139
Meeting of the Transportation Disadvantaged Coordinating Board (TDCB) Friday, June 23, 2017, 9:30 a.m. County Center, 18 th Floor - Plan Hillsborough Committee Room I. Call to Order and Pledge of Allegiance II. Public Comment 3 minutes per speaker, please III. Approval of Minutes February 24, 2017 and April 27, 2017 IV. Action Items A. Community Transportation Coordinator Eligibility Procedures (Kelly Kelley, TDCB Member) B. HART Operations and Maintenance Feasibility Study (Kasey Cursey, AECOM and Allison Yeh, MPO Staff) C. Community Transportation Coordinator Service Rates (Karen Smith, Sunshine Line) D. Transportation Disadvantaged Coordinating Board Grievance Review (Michele Ogilvie, MPO Staff) E. Transportation Disadvantaged Coordinating Board Bylaws (Michele Ogilvie, MPO Staff) V. Status Reports A. Vision Zero (Gena Torres, MPO Staff) B. HARTPlus Update (Greg Brackin, HART) C. Sunshine Line Report (Scott Clark, Sunshine Line) VI. Old Business & New Business VII. Adjournment VIII. Addendum A. MPO Committee Report B. HART Round 2 Outreach: Transit Development Plan C. West Busch Blvd Study Kickoff The full agenda packet is available on the MPO’s website, www.planhillsborough.org, or by calling (813) 272-5940. The MPO does not discriminate in any of its programs or services. Public participation is solicited without regard to race, color, national origin, age, sex, religion, disability or family status. Learn more about our commitment to non-discrimination Commissioner Lesley “Les” Miller, Jr. Hillsborough County MPO Chairman Councilman Harry Cohen City of Tampa MPO Vice Chairman Paul Anderson Tampa Port Authority Wallace Bowers HART Trent Green Planning Commission Commissioner Ken Hagan Hillsborough County Commissioner Pat Kemp Hillsborough County Mayor Kim Leinbach Temple Terrace Joe Lopano Hillsborough County Aviation Authority Mayor Rick A Lott City of Plant City Councilman Guido Maniscalco City of Tampa Commissioner Sandra Murman Hillsborough County Cindy Stuart Hillsborough County School Board Councilman Luis Viera City of Tampa Joseph Waggoner Expressway Authority Commissioner Stacy R. White Hillsborough County Beth Alden, AICP Executive Director Plan Hillsborough planhillsborough.org [email protected] 813 - 272 - 5940 601 E Kennedy Blvd 18 th Floor Tampa, FL, 33602

Meeting of the Transportation Disadvantaged Coordinating ... · Meeting of the Transportation Disadvantaged Coordinating Board(TDCB) Friday, June 23, 2017, 9:30 a.m. County Center,

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Meeting of the Transportation Disadvantaged Coordinating ... · Meeting of the Transportation Disadvantaged Coordinating Board(TDCB) Friday, June 23, 2017, 9:30 a.m. County Center,

Meeting of the Transportation Disadvantaged Coordinating Board (TDCB) Friday, June 23, 2017, 9:30 a.m. County Center, 18th Floor - Plan Hillsborough Committee Room

I. Call to Order and Pledge of Allegiance

II. Public Comment – 3 minutes per speaker, please

III. Approval of Minutes – February 24, 2017 and April 27, 2017

IV. Action Items

A. Community Transportation Coordinator Eligibility Procedures (Kelly Kelley,

TDCB Member)

B. HART Operations and Maintenance Feasibility Study (Kasey Cursey,

AECOM and Allison Yeh, MPO Staff)

C. Community Transportation Coordinator Service Rates (Karen Smith,

Sunshine Line)

D. Transportation Disadvantaged Coordinating Board Grievance Review

(Michele Ogilvie, MPO Staff)

E. Transportation Disadvantaged Coordinating Board Bylaws (Michele Ogilvie,

MPO Staff)

V. Status Reports

A. Vision Zero (Gena Torres, MPO Staff)

B. HARTPlus Update (Greg Brackin, HART)

C. Sunshine Line Report (Scott Clark, Sunshine Line)

VI. Old Business & New Business

VII. Adjournment

VIII. Addendum

A. MPO Committee Report

B. HART Round 2 Outreach: Transit Development Plan

C. West Busch Blvd Study Kickoff

The full agenda packet is available on the MPO’s website, www.planhillsborough.org, or by calling (813) 272-5940. The MPO does not discriminate in any of its programs or services. Public participation is solicited without regard to race, color, national origin, age, sex, religion, disability or family status. Learn more about our commitment to non-discrimination

Commissioner Lesley “Les” Miller, Jr.

Hillsborough County MPO Chairman

Councilman Harry Cohen City of Tampa

MPO Vice Chairman

Paul Anderson Tampa Port Authority

Wallace Bowers HART

Trent Green Planning Commission

Commissioner Ken Hagan Hillsborough County

Commissioner Pat Kemp Hillsborough County

Mayor Kim Leinbach Temple Terrace

Joe Lopano Hillsborough County

Aviation Authority

Mayor Rick A Lott City of Plant City

Councilman Guido Maniscalco

City of Tampa

Commissioner Sandra Murman

Hillsborough County

Cindy Stuart Hillsborough County

School Board

Councilman Luis Viera City of Tampa

Joseph Waggoner Expressway Authority

Commissioner Stacy R. White

Hillsborough County

Beth Alden, AICP Executive Director

Plan Hillsborough planhillsborough.org

[email protected] 813 - 272 - 5940

601 E Kennedy Blvd 18th Floor

Tampa, FL, 33602

Page 2: Meeting of the Transportation Disadvantaged Coordinating ... · Meeting of the Transportation Disadvantaged Coordinating Board(TDCB) Friday, June 23, 2017, 9:30 a.m. County Center,

Persons needing interpreter services or accommodations for a disability in order to participate in this meeting, free of charge, are encouraged to contact Michele Ogilvie, 813-273-3774 x317 or [email protected], three business days in advance of the meeting. Also, if you are only able to speak Spanish, please call the Spanish help line at (813) 273-3774, ext. 211. Si necesita servicios de traducción, el MPO ofrece por gratis. Para registrarse por estos servicios, por favor llame a Michele Ogilvie directamente al (813) 273-3774, ext. 317 con tres días antes, o [email protected] de cerro electronico. También, si sólo se puede hablar en español, por favor llame a la línea de ayuda en español al (813) 273-3774, ext. 211. In accordance with Title 17 U.S.C. Section 107, materials attached are for research and educational purposes, and are distributed without profit to MPO Board members, MPO staff, or related committees or subcommittees the MPO supports. The MPO has no affiliation whatsoever with the originator of attached articles nor is the MPO endorsed or sponsored by the originator. Persons wishing to use copyrighted material for purposes of their own that go beyond ‘fair use’ must first obtain permission from the copyright owner.

Page 3: Meeting of the Transportation Disadvantaged Coordinating ... · Meeting of the Transportation Disadvantaged Coordinating Board(TDCB) Friday, June 23, 2017, 9:30 a.m. County Center,

HILLSBOROUGH COUNTY 

TRANSPORTATION DISADVANTAGED COORDINATING BOARD 

MEETING OF FEBRUARY 24, 2017 

MINUTES 

 

CALL TO ORDER AND PLEDGE OF ALLEGIANCE 

 

The meeting was called to order by Vice‐Chair, Ms. Gloria Mills at 9:35 a.m., 

and the Pledge of Allegiance took place.  The meeting was held in the Planning 

Commission Board Room on the 18th floor of the County Center.   

 

Members  present:  Councilman  Harry  Cohen;  Gloria Mills;  Leslie  Pokres; 

Tiffany Kohnen; Dave Newell; Penelope Barnard; Kristina Melling; Dr. Leslene 

Gordon; Shelley Barthel; Dr. Fred Barja; Becki Forsell; and Artie Fryer.  

 

Others present:  Beth Alden, Michele Ogilvie, Wade Reynolds, Wanda West, 

MPO Staff; Scott Clark, Karen Smith, Sunshine Line.  

 

PUBLIC COMMENT 

 

There were no public comments. 

 

APPROVAL OF MINUTES (December 9, 2016) 

 

MOTION by Gloria Mills  to approve  the December 9, 2016 minutes. The 

motion was seconded by Dr. Barja and carried. 

 

ACTION ITEMS 

 

A. Community Transportation Coordinator Annual Evaluation Report  

Ms.  Ogilvie,  MPO  staff  congratulated  the  Board  on  being  named  Local 

Coordinating Board of the year for 2016.  The Hillsborough County BOCC is the 

CTC for Hillsborough County.   Sunshine Line and HART Plus are the operators 

providing trips for those served by the service.  Ms. Ogilvie described the funding 

Page 4: Meeting of the Transportation Disadvantaged Coordinating ... · Meeting of the Transportation Disadvantaged Coordinating Board(TDCB) Friday, June 23, 2017, 9:30 a.m. County Center,

TDCB Minutes February 24, 2017

2

mechanisms  for  the  program  and  the metrics  for  the  evaluation,  including  a 

customer survey.  Ms. Ogilvie noted that road calls for vehicles were an area that 

did  not meet  the  standard,  but  that  these  calls were  down  from  the  previous 

evaluation.  Gloria Mills wanted clarification on the formula that CTD uses for trip‐

counting procedures.  Scott Clark provided clarification. 

Becki Forsell asked Mr. Clark if he was coming to the CTC meeting in Tallahassee 

and  suggested  asking  for  a motion  to  bring  the  issue  forward  and  explain  to 

legislators.  Ms. Forsell also wanted to know where HART was with the fare box 

technology.   Dr. Gordon wanted more  information on the reliability of Sunshine 

Line by the number of road calls.  Sunshine Line just surplused the last 2007 vehicle.  

Mr. Clark  said  that by  2018  the  Sunshine Line  should be  back  to  their normal 

schedule of vehicle replacements.  Mr. Clark reported that 2016 had seen a decent 

on time service report.  The Fleet Director has advocated to get buses replaced and 

Sunshine Line has been replacing the vehicles.   

Following the presentation, Dr. Gordon made comments about the display of the 

performance criteria and that it should read consecutively by year and moving left 

to right so that it is easier to read.   

MOTION  by  Artie  Fryer  to  approve  the  CTC  Evaluation  and  its 

recommendations and transmit to the Florida Commission for the Transportation 

Disadvantaged. The motion was seconded by Gloria Mills and carried. 

Board members acknowledged work done by Tindale Oliver and staff on the report. 

 

B.  George Road Health Impact Assessment  

Page 5: Meeting of the Transportation Disadvantaged Coordinating ... · Meeting of the Transportation Disadvantaged Coordinating Board(TDCB) Friday, June 23, 2017, 9:30 a.m. County Center,

TDCB Minutes February 24, 2017

3

Allison Nguyen, Florida Department of Health – Hillsborough and Wade Reynolds, 

MPO staff presented the update.   

Nancy Pacifico wanted clarification on the speed limit of the segment near Memorial 

Hwy.  Mr. Reynolds stated that it was 35 MPH on George Road. 

Becki Forsell asked about statistics on crime in the area/related to costs for the project 

for  additional  lighting  and  if  that would  take  priority  over  sidewalks  or  other 

improvements.   

Mr. Reynolds stated that data is available from the last 5 years and that crime maps 

are in the report.  Ms. Ogilvie clarified that all the improvements are proposed as a 

package.   

Ms. Ogilvie stated that the report can be emailed to the board and that it is available 

on the MPO’s website.   

Nancy Pacifico mentioned the importance of lighting on Memorial Hwy. 

Following the presentation, there were no questions.   

MOTION by Artie Fryer, seconded by Kristina Melling to accept the report and 

recommend approval to the MPO Board. The motion passed. 

 

C.  2017  Legislative  Message  for  Transportation  Disadvantaged  Day  in 

Tallahassee  

Michele Ogilvie, MPO staff provided information on the educational process.  Becki 

Forsell has been  the  representative  in Tallahassee over  the past  few years.   The 

request is for Board approval.   

Page 6: Meeting of the Transportation Disadvantaged Coordinating ... · Meeting of the Transportation Disadvantaged Coordinating Board(TDCB) Friday, June 23, 2017, 9:30 a.m. County Center,

TDCB Minutes February 24, 2017

4

Nancy Castellano plans on being  in Tallahassee and struggles with  the TD  trips 

provided vs. what the formula is in other places (suggested adding a footnote to 

state how the count is made – counting mechanism vs. service point).   

Dr.  Barja made  comments  regarding  being  treating  fairly  in  the  allocation  of 

funding.  Mr. Clark suggested a total of all three agencies to give a picture of what 

the tri‐county region is doing or take out altogether.  Ms. Forsell stated that she has 

contacted all senators and has received 30 responses.  Kristina Melling suggested 

including client testimony to put a face on who we are serving.  TD consumer served 

(comparison of clients and who we served).  Capture what the need and GAP are 

and show what additional funds are needed and what they are needed for. 

MOTION by Nancy Castellano, seconded by Becki Forsell.  The motion carried 

unanimously. 

 

D.  TDCB Appointee to the Citizen Advisory Committee  

Wade  Reynolds, MPO  staff  told  the  Board  that  the MPO  Citizen’s  Advisory 

Committee is seeking a volunteer for the Transportation Disadvantaged appointee. 

Nancy Pacifico volunteered. 

MOTION by Dr. Barja and seconded by Becki Forsell. Motion carried.  

Nancy Castellano agreed to be the backup. 

 

STATUS REPORTS 

 

A.  Northwest Transit Study   

Sarah McKinley, MPO staff provided an update.   

 

Page 7: Meeting of the Transportation Disadvantaged Coordinating ... · Meeting of the Transportation Disadvantaged Coordinating Board(TDCB) Friday, June 23, 2017, 9:30 a.m. County Center,

TDCB Minutes February 24, 2017

5

The study evaluated the use of transit in the area and how the population could best 

be served noting that some of the lines were underperforming.  A Metrorapid line 

is planned for the Northwest Corridor and a flex route is proposed.  Becki Forsell 

mentioned that the Northdale area was not talked about and that all buses were 

taken from this area; Ms. Forsell explained this are needs more transportation and 

previously had better service.   Ms. McKinley mentioned that HART does have a 

Metrorapid route planned for Dale Mabry.   

Nancy Castellano had questions regarding the Town ‘n Country Flex Route.  Nancy 

Pacifico wanted clarification on HyperLINK and thinks adding the Oldsmar and 

Westchase areas is a nice addition.     

There was extensive discussion on routes and ridership in the northwest.   

Nancy Castellano asked how many surveys were sent out, Ms. McKinley clarified 

that large numbers of surveys were distributed via email through Constant Contact 

and through HART as well as at events in the community.   

 

B.  Transportation Disadvantaged Return on Investment – Hillsborough 

Mr. Brandon Berry, MPO Intern presented the study and explained that these 

trips  include medical,  training,  nutrition,  employment,  and  life  sustaining 

trips.   

Dr. Gordon had an inquired about the assumption of benefits of medical and 

nutritional trips.  Nancy Castellano wanted to know what was included in the 

number  of  trips  (Ambulatory/non‐wheelchair  trips).    It  was  suggested  to 

include the benefits of medical & nutritional trips dollar figure being added to 

the information that is being presented in Tallahassee in order to present these 

Page 8: Meeting of the Transportation Disadvantaged Coordinating ... · Meeting of the Transportation Disadvantaged Coordinating Board(TDCB) Friday, June 23, 2017, 9:30 a.m. County Center,

TDCB Minutes February 24, 2017

6

statistics in the best possible way.  It was suggested to include ambulance trips 

as well. (The information will be used in the narrative) 

 

C. Federal Transit Administration 5310 Applicants and Awards  for Fiscal 

Year 2016‐2017 

 

Dave Newell, FDOT  reported  that  applications were due  in December.    35 

applications were received from 29 agencies.  As always there was more asked 

for than funds available.  Approximately $3.7 million was awarded last year.   

A breakdown of the numbers will be sent out to Board.   

Mr. Clark wanted  to know  if we  could get  the  list and asked  if vehicle  life 

expectancy information is available?   

Mr. Clark suggested they we should advocate for funding with the 5310 funds 

and that we should bring up when we go to Tallahassee. 

 

D.  Sidewalk Inventory and Construction Costs Update 

Wade Reynolds, MPO staff provided an update on the presence of sidewalks 

in all four jurisdictions.   

Dr. Barja had a question regarding the cost of cement vs. the cost of installed 

sidewalks. 

Ms. Forsell said that she spoke with Representative Castor and there’s extra 

money available from the federal government.   If there’s money available, we 

should be asking for it and protecting our population.  Ms. Forsell suggested 

that we get a proposal to Representative Castor to fund sidewalks in the area.   

Page 9: Meeting of the Transportation Disadvantaged Coordinating ... · Meeting of the Transportation Disadvantaged Coordinating Board(TDCB) Friday, June 23, 2017, 9:30 a.m. County Center,

TDCB Minutes February 24, 2017

7

Councilman Cohen stated that he was  in the process of getting  information.  

(Ms. Castor wanted to know if the group could get something together within 

the next couple of months) 

MOTION from Becki Forsell and seconded by Nancy Castellano to compile 

the need and data on sidewalks and work with the jurisdictions to present a 

proposal to Representative Castor (Mr. Reynolds restated the motion).  The 

motion was approved.   

 

E.  Sunshine Line Report 

 

Mr. Scott Clark, Sunshine Line informed the Board of compliments that have 

been received regarding drivers and staff.  Two dimensions were added to the 

door‐to‐door  survey  and  there  have  been  increased  HART  Plus  passes.  

Sunshine Line has started Saturday service and  it has been extremely slow.  

Also,  they have started a pilot project with Aging Services with  their active 

seniors program. 

