Upload
manish-ray
View
176
Download
3
Embed Size (px)
Citation preview
Marital Status MarriedLanguage Known English, Hindi,
RussianPassport number F6063989Nationality IndianSaudi driving licenses no 2358357669
SUMMARY OF EXPERIANCE :
MANISH KUMAR RAYAstha Tara MansionFlat # - 1/3Polytechnic RoadDist- Dhanbad -826001 State - JharkhandMobile: 0091-8936859552
Mobile: 0091-8986722698
Mobile: 00966 -582268695
E-mail [email protected]
A Graduate Engineer with 14 Years of Professional Experience both in Plant Piping and Cross country Pipe Lines of Oil and Gas Industry, Power Plants, Water Treatment Plants, Sewage Treatment Plants, Piping Platform skids, RDS (Remote degassing stations), Water Injection Clusters, Oil Production Wells, Hydro Test Activities, HSE Management, Safety Coordination and Pre-Commissioning Activities based on Project Division requirement.
Bachelor of Mechanical Engineering from ULYANOVSK STATE TECHNICAL UNIVERSITY OF RUSSIA – RUSSIAN UNIVERSITY
1) Plant Piping Fabrication@ Fab shop/Site, Site Erection, Testing and Pre-Commissioning
2) Modular Structure Assembly and Erection – Ranging from 12 Ton ~ 48 Ton3) Static and Rotary Equipment Erection and Testing 4) Planning and Scheduling5) Well versed with ASME Piping Standards and API standards for Material Selection
and for Execution of Job.6) Good exposure in Pressure design of Process Piping and Component as per ASME
B 31.3 [Straight Pipe, Flanges, Elbows and Miter bends, Reinforced branch connections, Blanks, Blind flanges, Expansion joints].
TECHNICAL EXPERTISE:
EDUCATIONAL QUALIFICATION:
PERSONAL DETAILS:
TRAINING COMPETED:
JOB PROFILE :
H2s safety training - Abu Dhabi
Onshore Safety Task Training - Abu Dhabi
Central Rigging Training - Abu Dhabi
Total Safety Task Instruction Training - Saudi Arabia
Industrial Leadership Management Training - Saudi Arabia
Pre-Commissioning Training – Mauritania
1) Preparation and reporting all the Critical and Relevant project data’s to
Construction Manager to track and achieve project Major Milestones.
2) Preparation and getting approvals of necessary documentation from Client like
Method Statements, Procedures according to Standards and Project Quality
Specifications.
3) Preparation of Constructability studies according to site lay-outs.
4) Preparation of Construction schedules along with Planning in establishing the
Level – V schedule.
5) Daily site activities planning according weekly and monthly forecast.
6) Execution of job in direct co-ordination with Supervisory staff and ensuring that
job has been executed in compliance of work scope, specification and standards
7) Preparation of Summaries of actual man-hours against the budgeted man-hours to
Cost Dept. to evaluate the variation.
8) Inspecting the Edge Preparation of the Joints in terms of WEP (weld edge
preparation), Inspection of the Raw materials like, pipes, knee brackets, hangers as
per given specification (ASME B-31.3).
9) Stage wise Inspection of various activities in the shop floor.
10)Supervising contractor’s work plan for project.
11)Technical support for onsite modification of pipes.
CURRENT JOB PROFILE / RESPOSIBILITIES
CURRENT EMPLOYMENT:
Track Record
CURRENT EMPLOYER:
COMPANY NAME : CONSOLIDATED CONTRACTORS INTL COMPANY
POSITION TITLE : SECTION PIPING ENGINEER
SPECIALISATION : PIPING
INDUSTURY : PETROCHEMICAL
POSITION : SECTION PIPING ENGINEER
COMPANY : CONSOLIDATED CONTRACTORS INTL COMPANY
LOCATION : SAUDI ARABIA JUBAIL
PROJECT NAME : SADARA HYDROGEN PEROXIDE PLANT
DURATION : DECEMBER 2013 TO TILL DATE
Overall Supervision of including such as:1) HSE, House Keeping, piping prefabrication including pipe supports, piping
erections including pipe supports, spool pieces control, check and monitor tools, equipment and welding consumables, check and monitor preservation, pipe internal cleaning for small bore and large bore, including jacket pipes for storage tanks for H2SO4 (trains 4 and 5);
2) Schedule monitoring for manpower mobilization welding Dia-inch, No. of spools and Pipe Supports
3) Piping internal inspection witness for large bore piping4) Check if the latest construction drawings are used5) Consult Engineering problems6) Check and consult spools delivery in site7) Check work front and coordinate with other disciplines8) Request scaffolding construction9) Ensure work permits (confined space welding, grinding, erection, work for high
level, etc)10) Check flange alignment related to rotating equipment and static equipment
nozzle11) Follow Up of punch work12) Prepare daily and weekly reports
POSITION : SITE PIPING ENGINEER
COMPANY : CONSOLIDATED CONTRACTORS INTL COMPANY, UAE
LOCATION : SOUTH AFRICA - MOURTANIA
PROJECT NAME : TASIAST EXPENSION PROJECT
DURATION : FEBRUARY 2013 TO NOVEMBER 2013
Overall supervision for:1) Managing construction activities carried out by contractors, ensuring the scope of
work is achieved in accordance with contract requirement and time frame, and compliance with specifications and standard established
2) Coordinating the activities of subordinated supervisors ensuring that the project steps are respected
3) Ensuring that contractor’s duties are performed by competent and experienced personnel and in sufficient number to achieve objectives
4) Coordination of fabrication for 20 temporary bridges5) Painting pipes and supports in workshop6) Work organization of Site area site, such as:
a. Assembly two towers crane b. Bringing a permanent crane type COBELCO - 250 tones c. Bringing also four hydraulic crane type GROWE & TADANO by 100 tons, 80
tons, 55 tons, and 30 tons.d. Bringing the Diesel welding machines (40 pcs.) and all the cables and tools
for welders, including also 40 portable welding machines.e. Bringing the tools container and all the tools and devices for piping group.f. Bringing the site store container to store spools and site consumables
EXPERIENCE: 1
JOB RESPONSIBILITIES
J OB RESPONSIBILITIES
EXPERIENCE: 3
JOB RESPONSIBILITIES
EXPERIENCE: 2
EXPERIENCE: 3
JOB RESPONSIBILITIES
POSITION : SITE PIPING ENGINEER
COMPANY : CONSOLIDATED CONTRACTORS INTL COMPANY
LOCATION : UAE – ABUDHABI
PROJECT NAME : BAB TAMAMA G PROJECT (HABSHAN OIL FIELD)
INDUSTRY : OIL AND GAS
DURATION : AUGUST 2011 TO NOVEMBER 2012
Worked as a Field Piping Engineer in Remote Degassing Stations, Oil Production Wells, Remote De-Gassing Manifolds, Water Injection Clusters and Water Injection wells for crude oil production.
