Upload
others
View
3
Download
0
Embed Size (px)
Citation preview
Meeting of the Transportation Disadvantaged Coordinating Board (TDCB) Friday, June 23, 2017, 9:30 a.m. County Center, 18th Floor - Plan Hillsborough Committee Room
I. Call to Order and Pledge of Allegiance
II. Public Comment – 3 minutes per speaker, please
III. Approval of Minutes – February 24, 2017 and April 27, 2017
IV. Action Items
A. Community Transportation Coordinator Eligibility Procedures (Kelly Kelley,
TDCB Member)
B. HART Operations and Maintenance Feasibility Study (Kasey Cursey,
AECOM and Allison Yeh, MPO Staff)
C. Community Transportation Coordinator Service Rates (Karen Smith,
Sunshine Line)
D. Transportation Disadvantaged Coordinating Board Grievance Review
(Michele Ogilvie, MPO Staff)
E. Transportation Disadvantaged Coordinating Board Bylaws (Michele Ogilvie,
MPO Staff)
V. Status Reports
A. Vision Zero (Gena Torres, MPO Staff)
B. HARTPlus Update (Greg Brackin, HART)
C. Sunshine Line Report (Scott Clark, Sunshine Line)
VI. Old Business & New Business
VII. Adjournment
VIII. Addendum
A. MPO Committee Report
B. HART Round 2 Outreach: Transit Development Plan
C. West Busch Blvd Study Kickoff
The full agenda packet is available on the MPO’s website, www.planhillsborough.org, or by calling (813) 272-5940. The MPO does not discriminate in any of its programs or services. Public participation is solicited without regard to race, color, national origin, age, sex, religion, disability or family status. Learn more about our commitment to non-discrimination
Commissioner Lesley “Les” Miller, Jr.
Hillsborough County MPO Chairman
Councilman Harry Cohen City of Tampa
MPO Vice Chairman
Paul Anderson Tampa Port Authority
Wallace Bowers HART
Trent Green Planning Commission
Commissioner Ken Hagan Hillsborough County
Commissioner Pat Kemp Hillsborough County
Mayor Kim Leinbach Temple Terrace
Joe Lopano Hillsborough County
Aviation Authority
Mayor Rick A Lott City of Plant City
Councilman Guido Maniscalco
City of Tampa
Commissioner Sandra Murman
Hillsborough County
Cindy Stuart Hillsborough County
School Board
Councilman Luis Viera City of Tampa
Joseph Waggoner Expressway Authority
Commissioner Stacy R. White
Hillsborough County
Beth Alden, AICP Executive Director
Plan Hillsborough planhillsborough.org
[email protected] 813 - 272 - 5940
601 E Kennedy Blvd 18th Floor
Tampa, FL, 33602
Persons needing interpreter services or accommodations for a disability in order to participate in this meeting, free of charge, are encouraged to contact Michele Ogilvie, 813-273-3774 x317 or [email protected], three business days in advance of the meeting. Also, if you are only able to speak Spanish, please call the Spanish help line at (813) 273-3774, ext. 211. Si necesita servicios de traducción, el MPO ofrece por gratis. Para registrarse por estos servicios, por favor llame a Michele Ogilvie directamente al (813) 273-3774, ext. 317 con tres días antes, o [email protected] de cerro electronico. También, si sólo se puede hablar en español, por favor llame a la línea de ayuda en español al (813) 273-3774, ext. 211. In accordance with Title 17 U.S.C. Section 107, materials attached are for research and educational purposes, and are distributed without profit to MPO Board members, MPO staff, or related committees or subcommittees the MPO supports. The MPO has no affiliation whatsoever with the originator of attached articles nor is the MPO endorsed or sponsored by the originator. Persons wishing to use copyrighted material for purposes of their own that go beyond ‘fair use’ must first obtain permission from the copyright owner.
HILLSBOROUGH COUNTY
TRANSPORTATION DISADVANTAGED COORDINATING BOARD
MEETING OF FEBRUARY 24, 2017
MINUTES
CALL TO ORDER AND PLEDGE OF ALLEGIANCE
The meeting was called to order by Vice‐Chair, Ms. Gloria Mills at 9:35 a.m.,
and the Pledge of Allegiance took place. The meeting was held in the Planning
Commission Board Room on the 18th floor of the County Center.
Members present: Councilman Harry Cohen; Gloria Mills; Leslie Pokres;
Tiffany Kohnen; Dave Newell; Penelope Barnard; Kristina Melling; Dr. Leslene
Gordon; Shelley Barthel; Dr. Fred Barja; Becki Forsell; and Artie Fryer.
Others present: Beth Alden, Michele Ogilvie, Wade Reynolds, Wanda West,
MPO Staff; Scott Clark, Karen Smith, Sunshine Line.
PUBLIC COMMENT
There were no public comments.
APPROVAL OF MINUTES (December 9, 2016)
MOTION by Gloria Mills to approve the December 9, 2016 minutes. The
motion was seconded by Dr. Barja and carried.
ACTION ITEMS
A. Community Transportation Coordinator Annual Evaluation Report
Ms. Ogilvie, MPO staff congratulated the Board on being named Local
Coordinating Board of the year for 2016. The Hillsborough County BOCC is the
CTC for Hillsborough County. Sunshine Line and HART Plus are the operators
providing trips for those served by the service. Ms. Ogilvie described the funding
TDCB Minutes February 24, 2017
2
mechanisms for the program and the metrics for the evaluation, including a
customer survey. Ms. Ogilvie noted that road calls for vehicles were an area that
did not meet the standard, but that these calls were down from the previous
evaluation. Gloria Mills wanted clarification on the formula that CTD uses for trip‐
counting procedures. Scott Clark provided clarification.
Becki Forsell asked Mr. Clark if he was coming to the CTC meeting in Tallahassee
and suggested asking for a motion to bring the issue forward and explain to
legislators. Ms. Forsell also wanted to know where HART was with the fare box
technology. Dr. Gordon wanted more information on the reliability of Sunshine
Line by the number of road calls. Sunshine Line just surplused the last 2007 vehicle.
Mr. Clark said that by 2018 the Sunshine Line should be back to their normal
schedule of vehicle replacements. Mr. Clark reported that 2016 had seen a decent
on time service report. The Fleet Director has advocated to get buses replaced and
Sunshine Line has been replacing the vehicles.
Following the presentation, Dr. Gordon made comments about the display of the
performance criteria and that it should read consecutively by year and moving left
to right so that it is easier to read.
MOTION by Artie Fryer to approve the CTC Evaluation and its
recommendations and transmit to the Florida Commission for the Transportation
Disadvantaged. The motion was seconded by Gloria Mills and carried.
Board members acknowledged work done by Tindale Oliver and staff on the report.
B. George Road Health Impact Assessment
TDCB Minutes February 24, 2017
3
Allison Nguyen, Florida Department of Health – Hillsborough and Wade Reynolds,
MPO staff presented the update.
Nancy Pacifico wanted clarification on the speed limit of the segment near Memorial
Hwy. Mr. Reynolds stated that it was 35 MPH on George Road.
Becki Forsell asked about statistics on crime in the area/related to costs for the project
for additional lighting and if that would take priority over sidewalks or other
improvements.
Mr. Reynolds stated that data is available from the last 5 years and that crime maps
are in the report. Ms. Ogilvie clarified that all the improvements are proposed as a
package.
Ms. Ogilvie stated that the report can be emailed to the board and that it is available
on the MPO’s website.
Nancy Pacifico mentioned the importance of lighting on Memorial Hwy.
Following the presentation, there were no questions.
MOTION by Artie Fryer, seconded by Kristina Melling to accept the report and
recommend approval to the MPO Board. The motion passed.
C. 2017 Legislative Message for Transportation Disadvantaged Day in
Tallahassee
Michele Ogilvie, MPO staff provided information on the educational process. Becki
Forsell has been the representative in Tallahassee over the past few years. The
request is for Board approval.
TDCB Minutes February 24, 2017
4
Nancy Castellano plans on being in Tallahassee and struggles with the TD trips
provided vs. what the formula is in other places (suggested adding a footnote to
state how the count is made – counting mechanism vs. service point).
Dr. Barja made comments regarding being treating fairly in the allocation of
funding. Mr. Clark suggested a total of all three agencies to give a picture of what
the tri‐county region is doing or take out altogether. Ms. Forsell stated that she has
contacted all senators and has received 30 responses. Kristina Melling suggested
including client testimony to put a face on who we are serving. TD consumer served
(comparison of clients and who we served). Capture what the need and GAP are
and show what additional funds are needed and what they are needed for.
MOTION by Nancy Castellano, seconded by Becki Forsell. The motion carried
unanimously.
D. TDCB Appointee to the Citizen Advisory Committee
Wade Reynolds, MPO staff told the Board that the MPO Citizen’s Advisory
Committee is seeking a volunteer for the Transportation Disadvantaged appointee.
Nancy Pacifico volunteered.
MOTION by Dr. Barja and seconded by Becki Forsell. Motion carried.
Nancy Castellano agreed to be the backup.
STATUS REPORTS
A. Northwest Transit Study
Sarah McKinley, MPO staff provided an update.
TDCB Minutes February 24, 2017
5
The study evaluated the use of transit in the area and how the population could best
be served noting that some of the lines were underperforming. A Metrorapid line
is planned for the Northwest Corridor and a flex route is proposed. Becki Forsell
mentioned that the Northdale area was not talked about and that all buses were
taken from this area; Ms. Forsell explained this are needs more transportation and
previously had better service. Ms. McKinley mentioned that HART does have a
Metrorapid route planned for Dale Mabry.
Nancy Castellano had questions regarding the Town ‘n Country Flex Route. Nancy
Pacifico wanted clarification on HyperLINK and thinks adding the Oldsmar and
Westchase areas is a nice addition.
There was extensive discussion on routes and ridership in the northwest.
Nancy Castellano asked how many surveys were sent out, Ms. McKinley clarified
that large numbers of surveys were distributed via email through Constant Contact
and through HART as well as at events in the community.
B. Transportation Disadvantaged Return on Investment – Hillsborough
Mr. Brandon Berry, MPO Intern presented the study and explained that these
trips include medical, training, nutrition, employment, and life sustaining
trips.
Dr. Gordon had an inquired about the assumption of benefits of medical and
nutritional trips. Nancy Castellano wanted to know what was included in the
number of trips (Ambulatory/non‐wheelchair trips). It was suggested to
include the benefits of medical & nutritional trips dollar figure being added to
the information that is being presented in Tallahassee in order to present these
TDCB Minutes February 24, 2017
6
statistics in the best possible way. It was suggested to include ambulance trips
as well. (The information will be used in the narrative)
C. Federal Transit Administration 5310 Applicants and Awards for Fiscal
Year 2016‐2017
Dave Newell, FDOT reported that applications were due in December. 35
applications were received from 29 agencies. As always there was more asked
for than funds available. Approximately $3.7 million was awarded last year.
A breakdown of the numbers will be sent out to Board.
Mr. Clark wanted to know if we could get the list and asked if vehicle life
expectancy information is available?
Mr. Clark suggested they we should advocate for funding with the 5310 funds
and that we should bring up when we go to Tallahassee.
D. Sidewalk Inventory and Construction Costs Update
Wade Reynolds, MPO staff provided an update on the presence of sidewalks
in all four jurisdictions.
Dr. Barja had a question regarding the cost of cement vs. the cost of installed
sidewalks.
Ms. Forsell said that she spoke with Representative Castor and there’s extra
money available from the federal government. If there’s money available, we
should be asking for it and protecting our population. Ms. Forsell suggested
that we get a proposal to Representative Castor to fund sidewalks in the area.
TDCB Minutes February 24, 2017
7
Councilman Cohen stated that he was in the process of getting information.
(Ms. Castor wanted to know if the group could get something together within
the next couple of months)
MOTION from Becki Forsell and seconded by Nancy Castellano to compile
the need and data on sidewalks and work with the jurisdictions to present a
proposal to Representative Castor (Mr. Reynolds restated the motion). The
motion was approved.
E. Sunshine Line Report
Mr. Scott Clark, Sunshine Line informed the Board of compliments that have
been received regarding drivers and staff. Two dimensions were added to the
door‐to‐door survey and there have been increased HART Plus passes.
Sunshine Line has started Saturday service and it has been extremely slow.
Also, they have started a pilot project with Aging Services with their active
seniors program.
Nancy Castellano wanted to know if the customer service representatives
informed seniors of Saturday services. They are working with Kemly (HART)
informing their customer service about Sunshine Line and use this as a joint
training opportunity. Also, they are having a call center school for customer
service representatives. By May/June they should be moved into a new facility.
A meeting with Hillsborough Hope, focusing on the elderly, took place this
year and looked at population growth of seniors and addressing transportation
TDCB Minutes February 24, 2017
8
needs. 12 buses are being purchased this year and 4 Toyota Siennas are being
replaced with MV1s.
OLD BUSINESS AND NEW BUSINESS
NONE
The next meeting is scheduled for Thursday, April 27, 2017at 6:00 PM.
ADJOURNMENT
There being no further business, the meeting adjourned at 11:25 AM. ADDENDUM
A. MPO Committee Report
The full agenda packet is available on the MPO’s website,
www.planhillsborough.org, or by calling (813) 272‐5940.
The MPO does not discriminate in any of its programs or services. Public
participation is solicited without regard to race, color, national origin, age,
sex, religion, disability or family status. Learn more about our commitment
to non‐discrimination
Persons needing interpreter services or accommodations for a disability in order to
participate in this meeting, free of charge, are encouraged to contact Michele Ogilvie,
813‐273‐3774 x317 or [email protected], three business days in advance of the
meeting. Also, if you are only able to speak Spanish, please call the Spanish help line
at (813) 273‐3774, ext. 211.
Si necesita servicios de traducción, el MPO ofrece por gratis. Para registrarse
por estos servicios, por favor llame a Michele Ogilvie directamente al (813) 273‐
TDCB Minutes February 24, 2017
9
3774, ext. 317 con tres días antes, o [email protected] de cerro electronico.
También, si sólo se puede hablar en español, por favor llame a la línea de ayuda
en español al (813) 273‐3774, ext. 211.
In accordance with Title 17 U.S.C. Section 107, materials attached are for research and
educational purposes, and are distributed without profit to MPO Board members,
MPO staff, or related committees or subcommittees the MPO supports. The MPO has
no affiliation whatsoever with the originator of attached articles nor is the MPO
endorsed or sponsored by the originator. Persons wishing to use copyrighted material
for purposes of their own that go beyond ‘fair use’ must first obtain permission from
the copyright owner.
HILLSBOROUGH COUNTY
MEETING AND ANNUAL PUBLIC HEARING OF THE TRANSPORTATION DISADVANTAGED COORDINATING BOARD
(TDCB)
COUNTY CENTER BUILDING
601 E. KENNEDY BLVD.
MEETING OF APRIL 27, 2017
MINUTES
I. CALL TO ORDER AND PLEDGE OF ALLEGIANCE
The public hearing was called to order by Vice Chair Gloria Mills at 6:07 PM and was held in the Plan Hillsborough Room on the 18th floor of the County Center Building. Roll Call and the Pledge of Allegiance were held at this time.
II. PUBLIC HEARING
Roll Call of Board Members: Dr. Fred Barja, Penelope Barnard, Kelly Kelley, Kristina Melling, Vice Chair Gloria Mills
Others present: Beth Alden, Wade Reynolds, Allison Yeh – MPO Staff, Greg Brackin, Gamal Gasser, Georgette Petit-Homme, Scott Clark, Karen Smith
Welcome (TDCB Chair, Councilman Cohen)
As Councilman Harry Cohen was not present, Vice Chair Gloria Mills welcomed the board members and public attendees.
Public Comment:
Georgette Petit-Homme suggested that ADA revise safety for customers using HARTPlus, recounting two customer service experiences she felt were not handled adequately. She also thanked the TDCB for making transportation available to everyone.
Gamal Gasser, a member of Hillsborough Organization for Progress and Equality, requested that the Board of County Commissioners set up an affordable housing trust fund. He also requested senior citizen care, such as providing elderly individuals transportation to a place of worship once per week. He suggested that individuals often
do not know about the services available to them, and recommended promotion or advertising.
Adjourn Public Hearing & Call Regular Meeting to Order:
Ms. Kelly Kelley moved to adjourn the public hearing at 6:14. Vice Chair Mills immediately called the next meeting to order.
III. ACTION ITEMS
A quorum was not reached during this meeting. While Community Transportation Coordinator Service Rate and Unified Planning Work Program Update presentations were held, members did not vote on these action items.
A. Approval of Minutes – February 24, 2017
A quorum was not reached, so approval of February 2017’s minutes was moved to the following meeting.
B. Community Transportation Coordinator (CTC) Service Rates for 2016/2017 (Karen Smith, Sunshine Line)
Ms. Karen Smith of Sunshine Line presented on the CTC service rate updates for 2016 and 2017. Ever year the CTC completes a rate worksheet, which determines the rates reimbursed for each trip provided. The CTC submits projected trips and miles for the following year, which determines rates for the following year’s grant. The CTC expects this year’s grant amount to be the same as for the prior year, which was approximately $2.1 million. From the prior year, the rates are increasing approximately 2%. Ms. Smith mentioned that the rates will need to be approved at the June 2017 meeting so that they are included in the grant agreement, and so that the language is included in the Transportation Disadvantaged Service Plan.
As the TDCB did not meet a quorum, no action was taken. There were no questions.
C. Transportation Disadvantaged Coordinating Board Grievance Procedures
A quorum was not reached, so the TDCB Grievance Procedures action item was moved to the following meeting.
D. Transportation Disadvantaged Coordinating Board By-laws
A quorum was not reached, so the TDCB By-laws action item was moved to the following meeting.
E. Unified Planning Work Program (UPWP) Update (Allison Yeh, MPO Staff)
Ms. Allison Yeh of the MPO presented on the UPWP update, as the MPO is nearing the end of its fiscal year. The UPWP outlines major planning tasks, documents federal and state funding, ensures the MPO is complying with federal and state rules, and coordinates federally-funded planning tasks performed by the MPO, HART and FDOT. The purpose of the update is to make final adjustments to the Fiscal Year 2017 budget, update the budget and tasks based on annual funding allocations, and update administrative documents.
The UPWP contains the MPO’s six major planning tasks, including transportation planning management, system and corridor planning, the Long Range Transportation Plan (LRTP) and data collection, the Transportation Improvement Plan (TIP), public participation, and local and regional coordination and planning. Ms. Yeh outlined the projects to be completed in FY 2017, continuing projects in FY 2017, and projects identified for FY 2018. She ended the presentation outlining the funding for the six UPWP tasks in FY 2017 and 2018.
As the TDCB did not reach a quorum, no action was taken. There were no questions.
IV. STATUS REPORTS
A. Plant City Walk-Bike Plan Update (Wade Reynolds, MPO staff)
Mr. Reynolds provided an update on the Plant City Walk-Bike Plan. The team is currently in the process of developing a draft plan, after which it will finalize the plan in May 2017. A public meeting was held in February, which produced additional points of interest for the plan and a general comment map. The plan is structured to provide a vision and executive summary, which includes a list of community priorities, an existing conditions assessment, recommendations, and an action plan. The priority projects for the Plan are providing a minimum grid for bikeways, a canal trail, and pedestrian safety improvements. Next steps will involve completing the assessment, identifying bicycle network facility recommendations, holding a steering committee meeting to finalize recommendations and policies, completing a draft document, and presenting the document to the Plant City City Commission. After the document is finalized, the Plan will be presented to the Hillsborough MPO Committees and Board.
There were no questions.
B. HARTPlus Customer Choice Voucher Program – 1st year report (Greg Brackin, HART)
Mr. Greg Brackin of HART presented on the first year report for the HARTPlus Customer Choice Voucher Program, also known as the paratransit voucher or Yellow Cab program. The program began in January 2016. As of March 2017, 56,606 trips have been taken using the Voucher Program. The current rate paid to Yellow Cab is $16 per trip of 7.6 miles or less, with a cost to the customer of $4. The Voucher Program has saved HART
over $1 million compared to providing the trips themselves, and has helped absorb the 8% growth rate in paratransit over prior years. Customer pick-up and drop-off metrics have improved in 2017 compared to 2016 metrics as well. Mr. Brackin ended the presentation with a discussion of recent updates, including HART’s Tesla last-mile rollout in the University Area.
Discussion ensued about the positive impact of the Yellow Cab program on planning for paratransit trips, managing peak time response, customer service call volume, and contract length.
C. Sunshine Line Report (Scott Clark, Sunshine Line)
Mr. Scott Clark reported on some of the compliments that the Sunshine Line recently received, and followed by presenting the March monthly report. In March 2017, 14,246 Sunshine Line trips were completed. That number is more than a 12% increase from previous months. Sunshine Line received 27 compliments, 2 complaints, and had a 93% on-time rate during this month. The average caller hold time for customers was 60 seconds, down from a standard of 120 seconds. Sunshine Line’s average cost per trip was $27.34 during this month.
Mr. Clark followed with a vehicle update. The purchase price of buses has increased to more than $80,000, resulting in Sunshine Line updating their fleet projections. Sunshine Line originally intended to purchase 16 buses, but have now decided to purchase 10 buses and six MV-1s. The MV-1s cost approximately $30,000 less up front and $37,000 less to maintain over their lifespan. Both vehicles are ADA compliant.
Discussion ensued about the cost per trip to Sunshine Line.
V. OLD BUSINESS & NEW BUSINESS
A. MPO Regional Coordination Structure Research & Best Practices Study (Beth Alden, MPO Director)
Ms. Beth Alden of the Hillsborough County MPO informed members of the Board about an upcoming stakeholder workshop regarding best practices for regional planning organizations. This workshop precedes independent research that will begin on July 1, 2017. The stakeholder workshop will be held at St. Petersburg College’s Collaborative Labs on Friday, May 12 from 10 AM to 2 PM, and the MPO will provide transportation to anyone who requests it. The workshop will involve four subjects, including how a regional planning organization should advance major regionally-significant partnerships, how cities and counties can maintain their unique character under a regional organization, the kind of planning that will ideally occur at the regional level, and how to house and pay for a regional organization. Interested members were informed to RSVP with Anthony Matonti.
Discussion ensued about how to confirm attendance and the location of the workshop.
ADJOURNMENT
There being no further business, the meeting adjourned at 7:03 PM.
Board & Committee Agenda Item
Agenda Item: Community Transportation Coordinator (CTC) Eligibility Procedures Presenter: Michele Ogilvie, MPO staff and Kelly Kelley, Board Member Summary: Florida Administrative Code Chapter 41-2 establishes the Commission for
the Transportation Disadvantaged (CTD) with the assigned responsibility to accomplish the coordination of transportation services provided to the transportation disadvantaged. The statute also establishes the role of the Metropolitan Planning Organization (MPO) as the designated official planning agency to perform long-range planning and assist the Commission and a Local Coordinating Board in implementing the transportation disadvantaged program in designated service areas. The Code includes the purpose and responsibilities of the Coordinating Board to identify local service needs and to provide information, advice, and direction to the Community Transportation Coordinator on the coordination of services to be provided to the transportation disadvantaged through the Florida Coordinated Transportation System. Each Coordinating Board is recognized as an advisory body to the Commission for Transportation Disadvanatged (CTD) in its service area. Recently, the CTD issued a letter stating that the eligibility process for the CTC-Sunshine Line “would not meet the requirement of obtaining an application and backup documentation in order to determine eligibility”. The letter is attached. The Planning Subcommittee of this Coordinating Board met on May 31, 2017 to discuss the letter from the CTD. The Subcommittee made the following observations: a. The Sunshine Line provides a safety net for essential door to door
transportation to clients within 2 days of eligibility including HARTPlus clients who may wait as long as 45 days for eligibility
b. The Sunshine Line eligibility process meets the standard for non- self-eligibility declaration
c. Sunshine Line serves 350 clients per month d. Implementation of a paper process will incur costs that cannot be
immediately absorbed by the agency e. The Priority for the Transportation Disadvantaged is RIDES, RIDES,
RIDES.
Plan Hillsborough planhillsborough.org
[email protected] 813 - 272 - 5940
601 E Kennedy Blvd 18th floor
Tampa, FL, 33602
Recommended Action
1. Support the Planning Subcommittee’s observations as Findings of Fact 2. Request the MPO Board to support the Transportation Disadvantaged Coordinating Board’s Findings of Fact 3. Endorse Kelly Kelley as the Coordinating Board’s Representative 4. Request that this issue is placed on the CTD’s August Business Meeting Agenda
Prepared By Michele Ogilvie Attachments Commission for the Transportation Eligibility Letter
Community Transportation Coordinator Priorities TD Trust Fund Eligibility Criteria Sunshine Line Eligibility flow chart
EXERT TRANSPORTATION DISADVANATAGED SERVICE PLAN 43
3.1 COMMUNITY TRANSPORTATION COORDINATOR PRIORITIES
Due to limited resources, Sunshine Line must have priorities when providing service. Table 3-1
details the trips that are considered Priority I through Priority V. All other trips are scheduled as
resources are available.
TABLE 3-1: SUNSHINE LINE PRIORITIESPRIORITY I
Life sustaining medical (dialysis, chemotherapy, radiation, etc.)
Other medical appointments and treatment
Mental Health
Dental
Drug Treatment/Therapy
Pharmacy
Physical Therapy/Rehabilitation
PRIORITY II
Grocery
Human Services/Social Services
Shopping
Medical Records
Hospital Discharge
PRIORITY III
Personal Business (e.g.: government office, bank, post office, legal, hair appointments, etc.)
Employment for persons with disabilities
PRIORITY IV
Employment
Education
Recreation
Social
PRIORITY V
Other
2/17/2015
Determining Client Eligibility:
Board & Committee Agenda Item
Agenda Item
HART Operations and Maintenance Feasibility Study
Presenter
Rick Sparer, AECOM and Allison Yeh, MPO staff
Summary
HART’s service area covers approximately 1,000 square miles in Hillsborough County. The existing Operations and Maintenance facilities, located at 4305 E. 21st Avenue, services its entire bus fleet of almost 200 vehicles, which includes variously-sized transit buses, para-transit vehicles, and staff vehicles. The fleet consists of diesel, gasoline and Compressed Natural Gas (CNG) fueled vehicles. This operations and maintenance site is at maximum capacity. In addition to current overcrowding, changes in fleet size could occur due to expansion of para-transit services, adding additional CNG fueling tanks, or recommendations from on-going studies such as the Premium Transit Study or the Tampa Bay Next initiative. To efficiently respond to future needs, HART coordinated with the Hillsborough MPO on a preliminary feasibility study to determine the general “order of magnitude” of utilizing an additional location for operations and maintenance, considering short-range (relocating para-transit vehicles only) to long-range (relocating up to 100 vans and 100 buses) options. The existing facility at 21st Avenue would remain in operation and serve as the main Administration, Operations and Maintenance facility. The satellite facility would support parking and daily needs for drivers and minimal staff to operate the facility.
The study included working with HART to develop specific building and maintenance facility needs, real estate acreage requirements, and pre-concept level programming and budget requirements to be used by HART for future considerations. The general layout site plans included fueling, washing, fare collection and parking for vehicles, drivers and staff. The study lists the various minimal components of developing a new satellite facility, possibly combining services with other county facilities, or leasing a property that can serve as an interim solution. Developing these technical specifications for a future operations and maintenance facility will help HART to anticipate future needs and advance implementation as needed.
Plan Hillsborough planhillsborough.org
[email protected] 813 - 272 - 5940
601 E Kennedy Blvd 18th floor
Tampa, FL, 33602
Recommended Action
Approve the HART Operations and Maintenance Feasibility Study.
Prepared By
Allison Yeh, AICP, LEED GA
Attachments
HART Operations and Maintenance Feasibility Study – Final Draft
i
Executive Summary Hillsborough Area Regional Transit (HART)’s existing Operations and Maintenance site located at 4305 E. 21st Avenue, Tampa Florida services approximately 200 transit buses, para-transit vehicles and staff vehicles is at maximum capacity. Diesel and Compressed Natural Gas (CNG) vehicles are fueled at this facility. Vehicles (including buses) that require gasoline are taken off site to be refueled for the next day. All vehicles will be fueled by CNG, as the fleet is updated. With current overcrowding, proposed fleet changes that could occur such as expansion of para-transit service, adding additional CNG fueling tanks, or implementing recommendations from studies such as the Premium Transit Study or the Tampa Bay Express, will be difficult to accommodate efficiently. In coordination with the Hillsborough County Metropolitan Planning Organization (MPO), HART requested that a preliminary feasibility study be conducted to determine the general “order of magnitude” of utilizing an additional location for operations and maintenance of HART vehicles. This study will consider options for near-term (5 years) relocating/ expanding para-transit vehicles only and long-term (10-15 years) relocating/expanding up to 100 vans and 100 buses. The existing facility at 21st Avenue would remain in operation as the main Administration, Operations and Maintenance facility. The satellite facility would support a short to long-range scenario if deemed necessary in the future with parking and daily needs for drivers and minimal staff to operate the facility. The study included working with HART to develop specific building and maintenance facility needs, real estate acreage requirements, and pre-concept level programming and budget requirements to be used by HART for future considerations. The general layout site plans included fueling, washing, fare collection, support facilities and parking for revenue vehicles, drivers, and minimal staff. The study lists the various minimal components of developing a new satellite facility, possibly combining services with other county facilities, or leasing a property that can serve as an interim solution. The site screening process did not include contacting property owners. It was a general screening of properties located within a reasonable distance of current service routes, and met the size requirements for a small, medium or large facility. The site screening analysis determined if any potential sites existed within 8 miles (a reasonable distance for deadhead miles) of the current HART 21st Avenue facility. Site location criteria assumed a property could qualify for a “Categorical Exclusion” (CatEx) to avoid excessive time in securing the property. This requires the site to have a number of critical features such as the following: a) located in an area predominately zoned for light industrial and heavy commercial activities; b) access to arterial streets with adequate capacity to handle increased traffic and minimal traffic control improvements (no specific calculations were conducted); c) limited identification of known environmental issues; d) minimized deadhead cost; e) suitable size and geometric shape to permit efficient facility design; and f) availability and location of utilities, including CNG, and stormwater conveyance. Three scenarios identified the space planning and programming requirements for a small (100 para-transit vans), medium (50 bus and 50 para-transit vans) and large (100 bus and
ii
100 para-transit vans) site. Representative sites were identified and concept site plans were provided for each. Depending upon HART’s needs, phased construction could be considered in the design and construction of the selected site. The following are the minimum requirements (a site evaluation list) for potential HART sites (see details in body of this report and appendices):
Small Scenario: • 7– 10 acres • CNG service • 100 para-transit van and 50 service vehicle parking spaces • 239 employee and visitor parking spaces • 9,447 sq. feet for Operations Bldg. • 26,920 sq. feet for Maintenance Bldg. • 6,710 sq. feet for fueling and bus wash • 218,000 sq. feet for circulation, landscaping and stormwater treatment • Access to major arterial streets • Industrial zoning • Order of Magnitude of Cost $42.9 million
Medium Scenario:
• 15-18 acres • CNG service • 50 bus, 50 para-transit van and 18 service vehicle parking spaces • 269 employee and visitor parking spaces • 12,288 sq. feet for Operations Bldg. • 45,063 sq. feet for Maintenance Bldg. • 10,740 sq. feet for fueling and bus wash • 272,766 sq. feet for circulation, landscaping and stormwater treatment • Access to major arterial streets • Industrial zoning • Order of Magnitude of Cost $58.1 million
Large Scenario:
• 24-27 acres • CNG service • 100 bus, 100 para-transit van and 16 service vehicle parking spaces • 499 employee and visitor parking spaces • 15,115 sq. feet for Operations Bldg. • 63,380 sq. feet for Maintenance Bldg. • 11,124 sq. feet for fueling and bus wash • 454,015 sq. feet for circulation, landscaping and stormwater treatment • Access to major arterial streets • Industrial zoning • Order of Magnitude of Cost $75.5 million
iii
Table of Contents Executive Summary ......................................................................................................... i Background ..................................................................................................................... 1 Introduction ..................................................................................................................... 1 Space Planning and Programming Requirements .......................................................... 2 Space Programming Requirements Summary ................................................................ 2
Small Scenario: 100 Para-transit Vehicles - (7-10 Acres) ............................................ 3 Medium Scenario: 50 Buses – 50 Para-transit Vehicles - (15-18 Acres) ..................... 5 Large Scenario: 100 Buses – 100 Para-transit Vehicles - (24-27 Acres) ..................... 7
Site Screening Process ................................................................................................... 9 Screening Methodology ............................................................................................. 10 Representative Sites .................................................................................................. 15 Comparison of Deadhead Miles and Cost for Representative Sites .......................... 15
Order of Magnitude Cost Estimate ................................................................................ 18 Findings ......................................................................................................................... 19
List of Tables Table 1: Summary of Location Criteria and Potential Sites ........................................................10
List of Figures Figure 1 - Small Site Conceptual Plan ........................................................................................ 4 Figure 2 - Medium Site Conceptual Plan .................................................................................... 6 Figure 3 - Large Site Conceptual Plan ....................................................................................... 8 Figure 4 - Representative Site Location Map ............................................................................12 Figure 5 - Representative Site Location Map ............................................................................13 Figure 6 - Small, Medium, and Large Sites ...............................................................................16
List of Appendices–HART Operations and Maintenance Feasibility Study Appendix A: Detail Space Planning And Programming Requirements Appendix B: Coordination Memo With FDOT District 7 And Future Expressway Plans Appendix C: Detailed Cost Estimates
1
Background HART’s service area covers approximately 1,000 square miles in Hillsborough County, Florida. The existing Operations and Maintenance facilities are located at 4305 E. 21st Avenue, Tampa, Florida. HART services its entire fleet of approximately 200 vehicles at this facility, which includes various sized transit buses, para-transit vehicles, and staff vehicles. The fleet consists of diesel, gasoline and Compressed Natural Gas (CNG) fueled vehicles. Only the diesel and CNG vehicles are fueled at this facility. Vehicles (including buses) that require gasoline are taken off site to a nearby gas station and refueled for the next day. The 21st Avenue facility is currently operating above maximum capacity, and every available space is being utilized. With current overcrowding, proposed fleet changes that could occur such as expansion of para-transit service, adding additional CNG fueling tanks, or implementing recommendations from studies such as the Premium Transit Study or the Tampa Bay Express, will be difficult to accommodate efficiently. In coordination with the Hillsborough MPO, HART requested that a preliminary feasibility study be conducted to determine the general “order of magnitude” of utilizing an additional facility for operations and maintenance. As part of the feasibility exercise, HART is reviewing the parameters for an operations and maintenance satellite facility for a near term (5 years) relocating/expanding 100 para-transit vehicles to long-term (10-15 years) relocating/expanding 100 para-transit and 100 buses concept. The new site would be comprised of a combination of standard transit vehicles and para-transit vehicles. Fueling for all new vehicles is planned to be CNG at the new site, thus CNG must be available at the proposed site. HART has expressed the possibility of considering phasing construction of the new facility to start with all para-transit vehicles (up to 100), with the additional expansion of 100 buses over time. The existing facility at 21st Avenue will remain in operation and serve as the main Administration, Operations and Maintenance facility. The satellite facility would support parking and daily needs for drivers and minimal staff to operate the facility.
