Marital Status Married Language Known English, Hindi, Russian Passport number F6063989 Nationality Indian Saudi driving licenses no 2358357669 SUMMARY OF MANISH KUMAR RAY Astha Tara Mansion Flat # - 1/3 Polytechnic Road Dist- Dhanbad -826001 State - Jharkhand Mobile: 0091-8936859552 Mobile: 0091-8986722698 Mobile: 00966 -582268695 E-mail [email protected] A Graduate Engineer with 14 Years of Professional Experience both in Plant Piping and Cross country Pipe Lines of Oil and Gas Industry, Power Plants, Water Treatment Plants, Sewage Treatment Plants, Piping Platform skids, RDS (Remote degassing stations), Water Injection Clusters, Oil Production Wells, Hydro Test Activities, HSE Management, Safety Coordination and Pre-Commissioning Activities based on Project Division requirement. Bachelor of Mechanical Engineering from ULYANOVSK STATE TECHNICAL UNIVERSITY OF RUSSIA – RUSSIAN UNIVERSITY 1) Plant Piping Fabrication@ Fab shop/Site, Site Erection, Testing and Pre-Commissioning 2) Modular Structure Assembly and Erection – Ranging from 12 Ton ~ 48 Ton 3) Static and Rotary Equipment Erection and Testing 4) Planning and Scheduling TECHNICAL EXPERTISE: EDUCATIONAL QUALIFICATION: PERSO N AL D ETAILS:

Manish Ray - CV

Embed Size (px)

Citation preview

Page 1: Manish Ray - CV

Marital Status MarriedLanguage Known English, Hindi,

RussianPassport number F6063989Nationality IndianSaudi driving licenses no 2358357669

SUMMARY OF EXPERIANCE :

MANISH KUMAR RAYAstha Tara MansionFlat # - 1/3Polytechnic RoadDist- Dhanbad -826001 State - JharkhandMobile: 0091-8936859552

Mobile: 0091-8986722698

Mobile: 00966 -582268695

E-mail [email protected]

A Graduate Engineer with 14 Years of Professional Experience both in Plant Piping and Cross country Pipe Lines of Oil and Gas Industry, Power Plants, Water Treatment Plants, Sewage Treatment Plants, Piping Platform skids, RDS (Remote degassing stations), Water Injection Clusters, Oil Production Wells, Hydro Test Activities, HSE Management, Safety Coordination and Pre-Commissioning Activities based on Project Division requirement.

Bachelor of Mechanical Engineering from ULYANOVSK STATE TECHNICAL UNIVERSITY OF RUSSIA – RUSSIAN UNIVERSITY

1) Plant Piping Fabrication@ Fab shop/Site, Site Erection, Testing and Pre-Commissioning

2) Modular Structure Assembly and Erection – Ranging from 12 Ton ~ 48 Ton3) Static and Rotary Equipment Erection and Testing 4) Planning and Scheduling5) Well versed with ASME Piping Standards and API standards for Material Selection

and for Execution of Job.6) Good exposure in Pressure design of Process Piping and Component as per ASME

B 31.3 [Straight Pipe, Flanges, Elbows and Miter bends, Reinforced branch connections, Blanks, Blind flanges, Expansion joints].

TECHNICAL EXPERTISE:

EDUCATIONAL QUALIFICATION:

PERSONAL DETAILS:

Page 2: Manish Ray - CV

TRAINING COMPETED:

JOB PROFILE :

H2s safety training - Abu Dhabi

Onshore Safety Task Training - Abu Dhabi

Central Rigging Training - Abu Dhabi

Total Safety Task Instruction Training - Saudi Arabia

Industrial Leadership Management Training - Saudi Arabia

Pre-Commissioning Training – Mauritania

1) Preparation and reporting all the Critical and Relevant project data’s to

Construction Manager to track and achieve project Major Milestones.

2) Preparation and getting approvals of necessary documentation from Client like

Method Statements, Procedures according to Standards and Project Quality

Specifications.

3) Preparation of Constructability studies according to site lay-outs.

4) Preparation of Construction schedules along with Planning in establishing the

Level – V schedule.

5) Daily site activities planning according weekly and monthly forecast.

6) Execution of job in direct co-ordination with Supervisory staff and ensuring that

job has been executed in compliance of work scope, specification and standards

7) Preparation of Summaries of actual man-hours against the budgeted man-hours to

Cost Dept. to evaluate the variation.

