10
DRAFT 06.03.09 Madison Valley Stormwater Project Phase 2 Seattle Design Commission June 4, 2009 Seattle City Hall Boards and Commissions Room, L2-80

Madison Valley Stormwater Project Phase 2...Phase 2 Design Proposed Phase 2 public meetings Phase 2 Construction Stormwater Storage Facility Clearing and Grading Storage Tank Final

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

  • DRAFT 06.03.09

    Madison Valley Stormwater Project Phase 2

    Seattle Design Commission June 4, 2009

    Seattle City Hall

    Boards and Commissions Room, L2-80

  • DRAFT 06.03.09

    Three Stormwater Pipeline Alignment Options

    Baseline Open-Cut Trenchless

  • DRAFT 06.03.09

    Selected Stormwater Pipeline Alignment

    = Proposed shaft location

    = Stormwater pipeline

  • DRAFT 06.03.09

    Construction Boundaries in Washington Park

  • DRAFT 06.03.09

    Existing Conditions in Washington Park

    Looking toward southwest corner of Washington Park

    Mixed-use building on E

    Madison St

    E Madison St streetscape Batting cage and south slope

    from lower lawn

    View down into site from

    E Madison St

  • DRAFT 06.03.09

    Conceptual Landscape Plan

  • DRAFT 06.03.09

    Conceptual Landscape Details BALUSTRADE / ORNAMENTAL RAILING

    Concrete or Cast Stone Balustrade

    Metal Railing on Low Wall

    Metal Railing on Curb

  • DRAFT 06.03.09

    Conceptual Landscape Details EXISTING STORAGE TANK FACADE

    Natural Stone

    Shotcrete Stone Work in Washington Arboretum Stone Veneer

    Synthetic Stone

    Stone Façade

    on Tank

    Overlook with

    Ornamental Railing

    Upper Lawn

    Rain Garden and

    Drainage Grate

    Sunken Lawn Meadow with

    Wooded Hillside Beyond

  • DRAFT 06.03.09

    Preliminary Tree Preservation Plan

  • DRAFT 06.03.09

    Project Schedule