DRAFT 06.03.09
Madison Valley Stormwater Project Phase 2
Seattle Design Commission June 4, 2009
Seattle City Hall
Boards and Commissions Room, L2-80
DRAFT 06.03.09
Three Stormwater Pipeline Alignment Options
Baseline Open-Cut Trenchless
DRAFT 06.03.09
Selected Stormwater Pipeline Alignment
= Proposed shaft location
= Stormwater pipeline
DRAFT 06.03.09
Construction Boundaries in Washington Park
DRAFT 06.03.09
Existing Conditions in Washington Park
Looking toward southwest corner of Washington Park
Mixed-use building on E
Madison St
E Madison St streetscape Batting cage and south slope
from lower lawn
View down into site from
E Madison St
DRAFT 06.03.09
Conceptual Landscape Plan
DRAFT 06.03.09
Conceptual Landscape Details BALUSTRADE / ORNAMENTAL RAILING
Concrete or Cast Stone Balustrade
Metal Railing on Low Wall
Metal Railing on Curb
DRAFT 06.03.09
Conceptual Landscape Details EXISTING STORAGE TANK FACADE
Natural Stone
Shotcrete Stone Work in Washington Arboretum Stone Veneer
Synthetic Stone
Stone Façade
on Tank
Overlook with
Ornamental Railing
Upper Lawn
Rain Garden and
Drainage Grate
Sunken Lawn Meadow with
Wooded Hillside Beyond
DRAFT 06.03.09
Preliminary Tree Preservation Plan
DRAFT 06.03.09
Project Schedule