Nancy  Castellano wanted  to  know  if  the  customer  service  representatives 

informed seniors of Saturday services.  They are working with Kemly (HART) 

informing their customer service about Sunshine Line and use this as a  joint 

training opportunity.  Also, they are having a call center school for customer 

service representatives. By May/June they should be moved into a new facility.  

A meeting with Hillsborough Hope,  focusing on  the elderly,  took place  this 

year and looked at population growth of seniors and addressing transportation 

Page 10: Meeting of the Transportation Disadvantaged Coordinating ... · Meeting of the Transportation Disadvantaged Coordinating Board(TDCB) Friday, June 23, 2017, 9:30 a.m. County Center,

TDCB Minutes February 24, 2017

8

needs.  12 buses are being purchased this year and 4 Toyota Siennas are being 

replaced with MV1s. 

 

OLD BUSINESS AND NEW BUSINESS 

 

NONE 

 

The next meeting is scheduled for Thursday, April 27, 2017at 6:00 PM. 

 

ADJOURNMENT 

 

There being no further business, the meeting adjourned at 11:25 AM. ADDENDUM 

 

A. MPO Committee Report 

 

The  full  agenda  packet  is  available  on  the  MPO’s  website, 

www.planhillsborough.org, or by calling (813) 272‐5940. 

 

The MPO does not discriminate  in any of  its programs or services. Public 

participation  is solicited without regard to race, color, national origin, age, 

sex, religion, disability or family status.  Learn more about our commitment 

to non‐discrimination 

 

Persons needing  interpreter  services or accommodations  for a disability  in order  to 

participate in this meeting, free of charge, are encouraged to contact Michele Ogilvie, 

813‐273‐3774 x317 or [email protected], three business days in advance of the 

meeting.  Also, if you are only able to speak Spanish, please call the Spanish help line 

at (813) 273‐3774, ext. 211. 

 

Si necesita servicios de traducción, el MPO ofrece por gratis. Para registrarse 

por estos servicios, por favor llame a Michele Ogilvie directamente al (813) 273‐

Page 11: Meeting of the Transportation Disadvantaged Coordinating ... · Meeting of the Transportation Disadvantaged Coordinating Board(TDCB) Friday, June 23, 2017, 9:30 a.m. County Center,

TDCB Minutes February 24, 2017

9

3774, ext. 317 con tres días antes, o [email protected] de cerro electronico. 

También, si sólo se puede hablar en español, por favor llame a la línea de ayuda 

en español al (813) 273‐3774, ext. 211. 

 

In accordance with Title 17 U.S.C. Section 107, materials attached are for research and 

educational  purposes,  and  are  distributed without  profit  to MPO Board members, 

MPO staff, or related committees or subcommittees the MPO supports. The MPO has 

no  affiliation whatsoever with  the  originator  of  attached  articles  nor  is  the MPO 

endorsed or sponsored by the originator. Persons wishing to use copyrighted material 

for purposes of their own that go beyond ‘fair use’ must first obtain permission from 

the copyright owner. 

Page 12: Meeting of the Transportation Disadvantaged Coordinating ... · Meeting of the Transportation Disadvantaged Coordinating Board(TDCB) Friday, June 23, 2017, 9:30 a.m. County Center,

HILLSBOROUGH COUNTY

MEETING AND ANNUAL PUBLIC HEARING OF THE TRANSPORTATION DISADVANTAGED COORDINATING BOARD

(TDCB)

COUNTY CENTER BUILDING

601 E. KENNEDY BLVD.

MEETING OF APRIL 27, 2017

MINUTES

I. CALL TO ORDER AND PLEDGE OF ALLEGIANCE

The public hearing was called to order by Vice Chair Gloria Mills at 6:07 PM and was held in the Plan Hillsborough Room on the 18th floor of the County Center Building. Roll Call and the Pledge of Allegiance were held at this time.

II. PUBLIC HEARING

Roll Call of Board Members: Dr. Fred Barja, Penelope Barnard, Kelly Kelley, Kristina Melling, Vice Chair Gloria Mills

Others present: Beth Alden, Wade Reynolds, Allison Yeh – MPO Staff, Greg Brackin, Gamal Gasser, Georgette Petit-Homme, Scott Clark, Karen Smith

Welcome (TDCB Chair, Councilman Cohen)

As Councilman Harry Cohen was not present, Vice Chair Gloria Mills welcomed the board members and public attendees.

Public Comment:

Georgette Petit-Homme suggested that ADA revise safety for customers using HARTPlus, recounting two customer service experiences she felt were not handled adequately. She also thanked the TDCB for making transportation available to everyone.

Gamal Gasser, a member of Hillsborough Organization for Progress and Equality, requested that the Board of County Commissioners set up an affordable housing trust fund. He also requested senior citizen care, such as providing elderly individuals transportation to a place of worship once per week. He suggested that individuals often

Page 13: Meeting of the Transportation Disadvantaged Coordinating ... · Meeting of the Transportation Disadvantaged Coordinating Board(TDCB) Friday, June 23, 2017, 9:30 a.m. County Center,

do not know about the services available to them, and recommended promotion or advertising.

Adjourn Public Hearing & Call Regular Meeting to Order:

Ms. Kelly Kelley moved to adjourn the public hearing at 6:14. Vice Chair Mills immediately called the next meeting to order.

III. ACTION ITEMS

A quorum was not reached during this meeting. While Community Transportation Coordinator Service Rate and Unified Planning Work Program Update presentations were held, members did not vote on these action items.

A. Approval of Minutes – February 24, 2017

A quorum was not reached, so approval of February 2017’s minutes was moved to the following meeting.

B. Community Transportation Coordinator (CTC) Service Rates for 2016/2017 (Karen Smith, Sunshine Line)

Ms. Karen Smith of Sunshine Line presented on the CTC service rate updates for 2016 and 2017. Ever year the CTC completes a rate worksheet, which determines the rates reimbursed for each trip provided. The CTC submits projected trips and miles for the following year, which determines rates for the following year’s grant. The CTC expects this year’s grant amount to be the same as for the prior year, which was approximately $2.1 million. From the prior year, the rates are increasing approximately 2%. Ms. Smith mentioned that the rates will need to be approved at the June 2017 meeting so that they are included in the grant agreement, and so that the language is included in the Transportation Disadvantaged Service Plan.

As the TDCB did not meet a quorum, no action was taken. There were no questions.

C. Transportation Disadvantaged Coordinating Board Grievance Procedures

A quorum was not reached, so the TDCB Grievance Procedures action item was moved to the following meeting.

D. Transportation Disadvantaged Coordinating Board By-laws

A quorum was not reached, so the TDCB By-laws action item was moved to the following meeting.

E. Unified Planning Work Program (UPWP) Update (Allison Yeh, MPO Staff)

Page 14: Meeting of the Transportation Disadvantaged Coordinating ... · Meeting of the Transportation Disadvantaged Coordinating Board(TDCB) Friday, June 23, 2017, 9:30 a.m. County Center,

Ms. Allison Yeh of the MPO presented on the UPWP update, as the MPO is nearing the end of its fiscal year. The UPWP outlines major planning tasks, documents federal and state funding, ensures the MPO is complying with federal and state rules, and coordinates federally-funded planning tasks performed by the MPO, HART and FDOT. The purpose of the update is to make final adjustments to the Fiscal Year 2017 budget, update the budget and tasks based on annual funding allocations, and update administrative documents.

The UPWP contains the MPO’s six major planning tasks, including transportation planning management, system and corridor planning, the Long Range Transportation Plan (LRTP) and data collection, the Transportation Improvement Plan (TIP), public participation, and local and regional coordination and planning. Ms. Yeh outlined the projects to be completed in FY 2017, continuing projects in FY 2017, and projects identified for FY 2018. She ended the presentation outlining the funding for the six UPWP tasks in FY 2017 and 2018.

As the TDCB did not reach a quorum, no action was taken. There were no questions.

IV. STATUS REPORTS

A. Plant City Walk-Bike Plan Update (Wade Reynolds, MPO staff)

Mr. Reynolds provided an update on the Plant City Walk-Bike Plan. The team is currently in the process of developing a draft plan, after which it will finalize the plan in May 2017. A public meeting was held in February, which produced additional points of interest for the plan and a general comment map. The plan is structured to provide a vision and executive summary, which includes a list of community priorities, an existing conditions assessment, recommendations, and an action plan. The priority projects for the Plan are providing a minimum grid for bikeways, a canal trail, and pedestrian safety improvements. Next steps will involve completing the assessment, identifying bicycle network facility recommendations, holding a steering committee meeting to finalize recommendations and policies, completing a draft document, and presenting the document to the Plant City City Commission. After the document is finalized, the Plan will be presented to the Hillsborough MPO Committees and Board.

There were no questions.

B. HARTPlus Customer Choice Voucher Program – 1st year report (Greg Brackin, HART)

Mr. Greg Brackin of HART presented on the first year report for the HARTPlus Customer Choice Voucher Program, also known as the paratransit voucher or Yellow Cab program. The program began in January 2016. As of March 2017, 56,606 trips have been taken using the Voucher Program. The current rate paid to Yellow Cab is $16 per trip of 7.6 miles or less, with a cost to the customer of $4. The Voucher Program has saved HART

Page 15: Meeting of the Transportation Disadvantaged Coordinating ... · Meeting of the Transportation Disadvantaged Coordinating Board(TDCB) Friday, June 23, 2017, 9:30 a.m. County Center,

over $1 million compared to providing the trips themselves, and has helped absorb the 8% growth rate in paratransit over prior years. Customer pick-up and drop-off metrics have improved in 2017 compared to 2016 metrics as well. Mr. Brackin ended the presentation with a discussion of recent updates, including HART’s Tesla last-mile rollout in the University Area.

Discussion ensued about the positive impact of the Yellow Cab program on planning for paratransit trips, managing peak time response, customer service call volume, and contract length.

C. Sunshine Line Report (Scott Clark, Sunshine Line)

Mr. Scott Clark reported on some of the compliments that the Sunshine Line recently received, and followed by presenting the March monthly report. In March 2017, 14,246 Sunshine Line trips were completed. That number is more than a 12% increase from previous months. Sunshine Line received 27 compliments, 2 complaints, and had a 93% on-time rate during this month. The average caller hold time for customers was 60 seconds, down from a standard of 120 seconds. Sunshine Line’s average cost per trip was $27.34 during this month.

Mr. Clark followed with a vehicle update. The purchase price of buses has increased to more than $80,000, resulting in Sunshine Line updating their fleet projections. Sunshine Line originally intended to purchase 16 buses, but have now decided to purchase 10 buses and six MV-1s. The MV-1s cost approximately $30,000 less up front and $37,000 less to maintain over their lifespan. Both vehicles are ADA compliant.

Discussion ensued about the cost per trip to Sunshine Line.

V. OLD BUSINESS & NEW BUSINESS

A. MPO Regional Coordination Structure Research & Best Practices Study (Beth Alden, MPO Director)

Ms. Beth Alden of the Hillsborough County MPO informed members of the Board about an upcoming stakeholder workshop regarding best practices for regional planning organizations. This workshop precedes independent research that will begin on July 1, 2017. The stakeholder workshop will be held at St. Petersburg College’s Collaborative Labs on Friday, May 12 from 10 AM to 2 PM, and the MPO will provide transportation to anyone who requests it. The workshop will involve four subjects, including how a regional planning organization should advance major regionally-significant partnerships, how cities and counties can maintain their unique character under a regional organization, the kind of planning that will ideally occur at the regional level, and how to house and pay for a regional organization. Interested members were informed to RSVP with Anthony Matonti.

Discussion ensued about how to confirm attendance and the location of the workshop.

Page 16: Meeting of the Transportation Disadvantaged Coordinating ... · Meeting of the Transportation Disadvantaged Coordinating Board(TDCB) Friday, June 23, 2017, 9:30 a.m. County Center,

ADJOURNMENT

There being no further business, the meeting adjourned at 7:03 PM.

Page 17: Meeting of the Transportation Disadvantaged Coordinating ... · Meeting of the Transportation Disadvantaged Coordinating Board(TDCB) Friday, June 23, 2017, 9:30 a.m. County Center,

Board & Committee Agenda Item

Agenda Item: Community Transportation Coordinator (CTC) Eligibility Procedures Presenter: Michele Ogilvie, MPO staff and Kelly Kelley, Board Member Summary: Florida Administrative Code Chapter 41-2 establishes the Commission for

the Transportation Disadvantaged (CTD) with the assigned responsibility to accomplish the coordination of transportation services provided to the transportation disadvantaged. The statute also establishes the role of the Metropolitan Planning Organization (MPO) as the designated official planning agency to perform long-range planning and assist the Commission and a Local Coordinating Board in implementing the transportation disadvantaged program in designated service areas. The Code includes the purpose and responsibilities of the Coordinating Board to identify local service needs and to provide information, advice, and direction to the Community Transportation Coordinator on the coordination of services to be provided to the transportation disadvantaged through the Florida Coordinated Transportation System. Each Coordinating Board is recognized as an advisory body to the Commission for Transportation Disadvanatged (CTD) in its service area. Recently, the CTD issued a letter stating that the eligibility process for the CTC-Sunshine Line “would not meet the requirement of obtaining an application and backup documentation in order to determine eligibility”. The letter is attached. The Planning Subcommittee of this Coordinating Board met on May 31, 2017 to discuss the letter from the CTD. The Subcommittee made the following observations: a. The Sunshine Line provides a safety net for essential door to door

transportation to clients within 2 days of eligibility including HARTPlus clients who may wait as long as 45 days for eligibility

b. The Sunshine Line eligibility process meets the standard for non- self-eligibility declaration

c. Sunshine Line serves 350 clients per month d. Implementation of a paper process will incur costs that cannot be

immediately absorbed by the agency e. The Priority for the Transportation Disadvantaged is RIDES, RIDES,

RIDES.

Plan Hillsborough planhillsborough.org

[email protected] 813 - 272 - 5940

601 E Kennedy Blvd 18th floor

Tampa, FL, 33602

Page 18: Meeting of the Transportation Disadvantaged Coordinating ... · Meeting of the Transportation Disadvantaged Coordinating Board(TDCB) Friday, June 23, 2017, 9:30 a.m. County Center,

Recommended Action

1. Support the Planning Subcommittee’s observations as Findings of Fact 2. Request the MPO Board to support the Transportation Disadvantaged Coordinating Board’s Findings of Fact 3. Endorse Kelly Kelley as the Coordinating Board’s Representative 4. Request that this issue is placed on the CTD’s August Business Meeting Agenda

Prepared By Michele Ogilvie Attachments Commission for the Transportation Eligibility Letter

Community Transportation Coordinator Priorities TD Trust Fund Eligibility Criteria Sunshine Line Eligibility flow chart

Page 19: Meeting of the Transportation Disadvantaged Coordinating ... · Meeting of the Transportation Disadvantaged Coordinating Board(TDCB) Friday, June 23, 2017, 9:30 a.m. County Center,
Page 20: Meeting of the Transportation Disadvantaged Coordinating ... · Meeting of the Transportation Disadvantaged Coordinating Board(TDCB) Friday, June 23, 2017, 9:30 a.m. County Center,
Page 21: Meeting of the Transportation Disadvantaged Coordinating ... · Meeting of the Transportation Disadvantaged Coordinating Board(TDCB) Friday, June 23, 2017, 9:30 a.m. County Center,

EXERT TRANSPORTATION DISADVANATAGED SERVICE PLAN 43

3.1 COMMUNITY TRANSPORTATION COORDINATOR PRIORITIES

Due to limited resources, Sunshine Line must have priorities when providing service. Table 3-1

details the trips that are considered Priority I through Priority V. All other trips are scheduled as

resources are available.

TABLE 3-1: SUNSHINE LINE PRIORITIESPRIORITY I

Life sustaining medical (dialysis, chemotherapy, radiation, etc.)

Other medical appointments and treatment

Mental Health

Dental

Drug Treatment/Therapy

Pharmacy

Physical Therapy/Rehabilitation

PRIORITY II

Grocery

Human Services/Social Services

Shopping

Medical Records

Hospital Discharge

PRIORITY III

Personal Business (e.g.: government office, bank, post office, legal, hair appointments, etc.)

Employment for persons with disabilities

PRIORITY IV

Employment

Education

Recreation

Social

PRIORITY V

Other

Page 22: Meeting of the Transportation Disadvantaged Coordinating ... · Meeting of the Transportation Disadvantaged Coordinating Board(TDCB) Friday, June 23, 2017, 9:30 a.m. County Center,
Page 23: Meeting of the Transportation Disadvantaged Coordinating ... · Meeting of the Transportation Disadvantaged Coordinating Board(TDCB) Friday, June 23, 2017, 9:30 a.m. County Center,
Page 24: Meeting of the Transportation Disadvantaged Coordinating ... · Meeting of the Transportation Disadvantaged Coordinating Board(TDCB) Friday, June 23, 2017, 9:30 a.m. County Center,
Page 25: Meeting of the Transportation Disadvantaged Coordinating ... · Meeting of the Transportation Disadvantaged Coordinating Board(TDCB) Friday, June 23, 2017, 9:30 a.m. County Center,
Page 26: Meeting of the Transportation Disadvantaged Coordinating ... · Meeting of the Transportation Disadvantaged Coordinating Board(TDCB) Friday, June 23, 2017, 9:30 a.m. County Center,

2/17/2015

Determining Client Eligibility:

Page 27: Meeting of the Transportation Disadvantaged Coordinating ... · Meeting of the Transportation Disadvantaged Coordinating Board(TDCB) Friday, June 23, 2017, 9:30 a.m. County Center,

Board & Committee Agenda Item

Agenda Item

HART Operations and Maintenance Feasibility Study

Presenter

Rick Sparer, AECOM and Allison Yeh, MPO staff

Summary

HART’s service area covers approximately 1,000 square miles in Hillsborough County. The existing Operations and Maintenance facilities, located at 4305 E. 21st Avenue, services its entire bus fleet of almost 200 vehicles, which includes variously-sized transit buses, para-transit vehicles, and staff vehicles. The fleet consists of diesel, gasoline and Compressed Natural Gas (CNG) fueled vehicles. This operations and maintenance site is at maximum capacity. In addition to current overcrowding, changes in fleet size could occur due to expansion of para-transit services, adding additional CNG fueling tanks, or recommendations from on-going studies such as the Premium Transit Study or the Tampa Bay Next initiative. To efficiently respond to future needs, HART coordinated with the Hillsborough MPO on a preliminary feasibility study to determine the general “order of magnitude” of utilizing an additional location for operations and maintenance, considering short-range (relocating para-transit vehicles only) to long-range (relocating up to 100 vans and 100 buses) options. The existing facility at 21st Avenue would remain in operation and serve as the main Administration, Operations and Maintenance facility. The satellite facility would support parking and daily needs for drivers and minimal staff to operate the facility.