8) Inspecting the Edge Preparation of the Joints in terms of WEP (weld edge

preparation), Inspection of the Raw materials like, pipes, knee brackets, hangers as

per given specification (ASME B-31.3).

9) Stage wise Inspection of various activities in the shop floor.

10)Supervising contractor’s work plan for project.

11)Technical support for onsite modification of pipes.

Page 3: Manish Ray - CV

CURRENT JOB PROFILE / RESPOSIBILITIES

CURRENT EMPLOYMENT:

Track Record

CURRENT EMPLOYER:

COMPANY NAME : CONSOLIDATED CONTRACTORS INTL COMPANY

POSITION TITLE : SECTION PIPING ENGINEER

SPECIALISATION : PIPING

INDUSTURY : PETROCHEMICAL

POSITION : SECTION PIPING ENGINEER

COMPANY : CONSOLIDATED CONTRACTORS INTL COMPANY

LOCATION : SAUDI ARABIA JUBAIL

PROJECT NAME : SADARA HYDROGEN PEROXIDE PLANT

DURATION : DECEMBER 2013 TO TILL DATE

Overall Supervision of including such as:1) HSE, House Keeping, piping prefabrication including pipe supports, piping

erections including pipe supports, spool pieces control, check and monitor tools, equipment and welding consumables, check and monitor preservation, pipe internal cleaning for small bore and large bore, including jacket pipes for storage tanks for H2SO4 (trains 4 and 5);

2) Schedule monitoring for manpower mobilization welding Dia-inch, No. of spools and Pipe Supports

3) Piping internal inspection witness for large bore piping4) Check if the latest construction drawings are used5) Consult Engineering problems6) Check and consult spools delivery in site7) Check work front and coordinate with other disciplines8) Request scaffolding construction9) Ensure work permits (confined space welding, grinding, erection, work for high

level, etc)10) Check flange alignment related to rotating equipment and static equipment

nozzle11) Follow Up of punch work12) Prepare daily and weekly reports

Page 4: Manish Ray - CV

POSITION : SITE PIPING ENGINEER

COMPANY : CONSOLIDATED CONTRACTORS INTL COMPANY, UAE

LOCATION : SOUTH AFRICA - MOURTANIA

PROJECT NAME : TASIAST EXPENSION PROJECT

DURATION : FEBRUARY 2013 TO NOVEMBER 2013

Overall supervision for:1) Managing construction activities carried out by contractors, ensuring the scope of

work is achieved in accordance with contract requirement and time frame, and compliance with specifications and standard established

2) Coordinating the activities of subordinated supervisors ensuring that the project steps are respected

3) Ensuring that contractor’s duties are performed by competent and experienced personnel and in sufficient number to achieve objectives

4) Coordination of fabrication for 20 temporary bridges5) Painting pipes and supports in workshop6) Work organization of Site area site, such as:

a. Assembly two towers crane b. Bringing a permanent crane type COBELCO - 250 tones c. Bringing also four hydraulic crane type GROWE & TADANO by 100 tons, 80

tons, 55 tons, and 30 tons.d. Bringing the Diesel welding machines (40 pcs.) and all the cables and tools

for welders, including also 40 portable welding machines.e. Bringing the tools container and all the tools and devices for piping group.f. Bringing the site store container to store spools and site consumables

EXPERIENCE: 1

JOB RESPONSIBILITIES

Page 5: Manish Ray - CV

J OB RESPONSIBILITIES

EXPERIENCE: 3

JOB RESPONSIBILITIES

EXPERIENCE: 2

EXPERIENCE: 3

JOB RESPONSIBILITIES

POSITION : SITE PIPING ENGINEER

COMPANY : CONSOLIDATED CONTRACTORS INTL COMPANY

LOCATION : UAE – ABUDHABI

PROJECT NAME : BAB TAMAMA G PROJECT (HABSHAN OIL FIELD)

INDUSTRY : OIL AND GAS

DURATION : AUGUST 2011 TO NOVEMBER 2012

Worked as a Field Piping Engineer in Remote Degassing Stations, Oil Production Wells, Remote De-Gassing Manifolds, Water Injection Clusters and Water Injection wells for crude oil production.