Introduction This technical memorandum provides HART and the MPO with basic order of magnitude programming and budget information for a potential satellite operation and maintenance facility. This memorandum includes documentation of the evaluation of HART’s current and future needs, identifies facility and real estate acreage requirements, and provides pre-concept level programming and budget requirements for the project. The objective of this technical memorandum is to identify the number of vehicles near term (5 years), and long term (10-15 years), which the new transit satellite facility could be designed to support. Based on input from HART and the MPO, it was recommended to consider three possible scenarios for a satellite facility:
2
Small - 100 para-transit vehicles Medium - 50 para-transit vehicles and 50 buses Large – 100 para-transit vehicles and 100 buses.
These scenarios will include fueling, washing, fare collection and basic daily needs for drivers and minimal staff. This technical memorandum outlines the various components of developing a transit facility. It is general in nature, but provides enough detail to outline the required acreage necessary to support each scenario.
Space Planning and Programming Requirements The space plan and program assessment provides requirements and space needs for each type of function and operational characteristics of the services that will be located at the new facility. The programs are divided among the six major components of the operation:
• Administration • Transportation/operations, including fare box drop and money counting room • Maintenance, including fueling (diesel and CNG) and bus wash • Service, including transfer center maintenance • Yard/parking • Site circulation and detention/retention of water.
This data will be used to determine the approximate size necessary for each facility. A matrix that shows the site size requirements versus the number of vehicles is provided in Appendix A, Tables 1-3 and illustrates scenarios for small (100 para-transit vans), medium (50 buses and 50 para-transit vans) to large (100 para-transit vans and 100 buses) options. A conceptual site plan for each facility is provided in the body of this document.
Space Programming Requirements Summary As expressed by interviews with HART staff and considering input from the MPO, the most immediate need would be a facility that would service para-transit vehicles. It was suggested that this feasibility study consider accommodating approximately 100 para-transit vehicles to support the existing fleet of approximately 40 vehicles, and any future expansion of service. Developing a para-transit satellite facility would also increase available space for transit buses at the existing 21st Avenue facility. A space planning assessment was completed by interviewing HART staff. The assumptions used for this exercise are the new site would only accommodate the needs for the administration, dispatching, and maintenance of the para-transit operations. The current fleet of gasoline powered vehicles at the 21st Avenue site will eventually change over to all CNG. All other HART administrative requirements such as procurement, purchasing, and planning would remain at the HART 21st Avenue facility. Maintenance requirements relating to painting vehicles, and storage of other equipment would remain at HART’s 21st Avenue facility.
3
Small Scenario: 100 Para-transit Vehicles (7-10 Acres) The assumption for this facility is it would service 100 para-transit vehicles and require approximately 7-10 acres, (10 acres are preferred), including a stormwater treatment pond. Appendix A, Table 1 provides a detailed breakdown of the space planning requirements for this type of small facility. The assumptions are that the satellite facility would only accommodate the needs for the administration, dispatching, and maintenance of the vehicles assigned to this location. The current fleet of gasoline powered vehicles at the 21st Avenue site will eventually change over to all CNG. The following is a summary of the findings:
The Operations Building would require 9,447 sq. feet. This includes administration area, dispatch, and driver’s area, which includes lockers, restrooms/shower, exercise room and driver’s lounge area. The Maintenance Building would require 26,920 sq. feet and include office areas for maintenance management staff, support areas such as a break area, restroom/locker/shower area, repair bays, including lifts, tire shop, shop storage areas, and parts storeroom. The Fuel and Bus Wash building and lanes would require 6,710 sq. feet. Fare collection would be included in the adjacent building. Parking for 100 para-transit vehicles and 37 non-revenue vehicles would require 76,000 sq. feet. Parking for employees and visitors would require 78,336 sq. feet. Storage area, including CNG compressor and tank area, generator and used tire storage, would require an additional 20,600 sq. feet. Circulation/landscape/setback/stormwater would require an additional 218,014 sq. feet. Total sq. feet is 436,027 sq. feet or 10.0 acres.
Figure 1 is a conceptual site plan that could accommodate these program requirements.
4
Figure 1 - Small Site Conceptual Plan
5
Medium Scenario: 50 Buses – 50 Para-transit Vehicles (15-18 Acres) Based on discussions with HART and MPO staff, a second option was considered. This medium scenario could accommodate up to 100 vehicles, and would include moving over the current para-transit service of 40+ vehicles and provide space for up to 50 buses. This scenario would also alleviate overcrowding at the 21st Avenue site. The assumptions are that the new site would only accommodate the needs for the administration, dispatching and maintenance of the vehicles assigned to this location. The current fleet of gasoline powered vehicles at the 21st Avenue site will eventually change over to all CNG.
Appendix A, Table 2 provides a detailed breakdown of the space planning requirements for this type of medium-sized facility. The following is a summary of the findings:
This facility would service 50 buses and 50 para-transit vehicles and require approximately 14 acres, including a stormwater treatment pond. The Operations Building would require 12,288 sq. feet. This includes an administration area, dispatch, driver’s area, which includes lockers, restrooms/shower, an exercise room and driver’s lounge area. The Maintenance Building would require 45,063 sq. feet and include office area for Maintenance Management staff, support area, such as a break area, restroom/locker/shower area, repair bays, including lifts, tire shop, shop storage areas, and parts storeroom. The Fuel and Bus Wash building and lanes would require 10,740 sq. feet. Fare collection would be included in the adjacent building. Parking for 50 standard 40 ft. buses and 50 para-transit vehicles, and 16 non-revenue vehicles would require 91,200 sq. feet. Parking for employees and visitors would require 88,776 sq. feet. Storage area, including a CNG compressor tank, above ground fuel tanks, generator, and used tire storage, would require 24,700 sq. feet. Circulation/landscape/setback/stormwater would require an additional 272,766 sq. feet. Total sq. feet is 545,532 sq. feet or 12.5 acres.
Figure 2 is a conceptual site plan that would meet these program requirements.
6
Figure 2 - Medium Site Conceptual Plan
7
Large Scenario: 100 Buses – 100 Para-transit Vehicles (24-27 Acres) Based on discussions with HART and MPO staff, a third option, or long-range need, would be for a large facility that would meet the needs for 200 vehicles, including 100 buses and 100 para-transit vans. This site could be phased in construction to meet the current 100 para-transit needs and provide for potential future expansion to meet HART’s long-range bus needs. This may be necessary if studies such as the Premium Transit Study or Tampa Bay Express recommend expansion of transit services. The assumptions are that the new site would only accommodate the needs for the administration, dispatching and maintenance of the vehicles assigned to this location. The current fleet of gasoline powered vehicles at the 21st Avenue site will eventually change over to all CNG. Appendix A, Table 3 provides a detailed breakdown of the space planning requirements for this facility. The following is a summary of the findings:
This facility would service 100 buses and 100 paratransit vehicles and require approximately 23 acres, including a stormwater treatment pond. The Operations Building would require 15,115 sq. feet. This includes an administration area, dispatch, driver’s area, which includes lockers, restrooms/shower, an exercise room and driver’s lounge area. The Maintenance Building would require 63,380 sq. feet and include an office area for Maintenance Management staff, support area, such as a break area, restroom/locker/shower area, repair bays, including lifts, a tire shop, shop storage areas, parts storeroom. The Fuel and Bus Wash Building and lanes would require 11,124 sq. feet. Fare collection would be included in the adjacent building. Parking for 100 standard 40 ft. buses, 100 para-transit vehicles, and 20 non-revenue vehicles, and would require 174,400 sq. feet. Parking for employees and visitors would require 163,296 sq. feet. Storage Area, including a CNG compressor tank, above ground fuel tanks, generator and used tire storage would require an additional 26,700 sq. feet. Circulation/landscape/setback/stormwater would require 454,015 sq. feet. Total sq. feet is 908,029 sq. feet or 20.8 acres.
Figure 3 is a conceptual site plan that could accommodate these program requirements.
8
Figure 3 - Large Site Conceptual Plan
9
Site Screening Process Various roadway improvements are either planned or underway throughout Hillsborough County that will improve supporting increased access for transit on arterials and the interstate system. As part of this planning exercise, the Florida Department of Transportation (FDOT) coordinated with HART and MPO staff to inquire about the feasibility of locating a satellite maintenance facility under the interstate as part of the Tampa Bay Express project or other projects supported by the FDOT. FDOT requested that HART and the MPO provide preliminary findings as to the feasibility of considering a small maintenance site, including an approximate acreage, when conducting the site screening task. Once a preliminary acreage of 7–10 acres for a small para-transit facility (100 vehicles) was determined), a summary memo was provided to the MPO, HART and the FDOT detailing the types of services that are integral to an operations and maintenance facility, and what a general small scenario site would require regarding safety and security. Appendix B includes the summary memo provided to the MPO, HART and FDOT. Considering that a satellite facility for HART would include CNG fueling (a safety concern), and the need to be fenced for security to accommodate 24-hour parking and fare collection, it was concluded that , a maintenance site was not the most appropriate transit facility to be placed under the interstate to improve transit access. This feasibility study did not focus on possible sites under the interstate as it moved forward. The site screening process did not include contacting property owners. It was a general screening of properties that are located within a reasonable distance of current service routes, and met the size requirements for a small, medium or large facility. The site screening analysis determined if any potential sites existed within 8 miles (a reasonable distance for deadhead miles) of the current HART 21st Avenue facility. Site location criteria assumed a property could qualify for a “Categorical Exclusion” (CatEx) to avoid excessive time in securing the property. This required the site to have a number of critical characteristics and features such as:
• Located in an area predominately zoned for light industrial and heavy commercial activities
• Located near an arterial street with adequate capacity to handle increased traffic due to the development of the facility. The level of service for the roadways will be identified at a later date. No calculations were conducted at this time.
• Limited identification of known environmental issues • Minimized deadhead cost • Access to arterial streets – minimal traffic control improvements • A suitable size and geometric shape to permit efficient facility design • Availability and location of utilities, including CNG • Stormwater conveyance
The site search included sites that are currently listed for sale, publicly owned property, or sites that have similar zoning compatible with a transit operations and maintenance facility. The screening also included coordination with TECO Gas to develop a listing of potential sites based on availability of CNG, or the possibility of CNG coming to that
10
area. Representatives from the Hillsborough County Public Schools were also contacted regarding potential use of school property near the existing HART 21st Avenue facility, and this coordination was documented for future coordination if HART resumes this study in the future.
Screening Methodology Potential sites within 8 miles of the existing HART facility were identified that were from 7 to 30 acres. The initial screening investigated vacant, industrially-zoned properties and locations that either have or could be serviced in the future by TECO for CNG. The search began with properties closest to the existing HART facility on 21st Avenue and expanded to approximately 8 miles outward. Initially, 19 potential sites that could support a satellite facility were identified using the following location criteria: availability of CNG service (coordination with TECO staff), surrounding land uses compatible with a maintenance facility, available acres, access to major arterials, distance from the existing HART 21st Avenue facility, and distance from a gasoline service station as back-up to any vehicles that may use the new facility, but would not be CNG-compatible. Table 1 is a summary of the potential sites. Table 1: Summary of Location Criteria and Potential Sites
Site #
CNG Service
Current Land Use
Size (Acres)
Access To Major Arterial
Distance For Existing HART Office (Miles)
Distance To
Gasoline Source
Surrounding Land Use
1 Yes-125psi
Public school with 13,000 sq. ft. bld.
5.52** I-4/ MLK 40th and 50th Street
Adjacent
.36 HART facility/Deli/Residential/ HCPS Instructional Service Center
2A Yes-125psi
Truck Parts/Sales Ctr. with 9,000 sq. ft. bldg.
2.39** I-4/ MLK 40th and 50th Street
Adjacent
.38 HART facility/Equipment rental/Skate park
2B Yes-125psi
Warehouse with 34,000 sq. ft. bldg.
4.07** I-4/ MLK 40th and 50th Street
Adjacent
.40 HART facility/Treatment Center/ Equipment rental/Skate park
3 Yes-125psi
Auto Sales/Ryder truck with 17,000 sq. ft. bldg.
1.43** I-4/ MLK 40th and 50th Street
.76 mi. southeast .27 HART facility/truck equipment rental
4 Yes-125psi
Auto Sales/Ryder truck
1.89** I-4/ MLK 40th and 50th Street
.60 southeast .52 Truck rental/motel
5 Yes-125psi
Packing Plants With 12,000 sq. ft. bldg.
1.36** I-4/ MLK 40th and 50th Street
.61 southeast
.47
Truck rental/motel
6 Yes-125psi
Warehouse C 3.40** I-4/ MLK 40th and 50th Street
.64 northwest .65 Residential, RR/Lumber Yard/Material supplier
7 Possible Vacant Commercial
4.3** Adamo Rd –Selmon Expressway- N 26th St.
2.38 southwest .65 Warehouse/ IKEA/ Toll Rd.
7A Possible Vacant Commercial
3.37** Adamo Rd –Selmon Expressway
2.45 southwest .67
Warehouse/ IKEA/ Toll Rd
8 Yes-125psi
Vacant Industrial 18.8 Orient Rd. - Adamo Dr.
4.5 southeast
2.2
Vacant land, CSX storage yard industrial uses
9 None Warehouse with 100,000 sq. ft. of bldg.
11.22 Canal w of I-75 and E of 301-E 27th St.
4.27 northeast .18
Warehouse/Industrial/Equipment rental
10 Yes-125psi
Vacant – Commercial/Borrow pit?
27.46 Harney Rd and Hillsborough Ave
3.05 northeast .52
Warehouse/metal recycling/truck parts and service/county property
11
Site #
CNG Service
Current Land Use
Size (Acres)
Access To Major Arterial
Distance For Existing HART Office (Miles)
Distance To
Gasoline Source
Surrounding Land Use
11 Yes-125psi
Vacant industrial 26.48 Grant park area 2.70 northeast
.64 Environmental area or Old Land fill to be researched
12 None Vacant industrial 18.16 30th St and 40th Street/US 41
4. 2 northwest .34 Industrial/commercial/residential/railroad
13 Yes-125psi
Vacant acreage 51.5/42. US 301-Temple Terrace Hwy/Harney Rd
6.6 northeast .40 Retail center/ US 301/Church Equipment repair/ pump rental/Dairy farm
14 None Vacant 18.7 US 301 and I 75 8.1 northeast Vacant/I-75 and residential/Southwest Florida Water Management District
15 None Vacant industrial 10.36 US 301 and I 75 5.8 southeast Office/warehouse 16 None Warehouse 10.32 Adamo Rd I 75 7.8 southeast Warehouse/commercial 17 Yes-
125psi Mixed use retail/vacant?
15.3 Causeway Blvd/ US 301
6.6 southeast
.5 Mix use retail/vacant/self -storage
** Note: Several small sites would need to be assembled to reach the minimum size for a facility Figures 4 and 5 indicate potential sites that were investigated. A summary follows: Site #1 is a publicly owned site that is 5.52 acres and located adjacent to the HART facility. CNG service is available and has excellent access to major arterial streets such as 40th Street and I-4. The current land use is a maintenance and parking area. The surrounding land uses are the HART facility, commercial and a small amount of residential. The nearest gasoline station is .4 miles from the site. Sites #2A and #2B are privately owned sites that total 6.46 acres and are located adjacent to the HART facility. CNG service is available and has excellent access to major arterial streets such as 40th Street and I-4. The current land use is a trucks parts/ sales and warehouse facility. The surrounding land uses are HART facility, retail and commercial. The nearest gasoline station is .4 miles from the site. Sites #3, #4 and #5 are privately owned sites that total 4.68 acres and are .6 miles from the HART facility. CNG service is available and has excellent access to major arterial streets such as 40th Street and I-4. The current land use is a trucks parts/ sales cold storage facility. The surrounding land uses are HART facility and commercial. The nearest gasoline station is .5 miles from the site. Site #6 is a privately owned site that totals 3.4 acres and is .6 miles from the HART facility. CNG service is available and has excellent access to major arterial streets such as 40th Street and I-4. The current land use is warehouse facility. The surrounding land uses are residential, commercial, and railroad. The nearest gasoline station is .6 miles from the site. Sites #7A and #7B are privately owned vacant sites that total 7.7 acres and are 2.4 miles from the HART facility. CNG service is not currently available; however, it could be in the future. This site has excellent access to arterial streets such as Adamo Drive and Selmon Expressway. The current land use is vacant commercial. The surrounding land uses are commercial and warehouses. The nearest gasoline station is .6 miles from the site.
12
Figure 4 - Representative Site Location Map
13
Figure 5 - Representative Site Location Map
14
Site #8 represents four parcels that are privately owned vacant sites that could total up to 18.7 acres and are 4.5 miles from the HART facility. CNG service is available. This site has excellent access to major arterial streets such as Adamo Drive and Orient Road. The current land use is vacant industrial. The surrounding land uses are industrial. The nearest gasoline station is 2.2 miles from the site. Site #9 is a privately owned site that is 11.2 acres and is 4.3 miles from the HART facility. CNG service is not available. This site has access to I-75 and US 301. The current land use is warehouse. The surrounding land uses are warehouse, industrial and equipment rental. The nearest gasoline station is 1.8 miles from the site. Site #10 is a privately owned vacant site that is 27.5 acres and is 3 miles from the HART facility. CNG service is available. This site has direct access to Harney Road and Hillsborough Avenue. The current land use is vacant commercial. The surrounding land uses are warehouse, industrial and auto repair. The site may need additional fill since it was used as an excavation area. The nearest gasoline station is .5 miles from the site. Site #11 is a privately owned vacant site that is 26.5 acres and is 2.7 miles from the HART facility. CNG service is available. This site has access to N. 56th Street. The current land use is a former land fill/ vacant industrial. The surrounding land uses are warehouse and industrial. The nearest gasoline station is .6 miles from the site. Site #12 is a privately owned vacant site that is 18.2 acres and is 4.2 miles from the HART facility. CNG service is available. This site has access to N. 56th Street. The current land use is vacant industrial. The surrounding land uses are warehouse, industrial, and residential. The nearest gasoline station is .3 miles from the site. Site #13 is a privately owned vacant site that is 52 acres and is 6.6 miles from the HART facility. CNG service is available. This site has access to US 301 and Harney Road. The current land use is vacant and is heavily forested. The surrounding land uses are retail, dairy farm and equipment repair. The nearest gasoline station is .4 miles from the site. Site #14 is a privately owned vacant site that is 18 acres and is 8.1 miles from the HART facility. CNG service is not available. This site has access to US 301 and I-75. The current land use is vacant. The surrounding land uses are I-75, vacant land owned by Southwest Florida Water Management District and residential. Site #15 is a privately owned vacant industrial site that is 10.4 acres and is 5.8 miles from the HART facility. CNG service is not available. This site has access to US 301 and I-75. The current land use is vacant industrial. The surrounding land uses are office and warehouse. Site #16 is a privately owned warehouse site that is 10.3 acres and is 7.8 miles from the HART facility. CNG service is not available. This site has access to Adamo Drive and I-75. The current land use is vacant commercial. The surrounding land uses are commercial and warehouse. Site #17 is a privately owned vacant site that is 15.3 acres and is 6.6 miles from the HART facility. CNG service is available. This site has access to Causeway Blvd. and US
15
301. The current land use is vacant retail. The surrounding land uses are retail/vacant and self-storage. The nearest gasoline station is .5 mile from the site.
Representative Sites After reviewing these possible 19 locations with HART and MPO staff, three sites were matched to the criteria for the small, medium and large sites as shown in Figure 6. This next step was conducted to create an order of magnitude for development costs. If HART is interested in pursuing additional feasibility analysis at any time in the future, a new property search will need to be conducted. Sites #7A and #7B best matched the representative small scenario (7-10 acres required) was a site that is 7.7 acres located approximately 2.4 miles from the existing HART facility. This site is assumed to support the dispatch of 100 para-transit vans. It is vacant land that is zoned commercial and has excellent access to major arterial roadways. The surrounding land uses are commercial and warehouse. Gasoline is available .65 miles from this location. CNG service is not currently available; however TECO Gas has indicated that it may be possible in the future. There are no known environmental issues. Site #8 best matched the representative medium site (approximately 17 acres required) was a site that is 18 acres, located approximately 4.5 miles from the existing HART facility. This site is assumed to support the dispatch of 50 buses and 50 para-transit vehicles. It is vacant land that is industrial. The access roads to the site may require some improvement considering the heavy bus traffic. It is within one mile of major arterial roadways. The surrounding land uses are commercial and warehouse. Gasoline is available 2.2 miles from this location. CNG service is available and can provide the 125 psi service required. There are no known environmental issues. Site #10 best matched the representative large site (approximately 21 acres required) was a site that is 27 acres located approximately 3.0 miles from the existing HART facility. It is vacant land that is zoned commercial and has excellent access to major arterial roadways. The surrounding land uses are commercial and industrial/warehouse. Gasoline is available 0.52 miles from this location. CNG service is available and can provide the 125 psi service required. The site may require additional fill to adjust the grades on the site. There are no known environmental issues.
Comparison of Deadhead Miles and Cost for Representative Sites Annual deadhead costs are a key factor in operating costs, therefore HART would prefer to minimize deadhead miles when considering a satellite facility location. Currently, all buses and para-transit vans begin and end their trips at the HART facility located at 4305 E. 21st Avenue. Data for all bus routes indicates that the 153 buses dispatched have a total of 3,300 daily deadhead miles. Using HART’s marginal cost of $3.79 per mile, this is estimated to be $12,507 daily for buses. HART’s 36 para-transit vehicles average 565 total daily deadhead miles. Using HART’s marginal cost of $2.55 per mile, this is estimated to be $1,440 daily.
16
Figure 6 - Small, Medium, and Large Sites
17
Representative Site Calculation for Deadhead miles – Three scenarios: The distance from the beginning and end points for revenue service for each bus route was calculated for each of the representative sites (small, medium and large). The estimated deadhead miles was calculated and divided by the 153 daily buses in order to get the new deadhead miles per bus. The bus cost per mile of $3.79 was applied to the new deadhead miles per bus to calculate the new estimated deadhead cost per bus. Since the deadhead miles for the para-transit vehicles is calculated based upon total revenue miles of service and vehicle miles of service, it is not possible to calculate the change in miles for each of the representative sites per vehicle. The para-transit vehicles begin and end for revenue service is variable based on first and last dispatched pickup. The distance from the representative sites and the existing HART facility was used to calculate the change in deadhead miles per vehicle. The para-transit cost per mile of $2.55 was applied to the new deadhead miles per vehicles to calculate the new deadhead cost per vehicle. Estimated Deadhead Cost for Small Site: The small site would be sufficient for 100 para-transit vehicles and the cost for the 100 vehicles was estimated at $4,638 per day. Estimated Deadhead Cost for Medium Site: The medium site was estimated for 50 buses ($4,770) and 50 ($2,447) para-transit vehicles or $7,217 per day for the 100 vehicles. Estimated Deadhead Cost for Large Site: The large site was estimated for 100 buses ($9,153) and 100 para-transit vehicles ($4,766) or $13,919 per day for the 200 vehicles.
Site Deadhead(DH) miles per bus
DH cost/ bus ($3.79/mi)
Estimated DH cost for 50 buses
Estimated cost for 100 buses
Existing HART 21.57 $81.75 $4,087 $8,175 Small 19.52 $73.97 Medium 25.17 $95.39 $4,770 Large 24.15 $91.53 $9,153
Site Deadhead(DH) miles per para-
transit Veh DH cost/veh
($2.55/mi) Estimated DH
cost for 50 veh. Estimated cost
for 100 veh.
Existing HART 15.69 $40.01 $2,000 $4,000 Small 19.52 $46.38 $4,638 Medium 25.17 $48.93 $2,447 Large 24.15 $47.66 $4,766
These deadhead costs are for comparison purposes since the actual number and the types of vehicles to be assigned to the new location has not been determined at this time.
18
Order of Magnitude Cost Estimate The purpose of this order of magnitude cost estimate is to provide cost information to plan, design, acquire land, construct and commission the proposed project. Order of magnitude costs provide an upper range of “expected” costs required to complete the planned conceptual scope for a facility. The site acquisition cost includes the fair market value of the representative property, costs associated with the real estate transaction (including buyers and owner’s appraisal fees), agency fees, broker fees, legal fees, surveying costs, and recording fees. This cost was developed based on average transactions in the area. It did not represent individual properties. The estimate included with this technical memorandum reflects order of magnitude cost for both Hard Cost and Soft Cost Program items.
Hard Cost items include: • Land Acquisition • Mobilization, general conditions, and demobilization • Site work and site development (excluding demolition, if required) • Facility utility services • Facility structures and roadways • Facility systems • Facility finishes • Vertical people movers • Testing and start-up
Soft Cost items include: • Project Planning and Development • Environmental Documentation and Clearance • Cost Estimating and Scheduling • Program Management and Controls • Permitting services and fees • Design services • Project insurance • Construction Management services • Outside agency force accounts; and • Transit Authority force accounts
Both the Hard Costs and Soft Costs include a contingency of 30 percent of their respective estimated amounts using 2017 dollars. Appendix C includes the detailed breakdown of the order of magnitude cost estimates for the small, medium and large representative sites. Small Scenario: A summary of the costs related to the representative Small Scenario site (100 para-transit vans) is as follows:
19
Land Acquisition (7 acres) $ 2,700,000 Building, Equipment, Site Development $32,200,000 Soft Costs (PE, Final Design, Const. Mgmt.) $ 8,000,000 Total $42,900,000
Note: costs include 30% contingency Medium Scenario: A summary of the costs related to the representative Medium Scenario site (50 buses and 50 para-transit vans) is as follows:
Land Acquisition (18 acres) $ 4,300,000 Building, Equipment, Site Development $43,000,000 Soft Costs (PE, Final Design, Const. Mgmt.) $10,800,000 Total $58,100,000
Note: costs include 30% contingency Large Scenario: A summary of the costs related to the representative Large Scenario site (100 buses and 100 para-transit vans) is as follows: Land Acquisition (27 acres) $ 5,600,000 Building, Equipment, Site Development $55,900,000 Soft Costs (PE, Final Design, Const. Mgmt.) $14,000,000 Total $75,530,000
Note: costs include 30% contingency
Findings This technical memorandum provides a preliminary feasibility study that determined the general “order of magnitude” of utilizing an additional facility for operations and maintenance for HART. Three scenarios identified the space planning and programming requirements for small (100 para-transit vehicles), medium (50 bus and 50 para-transit vehicles) and large (100 bus and 100 para-transit vehicles) sites. Representative sites were identified and concept site plans were provided for each in the body of this technical memorandum and in the Appendices. Depending upon HART’s needs, phased construction could be considered in the design and construction of the selected site. Order of Magnitude cost range from $42 million to $75 million. These findings can be used in the future by HART and the MPO if the need for a satellite facility is considered necessary for further study.