The study included working with HART to develop specific building and maintenance facility needs, real estate acreage requirements, and pre-concept level programming and budget requirements to be used by HART for future considerations. The general layout site plans included fueling, washing, fare collection and parking for vehicles, drivers and staff. The study lists the various minimal components of developing a new satellite facility, possibly combining services with other county facilities, or leasing a property that can serve as an interim solution. Developing these technical specifications for a future operations and maintenance facility will help HART to anticipate future needs and advance implementation as needed.

Plan Hillsborough planhillsborough.org

[email protected] 813 - 272 - 5940

601 E Kennedy Blvd 18th floor

Tampa, FL, 33602

Page 28: Meeting of the Transportation Disadvantaged Coordinating ... · Meeting of the Transportation Disadvantaged Coordinating Board(TDCB) Friday, June 23, 2017, 9:30 a.m. County Center,

Recommended Action

Approve the HART Operations and Maintenance Feasibility Study.

Prepared By

Allison Yeh, AICP, LEED GA

Attachments

HART Operations and Maintenance Feasibility Study – Final Draft

Page 29: Meeting of the Transportation Disadvantaged Coordinating ... · Meeting of the Transportation Disadvantaged Coordinating Board(TDCB) Friday, June 23, 2017, 9:30 a.m. County Center,
Page 30: Meeting of the Transportation Disadvantaged Coordinating ... · Meeting of the Transportation Disadvantaged Coordinating Board(TDCB) Friday, June 23, 2017, 9:30 a.m. County Center,

i

Executive Summary Hillsborough Area Regional Transit (HART)’s existing Operations and Maintenance site located at 4305 E. 21st Avenue, Tampa Florida services approximately 200 transit buses, para-transit vehicles and staff vehicles is at maximum capacity. Diesel and Compressed Natural Gas (CNG) vehicles are fueled at this facility. Vehicles (including buses) that require gasoline are taken off site to be refueled for the next day. All vehicles will be fueled by CNG, as the fleet is updated. With current overcrowding, proposed fleet changes that could occur such as expansion of para-transit service, adding additional CNG fueling tanks, or implementing recommendations from studies such as the Premium Transit Study or the Tampa Bay Express, will be difficult to accommodate efficiently. In coordination with the Hillsborough County Metropolitan Planning Organization (MPO), HART requested that a preliminary feasibility study be conducted to determine the general “order of magnitude” of utilizing an additional location for operations and maintenance of HART vehicles. This study will consider options for near-term (5 years) relocating/ expanding para-transit vehicles only and long-term (10-15 years) relocating/expanding up to 100 vans and 100 buses. The existing facility at 21st Avenue would remain in operation as the main Administration, Operations and Maintenance facility. The satellite facility would support a short to long-range scenario if deemed necessary in the future with parking and daily needs for drivers and minimal staff to operate the facility. The study included working with HART to develop specific building and maintenance facility needs, real estate acreage requirements, and pre-concept level programming and budget requirements to be used by HART for future considerations. The general layout site plans included fueling, washing, fare collection, support facilities and parking for revenue vehicles, drivers, and minimal staff. The study lists the various minimal components of developing a new satellite facility, possibly combining services with other county facilities, or leasing a property that can serve as an interim solution. The site screening process did not include contacting property owners. It was a general screening of properties located within a reasonable distance of current service routes, and met the size requirements for a small, medium or large facility. The site screening analysis determined if any potential sites existed within 8 miles (a reasonable distance for deadhead miles) of the current HART 21st Avenue facility. Site location criteria assumed a property could qualify for a “Categorical Exclusion” (CatEx) to avoid excessive time in securing the property. This requires the site to have a number of critical features such as the following: a) located in an area predominately zoned for light industrial and heavy commercial activities; b) access to arterial streets with adequate capacity to handle increased traffic and minimal traffic control improvements (no specific calculations were conducted); c) limited identification of known environmental issues; d) minimized deadhead cost; e) suitable size and geometric shape to permit efficient facility design; and f) availability and location of utilities, including CNG, and stormwater conveyance. Three scenarios identified the space planning and programming requirements for a small (100 para-transit vans), medium (50 bus and 50 para-transit vans) and large (100 bus and

Page 31: Meeting of the Transportation Disadvantaged Coordinating ... · Meeting of the Transportation Disadvantaged Coordinating Board(TDCB) Friday, June 23, 2017, 9:30 a.m. County Center,

ii

100 para-transit vans) site. Representative sites were identified and concept site plans were provided for each. Depending upon HART’s needs, phased construction could be considered in the design and construction of the selected site. The following are the minimum requirements (a site evaluation list) for potential HART sites (see details in body of this report and appendices):

Small Scenario: • 7– 10 acres • CNG service • 100 para-transit van and 50 service vehicle parking spaces • 239 employee and visitor parking spaces • 9,447 sq. feet for Operations Bldg. • 26,920 sq. feet for Maintenance Bldg. • 6,710 sq. feet for fueling and bus wash • 218,000 sq. feet for circulation, landscaping and stormwater treatment • Access to major arterial streets • Industrial zoning • Order of Magnitude of Cost $42.9 million

Medium Scenario:

• 15-18 acres • CNG service • 50 bus, 50 para-transit van and 18 service vehicle parking spaces • 269 employee and visitor parking spaces • 12,288 sq. feet for Operations Bldg. • 45,063 sq. feet for Maintenance Bldg. • 10,740 sq. feet for fueling and bus wash • 272,766 sq. feet for circulation, landscaping and stormwater treatment • Access to major arterial streets • Industrial zoning • Order of Magnitude of Cost $58.1 million

Large Scenario:

• 24-27 acres • CNG service • 100 bus, 100 para-transit van and 16 service vehicle parking spaces • 499 employee and visitor parking spaces • 15,115 sq. feet for Operations Bldg. • 63,380 sq. feet for Maintenance Bldg. • 11,124 sq. feet for fueling and bus wash • 454,015 sq. feet for circulation, landscaping and stormwater treatment • Access to major arterial streets • Industrial zoning • Order of Magnitude of Cost $75.5 million

Page 32: Meeting of the Transportation Disadvantaged Coordinating ... · Meeting of the Transportation Disadvantaged Coordinating Board(TDCB) Friday, June 23, 2017, 9:30 a.m. County Center,

iii

Table of Contents Executive Summary ......................................................................................................... i Background ..................................................................................................................... 1 Introduction ..................................................................................................................... 1 Space Planning and Programming Requirements .......................................................... 2 Space Programming Requirements Summary ................................................................ 2

Small Scenario: 100 Para-transit Vehicles - (7-10 Acres) ............................................ 3 Medium Scenario: 50 Buses – 50 Para-transit Vehicles - (15-18 Acres) ..................... 5 Large Scenario: 100 Buses – 100 Para-transit Vehicles - (24-27 Acres) ..................... 7

Site Screening Process ................................................................................................... 9 Screening Methodology ............................................................................................. 10 Representative Sites .................................................................................................. 15 Comparison of Deadhead Miles and Cost for Representative Sites .......................... 15

Order of Magnitude Cost Estimate ................................................................................ 18 Findings ......................................................................................................................... 19

List of Tables Table 1: Summary of Location Criteria and Potential Sites ........................................................10

List of Figures Figure 1 - Small Site Conceptual Plan ........................................................................................ 4 Figure 2 - Medium Site Conceptual Plan .................................................................................... 6 Figure 3 - Large Site Conceptual Plan ....................................................................................... 8 Figure 4 - Representative Site Location Map ............................................................................12 Figure 5 - Representative Site Location Map ............................................................................13 Figure 6 - Small, Medium, and Large Sites ...............................................................................16

List of Appendices–HART Operations and Maintenance Feasibility Study Appendix A: Detail Space Planning And Programming Requirements Appendix B: Coordination Memo With FDOT District 7 And Future Expressway Plans Appendix C: Detailed Cost Estimates

Page 33: Meeting of the Transportation Disadvantaged Coordinating ... · Meeting of the Transportation Disadvantaged Coordinating Board(TDCB) Friday, June 23, 2017, 9:30 a.m. County Center,

1

Background HART’s service area covers approximately 1,000 square miles in Hillsborough County, Florida. The existing Operations and Maintenance facilities are located at 4305 E. 21st Avenue, Tampa, Florida. HART services its entire fleet of approximately 200 vehicles at this facility, which includes various sized transit buses, para-transit vehicles, and staff vehicles. The fleet consists of diesel, gasoline and Compressed Natural Gas (CNG) fueled vehicles. Only the diesel and CNG vehicles are fueled at this facility. Vehicles (including buses) that require gasoline are taken off site to a nearby gas station and refueled for the next day. The 21st Avenue facility is currently operating above maximum capacity, and every available space is being utilized. With current overcrowding, proposed fleet changes that could occur such as expansion of para-transit service, adding additional CNG fueling tanks, or implementing recommendations from studies such as the Premium Transit Study or the Tampa Bay Express, will be difficult to accommodate efficiently. In coordination with the Hillsborough MPO, HART requested that a preliminary feasibility study be conducted to determine the general “order of magnitude” of utilizing an additional facility for operations and maintenance. As part of the feasibility exercise, HART is reviewing the parameters for an operations and maintenance satellite facility for a near term (5 years) relocating/expanding 100 para-transit vehicles to long-term (10-15 years) relocating/expanding 100 para-transit and 100 buses concept. The new site would be comprised of a combination of standard transit vehicles and para-transit vehicles. Fueling for all new vehicles is planned to be CNG at the new site, thus CNG must be available at the proposed site. HART has expressed the possibility of considering phasing construction of the new facility to start with all para-transit vehicles (up to 100), with the additional expansion of 100 buses over time. The existing facility at 21st Avenue will remain in operation and serve as the main Administration, Operations and Maintenance facility. The satellite facility would support parking and daily needs for drivers and minimal staff to operate the facility.

Introduction This technical memorandum provides HART and the MPO with basic order of magnitude programming and budget information for a potential satellite operation and maintenance facility. This memorandum includes documentation of the evaluation of HART’s current and future needs, identifies facility and real estate acreage requirements, and provides pre-concept level programming and budget requirements for the project. The objective of this technical memorandum is to identify the number of vehicles near term (5 years), and long term (10-15 years), which the new transit satellite facility could be designed to support. Based on input from HART and the MPO, it was recommended to consider three possible scenarios for a satellite facility:

Page 34: Meeting of the Transportation Disadvantaged Coordinating ... · Meeting of the Transportation Disadvantaged Coordinating Board(TDCB) Friday, June 23, 2017, 9:30 a.m. County Center,

2

Small - 100 para-transit vehicles Medium - 50 para-transit vehicles and 50 buses Large – 100 para-transit vehicles and 100 buses.

These scenarios will include fueling, washing, fare collection and basic daily needs for drivers and minimal staff. This technical memorandum outlines the various components of developing a transit facility. It is general in nature, but provides enough detail to outline the required acreage necessary to support each scenario.

Space Planning and Programming Requirements The space plan and program assessment provides requirements and space needs for each type of function and operational characteristics of the services that will be located at the new facility. The programs are divided among the six major components of the operation:

• Administration • Transportation/operations, including fare box drop and money counting room • Maintenance, including fueling (diesel and CNG) and bus wash • Service, including transfer center maintenance • Yard/parking • Site circulation and detention/retention of water.

This data will be used to determine the approximate size necessary for each facility. A matrix that shows the site size requirements versus the number of vehicles is provided in Appendix A, Tables 1-3 and illustrates scenarios for small (100 para-transit vans), medium (50 buses and 50 para-transit vans) to large (100 para-transit vans and 100 buses) options. A conceptual site plan for each facility is provided in the body of this document.

Space Programming Requirements Summary As expressed by interviews with HART staff and considering input from the MPO, the most immediate need would be a facility that would service para-transit vehicles. It was suggested that this feasibility study consider accommodating approximately 100 para-transit vehicles to support the existing fleet of approximately 40 vehicles, and any future expansion of service. Developing a para-transit satellite facility would also increase available space for transit buses at the existing 21st Avenue facility. A space planning assessment was completed by interviewing HART staff. The assumptions used for this exercise are the new site would only accommodate the needs for the administration, dispatching, and maintenance of the para-transit operations. The current fleet of gasoline powered vehicles at the 21st Avenue site will eventually change over to all CNG. All other HART administrative requirements such as procurement, purchasing, and planning would remain at the HART 21st Avenue facility. Maintenance requirements relating to painting vehicles, and storage of other equipment would remain at HART’s 21st Avenue facility.

Page 35: Meeting of the Transportation Disadvantaged Coordinating ... · Meeting of the Transportation Disadvantaged Coordinating Board(TDCB) Friday, June 23, 2017, 9:30 a.m. County Center,

3

Small Scenario: 100 Para-transit Vehicles (7-10 Acres) The assumption for this facility is it would service 100 para-transit vehicles and require approximately 7-10 acres, (10 acres are preferred), including a stormwater treatment pond. Appendix A, Table 1 provides a detailed breakdown of the space planning requirements for this type of small facility. The assumptions are that the satellite facility would only accommodate the needs for the administration, dispatching, and maintenance of the vehicles assigned to this location. The current fleet of gasoline powered vehicles at the 21st Avenue site will eventually change over to all CNG. The following is a summary of the findings:

The Operations Building would require 9,447 sq. feet. This includes administration area, dispatch, and driver’s area, which includes lockers, restrooms/shower, exercise room and driver’s lounge area. The Maintenance Building would require 26,920 sq. feet and include office areas for maintenance management staff, support areas such as a break area, restroom/locker/shower area, repair bays, including lifts, tire shop, shop storage areas, and parts storeroom. The Fuel and Bus Wash building and lanes would require 6,710 sq. feet. Fare collection would be included in the adjacent building. Parking for 100 para-transit vehicles and 37 non-revenue vehicles would require 76,000 sq. feet. Parking for employees and visitors would require 78,336 sq. feet. Storage area, including CNG compressor and tank area, generator and used tire storage, would require an additional 20,600 sq. feet. Circulation/landscape/setback/stormwater would require an additional 218,014 sq. feet. Total sq. feet is 436,027 sq. feet or 10.0 acres.

Figure 1 is a conceptual site plan that could accommodate these program requirements.

Page 36: Meeting of the Transportation Disadvantaged Coordinating ... · Meeting of the Transportation Disadvantaged Coordinating Board(TDCB) Friday, June 23, 2017, 9:30 a.m. County Center,

4

Figure 1 - Small Site Conceptual Plan

Page 37: Meeting of the Transportation Disadvantaged Coordinating ... · Meeting of the Transportation Disadvantaged Coordinating Board(TDCB) Friday, June 23, 2017, 9:30 a.m. County Center,

5

Medium Scenario: 50 Buses – 50 Para-transit Vehicles (15-18 Acres) Based on discussions with HART and MPO staff, a second option was considered. This medium scenario could accommodate up to 100 vehicles, and would include moving over the current para-transit service of 40+ vehicles and provide space for up to 50 buses. This scenario would also alleviate overcrowding at the 21st Avenue site. The assumptions are that the new site would only accommodate the needs for the administration, dispatching and maintenance of the vehicles assigned to this location. The current fleet of gasoline powered vehicles at the 21st Avenue site will eventually change over to all CNG.

Appendix A, Table 2 provides a detailed breakdown of the space planning requirements for this type of medium-sized facility. The following is a summary of the findings:

This facility would service 50 buses and 50 para-transit vehicles and require approximately 14 acres, including a stormwater treatment pond. The Operations Building would require 12,288 sq. feet. This includes an administration area, dispatch, driver’s area, which includes lockers, restrooms/shower, an exercise room and driver’s lounge area. The Maintenance Building would require 45,063 sq. feet and include office area for Maintenance Management staff, support area, such as a break area, restroom/locker/shower area, repair bays, including lifts, tire shop, shop storage areas, and parts storeroom. The Fuel and Bus Wash building and lanes would require 10,740 sq. feet. Fare collection would be included in the adjacent building. Parking for 50 standard 40 ft. buses and 50 para-transit vehicles, and 16 non-revenue vehicles would require 91,200 sq. feet. Parking for employees and visitors would require 88,776 sq. feet. Storage area, including a CNG compressor tank, above ground fuel tanks, generator, and used tire storage, would require 24,700 sq. feet. Circulation/landscape/setback/stormwater would require an additional 272,766 sq. feet. Total sq. feet is 545,532 sq. feet or 12.5 acres.

Figure 2 is a conceptual site plan that would meet these program requirements.

