View
216
Download
0
Tags:
Embed Size (px)
Citation preview
MECC Central Rollout Technical Information for IT Managers
WARNING: NO PRETTY PICTURES BEYOND THIS POINT
Standard Operating Environment IE6, IE7 (for now, will review
annually) IE8, IE9 Firefox 3+, Safari 4+, Chrome iPhone, Blackberry, iPad, Andriod HTTPS Email to/from *.mecccentral.com
Yes, we support tablets
INTEGRATION
GIS via GeoRSS & KML open standards
Property Data via Google Maps, CSV upload, CouncilView.
MECC-to-MECC data sharing via authenticated XML-over-HTTPS API
Ability to access SQL data directly for Crystal Reports, etc.
Nothing
HOSTING, SECURITY & REDUNDANCY Cloud-based. Professionally engineered infrastructure
across two Tier-A data centres. Multiple servers, no single point of failure. Secure replication, encrypted offsite backups. DCs in Melbourne and Sydney. Rapid upscaling based on load. Regular PCI-DSS penetration tests and scans. 24 hour infrastructure monitoring and
response.
Nothing
SUPPORT
Service desk via phone, email, online.
Standard 9 to 5 service. 24x7 system monitoring and
response. Outage notification list. Extended service available during
emergencies, including 24 hour support.
TRAINING
Roadshows provide familiarity. Training certifications for User, Incident
Controller, and IT Support will be available from November.
In-system induction videos for users. Courses are provided online via Web-
Ex, and in-person at our Melbourne office.
Can provide training at Council MECC simulations.
PROJECT ROLLOUT SCHEDULE
Aug 15 – Aug 31 Roadshow startsSep 15 Last day to sign-up for 2011 rollout Registrations for training sessions
openNov 15 Rollout to councils commences Training starts
Take Away• Scope - 69 councils, shared service.
• Cloud based - no firewall changes, no new infrastructure.
• Integration - GIS integration via KML and GeoRSS, and optional Council property data via CSV.
• Roadshows - in next 3 weeks.
• Sign-up date - by September 15 for 2011 rollout and training courses.
• More Info - www.mecccentral.com