20
The following are the minimum requirements or site evaluation criteria for potential HART sites: Small Scenario:
• 7-10 acres • CNG service • 100 para-transit van and 50 service vehicle parking spaces • 239 employee and visitor parking spaces • 9,447 sq. feet for Operations Bldg. • 26,920 sq. feet for Maintenance Bldg. • 6,710 sq. feet for fueling and bus wash • 218,000 sq. feet for circulation, landscaping and stormwater treatment • Access to major arterial streets • Industrial zoning
Medium Scenario:
• 15-18 acres • CNG service • 50 bus, 50 para-transit van and 18 service vehicle parking spaces • 269 employee and visitor parking spaces • 12,288 sq. feet for Operations Bldg. • 45,063 sq. feet for Maintenance Bldg. • 10,740 sq. feet for fueling and bus wash • 272,766 sq. feet for circulation, landscaping and stormwater treatment • Access to major arterial streets • Industrial zoning
Large Scenario:
• 24-27 acres • CNG service • 100 bus, 100 para-transit van and 16 service vehicle parking spaces • 499 employee and visitor parking spaces • 15,115 sq. feet for Operations Bldg. • 63,380 sq. feet for Maintenance Bldg. • 11,124 sq. feet for fueling and bus wash • 454,015 sq. feet for circulation, landscaping and stormwater treatment • Access to major arterial streets • Industrial zoning
APPENDICES - HART OPERATIONS AND MAINTENANCE FEASIBILITY STUDY
APPENDIX A: DETAIL SPACE PLANNING AND PROGRAMMING REQUIREMENTS
1-Dec-16
Staff Space Area
Superintendent 12 x 20 1 240 Private office
Assistant Superintendent 12 x 15 1 180 Private office
Secretary/Clerk 8 x 10 1 80 Workstation
Clerk 8 x 10 1 80 Workstation
Copy/File/Work Room 12 x 12 144 144 Copier, fax, printer
Lobby 8 x 10 80 80
Conference Room 12 x 16 192 192 8-10 people
Street Supervisors 10 x 12 4 480 Private offices
Dispatch Offices with Clerks 16 x 16 6 256 256 Two separate Dispatches
Dispatch Vestibule 8 x 16 128 128Enclosed area in glass for business contact with
Dispatch Clerks, not part of outside access
Transfer Storage 10 x 10 100 100
Tracking and Communications 10 x 10 100 100Adjacent to Dispatch Office for tracking vehicles and
radio communications with drivers
Computer Area 10 x 16 160 160
Mailboxes (150) 10 x 16 160 160 Pass - thru mailboxes loaded from the Dispatch Office
Entrance/ Exit Vestibule 8 x 10 80 80
Driver's Room 32 x 32 150 1,024
TV Alcove 10 x 16 160 160
Vending/Kitchenette 10 x 15 150 150 Kitchenette w/sink, refrigerator, microwave, coffee
machine and 3 vending machines
Quiet Room/Dormitory 12 x 16 192 192 two beds and reading area
Exercise Room 16 x 18 288 288 Space for 4 pieces of exercise equipment
Locker Area (1/2 height) 150 300 150 lockers
Men's Restroom/Shower 24 x 48 1,152Space for 2 showers, 12 lockers, and three sets of toilet
facilities
Women's Restroom/Shower 24 x 48 1,152Space for 2 showers, 12 lockers, and four sets of toilet
facilities
Custodial Closet 10 x 12 120 120
Subtotal 164 6,998
Circ/Mech/Elec/Struc 2,449
9,447
Staff Space Area
Fleet Manager 16 x 24 1 384 Private office
Assistant Manger 12 x 20 0 Private office
Maintenance Director 12 x 20 1 240 Private office
Administrative Assistant 8 x 10 2 160 Workstation
Copy/File Area 10 x 12 120 120
Maintenance Supervisor 12 x 15 2 180 180 At Shop Floor - one per shift
Maintenance Counter/Library w/ computer 12 x 24 288 288 Window to Maintenance Supervisor Office
Radio Room 10 x 10 100 100
Training Office 12 x 15 1 180
Training Room w/ Modules 20 x 24 480 480
Audio/Visual Storage 12 x 16 192 192
Chair/Table Storage 12 x 20 240 240
Training Bay 24 x 50 1200 1200 Next to Training Room
Lunch/Break Room 18 x 24 40 432 432
Men's Restroom/Locker/Shower 30 x 34 1020 1020 3 toilet fixtures
Women's Restroom/Locker/Shower 16 x 26 416 416 3 toilet fixtures
Unisex Shop Restroom 8 x 10 1 80
Uniform Storage 10 x 16 160 160
Data/Communication Room 10 x 12 120 120
Custodial Closet 12 x 20 240 240 Storage for floor scrubbers
Chassis Wash 20 x 50 1 1000 Vertical lift flush with floor
Chassis Wash Equipment Room 12 x 18 1 216
Van Lift Bays 12 x 30 5 1800 Above ground platform lifts
Van Flat Bays 12 x 30 5 1800
Parts Cleaning Area 16 x 24 1 384 Steam Cleaning and Parts Cleaning Equipment
Repair Bays
4
35%
TOTAL - OPERATIONS
Area DescriptionSpace Space Program
RemarksStandard
MAINTENANCE
Office Areas
Support Areas
RemarksStandard
OPERATIONS
Administration
Dispatch
Driver Areas
HART Satellite FacilityPreliminary O & M Program
100 Vans
Area DescriptionSpace Space Program
Table 1:
A-1
Tire Shop 12 x 36 1 432 Shop and Storage beside Tire Bay
Tire Storage 10 x 16 1 160 119 van tires on tire carousel
Tire Bay 20 x 35 1 700 Inground self-contained one post hydraulic lift
Common Work Area 16 x 24 1 384
Battery Room 10 x 12 1 120
Portable Equipment Storage 10 x 20 1 200
Toolbox Storage 12 x 16 1 192
Parts Office 10 x 12 2 240 Private offices near Parts Counter
Work/copy/file 12 x 12 1 144
Parts Counter 10 x 12 1 120
Receiving Area 32 x 32 1 1024
Loading Dock 32 x 80 1 2560
Parts Storeroom 40 x 80 1 3200
Mezzanine 20 x 40 1 800
Tool Crib 10 x 10 1 100
Lube/Compressor Room 16 x 32 1 512
Subtotal 49 21,536 Mezz. sf @ 50%
Circ/Mech/Elec/Struc 5,384
TOTAL - MAINTENANCE 26,920
Staff Space Area
Office 10 x 12 1 120 Private office
Fare Box Storage and Counting Room 12 x 30 1 360
Fueling Positions (Gasoline & Diesel) 24 x 50 4 2 2400Four people to circulate the 90 operational vans for
fueling, check fluids, washing and interior cleaning
Vaccum Equipment Room 12 x 20 1 240
Fuel Management Equipment Room 10 x 10 1 100
Van Cleaning Supply Storage Room 10 x 10 1 100
Restrooms 8 x 10 1 80 Unisex
Lube/Compressor Room 12 x 16 1 192
Drive Through Vehicle Wash 20 x 60 1 1200
Reclaim/Support Equipment 20 x 40 1 800
Subtotal 5 5,592
Circ/Mech/Elec/Struc 1,118
6,710
Parking Areas
Vans (24') 10 x 30 100 30,000
Operations Non-Revenue Vehicles 10 x 20 30 6000
Maintenance Non-Revenue Vehicles 10 x 20 10 2000
Stacked Vehicle Parking Circulation 34,200
Tandem Vehicle Parking Circulation 38,000
Stacked Vehicle Parking Subtotal 72,200
Tandem Vehicle Parking Subtotal 76,000
Employee/Visitor Parking Areas
Employee 9 x 18 230 37,260
Visitor 9 x 18 4 648
Disability Parking 14 x 18 5 1260
Car Parking Circulation 39,168
Subtotal 78,336
Storage Areas
Emergency Generator 500
Alternative Fuel Equipment Farm 16,000 CNG Compressor and Tank Area
Tire Storage (used) 200
Trash/Recycling Dumpsters 400 Canopy Covered
Hazmat Storage 200
Disabled Van Storage 10 x 30 10 3,000
Employee Areas
Patio 300
Subtotal 20,600
174,936
Building Areas
Operations 9,447
Maintenance 26,920
SPACE NEEDS PROGRAM SUMMARY
TOTAL - PARKING & EXTERIOR
FUEL/WASH
Fuel Lane
Wash Lane
20%
TOTAL - FUEL/WASH
PARKING & EXTERIOR
90%
100%
100%
Tire Shop/Bay
Shop/Storage Areas
Storeroom
25%
Area DescriptionSpace Space Program
RemarksStandard
A-2
Fuel/Wash 6,710
Subtotal Building Areas 43,078
Site Areas
Stacked Bus Parking Areas (Urban Site) 72,200
Tandem Bus Parking Areas (Suburban Site) 76,000
Employee/Visitor Parking Areas 78,336
Exterior Storage Areas 20,600
Subtotal Urban Site 214,214
Circulation/Landscape/Setbacks/Stormwater 42,843
Subtotal Suburban Site 218,014
Circulation/Landscape/Setbacks 218,014
Total SF 436,027
Total acres / Vehicles per acre 10.01 3.6
257,056 square feet
5.9 acres
436,027 square feet
10.0 acresTOTAL SUBURBAN SITE REQUIREMENTS
20%
100%
TOTAL URBAN SITE REQUIREMENTS
A-3
31-Mar-17
Staff Space Area
Superintendent 12 x 20 1 240 Private office
Assistant Superintendent 12 x 15 1 180 Private office
Secretary/Clerk 8 x 10 1 80 Workstation
Clerk 8 x 10 1 80 Workstation
Copy/File/Work Room 12 x 12 144 144 Copier, fax, printer
Lobby 8 x 10 80 80
Conference Room 15 x 20 300 300 8-10 people
Street Supervisors 10 x 12 6 720 Private offices
Dispatch Offices with Clerks 16 x 24 6 384 384 Three separate Dispatches
Dispatch Vestibule 12 x 16 192 192Enclosed area in glass for business contact with Dispatch
Clerks, not part of outside access
Transfer Storage 10 x 15 150 150
Tracking and Communications 10 x 15 150 150Adjacent to Dispatch Office for tracking vehicles and
radio communications with drivers
Computer Area 10 x 16 160 160
Mailboxes (200) 10 x 18 180 180 Pass - thru mailboxes loaded from the Dispatch Office
Entrance/ Exit Vestibule 8 x 10 80 80
Driver's Room 32 x 54 200 1,728
TV Alcove 10 x 16 160 160
Vending/Kitchenette 10 x 15 150 150 Kitchenette w/sink, refrigerator, microwave, coffee
machine and 3 vending machines
Quiet Room/Dormitory 12 x 20 240 240 two beds and reading area
Exercise Room 16 x 18 288 288 Space for 4 pieces of exercise equipment
Locker Area (1/2 height) 200 800 200 lockers
Men's Restroom/Shower 24 x 52 1,248Space for 3 showers, 18 lockers, and three sets of toilet
facilities
Women's Restroom/Shower 24 x 52 1,248Space for 3 showers, 18 lockers, and three sets of toilet
facilities
Custodial Closet 10 x 12 120 120
Subtotal 216 9,102
Circ/Mech/Elec/Struc 3,186
12,288
Staff Space Area
Fleet Manager 16 x 24 1 384 Private office
Assistant Manger 12 x 20 0 Private office
Maintenance Director 12 x 20 1 240 Private office
Administrative Assistant 8 x 10 2 160 Workstation
Copy/File Area 10 x 12 120 120
Maintenance Supervisor 12 x 15 2 180 180 At Shop Floor - one per shift
Maintenance Counter/Library w/ computer 12 x 24 288 288 Window to Maintenance Supervisor Office
Radio Room 10 x 10 100 100
Training Office 12 x 15 1 180
Training Room w/ Modules 20 x 30 600 600
Audio/Visual Storage 12 x 16 192 192
Chair/Table Storage 20 x 20 400 400
Training Bay 24 x 60 1440 1440 Next to Training Room
Lunch/Break Room 20 x 24 60 480 480
Men's Restroom/Locker/Shower 30 x 34 1020 1020 3 toilet fixtures
Women's Restroom/Locker/Shower 16 x 26 416 416 3 toilet fixtures
Unisex Shop Restroom 8 x 10 2 160
Uniform Storage 10 x 18 180 180
Data/Communication Room 10 x 12 120 120
Custodial Closet 12 x 20 240 240 Storage for floor scrubbers
Chassis Wash - Vans 20 x 50 1 1000 Vertical lift flush with floor
Chassis Wash - Buses 20 x 60 1 1200 Vertical lift flush with floor
Chassis Wash Equipment Room 12 x 18 1 216
Bus Bays 20 x 60 4 4800 3 wireless portable lifts
A/C Bay - Body Bay 20 x 60 1 1200
PM/Inspection Bays 20 x 60 3 3600 3 wireless portable lifts
Van Lift Bays 12 x 30 3 1080 Above ground platform lifts
Van Flat Bays 12 x 30 2 720
Parts Cleaning Area 16 x 24 1 384 Steam Cleaning and Parts Cleaning Equipment
Tire Shop 12 x 50 1 600 Shop and Storage beside Tire Bay
Tire Storage 10 x 32 1 320 65 bus tires and 119 van tires on tire carousel
Tire Bay 24 x 55 1 1320 Inground self-contained one post hydraulic lift
Common Work Area 16 x 24 1 384
Electronics Shop 16 x 24 3 1 384 3 shifts w/ 1 workers each shift with electronic storage
Brake Storage 16 x 24 1 384
Facility Maintenance Office and Shop 20 x 20 1 400
Facility Storage 20 x 20 1 400
Battery Room 12 x 12 1 144
Portable Equipment Storage 12 x 20 1 240
Toolbox Storage 12 x 24 2 576
Parts Office 10 x 12 2 240 Private offices near Parts Counter
Driver Areas
HART Satellite FacilityPreliminary O & M Program
50 buses - 50 vans
Area DescriptionSpace Space Program
RemarksStandard
OPERATIONS
Administration
Dispatch
Repair Bays
4
35%
TOTAL - OPERATIONS
Area DescriptionSpace Space Program
RemarksStandard
MAINTENANCE
Office Areas
Support Areas
Tire Shop/Bay
Shop/Storage Areas
Storeroom
Table 2:
A-4
Work/copy/file 12 x 14 1 168
Parts Counter 10 x 20 1 200
Receiving Area 32 x 32 1 1024
Loading Dock 32 x 80 1 2560
Parts Storeroom 60 x 80 1 4800
Mezzanine 20 x 40 1 800
Tool Crib 10 x 15 1 150
Lube/Compressor Room 16 x 40 1 640
Subtotal 72 36,050 Mezz. sf @ 50%
Circ/Mech/Elec/Struc 9,013
TOTAL - MAINTENANCE 45,063
Staff Space Area
Office 10 x 12 1 120 Private office
Fare Box Storage and Counting Room 16 x 60 1 960
Fueling Positions (Gasoline & Diesel) 24 x 60 4 2 2880Four people to circulate the 80 operational vehicles for
fueling, check fluids, washing and interior cleaning
Vacuum Equipment Room 20 x 20 1 400
Fuel Management Equipment Room 10 x 12 1 120
Van Cleaning Supply Storage Room 10 x 15 1 150
Restrooms 8 x 10 1 80 Unisex
Lube/Compressor Room 12 x 20 1 240
Drive Through Vehicle Wash 20 x 80 2 3200
Reclaim/Support Equipment 20 x 40 1 800
Subtotal 5 8,950
Circ/Mech/Elec/Struc 1,790
10,740
Parking Areas
Vans (24') 10 x 30 50 15,000
Standard Bus (40') 12 x 45 50 27,000
Operations Non-Revenue Vehicles 10 x 20 12 2400
Maintenance Non-Revenue Vehicles 10 x 20 6 1200
Stacked Vehicle Parking Circulation 41,040
Tandem Vehicle Parking Circulation 45,600
Stacked Vehicle Parking Subtotal 86,640
Tandem Vehicle Parking Subtotal 91,200
Employee/Visitor Parking Areas
Employee 9 x 18 250 40,500
Visitor 9 x 18 10 1620
Disability Parking 14 x 18 9 2268
Car Parking Circulation 44,388
Subtotal 88,776
Storage Areas
Emergency Generator 500
Alternative Fuel Equipment Farm 16,000 CNG Compressor and Tank Area
Above Ground Deisel Fuel Equipment 1,800
Tire Storage (used) 300
Trash/Recycling Dumpsters 600 Canopy Covered
Hazmat Storage 200
Disabled Van Storage 10 x 30 10 5,000
Employee Areas
Patio 300
Subtotal 24,700
204,676
Building Areas
Operations 12,288
Maintenance 45,063
Fuel/Wash 10,740
Subtotal Building Areas 68,090
Site Areas
Stacked Bus Parking Areas (Urban Site) 86,640
Tandem Bus Parking Areas (Suburban Site) 91,200
Employee/Visitor Parking Areas 88,776
Exterior Storage Areas 24,700
Subtotal Urban Site 268,206
Circulation/Landscape/Setbacks/Stormwater 53,641
Subtotal Suburban Site 272,766
Circulation/Landscape/Setbacks 272,766
Total SF 545,532
Total acres / Vehicles per acre 12.52
321,847 square feet
7.4 acres
545,532 square feet
12.5 acres
25%
Area DescriptionSpace Space Program
RemarksStandard
TOTAL - PARKING & EXTERIOR
FUEL/WASH
Fuel Lane
Wash Lane
20%
TOTAL - FUEL/WASH
PARKING & EXTERIOR
90%
100%
100%
TOTAL SUBURBAN SITE REQUIREMENTS
SPACE NEEDS PROGRAM SUMMARY
20%
100%
TOTAL URBAN SITE REQUIREMENTS
A-5
Table 3:
A-6
A-7
APPENDIX B: COORDINATION MEMO WITH FDOT DISTRICT 7 AND FUTURE EXPRESSWAY PLANS
\ AECOM
7650 W. Courtney Campbell
Cswy
Tampa, FL 33607-1462
www.aecom.com
813 286-1711 tel
813 287-8591 fax
Memorandum
The FDOT District Seven is conducting multiple community and agency outreach events as part of the
Tampa Bay Express project, with the project’s limits including proposed improvements to both Interstate
275 (I-275) and Interstate 4 (I-4) in Hillsborough County. As part of the FDOT’s continued outreach
efforts to document the communities’ needs and desires for transportation services, the TBX team is
coordinating with the MPO and HART to identify potential opportunities to support transit services as
part of the TBX reconstruction. As part of the FDOT’s agency coordination on current projects, the
FDOT has inquired about this current Pre-Concept Study to identify if this type of transit facility could be
accommodated as part of the design features under the I-275/I-4 Interchange.
Project Background and Description: AECOM was issued a NTP in October 2016 to conduct a study
funded by the Hillsborough County MPO in support of the Hillsborough Area Regional Transit (HART)
Agency entitled: Pre-Concept Development for a New Satellite Operations and Maintenance Facility:
Feasibility Analysis and Site Location Study.
As part of the scoping process, HART provided the following parameters: HART’s service area covers
approximately 1,000 square miles in Hillsborough County, FL. The existing operations and maintenance
facilities are located at 4305 E. 21st Avenue and over time have been reconstructed to address an
expanding fleet. Changes in policy regarding fueling by CNG has also impacted use of the 21st Ave.
site as the total fleet eventually will be fueled by CNG and more CNG capacity will need to be added.
HART currently services its entire fleet of almost 200 vehicles, which includes various sized transit
buses and paratransit vehicles, at the 21st Ave. facility. The fleet consists of diesel, gasoline and CNG
fueled vehicles, and diesel and CNG fueling occurs at the current site. All gasoline-fueled vehicles are
taken for fueling off-site during the night. The existing facility has extensive flooding issues and HART
will be securing a design-build project in 2017 to reconstruct the heavy maintenance infrastructure at
the 21st Ave. site (grant funding) to improve the drainage issues and general construction features of
the building. However, the reconstruction will not increase capacity at the current facility, limiting
HART’s ability to effectively receive new CNG vehicles and retire vehicles over time, and most
importantly, to plan for growth.
To
Allison Yeh, AICP, Hillsborough County MPO, Executive
Planner and Project Manager Page 1
CC Alice Price, FDOT District 7, GEC
Subject
Agency Coordination:
FDOT District Seven Request for Progress on Pre-Concept Development for a
New Satellite Operations and Maintenance Facility; Feasibility Analysis and Site
Location Study
From Kasey Cursey, AICP, AECOM Tampa, FL
Date December 11, 2016
B-1
With current overcrowding of the existing facility and the anticipated expansion of the fleet, HART is
considering a new satellite facility that would service 200 vehicles (a combination of new vehicles and
existing vehicles from the 21st Avenue site). The new site would be comprised of a combination of
standard transit vehicles and para-transit vans, and the new satellite facility will need to include CNG
fueling. HART has expressed an interest in phasing the new facility to start with all vans (up to 100),
with the additional expansion of 100 buses. The existing facility at 21st Avenue will remain in operation
and serve as the main Administration, Operations and Maintenance Facility.
This AECOM study will be completed by June 2017 and will provide HART with basic “order of
magnitude” programming and budget information for the proposed new satellite site. AECOM will study
and evaluate HART’s current and future needs, identify facility and real estate requirements, and
provide pre-concept-level programming and budget requirements for the project. The result will be a
report that provides recommendations for acreage and potential locations for three possible satellite
scenarios: minimum (100 vans at new satellite site); mid-term (combination of 50-100 vans and 50
buses); and long-term, maximum (100 vans and 100 buses).
The Hillsborough County MPO has requested that AECOM respond to the FDOT’s agency coordination
request, and provide a draft finding on the minimum acreage needed to support a new satellite
maintenance facility (low-end scenario). As of December 9, 2016, AECOM has met with HART
planning, operations and maintenance staff to document current and projected services. At a minimum,
the new satellite facility would need to meet these fundamental requirements:
a) Acreage: A site that can accommodate a minimum of 100 vans, on-site CNG fueling, parking for
both drivers and dispatch employees, limited administrative services and restroom facilities, rest
and eating facilities for up to 100 drivers and other employees, and other required services such as
fare collection, maintenance and wash services.
b) Security: A site that can be fully-secured with fencing and an entrance gate to protect staff,
vehicles, CNG fueling tanks, and fare collection.
c) Access: A site that has adequate roadway access for 100 vans and employees to enter and exit
throughout the day, and eventually have adequate access for up to 100 buses (a total of 200
vehicles) to enter and exit with minimal delay during operating hours.
AECOM has documented the initial facility requirements and is working on detailing the recommended
site acreage and location. For FDOT’s request, this memo has been prepared to provide an initial idea
of how much acreage would be needed to meet a minimum maintenance facility for 100 vehicles.
AECOM has developed this initial acreage recommendation and compared it to requirements from
national examples and recent operations and maintenance facility design work conducted by AECOM
for LYNX in Orlando, FL and LeeTran in Fort Myers, FL.
Initial Site Acreage Requirements for Phase 1 Scenario (100 vans with CNG fueling on-site):
Based on needs identified by HART’s planning, operations and maintenance staff, AECOM’s initial
finding is for HART to consider sites that are a minimum of 10 acres (suburban site) to accommodate
the features of a maintenance facility (100 vans with CNG fueling and fenced-security) as identified in
data collection meetings with HART in November 2016. This draft finding is preliminary to assist
FDOT in providing agency project information during the community outreach process, and still
must be approved by HART and the MPO before a final recommendation is published in June
2017.
B-2
APPENDIX C: DETAILED COST ESTIMATES
MAINTENANCE BUILDING
OPS AND ADMIN
PARKING
GENERAL
POND
DETENTION
COLLECTION
FARE
WASH BAYS
FUELING &
CN
G T
AN
KS
100 PARA-TRANSIT VANS
10.2 AC.
APRIL 24, 2017
100 PARA-TRANSIT VANS
37 OPS AND MAINT NON REV
9 DISABLED/REPAIR VEHICLES
100 PARA-TRANSIT VANS
5 DISABILITY
4 VISITOR
254 EMPLOYEE
RE
PAIR V
EHIC
LE
S
9 DIS
AB
LE
D
37 OPS AND MAINT VEHICLES
C-1
HART Operations and Maintenance Facility Estimate
Small - (100 Van) Facility Order of Magnatidute Cost Estimate
Land acqusitionLand (purchse price) $6.50 sf 1,981,980$ Buyers' fees 54,514$ Appraisal 17,000$ Boundary Survey 10,000$ Environmental studies 50,000$ Subtotal 2,113,494$ Contingency 30.0% $634,048Total (Rounded) $2,700,000
Buildings and equipment DivisionGeneral Requirements 01 00 00 $2,420,800Existing Conditions 02 00 00 $0Concrete 03 00 00 $932,202Masonry 04 00 00 $825,156Steel & Metals 05 00 00 $2,477,549Wood, Plastics & Composites 06 00 00 $4,128Thermal & Moisture Protection 07 00 00 $3,262,492Openings 08 00 00 $799,550Finishes 09 00 00 $454,750Specialties 10 00 00 $374,953Equipment 11 00 00 $1,061,359Furnishings 12 00 00 $61,400Special Construction 13 00 00 $0Conveying Equipment 14 00 00 $850,815Fire Suppression 21 00 00 $390,939Plumbing 22 00 00 $1,097,243HVAC 23 00 00 $1,138,134Electrical 26 00 00 $1,633,307Communications 27 00 00 $267,011Electronic Safety & Security 28 00 00 $132,075Subtotal $18,183,863Contingency 30.0% $5,455,159Total (Rounded) $23,600,000
Site DevelopmentGeneral Requirements 01 00 00 213,500$ Concrete 03 00 00 1,790,330$ Specialties 10 00 00 70,000$ Electronic Safety & Security 28 00 00 265,850$ Earthwork 31 00 00 402,912$ Exterior Improvements 32 00 00 1,024,326$ Utilities 33 00 00 2,705,679$
C-2
Transportation 34 00 00 100,000$ Subtotal 6,572,597$ Contingency 30.0% $1,971,779Total (Rounded) $8,500,000
Hard Construction Cost Estimate $24,756,461Contingency 30.0% $7,426,938Total (Rounded) $32,200,000
Soft CostsPreliminary Engineering 4% 990,258$ Final Design 8% 1,980,517$ Project Manag. for Design and Construction 3% 742,694$ Construction Admin. And Management 6% 1,485,388$ Insurance 3% 742,694$ Legal: Permits: review fees 1% 247,565$ Subtotal 6,189,115$ Contingency 30.0% $1,856,735Total (Rounded) $8,000,000
Notes:Cost Estimating Assumptions;Estimates are prepared using current dollars (2017)Adequate experienced craft labor is availableNormal productivity rates as historically experienced are utilizedCompatible trade agreements exist in the regionNo strike impacts will be experienced by the projectThere are sufficient experienced contractors available to perform said workNormal Tampa area weather impacts to constructions scheduleExisting state of the art construction technology will be utilizedAssumes cooperation between stakeholdersTemporary Power is included in the General Conditions
C-3
HART Operations and Maintenance Facility100 Van Facility
by JRH
checked by KS 03/27/17
Division 1 - General Requirements
General Construction 16,920,000$ ls 10% $1,692,000
Building Systems Commissioning 1 ls 2% $338,400
Bonding Cost 18,800,000$ ls 0.80% $150,400
Submittals 1 ls 100,000$ $100,000
Testing and Surveying 1 ls 100,000$ $100,000
Contract Close-Out & As-Builds 1 ls 40,000.00$ $40,000
$2,420,800
Division 2
Spec. No. Existing Conditions Qty Units Unit Cost Total Comments
$0
$0
Division 2 Total $0
Division 3
Spec. No. Concrete Qty Units Unit Cost Total Comments
03 30 00 Continuous Footing, Footers and Piers 170 cy 500.00$ $85,000
03 30 00 Slab on Grade - Operations Area 9,477 sf 6.50$ $61,601
03 30 00 Slab on Grade- Maintenance and Service 33,630 sf 7.90$ $265,677
03 30 00 White non-metallic dryshake w/ sealant 8,100 sf 5.00$ $40,500
03 30 00 Topping on Epic Mezzanine Composite Deck 800 sf 12.50$ $10,000 3.5" conc on 3" deep deck03 30 00 Topping on Epic Maint Roof Comp. Deck 33,630 sf 10.89$ $366,231 3.25" conc on 2" deck 03 30 00 Topping on Epic Ops Roof Comp. Deck 9,477 sf 10.89$ $103,194
Division 3 Total $932,202
Division 4
Spec. No. Masonry Qty Units Unit Cost Total Comments
04 22 00 12" Block Wall 6,600 sf 20.00$ $132,000
04 22 00 8" Block Wall 6,666 sf 16.00$ $106,656
04 22 00 4" Glazed Block - one side glazed 900 sf 20.00$ $18,000
04 22 00 8" Glazed Block - two 4" glazed block one side 4,750 sf 38.00$ $180,500
04 22 00 8" Glazed Block - one side glazed 1,840 sf 30.00$ $55,200
04 22 00 12" SGFT both sides 1,920 sf 40.00$ $76,800
04 22 00 12" SGFT - 8" SGFT & 4" SGFT 6,400 sf 40.00$ $256,000
Division 4 Total $825,156
Division 5
Spec. No. Metals Qty Units Unit Cost Total Comments
05 12 00 Structural Steel (mat'l only) 326,670 lbs 2.10$ $686,007
05 12 00 Structural Steel (labor & equipment) 326,670 lbs 1.60$ $522,672
05 13 00 Misc. Metals 35,000 lbs 6.00$ $210,000
05 13 00 Stair Frames - 1 stairs @ 3,600 lbs 3.70$ $13,320
Stair Treads 22 ea 250.00$ $5,500
Handrails - steel for mezzanine stairs 54 lf 200.00$ $10,800
