredpr book
Page 36: Loomis armoredpr book
Page 37: Loomis armoredpr book

Exterior workincluded theaddition oflandscapedareas, twoconcrete drive-in ramps, andsecurity fencing

Page 38: Loomis armoredpr book
Page 39: Loomis armoredpr book
Page 40: Loomis armoredpr book
Page 41: Loomis armoredpr book
Page 42: Loomis armoredpr book
Page 43: Loomis armoredpr book
Page 44: Loomis armoredpr book