POSITION : SITE PIPING ENGINEER

COMPANY : M/S. BLACK CAT WLL

LOCATION : QATER

PROJECT NAME : EPIC OF SMOKELESS FLARE & AUTOMATIC BLOW DOWN

YSTEM

INDUSTRY : OIL AND GAS

DURATION : DECEMBER 2009 TO JUNE 2011

1) Worked as a Site Piping Engineer - Smokeless Flare Project. Executed and completed the Seal Gas Drum Piping, High Pressure Compressor Piping, Vessels Piping, Main Pipe Racks Piping and Lube oil skid Piping.

2) Planning, Execution and co-ordination with Management, etc.

Page 6: Manish Ray - CV

PREVIOUS EXPERIENCE: 4

PREVIOUS EXPERIENCE: 5

JOB RESPONSIBILITIES

JOB RESPONSIBILITIES

POSITION : SITE PIPING ENGINEER

COMPANY : CONSOLIDATED CONTRACTORS INTL COMPANY

LOCATION : SAUDI ARABIA - JUBAIL

PROJECT NAME : KHURSANIYAH GAS PROJECT

INDUSTRY : OIL AND GAS

DURATION : OCTOBER 2008 TO OCTOBER 2009

1) My responsibilities include Supervision of Fabrication and Erection of Spools of Utilities Service and Process Piping

2) Co-ordination with Pre-Commissioning Group3) Planning and Scheduling, Progress Monitoring, Preparation of As-Built Drawing

according to the site conditions 4) Working in line with the company’s HSE and Quality policy.

POSITION : SR. MECHANICAL ENGINEER.

COMPANY : TOYO ENGINEERING INDIA LTD.,

LOCATION : HALDIA, WEST BENGAL

PROJECT NAME : HALDIA PETROCHEMICALS LTD., REVAMP SUPER MAX

PROJECT

INDUSTRY : OIL AND GAS

DURATION : MAY 2007 TO SEPTEMBER 2008

1) Piping and Heater – Furnace and Piping of Naphtha Cracker Unit2) Erection and Alignment of structure, module, radiant coil, TLE, Steam drum, ID

fans, cross over, jump over, peep door burner works and 3) LTCS, CS and Alloy steel HP, MP, and LP Piping in Furnace and Naphtha Unit

Piping. 4) Preparation of As Built Drawing5) Material Reconciliation.

Page 7: Manish Ray - CV

PREVIOUS EXPERIENCE: 6

POSITION : SITE PIPING ENGINEER

COMPANY : ENGINEERS INDIA LTD.,

LOCATION : DHABOL -PANVEL PIPE LINE

MDPL MUNDRA-DELHI PIPE LINE

DURATION : APRIL 01, 2006 TO APRIL 30, 2007.

My responsibilities includes inspection for lowering coating, tie-in welding, trenching, back filling,

of pipe lines & bill certification. Multipurpose Line and 30” Gas Line, As a Site Piping Engineer.

POSITION : SITE PIPING ENGINEERCOMPAN : S K CONSTRUCTIONLOCATION : ESSAR OIL REFINERY PROJECTDURATION : MAY 2005 to MARCH 2006.

My responsibilities include supervision of Project construction activities- Unit and Rack piping of CDU, VDU, SGU and FCCU.

POSITION : PIPING ENGINEERCOMPANY : RANDHAWA CONSTRUCTION COMPANYWORKING LOCATION: RELIANCE REFINERY PROJECT JAMNAGAR, GUJARAT INDUSTRY : OIL AND GASDURATION OF WORK: AUGUST 2002 TO MARCH 2005.Grass root project as a Piping Engineer.My responsibilities include supervision of Project Construction, Piping, and Equipment Fabrication & Erection activities in FCCU.

POSITION : PIPING ENGINEERCOMPANY : NAWAZ CONSTRUCTION COMPANYLOCATION : RELIANCE REFINERY PROJECT JAMNAGAR, GUJARATINDUSTRY : OIL AND GASDURATION : FEBRUARY 2000 TO JUNE 2002

Grass root project as a Piping Engineer.

PREVIOUS EXPERIENCE: 7

PREVIOUS EXPERIENCE: 8

PREVIOUS EXPERIENCE: 9

Page 8: Manish Ray - CV

My responsibilities include supervision of Rack Piping, fabrication & Erection in CRUDE-1

SOFTWARE SKILLS: