16
Update on EcoOBM (Officer Box Model, for Physical Exchanges) and Translation to Criteria-Relevant Metrics Mark Brush CHRP 2012 Managers’ Workshop

Mark Brush CHRP 2012 Managers’ Workshop

  • Upload
    cian

  • View
    22

  • Download
    0

Embed Size (px)

DESCRIPTION

Update on EcoOBM (Officer Box Model, for Physical Exchanges) and Translation to Criteria-Relevant Metrics. Mark Brush CHRP 2012 Managers’ Workshop. Officer Box Model: exchanges = f (freshwater, salinity). Fast run times Exchanges independent of ROMS Enables long term runs: 2001-09. - PowerPoint PPT Presentation

Citation preview

Page 1: Mark Brush CHRP  2012  Managers’ Workshop

Update on EcoOBM (Officer Box Model, for Physical Exchanges) and Translation to Criteria-

Relevant Metrics

Mark BrushCHRP 2012 Managers’ Workshop

Page 2: Mark Brush CHRP  2012  Managers’ Workshop

Officer Box Model:exchanges = f (freshwater, salinity)

• Fast run times• Exchanges independent of ROMS• Enables long term runs: 2001-09

• 7 gauged rivers • Ungauged area extrapolated• WWTFs• PPT and

Evaporation

Page 3: Mark Brush CHRP  2012  Managers’ Workshop

0.00

5.00

10.00

15.00

20.00

25.00

30.00

35.00

12/6/99 4/19/01 9/1/02 1/14/04 5/28/05 10/10/06 2/22/08 7/6/09 11/18/10

3S_S

3B_S

3S

3B

Insomniacs NuShuttle+ Buoys+

Box Model: Exchanges = f (freshwater, salinity)

Page 4: Mark Brush CHRP  2012  Managers’ Workshop

EcoOBM: Exchanges Compared to ROMS

Rogers (2008)

vs.

3D ROMS

2D boxmodel

Destination Box

Frac

tion

of W

ater

Box Model

ROMS

Source Box

2006

Page 5: Mark Brush CHRP  2012  Managers’ Workshop

EcoOBM: Surface Layer Chl-a

0

20

40

60

80

100

2001 2002 2003 2004 2005 2006 2007 2008 2009

0

20

40

60

80

100

2001 2002 2003 2004 2005 2006 2007 2008 2009

0

20

40

60

80

100

2001 2002 2003 2004 2005 2006 2007 2008 2009

0

20

40

60

80

100

2001 2002 2003 2004 2005 2006 2007 2008 2009

0

20

40

60

80

100

2001 2002 2003 2004 2005 2006 2007 2008 2009

mg m-3

Page 6: Mark Brush CHRP  2012  Managers’ Workshop

0123456

2001 2002 2003 2004 2005 2006 2007 2008 2009

01234567

2001 2002 2003 2004 2005 2006 2007 2008 2009

00.5

11.5

22.5

33.5

2001 2002 2003 2004 2005 2006 2007 2008 2009

00.5

11.5

22.5

33.5

44.5

5

2001 2002 2003 2004 2005 2006 2007 2008 2009

0

0.5

1

1.5

2

2.5

2001 2002 2003 2004 2005 2006 2007 2008 2009

EcoOBM: Phyto NPP

g C m-2 d-1

Page 7: Mark Brush CHRP  2012  Managers’ Workshop

EcoOBM: Bottom DO

0

5

10

15

20

2001 2002 2003 2004 2005 2006 2007 2008 2009

0

5

10

15

20

2001 2002 2003 2004 2005 2006 2007 2008 2009

0

5

10

15

20

2001 2002 2003 2004 2005 2006 2007 2008 2009

0

5

10

15

20

2001 2002 2003 2004 2005 2006 2007 2008 2009

0

5

10

15

20

2001 2002 2003 2004 2005 2006 2007 2008 2009

g m-3

Page 8: Mark Brush CHRP  2012  Managers’ Workshop

010203040506070

J F M A M J J A S O N D

Surface Chl- a, mg/m3

Bottom O20

10

20

30

40

50

60

70

J F M A M J J A S O N D

Standard Run

50% Load Reduction

Criterion:

40 ug/l 30 ug/l 20 ug/l

Std Run 3.4 12.7 33.8

50% Load 1.4 6.5 23.9

% Chance of Violations:

Stochastic Simulation

Page 9: Mark Brush CHRP  2012  Managers’ Workshop

MeanDO

MinimumDO

% Non-Compliance

1 0.7 ± 0.03 99.6

2 1.4 ± 0.05 97.2

3 2.2 ± 0.06 91.6

4 3.1 ± 0.06 78.7

5 4.1 ± 0.07 63.2

6 5.0 ± 0.08 46.0

7 6.0 ± 0.09 34.6

8 7.0 ± 0.10 24.1

Empirical Linkages to Assess State Criteria:Temporal Variability

Buoy Data

Page 10: Mark Brush CHRP  2012  Managers’ Workshop

Empirical Linkages to Assess State Criteria:Spatial Variability

0

5

10

15

0 5 10 15

Min

imum

Box

DO

, mg l

-1

Mean Box DO, mg l-1

All Data

Surface

Bottom

0

2

4

6

8

10

12

0 5 10 15

Min

imum

Box

DO

, mg

l-1

Mean Box DO, mg l-1

Box 1

0

2

4

6

8

10

12

0 5 10 15

Min

imum

Box

DO

, mg

l-1

Mean Box DO, mg l-1

Box 2

Insomniacs Data

Page 11: Mark Brush CHRP  2012  Managers’ Workshop

CHRP II Funding

Add 2010+ for a decade-long model run (2001-2010+)

Compare OBM and ROMS exchanges for 2007+ (currently 2006 only)

Develop functions for salinity and pycnocline depth vs. physical forcing (i.e. FW loading); add variable hypsography

Scenario runs in collaboration with RI DEM

Online hosting of EcoOBM

y = 26.363e-0.109x

R² = 0.5899

05

101520253035

0 2 4 6 8

Box

Aver

age

Salin

ity

10-Day Average FW Input, x 106 m3 d-1

Box 1S

y = 28.553e-0.078x

R² = 0.6402

05

101520253035

0 2 4 6 8

Box

Aver

age

Salin

ity10-Day Average FW Input, x 106 m3 d-1

Box 2S

Page 12: Mark Brush CHRP  2012  Managers’ Workshop

CHRP II Funding

+ selected runs in Greenwich Bay model to assess role of macroalgae in hypoxia

Page 13: Mark Brush CHRP  2012  Managers’ Workshop

Current EcoOBM Applications

Proposal pending:• Bush/Gundpowder Rivers, MD• Neuse River, NC• Pensacola/Escambia Bays, FL

Lake dissertation chapter:• Narr Bay vs. York River vs.

New River (including MPB)

Page 14: Mark Brush CHRP  2012  Managers’ Workshop

Online Model Hosting

Capability has been developed:http://www3.vims.edu/netsim/netsims/brush/wrr_model_apr_2011/index.html

Page 15: Mark Brush CHRP  2012  Managers’ Workshop

Online Model Hosting

Capability has been developed:http://www3.vims.edu/netsim/netsims/brush/wrr_model_apr_2011/index.html

Page 16: Mark Brush CHRP  2012  Managers’ Workshop

Online Model Hosting

Preliminary EcoOBM version: