Lunar Lander ProjectPatrick Thurston and David Cobler
Problem
• VTC is sending a cube-sat to the moon and the Lander needs to be thoroughly tested before a final design can be made.
Mission Diagram
Solution
• Create a testing system that will repeatadly test the lander under various conditions and record the information gathered.
Technical Details
• The testing platform will need to simulate:– Varying drop height/mass/velocity– Varying Landing orientations– Varying Terrain conditions– Calculate the shock– Calculate the stability of the lander
System Design
Cube Sat
Release/Retrieve System
Base Adjustment System
Mechanical Aspects
Electrical
• Large Stepper motor for base• Small Stepper motor for inclining base• Medium Stepper motor to lift the Lander• One Electromagnetic clutch to release Lander• An accelerometer in the Lander to measure shock
Logic Flow
Lab View/6808
Lifting Motor Controller
Base Orientation Motor Controller
Lifting Stepper Motor
Electromagnetic Clutch
Inclined Table Stepper Motor
Base Stepper Motor
Accelerometer
Inclined Table Motor Controller
Budget
• Three Stepper Motors $100• One Electromagnetic Clutch $25• One Accelerometer $20• Aluminum stock (for frame) $100• Threaded Rod $10• Line Spool $10Total: $265
Time Management
Nov. Dec. Jan. Feb. Mar. Apr. May.Brainstorming
Systems Design
Programming
ElectricalMechanical System Build
Test Apparatus Build
Testing