Page 38: Meeting of the Transportation Disadvantaged Coordinating ... · Meeting of the Transportation Disadvantaged Coordinating Board(TDCB) Friday, June 23, 2017, 9:30 a.m. County Center,

6

Figure 2 - Medium Site Conceptual Plan

Page 39: Meeting of the Transportation Disadvantaged Coordinating ... · Meeting of the Transportation Disadvantaged Coordinating Board(TDCB) Friday, June 23, 2017, 9:30 a.m. County Center,

7

Large Scenario: 100 Buses – 100 Para-transit Vehicles (24-27 Acres) Based on discussions with HART and MPO staff, a third option, or long-range need, would be for a large facility that would meet the needs for 200 vehicles, including 100 buses and 100 para-transit vans. This site could be phased in construction to meet the current 100 para-transit needs and provide for potential future expansion to meet HART’s long-range bus needs. This may be necessary if studies such as the Premium Transit Study or Tampa Bay Express recommend expansion of transit services. The assumptions are that the new site would only accommodate the needs for the administration, dispatching and maintenance of the vehicles assigned to this location. The current fleet of gasoline powered vehicles at the 21st Avenue site will eventually change over to all CNG. Appendix A, Table 3 provides a detailed breakdown of the space planning requirements for this facility. The following is a summary of the findings:

This facility would service 100 buses and 100 paratransit vehicles and require approximately 23 acres, including a stormwater treatment pond. The Operations Building would require 15,115 sq. feet. This includes an administration area, dispatch, driver’s area, which includes lockers, restrooms/shower, an exercise room and driver’s lounge area. The Maintenance Building would require 63,380 sq. feet and include an office area for Maintenance Management staff, support area, such as a break area, restroom/locker/shower area, repair bays, including lifts, a tire shop, shop storage areas, parts storeroom. The Fuel and Bus Wash Building and lanes would require 11,124 sq. feet. Fare collection would be included in the adjacent building. Parking for 100 standard 40 ft. buses, 100 para-transit vehicles, and 20 non-revenue vehicles, and would require 174,400 sq. feet. Parking for employees and visitors would require 163,296 sq. feet. Storage Area, including a CNG compressor tank, above ground fuel tanks, generator and used tire storage would require an additional 26,700 sq. feet. Circulation/landscape/setback/stormwater would require 454,015 sq. feet. Total sq. feet is 908,029 sq. feet or 20.8 acres.

Figure 3 is a conceptual site plan that could accommodate these program requirements.

Page 40: Meeting of the Transportation Disadvantaged Coordinating ... · Meeting of the Transportation Disadvantaged Coordinating Board(TDCB) Friday, June 23, 2017, 9:30 a.m. County Center,

8

Figure 3 - Large Site Conceptual Plan

Page 41: Meeting of the Transportation Disadvantaged Coordinating ... · Meeting of the Transportation Disadvantaged Coordinating Board(TDCB) Friday, June 23, 2017, 9:30 a.m. County Center,

9

Site Screening Process Various roadway improvements are either planned or underway throughout Hillsborough County that will improve supporting increased access for transit on arterials and the interstate system. As part of this planning exercise, the Florida Department of Transportation (FDOT) coordinated with HART and MPO staff to inquire about the feasibility of locating a satellite maintenance facility under the interstate as part of the Tampa Bay Express project or other projects supported by the FDOT. FDOT requested that HART and the MPO provide preliminary findings as to the feasibility of considering a small maintenance site, including an approximate acreage, when conducting the site screening task. Once a preliminary acreage of 7–10 acres for a small para-transit facility (100 vehicles) was determined), a summary memo was provided to the MPO, HART and the FDOT detailing the types of services that are integral to an operations and maintenance facility, and what a general small scenario site would require regarding safety and security. Appendix B includes the summary memo provided to the MPO, HART and FDOT. Considering that a satellite facility for HART would include CNG fueling (a safety concern), and the need to be fenced for security to accommodate 24-hour parking and fare collection, it was concluded that , a maintenance site was not the most appropriate transit facility to be placed under the interstate to improve transit access. This feasibility study did not focus on possible sites under the interstate as it moved forward. The site screening process did not include contacting property owners. It was a general screening of properties that are located within a reasonable distance of current service routes, and met the size requirements for a small, medium or large facility. The site screening analysis determined if any potential sites existed within 8 miles (a reasonable distance for deadhead miles) of the current HART 21st Avenue facility. Site location criteria assumed a property could qualify for a “Categorical Exclusion” (CatEx) to avoid excessive time in securing the property. This required the site to have a number of critical characteristics and features such as:

• Located in an area predominately zoned for light industrial and heavy commercial activities

• Located near an arterial street with adequate capacity to handle increased traffic due to the development of the facility. The level of service for the roadways will be identified at a later date. No calculations were conducted at this time.

• Limited identification of known environmental issues • Minimized deadhead cost • Access to arterial streets – minimal traffic control improvements • A suitable size and geometric shape to permit efficient facility design • Availability and location of utilities, including CNG • Stormwater conveyance

The site search included sites that are currently listed for sale, publicly owned property, or sites that have similar zoning compatible with a transit operations and maintenance facility. The screening also included coordination with TECO Gas to develop a listing of potential sites based on availability of CNG, or the possibility of CNG coming to that

Page 42: Meeting of the Transportation Disadvantaged Coordinating ... · Meeting of the Transportation Disadvantaged Coordinating Board(TDCB) Friday, June 23, 2017, 9:30 a.m. County Center,

10

area. Representatives from the Hillsborough County Public Schools were also contacted regarding potential use of school property near the existing HART 21st Avenue facility, and this coordination was documented for future coordination if HART resumes this study in the future.

Screening Methodology Potential sites within 8 miles of the existing HART facility were identified that were from 7 to 30 acres. The initial screening investigated vacant, industrially-zoned properties and locations that either have or could be serviced in the future by TECO for CNG. The search began with properties closest to the existing HART facility on 21st Avenue and expanded to approximately 8 miles outward. Initially, 19 potential sites that could support a satellite facility were identified using the following location criteria: availability of CNG service (coordination with TECO staff), surrounding land uses compatible with a maintenance facility, available acres, access to major arterials, distance from the existing HART 21st Avenue facility, and distance from a gasoline service station as back-up to any vehicles that may use the new facility, but would not be CNG-compatible. Table 1 is a summary of the potential sites. Table 1: Summary of Location Criteria and Potential Sites

Site #

CNG Service

Current Land Use

Size (Acres)

Access To Major Arterial

Distance For Existing HART Office (Miles)

Distance To

Gasoline Source

Surrounding Land Use

1 Yes-125psi

Public school with 13,000 sq. ft. bld.

5.52** I-4/ MLK 40th and 50th Street

Adjacent

.36 HART facility/Deli/Residential/ HCPS Instructional Service Center

2A Yes-125psi

Truck Parts/Sales Ctr. with 9,000 sq. ft. bldg.

2.39** I-4/ MLK 40th and 50th Street

Adjacent

.38 HART facility/Equipment rental/Skate park

2B Yes-125psi

Warehouse with 34,000 sq. ft. bldg.

4.07** I-4/ MLK 40th and 50th Street

Adjacent

.40 HART facility/Treatment Center/ Equipment rental/Skate park

3 Yes-125psi

Auto Sales/Ryder truck with 17,000 sq. ft. bldg.

1.43** I-4/ MLK 40th and 50th Street

.76 mi. southeast .27 HART facility/truck equipment rental

4 Yes-125psi

Auto Sales/Ryder truck

1.89** I-4/ MLK 40th and 50th Street

.60 southeast .52 Truck rental/motel

5 Yes-125psi

Packing Plants With 12,000 sq. ft. bldg.

1.36** I-4/ MLK 40th and 50th Street

.61 southeast

.47

Truck rental/motel

6 Yes-125psi

Warehouse C 3.40** I-4/ MLK 40th and 50th Street

.64 northwest .65 Residential, RR/Lumber Yard/Material supplier

7 Possible Vacant Commercial

4.3** Adamo Rd –Selmon Expressway- N 26th St.

2.38 southwest .65 Warehouse/ IKEA/ Toll Rd.

7A Possible Vacant Commercial

3.37** Adamo Rd –Selmon Expressway

2.45 southwest .67

Warehouse/ IKEA/ Toll Rd

8 Yes-125psi

Vacant Industrial 18.8 Orient Rd. - Adamo Dr.

4.5 southeast

2.2

Vacant land, CSX storage yard industrial uses

9 None Warehouse with 100,000 sq. ft. of bldg.

11.22 Canal w of I-75 and E of 301-E 27th St.

4.27 northeast .18

Warehouse/Industrial/Equipment rental

10 Yes-125psi

Vacant – Commercial/Borrow pit?

27.46 Harney Rd and Hillsborough Ave

3.05 northeast .52

Warehouse/metal recycling/truck parts and service/county property

Page 43: Meeting of the Transportation Disadvantaged Coordinating ... · Meeting of the Transportation Disadvantaged Coordinating Board(TDCB) Friday, June 23, 2017, 9:30 a.m. County Center,

11

Site #

CNG Service

Current Land Use

Size (Acres)

Access To Major Arterial

Distance For Existing HART Office (Miles)

Distance To

Gasoline Source

Surrounding Land Use

11 Yes-125psi

Vacant industrial 26.48 Grant park area 2.70 northeast

.64 Environmental area or Old Land fill to be researched

12 None Vacant industrial 18.16 30th St and 40th Street/US 41

4. 2 northwest .34 Industrial/commercial/residential/railroad

13 Yes-125psi

Vacant acreage 51.5/42. US 301-Temple Terrace Hwy/Harney Rd

6.6 northeast .40 Retail center/ US 301/Church Equipment repair/ pump rental/Dairy farm

14 None Vacant 18.7 US 301 and I 75 8.1 northeast Vacant/I-75 and residential/Southwest Florida Water Management District

15 None Vacant industrial 10.36 US 301 and I 75 5.8 southeast Office/warehouse 16 None Warehouse 10.32 Adamo Rd I 75 7.8 southeast Warehouse/commercial 17 Yes-

125psi Mixed use retail/vacant?

15.3 Causeway Blvd/ US 301

6.6 southeast

.5 Mix use retail/vacant/self -storage

** Note: Several small sites would need to be assembled to reach the minimum size for a facility Figures 4 and 5 indicate potential sites that were investigated. A summary follows: Site #1 is a publicly owned site that is 5.52 acres and located adjacent to the HART facility. CNG service is available and has excellent access to major arterial streets such as 40th Street and I-4. The current land use is a maintenance and parking area. The surrounding land uses are the HART facility, commercial and a small amount of residential. The nearest gasoline station is .4 miles from the site. Sites #2A and #2B are privately owned sites that total 6.46 acres and are located adjacent to the HART facility. CNG service is available and has excellent access to major arterial streets such as 40th Street and I-4. The current land use is a trucks parts/ sales and warehouse facility. The surrounding land uses are HART facility, retail and commercial. The nearest gasoline station is .4 miles from the site. Sites #3, #4 and #5 are privately owned sites that total 4.68 acres and are .6 miles from the HART facility. CNG service is available and has excellent access to major arterial streets such as 40th Street and I-4. The current land use is a trucks parts/ sales cold storage facility. The surrounding land uses are HART facility and commercial. The nearest gasoline station is .5 miles from the site. Site #6 is a privately owned site that totals 3.4 acres and is .6 miles from the HART facility. CNG service is available and has excellent access to major arterial streets such as 40th Street and I-4. The current land use is warehouse facility. The surrounding land uses are residential, commercial, and railroad. The nearest gasoline station is .6 miles from the site. Sites #7A and #7B are privately owned vacant sites that total 7.7 acres and are 2.4 miles from the HART facility. CNG service is not currently available; however, it could be in the future. This site has excellent access to arterial streets such as Adamo Drive and Selmon Expressway. The current land use is vacant commercial. The surrounding land uses are commercial and warehouses. The nearest gasoline station is .6 miles from the site.

Page 44: Meeting of the Transportation Disadvantaged Coordinating ... · Meeting of the Transportation Disadvantaged Coordinating Board(TDCB) Friday, June 23, 2017, 9:30 a.m. County Center,

12

Figure 4 - Representative Site Location Map

Page 45: Meeting of the Transportation Disadvantaged Coordinating ... · Meeting of the Transportation Disadvantaged Coordinating Board(TDCB) Friday, June 23, 2017, 9:30 a.m. County Center,

13

Figure 5 - Representative Site Location Map

Page 46: Meeting of the Transportation Disadvantaged Coordinating ... · Meeting of the Transportation Disadvantaged Coordinating Board(TDCB) Friday, June 23, 2017, 9:30 a.m. County Center,

14

Site #8 represents four parcels that are privately owned vacant sites that could total up to 18.7 acres and are 4.5 miles from the HART facility. CNG service is available. This site has excellent access to major arterial streets such as Adamo Drive and Orient Road. The current land use is vacant industrial. The surrounding land uses are industrial. The nearest gasoline station is 2.2 miles from the site. Site #9 is a privately owned site that is 11.2 acres and is 4.3 miles from the HART facility. CNG service is not available. This site has access to I-75 and US 301. The current land use is warehouse. The surrounding land uses are warehouse, industrial and equipment rental. The nearest gasoline station is 1.8 miles from the site. Site #10 is a privately owned vacant site that is 27.5 acres and is 3 miles from the HART facility. CNG service is available. This site has direct access to Harney Road and Hillsborough Avenue. The current land use is vacant commercial. The surrounding land uses are warehouse, industrial and auto repair. The site may need additional fill since it was used as an excavation area. The nearest gasoline station is .5 miles from the site. Site #11 is a privately owned vacant site that is 26.5 acres and is 2.7 miles from the HART facility. CNG service is available. This site has access to N. 56th Street. The current land use is a former land fill/ vacant industrial. The surrounding land uses are warehouse and industrial. The nearest gasoline station is .6 miles from the site. Site #12 is a privately owned vacant site that is 18.2 acres and is 4.2 miles from the HART facility. CNG service is available. This site has access to N. 56th Street. The current land use is vacant industrial. The surrounding land uses are warehouse, industrial, and residential. The nearest gasoline station is .3 miles from the site. Site #13 is a privately owned vacant site that is 52 acres and is 6.6 miles from the HART facility. CNG service is available. This site has access to US 301 and Harney Road. The current land use is vacant and is heavily forested. The surrounding land uses are retail, dairy farm and equipment repair. The nearest gasoline station is .4 miles from the site. Site #14 is a privately owned vacant site that is 18 acres and is 8.1 miles from the HART facility. CNG service is not available. This site has access to US 301 and I-75. The current land use is vacant. The surrounding land uses are I-75, vacant land owned by Southwest Florida Water Management District and residential. Site #15 is a privately owned vacant industrial site that is 10.4 acres and is 5.8 miles from the HART facility. CNG service is not available. This site has access to US 301 and I-75. The current land use is vacant industrial. The surrounding land uses are office and warehouse. Site #16 is a privately owned warehouse site that is 10.3 acres and is 7.8 miles from the HART facility. CNG service is not available. This site has access to Adamo Drive and I-75. The current land use is vacant commercial. The surrounding land uses are commercial and warehouse. Site #17 is a privately owned vacant site that is 15.3 acres and is 6.6 miles from the HART facility. CNG service is available. This site has access to Causeway Blvd. and US

Page 47: Meeting of the Transportation Disadvantaged Coordinating ... · Meeting of the Transportation Disadvantaged Coordinating Board(TDCB) Friday, June 23, 2017, 9:30 a.m. County Center,

15

301. The current land use is vacant retail. The surrounding land uses are retail/vacant and self-storage. The nearest gasoline station is .5 mile from the site.

Representative Sites After reviewing these possible 19 locations with HART and MPO staff, three sites were matched to the criteria for the small, medium and large sites as shown in Figure 6. This next step was conducted to create an order of magnitude for development costs. If HART is interested in pursuing additional feasibility analysis at any time in the future, a new property search will need to be conducted. Sites #7A and #7B best matched the representative small scenario (7-10 acres required) was a site that is 7.7 acres located approximately 2.4 miles from the existing HART facility. This site is assumed to support the dispatch of 100 para-transit vans. It is vacant land that is zoned commercial and has excellent access to major arterial roadways. The surrounding land uses are commercial and warehouse. Gasoline is available .65 miles from this location. CNG service is not currently available; however TECO Gas has indicated that it may be possible in the future. There are no known environmental issues. Site #8 best matched the representative medium site (approximately 17 acres required) was a site that is 18 acres, located approximately 4.5 miles from the existing HART facility. This site is assumed to support the dispatch of 50 buses and 50 para-transit vehicles. It is vacant land that is industrial. The access roads to the site may require some improvement considering the heavy bus traffic. It is within one mile of major arterial roadways. The surrounding land uses are commercial and warehouse. Gasoline is available 2.2 miles from this location. CNG service is available and can provide the 125 psi service required. There are no known environmental issues. Site #10 best matched the representative large site (approximately 21 acres required) was a site that is 27 acres located approximately 3.0 miles from the existing HART facility. It is vacant land that is zoned commercial and has excellent access to major arterial roadways. The surrounding land uses are commercial and industrial/warehouse. Gasoline is available 0.52 miles from this location. CNG service is available and can provide the 125 psi service required. The site may require additional fill to adjust the grades on the site. There are no known environmental issues.

Comparison of Deadhead Miles and Cost for Representative Sites Annual deadhead costs are a key factor in operating costs, therefore HART would prefer to minimize deadhead miles when considering a satellite facility location. Currently, all buses and para-transit vans begin and end their trips at the HART facility located at 4305 E. 21st Avenue. Data for all bus routes indicates that the 153 buses dispatched have a total of 3,300 daily deadhead miles. Using HART’s marginal cost of $3.79 per mile, this is estimated to be $12,507 daily for buses. HART’s 36 para-transit vehicles average 565 total daily deadhead miles. Using HART’s marginal cost of $2.55 per mile, this is estimated to be $1,440 daily.