05 31 90 Bar Joist Roof System 276,904 lbs 2.50$ $692,260
05 32 00 Epic Composite Floor Deck - Mezzanine 800 sf 7.00$ $5,600
05 32 00 Epic Composite Roof Deck - OPS 9,447 sf 6.60$ $62,350
05 32 00 Epic Acoustic Composite Roof Deck 33,630 sf 8.00$ $269,040
Division 5 Total $2,477,549
Division 6
Spec. No. Wood, Plastics, Composites Qty Units Unit Cost Total Comments
06 10 00 Roof Carpentry
2x6 Roof Cap Blocking (2500 lf) 1250 bf 3.00$ $3,750
06 10 00 In-Wall Blocking
2x6 Misc. Blocking (210 lf) 105 bf 3.60$ $378
Division 6 Total $4,128
Division 7
Spec. No. Thermal and Moisture Protection Qty Units Unit Cost Total Comments
07 21 15 Batt Insulation- 4" unfaced sound batts 4608 sf 1.50$ $6,912
07 22 15 Roof Insulation - 4" Isocyanurate 43,077 sf 3.30$ $142,154
07 26 15 Slab Vapor Barrier 43,077 sf 0.35$ $15,077
07 40 10 Metal Wall Panels - 2'-6" H 50,762 sf 50.00$ $2,538,100 Centria 3"T Formawall Dim. Series w/insul.
Steel Stud Framing for Metal wall panels- 6" W 5,700 sf 4.69$ $26,733 Ops
Steel Stud Framing for Metal wall panels - 12"W 20,600 sf 6.50$ $133,900 Maintenance
07 54 15 Sarnafil PVC Roofing 43,077 sf 8.00$ $344,616
07 56 00 Roof Metal Coping 1500 ft 10.00$ $15,000
07 72 25 Roof Hatches 2-6x6-6 3 ea 3,500.00$ $10,500
C-4
07 84 20 Fire-Resistant Joint Sealants 1000 lf 2.50$ $2,500
07 92 15 Joint Sealants 15,000 lf 1.80$ $27,000
Division 7 Total $3,262,492
Division 8
Spec. No. Openings Qty Units Unit Cost Total Comments
08 10 00 Hollow Metal Door/Frame 3x7 Exterior Insulated 20 ea 1,100.00$ $22,000
08 10 00 Hollow Metal Door/Frame 6x7 Exterior Insulated 2 ea 1,800.00$ $3,600
08 10 00 Hollow Metal Door/Frame 3x7 Interior 54 ea 900.00$ $48,600
08 10 00 Hollow Metal Door/Frame 6x7 Interior 3 ea 1,350.00$ $4,050
08 30 00 Overhead Coiling Doors 12x12 15 ea 6,800.00$ $102,000
08 40 00 Entrance Doors - Kawneer Aluminum 4 ea 2,500.00$ $10,000
08 40 00 Entrance Windows - Kawneer Aluminum 4 ea 1,200.00$ $4,800
08 55 00 Windows - alum frame 52 ea 1,375.00$ $71,500 5'H x 5'L double pane w/ low-e coating
08 60 00Polycarbonate Monitor Windows - 140 L w/ 8' x 8'
sloped sides w/ aluminum frames8,960 sf 50.00$ $448,000
08 71 00 Finish Hardware $0 Included in door prices
08 90 00 Louvers and Vents 1 ls 15,000.00$ $15,000
Division 8 Labor & Equipment 1 ls 70,000.00$ $70,000 Doors and Windows Only
Division 8 Total $799,550
Division 9
Spec. No. Finishes Qty Units Unit Cost Total Comments
09 20 00 Drywall & Studs $0
One sided 1600 sf 4.00$ $6,400
Two sided to 10' 7,500 sf 6.80$ $51,000
One sided Ceiling 3820 sf 4.20$ $16,044
09 30 00 Ceramic Tile $0
Toilet Rooms 3820 sf 28.00$ $106,960
09 50 00 Ceilings $0
ACT at 10' AFF 8,000 sf 6.00$ $48,000
09 65 80 Resilient Tile & Carpet Flooring $0
Rubber Flooring - recycled tires 6,500 sf 8.00$ $52,000
Rubber Base Cove 1200 lf 3.40$ $4,080
Office Carpeting - carpet squares 175 sy 60.00$ $10,500
Rubber Base 935 lf 4.00$ $3,740
09 90 00 Painting $0
Interior Walls 16,600 sf 1.50$ $24,900
Interior Ceilings 3820 sf 1.80$ $6,876
Interior Ceilings - Industrial one-coat system 33,200 1.00$ $33,200
Epoxy and Enamel 27,000 sf 0.80$ $21,600
HM Door & Frames 84 ea 175.00$ $14,700
Metal OH Doors 18 ea 275.00$ $4,950
Anti Graffiti Coating 0 sf 1.60$ $0
09 90 10 Concrete Flooring Coating (Ashford Formula) 33,200 sf 1.50$ $49,800
sf $0
Division 9 Total $454,750
Division 10
Spec. No. Specialties Qty Units Unit Cost Total Comments
10 11 00 Markerboards - 4'h x 8'l 8 ea 500$ $4,000
10 11 00 Tackboards - 4'h x 8'l 16 ea 350$ $5,600
10 14 00 Exterior Identification Sign 1 ls 3,840$ $3,840
10 14 00 Door Identification Signs 60 ea 30$ $1,800
10 14 00 Maintenance Hazard Signs 50 ea 19$ $971
10 40 00 FE Cabinets 9 ea 660$ $5,940
10 40 00 Extinguisher 16 ea -$ $0 See Division 21
10 50 00 Full Height Lockers - 15"w x 18"d x 60" h 40 ea 750$ $30,000 Recycled plastic lockers
10 50 00 Full Height Lockers - 12"w x 15"d x 60"h 24 ea 690$ $16,560 Recycled plastic lockers
10 50 00 Half Height Lockers - 12" w x 18"d x 60"h 75 ea 780$ $58,500 Recycled plastic lockers
10 50 00 Locker Benches - 8 feet long 8 ea 520$ $4,160
10 21 13 Toilet Partitions - recycled plastic 12 ea 1,100$ $13,200
10 21 13 Urinal Partitions - recycled plastic 3 ea 400$ $1,200
10 21 90 Work Station Cubicals - 8' x 8' space 4 ea 2,048$ $8,192
10 28 00 Toilet Paper Dispensers - two rolls 14 ea 100$ $1,400
10 28 00 Sanitary Dispensers 2 ea 90$ $180
10 28 00 Used Sanitary Container 2 ea 70$ $140
10 28 00 Paper Towel Dispensers 12 ea 200$ $2,400
10 28 00 Used Paper Towel Containers 12 ea 100$ $1,200
10 28 00 Soap Dispensers 14 ea 100$ $1,400
10 28 00 Grab Bars - Toilets 1@42",36",18" each toilet 4 sets 400$ $1,600
10 28 00 Grab Bars - Showers 1@ 30" & 2@18" 4 sets 300$ $1,200
10 28 00 Shower Curtains 12 ea 200$ $2,400
10 28 00 Shower Seats 6 ea 150$ $900
10 28 00 Dressing Seats 6 ea 200$ $1,200
C-5
10 28 00 Soap Dishes 6 ea 60$ $360
10 28 00 Dressing Hooks - double hooks 12 ea 30$ $360
10 55 40 Mail Boxes through wall, back loaded 150 ea 40$ $6,000
10 56 00 Parts Storage Equipment
1005 Pegboard 8 ea 400$ $3,200
1041 Drawer Cabinets 21 ea 2,200$ $46,200
1042 Drawer Cabinets under counter 3 ea 1,350$ $4,050
1046 Storage Cabinet, Electronics 1 ea 900$ $900
1070 Flammables Cabinet 3 ea 2,100$ $6,300
1116 Storage Cabinet, Heavy Duty, Tools/Accessories 7 ea 1,650$ $11,550
1117 Storage Cabinet, Heavy Duty, Shelving/Drawers 2 ea 1,500$ $3,000
1119 Storage Cabinet, Heavy Duty, Janitorial 1 ea 1,300$ $1,300
1137 Carousel, Small Tires 1 ea 18,000$ $18,000
1325 Pallet Rack with Shelving 4 ea 1,200$ $4,800
1326 Pallet Rack with Wire Decking 1 ea 1,800$ $1,800
1344 Parts Storage Rack System 1 ea 75,000$ $75,000
1366 Shelving with wire shelves - 2' x 4' 8 ea 800$ $6,400
1367 Shelving with wire shelves - 1'-6" x 4' 12 ea 600$ $7,200
1391 Glass Rack 1 ea 750$ $750
1489 Book Shelves 4 ea 350$ $1,400
1516 Storage Shelving 1 ea 400$ $400
10 75 00 Flag Poles - 40 feet high 2 ea 4,000$ $8,000
Division 10 Total $374,953
Division 11
Equip. No. Equipment Qty Units Unit Cost Total Comments
2036 Wheel Balancer 1 ea. 5,500$ $5,500
2065 Buffer/Grinder 10" w/ dust collector 3 ea. 9,900$ $29,700
2090 Tire Inflation Chamber 1 ea. 3,495$ $3,495
2106 Fleet Battery Charger 1 ea. 730$ $730
2107 Battery Charger/Tester w/ Cart 1 ea. 3,800$ $3,800
2169 Air Compressor, 25 HP Duplex 1 ea. 30,000$ $30,000
2170 Air Dryer 1 ea. 2,000$ $2,000
2178 Air Compressor, 7.5 HP Duplex 1 ea. 6,200$ $6,200
2179 Air Dryer 1 ea. 1,000$ $1,000
2227 Disc Grinder/Sander 12" 1 ea. 4,620$ $4,620
2230 Drill Press, Variable Speed 15" 2 ea. 600$ $1,200
2290 Tire Dunker 1 ea. 4,030$ $4,030
2320 Fall Protection 4 ea. 1,700$ $6,800
2354 Brake Lathe 1 ea. 75,500$ $75,500
2356 Drum Brake Lathe 1 ea. 11,000$ $11,000
2400 Tire Mounter/Demounter 1 ea. 12,500$ $12,500
2456 Arbor Press 1 ea. 430$ $430
2466 Press, 60 Tons 1 ea. 7,500$ $7,500
2506 Refrigerant Recovery 1 ea. 5,300$ $5,300
2527 Vertical Band Saw, 20" 1 ea. 8,500$ $8,500
2543 Cold-Cut Saw, 12" 1 ea. 6,231$ $6,231
2585 Welding Screen 4 ea. 265$ $1,060
2628 Vise, Swivel Base, 5" 12 ea. 500$ $6,000
2662 MIG Welder, Portable 1 ea. 2,819$ $2,819
2668 Oxyacetylene Welder w/ Cart 1 ea. 1,100$ $1,100
2672 TIG Welder 1 ea. 2,500$ $2,500
3031 High Pressure Hot Water, Portable 1 ea. 8,700$ $8,700
3071 High Pressure Washer 1 ea. 27,000$ $27,000
3087 Parts Washer, 500# Capacity 1 ea. 18,000$ $18,000
3216 Vehicle Washer 1 ea. 200,000$ $200,000
2348 Ladder, rolling with Safety Cage 2 ea. 9,000$ $18,000
3510 Vacuum System 1 ea. 25,000$ $25,000
3590 Welding Fume Extractor 1 ea. 6,600$ $6,600
3591 Fume Hood, Benchtop 1 ea. 1,074$ $1,074
3620 Vehicle Exhaust Reel 10 ea. 7,350$ $73,500
3700 Waste Hopper 2 Tons 3 ea. 2,500$ $7,500
5010 Wheel Dolly 2 ea. 800$ $1,600
5051 Service Carts 6 ea. 638$ $3,828
5065 Basket, Portable, Laundry 1 ea. 150$ $150
5071 Computer Cabinets 2 ea. 364$ $728
7012 Diesel Fuel Dispenser - 20 GPM 1 ea. 3,138$ $3,138
7702 DEF Dispensing System 1 ea. 5,930$ $5,930
CNG Dispenser 2 ea. 4,000$ $8,000
7425 Tank Monitoring System 2 ea. 2,500$ $5,000
7500 Fluid Management System 2 ea. 10,000$ $20,000
7520 Pump 75:1 (Grease) 1 ea. 3,500$ $3,500
7522 Pump 6:1 (MO) 1 ea. 3,200$ $3,200
7527 Pump 10:1 (Gear Oil) 1 ea. 3,300$ $3,300
7530 Pump 1:1 ( Antifreeze & Window Cleaner) 4 ea. 2,800$ $11,200
7531 Pump 3:1 (MO & ATF) 2 ea. 2,900$ $5,800
C-6
7533 Pump 5:1 (ATF) 1 ea. 3,100$ $3,100
7534 SS Submersible Pump (DEF) 1 ea. 7,500$ $7,500
7547 Fluid Evacuation Pump 2 ea. 1,850$ $3,700
7703 Window Washer Reel 2 ea. 1,800$ $3,600
7704 Antifreeze/Coolant Recycling System 1 ea. 4,500$ $4,500
7705 Waste Coolant Receiver 3 ea. 2,010$ $6,030
7706 Waste Oil Receiver 3 ea. 1,707$ $5,121
7750 Hose Reels - CA 10 ea. 1,800$ $18,000
7751 Hose Reels - ATF 5 ea. 2,675$ $13,375
7752 Hose Reels - EO 5 ea. 2,675$ $13,375
7753 Hose Reels - CO 5 ea. 1,800$ $9,000
7754 Hose Reels - GO 5 ea. 2,262$ $11,310
7755 Hose Reels - CG 5 ea. 2,644$ $13,220
7757 Electric Light/Outlet Wire Reel 10 ea. 300$ $3,000
7927 Tank, 120 Gal 3 ea. 2,050$ $6,150
7930 Tank, 280 Gal 3 ea. 4,249$ $12,747
7933 Tank, 500 Gal 1 ea. 5,080$ $5,080
7940 Tank, 120 Gal WW Polyethylene 2 ea. 600$ $1,200
7945 Tank, 1000 Gal DEF Polyethylene 1 ea. 5,000$ $5,000
7958 Waste Oil Tank, 1000 Gal Fiberglass 1 ea. 12,000$ $12,000
7965 Diesel Storage Tank, 10,000 Gal 1 ea. 30,000$ $30,000
8106 Electronics Workbench 2 ea. 744$ $1,488
8117 Severe Duty Workbench 12 ea. 2,000$ $24,000
Loading Dock 1 ea. 24,000$ $24,000
11800 Equipment Installation 1 ls 124,600$ $124,600
Division 11 Total $1,061,359
Division 12
Spec. No. Furnishings Qty Units Unit Cost Total Comments
Base Cabinet Units 60 lf 250.00$ $15,000
Counter Tops 80 lf 300.00$ $24,000
Coat Rack & Shelf 20 lf 120.00$ $2,400
Operation Control Center Furniture 1 LS 20,000.00$ $20,000 Allowance
Division 2 Total $61,400
Division 13
Spec. No. Special Construction Qty Units Unit Cost Total Comments
Division 13 Total $0
Division 14
Equip. No. Conveying Equipment Qty Units Unit Cost Total Comments
9120 Bridge Crane 3 ton 1 ea 30,000$ $30,000 Acco - above one bay
9306 Forklift, 4000# 1 ea 70,300$ $70,300 Mitsubishi
9672 Vehicle Platform Lifts 6 ea 125,000$ $750,000
9815 Pallet Jack, 5500# 1 ea 515$ $515
Division 14 Total $850,815
Division 21
Spec. No. Fire Suppression Qty Units Unit Cost Total Comments
Preaction Valve 1 ea 42,000$ $42,000
Fire Alarm Panel 1 ea 25,000$ $25,000
Wet-Pipe Sprinkler System 43,077 sf 7$ $301,539
Smoke Detectors 15 ea. 200$ $3,000
Heat Detectors 2 ea. 250$ $500
Fire Extinguishers 24 ea. 350$ $8,400
Fire Hydrants 3 ea. 2,500$ $7,500
Fire Line PIV 1 ea 3,000$ $3,000
Division 21 Total $390,939
Division 22
Spec. No. Plumbing Qty Units Unit Cost Total Comments
Horizontal Pipe Support 100 ea. 25$ $2,500
Hanger Rod Connection 717 ea. 30$ $21,500
15107 Water Piping 300 lf 15$ $4,500
Water Supply Piping 300 lf 45$ $13,500
Compressed Air Piping 850 lf 25$ $21,250
Drain Piping 1025 lf 40$ $41,000
Roof Drain Piping with Hangers 2000 lf 35$ $70,000
Oil-Lubrication System Piping 2500 lf 40$ $100,000
Sanitary Line 1500 lf 40$ $60,000
15110 Domestic Water Ball Valves 16 ea. 70$ $1,120
Compressed Air Valves 32 ea. 250$ $8,000
Gas Supply Valves 15 ea. 320$ $4,800
C-7
Gas Supply Pressure Regulators 9 ea. 1,500$ $13,500
Butterfly Valves 16 ea. 750$ $12,000
15112 General Duty Valves for HVAC 32 ea. 250$ $8,000
Hot Water Valves 24 ea. 260$ $6,240
Main Water Meter Service 1 ea. 9,000$ $9,000
3" Diameter Cast Iron Valves 5 ea. 700$ $3,500
8" Diameter Cast Iron Valves 2 ea. 1,800$ $3,600
15120 Water Meter Service Gate Valves 3" 3 ea. 400$ $1,200
15124 Expansion Fittings 16 ea. 205$ $3,280
15140 Main Backflow Preventer 1 ea. 20,000$ $20,000
3" Service Backflow Preventers 2 ea. 2,500$ $5,000
15155 Floor Clean Outs 8 ea. 150$ $1,200
Clean Out Tees 8 ea. 400$ $3,200
Floor Drains 20 ea. 500$ $10,000
Roof Drains 20 ea. 650$ $13,000
Shower Drain with Strainer 7 ea. 180$ $1,260
Interceptors 6 ea. 2,000$ $12,000
Oil-Water Separators 3 ea. 4,000$ $12,000
Traps 8 ea. 300$ $2,400
Trench Drains 350 ft 210$ $73,500
15180 Hose Bibs 12 ea. 250$ $3,000
15400 Sink Fixtures with Hardware 13 ea. 700$ $9,100
Hand Sinks in Maintenance 2 ea. 800$ $1,600
Water Fountains 6 ea. 1,800$ $10,800
Urinals 6 ea. 1,100$ $6,600
Water Closets 13 ea. 1,200$ $15,600
Showers 6 ea. 1,500$ $9,000
15440 Grinder Pump System 1 ls 10,000$ $10,000
Material Mark Up 27% $169,493 Includes 7% Sales Tax
Plumbing Labor and Equipment from Detail Sheet $300,000 Assumes 3 months; includes mark-ups
Division 22 Total $1,097,243
Division 23
Spec. No. HVAC Qty Units Unit Cost Total Comments
Roof Duct Supports 20 ea. 150$ $3,000
15083 HVAC Insulation 7500 sf 4$ $30,000
Expansion Tanks - Diaphragm Type 1 ea. 2,800$ $2,800
15127 Meters and Gages for HVAC 8 ea. 250$ $2,000
Electronic Type Air Measuring Station 3 ea. 4,000$ $12,000
Venturi Type Water Measuring Sta. 1 ea. 3,500$ $3,500
15181 Hydronic Piping 1500 ft 25$ $37,500
15183 Refrigerant Piping 250 ft 20$ $5,000
Piping Through Penetrations 20 ea. 150$ $3,000
15185 Hydronic Pumps 2 ea 3,365$ $6,730
15189 HVAC Water Treatment 1 ls 1,500$ $1,500
Air Separator for Heating Water 1 ea. 1,000$ $1,000
Hot Water Pump Filter 1 ea. 565$ $565
Chemical By-Pass Feeder 1 ea. 1,500$ $1,500
15513 Gas Fired Boilers; Hot Water; 1400 MBH 2 ea. 25,000$ $50,000
15671 Condensing Units 1 ea. 40,000$ $40,000
Condensate Piping 600 ft 20$ $12,000
15725 Modular Indoor Air Handling 1 ea. 30,000$ $30,000
15738 Split System Air Conditioning 2 ea. 6,000$ $12,000
15762 Unit Heaters 10 ea. 1,400$ $14,000
15764 Convection Heating Units
Hot Water Finned Tube Radiation Units 600 lf 48$ $28,800
15785 Energy Recovery Units 2 ea. 18,000$ $36,000
Energy Unit Heat Exchanger (AHU-1) 1 ea. 10,000$ $10,000
15815 Metal Ducts 1 ls 100,000$ $100,000
15820 Duct Accessories 1 ls 20,000$ $20,000 Allowance
Sound Attenuation 2 ea. 2,000$ $4,000
15837 Centrifugal Fans
Exhaust Fans 1000 CFM 0.5" w.g. 6 ea. 1,800$ $10,800
Exhaust Fans 2000 CFM 1.0" w.g. 1 ea. 2,800$ $2,800
10,000 CFM Exhaust Fans 4 ea. 5,500$ $22,000
Variable Speed Return Air Fan 1 ea. 5,000$ $5,000
Variable Speed Supply Air Fan 1 ea. 5,000$ $5,000
15838 Power Ventilators 6 ea. 900$ $5,400
15840 Air Terminal Units 15 ea. 1,500$ $22,500
15855 Diffusers, Registers and Grilles 20 ea. 125$ $2,500
15856 Intake and Relief Valves 20 ea. 110$ $2,200
Air Blender Stations 2 ea. 3,000$ $6,000
15861 Air Filters 1 ea. 1,200$ $1,200
15900 HVAC Instrumentation 1 ls 90,000$ $90,000
Tamper Switches 6 ea. 150$ $900
HVAC Instrumentation 6 ea. 250$ $1,500
C-8
Duct Detectors 9 ea. 300$ $2,700
CO Sensors 8 ea. 200$ $1,600
CO2 Sensors 4 ea. 500$ $2,000
Material Mark Up 27% $175,769 Includes 7% Sales Tax
HVAC Labor and Equipment $311,371 Assumes 4 months; includes mark-ups
Division 23 Total $1,138,134
Division 26
Spec. No. Electrical Qty Units Unit Cost Total Comments
#10 THHN 20700 ft 0.25$ $5,175
12/2 MC 6000 ft 0.38$ $2,280
12/2 MC w/Insulated Ground 2000 ft 0.45$ $900
#2 XLP 6800 ft 1.46$ $9,951
#6 XLP 5000 ft 0.91$ $4,573
#8 XLP 6830 ft 0.57$ $3,904
12/2 Fire Alarm Cable 4800 ft 0.38$ $1,824
18/2 Alarm Cable 6000 ft 0.98$ $5,854
#4 XLP 1500 ft 1.16$ $1,738
#4 XLP (Switch Heaters) 16000 ft 1.16$ $18,537
#10 XLP 12000 ft 0.69$ $8,232
4/0 THHN 1200 ft 4.70$ $5,640
#12 XLP 1150 ft 0.55$ $633
#2 THHN 300 ft 1.20$ $360
500 MCM 12400 ft 6.60$ $81,840
#6 THHN 2080 ft 0.65$ $1,352
#4 THHN 4600 ft 0.85$ $3,910
Coaxial Cable RC6 1200 ft 0.95$ $1,140
Telephone Wire 1200 ft 0.25$ $300
Conduit - 1" EMT 1950 ft 3.60$ $7,020
3/4" EMT 4850 ft 2.80$ $13,580
1 1/2" EMT 1850 ft 4.20$ $7,770
2" EMT 200 ft 5.00$ $1,000
2 1/2" PVC 250 ft 4.00$ $1,000
1 1/2" PVC 650 ft 3.60$ $2,340
1 1/2" PVC (Buried) 6500 ft 8.20$ $53,300
1" PVC 2250 ft 3.20$ $7,200
3/4" RGS 1000 ft 5.00$ $5,000
3/4" PVC 850 ft 2.60$ $2,210
1 1/2" RGS 100 ft 7.50$ $750
2" PVC 1670 ft 3.80$ $6,346
Stub Up Conduits 250 ea. 150.00$ $37,500
4" PVC 2750 ft 12.00$ $33,000
Boxes; NEMA 1 6"x6"x4" 270 ea. 40.00$ $10,800
NEMA 12 24"x30" 8 ea. 400.00$ $3,200
Wiring Devices - Toggle Switches 55 ea. 20.00$ $1,100
Switch Plates 55 ea. 25.00$ $1,375
3 Gang Switch Plates 16 ea. 60.00$ $960
120v. Duplex Receptacles 105 ea. 15.00$ $1,575
GFI Duplex Receptacles 15 ea. 30.00$ $450
Duplex Receptacles w/Internal Ground 45 ea. 25.00$ $1,125
Welding Receptacles w/Disconnect 12 ea. 140.00$ $1,680
Flexible Conduit Connection to Motors 45 ea. 20.00$ $900
Emergency Generator - 1000 KVA 1 ea. 300,000$ $300,000
Single Phase 240/480 Transformers 2 ea. 15,000.00$ $30,000
Main Disconnect Panel 800 amp 2 ea. 18,000.00$ $36,000
Main Disconnect Panel 1200 amp 2 ea. 20,000.00$ $40,000
400 amp 3 Phase Panel 3 ea. 5,000.00$ $15,000
200 amp single Phase Panel 4 ea. 1,200.00$ $4,800
MCC Starter Combinations -Size 0 12 ea. 1,600.00$ $19,200
Size 1 10 ea. 1,800.00$ $18,000
Size 2 6 ea. 2,020.00$ $12,120
MCC Stand Up Bays 9 ea. 1,400.00$ $12,600
Disconnects - 30 amp 18 ea. 600.00$ $10,800
60 amp 11 ea. 800.00$ $8,800
Interior Lighting - 2x4 277volt 75 ea. 250.00$ $18,750
14x48 277 volt 36 ea. 190.00$ $6,840
Bathroom Overhead Sink Fixtures (4' ea.) 12 ea. 200.00$ $2,400
Down Light 120 volt 50 ea. 180.00$ $9,000
Exit Lights 16 ea. 190.00$ $3,040
Outdoor Wall Pack 250w 15 ea. 600.00$ $9,000
High Bay 1000w 55 ea. 650.00$ $35,750 Assumes 400 sf coverage per light
Material Mark-Up 27% $256,884 Includes 7% Sales Tax
Labor and Equipment Installation 1 ls $425,000 $425,000
Division 26 Total $1,633,307
Division 27
C-9
4/7/2017
L:\60522223 HART Site report\900 Work\cost estimate\60522223 HCMPO DRAFT Estimate.xlsx
Order of Magnitude Estimate DRAFTOption: 100 Van Prepared: JWB
Item Description Amount UOM Cost Sub-Total Notes1 Mobilization 1 LS 100,000$ 100,000$ 2 Silt Fence 2,700 lf 5$ 13,500$ Site perimeter3 Clear & Grub 10.16 ac 8,000$ 81,280$ P2S SOV4 Regular excavation 22,974 cy 10.00$ 229,737$ P2S SOV; 6 ft pond, parking excavate 15"5 Embankment 22,974 cy 4.00$ 91,895$ P2S SOV; Place holder6 Site utilities 1 LS 100,000$ 100,000$ Place holder7 Site drainage 4,813 lf 125$ 601,579$ Place holder8 Concrete sidewalks 4,908 sf 4.50$ 22,086$ P2S SOV9 Fence & gate 2,700 lf 15$ 140,500$ Includes 2 Access gates allowance; FDOT state wide
10 Landscaping 58,392 sf 4.50$ 262,764$ Includes irrigation; P2S SOV11 Hardscape 1 LS 100,000$ 100,000$ Place holder: Bike racks; benches; trash receptacles12 Roadway - Concrete paving 18,779 sy 90$ 1,690,100$ 8" reinforced; incl stabilization; P2S SOV13 Asphalt paving 12,731 sy 35$ 445,581$ Incl stabization & superpave; P2S SOV14 Concrete curb & gutter 7,710 lf 13$ 100,230$ P2S SOV15 Bumper stops 409 stall 55$ 22,495$ FDOT state-wide average16 Pavement marking 309 stall 100$ 30,900$ P2S SOV17 MOT 1 LS 100,000$ 100,000$ 18 Signalize new intersection, simple 1 ea 100,000$ 100,000$ Place holder19 Site Lighting & Power 409 stall 4,900$ 2,004,100$ P2S SOV20 Parking Signage 1 LS 45,000$ 45,000$ P2S SOV21 Monument entrance sign 1 LS 25,000$ 25,000$ Place holder22 CCTV & conduit 409 stall 650$ 265,850$
6,572,597$ Sub-Total30% 1,971,779$ Contingency
8,544,377$ TOTAL
Excluded items:Environmental & wetland mitigationRetaining wallsFiberLand acquisitionOff site improvementsEngineering, CEIArt-in-TransitStorm chambersCosts associated with CCTV central monitoring stationBuilding Costs
C-10
16
OPS AND ADMIN
PARKING
GENERAL
DETAIL BAYS
FUELING &
BAYS
WASH COLLECTION
FARE
10 DISABILITY
10 VISITOR
257 EMPLOYEE
16 OPS AND MAINT NON REV
6 DISABLED BUS
50 VAN
50 BUS
POND
DETENTION
MAINTENANCE BUILDING
CN
G T
AN
KS
14.6 AC.
APRIL 24, 2017
6 DISABLED BUS
8 BUS
42 BUS
50 PARA-TRANSIT BUS
50 BUS 50 PARA-TRANSIT VANS
C-11
HART Operations and Maintenance Facility Estimate
Medium 50 Bus 50 Van Facility Order of Magnatude Cost Estimate
Land acqusitionLand (purchse price) $4.00 sf $3,136,320Buyers' fees $94,682Appraisal $17,000Boundary Survey $10,000Environmental studies $50,000Subtotal $3,308,002Contingency 30.0% $992,401Total (Rounded) $4,300,000
Buildings and equipment DivisionGeneral Requirements 01 00 00 $2,792,000Existing Conditions 02 00 00 $0Concrete 03 00 00 $1,698,408Masonry 04 00 00 $1,490,980Steel & Metals 05 00 00 $3,694,677Wood, Plastics & Composites 06 00 00 $7,434Thermal & Moisture Protection 07 00 00 $3,751,631Openings 08 00 00 $586,050Finishes 09 00 00 $740,195Specialties 10 00 00 $493,053Equipment 11 00 00 $2,647,404Furnishings 12 00 00 $61,400Special Construction 13 00 00 $0Conveying Equipment 14 00 00 $1,577,145Fire Suppression 21 00 00 $620,000Plumbing 22 00 00 $1,521,715HVAC 23 00 00 $1,245,991Electrical 26 00 00 $1,778,613Communications 27 00 00 $267,011Electronic Safety & Security 28 00 00 $151,125Subtotal $25,124,833Contingency 30.0% $7,537,450Total (Rounded) $32,700,000
Site Development
General Requirements 01 00 00 $216,630Concrete 03 00 00 $2,526,790Specialties 10 00 00 $70,000Electronic Safety & Security 28 00 00 $259,350Earthwork 31 00 00 $624,397Exterior Improvements 32 00 00 $1,246,412
C-12
Utilities 33 00 00 $2,919,574Transportation 34 00 00 $100,000Subtotal $7,963,153Contingency 30.0% $2,388,946Total (Rounded) $10,400,000
Hard Construction Cost Estimate $33,087,986Contingency 30.0% $9,926,396Total (Rounded) $43,000,000
Soft CostsPreliminary Engineering 4% $1,323,519Final Design 8% $2,647,039Project Manag. for Design and Construction 3% $992,640Construction Admin. And Management 6% $1,985,279Insurance 3% $992,640Legal: Permits: review fees 1% $330,880Subtotal $8,271,997Contingency 30.0% $2,481,599Total (Rounded) $10,800,000Notes:Cost Estimating Assumptions;Estimates are prepared using current dollars (2017)Adequate experienced craft labor is availableNormal productivity rates as historically experienced are utilizedCompatible trade agreements exist in the regionNo strike impacts will be experienced by the projectThere are sufficient experienced contractors available to perform said workNormal Tampa area weather impacts to constructions scheduleExisting state of the art construction technology will be utilizedAssumes cooperation between stakeholdersTemporary Power is included in the General Conditions
C-13
HART Operations and Maintenance Facility50 Bus 50 Van Facility
by JRH
checked by KS 03/29/17
Division 1 - General Requirements
General Construction 19,800,000$ ls 10% $1,980,000
Building Systems Commissioning 1 ls 2% $396,000
Bonding Cost 22,000,000$ ls 0.80% $176,000
Submittals 1 ls 100,000$ $100,000
Testing and Surveying 1 ls 100,000$ $100,000
Contract Close-Out & As-Builds 1 ls 40,000.00$ $40,000
Division 1 - Total $2,792,000
Division 2
Spec. No. Existing Conditions Qty Units Unit Cost Total Comments
$0
$0
Division 2 Total $0
Division 3
Spec. No. Concrete Qty Units Unit Cost Total Comments
03 30 00 Continuous Footing, Footers and Piers 355 cy 500.00$ $177,500
03 30 00 Slab on Grade - Operations Area 14,000 sf 6.50$ $91,000
03 30 00 Slab on Grade- Maintenance and Service 61,600 sf 7.90$ $486,640
03 30 00 White non-metallic dryshake w/ sealant 20,000 sf 5.00$ $100,000
03 30 00 Topping on Epic Mezzanine Composite Deck 1600 sf 12.50$ $20,000 3.5" conc on 3" deep deck03 30 00 Topping on Epic Maint Roof Comp. Deck 61,600 sf 10.89$ $670,824 3.25" conc on 2" deck 03 30 00 Topping on Epic Ops Roof Comp. Deck 14,000 sf 10.89$ $152,444
Division 3 Total $1,698,408
Division 4
Spec. No. Masonry Qty Units Unit Cost Total Comments
04 22 00 12" Block Wall 11,880 sf 20.00$ $237,600
04 22 00 8" Block Wall 11,880 sf 16.00$ $190,080
04 22 00 4" Glazed Block - one side glazed 1,620 sf 20.00$ $32,400
04 22 00 8" Glazed Block - two 4" glazed block one side 8,550 sf 38.00$ $324,900
04 22 00 8" Glazed Block - one side glazed 3,400 sf 30.00$ $102,000
04 22 00 12" SGFT both sides 3,500 sf 40.00$ $140,000
04 22 00 12" SGFT - 8" SGFT & 4" SGFT 11,600 sf 40.00$ $464,000
Division 4 Total $1,490,980
Division 5
Spec. No. Metals Qty Units Unit Cost Total Comments
05 12 00 Structural Steel (mat'l only) 588,006 lbs 2.10$ $1,234,813
05 12 00 Structural Steel (labor & equipment) 588,006 lbs 1.60$ $940,810
05 13 00 Misc. Metals 45,000 lbs 6.00$ $270,000
05 13 00 Stair Frames - 1 stairs @ 3,600 lbs 3.70$ $13,320
Stair Treads 22 ea 250.00$ $5,500
Handrails - steel for mezzanine stairs 54 lf 200.00$ $10,800
05 31 90 Bar Joist Roof System 249,214 lbs 2.50$ $623,035
05 32 00 Epic Composite Floor Deck - Mezzanine 1,600 sf 7.00$ $11,200
05 32 00 Epic Composite Roof Deck - OPS 14,000 sf 6.60$ $92,400
05 32 00 Epic Acoustic Composite Roof Deck 61,600 sf 8.00$ $492,800
Division 5 Total $3,694,677
Division 6
Spec. No. Wood, Plastics, Composites Qty Units Unit Cost Total Comments
06 10 00 Roof Carpentry
2x6 Roof Cap Blocking (2500 lf) 2250 bf 3.00$ $6,750
06 10 00 In-Wall Blocking
2x6 Misc. Blocking (210 lf) 190 bf 3.60$ $684
Division 6 Total $7,434
Division 7
Spec. No. Thermal and Moisture Protection Qty Units Unit Cost Total Comments
07 21 15 Batt Insulation- 4" unfaced sound batts 6220 sf 1.50$ $9,330
07 22 15 Roof Insulation - 4" Isocyanurate 75,600 sf 3.30$ $249,480
07 26 15 Slab Vapor Barrier 75,600 sf 0.90$ $68,040
07 40 10 Metal Wall Panels 50,762 sf 50.00$ $2,538,100 Centria 3"T Formawall Dim. Series w/insul.
Steel Stud Framing for Metal wall panels- 6" W 6,900 sf 4.69$ $32,361 Ops
Steel Stud Framing for Metal wall panels - 12"W 24,800 sf 6.50$ $161,200 Maintenance
07 54 15 Sarnafil PVC Roofing 75,600 sf 8.00$ $604,800
07 56 00 Roof Metal Coping 2122 ft 10.00$ $21,220
07 72 25 Roof Hatches 2-6x6-6 4 ea 3,500.00$ $14,000
07 84 20 Fire-Resistant Joint Sealants 1800 lf 2.50$ $4,500
07 92 15 Joint Sealants 27,000 lf 1.80$ $48,600
Division 7 Total $3,751,631
C-14
Division 8
Spec. No. Openings Qty Units Unit Cost Total Comments