POSITION : SITE PIPING ENGINEER
COMPANY : M/S. BLACK CAT WLL
LOCATION : QATER
PROJECT NAME : EPIC OF SMOKELESS FLARE & AUTOMATIC BLOW DOWN
YSTEM
INDUSTRY : OIL AND GAS
DURATION : DECEMBER 2009 TO JUNE 2011
1) Worked as a Site Piping Engineer - Smokeless Flare Project. Executed and completed the Seal Gas Drum Piping, High Pressure Compressor Piping, Vessels Piping, Main Pipe Racks Piping and Lube oil skid Piping.
2) Planning, Execution and co-ordination with Management, etc.
PREVIOUS EXPERIENCE: 4
PREVIOUS EXPERIENCE: 5
JOB RESPONSIBILITIES
JOB RESPONSIBILITIES
POSITION : SITE PIPING ENGINEER
COMPANY : CONSOLIDATED CONTRACTORS INTL COMPANY
LOCATION : SAUDI ARABIA - JUBAIL
PROJECT NAME : KHURSANIYAH GAS PROJECT
INDUSTRY : OIL AND GAS
DURATION : OCTOBER 2008 TO OCTOBER 2009
1) My responsibilities include Supervision of Fabrication and Erection of Spools of Utilities Service and Process Piping
2) Co-ordination with Pre-Commissioning Group3) Planning and Scheduling, Progress Monitoring, Preparation of As-Built Drawing
according to the site conditions 4) Working in line with the company’s HSE and Quality policy.
POSITION : SR. MECHANICAL ENGINEER.
COMPANY : TOYO ENGINEERING INDIA LTD.,
LOCATION : HALDIA, WEST BENGAL
PROJECT NAME : HALDIA PETROCHEMICALS LTD., REVAMP SUPER MAX
PROJECT
INDUSTRY : OIL AND GAS
DURATION : MAY 2007 TO SEPTEMBER 2008
1) Piping and Heater – Furnace and Piping of Naphtha Cracker Unit2) Erection and Alignment of structure, module, radiant coil, TLE, Steam drum, ID
fans, cross over, jump over, peep door burner works and 3) LTCS, CS and Alloy steel HP, MP, and LP Piping in Furnace and Naphtha Unit
Piping. 4) Preparation of As Built Drawing5) Material Reconciliation.
PREVIOUS EXPERIENCE: 6
POSITION : SITE PIPING ENGINEER
COMPANY : ENGINEERS INDIA LTD.,
LOCATION : DHABOL -PANVEL PIPE LINE
MDPL MUNDRA-DELHI PIPE LINE
DURATION : APRIL 01, 2006 TO APRIL 30, 2007.
My responsibilities includes inspection for lowering coating, tie-in welding, trenching, back filling,
of pipe lines & bill certification. Multipurpose Line and 30” Gas Line, As a Site Piping Engineer.
POSITION : SITE PIPING ENGINEERCOMPAN : S K CONSTRUCTIONLOCATION : ESSAR OIL REFINERY PROJECTDURATION : MAY 2005 to MARCH 2006.
My responsibilities include supervision of Project construction activities- Unit and Rack piping of CDU, VDU, SGU and FCCU.
POSITION : PIPING ENGINEERCOMPANY : RANDHAWA CONSTRUCTION COMPANYWORKING LOCATION: RELIANCE REFINERY PROJECT JAMNAGAR, GUJARAT INDUSTRY : OIL AND GASDURATION OF WORK: AUGUST 2002 TO MARCH 2005.Grass root project as a Piping Engineer.My responsibilities include supervision of Project Construction, Piping, and Equipment Fabrication & Erection activities in FCCU.
POSITION : PIPING ENGINEERCOMPANY : NAWAZ CONSTRUCTION COMPANYLOCATION : RELIANCE REFINERY PROJECT JAMNAGAR, GUJARATINDUSTRY : OIL AND GASDURATION : FEBRUARY 2000 TO JUNE 2002
Grass root project as a Piping Engineer.
PREVIOUS EXPERIENCE: 7
PREVIOUS EXPERIENCE: 8
PREVIOUS EXPERIENCE: 9
My responsibilities include supervision of Rack Piping, fabrication & Erection in CRUDE-1
SOFTWARE SKILLS:
Piping Drafting: - Auto CADDeclaration:I hereby confirm that the information given above is true to best of my knowledge
Place: JUBAIL SAUDI ARABIA Yours Faithfully,
Manish Kumar Ray