Page 48: Meeting of the Transportation Disadvantaged Coordinating ... · Meeting of the Transportation Disadvantaged Coordinating Board(TDCB) Friday, June 23, 2017, 9:30 a.m. County Center,

16

Figure 6 - Small, Medium, and Large Sites

Page 49: Meeting of the Transportation Disadvantaged Coordinating ... · Meeting of the Transportation Disadvantaged Coordinating Board(TDCB) Friday, June 23, 2017, 9:30 a.m. County Center,

17

Representative Site Calculation for Deadhead miles – Three scenarios: The distance from the beginning and end points for revenue service for each bus route was calculated for each of the representative sites (small, medium and large). The estimated deadhead miles was calculated and divided by the 153 daily buses in order to get the new deadhead miles per bus. The bus cost per mile of $3.79 was applied to the new deadhead miles per bus to calculate the new estimated deadhead cost per bus. Since the deadhead miles for the para-transit vehicles is calculated based upon total revenue miles of service and vehicle miles of service, it is not possible to calculate the change in miles for each of the representative sites per vehicle. The para-transit vehicles begin and end for revenue service is variable based on first and last dispatched pickup. The distance from the representative sites and the existing HART facility was used to calculate the change in deadhead miles per vehicle. The para-transit cost per mile of $2.55 was applied to the new deadhead miles per vehicles to calculate the new deadhead cost per vehicle. Estimated Deadhead Cost for Small Site: The small site would be sufficient for 100 para-transit vehicles and the cost for the 100 vehicles was estimated at $4,638 per day. Estimated Deadhead Cost for Medium Site: The medium site was estimated for 50 buses ($4,770) and 50 ($2,447) para-transit vehicles or $7,217 per day for the 100 vehicles. Estimated Deadhead Cost for Large Site: The large site was estimated for 100 buses ($9,153) and 100 para-transit vehicles ($4,766) or $13,919 per day for the 200 vehicles.

Site Deadhead(DH) miles per bus

DH cost/ bus ($3.79/mi)

Estimated DH cost for 50 buses

Estimated cost for 100 buses

Existing HART 21.57 $81.75 $4,087 $8,175 Small 19.52 $73.97 Medium 25.17 $95.39 $4,770 Large 24.15 $91.53 $9,153

Site Deadhead(DH) miles per para-

transit Veh DH cost/veh

($2.55/mi) Estimated DH

cost for 50 veh. Estimated cost

for 100 veh.

Existing HART 15.69 $40.01 $2,000 $4,000 Small 19.52 $46.38 $4,638 Medium 25.17 $48.93 $2,447 Large 24.15 $47.66 $4,766

These deadhead costs are for comparison purposes since the actual number and the types of vehicles to be assigned to the new location has not been determined at this time.

Page 50: Meeting of the Transportation Disadvantaged Coordinating ... · Meeting of the Transportation Disadvantaged Coordinating Board(TDCB) Friday, June 23, 2017, 9:30 a.m. County Center,

18

Order of Magnitude Cost Estimate The purpose of this order of magnitude cost estimate is to provide cost information to plan, design, acquire land, construct and commission the proposed project. Order of magnitude costs provide an upper range of “expected” costs required to complete the planned conceptual scope for a facility. The site acquisition cost includes the fair market value of the representative property, costs associated with the real estate transaction (including buyers and owner’s appraisal fees), agency fees, broker fees, legal fees, surveying costs, and recording fees. This cost was developed based on average transactions in the area. It did not represent individual properties. The estimate included with this technical memorandum reflects order of magnitude cost for both Hard Cost and Soft Cost Program items.

Hard Cost items include: • Land Acquisition • Mobilization, general conditions, and demobilization • Site work and site development (excluding demolition, if required) • Facility utility services • Facility structures and roadways • Facility systems • Facility finishes • Vertical people movers • Testing and start-up

Soft Cost items include: • Project Planning and Development • Environmental Documentation and Clearance • Cost Estimating and Scheduling • Program Management and Controls • Permitting services and fees • Design services • Project insurance • Construction Management services • Outside agency force accounts; and • Transit Authority force accounts

Both the Hard Costs and Soft Costs include a contingency of 30 percent of their respective estimated amounts using 2017 dollars. Appendix C includes the detailed breakdown of the order of magnitude cost estimates for the small, medium and large representative sites. Small Scenario: A summary of the costs related to the representative Small Scenario site (100 para-transit vans) is as follows:

Page 51: Meeting of the Transportation Disadvantaged Coordinating ... · Meeting of the Transportation Disadvantaged Coordinating Board(TDCB) Friday, June 23, 2017, 9:30 a.m. County Center,

19

Land Acquisition (7 acres) $ 2,700,000 Building, Equipment, Site Development $32,200,000 Soft Costs (PE, Final Design, Const. Mgmt.) $ 8,000,000 Total $42,900,000

Note: costs include 30% contingency Medium Scenario: A summary of the costs related to the representative Medium Scenario site (50 buses and 50 para-transit vans) is as follows:

Land Acquisition (18 acres) $ 4,300,000 Building, Equipment, Site Development $43,000,000 Soft Costs (PE, Final Design, Const. Mgmt.) $10,800,000 Total $58,100,000

Note: costs include 30% contingency Large Scenario: A summary of the costs related to the representative Large Scenario site (100 buses and 100 para-transit vans) is as follows: Land Acquisition (27 acres) $ 5,600,000 Building, Equipment, Site Development $55,900,000 Soft Costs (PE, Final Design, Const. Mgmt.) $14,000,000 Total $75,530,000

Note: costs include 30% contingency

Findings This technical memorandum provides a preliminary feasibility study that determined the general “order of magnitude” of utilizing an additional facility for operations and maintenance for HART. Three scenarios identified the space planning and programming requirements for small (100 para-transit vehicles), medium (50 bus and 50 para-transit vehicles) and large (100 bus and 100 para-transit vehicles) sites. Representative sites were identified and concept site plans were provided for each in the body of this technical memorandum and in the Appendices. Depending upon HART’s needs, phased construction could be considered in the design and construction of the selected site. Order of Magnitude cost range from $42 million to $75 million. These findings can be used in the future by HART and the MPO if the need for a satellite facility is considered necessary for further study.

Page 52: Meeting of the Transportation Disadvantaged Coordinating ... · Meeting of the Transportation Disadvantaged Coordinating Board(TDCB) Friday, June 23, 2017, 9:30 a.m. County Center,

20

The following are the minimum requirements or site evaluation criteria for potential HART sites: Small Scenario:

• 7-10 acres • CNG service • 100 para-transit van and 50 service vehicle parking spaces • 239 employee and visitor parking spaces • 9,447 sq. feet for Operations Bldg. • 26,920 sq. feet for Maintenance Bldg. • 6,710 sq. feet for fueling and bus wash • 218,000 sq. feet for circulation, landscaping and stormwater treatment • Access to major arterial streets • Industrial zoning

Medium Scenario:

• 15-18 acres • CNG service • 50 bus, 50 para-transit van and 18 service vehicle parking spaces • 269 employee and visitor parking spaces • 12,288 sq. feet for Operations Bldg. • 45,063 sq. feet for Maintenance Bldg. • 10,740 sq. feet for fueling and bus wash • 272,766 sq. feet for circulation, landscaping and stormwater treatment • Access to major arterial streets • Industrial zoning

Large Scenario:

• 24-27 acres • CNG service • 100 bus, 100 para-transit van and 16 service vehicle parking spaces • 499 employee and visitor parking spaces • 15,115 sq. feet for Operations Bldg. • 63,380 sq. feet for Maintenance Bldg. • 11,124 sq. feet for fueling and bus wash • 454,015 sq. feet for circulation, landscaping and stormwater treatment • Access to major arterial streets • Industrial zoning

Page 53: Meeting of the Transportation Disadvantaged Coordinating ... · Meeting of the Transportation Disadvantaged Coordinating Board(TDCB) Friday, June 23, 2017, 9:30 a.m. County Center,

APPENDICES - HART OPERATIONS AND MAINTENANCE FEASIBILITY STUDY

Page 54: Meeting of the Transportation Disadvantaged Coordinating ... · Meeting of the Transportation Disadvantaged Coordinating Board(TDCB) Friday, June 23, 2017, 9:30 a.m. County Center,

APPENDIX A: DETAIL SPACE PLANNING AND PROGRAMMING REQUIREMENTS

Page 55: Meeting of the Transportation Disadvantaged Coordinating ... · Meeting of the Transportation Disadvantaged Coordinating Board(TDCB) Friday, June 23, 2017, 9:30 a.m. County Center,

1-Dec-16

Staff Space Area

Superintendent 12 x 20 1 240 Private office

Assistant Superintendent 12 x 15 1 180 Private office

Secretary/Clerk 8 x 10 1 80 Workstation

Clerk 8 x 10 1 80 Workstation

Copy/File/Work Room 12 x 12 144 144 Copier, fax, printer

Lobby 8 x 10 80 80

Conference Room 12 x 16 192 192 8-10 people

Street Supervisors 10 x 12 4 480 Private offices

Dispatch Offices with Clerks 16 x 16 6 256 256 Two separate Dispatches

Dispatch Vestibule 8 x 16 128 128Enclosed area in glass for business contact with

Dispatch Clerks, not part of outside access

Transfer Storage 10 x 10 100 100

Tracking and Communications 10 x 10 100 100Adjacent to Dispatch Office for tracking vehicles and

radio communications with drivers

Computer Area 10 x 16 160 160

Mailboxes (150) 10 x 16 160 160 Pass - thru mailboxes loaded from the Dispatch Office

Entrance/ Exit Vestibule 8 x 10 80 80

Driver's Room 32 x 32 150 1,024

TV Alcove 10 x 16 160 160

Vending/Kitchenette 10 x 15 150 150 Kitchenette w/sink, refrigerator, microwave, coffee

machine and 3 vending machines

Quiet Room/Dormitory 12 x 16 192 192 two beds and reading area

Exercise Room 16 x 18 288 288 Space for 4 pieces of exercise equipment

Locker Area (1/2 height) 150 300 150 lockers

Men's Restroom/Shower 24 x 48 1,152Space for 2 showers, 12 lockers, and three sets of toilet

facilities

Women's Restroom/Shower 24 x 48 1,152Space for 2 showers, 12 lockers, and four sets of toilet

facilities

Custodial Closet 10 x 12 120 120

Subtotal 164 6,998

Circ/Mech/Elec/Struc 2,449

9,447

Staff Space Area

Fleet Manager 16 x 24 1 384 Private office

Assistant Manger 12 x 20 0 Private office

Maintenance Director 12 x 20 1 240 Private office

Administrative Assistant 8 x 10 2 160 Workstation

Copy/File Area 10 x 12 120 120

Maintenance Supervisor 12 x 15 2 180 180 At Shop Floor - one per shift

Maintenance Counter/Library w/ computer 12 x 24 288 288 Window to Maintenance Supervisor Office

Radio Room 10 x 10 100 100

Training Office 12 x 15 1 180

Training Room w/ Modules 20 x 24 480 480

Audio/Visual Storage 12 x 16 192 192

Chair/Table Storage 12 x 20 240 240

Training Bay 24 x 50 1200 1200 Next to Training Room

Lunch/Break Room 18 x 24 40 432 432

Men's Restroom/Locker/Shower 30 x 34 1020 1020 3 toilet fixtures

Women's Restroom/Locker/Shower 16 x 26 416 416 3 toilet fixtures

Unisex Shop Restroom 8 x 10 1 80

Uniform Storage 10 x 16 160 160

Data/Communication Room 10 x 12 120 120

Custodial Closet 12 x 20 240 240 Storage for floor scrubbers

Chassis Wash 20 x 50 1 1000 Vertical lift flush with floor

Chassis Wash Equipment Room 12 x 18 1 216

Van Lift Bays 12 x 30 5 1800 Above ground platform lifts

Van Flat Bays 12 x 30 5 1800

Parts Cleaning Area 16 x 24 1 384 Steam Cleaning and Parts Cleaning Equipment

Repair Bays

4

35%

TOTAL - OPERATIONS

Area DescriptionSpace Space Program

RemarksStandard

MAINTENANCE

Office Areas

Support Areas

RemarksStandard

OPERATIONS

Administration

Dispatch

Driver Areas

HART Satellite FacilityPreliminary O & M Program

100 Vans

Area DescriptionSpace Space Program

Table 1:

A-1

Page 56: Meeting of the Transportation Disadvantaged Coordinating ... · Meeting of the Transportation Disadvantaged Coordinating Board(TDCB) Friday, June 23, 2017, 9:30 a.m. County Center,

Tire Shop 12 x 36 1 432 Shop and Storage beside Tire Bay

Tire Storage 10 x 16 1 160 119 van tires on tire carousel

Tire Bay 20 x 35 1 700 Inground self-contained one post hydraulic lift

Common Work Area 16 x 24 1 384

Battery Room 10 x 12 1 120

Portable Equipment Storage 10 x 20 1 200

Toolbox Storage 12 x 16 1 192

Parts Office 10 x 12 2 240 Private offices near Parts Counter

Work/copy/file 12 x 12 1 144

Parts Counter 10 x 12 1 120

Receiving Area 32 x 32 1 1024

Loading Dock 32 x 80 1 2560

Parts Storeroom 40 x 80 1 3200

Mezzanine 20 x 40 1 800

Tool Crib 10 x 10 1 100

Lube/Compressor Room 16 x 32 1 512

Subtotal 49 21,536 Mezz. sf @ 50%

Circ/Mech/Elec/Struc 5,384

TOTAL - MAINTENANCE 26,920

Staff Space Area

Office 10 x 12 1 120 Private office

Fare Box Storage and Counting Room 12 x 30 1 360

Fueling Positions (Gasoline & Diesel) 24 x 50 4 2 2400Four people to circulate the 90 operational vans for

fueling, check fluids, washing and interior cleaning

Vaccum Equipment Room 12 x 20 1 240

Fuel Management Equipment Room 10 x 10 1 100

Van Cleaning Supply Storage Room 10 x 10 1 100

Restrooms 8 x 10 1 80 Unisex

Lube/Compressor Room 12 x 16 1 192

Drive Through Vehicle Wash 20 x 60 1 1200

Reclaim/Support Equipment 20 x 40 1 800

Subtotal 5 5,592

Circ/Mech/Elec/Struc 1,118

6,710

Parking Areas

Vans (24') 10 x 30 100 30,000

Operations Non-Revenue Vehicles 10 x 20 30 6000

Maintenance Non-Revenue Vehicles 10 x 20 10 2000

Stacked Vehicle Parking Circulation 34,200

Tandem Vehicle Parking Circulation 38,000

Stacked Vehicle Parking Subtotal 72,200

Tandem Vehicle Parking Subtotal 76,000

Employee/Visitor Parking Areas

Employee 9 x 18 230 37,260

Visitor 9 x 18 4 648

Disability Parking 14 x 18 5 1260

Car Parking Circulation 39,168

Subtotal 78,336

Storage Areas

Emergency Generator 500

Alternative Fuel Equipment Farm 16,000 CNG Compressor and Tank Area

Tire Storage (used) 200

Trash/Recycling Dumpsters 400 Canopy Covered

Hazmat Storage 200

Disabled Van Storage 10 x 30 10 3,000

Employee Areas

Patio 300

Subtotal 20,600

174,936

Building Areas

Operations 9,447

Maintenance 26,920

SPACE NEEDS PROGRAM SUMMARY

TOTAL - PARKING & EXTERIOR

FUEL/WASH

Fuel Lane

Wash Lane

20%

TOTAL - FUEL/WASH

PARKING & EXTERIOR

90%

100%

100%

Tire Shop/Bay

Shop/Storage Areas

Storeroom

25%

Area DescriptionSpace Space Program

RemarksStandard

A-2

Page 57: Meeting of the Transportation Disadvantaged Coordinating ... · Meeting of the Transportation Disadvantaged Coordinating Board(TDCB) Friday, June 23, 2017, 9:30 a.m. County Center,

Fuel/Wash 6,710

Subtotal Building Areas 43,078

Site Areas

Stacked Bus Parking Areas (Urban Site) 72,200

Tandem Bus Parking Areas (Suburban Site) 76,000

Employee/Visitor Parking Areas 78,336

Exterior Storage Areas 20,600

Subtotal Urban Site 214,214

Circulation/Landscape/Setbacks/Stormwater 42,843

Subtotal Suburban Site 218,014

Circulation/Landscape/Setbacks 218,014

Total SF 436,027

Total acres / Vehicles per acre 10.01 3.6

257,056 square feet

5.9 acres

436,027 square feet

10.0 acresTOTAL SUBURBAN SITE REQUIREMENTS

20%

100%

TOTAL URBAN SITE REQUIREMENTS

A-3

Page 58: Meeting of the Transportation Disadvantaged Coordinating ... · Meeting of the Transportation Disadvantaged Coordinating Board(TDCB) Friday, June 23, 2017, 9:30 a.m. County Center,

31-Mar-17

Staff Space Area

Superintendent 12 x 20 1 240 Private office

Assistant Superintendent 12 x 15 1 180 Private office

Secretary/Clerk 8 x 10 1 80 Workstation

Clerk 8 x 10 1 80 Workstation

Copy/File/Work Room 12 x 12 144 144 Copier, fax, printer

Lobby 8 x 10 80 80

Conference Room 15 x 20 300 300 8-10 people

Street Supervisors 10 x 12 6 720 Private offices

Dispatch Offices with Clerks 16 x 24 6 384 384 Three separate Dispatches

Dispatch Vestibule 12 x 16 192 192Enclosed area in glass for business contact with Dispatch

Clerks, not part of outside access

Transfer Storage 10 x 15 150 150

Tracking and Communications 10 x 15 150 150Adjacent to Dispatch Office for tracking vehicles and

radio communications with drivers

Computer Area 10 x 16 160 160

Mailboxes (200) 10 x 18 180 180 Pass - thru mailboxes loaded from the Dispatch Office