08 10 00 Hollow Metal Door/Frame 3x7 Exterior Insulated 18 ea 1,100.00$ $19,800
08 10 00 Hollow Metal Door/Frame 6x7 Exterior Insulated 4 ea 1,800.00$ $7,200
08 10 00 Hollow Metal Door/Frame 3x7 Interior 60 ea 900.00$ $54,000
08 10 00 Hollow Metal Door/Frame 6x7 Interior 5 ea 1,350.00$ $6,750
08 30 00 Overhead Coiling Doors 12x12 6 ea 6,800.00$ $40,800
08 30 00 Overhead Coiling Doors 12x14 11 ea 8,800.00$ $96,800
08 40 00 Entrance Doors - Kawneer Aluminum 6 ea 2,500.00$ $15,000
08 40 00 Entrance Windows - Kawneer Aluminum 6 ea 1,200.00$ $7,200
08 55 00 Windows - alum frame 52 ea 1,375.00$ $71,500 5'H x 5'L double pane w/ low-e coating
08 60 00Polycarbonate Monitor Windows - 200 L w/ 8' x 8'
sloped sides w/ aluminum frames3,200 sf 50.00$ $160,000
08 71 00 Finish Hardware $0 Included in door prices
08 90 00 Louvers and Vents 1 ls 27,000.00$ $27,000
Division 8 Labor & Equipment 1 ls 80,000.00$ $80,000 Doors and Windows Only
Division 8 Total $586,050
Division 9
Spec. No. Finishes Qty Units Unit Cost Total Comments
09 20 00 Drywall & Studs
One sided 5800 sf 4.00$ $23,200
Two sided to 10' 13,500 sf 6.80$ $91,800
One sided Ceiling 5040 sf 4.20$ $21,168
09 30 00 Ceramic Tile $0
Toilet Rooms 5040 sf 28.00$ $141,120
09 50 00 Ceilings $0
ACT at 10' AFF 12,250 sf 6.00$ $73,500
09 65 80 Resilient Tile & Carpet Flooring $0
Rubber Flooring - recycled tires 9,000 sf 8.00$ $72,000
Rubber Base Cove 1700 lf 3.40$ $5,780
Office Carpeting - carpet squares 300 sy 60.00$ $18,000
Rubber Base 1200 lf 4.00$ $4,800
09 90 00 Painting $0
Interior Walls 32,800 sf 1.50$ $49,200
Interior Ceilings 5040 sf 1.80$ $9,072
Interior Ceilings - Industrial one-coat system 61,600 1.00$ $61,600
Epoxy and Enamel 35,100 sf 0.80$ $28,080
HM Door & Frames 96 ea 175.00$ $16,800
Metal OH Doors 17 ea 275.00$ $4,675
Anti Graffiti Coating 0 sf 1.60$ $0
09 90 10 Concrete Flooring Coating (Ashford Formula) 79,600 sf 1.50$ $119,400
Division 9 Total $740,195
Division 10
Spec. No. Specialties Qty Units Unit Cost Total Comments
10 11 00 Markerboards - 4'h x 8'l 8 ea 500$ $4,000
10 11 00 Tackboards - 4'h x 8'l 16 ea 350$ $5,600
10 14 00 Exterior Identification Sign 1 ls 3,840$ $3,840
10 14 00 Door Identification Signs 68 ea 30$ $2,040
10 14 00 Maintenance Hazard Signs 60 ea 19$ $1,165
10 40 00 FE Cabinets 12 ea 660$ $7,920
10 40 00 Extinguisher 24 ea -$ $0 See Division 21
10 50 00 Full Height Lockers - 15"w x 18"d x 60" h 60 ea 750$ $45,000 Recycled plastic lockers
10 50 00 Full Height Lockers - 12"w x 15"d x 60"h 40 ea 690$ $27,600 Recycled plastic lockers
10 50 00 Half Height Lockers - 12" w x 18"d x 60"h 100 ea 780$ $78,000 Recycled plastic lockers
10 50 00 Locker Benches - 8 feet long 18 ea 520$ $9,360
10 21 13 Toilet Partitions - recycled plastic 20 ea 1,100$ $22,000
10 21 13 Urinal Partitions - recycled plastic 10 ea 400$ $4,000
10 21 90 Work Station Cubicals - 8' x 8' space 6 ea 2,048$ $12,288
10 28 00 Toilet Paper Dispensers - two rolls 20 ea 100$ $2,000
10 28 00 Sanitary Dispensers 4 ea 90$ $360
10 28 00 Used Sanitary Container 4 ea 70$ $280
10 28 00 Paper Towel Dispensers 12 ea 200$ $2,400
10 28 00 Used Paper Towel Containers 12 ea 100$ $1,200
10 28 00 Soap Dispensers 14 ea 100$ $1,400
10 28 00 Grab Bars - Toilets 1@42",36",18" each toilet 6 sets 400$ $2,400
10 28 00 Grab Bars - Showers 1@ 30" & 2@18" 4 sets 300$ $1,200
10 28 00 Shower Curtains 20 ea 200$ $4,000
10 28 00 Shower Seats 4 ea 150$ $600
10 28 00 Dressing Seats 10 ea 200$ $2,000
10 28 00 Soap Dishes 10 ea 60$ $600
10 28 00 Dressing Hooks - double hooks 10 ea 30$ $300
10 55 40 Mail Boxes through wall, back loaded 150 ea 40$ $6,000
10 56 00 Parts Storage Equipment
1005 Pegboard 12 ea 400$ $4,800
1041 Drawer Cabinets 24 ea 2,200$ $52,800
1042 Drawer Cabinets under counter 3 ea 1,350$ $4,050
1046 Storage Cabinet, Electronics 3 ea 900$ $2,700
C-15
1070 Flammables Cabinet 4 ea 2,100$ $8,400
1116 Storage Cabinet, Heavy Duty, Tools/Accessories 8 ea 1,650$ $13,200
1117 Storage Cabinet, Heavy Duty, Shelving/Drawers 2 ea 1,500$ $3,000
1119 Storage Cabinet, Heavy Duty, Janitorial 2 ea 1,300$ $2,600
1136 Carousel, Large Tires 1 ea 24,000$ $24,000
1137 Carousel, Small Tires 1 ea 22,000$ $22,000
1325 Pallet Rack with Shelving 4 ea 1,200$ $4,800
1326 Pallet Rack with Wire Decking 1 ea 1,800$ $1,800
1344 Parts Storage Rack System 1 ea 75,000$ $75,000
1366 Shelving with wire shelves - 2' x 4' 8 ea 800$ $6,400
1367 Shelving with wire shelves - 1'-6" x 4' 12 ea 600$ $7,200
1391 Glass Rack 2 ea 750$ $1,500
1391 Panel Rack 1 ea 750$ $750
1489 Book Shelves 6 ea 350$ $2,100
1516 Storage Shelving 1 ea 400$ $400
10 75 00 Flag Poles - 40 feet high 2 ea 4,000$ $8,000
Division 10 Total $493,053
Division 11
Equip. No. Equipment Qty Units Unit Cost Total Comments
2036 Wheel Balancer - Vans 1 ea. 5,500$ $5,500
2037 Wheel Balancer 1 ea. 16,350.00$ $16,350
2065 Buffer/Grinder 10" w/ dust collector 3 ea. 9,900$ $29,700
2090 Tire Inflation Chamber 1 ea. 3,495$ $3,495
2106 Fleet Battery Charger 1 ea. 730$ $730
2107 Battery Charger/Tester w/ Cart 1 ea. 3,800$ $3,800
2169 Air Compressor, 20 HP Duplex 1 ea. 30,000$ $30,000
2170 Air Dryer 1 ea. 5,000$ $5,000
2178 Air Compressor, 7.5 HP Duplex 1 ea. 6,200$ $6,200
2179 Air Dryer 1 ea. 1,000$ $1,000
2227 Disc Grinder/Sander 12" 1 ea. 4,620$ $4,620
2230 Drill Press, Variable Speed 15" 2 ea. 600$ $1,200
2290 Tire Dunker 1 ea. 4,030$ $4,030
2320 Fall Protection 4 ea. 1,700$ $6,800
2400 Tire Mounter/Demounter 1 ea. 12,500$ $12,500
2456 Arbor Press 1 ea. 430$ $430
2466 Press, 60 Tons 2 ea. 7,500$ $15,000
2506 Refrigerant Recovery 1 ea. 5,300$ $5,300
2527 Vertical Band Saw, 20" 1 ea. 8,500$ $8,500
2543 Cold-Cut Saw, 12" 1 ea. 6,231$ $6,231
2585 Welding Screen 4 ea. 265$ $1,060
2628 Vise, Swivel Base, 5" 12 ea. 500$ $6,000
2662 MIG Welder, Portable 1 ea. 2,819$ $2,819
2668 Oxyacetylene Welder w/ Cart 1 ea. 1,100$ $1,100
2672 TIG Welder 1 ea. 2,500$ $2,500
3004 Abrasive Blast Cabinet 1 ea. 1,135.00$ $1,135
3012 Ultrasonic Cleaner 1 ea. 17,800.00$ $17,800
3031 High Pressure Hot Water, Portable 1 ea. 8,700$ $8,700
3071 High Pressure Washer 2 ea. 27,000$ $54,000
3087 Parts Washer, 500# Capacity 1 ea. 18,000$ $18,000
3216 Vehicle Washer 2 ea. 600,000$ $1,200,000
2348 Ladder, rolling with Safety Cage 4 ea. 16,000$ $64,000
3510 Vacuum System 1 ea. 45,000$ $45,000
3590 Welding Fume Extractor 1 ea. 6,600$ $6,600
3591 Fume Hood, Benchtop 1 ea. 1,074$ $1,074
3620 Vehicle Exhaust Reel 12 ea. 7,350$ $88,200
3700 Waste Hopper 2 Tons 4 ea. 2,500$ $10,000
5010 Wheel Dolly 4 ea. 800$ $3,200
5051 Service Carts 12 ea. 638$ $7,656
5065 Basket, Portable, Laundry 1 ea. 150$ $150
5071 Computer Cabinets 6 ea. 364$ $2,184
7012 Diesel Fuel Dispenser - 20 GPM 2 ea. 3,138$ $6,276
7702 DEF Dispensing System 2 ea. 5,930$ $11,859
CNG Dispenser 2 ea. 4,000$ $8,000
7425 Tank Monitoring System 2 ea. 2,500$ $5,000
7500 Fluid Management System 6 ea. 10,000$ $60,000
7520 Pump 75:1 (Grease) 1 ea. 3,500$ $3,500
7522 Pump 6:1 (EO) 1 ea. 3,200$ $3,200
7527 Pump 10:1 (Gear Oil) 1 ea. 3,300$ $3,300
7530 Pump 1:1 ( Antifreeze & Window Cleaner) 4 ea. 2,800$ $11,200
7531 Pump 3:1 (EO & ATF) 2 ea. 2,900$ $5,800
7533 Pump 5:1 (ATF) 1 ea. 3,100$ $3,100
7534 SS Submersible Pump (DEF) 1 ea. 7,500$ $7,500
7547 Fluid Evacuation Pump 4 ea. 1,850$ $7,400
7703 Window Washer Reel 2 ea. 1,800$ $3,600
7704 Antifreeze/Coolant Recycling System 1 ea. 4,500$ $4,500
7705 Waste Coolant Receiver 4 ea. 2,010$ $8,040
7706 Waste Oil Receiver 4 ea. 1,707$ $6,828
7750 Hose Reels - CA 28 ea. 1,800$ $50,400
7751 Hose Reels - ATF 14 ea. 2,675$ $37,450
7752 Hose Reels - EO 14 ea. 2,675$ $37,450
C-16
7753 Hose Reels - CO 14 ea. 1,800$ $25,200
7754 Hose Reels - GO 14 ea. 2,262$ $31,668
7755 Hose Reels - CG 14 ea. 2,644$ $37,016
7757 Electric Light/Outlet Wire Reel 28 ea. 300$ $8,400
7927 Tank, 120 Gal 3 ea. 2,050$ $6,150
7930 Tank, 280 Gal 3 ea. 4,249$ $12,747
7933 Tank, 500 Gal 1 ea. 5,080$ $5,080
7940 Tank, 120 Gal WW Polyethylene 2 ea. 600$ $1,200
7945 Tank, 1000 Gal DEF Polyethylene 1 ea. 5,000$ $5,000
7958 Waste Oil Tank, 1000 Gal Fiberglass 1 ea. 12,000$ $12,000
7965 Diesel Storage Tank, 10,000 Gal 2 ea. 30,000$ $60,000
8106 Electronics Workbench 4 ea. 744$ $2,976
8117 Severe Duty Workbench 12 ea. 2,000$ $24,000
Loading Dock 1 ea. 24,000$ $24,000
11800 Equipment Installation 1 ls 400,000$ $400,000
Division 11 Total $2,647,404
Division 12
Spec. No. Furnishings Qty Units Unit Cost Total Comments
Base Cabinet Units 60 lf 250.00$ $15,000
Counter Tops 80 lf 300.00$ $24,000
Coat Rack & Shelf 20 lf 120.00$ $2,400
Operation Control Center Furniture 1 LS 20,000.00$ $20,000 Allowance
Division 2 Total $61,400
Division 13
Spec. No. Special Construction Qty Units Unit Cost Total Comments
Division 13 Total $0
Division 14
Equip. No. Conveying Equipment Qty Units Unit Cost Total Comments
9120 Bridge Crane 3 ton 2 ea 40,000$ $80,000 Acco - above two bays
9306 Forklift, 4000# 2 ea 70,300$ $140,600 Mitsubishi
9513 Bus Lifts - Portable 6 ea 80,000$ $480,000 Sets of 4 portable wireless lifts - Stertil Koni
9672 Vertical Lift, Inground 75,000# capacity 1 ea 375,000$ $375,000
9672 Vehicle Platform Lifts 4 ea 125,000$ $500,000
9815 Pallet Jack, 5500# 3 ea 515$ $1,545
Division 14 Total $1,577,145
Division 21
Spec. No. Fire Suppression Qty Units Unit Cost Total Comments
Preaction Valve 1 ea 42,000$ $42,000
Fire Alarm Panel 1 ea 25,000$ $25,000
Wet-Pipe Sprinkler System 75,600 sf 7$ $529,200
Smoke Detectors 18 ea. 200$ $3,600
Heat Detectors 8 ea. 250$ $2,000
Fire Extinguishers 22 ea. 350$ $7,700
Fire Hydrants 3 ea. 2,500$ $7,500
Fire Line PIV 1 ea 3,000$ $3,000
Division 21 Total $620,000
Division 22
Spec. No. Plumbing Qty Units Unit Cost Total Comments
Horizontal Pipe Support 185 ea. 25$ $4,625
Hanger Rod Connection 645 ea. 30$ $19,350
15107 Water Piping 540 lf 15$ $8,100
Water Supply Piping 435 lf 45$ $19,575
Compressed Air Piping 1550 lf 25$ $38,750
Drain Piping 1845 lf 40$ $73,800
Roof Drain Piping with Hangers 2700 lf 35$ $94,500
Oil-Lubrication System Piping 3045 lf 40$ $121,800
Sanitary Line 1845 lf 40$ $73,800
15110 Domestic Water Ball Valves 18 ea. 70$ $1,260
Compressed Air Valves 36 ea. 250$ $9,000
Gas Supply Valves 18 ea. 320$ $5,760
Gas Supply Pressure Regulators 10 ea. 1,500$ $15,000
Butterfly Valves 18 ea. 750$ $13,500
15112 General Duty Valves for HVAC 36 ea. 250$ $9,000
Hot Water Valves 27 ea. 260$ $7,020
Main Water Meter Service 1 ea. 9,000$ $9,000
3" Diameter Cast Iron Valves 5 ea. 700$ $3,500
8" Diameter Cast Iron Valves 2 ea. 1,800$ $3,600
15120 Water Meter Service Gate Valves 3" 3 ea. 400$ $1,200
15124 Expansion Fittings 20 ea. 205$ $4,100
15140 Main Backflow Preventer 1 ea. 20,000$ $20,000
3" Service Backflow Preventers 2 ea. 2,500$ $5,000
15155 Floor Clean Outs 9 ea. 150$ $1,350
Clean Out Tees 9 ea. 400$ $3,600
C-17
Floor Drains 18 ea. 500$ $9,000
Roof Drains 25 ea. 650$ $16,250
Shower Drain with Strainer 10 ea. 180$ $1,800
Interceptors 5 ea. 2,000$ $10,000
Oil-Water Separators 4 ea. 4,000$ $16,000
Traps 10 ea. 300$ $3,000
Trench Drains 850 ft 210$ $178,500
15180 Hose Bibs 14 ea. 250$ $3,500
15400 Sink Fixtures with Hardware 14 ea. 700$ $9,800
Hand Sinks in Maintenance 2 ea. 800$ $1,600
Water Fountains 8 ea. 1,800$ $14,400
Urinals 6 ea. 1,100$ $6,600
Water Closets 18 ea. 1,200$ $21,600
Showers 10 ea. 1,500$ $15,000
15440 Grinder Pump System 1 ls 10,000$ $10,000
Material Mark Up 27% $238,475 Includes 7% Sales Tax
Plumbing Labor and Equipment from Detail Sheet $400,000 Assumes 4 months; includes mark-ups
Division 22 Total $1,521,715
Division 23
Spec. No. HVAC Qty Units Unit Cost Total Comments
Roof Duct Supports 22 ea. 150$ $3,300
15083 HVAC Insulation 9500 sf 4$ $38,000
Expansion Tanks - Diaphragm Type 1 ea. 2,800$ $2,800
15127 Meters and Gages for HVAC 9 ea. 250$ $2,250
Electronic Type Air Measuring Station 4 ea. 4,000$ $16,000
Venturi Type Water Measuring Sta. 1 ea. 3,500$ $3,500
15181 Hydronic Piping 1850 ft 25$ $46,250
15183 Refrigerant Piping 300 ft 20$ $6,000
Piping Through Penetrations 24 ea. 150$ $3,600
15185 Hydronic Pumps 2 ea 3,365$ $6,730
15189 HVAC Water Treatment 1 ls 1,500$ $1,500
Air Separator for Heating Water 1 ea. 1,000$ $1,000
Hot Water Pump Filter 1 ea. 565$ $565
Chemical By-Pass Feeder 1 ea. 1,500$ $1,500
15513 Gas Fired Boilers; Hot Water; 1400 MBH 2 ea. 25,000$ $50,000
15671 Condensing Units 1 ea. 40,000$ $40,000
Condensate Piping 600 ft 20$ $12,000
15725 Modular Indoor Air Handling 1 ea. 30,000$ $30,000
15738 Split System Air Conditioning 2 ea. 6,000$ $12,000
15762 Unit Heaters 9 ea. 1,400$ $12,600
15764 Convection Heating Units $0
Hot Water Finned Tube Radiation Units 700 lf 48$ $33,600
15785 Energy Recovery Units 4 ea. 18,000$ $72,000
Energy Unit Heat Exchanger (AHU-1) 1 ea. 10,000$ $10,000
15815 Metal Ducts 1 ls 120,000$ $120,000
15820 Duct Accessories 1 ls 20,000$ $20,000 Allowance
Sound Attenuation 2 ea. 2,000$ $4,000
15837 Centrifugal Fans $0
Exhaust Fans 1000 CFM 0.5" w.g. 9 ea. 1,800$ $16,200
Exhaust Fans 2000 CFM 1.0" w.g. 1 ea. 2,800$ $2,800
10,000 CFM Exhaust Fans 5 ea. 5,500$ $27,500
Variable Speed Return Air Fan 1 ea. 5,000$ $5,000
Variable Speed Supply Air Fan 1 ea. 5,000$ $5,000
15838 Power Ventilators 5 ea. 900$ $4,500
15840 Air Terminal Units 15 ea. 1,500$ $22,500
15855 Diffusers, Registers and Grilles 28 ea. 125$ $3,500
15856 Intake and Relief Valves 18 ea. 110$ $1,980
Air Blender Stations 2 ea. 3,000$ $6,000
15861 Air Filters 1 ea. 1,200$ $1,200
15900 HVAC Instrumentation 1 ls 90,000$ $90,000
Tamper Switches 5 ea. 150$ $750
HVAC Instrumentation 5 ea. 250$ $1,250
Duct Detectors 10 ea. 300$ $3,000
CO Sensors 10 ea. 200$ $2,000
CO2 Sensors 5 ea. 500$ $2,500
Material Mark Up 27% $201,116 Includes 7% Sales Tax
HVAC Labor and Equipment $300,000 Assumes 4 months; includes mark-ups
Division 23 Total $1,245,991
Division 26
Spec. No. Electrical Qty Units Unit Cost Total Comments
#10 THHN 23700 ft 0.25$ $5,925
12/2 MC 7500 ft 0.38$ $2,850
12/2 MC w/Insulated Ground 2800 ft 0.45$ $1,260
#2 XLP 9000 ft 1.46$ $13,171
#6 XLP 6500 ft 0.91$ $5,945
#8 XLP 9430 ft 0.57$ $5,391
12/2 Fire Alarm Cable 5500 ft 0.38$ $2,090
18/2 Alarm Cable 7500 ft 0.98$ $7,317
C-18
#4 XLP 2300 ft 1.16$ $2,665
#4 XLP (Switch Heaters) 19000 ft 1.16$ $22,012
#10 XLP 13000 ft 0.69$ $8,918
4/0 THHN 1300 ft 4.70$ $6,110
#12 XLP 1250 ft 0.55$ $688
#2 THHN 360 ft 1.20$ $432
500 MCM 14400 ft 6.60$ $95,040
#6 THHN 2280 ft 0.65$ $1,482
#4 THHN 4800 ft 0.85$ $4,080
Coaxial Cable RC6 1350 ft 0.95$ $1,283
Telephone Wire 1350 ft 0.25$ $338
Conduit - 1" EMT 1920 ft 3.60$ $6,912
3/4" EMT 5450 ft 2.80$ $15,260
1 1/2" EMT 1770 ft 4.20$ $7,434
2" EMT 200 ft 5.00$ $1,000
2 1/2" PVC 280 ft 4.00$ $1,120
1 1/2" PVC 770 ft 3.60$ $2,772
1 1/2" PVC (Buried) 7200 ft 8.20$ $59,040
1" PVC 2750 ft 3.20$ $8,800
3/4" RGS 1050 ft 5.00$ $5,250
3/4" PVC 925 ft 2.60$ $2,405
1 1/2" RGS 85 ft 7.50$ $638
2" PVC 1690 ft 3.80$ $6,422
Stub Up Conduits 280 ea. 150.00$ $42,000
4" PVC 3050 ft 12.00$ $36,600
Boxes; NEMA 1 6"x6"x4" 340 ea. 40.00$ $13,600
NEMA 12 24"x30" 10 ea. 400.00$ $4,000
Wiring Devices - Toggle Switches 56 ea. 20.00$ $1,120
Switch Plates 56 ea. 25.00$ $1,400
3 Gang Switch Plates 18 ea. 60.00$ $1,080
120v. Duplex Receptacles 145 ea. 15.00$ $2,175
GFI Duplex Receptacles 28 ea. 30.00$ $840
Duplex Receptacles w/Internal Ground 72 ea. 25.00$ $1,800
Welding Receptacles w/Disconnect 10 ea. 140.00$ $1,400
Flexible Conduit Connection to Motors 48 ea. 20.00$ $960
Emergency Generator - 1000 KVA 1 ea. 300,000$ $300,000
Single Phase 240/480 Transformers 2 ea. 15,000.00$ $30,000
Main Disconnect Panel 800 amp 3 ea. 18,000.00$ $54,000
Main Disconnect Panel 1200 amp 2 ea. 20,000.00$ $40,000
400 amp 3 Phase Panel 3 ea. 5,000.00$ $15,000
200 amp single Phase Panel 4 ea. 1,200.00$ $4,800
MCC Starter Combinations -Size 0 14 ea. 1,600.00$ $22,400
Size 1 9 ea. 1,800.00$ $16,200
Size 2 7 ea. 2,020.00$ $14,140
MCC Stand Up Bays 10 ea. 1,400.00$ $14,000
Disconnects - 30 amp 18 ea. 600.00$ $10,800
60 amp 12 ea. 800.00$ $9,600
Interior Lighting - 2x4 277volt 94 ea. 250.00$ $23,500
14x48 277 volt 38 ea. 190.00$ $7,220
Bathroom Overhead Sink Fixtures (4' ea.) 14 ea. 200.00$ $2,800
Down Light 120 volt 48 ea. 180.00$ $8,640
Exit Lights 15 ea. 190.00$ $2,850
Outdoor Wall Pack 250w 18 ea. 600.00$ $10,800
High Bay 1000w 135 ea. 650.00$ $87,750 Assumes 400 sf coverage per light
Material Mark-Up 27% $293,091 Includes 7% Sales Tax
Labor and Equipment Installation 1 ls $400,000 $400,000
Division 26 Total $1,778,613
Division 27
Spec. No. Communications Qty Units Unit Cost Total Comments
Fiber Optic Backbone 1200 lf 15.00$ $18,000
Equipment Rack 7ft- ADC 4 ea. 391$ $1,564
FDP-ADC-144 4 ea. 1,660$ $6,640
FDP-ADC-48 4 ea. 1,585$ $6,340
Ethernet Switch - 10GE w/ GBIC 2 ea. 12,133$ $24,266
L2 / L3 Ethernet Sw - applications 2 ea. 5,375$ $10,750
Cable Management Tray-ADC 1 ea. 328$ $328
CAT 6 Jack Panel-ADC 2 ea. 358$ $716
NVR Server 1 ea. 2,775$ $2,775
SAN Switch-Cisco 2960 1 ea. 1,295$ $1,295
RAID-5 Archive- Intransa 8T Edge Block 1 ea. 12,254$ $12,254
Analytics Server- Dell 2950 1 ea. 3,255$ $3,255
Wireless LAN Controller- Cisco 4402 1 ea. 11,755$ $11,755
Antenna 1 ea. $12,000 $12,000
Satellite Dish 1 ea. $5,000 $5,000
Operations Control Center Equipment 1 LS $50,000 $50,000
Material Mark-Up 27% $45,073 Includes 7% Sales Tax
Labor and Equipment Installation 1 ls $55,000 $55,000
Division 27 Total $267,011
C-19
Division 28
Spec. No. Electronic Safety & Security Qty Units Unit Cost Total Comments
Security and Surveillance System
Doors with Access Controls 9 ea. 6,000.00$ $54,000
Fixed Position Cameras 13 ea. 1,500.00$ $19,500
Digital Video Recorder 1 ea. 5,000.00$ $5,000
Security Controller Panel 1 ea. 1,500.00$ $1,500
Video Monitor 1 ea. 5,000.00$ $5,000
Operations Control Center Monitors 1 ea. 2,500.00$ $2,500
Material Mark-Up 27% $23,625 Includes 7% Sales Tax
Labor and Equipment Installation 1 ls 40,000$ $40,000
Division 28 Total $151,125
C-20
Order of Magnitude Estimate DRAFTOption: 50 Bus; 50 Van Prepared: JWB
Item Description Amount UOM Cost Sub-Total Notes1 Mobilization 154 1 LS 100,000$ 100,000$
17 MOT 155 1 LS 100,000$ 100,000$ 2 Silt Fence 156 3,326 lf 5$ 16,630$ Site perimeter
14 Concrete curb & gutter 330 9,000 lf 13$ 117,000$ P2S SOV12 Roadway - Concrete paving 331 26,775 sy 90$ 2,409,790$ 8" reinforced; incl stabilization; P2S SOV20 Parking Signage 1014 1 LS 45,000$ 45,000$ P2S SOV21 Monument entrance sign 1014 1 LS 25,000$ 25,000$ Place holder5 Embankment 3114 36,257 cy 4.00$ 145,028$ P2S SOV; Place holder
22 CCTV & conduit 2801 399 stall 650$ 259,350$ 3 Clear & Grub 3111 14.60 ac 8,000$ 116,800$ P2S SOV4 Regular excavation 3114 36,257 cy 10.00$ 362,569$ P2S SOV; 6 ft pond, parking excavate 15"
11 Hardscape 3206 1 LS 100,000$ 100,000$ Place holder: Bike racks; benches; trash receptacles13 Asphalt paving 3212 11,920 sy 35$ 417,184$ Incl stabization & superpave; P2S SOV8 Concrete sidewalks 3216 6,265 sf 4.50$ 28,193$ P2S SOV
15 Bumper stops 3216 293 stall 55$ 16,115$ FDOT state-wide average16 Pavement marking 3217 399 stall 100$ 39,900$ P2S SOV9 Fence & gate 3231 3,326 lf 15$ 99,890$ Includes Access gate allowance; FDOT state wide
10 Landscaping 3291 121,140 sf 4.50$ 545,130$ Includes irrigation; P2S SOV6 Site utilities 3311 1 LS 100,000$ 100,000$ Place holder7 Site drainage 3349 6,916 lf 125$ 864,474$ Place holder
19 Site Lighting & Power 3371 399 stall 4,900$ 1,955,100$ P2S SOV18 Signalize new intersection, simple 3441 1 ea 100,000$ 100,000$ Place holder
7,963,153$ Sub-Total30% 2,388,946$ Contingency
10,352,099$ TOTAL
Excluded items:Environmental & wetland mitigationRetaining wallsFiberLand acquisitionOff site improvementsEngineering, CEIArt-in-TransitStorm chambersCosts associated with CCTV central monitoring stationBuilding Costs
C-21
MAINTENANCE BUILDING OP
S A
ND A
DMIN
PA
RKIN
G
GE
NE
RA
L
DE
TAIL B
AY
S
FU
ELIN
G &
BA
YS
WA
SH
CO
LLE
CTIO
N
FA
RE
40
POND
10 DISABILITY
10 VISITOR
497 EMPLOYEE
CNG TANKS
23.4 AC.
APRIL 24, 2017
50 BUS
50 BUS + 10 DISABLED BUS
40 PARA-TRANSIT VANS
80 PARA-TRANSIT VANS
20 OPS AND MAINT NON REV
120 PARA-TRANSIT VANS
10 DISABLED BUS
100 BUS
100 BUS - 100 PARA-TRANSIT VANS
20 O
PS A
ND M
AIN
T N
ON R
EV
C-22
HART Operations and Maintenance Facility Estimate
Large (100 Bus 100 Van) Facility Order of Magnatude Cost Estimate
Land acqusitionLand (purchse price) $3.50 sf 4,116,420$ Buyers' fees 121,144$ Appraisal 17,000$ Boundary Survey 10,000$ Environmental studies 80,000$ Subtotal 4,344,564$ Contingency 30.0% $1,303,369Total (Rounded) $5,600,000
Buildings and Equipment DivisionGeneral Requirements 01 00 00 $3,256,000Existing Conditions 02 00 00 $0Concrete 03 00 00 $2,146,406Masonry 04 00 00 $1,650,720Steel & Metals 05 00 00 $4,192,838Wood, Plastics & Composites 06 00 00 $8,238Thermal & Moisture Protection 07 00 00 $4,043,882Openings 08 00 00 $806,450Finishes 09 00 00 $801,130Specialties 10 00 00 $737,103Equipment 11 00 00 $4,100,618Furnishings 12 00 00 $61,400Special Construction 13 00 00 $0Conveying Equipment 14 00 00 $2,147,145Fire Suppression 21 00 00 $761,600Plumbing 22 00 00 $1,669,848HVAC 23 00 00 $1,282,279Electrical 26 00 00 $1,896,369Communications 27 00 00 $267,011Electronic Safety & Security 28 00 00 $167,555Subtotal $29,996,593Contingency 30.0% $8,998,978Total (Rounded) $39,000,000
Site Development
General Requirements 01 00 00 $314,530Concrete 03 00 00 $152,628Specialties 10 00 00 $5,045,826Electronic Safety & Security 28 00 00 $100,000Earthwork 31 00 00 $4,215,099
C-23
Exterior Improvements 32 00 00 $2,230,372Utilities 33 00 00 $215,000Transportation 34 00 00 $723,965Subtotal $12,997,420Contingency 30.0% $3,899,226Total (Rounded) $16,900,000
Hard Construction Cost Estimate $42,978,013Contingency 30.0% $12,893,404Total (Rounded) $55,900,000
Soft CostsPreliminary Engineering 4% 1,719,121$ Final Design 8% 3,438,241$ Project Manag. for Design and Cons 3% 1,289,340$ Construction Admin. And Managem 6% 2,578,681$ Insurance 3% 1,289,340$ Legal: Permits: review fees 1% 429,780$ Subtotal 10,744,503$ Contingency 30.0% $3,223,351Total (Rounded) $14,000,000
Notes:Cost Estimating Assumptions;Estimates are prepared using current dollars (2017)Adequate experienced craft labor is availableNormal productivity rates as historically experienced are utilizedCompatible trade agreements exist in the regionNo strike impacts will be experienced by the projectThere are sufficient experienced contractors available to perform said workNormal Tampa area weather impacts to constructions scheduleExisting state of the art construction technology will be utilizedAssumes cooperation between stakeholdersTemporary Power is included in the General Conditions
C-24
HART Operations and Maintenance Facility100 Bus 100 Van Facility
by JRH
checked by 03/28/17
Division 1 - General Requirements
General Construction 23,400,000$ ls 10% $2,340,000
Building Systems Commissioning 1 ls 2% $468,000
Bonding Cost 26,000,000$ ls 0.80% $208,000
Submittals 1 ls 100,000$ $100,000
Testing and Surveying 1 ls 100,000$ $100,000
Contract Close-Out & As-Builds 1 ls 40,000.00$ $40,000
Division 1 - Total $3,256,000
Division 2
Spec. No. Existing Conditions Qty Units Unit Cost Total Comments
$0
$0
Division 2 Total $0
Division 3
Spec. No. Concrete Qty Units Unit Cost Total Comments
03 30 00 Continuous Footing, Footers and Piers 405 cy 500.00$ $202,500
03 30 00 Slab on Grade - Operations Area 16,000 sf 6.50$ $104,000
03 30 00 Slab on Grade- Maintenance and Service 79,600 sf 7.90$ $628,840
03 30 00 White non-metallic dryshake w/ sealant 30,000 sf 5.00$ $150,000
03 30 00 Topping on Epic Mezzanine Composite Deck 1600 sf 12.50$ $20,000 3.5" conc on 3" deep deck03 30 00 Topping on Epic Maint Roof Comp. Deck 79,600 sf 10.89$ $866,844 3.25" conc on 2" deck 03 30 00 Topping on Epic Ops Roof Comp. Deck 16,000 sf 10.89$ $174,222
Division 3 Total $2,146,406
Division 4
Spec. No. Masonry Qty Units Unit Cost Total Comments
04 22 00 12" Block Wall 13,200 sf 20.00$ $264,000
04 22 00 8" Block Wall 13,320 sf 16.00$ $213,120
04 22 00 4" Glazed Block - one side glazed 1,800 sf 20.00$ $36,000
04 22 00 8" Glazed Block - two 4" glazed block one side 9,500 sf 38.00$ $361,000
04 22 00 8" Glazed Block - one side glazed 3,700 sf 30.00$ $111,000
04 22 00 12" SGFT both sides 3,840 sf 40.00$ $153,600
04 22 00 12" SGFT - 8" SGFT & 4" SGFT 12,800 sf 40.00$ $512,000
Division 4 Total $1,650,720
Division 5
Spec. No. Metals Qty Units Unit Cost Total Comments
05 12 00 Structural Steel (mat'l only) 653,340 lbs 2.10$ $1,372,014
05 12 00 Structural Steel (labor & equipment) 653,340 lbs 1.60$ $1,045,344
05 13 00 Misc. Metals 50,000 lbs 6.00$ $300,000
05 13 00 Stair Frames - 1 stairs @ 3,600 lbs 3.70$ $13,320
Stair Treads 22 ea 250.00$ $5,500
Handrails - steel for mezzanine stairs 54 lf 200.00$ $10,800
05 31 90 Bar Joist Roof System 276,904 lbs 2.50$ $692,260
05 32 00 Epic Composite Floor Deck - Mezzanine 1,600 sf 7.00$ $11,200
05 32 00 Epic Composite Roof Deck - OPS 16,000 sf 6.60$ $105,600
05 32 00 Epic Acoustic Composite Roof Deck 79,600 sf 8.00$ $636,800
Division 5 Total $4,192,838
Division 6
Spec. No. Wood, Plastics, Composites Qty Units Unit Cost Total Comments
06 10 00 Roof Carpentry
2x6 Roof Cap Blocking (2500 lf) 2500 bf 3.00$ $7,500
06 10 00 In-Wall Blocking
2x6 Misc. Blocking (210 lf) 205 bf 3.60$ $738
Division 6 Total $8,238
Division 7
Spec. No. Thermal and Moisture Protection Qty Units Unit Cost Total Comments
07 21 15 Batt Insulation- 4" unfaced sound batts 6910 sf 1.50$ $10,365
07 22 15 Roof Insulation - 4" Isocyanurate 95,600 sf 3.30$ $315,480
07 26 15 Slab Vapor Barrier 95,600 sf 0.90$ $86,040
07 40 10 Metal Wall Panels 50,762 sf 50.00$ $2,538,100 Centria 3"T Formawall Dim. Series w/insul.