Entrance/ Exit Vestibule 8 x 10 80 80

Driver's Room 32 x 54 200 1,728

TV Alcove 10 x 16 160 160

Vending/Kitchenette 10 x 15 150 150 Kitchenette w/sink, refrigerator, microwave, coffee

machine and 3 vending machines

Quiet Room/Dormitory 12 x 20 240 240 two beds and reading area

Exercise Room 16 x 18 288 288 Space for 4 pieces of exercise equipment

Locker Area (1/2 height) 200 800 200 lockers

Men's Restroom/Shower 24 x 52 1,248Space for 3 showers, 18 lockers, and three sets of toilet

facilities

Women's Restroom/Shower 24 x 52 1,248Space for 3 showers, 18 lockers, and three sets of toilet

facilities

Custodial Closet 10 x 12 120 120

Subtotal 216 9,102

Circ/Mech/Elec/Struc 3,186

12,288

Staff Space Area

Fleet Manager 16 x 24 1 384 Private office

Assistant Manger 12 x 20 0 Private office

Maintenance Director 12 x 20 1 240 Private office

Administrative Assistant 8 x 10 2 160 Workstation

Copy/File Area 10 x 12 120 120

Maintenance Supervisor 12 x 15 2 180 180 At Shop Floor - one per shift

Maintenance Counter/Library w/ computer 12 x 24 288 288 Window to Maintenance Supervisor Office

Radio Room 10 x 10 100 100

Training Office 12 x 15 1 180

Training Room w/ Modules 20 x 30 600 600

Audio/Visual Storage 12 x 16 192 192

Chair/Table Storage 20 x 20 400 400

Training Bay 24 x 60 1440 1440 Next to Training Room

Lunch/Break Room 20 x 24 60 480 480

Men's Restroom/Locker/Shower 30 x 34 1020 1020 3 toilet fixtures

Women's Restroom/Locker/Shower 16 x 26 416 416 3 toilet fixtures

Unisex Shop Restroom 8 x 10 2 160

Uniform Storage 10 x 18 180 180

Data/Communication Room 10 x 12 120 120

Custodial Closet 12 x 20 240 240 Storage for floor scrubbers

Chassis Wash - Vans 20 x 50 1 1000 Vertical lift flush with floor

Chassis Wash - Buses 20 x 60 1 1200 Vertical lift flush with floor

Chassis Wash Equipment Room 12 x 18 1 216

Bus Bays 20 x 60 4 4800 3 wireless portable lifts

A/C Bay - Body Bay 20 x 60 1 1200

PM/Inspection Bays 20 x 60 3 3600 3 wireless portable lifts

Van Lift Bays 12 x 30 3 1080 Above ground platform lifts

Van Flat Bays 12 x 30 2 720

Parts Cleaning Area 16 x 24 1 384 Steam Cleaning and Parts Cleaning Equipment

Tire Shop 12 x 50 1 600 Shop and Storage beside Tire Bay

Tire Storage 10 x 32 1 320 65 bus tires and 119 van tires on tire carousel

Tire Bay 24 x 55 1 1320 Inground self-contained one post hydraulic lift

Common Work Area 16 x 24 1 384

Electronics Shop 16 x 24 3 1 384 3 shifts w/ 1 workers each shift with electronic storage

Brake Storage 16 x 24 1 384

Facility Maintenance Office and Shop 20 x 20 1 400

Facility Storage 20 x 20 1 400

Battery Room 12 x 12 1 144

Portable Equipment Storage 12 x 20 1 240

Toolbox Storage 12 x 24 2 576

Parts Office 10 x 12 2 240 Private offices near Parts Counter

Driver Areas

HART Satellite FacilityPreliminary O & M Program

50 buses - 50 vans

Area DescriptionSpace Space Program

RemarksStandard

OPERATIONS

Administration

Dispatch

Repair Bays

4

35%

TOTAL - OPERATIONS

Area DescriptionSpace Space Program

RemarksStandard

MAINTENANCE

Office Areas

Support Areas

Tire Shop/Bay

Shop/Storage Areas

Storeroom

Table 2:

A-4

Page 59: Meeting of the Transportation Disadvantaged Coordinating ... · Meeting of the Transportation Disadvantaged Coordinating Board(TDCB) Friday, June 23, 2017, 9:30 a.m. County Center,

Work/copy/file 12 x 14 1 168

Parts Counter 10 x 20 1 200

Receiving Area 32 x 32 1 1024

Loading Dock 32 x 80 1 2560

Parts Storeroom 60 x 80 1 4800

Mezzanine 20 x 40 1 800

Tool Crib 10 x 15 1 150

Lube/Compressor Room 16 x 40 1 640

Subtotal 72 36,050 Mezz. sf @ 50%

Circ/Mech/Elec/Struc 9,013

TOTAL - MAINTENANCE 45,063

Staff Space Area

Office 10 x 12 1 120 Private office

Fare Box Storage and Counting Room 16 x 60 1 960

Fueling Positions (Gasoline & Diesel) 24 x 60 4 2 2880Four people to circulate the 80 operational vehicles for

fueling, check fluids, washing and interior cleaning

Vacuum Equipment Room 20 x 20 1 400

Fuel Management Equipment Room 10 x 12 1 120

Van Cleaning Supply Storage Room 10 x 15 1 150

Restrooms 8 x 10 1 80 Unisex

Lube/Compressor Room 12 x 20 1 240

Drive Through Vehicle Wash 20 x 80 2 3200

Reclaim/Support Equipment 20 x 40 1 800

Subtotal 5 8,950

Circ/Mech/Elec/Struc 1,790

10,740

Parking Areas

Vans (24') 10 x 30 50 15,000

Standard Bus (40') 12 x 45 50 27,000

Operations Non-Revenue Vehicles 10 x 20 12 2400

Maintenance Non-Revenue Vehicles 10 x 20 6 1200

Stacked Vehicle Parking Circulation 41,040

Tandem Vehicle Parking Circulation 45,600

Stacked Vehicle Parking Subtotal 86,640

Tandem Vehicle Parking Subtotal 91,200

Employee/Visitor Parking Areas

Employee 9 x 18 250 40,500

Visitor 9 x 18 10 1620

Disability Parking 14 x 18 9 2268

Car Parking Circulation 44,388

Subtotal 88,776

Storage Areas

Emergency Generator 500

Alternative Fuel Equipment Farm 16,000 CNG Compressor and Tank Area

Above Ground Deisel Fuel Equipment 1,800

Tire Storage (used) 300

Trash/Recycling Dumpsters 600 Canopy Covered

Hazmat Storage 200

Disabled Van Storage 10 x 30 10 5,000

Employee Areas

Patio 300

Subtotal 24,700

204,676

Building Areas

Operations 12,288

Maintenance 45,063

Fuel/Wash 10,740

Subtotal Building Areas 68,090

Site Areas

Stacked Bus Parking Areas (Urban Site) 86,640

Tandem Bus Parking Areas (Suburban Site) 91,200

Employee/Visitor Parking Areas 88,776

Exterior Storage Areas 24,700

Subtotal Urban Site 268,206

Circulation/Landscape/Setbacks/Stormwater 53,641

Subtotal Suburban Site 272,766

Circulation/Landscape/Setbacks 272,766

Total SF 545,532

Total acres / Vehicles per acre 12.52

321,847 square feet

7.4 acres

545,532 square feet

12.5 acres

25%

Area DescriptionSpace Space Program

RemarksStandard

TOTAL - PARKING & EXTERIOR

FUEL/WASH

Fuel Lane

Wash Lane

20%

TOTAL - FUEL/WASH

PARKING & EXTERIOR

90%

100%

100%

TOTAL SUBURBAN SITE REQUIREMENTS

SPACE NEEDS PROGRAM SUMMARY

20%

100%

TOTAL URBAN SITE REQUIREMENTS

A-5

Page 60: Meeting of the Transportation Disadvantaged Coordinating ... · Meeting of the Transportation Disadvantaged Coordinating Board(TDCB) Friday, June 23, 2017, 9:30 a.m. County Center,

Table 3:

A-6

Page 61: Meeting of the Transportation Disadvantaged Coordinating ... · Meeting of the Transportation Disadvantaged Coordinating Board(TDCB) Friday, June 23, 2017, 9:30 a.m. County Center,

A-7

Page 62: Meeting of the Transportation Disadvantaged Coordinating ... · Meeting of the Transportation Disadvantaged Coordinating Board(TDCB) Friday, June 23, 2017, 9:30 a.m. County Center,

APPENDIX B: COORDINATION MEMO WITH FDOT DISTRICT 7 AND FUTURE EXPRESSWAY PLANS

Page 63: Meeting of the Transportation Disadvantaged Coordinating ... · Meeting of the Transportation Disadvantaged Coordinating Board(TDCB) Friday, June 23, 2017, 9:30 a.m. County Center,

\ AECOM

7650 W. Courtney Campbell

Cswy

Tampa, FL 33607-1462

www.aecom.com

813 286-1711 tel

813 287-8591 fax

Memorandum

The FDOT District Seven is conducting multiple community and agency outreach events as part of the

Tampa Bay Express project, with the project’s limits including proposed improvements to both Interstate

275 (I-275) and Interstate 4 (I-4) in Hillsborough County. As part of the FDOT’s continued outreach

efforts to document the communities’ needs and desires for transportation services, the TBX team is

coordinating with the MPO and HART to identify potential opportunities to support transit services as

part of the TBX reconstruction. As part of the FDOT’s agency coordination on current projects, the

FDOT has inquired about this current Pre-Concept Study to identify if this type of transit facility could be

accommodated as part of the design features under the I-275/I-4 Interchange.

Project Background and Description: AECOM was issued a NTP in October 2016 to conduct a study

funded by the Hillsborough County MPO in support of the Hillsborough Area Regional Transit (HART)

Agency entitled: Pre-Concept Development for a New Satellite Operations and Maintenance Facility:

Feasibility Analysis and Site Location Study.

As part of the scoping process, HART provided the following parameters: HART’s service area covers

approximately 1,000 square miles in Hillsborough County, FL. The existing operations and maintenance

facilities are located at 4305 E. 21st Avenue and over time have been reconstructed to address an

expanding fleet. Changes in policy regarding fueling by CNG has also impacted use of the 21st Ave.

site as the total fleet eventually will be fueled by CNG and more CNG capacity will need to be added.

HART currently services its entire fleet of almost 200 vehicles, which includes various sized transit

buses and paratransit vehicles, at the 21st Ave. facility. The fleet consists of diesel, gasoline and CNG

fueled vehicles, and diesel and CNG fueling occurs at the current site. All gasoline-fueled vehicles are

taken for fueling off-site during the night. The existing facility has extensive flooding issues and HART

will be securing a design-build project in 2017 to reconstruct the heavy maintenance infrastructure at

the 21st Ave. site (grant funding) to improve the drainage issues and general construction features of

the building. However, the reconstruction will not increase capacity at the current facility, limiting

HART’s ability to effectively receive new CNG vehicles and retire vehicles over time, and most

importantly, to plan for growth.

To

Allison Yeh, AICP, Hillsborough County MPO, Executive

Planner and Project Manager Page 1

CC Alice Price, FDOT District 7, GEC

Subject

Agency Coordination:

FDOT District Seven Request for Progress on Pre-Concept Development for a

New Satellite Operations and Maintenance Facility; Feasibility Analysis and Site

Location Study

From Kasey Cursey, AICP, AECOM Tampa, FL

Date December 11, 2016

B-1

Page 64: Meeting of the Transportation Disadvantaged Coordinating ... · Meeting of the Transportation Disadvantaged Coordinating Board(TDCB) Friday, June 23, 2017, 9:30 a.m. County Center,

With current overcrowding of the existing facility and the anticipated expansion of the fleet, HART is

considering a new satellite facility that would service 200 vehicles (a combination of new vehicles and

existing vehicles from the 21st Avenue site). The new site would be comprised of a combination of

standard transit vehicles and para-transit vans, and the new satellite facility will need to include CNG

fueling. HART has expressed an interest in phasing the new facility to start with all vans (up to 100),

with the additional expansion of 100 buses. The existing facility at 21st Avenue will remain in operation

and serve as the main Administration, Operations and Maintenance Facility.

This AECOM study will be completed by June 2017 and will provide HART with basic “order of

magnitude” programming and budget information for the proposed new satellite site. AECOM will study

and evaluate HART’s current and future needs, identify facility and real estate requirements, and

provide pre-concept-level programming and budget requirements for the project. The result will be a

report that provides recommendations for acreage and potential locations for three possible satellite

scenarios: minimum (100 vans at new satellite site); mid-term (combination of 50-100 vans and 50

buses); and long-term, maximum (100 vans and 100 buses).

The Hillsborough County MPO has requested that AECOM respond to the FDOT’s agency coordination

request, and provide a draft finding on the minimum acreage needed to support a new satellite

maintenance facility (low-end scenario). As of December 9, 2016, AECOM has met with HART

planning, operations and maintenance staff to document current and projected services. At a minimum,

the new satellite facility would need to meet these fundamental requirements:

a) Acreage: A site that can accommodate a minimum of 100 vans, on-site CNG fueling, parking for

both drivers and dispatch employees, limited administrative services and restroom facilities, rest

and eating facilities for up to 100 drivers and other employees, and other required services such as

fare collection, maintenance and wash services.

b) Security: A site that can be fully-secured with fencing and an entrance gate to protect staff,

vehicles, CNG fueling tanks, and fare collection.

c) Access: A site that has adequate roadway access for 100 vans and employees to enter and exit

throughout the day, and eventually have adequate access for up to 100 buses (a total of 200

vehicles) to enter and exit with minimal delay during operating hours.

AECOM has documented the initial facility requirements and is working on detailing the recommended

site acreage and location. For FDOT’s request, this memo has been prepared to provide an initial idea

of how much acreage would be needed to meet a minimum maintenance facility for 100 vehicles.

AECOM has developed this initial acreage recommendation and compared it to requirements from

national examples and recent operations and maintenance facility design work conducted by AECOM

for LYNX in Orlando, FL and LeeTran in Fort Myers, FL.

Initial Site Acreage Requirements for Phase 1 Scenario (100 vans with CNG fueling on-site):

Based on needs identified by HART’s planning, operations and maintenance staff, AECOM’s initial

finding is for HART to consider sites that are a minimum of 10 acres (suburban site) to accommodate

the features of a maintenance facility (100 vans with CNG fueling and fenced-security) as identified in

data collection meetings with HART in November 2016. This draft finding is preliminary to assist

FDOT in providing agency project information during the community outreach process, and still

must be approved by HART and the MPO before a final recommendation is published in June

2017.

B-2

Page 65: Meeting of the Transportation Disadvantaged Coordinating ... · Meeting of the Transportation Disadvantaged Coordinating Board(TDCB) Friday, June 23, 2017, 9:30 a.m. County Center,

APPENDIX C: DETAILED COST ESTIMATES

Page 66: Meeting of the Transportation Disadvantaged Coordinating ... · Meeting of the Transportation Disadvantaged Coordinating Board(TDCB) Friday, June 23, 2017, 9:30 a.m. County Center,

MAINTENANCE BUILDING

OPS AND ADMIN

PARKING

GENERAL

POND

DETENTION

COLLECTION

FARE

WASH BAYS

FUELING &

CN

G T

AN

KS

100 PARA-TRANSIT VANS

10.2 AC.

APRIL 24, 2017

100 PARA-TRANSIT VANS

37 OPS AND MAINT NON REV

9 DISABLED/REPAIR VEHICLES

100 PARA-TRANSIT VANS

5 DISABILITY

4 VISITOR

254 EMPLOYEE

RE

PAIR V

EHIC

LE

S

9 DIS

AB

LE

D

37 OPS AND MAINT VEHICLES

C-1

Page 67: Meeting of the Transportation Disadvantaged Coordinating ... · Meeting of the Transportation Disadvantaged Coordinating Board(TDCB) Friday, June 23, 2017, 9:30 a.m. County Center,

HART Operations and Maintenance Facility Estimate

Small - (100 Van) Facility Order of Magnatidute Cost Estimate

Land acqusitionLand (purchse price) $6.50 sf 1,981,980$ Buyers' fees 54,514$ Appraisal 17,000$ Boundary Survey 10,000$ Environmental studies 50,000$ Subtotal 2,113,494$ Contingency 30.0% $634,048Total (Rounded) $2,700,000

Buildings and equipment DivisionGeneral Requirements 01 00 00 $2,420,800Existing Conditions 02 00 00 $0Concrete 03 00 00 $932,202Masonry 04 00 00 $825,156Steel & Metals 05 00 00 $2,477,549Wood, Plastics & Composites 06 00 00 $4,128Thermal & Moisture Protection 07 00 00 $3,262,492Openings 08 00 00 $799,550Finishes 09 00 00 $454,750Specialties 10 00 00 $374,953Equipment 11 00 00 $1,061,359Furnishings 12 00 00 $61,400Special Construction 13 00 00 $0Conveying Equipment 14 00 00 $850,815Fire Suppression 21 00 00 $390,939Plumbing 22 00 00 $1,097,243HVAC 23 00 00 $1,138,134Electrical 26 00 00 $1,633,307Communications 27 00 00 $267,011Electronic Safety & Security 28 00 00 $132,075Subtotal $18,183,863Contingency 30.0% $5,455,159Total (Rounded) $23,600,000

Site DevelopmentGeneral Requirements 01 00 00 213,500$ Concrete 03 00 00 1,790,330$ Specialties 10 00 00 70,000$ Electronic Safety & Security 28 00 00 265,850$ Earthwork 31 00 00 402,912$ Exterior Improvements 32 00 00 1,024,326$ Utilities 33 00 00 2,705,679$

C-2

Page 68: Meeting of the Transportation Disadvantaged Coordinating ... · Meeting of the Transportation Disadvantaged Coordinating Board(TDCB) Friday, June 23, 2017, 9:30 a.m. County Center,

Transportation 34 00 00 100,000$ Subtotal 6,572,597$ Contingency 30.0% $1,971,779Total (Rounded) $8,500,000

Hard Construction Cost Estimate $24,756,461Contingency 30.0% $7,426,938Total (Rounded) $32,200,000

Soft CostsPreliminary Engineering 4% 990,258$ Final Design 8% 1,980,517$ Project Manag. for Design and Construction 3% 742,694$ Construction Admin. And Management 6% 1,485,388$ Insurance 3% 742,694$ Legal: Permits: review fees 1% 247,565$ Subtotal 6,189,115$ Contingency 30.0% $1,856,735Total (Rounded) $8,000,000

Notes:Cost Estimating Assumptions;Estimates are prepared using current dollars (2017)Adequate experienced craft labor is availableNormal productivity rates as historically experienced are utilizedCompatible trade agreements exist in the regionNo strike impacts will be experienced by the projectThere are sufficient experienced contractors available to perform said workNormal Tampa area weather impacts to constructions scheduleExisting state of the art construction technology will be utilizedAssumes cooperation between stakeholdersTemporary Power is included in the General Conditions

C-3

Page 69: Meeting of the Transportation Disadvantaged Coordinating ... · Meeting of the Transportation Disadvantaged Coordinating Board(TDCB) Friday, June 23, 2017, 9:30 a.m. County Center,

HART Operations and Maintenance Facility100 Van Facility

by JRH

checked by KS 03/27/17

Division 1 - General Requirements

General Construction 16,920,000$ ls 10% $1,692,000

Building Systems Commissioning 1 ls 2% $338,400

Bonding Cost 18,800,000$ ls 0.80% $150,400

Submittals 1 ls 100,000$ $100,000

Testing and Surveying 1 ls 100,000$ $100,000

Contract Close-Out & As-Builds 1 ls 40,000.00$ $40,000

$2,420,800

Division 2

Spec. No. Existing Conditions Qty Units Unit Cost Total Comments

$0

$0

Division 2 Total $0

Division 3

Spec. No. Concrete Qty Units Unit Cost Total Comments

03 30 00 Continuous Footing, Footers and Piers 170 cy 500.00$ $85,000

03 30 00 Slab on Grade - Operations Area 9,477 sf 6.50$ $61,601

03 30 00 Slab on Grade- Maintenance and Service 33,630 sf 7.90$ $265,677

03 30 00 White non-metallic dryshake w/ sealant 8,100 sf 5.00$ $40,500

03 30 00 Topping on Epic Mezzanine Composite Deck 800 sf 12.50$ $10,000 3.5" conc on 3" deep deck03 30 00 Topping on Epic Maint Roof Comp. Deck 33,630 sf 10.89$ $366,231 3.25" conc on 2" deck 03 30 00 Topping on Epic Ops Roof Comp. Deck 9,477 sf 10.89$ $103,194

Division 3 Total $932,202

Division 4

Spec. No. Masonry Qty Units Unit Cost Total Comments

04 22 00 12" Block Wall 6,600 sf 20.00$ $132,000

04 22 00 8" Block Wall 6,666 sf 16.00$ $106,656

04 22 00 4" Glazed Block - one side glazed 900 sf 20.00$ $18,000

04 22 00 8" Glazed Block - two 4" glazed block one side 4,750 sf 38.00$ $180,500

04 22 00 8" Glazed Block - one side glazed 1,840 sf 30.00$ $55,200

04 22 00 12" SGFT both sides 1,920 sf 40.00$ $76,800

04 22 00 12" SGFT - 8" SGFT & 4" SGFT 6,400 sf 40.00$ $256,000

Division 4 Total $825,156

Division 5

Spec. No. Metals Qty Units Unit Cost Total Comments

05 12 00 Structural Steel (mat'l only) 326,670 lbs 2.10$ $686,007

05 12 00 Structural Steel (labor & equipment) 326,670 lbs 1.60$ $522,672

05 13 00 Misc. Metals 35,000 lbs 6.00$ $210,000

05 13 00 Stair Frames - 1 stairs @ 3,600 lbs 3.70$ $13,320

Stair Treads 22 ea 250.00$ $5,500

Handrails - steel for mezzanine stairs 54 lf 200.00$ $10,800

05 31 90 Bar Joist Roof System 276,904 lbs 2.50$ $692,260

05 32 00 Epic Composite Floor Deck - Mezzanine 800 sf 7.00$ $5,600

05 32 00 Epic Composite Roof Deck - OPS 9,447 sf 6.60$ $62,350

05 32 00 Epic Acoustic Composite Roof Deck 33,630 sf 8.00$ $269,040

Division 5 Total $2,477,549

Division 6

Spec. No. Wood, Plastics, Composites Qty Units Unit Cost Total Comments

06 10 00 Roof Carpentry

2x6 Roof Cap Blocking (2500 lf) 1250 bf 3.00$ $3,750

06 10 00 In-Wall Blocking

2x6 Misc. Blocking (210 lf) 105 bf 3.60$ $378

Division 6 Total $4,128

Division 7

Spec. No. Thermal and Moisture Protection Qty Units Unit Cost Total Comments

07 21 15 Batt Insulation- 4" unfaced sound batts 4608 sf 1.50$ $6,912

07 22 15 Roof Insulation - 4" Isocyanurate 43,077 sf 3.30$ $142,154

07 26 15 Slab Vapor Barrier 43,077 sf 0.35$ $15,077

07 40 10 Metal Wall Panels - 2'-6" H 50,762 sf 50.00$ $2,538,100 Centria 3"T Formawall Dim. Series w/insul.

Steel Stud Framing for Metal wall panels- 6" W 5,700 sf 4.69$ $26,733 Ops

Steel Stud Framing for Metal wall panels - 12"W 20,600 sf 6.50$ $133,900 Maintenance

07 54 15 Sarnafil PVC Roofing 43,077 sf 8.00$ $344,616

07 56 00 Roof Metal Coping 1500 ft 10.00$ $15,000

07 72 25 Roof Hatches 2-6x6-6 3 ea 3,500.00$ $10,500

C-4

Page 70: Meeting of the Transportation Disadvantaged Coordinating ... · Meeting of the Transportation Disadvantaged Coordinating Board(TDCB) Friday, June 23, 2017, 9:30 a.m. County Center,

07 84 20 Fire-Resistant Joint Sealants 1000 lf 2.50$ $2,500

07 92 15 Joint Sealants 15,000 lf 1.80$ $27,000

Division 7 Total $3,262,492

Division 8

Spec. No. Openings Qty Units Unit Cost Total Comments

08 10 00 Hollow Metal Door/Frame 3x7 Exterior Insulated 20 ea 1,100.00$ $22,000

08 10 00 Hollow Metal Door/Frame 6x7 Exterior Insulated 2 ea 1,800.00$ $3,600

08 10 00 Hollow Metal Door/Frame 3x7 Interior 54 ea 900.00$ $48,600

08 10 00 Hollow Metal Door/Frame 6x7 Interior 3 ea 1,350.00$ $4,050

08 30 00 Overhead Coiling Doors 12x12 15 ea 6,800.00$ $102,000

08 40 00 Entrance Doors - Kawneer Aluminum 4 ea 2,500.00$ $10,000

08 40 00 Entrance Windows - Kawneer Aluminum 4 ea 1,200.00$ $4,800

08 55 00 Windows - alum frame 52 ea 1,375.00$ $71,500 5'H x 5'L double pane w/ low-e coating

08 60 00Polycarbonate Monitor Windows - 140 L w/ 8' x 8'

sloped sides w/ aluminum frames8,960 sf 50.00$ $448,000

08 71 00 Finish Hardware $0 Included in door prices

08 90 00 Louvers and Vents 1 ls 15,000.00$ $15,000

Division 8 Labor & Equipment 1 ls 70,000.00$ $70,000 Doors and Windows Only

Division 8 Total $799,550

Division 9

Spec. No. Finishes Qty Units Unit Cost Total Comments

09 20 00 Drywall & Studs $0

One sided 1600 sf 4.00$ $6,400

Two sided to 10' 7,500 sf 6.80$ $51,000

One sided Ceiling 3820 sf 4.20$ $16,044

09 30 00 Ceramic Tile $0

Toilet Rooms 3820 sf 28.00$ $106,960

09 50 00 Ceilings $0

ACT at 10' AFF 8,000 sf 6.00$ $48,000

09 65 80 Resilient Tile & Carpet Flooring $0

Rubber Flooring - recycled tires 6,500 sf 8.00$ $52,000

Rubber Base Cove 1200 lf 3.40$ $4,080

Office Carpeting - carpet squares 175 sy 60.00$ $10,500

Rubber Base 935 lf 4.00$ $3,740

09 90 00 Painting $0

Interior Walls 16,600 sf 1.50$ $24,900

Interior Ceilings 3820 sf 1.80$ $6,876

Interior Ceilings - Industrial one-coat system 33,200 1.00$ $33,200

Epoxy and Enamel 27,000 sf 0.80$ $21,600

HM Door & Frames 84 ea 175.00$ $14,700

Metal OH Doors 18 ea 275.00$ $4,950

Anti Graffiti Coating 0 sf 1.60$ $0

09 90 10 Concrete Flooring Coating (Ashford Formula) 33,200 sf 1.50$ $49,800

sf $0

Division 9 Total $454,750

Division 10

Spec. No. Specialties Qty Units Unit Cost Total Comments

10 11 00 Markerboards - 4'h x 8'l 8 ea 500$ $4,000

10 11 00 Tackboards - 4'h x 8'l 16 ea 350$ $5,600

10 14 00 Exterior Identification Sign 1 ls 3,840$ $3,840

10 14 00 Door Identification Signs 60 ea 30$ $1,800

10 14 00 Maintenance Hazard Signs 50 ea 19$ $971

10 40 00 FE Cabinets 9 ea 660$ $5,940

10 40 00 Extinguisher 16 ea -$ $0 See Division 21

10 50 00 Full Height Lockers - 15"w x 18"d x 60" h 40 ea 750$ $30,000 Recycled plastic lockers

10 50 00 Full Height Lockers - 12"w x 15"d x 60"h 24 ea 690$ $16,560 Recycled plastic lockers

10 50 00 Half Height Lockers - 12" w x 18"d x 60"h 75 ea 780$ $58,500 Recycled plastic lockers

10 50 00 Locker Benches - 8 feet long 8 ea 520$ $4,160

10 21 13 Toilet Partitions - recycled plastic 12 ea 1,100$ $13,200

10 21 13 Urinal Partitions - recycled plastic 3 ea 400$ $1,200

10 21 90 Work Station Cubicals - 8' x 8' space 4 ea 2,048$ $8,192

10 28 00 Toilet Paper Dispensers - two rolls 14 ea 100$ $1,400

10 28 00 Sanitary Dispensers 2 ea 90$ $180

10 28 00 Used Sanitary Container 2 ea 70$ $140

10 28 00 Paper Towel Dispensers 12 ea 200$ $2,400

10 28 00 Used Paper Towel Containers 12 ea 100$ $1,200

10 28 00 Soap Dispensers 14 ea 100$ $1,400

10 28 00 Grab Bars - Toilets 1@42",36",18" each toilet 4 sets 400$ $1,600

10 28 00 Grab Bars - Showers 1@ 30" & 2@18" 4 sets 300$ $1,200

10 28 00 Shower Curtains 12 ea 200$ $2,400

10 28 00 Shower Seats 6 ea 150$ $900

10 28 00 Dressing Seats 6 ea 200$ $1,200

C-5

Page 71: Meeting of the Transportation Disadvantaged Coordinating ... · Meeting of the Transportation Disadvantaged Coordinating Board(TDCB) Friday, June 23, 2017, 9:30 a.m. County Center,

10 28 00 Soap Dishes 6 ea 60$ $360

10 28 00 Dressing Hooks - double hooks 12 ea 30$ $360

10 55 40 Mail Boxes through wall, back loaded 150 ea 40$ $6,000

10 56 00 Parts Storage Equipment

1005 Pegboard 8 ea 400$ $3,200

1041 Drawer Cabinets 21 ea 2,200$ $46,200

1042 Drawer Cabinets under counter 3 ea 1,350$ $4,050

1046 Storage Cabinet, Electronics 1 ea 900$ $900

1070 Flammables Cabinet 3 ea 2,100$ $6,300

1116 Storage Cabinet, Heavy Duty, Tools/Accessories 7 ea 1,650$ $11,550

1117 Storage Cabinet, Heavy Duty, Shelving/Drawers 2 ea 1,500$ $3,000

1119 Storage Cabinet, Heavy Duty, Janitorial 1 ea 1,300$ $1,300

1137 Carousel, Small Tires 1 ea 18,000$ $18,000

1325 Pallet Rack with Shelving 4 ea 1,200$ $4,800

1326 Pallet Rack with Wire Decking 1 ea 1,800$ $1,800

1344 Parts Storage Rack System 1 ea 75,000$ $75,000

1366 Shelving with wire shelves - 2' x 4' 8 ea 800$ $6,400

1367 Shelving with wire shelves - 1'-6" x 4' 12 ea 600$ $7,200

1391 Glass Rack 1 ea 750$ $750

1489 Book Shelves 4 ea 350$ $1,400

1516 Storage Shelving 1 ea 400$ $400

10 75 00 Flag Poles - 40 feet high 2 ea 4,000$ $8,000

Division 10 Total $374,953

Division 11

Equip. No. Equipment Qty Units Unit Cost Total Comments

2036 Wheel Balancer 1 ea. 5,500$ $5,500

2065 Buffer/Grinder 10" w/ dust collector 3 ea. 9,900$ $29,700

2090 Tire Inflation Chamber 1 ea. 3,495$ $3,495

2106 Fleet Battery Charger 1 ea. 730$ $730

2107 Battery Charger/Tester w/ Cart 1 ea. 3,800$ $3,800

2169 Air Compressor, 25 HP Duplex 1 ea. 30,000$ $30,000

2170 Air Dryer 1 ea. 2,000$ $2,000

2178 Air Compressor, 7.5 HP Duplex 1 ea. 6,200$ $6,200

2179 Air Dryer 1 ea. 1,000$ $1,000

2227 Disc Grinder/Sander 12" 1 ea. 4,620$ $4,620

2230 Drill Press, Variable Speed 15" 2 ea. 600$ $1,200

2290 Tire Dunker 1 ea. 4,030$ $4,030

2320 Fall Protection 4 ea. 1,700$ $6,800

2354 Brake Lathe 1 ea. 75,500$ $75,500

2356 Drum Brake Lathe 1 ea. 11,000$ $11,000

2400 Tire Mounter/Demounter 1 ea. 12,500$ $12,500

2456 Arbor Press 1 ea. 430$ $430

2466 Press, 60 Tons 1 ea. 7,500$ $7,500

2506 Refrigerant Recovery 1 ea. 5,300$ $5,300

2527 Vertical Band Saw, 20" 1 ea. 8,500$ $8,500

2543 Cold-Cut Saw, 12" 1 ea. 6,231$ $6,231

2585 Welding Screen 4 ea. 265$ $1,060

2628 Vise, Swivel Base, 5" 12 ea. 500$ $6,000

2662 MIG Welder, Portable 1 ea. 2,819$ $2,819

2668 Oxyacetylene Welder w/ Cart 1 ea. 1,100$ $1,100

2672 TIG Welder 1 ea. 2,500$ $2,500

3031 High Pressure Hot Water, Portable 1 ea. 8,700$ $8,700

3071 High Pressure Washer 1 ea. 27,000$ $27,000

3087 Parts Washer, 500# Capacity 1 ea. 18,000$ $18,000

3216 Vehicle Washer 1 ea. 200,000$ $200,000

2348 Ladder, rolling with Safety Cage 2 ea. 9,000$ $18,000

3510 Vacuum System 1 ea. 25,000$ $25,000

3590 Welding Fume Extractor 1 ea. 6,600$ $6,600

3591 Fume Hood, Benchtop 1 ea. 1,074$ $1,074

3620 Vehicle Exhaust Reel 10 ea. 7,350$ $73,500

3700 Waste Hopper 2 Tons 3 ea. 2,500$ $7,500

5010 Wheel Dolly 2 ea. 800$ $1,600

5051 Service Carts 6 ea. 638$ $3,828

5065 Basket, Portable, Laundry 1 ea. 150$ $150

5071 Computer Cabinets 2 ea. 364$ $728

7012 Diesel Fuel Dispenser - 20 GPM 1 ea. 3,138$ $3,138

7702 DEF Dispensing System 1 ea. 5,930$ $5,930

CNG Dispenser 2 ea. 4,000$ $8,000

7425 Tank Monitoring System 2 ea. 2,500$ $5,000

7500 Fluid Management System 2 ea. 10,000$ $20,000

7520 Pump 75:1 (Grease) 1 ea. 3,500$ $3,500

7522 Pump 6:1 (MO) 1 ea. 3,200$ $3,200

7527 Pump 10:1 (Gear Oil) 1 ea. 3,300$ $3,300

7530 Pump 1:1 ( Antifreeze & Window Cleaner) 4 ea. 2,800$ $11,200

7531 Pump 3:1 (MO & ATF) 2 ea. 2,900$ $5,800

C-6

Page 72: Meeting of the Transportation Disadvantaged Coordinating ... · Meeting of the Transportation Disadvantaged Coordinating Board(TDCB) Friday, June 23, 2017, 9:30 a.m. County Center,