Steel Stud Framing for Metal wall panels- 6" W 8,300 sf 4.69$ $38,927 Ops
Steel Stud Framing for Metal wall panels - 12"W 29,700 sf 6.50$ $193,050 Maintenance
07 54 15 Sarnafil PVC Roofing 95,600 sf 8.00$ $764,800
07 56 00 Roof Metal Coping 2412 ft 10.00$ $24,120
07 72 25 Roof Hatches 2-6x6-6 4 ea 3,500.00$ $14,000
C-25
07 84 20 Fire-Resistant Joint Sealants 2000 lf 2.50$ $5,000
07 92 15 Joint Sealants 30,000 lf 1.80$ $54,000
Division 7 Total $4,043,882
Division 8
Spec. No. Openings Qty Units Unit Cost Total Comments
08 10 00 Hollow Metal Door/Frame 3x7 Exterior Insulated 20 ea 1,100.00$ $22,000
08 10 00 Hollow Metal Door/Frame 6x7 Exterior Insulated 4 ea 1,800.00$ $7,200
08 10 00 Hollow Metal Door/Frame 3x7 Interior 64 ea 900.00$ $57,600
08 10 00 Hollow Metal Door/Frame 6x7 Interior 5 ea 1,350.00$ $6,750
08 30 00 Overhead Coiling Doors 12x12 12 ea 6,800.00$ $81,600
08 30 00 Overhead Coiling Doors 12x14 22 ea 8,800.00$ $193,600
08 40 00 Entrance Doors - Kawneer Aluminum 6 ea 2,500.00$ $15,000
08 40 00 Entrance Windows - Kawneer Aluminum 6 ea 1,200.00$ $7,200
08 55 00 Windows - alum frame 52 ea 1,375.00$ $71,500 5'H x 5'L double pane w/ low-e coating
08 60 00Polycarbonate Monitor Windows - 280 L w/ 8' x 8'
sloped sides w/ aluminum frames4,480 sf 50.00$ $224,000
08 71 00 Finish Hardware $0 Included in door prices
08 90 00 Louvers and Vents 1 ls 30,000.00$ $30,000
Division 8 Labor & Equipment 1 ls 90,000.00$ $90,000 Doors and Windows Only
Division 8 Total $806,450
Division 9
Spec. No. Finishes Qty Units Unit Cost Total Comments
09 20 00 Drywall & Studs
One sided 6400 sf 4.00$ $25,600
Two sided to 10' 15,000 sf 6.80$ $102,000
One sided Ceiling 5040 sf 4.20$ $21,168
09 30 00 Ceramic Tile $0
Toilet Rooms 5040 sf 28.00$ $141,120
09 50 00 Ceilings $0
ACT at 10' AFF 13,600 sf 6.00$ $81,600
09 65 80 Resilient Tile & Carpet Flooring $0
Rubber Flooring - recycled tires 9,500 sf 8.00$ $76,000
Rubber Base Cove 1800 lf 3.40$ $6,120
Office Carpeting - carpet squares 325 sy 60.00$ $19,500
Rubber Base 1300 lf 4.00$ $5,200
09 90 00 Painting $0
Interior Walls 36,400 sf 1.50$ $54,600
Interior Ceilings 5040 sf 1.80$ $9,072
Interior Ceilings - Industrial one-coat system 79,600 1.00$ $79,600
Epoxy and Enamel 39,000 sf 0.80$ $31,200
HM Door & Frames 112 ea 175.00$ $19,600
Metal OH Doors 34 ea 275.00$ $9,350
Anti Graffiti Coating 0 sf 1.60$ $0
09 90 10 Concrete Flooring Coating (Ashford Formula) 79,600 sf 1.50$ $119,400
Division 9 Total $801,130
Division 10
Spec. No. Specialties Qty Units Unit Cost Total Comments
10 11 00 Markerboards - 4'h x 8'l 8 ea 500$ $4,000
10 11 00 Tackboards - 4'h x 8'l 16 ea 350$ $5,600
10 14 00 Exterior Identification Sign 1 ls 3,840$ $3,840
10 14 00 Door Identification Signs 70 ea 30$ $2,100
10 14 00 Maintenance Hazard Signs 60 ea 19$ $1,165
10 40 00 FE Cabinets 12 ea 660$ $7,920
10 40 00 Extinguisher 24 ea -$ $0 See Division 21
10 50 00 Full Height Lockers - 15"w x 18"d x 60" h 80 ea 750$ $60,000 Recycled plastic lockers
10 50 00 Full Height Lockers - 12"w x 15"d x 60"h 48 ea 690$ $33,120 Recycled plastic lockers
10 50 00 Half Height Lockers - 12" w x 18"d x 60"h 150 ea 780$ $117,000 Recycled plastic lockers
10 50 00 Locker Benches - 8 feet long 20 ea 520$ $10,400
10 21 13 Toilet Partitions - recycled plastic 22 ea 1,100$ $24,200
10 21 13 Urinal Partitions - recycled plastic 12 ea 400$ $4,800
10 21 90 Work Station Cubicals - 8' x 8' space 6 ea 2,048$ $12,288
10 28 00 Toilet Paper Dispensers - two rolls 24 ea 100$ $2,400
10 28 00 Sanitary Dispensers 4 ea 90$ $360
10 28 00 Used Sanitary Container 4 ea 70$ $280
10 28 00 Paper Towel Dispensers 14 ea 200$ $2,800
10 28 00 Used Paper Towel Containers 14 ea 100$ $1,400
10 28 00 Soap Dispensers 16 ea 100$ $1,600
10 28 00 Grab Bars - Toilets 1@42",36",18" each toilet 6 sets 400$ $2,400
10 28 00 Grab Bars - Showers 1@ 30" & 2@18" 4 sets 300$ $1,200
10 28 00 Shower Curtains 24 ea 200$ $4,800
10 28 00 Shower Seats 4 ea 150$ $600
10 28 00 Dressing Seats 12 ea 200$ $2,400
C-26
10 28 00 Soap Dishes 12 ea 60$ $720
10 28 00 Dressing Hooks - double hooks 12 ea 30$ $360
10 55 40 Mail Boxes through wall, back loaded 300 ea 40$ $12,000
10 56 00 Parts Storage Equipment
1005 Pegboard 12 ea 400$ $4,800
1041 Drawer Cabinets 24 ea 2,200$ $52,800
1042 Drawer Cabinets under counter 3 ea 1,350$ $4,050
1046 Storage Cabinet, Electronics 3 ea 900$ $2,700
1070 Flammables Cabinet 5 ea 2,100$ $10,500
1116 Storage Cabinet, Heavy Duty, Tools/Accessories 8 ea 1,650$ $13,200
1117 Storage Cabinet, Heavy Duty, Shelving/Drawers 2 ea 1,500$ $3,000
1119 Storage Cabinet, Heavy Duty, Janitorial 2 ea 1,300$ $2,600
1136 Carousel, Large Tires 2 ea 24,000$ $48,000
1137 Carousel, Small Tires 1 ea 22,000$ $22,000
1325 Pallet Rack with Shelving 4 ea 1,200$ $4,800
1326 Pallet Rack with Wire Decking 1 ea 1,800$ $1,800
1344 Parts Storage Rack System 1 ea 75,000$ $75,000
1366 Shelving with wire shelves - 2' x 4' 8 ea 800$ $6,400
1367 Shelving with wire shelves - 1'-6" x 4' 12 ea 600$ $7,200
1391 Glass Rack 2 ea 750$ $1,500
1391 Panel Rack 2 ea 750$ $1,500
1489 Book Shelves 6 ea 350$ $2,100
1516 Storage Shelving 1 ea 400$ $400
1730 Automated Vertical Storage System 1 ea 145,000$ $145,000
10 75 00 Flag Poles - 40 feet high 2 ea 4,000$ $8,000
Division 10 Total $737,103
Division 11
Equip. No. Equipment Qty Units Unit Cost Total Comments
2036 Wheel Balancer - Vans 1 ea. 5,500$ $5,500
2037 Wheel Balancer 1 ea. 16,350.00$ $16,350
2065 Buffer/Grinder 10" w/ dust collector 4 ea. 9,900$ $39,600
2090 Tire Inflation Chamber 1 ea. 3,495$ $3,495
2106 Fleet Battery Charger 1 ea. 730$ $730
2107 Battery Charger/Tester w/ Cart 1 ea. 3,800$ $3,800
2169 Air Compressor, 30 HP Duplex 1 ea. 40,000$ $40,000
2170 Air Dryer 1 ea. 5,000$ $5,000
2178 Air Compressor, 7.5 HP Duplex 1 ea. 6,200$ $6,200
2179 Air Dryer 1 ea. 1,000$ $1,000
2227 Disc Grinder/Sander 12" 1 ea. 4,620$ $4,620
2230 Drill Press, Variable Speed 15" 3 ea. 600$ $1,800
2290 Tire Dunker 1 ea. 4,030$ $4,030
2320 Fall Protection 4 ea. 1,700$ $6,800
2400 Tire Mounter/Demounter 1 ea. 12,500$ $12,500
2456 Arbor Press 1 ea. 430$ $430
2466 Press, 60 Tons 2 ea. 7,500$ $15,000
2506 Refrigerant Recovery 1 ea. 5,300$ $5,300
2527 Vertical Band Saw, 20" 1 ea. 8,500$ $8,500
2543 Cold-Cut Saw, 12" 1 ea. 6,231$ $6,231
2585 Welding Screen 4 ea. 265$ $1,060
2628 Vise, Swivel Base, 5" 12 ea. 500$ $6,000
2662 MIG Welder, Portable 1 ea. 2,819$ $2,819
2668 Oxyacetylene Welder w/ Cart 1 ea. 1,100$ $1,100
2672 TIG Welder 1 ea. 2,500$ $2,500
3004 Abrasive Blast Cabinet 1 ea. 1,135.00$ $1,135
3012 Ultrasonic Cleaner 1 ea. 17,800.00$ $17,800
3031 High Pressure Hot Water, Portable 1 ea. 8,700$ $8,700
3071 High Pressure Washer 2 ea. 27,000$ $54,000
3087 Parts Washer, 500# Capacity 1 ea. 18,000$ $18,000
3216 Vehicle Washer 2 ea. 600,000$ $1,200,000
2348 Ladder, rolling with Safety Cage 4 ea. 16,000$ $64,000
3510 Vacuum System 1 ea. 45,000$ $45,000
3590 Welding Fume Extractor 1 ea. 6,600$ $6,600
3591 Fume Hood, Benchtop 1 ea. 1,074$ $1,074
3620 Vehicle Exhaust Reel 23 ea. 7,350$ $169,050
3700 Waste Hopper 2 Tons 6 ea. 2,500$ $15,000
5010 Wheel Dolly 4 ea. 800$ $3,200
5051 Service Carts 12 ea. 638$ $7,656
5065 Basket, Portable, Laundry 2 ea. 150$ $300
5071 Computer Cabinets 6 ea. 364$ $2,184
7012 Diesel Fuel Dispenser - 20 GPM 2 ea. 3,138$ $6,276
7702 DEF Dispensing System 2 ea. 5,930$ $11,859
CNG Dispenser 6 ea. 4,000$ $24,000
7425 Tank Monitoring System 2 ea. 2,500$ $5,000
7500 Fluid Management System 8 ea. 10,000$ $80,000
7520 Pump 75:1 (Grease) 1 ea. 3,500$ $3,500
C-27
7522 Pump 6:1 (EO) 1 ea. 3,200$ $3,200
7527 Pump 10:1 (Gear Oil) 1 ea. 3,300$ $3,300
7530 Pump 1:1 ( Antifreeze & Window Cleaner) 4 ea. 2,800$ $11,200
7531 Pump 3:1 (EO & ATF) 2 ea. 2,900$ $5,800
7533 Pump 5:1 (ATF) 1 ea. 3,100$ $3,100
7534 SS Submersible Pump (DEF) 1 ea. 7,500$ $7,500
7547 Fluid Evacuation Pump 4 ea. 1,850$ $7,400
7703 Window Washer Reel 2 ea. 1,800$ $3,600
7704 Antifreeze/Coolant Recycling System 1 ea. 4,500$ $4,500
7705 Waste Coolant Receiver 6 ea. 2,010$ $12,060
7706 Waste Oil Receiver 6 ea. 1,707$ $10,242
7750 Hose Reels - CA 38 ea. 1,800$ $68,400
7751 Hose Reels - ATF 19 ea. 2,675$ $50,825
7752 Hose Reels - EO 19 ea. 2,675$ $50,825
7753 Hose Reels - CO 19 ea. 1,800$ $34,200
7754 Hose Reels - GO 19 ea. 2,262$ $42,978
7755 Hose Reels - CG 19 ea. 2,644$ $50,236
7757 Electric Light/Outlet Wire Reel 38 ea. 300$ $11,400
7927 Tank, 120 Gal 3 ea. 2,050$ $6,150
7930 Tank, 280 Gal 3 ea. 4,249$ $12,747
7933 Tank, 500 Gal 1 ea. 5,080$ $5,080
7940 Tank, 120 Gal WW Polyethylene 2 ea. 600$ $1,200
7945 Tank, 1000 Gal DEF Polyethylene 1 ea. 5,000$ $5,000
7958 Waste Oil Tank, 1000 Gal Fiberglass 1 ea. 12,000$ $12,000
7965 Diesel Storage Tank, 10,000 Gal 2 ea. 30,000$ $60,000
8062 Welding Table, 10' w/ Exhaust System 1 ea. 18,000.00$ $18,000
8106 Electronics Workbench 4 ea. 744$ $2,976
8117 Severe Duty Workbench 14 ea. 2,000$ $28,000
Loading Dock 1 ea. 24,000$ $24,000
Paint Booth with side lifts 1 ea. 1,200,000$ $1,200,000
11800 Equipment Installation 1 ls 400,000$ $400,000
Division 11 Total $4,100,618
Division 12
Spec. No. Furnishings Qty Units Unit Cost Total Comments
Base Cabinet Units 60 lf 250.00$ $15,000
Counter Tops 80 lf 300.00$ $24,000
Coat Rack & Shelf 20 lf 120.00$ $2,400
Operation Control Center Furniture 1 LS 20,000.00$ $20,000 Allowance
Division 2 Total $61,400
Division 13
Spec. No. Special Construction Qty Units Unit Cost Total Comments
Division 13 Total $0
Division 14
Equip. No. Conveying Equipment Qty Units Unit Cost Total Comments
9120 Bridge Crane 3 ton 2 ea 40,000$ $80,000 Acco - above two bays
9306 Forklift, 4000# 2 ea 70,300$ $140,600 Mitsubishi
9513 Bus Lifts - Portable 10 ea 80,000$ $800,000.00 Sets of 4 portable wireless lifts - Stertil Koni
9672 Vertical Lift, Inground 75,000# capacity 1 ea 375,000$ $375,000.00
9672 Vehicle Platform Lifts 6 ea 125,000$ $750,000
9815 Pallet Jack, 5500# 3 ea 515$ $1,545
Division 14 Total $2,147,145
Division 21
Spec. No. Fire Suppression Qty Units Unit Cost Total Comments
Preaction Valve 1 ea 42,000$ $42,000
Fire Alarm Panel 1 ea 25,000$ $25,000
Wet-Pipe Sprinkler System 95,600 sf 7$ $669,200
Smoke Detectors 20 ea. 200$ $4,000
Heat Detectors 10 ea. 250$ $2,500
Fire Extinguishers 24 ea. 350$ $8,400
Fire Hydrants 3 ea. 2,500$ $7,500
Fire Line PIV 1 ea 3,000$ $3,000
Division 21 Total $761,600
Division 22
Spec. No. Plumbing Qty Units Unit Cost Total Comments
Horizontal Pipe Support 205 ea. 25$ $5,120
Hanger Rod Connection 717 ea. 30$ $21,500
15107 Water Piping 600 lf 15$ $9,000
Water Supply Piping 480 lf 45$ $21,600
C-28
Compressed Air Piping 1700 lf 25$ $42,500
Drain Piping 2050 lf 40$ $82,000
Roof Drain Piping with Hangers 3000 lf 35$ $105,000
Oil-Lubrication System Piping 3380 lf 40$ $135,200
Sanitary Line 2050 lf 40$ $82,000
15110 Domestic Water Ball Valves 20 ea. 70$ $1,400
Compressed Air Valves 40 ea. 250$ $10,000
Gas Supply Valves 20 ea. 320$ $6,400
Gas Supply Pressure Regulators 12 ea. 1,500$ $18,000
Butterfly Valves 20 ea. 750$ $15,000
15112 General Duty Valves for HVAC 40 ea. 250$ $10,000
Hot Water Valves 30 ea. 260$ $7,800
Main Water Meter Service 1 ea. 9,000$ $9,000
3" Diameter Cast Iron Valves 5 ea. 700$ $3,500
8" Diameter Cast Iron Valves 2 ea. 1,800$ $3,600
15120 Water Meter Service Gate Valves 3" 3 ea. 400$ $1,200
15124 Expansion Fittings 20 ea. 205$ $4,100
15140 Main Backflow Preventer 1 ea. 20,000$ $20,000
3" Service Backflow Preventers 2 ea. 2,500$ $5,000
15155 Floor Clean Outs 10 ea. 150$ $1,500
Clean Out Tees 10 ea. 400$ $4,000
Floor Drains 20 ea. 500$ $10,000
Roof Drains 28 ea. 650$ $18,200
Shower Drain with Strainer 12 ea. 180$ $2,160
Interceptors 6 ea. 2,000$ $12,000
Oil-Water Separators 4 ea. 4,000$ $16,000
Traps 10 ea. 300$ $3,000
Trench Drains 1060 ft 210$ $222,600
15180 Hose Bibs 14 ea. 250$ $3,500
15400 Sink Fixtures with Hardware 16 ea. 700$ $11,200
Hand Sinks in Maintenance 2 ea. 800$ $1,600
Water Fountains 8 ea. 1,800$ $14,400
Urinals 8 ea. 1,100$ $8,800
Water Closets 20 ea. 1,200$ $24,000
Showers 12 ea. 1,500$ $18,000
15440 Grinder Pump System 1 ls 10,000$ $10,000
Material Mark Up 27% $269,968 Includes 7% Sales Tax
Plumbing Labor and Equipment from Detail Sheet $400,000 Assumes 4 months; includes mark-ups
Division 22 Total $1,669,848
Division 23
Spec. No. HVAC Qty Units Unit Cost Total Comments
Roof Duct Supports 24 ea. 150$ $3,600
15083 HVAC Insulation 10000 sf 4$ $40,000
Expansion Tanks - Diaphragm Type 1 ea. 2,800$ $2,800
15127 Meters and Gages for HVAC 10 ea. 250$ $2,500
Electronic Type Air Measuring Station 4 ea. 4,000$ $16,000
Venturi Type Water Measuring Sta. 1 ea. 3,500$ $3,500
15181 Hydronic Piping 2048 ft 25$ $51,200
15183 Refrigerant Piping 300 ft 20$ $6,000
Piping Through Penetrations 25 ea. 150$ $3,750
15185 Hydronic Pumps 2 ea 3,365$ $6,730
15189 HVAC Water Treatment 1 ls 1,500$ $1,500
Air Separator for Heating Water 1 ea. 1,000$ $1,000
Hot Water Pump Filter 1 ea. 565$ $565
Chemical By-Pass Feeder 1 ea. 1,500$ $1,500
15513 Gas Fired Boilers; Hot Water; 1400 MBH 2 ea. 25,000$ $50,000
15671 Condensing Units 1 ea. 40,000$ $40,000
Condensate Piping 600 ft 20$ $12,000
15725 Modular Indoor Air Handling 1 ea. 30,000$ $30,000
15738 Split System Air Conditioning 2 ea. 6,000$ $12,000
15762 Unit Heaters 10 ea. 1,400$ $14,000
15764 Convection Heating Units
Hot Water Finned Tube Radiation Units 700 lf 48$ $33,600
15785 Energy Recovery Units 4 ea. 18,000$ $72,000
Energy Unit Heat Exchanger (AHU-1) 1 ea. 10,000$ $10,000
15815 Metal Ducts 1 ls 120,000$ $120,000
15820 Duct Accessories 1 ls 20,000$ $20,000 Allowance
Sound Attenuation 2 ea. 2,000$ $4,000
15837 Centrifugal Fans
Exhaust Fans 1000 CFM 0.5" w.g. 10 ea. 1,800$ $18,000
Exhaust Fans 2000 CFM 1.0" w.g. 1 ea. 2,800$ $2,800
10,000 CFM Exhaust Fans 6 ea. 5,500$ $33,000
Variable Speed Return Air Fan 1 ea. 5,000$ $5,000
Variable Speed Supply Air Fan 1 ea. 5,000$ $5,000
15838 Power Ventilators 6 ea. 900$ $5,400
C-29
15840 Air Terminal Units 15 ea. 1,500$ $22,500
15855 Diffusers, Registers and Grilles 30 ea. 125$ $3,750
15856 Intake and Relief Valves 20 ea. 110$ $2,200
Air Blender Stations 2 ea. 3,000$ $6,000
15861 Air Filters 1 ea. 1,200$ $1,200
15900 HVAC Instrumentation 1 ls 90,000$ $90,000
Tamper Switches 6 ea. 150$ $900
HVAC Instrumentation 6 ea. 250$ $1,500
Duct Detectors 12 ea. 300$ $3,600
CO Sensors 12 ea. 200$ $2,400
CO2 Sensors 6 ea. 500$ $3,000
Material Mark Up 27% $206,414 Includes 7% Sales Tax
HVAC Labor and Equipment $311,371 Assumes 4 months; includes mark-ups
Division 23 Total $1,282,279
Division 26
Spec. No. Electrical Qty Units Unit Cost Total Comments
#10 THHN 24700 ft 0.25$ $6,175
12/2 MC 8000 ft 0.38$ $3,040
12/2 MC w/Insulated Ground 3000 ft 0.45$ $1,350
#2 XLP 9800 ft 1.46$ $14,341
#6 XLP 7000 ft 0.91$ $6,402
#8 XLP 9830 ft 0.57$ $5,619
12/2 Fire Alarm Cable 6000 ft 0.38$ $2,280
18/2 Alarm Cable 8000 ft 0.98$ $7,805
#4 XLP 2500 ft 1.16$ $2,896
#4 XLP (Switch Heaters) 20000 ft 1.16$ $23,171
#10 XLP 14000 ft 0.69$ $9,604
4/0 THHN 1500 ft 4.70$ $7,050
#12 XLP 1350 ft 0.55$ $743
#2 THHN 400 ft 1.20$ $480
500 MCM 15400 ft 6.60$ $101,640
#6 THHN 2480 ft 0.65$ $1,612
#4 THHN 5700 ft 0.85$ $4,845
Coaxial Cable RC6 1500 ft 0.95$ $1,425
Telephone Wire 1500 ft 0.25$ $375
Conduit - 1" EMT 2020 ft 3.60$ $7,272
3/4" EMT 6030 ft 2.80$ $16,884
1 1/2" EMT 1970 ft 4.20$ $8,274
2" EMT 220 ft 5.00$ $1,100
2 1/2" PVC 300 ft 4.00$ $1,200
1 1/2" PVC 850 ft 3.60$ $3,060
1 1/2" PVC (Buried) 8000 ft 8.20$ $65,600
1" PVC 3045 ft 3.20$ $9,744
3/4" RGS 1150 ft 5.00$ $5,750
3/4" PVC 950 ft 2.60$ $2,470
1 1/2" RGS 100 ft 7.50$ $750
2" PVC 1870 ft 3.80$ $7,106
Stub Up Conduits 300 ea. 150.00$ $45,000
4" PVC 3050 ft 12.00$ $36,600
Boxes; NEMA 1 6"x6"x4" 350 ea. 40.00$ $14,000
NEMA 12 24"x30" 10 ea. 400.00$ $4,000
Wiring Devices - Toggle Switches 60 ea. 20.00$ $1,200
Switch Plates 60 ea. 25.00$ $1,500
3 Gang Switch Plates 20 ea. 60.00$ $1,200
120v. Duplex Receptacles 150 ea. 15.00$ $2,250
GFI Duplex Receptacles 30 ea. 30.00$ $900
Duplex Receptacles w/Internal Ground 75 ea. 25.00$ $1,875
Welding Receptacles w/Disconnect 12 ea. 140.00$ $1,680
Flexible Conduit Connection to Motors 50 ea. 20.00$ $1,000
Emergency Generator - 1000 KVA 1 ea. 300,000$ $300,000
Single Phase 240/480 Transformers 2 ea. 15,000.00$ $30,000
Main Disconnect Panel 800 amp 3 ea. 18,000.00$ $54,000
Main Disconnect Panel 1200 amp 3 ea. 20,000.00$ $60,000
400 amp 3 Phase Panel 3 ea. 5,000.00$ $15,000
200 amp single Phase Panel 4 ea. 1,200.00$ $4,800
MCC Starter Combinations -Size 0 15 ea. 1,600.00$ $24,000
Size 1 10 ea. 1,800.00$ $18,000
Size 2 8 ea. 2,020.00$ $16,160
MCC Stand Up Bays 11 ea. 1,400.00$ $15,400
Disconnects - 30 amp 20 ea. 600.00$ $12,000
60 amp 13 ea. 800.00$ $10,400
Interior Lighting - 2x4 277volt 100 ea. 250.00$ $25,000
14x48 277 volt 40 ea. 190.00$ $7,600
Bathroom Overhead Sink Fixtures (4' ea.) 16 ea. 200.00$ $3,200
Down Light 120 volt 50 ea. 180.00$ $9,000
C-30
Exit Lights 17 ea. 190.00$ $3,230
Outdoor Wall Pack 250w 20 ea. 600.00$ $12,000
High Bay 1000w 150 ea. 650.00$ $97,500 Assumes 400 sf coverage per light
Material Mark-Up 27% $312,811 Includes 7% Sales Tax
Labor and Equipment Installation 1 ls $425,000 $425,000
Division 26 Total $1,896,369
Division 27
Spec. No. Communications Qty Units Unit Cost Total Comments
Fiber Optic Backbone 1200 lf 15.00$ $18,000
Equipment Rack 7ft- ADC 4 ea. 391$ $1,564
FDP-ADC-144 4 ea. 1,660$ $6,640
FDP-ADC-48 4 ea. 1,585$ $6,340
Ethernet Switch - 10GE w/ GBIC 2 ea. 12,133$ $24,266
L2 / L3 Ethernet Sw - applications 2 ea. 5,375$ $10,750
Cable Management Tray-ADC 1 ea. 328$ $328
CAT 6 Jack Panel-ADC 2 ea. 358$ $716
NVR Server 1 ea. 2,775$ $2,775
SAN Switch-Cisco 2960 1 ea. 1,295$ $1,295
RAID-5 Archive- Intransa 8T Edge Block 1 ea. 12,254$ $12,254
Analytics Server- Dell 2950 1 ea. 3,255$ $3,255
Wireless LAN Controller- Cisco 4402 1 ea. 11,755$ $11,755
Antenna 1 ea. $12,000 $12,000
Satellite Dish 1 ea. $5,000 $5,000
Operations Control Center Equipment 1 LS $50,000 $50,000
Material Mark-Up 27% $45,073 Includes 7% Sales Tax
Labor and Equipment Installation 1 ls $55,000 $55,000
Division 27 Total $267,011
Division 28
Spec. No. Electronic Safety & Security Qty Units Unit Cost Total Comments
Security and Surveillance System
Doors with Access Controls 10 ea. 6,000.00$ $60,000
Fixed Position Cameras 15 ea. 1,500.00$ $22,500
Digital Video Recorder 1 ea. 5,000.00$ $5,000
Security Controller Panel 1 ea. 1,500.00$ $1,500
Video Monitor 1 ea. 5,000.00$ $5,000
Operations Control Center Monitors 1 ea. 2,500.00$ $2,500
Material Mark-Up 27% $26,055 Includes 7% Sales Tax
Labor and Equipment Installation 1 ls 45,000$ $45,000
Division 28 Total $167,555
C-31
Board & Committee Agenda Item Agenda Item Community Transportation Coordinator (CTC) Service Rates for 2017/2018
Presenter
Karen Smith, Sunshine Line
Summary
Each year the Community Transportation Coordinator (CTC) is required to submit a completed Rate Calculation Model worksheet to the Commission for the Transportation Disadvantaged. This rate model determines the trip rates for reimbursement to the CTC from the Trip/Equipment Grant from the Commission for the Transportation Disadvantaged (CTD). Rates are determined by the model using budget and estimated trip and mileage data from the current fiscal year. Staff will report on the CTD Disadvantaged Rate Calculation Model for the 2017/2018 grant year effective July 1, 2017: DOOR-TO-DOOR SERVICE RATE PER ONE-WAY TRIP AMBULATORY TRIP $25.89 (currently $24.33) WHEELCHAIR TRIP $44.38 (currently $41.71) GROUP TRIP* $12.71 (currently $12.13) *(5 or more passengers going to or from the same address at the same time such that all passengers can be picked up and dropped off within one hour) BUS PASSES/TICKETS: Cost of pass or ticket plus administration.* *The per - trip co‐payment is on a sliding scale, depending on the client’s household income as follows: Household Income Co‐Pay per Trip 125% (or less) of Federal Poverty Guidelines No Co‐Pay 126%‐300% of Federal Poverty Guidelines $2.00 More than 300% of Federal Poverty Guidelines $5.00
The Transportation Disadvantaged Coordinating Board is required to review and approve the Service Rates annually. Recommended Action
Approve the 2017/2018 Service Rates and its inclusion in the TDSP update.
Prepared By
Michele Ogilvie, MPO staff
Attachments
Rate Model Worksheet
Plan Hillsborough planhillsborough.org
[email protected] 813 - 272 - 5940
601 E Kennedy Blvd 18th floor
Tampa, FL, 33602
Preliminary Information Worksheet Version 1.4
CTC Name:
County (Service Area):
Contact Person:
Phone #
Check Applicable Characteristic:
ORGANIZATIONAL TYPE: NETWORK TYPE:
Governmental Fully Brokered
Private Non-Profit Partially Brokered
Private For Profit Sole Source
Once completed, proceed to the Worksheet entitled "Comprehensive Budget"
Hillsborough County BOCC
Hillsborough
Karen Smith
813-276-8126
HillsboroughCTDRateCalc2017.xls: Preliminary InformationPage 1 of 8
Comprehensive Budget Worksheet Version 1.4 CTC: Hillsborough County BOCC
County: Hillsborough
1. Complete applicable GREEN cells in columns 2, 3, 4, and 7
Prior Year's
ACTUALS
Current Year's
APPROVED
Budget, as
amended
Upcoming Year's
PROPOSED
Budget
from from from Confirm whether revenues are collected as a system subsidy VS
Oct 1st of Oct 1st of 1 a purchase of service at a unit price.
2015 2016 2017
to to to
Sept 30th of Sept 30th of Sept 30th of
2016 2017 2018 Explain Changes in Column 6 That Are > ± 10% and Also > ± $50,000
1 2 3 4 5 6 7
REVENUES (CTC/Operators ONLY / Do NOT include coordination contractors!)
Local Non-Govt
Farebox 59,163$ 51,522$ 51,640$ -12.9% 0.2%
Medicaid Co-Pay Received
Donations/ Contributions
In-Kind, Contributed Services
Other
Bus Pass Program Revenue
Local Government
District School Board
Compl. ADA Services
County Cash 3,144,576$ 3,452,466$ 4,400,701$ 9.8% 27.5%
County In-Kind, Contributed Services
City Cash
City In-kind, Contributed Services
Other Cash
Other In-Kind, Contributed Services
Bus Pass Program Revenue 233,569$ 414,879$ 253,293$ 77.6% -38.9%
CTD
Non-Spons. Trip Program 1,253,932$ 1,478,936$ 987,751$ 17.9% -33.2%
Non-Spons. Capital Equipment
Rural Capital Equipment
Other TD (specify in explanation)
Bus Pass Program Revenue 767,807$ 824,620$ 925,874$ 7.4% 12.3%
USDOT & FDOT
49 USC 5307
49 USC 5310
49 USC 5311 (Operating)
49 USC 5311(Capital)
Block Grant
Service Development
Commuter Assistance
Other DOT (specify in explanation)
Bus Pass Program Revenue
AHCA
Medicaid
Other AHCA (specify in explanation)
Bus Pass Program Revenue
DCF
Alcoh, Drug & Mental Health
Family Safety & Preservation
Comm. Care Dis./Aging & Adult Serv.
Other DCF (specify in explanation)
Bus Pass Program Revenue
DOH
Children Medical Services
County Public Health
Other DOH (specify in explanation)
Bus Pass Program Revenue
DOE (state)
Carl Perkins
Div of Blind Services
Vocational Rehabilitation
Day Care Programs
Other DOE (specify in explanation)
Bus Pass Program Revenue
AWI
WAGES/Workforce Board
Other AWI (specify in explanation)
Bus Pass Program Revenue
DOEA
Older Americans Act 357,005$ 500,000$ 428,123$ 40.1% -14.4%
Community Care for Elderly
Other DOEA (specify in explanation)
Bus Pass Program Revenue
DCA
Community Services
Other DCA (specify in explanation)
Bus Pass Admin. Revenue 9,704$ -$ -$ -100.0%
Funding levels for this service has been fluctuating
Community Service Block Grant program no longer funding trnasportation.
% Change
from Prior
Year to
Current
Year
Proposed
% Change
from
Current
Year to
Upcoming
Year
County funding covers trips and passes funded by County sources, as well as
covering balance of expenses depending on revenue streams. FY 16/17 reflects
a greater portion of bus pass expenses covered by County funds than past year
or projected next year.
Reflects projected return of grant to previous year funding level. FY 16/17 higher
funding reflects one-time increase due to proviso funding.
HillsboroughCTDRateCalc2017.xls: Comprehensive BudgetPage 2 of 8
Comprehensive Budget Worksheet Version 1.4 CTC: Hillsborough County BOCC
County: Hillsborough
1. Complete applicable GREEN cells in columns 2, 3, 4, and 7
Prior Year's
ACTUALS
Current Year's
APPROVED
Budget, as
amended
Upcoming Year's
PROPOSED
Budget
from from from Confirm whether revenues are collected as a system subsidy VS
Oct 1st of Oct 1st of 1 a purchase of service at a unit price.
2015 2016 2017
to to to
Sept 30th of Sept 30th of Sept 30th of
2016 2017 2018 Explain Changes in Column 6 That Are > ± 10% and Also > ± $50,000
1 2 3 4 5 6 7
% Change
from Prior
Year to
Current
Year
Proposed
% Change
from
Current
Year to
Upcoming
Year
APD
Office of Disability Determination
Developmental Services
Other APD (specify in explanation)
Bus Pass Program Revenue
DJJ
(specify in explanation)
Bus Pass Program Revenue
Other Fed or State
xxx
xxx
Bus Pass Program Revenue 2,319$ -$ -$ -100.0%
Other Revenues
Interest Earnings
xxxx
xxxx
Bus Pass Program Revenue
Balancing Revenue to Prevent Deficit
Actual or Planned Use of Cash Reserve
Balancing Revenue is Short By = None None
Total Revenues = $5,828,075 $6,722,423 $7,047,382 15.3% 4.8%
EXPENDITURES (CTC/Operators ONLY / Do NOT include Coordination Contractors!)
Operating Expenditures
Labor 2,310,113$ 2,408,945$ 2,727,255$ 4.3% 13.2%
Fringe Benefits 879,960$ 1,048,286$ 1,198,606$ 19.1% 14.3%
Services 503,247$ 831,874$ 588,701$ 65.3% -29.2%
Materials and Supplies 306,728$ 281,464$ 411,231$ -8.2% 46.1%
Utilities 61,459$ 54,624$ 47,900$ -11.1% -12.3%
Casualty and Liability 60,745$ 61,437$ 61,135$ 1.1% -0.5%
Taxes
Purchased Transportation:
Purchased Bus Pass Expenses 1,013,399$ 1,239,499$ 1,179,167$ 22.3% -4.9%
School Bus Utilization Expenses
Contracted Transportation Services
Other 18,212$ 24,702$ 24,702$ 35.6% 0.0%
Miscellaneous 40,530$ 33,526$ 35,442$ -17.3% 5.7%
Operating Debt Service - Principal & Interest
Leases and Rentals
Contrib. to Capital Equip. Replacement Fund 581,239$ 738,066$ 773,243$ 27.0% 4.8%
In-Kind, Contributed Services -$ -$ -$
Allocated Indirect 52,443$ -$ -$ -100.0%
Capital Expenditures
Equip. Purchases with Grant Funds
Equip. Purchases with Local Revenue
Equip. Purchases with Rate Generated Rev.
Capital Debt Service - Principal & Interest
Total Expenditures = $5,828,075 $6,722,423 $7,047,382 15.3% 4.8%
Once completed, proceed to the Worksheet entitled "Budgeted Rate Base"
Reflects increase in personnel costs including projected pay increases, 2 new
driver postions and increased medical insurance costs; materials increase reflects
projected maintenance supplies including fuel and oil; increase to vehicle
replacement program is due to increased purchase cost of vehicles and
shortening of replacement schedule back to 5 years based on experience with
vehicles. Reduction in projected services costs reflects projected reduction in
maintenance service costs as older vehicles have been or are scheduled to be
replaced. Allocated indirect costs were only charged to Dept one year due to
temporary increase in grant funding that year.
Homleless Veterans program. No longer funding transportation.
HillsboroughCTDRateCalc2017.xls: Comprehensive BudgetPage 3 of 8
Budgeted Rate Base Worksheet Version 1.4 CTC: Hillsborough County BOCC
County: Hillsborough
1. Complete applicable GREEN cells in column 3; YELLOW and BLUE cells are automatically completed in column 3
2. Complete applicable GOLD cells in column and 5
Upcoming Year's
BUDGETED
Revenues
from
Oct 1st of
2017
to
Sept 30th of
2018
1 2 3 4 5
REVENUES (CTC/Operators ONLY)
Local Non-Govt
Farebox 51,640$ 51,640$ YELLOW cellsMedicaid Co-Pay Received -$ -$ are NEVER Generated by Applying Authorized RatesDonations/ Contributions -$ -$
In-Kind, Contributed Services -$ -$ -$
Other -$ -$
Bus Pass Program Revenue -$ -$ -$
Local Government
District School Board -$ -$ -$ BLUE cells
Compl. ADA Services -$ -$ -$ Should be funds generated by rates in this spreadsheetCounty Cash 4,400,701$ 1,901,979$ 2,498,722$
County In-Kind, Contributed Services -$ -$ -$
City Cash -$ -$
City In-kind, Contributed Services -$ -$ -$
Other Cash -$ -$
Other In-Kind, Contributed Services -$ -$ -$
Bus Pass Program Revenue 253,293$ -$ 253,293$
CTD local match req. GREEN cells
Non-Spons. Trip Program 987,751$ 987,751$ -$ -$ 109,750$ MAY BE Revenue Generated by ApplyingNon-Spons. Capital Equipment -$ -$ -$ -$ -$ Authorized Rate per Mile/Trip Charges
Rural Capital Equipment -$ -$ -$ -$ -$
Other TD -$ -$
Bus Pass Program Revenue 925,874$ -$ 925,874$
USDOT & FDOT
49 USC 5307 -$ -$ -$
49 USC 5310 -$ -$ -$ -$ -$
49 USC 5311 (Operating) -$ -$
49 USC 5311(Capital) -$ -$ -$ -$ -$
Block Grant -$ -$ -$
Service Development -$ -$ -$
Commuter Assistance -$ -$ -$
Other DOT -$ -$
Bus Pass Program Revenue -$ -$ -$
AHCA
Medicaid -$ -$ -$
Other AHCA -$ -$
Bus Pass Program Revenue -$ -$ -$
DCF
Alcoh, Drug & Mental Health -$ -$ -$
Family Safety & Preservation -$ -$ -$
Comm. Care Dis./Aging & Adult Serv. -$ -$ -$
Other DCF -$ -$ GOLD cells
Bus Pass Program Revenue -$ -$ -$
DOH
Children Medical Services -$ -$ -$
County Public Health -$ -$ -$
Other DOH -$ -$
Bus Pass Program Revenue -$ -$ -$
DOE (state)
Carl Perkins -$ -$ -$
Div of Blind Services -$ -$ -$
Vocational Rehabilitation -$ -$ -$
Day Care Programs -$ -$ -$
Other DOE -$ -$
Bus Pass Program Revenue -$ -$ -$
AWI
WAGES/Workforce Board -$ -$ -$
AWI -$ -$
Bus Pass Program Revenue -$ -$ -$
DOEA
Older Americans Act 428,123$ 428,123$ -$
Community Care for Elderly -$ -$ -$
Other DOEA -$ -$
Bus Pass Program Revenue -$ -$ -$
DCA
Community Services -$ -$ -$
Other DCA -$ -$
Bus Pass Program Revenue -$ -$ -$
What amount of the
Budgeted Revenue
in col. 2 will be
generated at the
rate per unit
determined by this
spreadsheet, OR
used as local match
for these type
revenues?
Budgeted Rate
Subsidy Revenue
EXcluded from
the Rate Base
What amount of the
Subsidy Revenue in
col. 4 will come
from funds to
purchase
equipment, OR will
be used as match
for the purchase of
equipment?
Fill in that portion of Budgeted Rate Subsidy Revenue in
Column 4 that will come from Funds Earmarked by the Funding
Source for Purchasing Capital Equipment. Also include the
portion of Local Funds earmarked as Match related to the
Purchase of Capital Equipment if a match amount is required
by the Funding Source.
Fill in that portion of budgeted revenue in Column 2 that will be
GENERATED through the application of authorized per mile,
per trip, or combination per trip plus per mile rates. Also,
include the amount of funds that are Earmarked as local match
for Transportation Services and NOT Capital Equipment
purchases.
If the Farebox Revenues are used as a source of Local Match
Dollars, then identify the appropriate amount of Farebox
Revenue that represents the portion of Local Match required
on any state or federal grants. This does not mean that
Farebox is the only source for Local Match.
Please review all Grant Applications and Agreements
containing State and/or Federal funds for the proper Match
Requirement levels and allowed sources.
HillsboroughCTDRateCalc2017.xls: Budgeted Rate BasePage 4 of 8
Budgeted Rate Base Worksheet Version 1.4 CTC: Hillsborough County BOCC
County: Hillsborough
1. Complete applicable GREEN cells in column 3; YELLOW and BLUE cells are automatically completed in column 3
2. Complete applicable GOLD cells in column and 5
Upcoming Year's
BUDGETED
Revenues
from
Oct 1st of
2017
to
Sept 30th of
2018
1 2 3 4 5
What amount of the
Budgeted Revenue
in col. 2 will be
generated at the
rate per unit
determined by this
spreadsheet, OR
used as local match
for these type
revenues?
Budgeted Rate
Subsidy Revenue
EXcluded from
the Rate Base
What amount of the
Subsidy Revenue in
col. 4 will come
from funds to
purchase
equipment, OR will
be used as match
for the purchase of
equipment?
APD
Office of Disability Determination -$ -$ -$
Developmental Services -$ -$ -$
Other APD -$ -$
Bus Pass Program Revenue -$ -$ -$
DJJ
DJJ -$ -$
Bus Pass Program Revenue -$ -$ -$
Other Fed or State
-$ -$
xxx -$ -$
xxx -$ -$
Bus Pass Program Revenue -$ -$ -$
Other Revenues
Interest Earnings -$ -$ -$
xxxx -$ -$
xxxx -$ -$
Bus Pass Program Revenue -$ -$ -$
Balancing Revenue to Prevent Deficit
Actual or Planned Use of Cash Reserve -$ -$ -$
Total Revenues = 7,047,382$ 3,317,853$ 3,729,529$ -$
EXPENDITURES (CTC/Operators ONLY) 3,729,529$
Operating Expenditures
Labor 2,727,255$
Fringe Benefits 1,198,606$
Services 588,701$
Materials and Supplies 411,231$
Utilities 47,900$
Casualty and Liability 61,135$
Taxes -$
Purchased Transportation:
Purchased Bus Pass Expenses 1,179,167$
School Bus Utilization Expenses -$
Contracted Transportation Services -$
Other 24,702$
Miscellaneous 35,442$
Operating Debt Service - Principal & Interest -$
Leases and Rentals -$
Contrib. to Capital Equip. Replacement Fund 773,243$
In-Kind, Contributed Services -$
Allocated Indirect -$
Capital Expenditures
Equip. Purchases with Grant Funds -$
Equip. Purchases with Local Revenue -$
Equip. Purchases with Rate Generated Rev. -$
Capital Debt Service - Principal & Interest -$
-$
Total Expenditures = 7,047,382$ 1,179,167$
minus EXCLUDED Subsidy Revenue = 3,729,529$
Budgeted Total Expenditures INCLUDED in
Rate Base = 3,317,853$
Rate Base Adjustment1 =
Adjusted Expenditures Included in Rate
Base = 3,317,853$
1 The Difference between Expenses and Revenues for Fiscal Year: 2015 - 2016
Once Completed, Proceed to the Worksheet entitled "Program-wide Rates"
Amount of
Budgeted
Operating Rate
Subsidy Revenue
1 Rate Base Adjustment Cell
If necessary and justified, this cell is where you could optionally adjust proposed service rates up or down to adjust for program revenue (or unapproved profit), or losses from the Actualperiod shown at the bottom of the Comprehensive Budget Sheet. This is not theonly acceptable location or method of reconciling for excess gains or losses. If allowed by the respective funding sources, excess gains may also be adjusted by providing system subsidy revenue or by the purchase of additional trips in a period following the Actual period. If such an adjustment has been made, provide notation in the respective exlanation area of the Comprehensive Budget tab.
HillsboroughCTDRateCalc2017.xls: Budgeted Rate BasePage 5 of 8
Worksheet for Program-wide Rates CTC: Hillsborough Coun Version 1.4
County: Hillsborough
1. Complete Total Projected Passenger Miles and ONE-WAY Passenger Trips ( GREEN cells) below
Do NOT include trips or miles related to Coordination Contractors!
Do NOT include School Board trips or miles UNLESS…........
INCLUDE all ONE-WAY passenger trips and passenger miles related to services you purchased from your transportation operators!
Do NOT include trips or miles for services provided to the general public/private pay UNLESS..
Do NOT include escort activity as passenger trips or passenger miles unless charged the full rate for service!
Do NOT include fixed route bus program trips or passenger miles!
PROGRAM-WIDE RATES
Total Projected Passenger Miles = 1,427,643 Fiscal Year
Rate Per Passenger Mile = 2.32$ 2017 - 2018
Total Projected Passenger Trips = 145,366
Rate Per Passenger Trip = 22.82$ Avg. Passenger Trip Length = 9.8 Miles
Rate Per Passenger Mile = 4.11$
Rate Per Passenger Trip = 40.37$
Once Completed, Proceed to the Worksheet entitled "Multiple Service Rates"
Vehicle Miles
The miles that a vehicle is scheduled to or actually travels from the time it pulls out from its garage to go into revenue service to the time it pulls in from revenue service.
Vehicle Revenue Miles (VRM)
The miles that vehicles are scheduled to or actually travel while in revenue service. Vehicle revenue miles exclude:
Deadhead
Operator training, and
Vehicle maintenance testing, as well as
School bus and charter services.
Passenger Miles (PM)
The cumulative sum of the distances ridden by each passenger.
Rates If No Revenue Funds Were Identified As Subsidy
Funds
HillsboroughCTDRateCalc2017.xls: Program-wide RatesPage 6 of 8
Worksheet for Multiple Service Rates CTC: Hillsborough CoVersion 1.4
1. Answer the questions by completing the GREEN cells starting in Section I for all services County: Hillsborough
2. Follow the DARK RED prompts directing you to skip or go to certain questions and sections based on previous answers
SECTION I: Services Provided
1 Ambulatory 1 Wheelchair 2 Stretcher 1 Group
1.Yes Yes Yes Yes
No No No No
Go to Section II
for Ambulatory
Service
Go to Section II
for Wheelchair
Service
STOP! Do NOT
Complete
Sections II - V
for Stretcher
Service
Go to Section II
for Group
Service
SECTION II: Contracted Services
2 Ambulatory 2 Wheelchair 2 Stretcher 2 Group
1. Will the CTC be contracting out any of these Services TOTALLY in the upcoming budget year?....Yes Yes Yes Yes
No No No No
Skip # 2, 3 & 4
and Go to
Section III for
Ambulatory
Service
Skip # 2, 3 & 4
and Go to
Section III for
Wheelchair
Service
Do Not
Complete
Section II for
Stretcher
Service
Skip # 2, 3 & 4
and Go to
Section III for
Group Service
2.2 Yes 2 Yes 2 Yes 2 Yes
No No No No
Leave Blank Leave Blank
Do NOT
Complete
Section II for
Stretcher
Service Leave Blank
3. If you answered YES to #1 & #2 above, how much is the proposed contract amount for the service? -$
How many of the total projected Passenger Miles relate to the contracted service? 0
How many of the total projected passenger trips relate to the contracted service? 0
Effective Rate for Contracted Services: Ambulatory Wheelchair Stretcher Group
per Passenger Mile =
per Passenger Trip =
Go to Section III
for Ambulatory
Service
Go to Section III
for Wheelchair
Service
Do NOT
Complete
Section II for
Stretcher
Service
Go to Section III
for Group
Service
4. If you answered # 3 & want a Combined Rate per Trip PLUS a per Mile add-on for 1 or more Combination Trip and Mile Rate
services, INPUT the Desired per Trip Rate (but must be less than per trip rate in #3 above =
Rate per Passenger Mile for Balance =
Leave Blank
and Go to
Section III for
Ambulatory
Service
Leave Blank
and Go to
Section III for
Wheelchair
Service
Do NOT
Complete
Section II for
Stretcher
Service
Leave Blank
and Go to
Section III for
Group Service
Will the CTC be providing any of these Services to transportation disadvantaged passengers in the
upcoming budget year?........................................................................................
If you answered YES to #1 above, do you want to arrive at the billing rate by simply dividing the proposed
contract amount by the projected Passenger Miles / passenger trips?.....
HillsboroughCTDRateCalc2017.xls: Multiple Service RatesPage 7 of 8
Worksheet for Multiple Service Rates CTC: Hillsborough CoVersion 1.4
1. Answer the questions by completing the GREEN cells starting in Section I for all services County: Hillsborough
2. Follow the DARK RED prompts directing you to skip or go to certain questions and sections based on previous answers
SECTION III: Escort Service 2
1. Do you want to charge all escorts a fee?................................................................. Yes
No
Skip # 2 - 4 and
Go to Section IV
2. If you answered Yes to #1, do you want to charge the fee per passenger trip OR ……….... Pass. Trip 1 Leave Blank
per passenger mile?......................... Pass. Mile
3. If you answered Yes to # 1 and completed # 2, for how many of the projected
Passenger Trips / Passenger Miles will a passenger be accompanied by an escort? Leave Blank
-$
4. How much will you charge each escort?.................................................................... Leave Blank
SECTION IV: Group Service Loading
1.
number of Group Service Passenger Miles? (otherwise leave blank)............................ 500,831
Loading Rate
………. And what is the projected total number of Group Vehicle Revenue Miles? 134,001 3.74 to 1.00
SECTION V: Rate Calculations for Mulitple Services:
1.
* Miles and Trips you input must sum to the total for all Services entered on the "Program-wide Rates" Worksheet, MINUS miles
and trips for contracted services IF the rates were calculated in the Section II above
* Be sure to leave the service BLANK if you answered NO in Section I or YES to question #2 in Section II
RATES FOR FY: 2017 - 2018
Ambul Wheel Chair Stretcher Group
Leave Blank
Projected Passenger Miles (excluding totally contracted services addressed in Section II) = 1,427,643 = 738,321 + 188,491 + + 500,831
Rate per Passenger Mile = $2.54 $4.35 $0.00 $1.25 $4.66per passenger per group
Ambul Wheel Chair Stretcher Group
Leave Blank
Projected Passenger Trips (excluding totally contracted services addressed in Section II) = 145,366 = 64,637 + 19,527 + + 61,202
Rate per Passenger Trip = $25.89 $44.38 $0.00 $12.71 $47.50per passenger per group
2 If you answered # 1 above and want a COMBINED Rate per Trip PLUS a per Mile add-on for 1 or more services,… Combination Trip and Mile Rate
Ambul Wheel Chair Stretcher Group
Leave Blank
…INPUT the Desired Rate per Trip (but must be less than per trip rate above) = $0.00
Rate per Passenger Mile for Balance = $2.54 $4.35 $0.00 $1.25 $4.66per passenger per group
Rates If No Revenue Funds Were Identified As Subsidy Funds
Ambul Wheel Chair Stretcher Group
Rate per Passenger Mile = $4.49 $7.69 $0.00 $2.20 $8.24
per passenger per group
Ambul Wheel Chair Stretcher Group
Rate per Passenger Trip = $45.79 $78.50 $0.00 $22.48 $84.02per passenger per group
Program These Rates Into Your Medicaid Encounter Data
You Must
Complete This
Section!
If the message "You Must Complete This Section" appears to the right, what is the projected total
Input Projected Passenger Miles and Passenger Trips for each Service in the GREEN cells and the Rates for each Service will be calculated automatically
HillsboroughCTDRateCalc2017.xls: Multiple Service RatesPage 8 of 8
Board & Committee Agenda Item
Agenda Item
Transportation Disadvantaged Coordinating Board (TDCB) Grievance Procedures Annual Review and Adoption
Presenter
Michele Ogilvie, MPO Staff
Summary
To ensure quality control of the Transportation Disadvantaged system and to provide participating users, funding agencies, and transportation providers with an impartial body to hear complaints and make recommendations on disputes concerning services rendered, the TDCB creates the Hillsborough County Transportation Disadvantaged Grievance Procedures and a Grievance subcommittee. The TDCB’s Grievance Procedures are also found in Section 4.3 of the Transportation Disadvantaged Service Plan. The procedures include establishing a subcommittee, membership, powers and duties.
The Transportation Disadvantaged Coordinating Board is required to review and approve its Grievance Procedures annually. Additionally, the Board confirms the members of the Grievance subcommittee. Currently, the following members serve as the Grievance subcommittee: Kelly Kelley, Gloria Mills and Nancy Castellano.
Recommended Action
Confirm Grievance Procedures and Grievance Subcommittee members.
Prepared By
Michele Ogilvie, MPO staff
Attachments
Grievance Procedures 2017
Plan Hillsborough planhillsborough.org
[email protected] 813 - 272 - 5940
601 E Kennedy Blvd 18th floor
Tampa, FL, 33602
GRIEVANCE PROCEDURES
2017
Hillsborough County Transportation Disadvantaged Coordinating Board 601 E. Kennedy Blvd. 18th Floor Tampa, FL. 33602
1 Hillsborough Transportation Disadvantaged Coordinating Board
GRIEVANCE SUBCOMMITTEE POLICIES AND PROCEDURES
The TDCB creates a Hillsborough County Transportation Disadvantaged Grievance Subcommittee. This subcommittee develops rules and procedures to ensure quality control of the TD system and to provide participating users, funding agencies, and transportation providers with an impartial body to hear complaints and make recommendations on disputes concerning services rendered.
Section 1. Creation of Board
1.01 There is hereby created and established a Hillsborough County Transportation Disadvantaged Grievance Subcommittee, hereinafter referred to as Grievance Subcommittee, a subcommittee of the TDCB, as specified pursuant to Chapter 427, F.S. and Rule 41-2, Rules of the State of Florida and Operations Plan 2c of the Memorandum of Agreement (MOA) between Hillsborough County and the CTD.
Section 2. Definitions
2.01 As used in these Rules and Procedures, the following words and terms shall have the meanings assigned herein:
(a) CTC: Board of County Commissioners (BOCC) of Hillsborough County of the State of Florida.
(b) TDCB: Entity appointed by the Metropolitan Planning Organization (MPO) that provides assistance to the CTC relative to the coordination of transportation service.
(c) Funding Agency: Those agencies which have a funding contract with the CTC for transportation services for the TD.
(d) MPO: The Hillsborough County MPO, an organization responsible for carrying out transportation planning and staffing the TDCB.
(e) Program Manager: The individual responsible for the operation of the transportation program for the transportation provider.
(f) Transportation Provider: The entity providing transportation services for the TD whether it be the County or private non-profit or private for profit provider.
(g) TD (User): Those persons who because of physical or mental disability, income status or age, or who for other reasons are unable to purchase transportation and are; therefore, dependent upon others to obtain access to health care, employment, education, shopping, social activities, and other life sustaining activities.
(h) CTD: Entity responsible for fostering the coordination of transportation services statewide provided to the transportation disadvantaged.
Section 3. Objective
3.01 The objective of the Grievance Subcommittee shall be to develop rules and procedures to ensure quality control and to provide participating users, funding agencies, and
2 Hillsborough Transportation Disadvantaged Coordinating Board
transportation providers with an impartial body to hear complaints and make recommendations on disputes concerning services rendered.
Section 4. Membership
4.01 Members of the Grievance Subcommittee shall be appointed by the Chairman of the Hillsborough County Local Coordinating Board (LCB) and shall be composed of five voting members of the LCB as follows:
(a) One user of transportation services, (b) One representative of a recognized disabled group, and (c) Three representatives of the LCB at-large.
4.02 The designated representative of the CTC, charged with responsibility of overseeing the TD program shall be an advisory member of the Grievance Subcommittee. The MPO shall staff the Grievance Subcommittee.
Section 5. Terms of Members
5.01 The members of the Grievance Subcommittee shall serve a 2-year term.
5.02 A member of the Grievance Subcommittee may be removed for cause by the Chairman of the LCB. Vacancies in the membership of the subcommittee shall be filled in the same manner as the original appointments. An appointment to fill a vacancy shall only be for the remainder of the unexpired term being filled.
5.03 The Grievance Subcommittee shall elect a chairperson and a vice chairperson at the first scheduled meeting of each year who shall serve for 1 year.
5.04 A quorum (three voting members) shall be present for any official action. In the event of a tie vote, the chairperson shall then have the deciding vote. Meetings shall be held at such times as the Grievance Subcommittee may determine.
5.05 No voting member will have a vote on an issue that is deemed a conflict of interest.
Section 6. Grievance Procedures
6.01 Grievance procedures will be those as specified by the Grievance Subcommittee as set forth below.
6.02 Complaints that emanate from continued tardiness, driver behavior, passenger discomfort, irregularities in the system of delivery, or decisions made to deny, reduce, or terminate services constitute grievances for users or funding agencies. Complaints about charges or billing constitute grievances by a funding agency or transportation provider. Other complaints can be heard at the discretion of the Grievance Subcommittee.
3 Hillsborough Transportation Disadvantaged Coordinating Board
6.03 Complaints involving Medicaid Non-Emergency Transportation (NET) will be referred directly to the full TDCB in lieu of the Grievance Subcommittee. The TDCB will make a determination as to whether the complaint is a Medicaid NET issue or a CTC-related issue. If a complaint is determined by the TDCB to be a Medicaid NET issue, then the grievant will be informed of his/her right to file a grievance directly with the CTD.
The CTC is selected and recommended by the MPO, while the Medicaid NET in Hillsborough County is selected directly by the CTD without MPO involvement. Therefore, the TDCB cannot make recommendations on complaints regarding Medicaid NET. Medicaid clients should direct grievances to the CTD Ombudsman Program.
6.04 Clients or funding agencies shall contact the CTC Program Manager verbally or in writing in an attempt to resolve the complaint following the procedures of his/her agency.
6.05 If this effort is not successful, the grievant may present their grievance to the Grievance Subcommittee by securing a grievance form (Figure 4-1) from the program managers of the transportation providers care of the MPO. The client will also be advised about the CTD Ombudsman Program.
6.06 Upon receipt of the grievance form, the TDCB chairperson shall, within 15 working days, contact Grievance Subcommittee members and the CTC Program Manager to set a grievance hearing date and location.
4 Hillsborough Transportation Disadvantaged Coordinating Board
FIGURE 4-1: HILLSBOROUGH COUNTY TDCB GRIEVANCE FORM
Board & Committee Agenda Item
Agenda Item
Transportation Disadvantaged Coordinating Board (TDCB) By-Laws Annual Review and Adoption
Presenter
Michele Ogilvie, MPO Staff
Summary
Guidance from the Florida Commission for the Transportation Disadvantaged, states that the local coordinating board shall annually develop and adopt a set of By-Laws. Further, the By-Laws shall state that the local Coordinating Board will conduct business using parliamentary procedures according to Robert’s Rules of Order, unless stated otherwise in the By-Laws. The TDCB By-Laws establish the formal procedures for the TDCB activities including board meetings, staff, board duties, subcommittees, communication with other organizations. The By-Laws of all of the MPO’s committees are incorporated into the MPO By-Laws. No issues regarding the TDCB’s By-Laws have been reported since 2011’s adoption. The TDCB’s By-Laws are attached for review.
Recommended Action
Confirm By-Laws.
Prepared By
Michele Ogilvie, MPO staff
Attachments
TDCB By-Laws
Plan Hillsborough planhillsborough.org
[email protected] 813 - 272 - 5940
601 E Kennedy Blvd 18th floor
Tampa, FL, 33602
HILLSBOROUGH COUNTY METROPOLITAN PLANNING ORGANIZATION
VOTING MEMBERSHIP
Commissioner Les Miller (Chair) Hillsborough County Paul Anderson, CEO Port Authority Commissioner Kevin Beckner Hillsborough County Wallace Bowers HART Mayor Frank Chillura City of Temple Terrace Commissioner Victor Crist (Alternate) Hillsborough County Trent Green Planning Commission Commissioner Ken Hagan Hillsborough County Joe Lopano, CEO Aviation Authority
Councilman Harry Cohen (Vice-Chair) City of Tampa Mayor Rick A. Lott City of Plant City Councilman Guido Maniscalco City of Tampa
Councilwoman Lisa Montelione City of Tampa Commissioner Sandra Murman Hillsborough County Cindy Stuart Hillsborough County School Board Commissioner Stacy White Hillsborough County Joseph Waggoner, Executive Director Expressway Authority
Beth Alden, AICP Executive Director
TAC REQUEST AMENDMENT REQUEST
1
BY-LAWS OF
THE HILLSBOROUGH COUNTY METROPOLITAN PLANNING ORGANIZATION
AND ITS COMMITTEES Updated: March 8, 2017
1.0 PURPOSE: These By-laws are adopted by the Hillsborough County Metropolitan
Planning Organization hereinafter called the “MPO” to govern the performance of the MPO’s duties as well as those of MPO committees and to inform the public of the nature of the MPO’s internal organization, operations and other related matters.
2.0 DEFINITIONS:
2.1 EMERGENCY: Any occurrence or threat thereof, whether accidental or natural, caused by man, in war or in peace, which necessitates immediate action because it results or may result in substantial injury or harm to the population or the MPO or substantial damage to or loss of property or public funds.
2.2 GOOD CAUSE: A substantial reason which is put forward in good faith.
2.3 INTERESTED PERSON: Any person who has or may have or who
represents any group or entity which has or may have some concern, participation or relation to any matter which will or may be considered by the MPO.
2.4 MEMBER(S): The MPO consists of sixteen (16) official members, with
FDOT designated as a non-voting advisor. Each member government or authority may also appoint an alternate member, who may vote at any MPO meeting in place of a regular member. MPO committee membership is as provided in these By-laws.
2.5 PUBLIC HEARING: A meeting of the MPO convened for the purpose of
receiving public testimony regarding a specific subject and for the purpose of taking action on amendment to or adoption of a plan or program. A public hearing may be convened with less than a quorum present; however, no official action other than adjournment or continuation of the public hearing to another time may be taken unless a quorum is present.
2.6 REGULAR MEETING: The regular scheduled meeting of the MPO at which
all official business may be transacted.
2.7 SPECIAL MEETING: A meeting of the MPO held at a time other than the regularly scheduled meeting time. All official business may be transacted at a special meeting.
TAC REQUEST AMENDMENT REQUEST
2
2.8 WORKSHOP: A conference where members are present and are meeting to discuss a specific subject. A workshop may be convened with less than a quorum present; however, no official action other than adjournment or continuation of the workshop to another time may be taken.
3.0 MPO OFFICERS: There shall be a Chair and a Vice-Chair. All officers shall be
voting members of the MPO. 3.1 TENURE: All officers shall hold office for one (1) year or until a successor is
elected. However, any officer may be removed by a majority of the total members.
3.2 SELECTION: At the regular meeting in December, the members shall
nominate one or more candidates to fill each office. Immediately following the close of nominations, the MPO shall vote to fill each office, with the vote for each office being taken in the order in which candidates for that office were nominated, until one is elected. New officers shall take office immediately upon the conclusion of the election of officers.
3.3 VACANCY IN OFFICE: A vacant office shall be filled by the MPO at its first
regular meeting following the vacancy. The officer so elected shall serve the remainder of their predecessor’s term in office.
3.4 DUTIES: The officers shall have the following duties:
3.4.1 CHAIR: The Chair shall: (a) Preside at all regular and special meetings, workshops and public
hearings. (b) Represent the MPO on the West Central Florida MPO Chairs
Coordinating Committee (CCC) and the Florida MPO Advisory Council (MPOAC).
(c) Establish such ad hoc committees as the Chair may deem necessary and appoint their members and chairs.
(d) Call special meetings and workshops and public hearings. (e) Sign all contracts, resolutions, and other official documents of the
MPO, unless otherwise specified by the By-laws or Policies. (f) Express the position of the MPO as determined by vote or consensus
of the MPO. (g) See that all actions of the MPO are taken in accordance with the By-
laws, Policies and applicable laws. (h) Perform such duties as are usually exercised by the Chair of a
commission or board, and perform such other duties as may from time to time be assigned by the MPO.
3.4.2 Vice-Chair: the Vice-Chair shall, during the absence of the Chair or
the Chair’s inability to act, have and exercise all of the duties and powers of the Chair, and shall perform such other duties as may from time to time be assigned to the Chair by the MPO.
TAC REQUEST AMENDMENT REQUEST
3
4.0 COMMITTEES:
4.1 AD HOC COMMITTEES:
4.1.1 Chair and Expiration: An ad hoc committee shall consist of a committee chair, who shall be a member of the MPO. All ad hoc committees shall have an expiration time identified by the Chair at the time of creation or shall dissolve at the expiration of the Chair’s term.
4.1.2 Purpose: The purpose of establishing ad hoc committees is to
facilitate the accomplishment of a specific task identified by the Chair.
4.2 STANDING COMMITTEES:
4.2.1 Appointment of Committee Members: Members and alternate
members of all committees shall be appointed by action of the MPO. Members representing an organization on a committee, as specified in the committee membership list, shall be nominated in writing by their organization. Members representing the citizens of Hillsborough County, and not representing any particular entity as specified in the committee membership list, shall be recommended for membership by action of the committee on which they would like to serve. Using the same procedure, alternate members may be designated to act on behalf of regular members with all the privileges accorded thereto. The MPO shall not appoint committee applicants who are affiliated with private MPO consultants or contractors. If such an affiliation occurs, an existing committee member shall be deemed to have resigned.
4.2.2 Termination of Committee Membership: Any member of any committee may resign at any time by notice in writing to the Chair. Unless otherwise specified in such notice, such resignation shall take effect upon receipt thereof by the Chair. Each member of each committee is expected to demonstrate his/her interest in the committee’s activities through attendance of the scheduled meetings, except for reasons of an unavoidable nature. In each instance of an unavoidable absence, the absent member should ensure that his/her alternate will attend. The MPO may review, and consider rescinding, the appointment of any member of any committee who fails to attend three (3) consecutive meetings. In each case, the MPO will warn the member in writing, and if applicable the member’s nominating organization, thirty days in advance of an action to rescind membership. At a minimum, committee member attendance will be reviewed annually. In the case of members representing an organization on a committee as specified in the committee membership list, the individual’s membership may also be rescinded by the nominating organization, by letter to the Chair.
TAC REQUEST AMENDMENT REQUEST
4
4.2.3 Officers of Standing Committees: The committee shall hold an
organizational meeting each year for the purpose of electing a committee chair (unless designated by the MPO), a committee vice-chair, and, at the discretion of the committee chair, an officer-at-large. Officers shall be elected by a majority vote of a quorum of the members. Except as otherwise provided in these By-laws, officers shall serve a term of one year starting with the next meeting. The powers and duties of the committee chair shall be to preside at all meetings; to express the position of the committee as determined by vote or consensus of the committee; and to ensure that all actions of the committee are taken in accordance with the bylaws and applicable law. The committee vice chair shall have these same powers and responsibilities in the absence of the committee chair. The officer-at-large shall, during the absence of both the committee chair and the committee vice-chair or their inability to act, have these same duties and responsibilities, and in addition shall perform other duties as may from time to time be assigned by the committee chair.
4.2.4 Conduct of Committee Meetings: Sections 5 through 9, excluding Section 8.1, of these MPO By-laws shall be used for the conduct of all MPO committee meetings.
4.2.5 Standing Committee Sub-Committees: An MPO standing
committee or the MPO may establish such sub-committees to a standing committee as deemed necessary to investigate and report on specific subject areas within the scope of the standing committee. Such sub-committees shall be of limited duration and shall dissolve at such time as designated at the time of establishment or upon completion of the task(s) specified at the time of establishment. These MPO By-laws shall be used for the conduct of such sub-committees meetings in the same manner as the MPO committees.
4.2.6 MPO Technical Advisory Committee (TAC): Established pursuant to Section 339.175, Florida Statutes, the TAC shall be responsible for considering safe access to schools in the review of transportation project priorities, long-range transportation plans and transportation improvement programs and shall advise the MPO on such matters. In addition, the TAC shall be responsible for assisting in the development of transportation planning work programs; coordinating transportation planning and programming; review of all transportation studies, reports, plans and/or programs, and making recommendations to the MPO that are pertinent to the subject documents based upon the technical sufficiency, accuracy, and completeness of and the needs as determined by the studies, plans and/or programs. The TAC shall coordinate its actions with the School Board of Hillsborough County and other local programs and organizations within Hillsborough County that participate in school
TAC REQUEST AMENDMENT REQUEST
5
safety activities and shall also coordinate its actions with the appropriate representatives of the Florida Department of Transportation.
TAC Membership: The TAC shall be composed of technically qualified representatives for the purpose of planning, programming and engineering of the transportation system within the Hillsborough County Metropolitan Planning Organization area boundary. The membership shall be composed of: two (2) members from Hillsborough County, two (2) members from City of Tampa, two (2) members from the Hillsborough County City-County Planning Commission, one (1) member from the Tampa Hillsborough Expressway Authority, one (1) member from the Hillsborough Area Regional Transit Authority, one (1) member from Environmental Protection Commission, one (1) member from the Tampa Port Authority, one (1) member from City of Temple Terrace, one (1) member from the Tampa Bay Regional Planning Council, one (1) member from the Florida Department of Environmental Protection, one (1) member from City of Plant City, one (1) member from the Hillsborough County Aviation Authority, one (1) member from the Hillsborough County School Board, one (1) member from the Tampa Bay Area Regional Transportation Authority, one (1) member from the Tampa Historic Streetcar, Inc., one (1) member from the Department of Health-Hillsborough and one (1) member from the Florida Trucking Association. Terms of Membership: Members shall serve terms of indefinite length at the pleasure of their respective nominating organizations and the MPO.
4.2.7 MPO Citizens Advisory Committee (CAC): The CAC shall be responsible for providing information and overall community values and needs into the transportation planning program of the MPO; evaluating and proposing solutions from a citizens perspective concerning alternative transportation proposals and critical issues; providing knowledge gained through the CAC into local citizen group discussions and meetings; and establishing comprehension and promoting credibility for the MPO Program.
CAC Membership: The CAC shall be composed of appointed citizens (transportation agency staff are not eligible) who together shall represent a broad spectrum of social and economic backgrounds and who have an interest in the development of an efficient, safe and cost-effective transportation system. Minorities, the elderly and persons with disabilities must be adequately represented on the CAC.
All members must be residents of Hillsborough County. Membership will be as follows: one (1) member nominated by each member of the
TAC REQUEST AMENDMENT REQUEST
6
Board of County Commissioners serving on the MPO, one (1) member nominated by each member from the City of Tampa serving on the MPO, one (1) member from the City of Temple Terrace nominated by the Mayor of the City of Temple Terrace, one (1) member from the City of Plant City nominated by the Mayor of the City of Plant City, one (1) member nominated by each respective Chairperson of the Hillsborough County Aviation, Tampa-Hillsborough Expressway, Tampa Port and Hillsborough Area Regional Transit Authorities, one (1) member representing the transportation disadvantaged nominated by the Chairman of the Transportation Disadvantaged Coordinating Board, one (1) member nominated by the Chairperson of the Hillsborough County City-County Planning Commission and one (1) member nominated by the School Board member serving on the MPO. In addition, there shall be six (6) at-large members nominated by local organizations representing the following constituencies or through application directly to the CAC as provided in Section 4.2.1. These shall comprise one (1) person of Hispanic ethnicity, one (1) person of African-American descent, one (1) person under the age of 30, one (1) woman, one (1) person to represent neighborhoods, and one (1) person to represent the business community.
Terms of appointment shall be for a two-year period with an opportunity for reappointment thereafter, unless the official who appointed the member leaves office or the MPO board during the term of the member’s appointment. In that case, the member shall be deemed to have resigned from the CAC and the new official shall have the right to appoint a new member or reappoint the same member. A member of the committee whose term has expired shall continue to serve until they are reappointed or replaced. The terms of appointment notwithstanding, CAC members shall serve at the pleasure of the MPO.
4.2.8 MPO Policy Committee: The MPO Policy Committee shall be responsible for the review and in-depth discussion of items and issues proposed to come before the MPO and for development of recommendations to the MPO, as appropriate, regarding such items and issues in order to facilitate the accomplishment of the MPO’s responsibilities to manage a continuing, cooperative and comprehensive transportation planning process and the development of transportation plans and programs.
Membership: The Policy Committee shall be composed of at least five (5) members of the MPO who shall serve on a voluntary basis. Volunteers for membership will be solicited at the MPO meeting at which the Chair is elected and at any MPO meeting thereafter if the total membership of the Policy Committee falls below five (5). Those MPO members requesting to be made Policy Committee members in response to such solicitation or upon the initiative of an individual
TAC REQUEST AMENDMENT REQUEST
7
MPO member shall be so appointed by action of the MPO and shall serve terms that last until the next MPO meeting at which the Chair is elected.
4.2.9 Transportation Disadvantaged Coordinating Board (TDCB): The
primary purpose of the TDCB is to assist the MPO in identifying local service needs and providing information, advice, and direction to the Community Transportation Coordinator (CTC) on the coordination of services to be provided to the transportation disadvantaged pursuant to Section 427.0157, Florida Statutes.
The following agencies or groups shall be represented on the TDCB
as voting members: an elected official serving on the Hillsborough County MPO who
has been appointed by the MPO to serve as TDCB Chairperson;
a local representative of the Florida Department of Transportation;
a local representative of the Florida Department of Children & Families;
a local representative of the Public Education Community, which could include, but is not limited to, a representative of Hillsborough County Public Schools, School Board Transportation Office or Headstart Program;
a local representative of the Florida Division of Vocational Rehabilitation or the Division of Blind Services, representing the Department of Education;
a person recommended by the local Veterans Service Office representing the veterans in the county;
a person who is recognized by the Florida Association for Community Action (President) as representing the economically disadvantaged in the county;
a person over sixty years of age representing the elderly citizens in the county;
a person with a disability representing the disabled citizens in the county;
two citizen advocates in the county, one of whom must be a user of the transportation services of the coordinated transportation disadvantaged system as their primary means of transportation;
a local representative for children at risk; the chairperson or designee of the local mass transit system's
board except when they are also the CTC; a local representative of the Florida Department of Elder Affairs; a local representative of the local for-profit transportation
industry; a local representative of the Florida Agency for Health Care
Administration;
TAC REQUEST AMENDMENT REQUEST
8
a local representative of the Regional Workforce Development Board, and;
a representative of the local medical community, which may include, but is not limited to, kidney dialysis centers, long term care facilities, assisted living facilities, hospitals, local health department or other home and community based services.
TDCB Terms of Appointment. Except for the TDCB Chairperson, the members of the TDCB shall be appointed for three (3) year terms which shall be staggered equally among the membership. The TDCB Chairperson shall serve until elected term of office has expired or is otherwise replaced by the MPO. TDCB Duties. The TDCB shall perform the following duties which include those specified in Chapter 41-2, Florida Administrative Code and Section 427.0157, Florida Statutes.
a. Maintain official meeting minutes, including an attendance roster, reflecting official actions and provide a copy of same to the Commission for the Transportation Disadvantaged and the MPO Chairperson;
b. Review and approve the CTC’s memorandum of agreement and the transportation disadvantaged service plan;
c. On a continuing basis, evaluate services provided under the transportation disadvantaged service plan. Not less than annually provide the MPO with an evaluation of the CTC’s performance relative to the standards adopted by the Commission for the Transportation Disadvantaged and the MPO. Recommendations relative to performance and the renewal of the CTC's memorandum of agreement with the Commission for the Transportation Disadvantaged shall be included in the report;
d. In cooperation with the CTC, review and provide recommendations to the Commission for the Transportation Disadvantaged and the MPO on all applications for local, state, or federal funds relating to transportation of the transportation disadvantaged in the county to ensure that any expenditures within the county are provided in the most cost effective and efficient manner;
e. Review coordination strategies for service provision to the transportation disadvantaged in the county to seek innovative ways to improve cost effectiveness, efficiency, safety, working hours, and types of service in an effort to increase ridership to a broader population. Such strategies should also encourage multi-county and regional transportation service agreements between area CTCs and consolidation of adjacent counties when it is appropriate and cost effective to do so;
f. Appoint a Grievance Subcommittee to process, investigate, resolve complaints, and make recommendations to the
TAC REQUEST AMENDMENT REQUEST
9
TDCB for improvement of service from agencies, users, or potential users, of the systems in the county. This Subcommittee shall meet as often as necessary to resolve complaints in a timely manner;
g. In coordination with the CTC, jointly develop applications for funds that may become available;
h. Prepare quarterly reports outlining the accomplishments and activities or other areas of interest to the Commission for the Transportation Disadvantaged and the MPO;
i. Consolidate the annual budget of local and federal government transportation disadvantaged funds estimates and forward them to the Commission for the Transportation Disadvantaged. A copy of the consolidated report shall also be used by the TDCB for planning purposes;
j. Develop and maintain a vehicle inventory and utilization plan of those vehicles purchased with transportation disadvantaged funds for inclusion in the transportation disadvantaged service plan for the Commission for the Transportation Disadvantaged;
k. Assist the MPO in preparing a Transportation Disadvantaged Element in their Transportation Improvement Program (TIP);
l. Assist the CTC in establishing eligibility guidelines and priorities with regard to the recipients of nonsponsored transportation disadvantaged services that are purchased with Transportation Disadvantaged Trust Fund moneys;
m. Work cooperatively with regional workforce boards established in Chapter 445, Florida Statutes, to provide assistance in the development of innovative transportation services for participants in the welfare transition program.
4.2.10 MPO Intelligent Transportation Systems (ITS) Committee: The
ITS Committee is responsible for assisting in the development of Intelligent Transportation System (ITS) planning work programs, as well as reviewing ITS related studies, reports, plans, projects (including consistency with regional architecture and other standards and/or programs) and making recommendations to the MPO and/or other agencies. ITS Committee recommendations to the MPO shall be based upon the technical sufficiency, accuracy, and completeness of studies, plans and/or programs. The ITS Committee shall coordinate its actions with the appropriate representatives of the Florida Department of Transportation.
ITS Committee Membership: The ITS Committee shall be composed of members technically qualified in the planning, programming, engineering and/or implementation of intelligent transportation systems or projects within the Hillsborough County Metropolitan Planning Organization area boundary or in the case of the member nominated by the Environmental Protection
TAC REQUEST AMENDMENT REQUEST
10
Committee, technically qualified in the area of air quality impacts of transportation. The membership shall be composed of: one (1) member each from Hillsborough County, the City of Tampa, the Environmental Protection Commission, Tampa-Hillsborough Expressway Authority, Hillsborough Area Regional Transit Authority, the City of Plant City and the City of Temple Terrace. Members and Alternate Members shall serve terms of indefinite length at the pleasure of their respective governmental bodies or agencies and the MPO.
4.2.11 MPO Bicycle/Pedestrian Advisory Committee (BPAC): The
BPAC shall be responsible for making recommendations to the MPO, Hillsborough County, City of Tampa, City of Plant City, City of Temple Terrace, the Hillsborough County Environmental Protection Commission, the Florida Department of Transportation, the Southwest Florida Water Management District, and others, on matters concerning the planning, implementation and maintenance of a comprehensive bikeway and pedestrian system. In addition, the BPAC shall be responsible for studying and making recommendations concerning the safety, security, and regulations pertaining to bicyclists and pedestrians. The BPAC shall coordinate its actions with the appropriate representatives of the Florida Department of Transportation.
BPAC Membership: The BPAC shall be composed of up to twenty- five members. One member shall represent each of the following entities, except as noted: City of Tampa (three seats), City of Temple Terrace, City of Plant City, Hillsborough County (three seats), University of South Florida USF, the Environmental Protection Commission of Hillsborough County, the Hillsborough County City-County Planning Commission, HART, and the Florida Health Department. The remaining members shall be citizen representatives. All members of this Committee shall serve for a two-year term, ending on June 30th of its respective year. Without restriction, each member can be appointed to serve an unlimited number of two-year terms.
4.2.12 MPO Livable Roadways Committee (LRC): The LRC shall be
responsible for integrating Livable Roadways principles into the design and use of public rights-of-way and the major road network throughout Hillsborough County. The LRC seeks to accomplish this responsibility by: making recommendations to create a transportation system that balances design and aesthetics with issues of roadway safety and function; ensuring that public policy and decisions result in a transportation system that supports all modes of transportation, with a special emphasis on pedestrian and bicycle infrastructure and transit infrastructure and service;
TAC REQUEST AMENDMENT REQUEST
11
providing information and assistance to the MPO, local governments and transportation agencies relating to the mission of the Committee; and enhancing coordination among MPO member agencies and public participation in the transportation planning process. The LRC shall coordinate its actions with the appropriate representatives of the Florida Department of Transportation.
LRC Membership: The LRC shall be composed of representatives of local government departments, transportation agencies and other organizations. They may be elected officials, appointed officials, organization members, designated representatives or staff, but may not be staff to the MPO. Members will represent the following: City of Plant City; City of Tampa Parks and Recreation Department, Public Works, Transportation Division, or Urban Development Department (up to two members); City of Temple Terrace; Hillsborough County Planning and Infrastructure (up to two members); Hillsborough Area Regional Transit; Hillsborough County MPO Board Member (appointed by the MPO to serve as chair of the committee); Hillsborough County City-County Planning Commission; Tampa Hillsborough Expressway Authority and five members from professional organizations whose mission is consistent with the principles of Livable Roadways (such as American Planning Association; American Society of Landscape Architects; Urban Land Institute; Institute of Transportation Engineers; Congress for New Urbanism and American Institute of Architects); University of South Florida; New North Transportation Alliance; Tampa Downtown Partnership; Westshore Alliance; Person with disabilities; Neighborhood representative; Transit user representative; Citizen advocate for livable communities and/or multimodal transportation.
5 MEETINGS:
5.1 SCHEDULE OF MPO MEETINGS:
5.1.1 Regular Meetings: Regular meetings shall take place on the first Tuesday of each month, unless otherwise decided by the MPO and shall be held in the Chamber of the Hillsborough County Board of County Commissioners or at another suitable location designated by the Chair.
5.1.2 Special Meetings and Workshops: Special meetings and workshops shall be held at the call of the Chair or majority of officers. Special meetings and workshops shall convene at a time designated by the Chair and shall be held in the Chambers of the Hillsborough County Board of County Commissioners or at another suitable location designated by the Chair.
5.1.3 Public Hearings: Public hearings of the MPO shall be held at a time designated by the Chair. A public hearing can be continued until a date and time certain, with due allowance of time for public notice of the continuation of the public hearing. Public hearings
TAC REQUEST AMENDMENT REQUEST
12
shall be held in the Chambers of the Hillsborough County Board of County Commissioners or at another suitable location designated by the Chair.
5.2 SCHEDULE OF STANDING COMMITTEE MEETINGS: Each standing
committee shall meet monthly, with the exception of the Intelligent Transportation Systems Committee and the Transportation Disadvantaged Coordinating Board which shall meet every two months, at a regular date and time designated by the Chair.
5.3 SCHEDULE OF AD HOC COMMITTEE MEETINGS: Each ad hoc committee shall meet at the call of the committee chair. Ad hoc committee meetings shall not be scheduled during the times reserved for MPO meetings. Ad hoc committee meetings shall be held at a suitable location designated by the committee chair.
5.4 NOTICE OF MPO AND COMMITTEE MEETINGS: The Executive Director
of the MPO shall be responsible for providing written public notice of all MPO meetings, public hearings and committee meetings. Except in case of emergencies, written notice of any meeting shall be given at least five (5) days prior to the meeting. In case of emergency, notice of such meeting shall be given to each member as far in advance of the meeting as possible and by the most direct means of communications. In addition, notice of such emergency meeting shall be given to the media, utilizing the most practicable method. Written notice of any meeting shall state the date, time and place of the meeting, a brief description of the agenda for the meeting, and shall be provided in accordance with the requirements of Florida law and the MPO’s Public Participation Plan.
5.5 AGENDA OF MPO AND COMMITTEE MEETINGS: The agenda for all MPO
regular and special meetings, workshops and public hearings shall be established by the Chair with the assistance of the Executive Director. Members or the Executive Director may request that an item be placed on the agenda by communicating such request to the Executive Director at least ten (10) days prior to the meeting date. The Chair shall consider with the Executive Director on a month to month basis whether there shall be a consent agenda.
The agenda for each committee meeting shall be established by the committee chair and shall be prepared by the Executive Director or designated MPO support staff. Members of a committee or the Executive Director may request that an item be placed on a committee agenda by communicating such request to the MPO support staff assigned to the committee, or the Executive Director at least ten (10) days prior to the committee meeting date.
The agenda shall list the items in the order they are to be considered. For good cause stated in the record, items on the agenda may be considered out of order with the approval of the MPO Chair or the committee chair.
TAC REQUEST AMENDMENT REQUEST
13
The agenda for any MPO or committee meeting shall be delivered to each member at least five (5) days prior to the meeting date and shall be mailed or delivered to interested persons at that time, except in case of an emergency meeting, where the agenda will be provided to members, and interested parties as far in advance of such meetings as practicable.
5.6 RULES OF ORDER: Except where they are inconsistent with the By-laws, Roberts Rule of Order shall be used for the conduct of all MPO and committee meetings.
5.7 QUORUM: A simple majority of the total non-vacant membership of the MPO
or MPO committee shall constitute a quorum for the transaction of business at all regular and special meetings and public hearings, except seven (7) members shall constitute a quorum for the CAC. Public hearings may be conducted with less than a quorum, but no action, other than as noted at the end of this section, shall be taken unless a quorum is present. When a quorum is present, a majority of those present may take action on matters properly presented at the meeting. Workshops may be conducted with less than a quorum, but no official action may be taken. A majority of the members present, whether or not a quorum exists, may adjourn any meeting or continue any public hearing to another time.
5.8 CONDUCT OF MEETINGS:
5.8.1 Chair Participation: The presiding MPO Chair, or committee chair,
shall not be deprived of any rights and privileges by reason of being presiding Chair, but may move or second a motion only after the gavel has been passed to the Vice-Chair or another member.
5.8.2 Form of Address: Each member shall address only the presiding
Chair for recognition; shall confine his/her remarks to the question under debate; and shall avoid personalities or indecorous language or behavior.
5.8.3 Public Participation: Any member of the public may address the
MPO or MPO committee at a regular or special meeting, public hearing, or public participation type workshop, after signing in with the MPO Staff for a specific item. When recognized by the Chair, a member of the public shall state their name, address, the person on whose behalf they are appearing and the subject of their testimony. Each member of the public shall limit his or her presentation to three (3) minutes unless otherwise authorized by the Chair.
5.8.4 Limitation of Testimony: The Chair may rule testimony out of order
if it is redundant, irrelevant, indecorous or untimely.
5.8.5 Motions: The Chair shall restate motions before a vote is taken and shall state the maker of the motion and the name of the supporter.
TAC REQUEST AMENDMENT REQUEST
14
5.8.6 Voting: Voting shall be done by voice, as a group, but a member
shall have his/her vote recorded in the minutes of the meeting if so desired. A roll call vote shall be taken if any member so requests. Any member may give a brief explanation of his/her vote. A tie vote shall result in failure of a motion.
5.8.7 Reconsideration: A motion to reconsider an item on which vote has
been taken may be made only by a member who voted with the prevailing side. The motion to reconsider must be made on the day the vote to be reconsidered was taken, or at the next succeeding meeting of the same type of meeting at which the vote to be reconsidered was taken (i.e., at the next succeeding regular meeting if the vote to be reconsidered was taken at a regular meeting). To be in order, the motion to reconsider must be made under the consideration of old business. Adoption of a motion to reconsider requires the approval of at least a simple majority of the votes cast. If a motion to reconsider is adopted, the members shall consider the need for additional notice to interested persons before a vote subject to the motion for reconsideration was taken at a special meeting or a public hearing for which no subsequently scheduled meeting will provide an opportunity for reconsideration of the item, then the motion to reconsider may be made at the next regular meeting in the manner provided.
5.9 ORDER OF BUSINESS AT MEETINGS: The order of business shall be
determined by the Chair; however, the following is provided as a guide:
5.9.1 Regular MPO Meetings:
(a) Call to Order and Pledge of Allegiance (b) Approval of minutes of prior meetings, workshops and public
hearings. (c) Public input on Agenda Items, MPO Committee Reports (d) Presentation of the Chair’s Report (e) Presentation of the Executive Director’s Report (f) Consideration of Action Items (g) Consideration of Status Reports (h) Public input regarding general concerns (i) Consideration of items under old business (j) Consideration of items under new business (k) Adjournment
5.9.2 Special Meetings or Workshops
(a) Call to Order (b) Consideration of individual agenda items (c) Adjournment
5.9.3 Public Hearings
TAC REQUEST AMENDMENT REQUEST
15
(a) Call to Order (b) Consideration of individual agenda items 1. Presentation by staff 2. Public comment 3. Board deliberation (c) Adjournment
5.9.4 Order of Consideration of Action Items: The order of consideration
of any individual agenda item shall be as follows unless otherwise authorized by the Chair:
(a) Chair introduces the agenda item. (b) Staff presents the agenda item. (c) Other invited speaker(s) make presentations. (d) MPO or committee members ask questions. (e) Motion is made, seconded and debated. (f) Vote is taken.
The Chair may expand all time limitations established by this section. 5.9 OPEN MEETINGS: All MPO regular and special meetings, workshops and
public hearings, MPO committee meetings, and all meetings of the committees are open to the public as provided by Florida’s Government-in-the-Sunshine Law, Section 286.011, Florida Statutes.
6.0 ATTENDANCE: Members are expected to attend all regular and special meetings,
public hearings and workshops of the MPO and its committees.
6.1 EXCUSAL FROM MEETINGS: Each member who knows that his/her attendance at a regular or special meeting, public hearing or workshop will not be possible, shall notify the Executive Director, or committee support staff, of the anticipated absence and the reason thereof. The Executive Director, or committee support staff, shall communicate this information to the Chair who may excuse the absent member for good cause.
7.0 CODE OF ETHICS:
7.1 COMPLIANCE WITH LAWS: Members shall comply with the applicable provisions of the Code of Ethics for Public Officers and Employees, Part III, Chapter 112, Florida Statutes.
7.2 REQUESTS FOR INFORMATION: Members may request information
readily available to the general public directly from the appropriate staff person. Requests for information not readily available to the general public, or information which would involve the expenditure of staff time in preparation or compilation, shall be made to the Executive Director, who may consult with the Chair for guidance.
TAC REQUEST AMENDMENT REQUEST
16
7.3 LOBBYING ACTIVITIES: Members shall use their discretion in conducting private discussions with interested persons regarding MPO business, as long as all interested persons are treated equally. Any written material received by a member in connection with a private discussion with an interested person shall be given to the Executive Director for distribution to other members and as appropriate, to staff.
7.4 GOVERNMENT IN THE SUNSHINE: Members shall refrain from
participating in any private communications regarding MPO business involving two or more members. For purposes of this section, a private discussion is one that is not conducted in accordance with the requirements of Florida’s Government-in-the-Sunshine Law, Section 286.011, Florida Statutes.
Any written material received by a member in connection with MPO Business shall be given to the Executive Director or the member’s committee support staff for distribution to other members and as appropriate, to staff.
7.5 STATEMENTS BY MEMBERS: Members will from time to time be asked to
give their opinions regarding matters which have been or will be considered by the MPO or one of its committees. No member shall be prohibited from stating his/her individual opinion on any matter; however, in doing so, each member shall take care to make clear that the opinion expressed is his/her own, and does not constitute the official position of the MPO or one of its committees.
8.0 ADMINISTRATION: The administration of MPO activities shall be accomplished
through official actions of the MPO in accordance with the following guidelines:
8.1 POLICIES: The MPO shall adopt, by a vote of a majority of the total membership, Policies to guide the administration of the MPO. The Policies shall be published in conjunction with the By-laws. The Policies may be amended from time to time by a vote of a majority of the total voting membership of the MPO.
8.2 STATUTES: The MPO shall abide by legislation authorizing and specifying
its duties and functions and all other requirements of Florida law. 8.3 STAFF: The staff of the MPO shall consist of the Executive Director and
such additional employees as provided by the Hillsborough County City-County Planning Commission. The staff shall be directed by the Executive Director of the MPO.
9.0 RULES OF CONSTRUCTION: The following rules apply to the text of this
document.
9.1 The particular controls the general.
TAC REQUEST AMENDMENT REQUEST
17
9.2 The word “shall” is mandatory and not discretionary. The word “may” is permissive.
9.3 Words used in the present tense include the future; words used in the
singular number shall include the plural and the plural the singular unless the context indicates the contrary.
9.4 Words not defined shall have the meaning commonly ascribed to them.
10.0 AMENDMENT: The By-laws may be amended by two-thirds majority vote of the
total voting membership of the MPO. Any amendment shall be proposed at a regular meeting and voted upon the next regular meeting.
Board & Committee Agenda Item
Agenda Item
Vision Zero Hillsborough Update
Presenter
Gena Torres, MPO Staff
Summary
Vision Zero is an approach based on the belief that traffic death and injury is preventable – that these aren’t “accidents,” but the result of poor behaviors combined with unforgiving roadway designs. The resulting philosophy is to approach the problem from multiple angles, including targeted education and data-driven enforcement, as well as street designs that emphasize safety, predictability, and the potential for human error.
The MPO’s Policy Committee has taken the lead locally to develop a Vision Zero Action Plan centered around four Action Tracks:
Paint Saves Lives – about low-cost engineering strategies
One Message, Many Voices – about public education strategies
Consistent and Fair – about community-oriented law enforcement
The Future Will Not Be Like the Past – focusing on design standards
Three of four workshops to develop the plan have been held. The draft strategies for each Action Track will be presented at this meeting along with the responsible party for implementation and the expected timeframe. The last workshop is scheduled for August 22, 2017. The location is to be decided, but the public is welcome to attend.
Recommended Action
None; for information only.
Prepared By
Gena Torres, MPO Staff
Attachments
Vision Zero Overview
Plan Hillsborough planhillsborough.org
[email protected] 813 - 272 - 5940
601 E Kennedy Blvd 18th floor
Tampa, FL, 33602
ONE TRAFFIC DEATH IS TOO MANY
S A F E S T R E E T S N O W
VISION ZERO. No more traffic-related deaths. No more pedestrians killed trying to cross the street. No more bicyclists and motorcyclists hit by unaware drivers. Safe streets for everyone.
IT’S AMBITIOUS. IT’S OUR MOTIVATION. IT’S OUR DRIVE.
WE HAVE A CRISIS IN HILLSBOROUGH COUNTY. No loss of life is acceptable. Between 2005 and 2016, there were 2,100 traffic-related deaths and 93,262 traffic-related injuries in Hillsborough County. Each one of these resulted in untold pain and suffering for the victims and their families. Moreover, every one of these was preventable.
Hillsborough County has the dubious distinction of being one of the highest traffic injury and death locations in the US. Pedestrians and bicyclists are particularly vulnerable. In 2015 there were 52 pedestrian traffic deaths and eight bicyclist traffic deaths in Hillsborough County. This is not surprising given the relationship between speed and pedestrian fatalities. Add in distracted driving, inadequate street lighting, and other contributing factors and we have a recipe for crashes.
DEATHS
HILLSBOROUGH COUNTY TRAFFIC DEATHS2006-2015SOURCE: PLAN HILLSBOROUGH
0
20
40
60
80
100
120
2006 2007 2008 2009 2010 2011 2012 2013 2014 2015
DEATH AND INJURY DUETO SPEED
20
010
30
50 70
90
110
12020MPH
100
40 8060
10% LIKELIHOOD OF FATALITY OR SERIOUS INJURY
20
010
30
50 70
90
110
12030MPH
100
40 8060
40% LIKELIHOOD OF FATALITY OR SERIOUS INJURY
20
010
30
50 70
90
110
12040MPH
100
40 8060
80% LIKELIHOOD OF FATALITY OR SERIOUS INJURY
Source: U.S. Department ofTransportation, Literature Reviewed
on Vehicle Travel Speeds andPedestrian Injuries. March 2000.
HILLSBOROUGH COUNTY IS DOING SOMETHING ABOUT IT.We are joining an international movement called Vision Zero. Many U.S. cities have joined and adopted Vision Zero, including New York, Chicago, Washington DC, Seattle, Austin, San Diego, and now Tampa and Hillsborough County.
At the core of the movement is the belief that death and injury on city streets is preventable – that these aren’t “accidents,” but the result of poor behaviors combined with unforgiving roadway designs. Vision Zero attacks the problem with a systematic approach that includes targeted education, data-driven analysis, enforcement, and street designs that emphasize safety, predictability, and the need for countermeasures for human error.
The Hillsborough Metropolitan Planning Organization is taking the lead, with help from local partners including Florida DOT, the Cities of Tampa, Temple Terrace, and Plant City, law enforcement, schools, hospitals, and media, among others. The MPO is engaging committed citizens to bring Vision Zero to reality, with four “Action Track” working groups:
ONE TRAFFIC DEATH IS TOO MANY
S A F E S T R E E T S N O W
“PAINT SAVES LIVES” Identifying low-cost engineering strategies
“ONE MESSAGE, MANY VOICES” Educating and informing the public
“CONSISTENT AND FAIR” Focusing on community-oriented law enforcement
“THE FUTURE WILL NOT BE LIKE THE PAST” Implementing context sensitive design
JOIN OUR CAUSE. We need your help to get the word out, locate problem areas, identify solutions, and advocate for investments in traffic safety. Join us to make Vision Zero a reality. Please check out our website, http://www.planhillsborough.org/vision-zero/ and follow us on Facebook at Vision Zero Hillsborough to learn more.
VISION ZERO.
ALL ROAD USERS.
ALL AGES.
ALL THE TIME.
Committee Reports
Meeting of the Citizens Advisory Committee (CAC) on May 10, 2017
The CAC approved and forwarded to the MPO:
The TIP “Early Start” Amendments, and The TIP Annual Update, after discussing funding allocations to Complete
Streets and multi-use trails standards, and the need to reflect in the TIP the number of comments received for and against the TBX project.
The CAC held a special election to fill officer positions that were vacated due to a member going off the Committee, electing Bill Roberts as vice chair, and Ray Alzamora to fill the Member at Large seat that Mr. Roberts had occupied. The CAC also received status reports from: FDOT on Tampa Bay Next; Coast BikeShare on bicycle utilization since the program was grown from downtown Tampa; and MPO staff seeking input on the Innovation Gateway landscaping concepts for the interchanges at I-275 and Busch Blvd and Fowler Ave. The CAC also discussed the then-upcoming May 12th Regional Transportation Leadership Workshop, and several members participated. Meeting of the Technical Advisory Committee (TAC) on May 15, 2017
The TAC approved and forwarded to the MPO:
The TIP “Early Start” Amendments, and The TIP Annual Update. Members asked for clarification if the amendments meant that sidewalks would be constructed sooner or if only planning dollars were advancing; if the access management on Kennedy Boulevard included complete median closures; and if the Bypass Canal trail amendment will need the LAP certification completed sooner.
The TAC heard status reports on the FDOT Intersection Lighting Program; Coast BikeShare and its commuter vs. entertainment analysis of bike usage; the Innovation Gateway project; and FDOT’s Community Working Groups for Tampa Bay Next. Verification was asked on the design of the Howard Frankland bridge and on addressing diverse needs, including health impact analyses. Members discussed moving forward on segments that have greater community support.
Policy Committee Meeting of May 23, 2017
The committee approved and forwarded to the MPO:
The TIP “Early Start” Amendments, after requesting that the Henderson intersection receive another look in the Kennedy Blvd project, and
Plan Hillsborough planhillsborough.org
[email protected] 813 - 272 - 5940
601 E Kennedy Blvd 18th floor
Tampa, FL, 33602
The TIP Annual Update. The committee also was briefed on Tampa Bay Next, and on the MPO’s Innovation Gateway study, and agreed to recess in June. There was discussion of broad-brush allocations of funds between types of projects, such as highway and transit projects, and agreement to explore this topic in July as a beginning step towards the 2045 Long Range Transportation Plan. Meeting of the Bicycle Pedestrian Advisory Committee on May 10, 2017
The committee:
approved the TIP Annual Update as presented; recommended that the MPO make the Real Choices When Not Driving program
the number one priority, and budget more funds for these projects in the TIP.
The members also decided that their June 14th meeting will consist of participation in the Bike/Walk Tampa Bay Forum, with no official business conducted. Start time is 6:00 pm on the 26th Floor of the County Center.
Meeting of the Livable Roadways Committee (LRC) on May 17, 2017
The LRC approved and forwarded to the MPO:
The TIP “Early Start” Amendments, and The TIP Annual Update, after discussion about agencies setting goals to
increase walk/bike spending to at least 1% of the transportation budget. In honor of national bike month, the committee heard status reports on Coast BikeShare and USF’s Bicycle Friendly Designation. Additionally, they weighed in on the I-275/Busch and Fowler Innovation Gateway and Student “Complete Street” Concepts for Morgan St. The committee was reminded of upcoming events and opportunities to review and provide comments on the Hillsborough County Technical Manuals and FDOT Compete Streets Handbook. TBARTA MPO Directors Meeting of May 19, 2017
The region’s MPO directors met and discussed:
Organizing the first annual Gulf Coast Safe Streets Summit in February 2018, and collaborating with Bike/Walk Tampa Bay and FDOT on safety messaging;
Setting performance targets regionally for the first of several federally-mandated performance metrics, transit asset management;
The agenda for the June 16 meeting of the TBARTA MPO Chairs with the Central Florida MPO Alliance, including updates of the regional priorities for the TRIP and Multi-Use Trails programs;
The public input received during the May 12 Regional Transportation Leadership Workshop – recurring themes were the importance of multimodalism, equity, public engagement and consensus-building, and coordination with economic development and land use -- and the next steps for the Regional Planning Best Practices study.
Tampa Bay TMA Leadership Group Meeting of June 2, 2017
Members developed the attached list of top priorities for the tri-county area. These have been integrated into Hillsborough MPO’s draft list of priority projects.
Tampa Bay Transportation Management Area (TMA) Leadership Group
2017 Top Priorities Approved by consensus June 2, 2017
Interstate Modernization Projects
Status: Funding is requested for reconstruction of two interchanges, I-275/SR 60 and I-275/I-4; interstate modernization including technology; reevalution of Tampa Interstate Study EIS; and for locational studies for transit centers in the Gateway and Fletcher/Fowler areas. Environmental impact studies are underway, and construction is funded for the Howard Frankland Bridge replacement.
Regional Transit Catalyst Project(s) which may include:
a. Central Avenue BRT, St. Petersburg downtown to beaches; b. Westshore Multimodal Center with fixed guideway connections to downtowns and airports; c. Further development of the Regional Transit Feasibility Plan; d. Regional Express Bus - opportunities include SR 60/Gulf-to-Bay Blvd, the Veterans
Exwy/Suncoast Pkwy, the Gandy/Selmon Exwy corridor, the SR 54/56 corridor, and as a part of Tampa Bay Next; and expansion of regional farebox system to adjoining counties;
e. Elevated transit in the SR 60 corridor – pilot project from downtown Clearwater to Clearwater Beach.
CSX Rail Corridors – Funding is requested for right-of-way preservation for development of potential commuter routes.
SR 54/56 Corridor, from US 19 to US 301 – Funding is requested to complete a Multimodal Corridor Assessment Study.
I-75 Improvements: a. I-75 at Overpass Road – new interchange b. I-75 at Big Bend Road – interchange reconfiguration
Waterborne Transportation Projects – Funding is requested for regional waterborne transportation
priority projects, which could include the Cross-Bay Ferry, waterborne service from south Hillsborough County to MacDill Air Force Base, and other regional projects.
“BELOW THE LINE” - projects are not in priority order
Interstate Express Lanes with Express Bus on I-4 and I-75 Partially Controlled Access Improvements on US 19 north of SR 580 to Pasco County New Road Extension of Ridge Road from Moon Lake Rd. to US 41 New Toll Road in New Tampa (East-West Road) from I-275 to Commerce Park US 41, Port Tampa Bay to Manatee County Line
Monday, June 19, 2017HCC Southshore Campus551 24th St NERuskin, FL 3357010:00 am – 12:00 pm(10:30 presentation)
Tuesday, June 27, 2017CDC of Tampa1907 E. Hillsborough Ave #100Tampa, FL 336106:00 pm – 8:00 pm(6:30 presentation)
Thursday, July 6, 2017Kate Jackson Community Center821 S. Rome AveTampa, FL 336066:00 pm – 8:00 pm(6:30 presentation)
Monday, July 10, 2017University Area CDC14013 North 22nd StTampa, FL 336136:00 pm – 8:00 pm(6:30 presentation)
Public Hearing
Wednesday, July 26, 2017HART Ybor, 1201 E. 7th Ave
Tampa, FL 336055:30 pm – 7:00 pm
Public Workshops
Your opinion is critical in designing transit service as HART plans for the next 10 years.
PUBLIC HEARING AND OUTREACH MEETINGSProposed Service Changes & Transit Development Plan Update
HART is analyzing how public transportation in Hillsborough County is currently being delivered, and what that service might look like in the future. Doing both a review of the current network, and planning for service over the next ten years allows HART to essentially “reset” the transit network, providing a strong foundation for future expansion.
During the first phase of outreach on the Transit Development Plan, we asked for your input on your commuting habits and your preferences for service additions or changes.
In this next phase, we need your input on the proposed service changes, and the various options that are being considered.
Help plan the next 10 years of HART service.
Join us at any of the following open-house style community meetings:
Special Accommodations:Any person requiring special accommodations to attend or participate, pursuant to the Americans with Disabilities Act,
should contact HART within at least three (3) business days prior to the meeting at (813) 384-6553.
Any questions concerning these community meetings and the public hearing may be directed to HART Service Development, 1201 East 7th Ave, Tampa, FL 33605, or by email
at [email protected] / HARTinfo Line: (813) 254-4278 / TDD: (813) 626-9158
You can also visit goHART.org/TDP for more information on this important plan being developed by HART.
Tuesday, June 20, 2017Marion Transit Center1211 N. Marion StTampa, FL 336026:30 am – 8:30 am and 4:00 pm – 6:00 pm
Wednesday, June 21, 2017University Area Transit Center13110 N. 27th StTampa, FL 336126:30 am – 8:30 am and 4:00 pm – 6:00 pm
Thursday, June 22, 2017Northwest Transfer Center9325 W. Waters AveTampa, FL 336156:30 am – 8:30 am and 4:00 pm – 6:00 pm
Sunday, June 25, 2017Tampa Outdoor Market – Al Barnes Jr. Park2902 N 32nd StTampa, FL 336051:00 pm – 4:00 pm
Sunday, June 25, 2017Multicultural Family DayWater Works Park1710 N Highland AveTampa, FL 3360211:00 am – 7:00 pm
Tuesday, June 27, 2017Marion Transit Center1211 N. Marion StTampa, FL 336026:30 am – 8:30 am and 4:00 pm – 6:00 pm
Wednesday, June 28, 2017University Area Transit Center13110 N. 27th StTampa, FL 336126:30 am – 8:30 am and 4:00 pm – 6:00 pm
Wednesday, June 28, 2017Town ‘N Country Public Library7606 Paula Drive #120Tampa, FL 336155:30 pm – 7:00 pm
Thursday, June 29, 2017West Tampa Transfer Center4201 N Himes AveTampa, FL 336076:30 am – 8:30 am and 4:00 pm – 6:00 pm
Thursday, July 6, 2017 Westfield- Brandon Transfer Center459 Brandon Town Center MallBrandon, FL 335116:30 am – 8:30 am and 4:00 pm – 6:00 pm
Friday, July 7, 2017netp@rk Transfer Center 5003 N. 56th StTampa, FL 336106:30 am – 8:30 am and 4:00 pm – 6:00 pm
Saturday, July 15, 2017Hillsborough County Neighborhoods Conference Sheraton Tampa East 10221 Princess Palm AveTampa, FL 336108:00 am – 2:30 pm
Saturday, July 15, 2017Brandon Mall – Back to School Bash459 Brandon Town Center MallBrandon, FL 3351110:00 am – 3:00 pm
Additional Outreach Opportunities
Florida Department of Transportation RICK SCOTT GOVERNOR
11201 North McKinley Drive Tampa, FL 33612-6456
MIKE DEW SECRETARY
www.dot.state.fl.us
Date: June 07, 2017 Subject: Officials/Agencies Kick-Off Meeting West Busch Boulevard (SR 580) Corridor Study from North Dale Mabry Highway to North Nebraska Avenue Hillsborough County, Florida FDOT Financial Project ID Number: 435908-1-22-01 Dear Agency Partner: The Florida Department of Transportation (FDOT), District Seven has scheduled an officials/agencies kick-off meeting to discuss the above referenced project. The West Busch Blvd Corridor study limits extend from North Dale Mabry Highway to North Nebraska Avenue, a distance of approximately 3.3 miles. The study area includes portions of incorporated Hillsborough County and the City of Tampa. This notice has been sent to other public officials and agency representatives interested in the project. The meeting is scheduled for June 29, 2017, from 10:00 AM to Noon at the North Tampa Branch Library, 8916 North Boulevard, Tampa, Florida 33604. The purpose of the Corridor Study is to work with the community, stakeholders and a Project Advisory Group (PAG) to develop a vision and identify needs and issues in the corridor. At the kick-off meeting, we hope to identify PAG participants from the area to help develop a vision for the corridor that will guide proposed short and long-term recommendations. This may include issues related to capacity, traffic operations, safety, access and egress, mobility, freight movements, transit, bicycles, and pedestrian movements. Public participation is solicited without regard to race, color, national origin, age, sex, religion, disability or family status. Persons who require special accommodations under the Americans with Disabilities Act or persons who require translation service (free of charge) should contact Christopher Speese, Public Involvement Coordinator, at (813) 975-6405 or (800) 226-7220 at least seven (7) working days in advance of the meeting.
The environmental review, consultation, and other actions required by applicable federal environmental laws for this project are being, or have been, carried out by the Florida Department of Transportation (FDOT) pursuant to 23 U.S.C. §327 and a Memorandum of Understanding dated December 14, 2016 and executed by the Federal Highway Administration and FDOT. If you require further information concerning this project, please contact Brian Shroyer, Florida Department of Transportation Project Manager at 813-975-6449 or by email at [email protected].
Sincerely,
Brian Shroyer Multimodal Project Manager
Florida Department of Transportation