7533 Pump 5:1 (ATF) 1 ea. 3,100$ $3,100

7534 SS Submersible Pump (DEF) 1 ea. 7,500$ $7,500

7547 Fluid Evacuation Pump 2 ea. 1,850$ $3,700

7703 Window Washer Reel 2 ea. 1,800$ $3,600

7704 Antifreeze/Coolant Recycling System 1 ea. 4,500$ $4,500

7705 Waste Coolant Receiver 3 ea. 2,010$ $6,030

7706 Waste Oil Receiver 3 ea. 1,707$ $5,121

7750 Hose Reels - CA 10 ea. 1,800$ $18,000

7751 Hose Reels - ATF 5 ea. 2,675$ $13,375

7752 Hose Reels - EO 5 ea. 2,675$ $13,375

7753 Hose Reels - CO 5 ea. 1,800$ $9,000

7754 Hose Reels - GO 5 ea. 2,262$ $11,310

7755 Hose Reels - CG 5 ea. 2,644$ $13,220

7757 Electric Light/Outlet Wire Reel 10 ea. 300$ $3,000

7927 Tank, 120 Gal 3 ea. 2,050$ $6,150

7930 Tank, 280 Gal 3 ea. 4,249$ $12,747

7933 Tank, 500 Gal 1 ea. 5,080$ $5,080

7940 Tank, 120 Gal WW Polyethylene 2 ea. 600$ $1,200

7945 Tank, 1000 Gal DEF Polyethylene 1 ea. 5,000$ $5,000

7958 Waste Oil Tank, 1000 Gal Fiberglass 1 ea. 12,000$ $12,000

7965 Diesel Storage Tank, 10,000 Gal 1 ea. 30,000$ $30,000

8106 Electronics Workbench 2 ea. 744$ $1,488

8117 Severe Duty Workbench 12 ea. 2,000$ $24,000

Loading Dock 1 ea. 24,000$ $24,000

11800 Equipment Installation 1 ls 124,600$ $124,600

Division 11 Total $1,061,359

Division 12

Spec. No. Furnishings Qty Units Unit Cost Total Comments

Base Cabinet Units 60 lf 250.00$ $15,000

Counter Tops 80 lf 300.00$ $24,000

Coat Rack & Shelf 20 lf 120.00$ $2,400

Operation Control Center Furniture 1 LS 20,000.00$ $20,000 Allowance

Division 2 Total $61,400

Division 13

Spec. No. Special Construction Qty Units Unit Cost Total Comments

Division 13 Total $0

Division 14

Equip. No. Conveying Equipment Qty Units Unit Cost Total Comments

9120 Bridge Crane 3 ton 1 ea 30,000$ $30,000 Acco - above one bay

9306 Forklift, 4000# 1 ea 70,300$ $70,300 Mitsubishi

9672 Vehicle Platform Lifts 6 ea 125,000$ $750,000

9815 Pallet Jack, 5500# 1 ea 515$ $515

Division 14 Total $850,815

Division 21

Spec. No. Fire Suppression Qty Units Unit Cost Total Comments

Preaction Valve 1 ea 42,000$ $42,000

Fire Alarm Panel 1 ea 25,000$ $25,000

Wet-Pipe Sprinkler System 43,077 sf 7$ $301,539

Smoke Detectors 15 ea. 200$ $3,000

Heat Detectors 2 ea. 250$ $500

Fire Extinguishers 24 ea. 350$ $8,400

Fire Hydrants 3 ea. 2,500$ $7,500

Fire Line PIV 1 ea 3,000$ $3,000

Division 21 Total $390,939

Division 22

Spec. No. Plumbing Qty Units Unit Cost Total Comments

Horizontal Pipe Support 100 ea. 25$ $2,500

Hanger Rod Connection 717 ea. 30$ $21,500

15107 Water Piping 300 lf 15$ $4,500

Water Supply Piping 300 lf 45$ $13,500

Compressed Air Piping 850 lf 25$ $21,250

Drain Piping 1025 lf 40$ $41,000

Roof Drain Piping with Hangers 2000 lf 35$ $70,000

Oil-Lubrication System Piping 2500 lf 40$ $100,000

Sanitary Line 1500 lf 40$ $60,000

15110 Domestic Water Ball Valves 16 ea. 70$ $1,120

Compressed Air Valves 32 ea. 250$ $8,000

Gas Supply Valves 15 ea. 320$ $4,800

C-7

Page 73: Meeting of the Transportation Disadvantaged Coordinating ... · Meeting of the Transportation Disadvantaged Coordinating Board(TDCB) Friday, June 23, 2017, 9:30 a.m. County Center,

Gas Supply Pressure Regulators 9 ea. 1,500$ $13,500

Butterfly Valves 16 ea. 750$ $12,000

15112 General Duty Valves for HVAC 32 ea. 250$ $8,000

Hot Water Valves 24 ea. 260$ $6,240

Main Water Meter Service 1 ea. 9,000$ $9,000

3" Diameter Cast Iron Valves 5 ea. 700$ $3,500

8" Diameter Cast Iron Valves 2 ea. 1,800$ $3,600

15120 Water Meter Service Gate Valves 3" 3 ea. 400$ $1,200

15124 Expansion Fittings 16 ea. 205$ $3,280

15140 Main Backflow Preventer 1 ea. 20,000$ $20,000

3" Service Backflow Preventers 2 ea. 2,500$ $5,000

15155 Floor Clean Outs 8 ea. 150$ $1,200

Clean Out Tees 8 ea. 400$ $3,200

Floor Drains 20 ea. 500$ $10,000

Roof Drains 20 ea. 650$ $13,000

Shower Drain with Strainer 7 ea. 180$ $1,260

Interceptors 6 ea. 2,000$ $12,000

Oil-Water Separators 3 ea. 4,000$ $12,000

Traps 8 ea. 300$ $2,400

Trench Drains 350 ft 210$ $73,500

15180 Hose Bibs 12 ea. 250$ $3,000

15400 Sink Fixtures with Hardware 13 ea. 700$ $9,100

Hand Sinks in Maintenance 2 ea. 800$ $1,600

Water Fountains 6 ea. 1,800$ $10,800

Urinals 6 ea. 1,100$ $6,600

Water Closets 13 ea. 1,200$ $15,600

Showers 6 ea. 1,500$ $9,000

15440 Grinder Pump System 1 ls 10,000$ $10,000

Material Mark Up 27% $169,493 Includes 7% Sales Tax

Plumbing Labor and Equipment from Detail Sheet $300,000 Assumes 3 months; includes mark-ups

Division 22 Total $1,097,243

Division 23

Spec. No. HVAC Qty Units Unit Cost Total Comments

Roof Duct Supports 20 ea. 150$ $3,000

15083 HVAC Insulation 7500 sf 4$ $30,000

Expansion Tanks - Diaphragm Type 1 ea. 2,800$ $2,800

15127 Meters and Gages for HVAC 8 ea. 250$ $2,000

Electronic Type Air Measuring Station 3 ea. 4,000$ $12,000

Venturi Type Water Measuring Sta. 1 ea. 3,500$ $3,500

15181 Hydronic Piping 1500 ft 25$ $37,500

15183 Refrigerant Piping 250 ft 20$ $5,000

Piping Through Penetrations 20 ea. 150$ $3,000

15185 Hydronic Pumps 2 ea 3,365$ $6,730

15189 HVAC Water Treatment 1 ls 1,500$ $1,500

Air Separator for Heating Water 1 ea. 1,000$ $1,000

Hot Water Pump Filter 1 ea. 565$ $565

Chemical By-Pass Feeder 1 ea. 1,500$ $1,500

15513 Gas Fired Boilers; Hot Water; 1400 MBH 2 ea. 25,000$ $50,000

15671 Condensing Units 1 ea. 40,000$ $40,000

Condensate Piping 600 ft 20$ $12,000

15725 Modular Indoor Air Handling 1 ea. 30,000$ $30,000

15738 Split System Air Conditioning 2 ea. 6,000$ $12,000

15762 Unit Heaters 10 ea. 1,400$ $14,000

15764 Convection Heating Units

Hot Water Finned Tube Radiation Units 600 lf 48$ $28,800

15785 Energy Recovery Units 2 ea. 18,000$ $36,000

Energy Unit Heat Exchanger (AHU-1) 1 ea. 10,000$ $10,000

15815 Metal Ducts 1 ls 100,000$ $100,000

15820 Duct Accessories 1 ls 20,000$ $20,000 Allowance

Sound Attenuation 2 ea. 2,000$ $4,000

15837 Centrifugal Fans

Exhaust Fans 1000 CFM 0.5" w.g. 6 ea. 1,800$ $10,800

Exhaust Fans 2000 CFM 1.0" w.g. 1 ea. 2,800$ $2,800

10,000 CFM Exhaust Fans 4 ea. 5,500$ $22,000

Variable Speed Return Air Fan 1 ea. 5,000$ $5,000

Variable Speed Supply Air Fan 1 ea. 5,000$ $5,000

15838 Power Ventilators 6 ea. 900$ $5,400

15840 Air Terminal Units 15 ea. 1,500$ $22,500

15855 Diffusers, Registers and Grilles 20 ea. 125$ $2,500

15856 Intake and Relief Valves 20 ea. 110$ $2,200

Air Blender Stations 2 ea. 3,000$ $6,000

15861 Air Filters 1 ea. 1,200$ $1,200

15900 HVAC Instrumentation 1 ls 90,000$ $90,000

Tamper Switches 6 ea. 150$ $900

HVAC Instrumentation 6 ea. 250$ $1,500

C-8

Page 74: Meeting of the Transportation Disadvantaged Coordinating ... · Meeting of the Transportation Disadvantaged Coordinating Board(TDCB) Friday, June 23, 2017, 9:30 a.m. County Center,

Duct Detectors 9 ea. 300$ $2,700

CO Sensors 8 ea. 200$ $1,600

CO2 Sensors 4 ea. 500$ $2,000

Material Mark Up 27% $175,769 Includes 7% Sales Tax

HVAC Labor and Equipment $311,371 Assumes 4 months; includes mark-ups

Division 23 Total $1,138,134

Division 26

Spec. No. Electrical Qty Units Unit Cost Total Comments

#10 THHN 20700 ft 0.25$ $5,175

12/2 MC 6000 ft 0.38$ $2,280

12/2 MC w/Insulated Ground 2000 ft 0.45$ $900

#2 XLP 6800 ft 1.46$ $9,951

#6 XLP 5000 ft 0.91$ $4,573

#8 XLP 6830 ft 0.57$ $3,904

12/2 Fire Alarm Cable 4800 ft 0.38$ $1,824

18/2 Alarm Cable 6000 ft 0.98$ $5,854

#4 XLP 1500 ft 1.16$ $1,738

#4 XLP (Switch Heaters) 16000 ft 1.16$ $18,537

#10 XLP 12000 ft 0.69$ $8,232

4/0 THHN 1200 ft 4.70$ $5,640

#12 XLP 1150 ft 0.55$ $633

#2 THHN 300 ft 1.20$ $360

500 MCM 12400 ft 6.60$ $81,840

#6 THHN 2080 ft 0.65$ $1,352

#4 THHN 4600 ft 0.85$ $3,910

Coaxial Cable RC6 1200 ft 0.95$ $1,140

Telephone Wire 1200 ft 0.25$ $300

Conduit - 1" EMT 1950 ft 3.60$ $7,020

3/4" EMT 4850 ft 2.80$ $13,580

1 1/2" EMT 1850 ft 4.20$ $7,770

2" EMT 200 ft 5.00$ $1,000

2 1/2" PVC 250 ft 4.00$ $1,000

1 1/2" PVC 650 ft 3.60$ $2,340

1 1/2" PVC (Buried) 6500 ft 8.20$ $53,300

1" PVC 2250 ft 3.20$ $7,200

3/4" RGS 1000 ft 5.00$ $5,000

3/4" PVC 850 ft 2.60$ $2,210

1 1/2" RGS 100 ft 7.50$ $750

2" PVC 1670 ft 3.80$ $6,346

Stub Up Conduits 250 ea. 150.00$ $37,500

4" PVC 2750 ft 12.00$ $33,000

Boxes; NEMA 1 6"x6"x4" 270 ea. 40.00$ $10,800

NEMA 12 24"x30" 8 ea. 400.00$ $3,200

Wiring Devices - Toggle Switches 55 ea. 20.00$ $1,100

Switch Plates 55 ea. 25.00$ $1,375

3 Gang Switch Plates 16 ea. 60.00$ $960

120v. Duplex Receptacles 105 ea. 15.00$ $1,575

GFI Duplex Receptacles 15 ea. 30.00$ $450

Duplex Receptacles w/Internal Ground 45 ea. 25.00$ $1,125

Welding Receptacles w/Disconnect 12 ea. 140.00$ $1,680

Flexible Conduit Connection to Motors 45 ea. 20.00$ $900

Emergency Generator - 1000 KVA 1 ea. 300,000$ $300,000

Single Phase 240/480 Transformers 2 ea. 15,000.00$ $30,000

Main Disconnect Panel 800 amp 2 ea. 18,000.00$ $36,000

Main Disconnect Panel 1200 amp 2 ea. 20,000.00$ $40,000

400 amp 3 Phase Panel 3 ea. 5,000.00$ $15,000

200 amp single Phase Panel 4 ea. 1,200.00$ $4,800

MCC Starter Combinations -Size 0 12 ea. 1,600.00$ $19,200

Size 1 10 ea. 1,800.00$ $18,000

Size 2 6 ea. 2,020.00$ $12,120

MCC Stand Up Bays 9 ea. 1,400.00$ $12,600

Disconnects - 30 amp 18 ea. 600.00$ $10,800

60 amp 11 ea. 800.00$ $8,800

Interior Lighting - 2x4 277volt 75 ea. 250.00$ $18,750

14x48 277 volt 36 ea. 190.00$ $6,840

Bathroom Overhead Sink Fixtures (4' ea.) 12 ea. 200.00$ $2,400

Down Light 120 volt 50 ea. 180.00$ $9,000

Exit Lights 16 ea. 190.00$ $3,040

Outdoor Wall Pack 250w 15 ea. 600.00$ $9,000

High Bay 1000w 55 ea. 650.00$ $35,750 Assumes 400 sf coverage per light

Material Mark-Up 27% $256,884 Includes 7% Sales Tax

Labor and Equipment Installation 1 ls $425,000 $425,000

Division 26 Total $1,633,307

Division 27

C-9

Page 75: Meeting of the Transportation Disadvantaged Coordinating ... · Meeting of the Transportation Disadvantaged Coordinating Board(TDCB) Friday, June 23, 2017, 9:30 a.m. County Center,

4/7/2017

L:\60522223 HART Site report\900 Work\cost estimate\60522223 HCMPO DRAFT Estimate.xlsx

Order of Magnitude Estimate DRAFTOption: 100 Van Prepared: JWB

Item Description Amount UOM Cost Sub-Total Notes1 Mobilization 1 LS 100,000$ 100,000$ 2 Silt Fence 2,700 lf 5$ 13,500$ Site perimeter3 Clear & Grub 10.16 ac 8,000$ 81,280$ P2S SOV4 Regular excavation 22,974 cy 10.00$ 229,737$ P2S SOV; 6 ft pond, parking excavate 15"5 Embankment 22,974 cy 4.00$ 91,895$ P2S SOV; Place holder6 Site utilities 1 LS 100,000$ 100,000$ Place holder7 Site drainage 4,813 lf 125$ 601,579$ Place holder8 Concrete sidewalks 4,908 sf 4.50$ 22,086$ P2S SOV9 Fence & gate 2,700 lf 15$ 140,500$ Includes 2 Access gates allowance; FDOT state wide

10 Landscaping 58,392 sf 4.50$ 262,764$ Includes irrigation; P2S SOV11 Hardscape 1 LS 100,000$ 100,000$ Place holder: Bike racks; benches; trash receptacles12 Roadway - Concrete paving 18,779 sy 90$ 1,690,100$ 8" reinforced; incl stabilization; P2S SOV13 Asphalt paving 12,731 sy 35$ 445,581$ Incl stabization & superpave; P2S SOV14 Concrete curb & gutter 7,710 lf 13$ 100,230$ P2S SOV15 Bumper stops 409 stall 55$ 22,495$ FDOT state-wide average16 Pavement marking 309 stall 100$ 30,900$ P2S SOV17 MOT 1 LS 100,000$ 100,000$ 18 Signalize new intersection, simple 1 ea 100,000$ 100,000$ Place holder19 Site Lighting & Power 409 stall 4,900$ 2,004,100$ P2S SOV20 Parking Signage 1 LS 45,000$ 45,000$ P2S SOV21 Monument entrance sign 1 LS 25,000$ 25,000$ Place holder22 CCTV & conduit 409 stall 650$ 265,850$

6,572,597$ Sub-Total30% 1,971,779$ Contingency

8,544,377$ TOTAL

Excluded items:Environmental & wetland mitigationRetaining wallsFiberLand acquisitionOff site improvementsEngineering, CEIArt-in-TransitStorm chambersCosts associated with CCTV central monitoring stationBuilding Costs

C-10

Page 76: Meeting of the Transportation Disadvantaged Coordinating ... · Meeting of the Transportation Disadvantaged Coordinating Board(TDCB) Friday, June 23, 2017, 9:30 a.m. County Center,

16

OPS AND ADMIN

PARKING

GENERAL

DETAIL BAYS

FUELING &

BAYS

WASH COLLECTION

FARE

10 DISABILITY

10 VISITOR

257 EMPLOYEE

16 OPS AND MAINT NON REV

6 DISABLED BUS

50 VAN

50 BUS

POND

DETENTION

MAINTENANCE BUILDING

CN

G T

AN

KS

14.6 AC.

APRIL 24, 2017

6 DISABLED BUS

8 BUS

42 BUS

50 PARA-TRANSIT BUS

50 BUS 50 PARA-TRANSIT VANS

C-11

Page 77: Meeting of the Transportation Disadvantaged Coordinating ... · Meeting of the Transportation Disadvantaged Coordinating Board(TDCB) Friday, June 23, 2017, 9:30 a.m. County Center,

HART Operations and Maintenance Facility Estimate

Medium 50 Bus 50 Van Facility Order of Magnatude Cost Estimate

Land acqusitionLand (purchse price) $4.00 sf $3,136,320Buyers' fees $94,682Appraisal $17,000Boundary Survey $10,000Environmental studies $50,000Subtotal $3,308,002Contingency 30.0% $992,401Total (Rounded) $4,300,000

Buildings and equipment DivisionGeneral Requirements 01 00 00 $2,792,000Existing Conditions 02 00 00 $0Concrete 03 00 00 $1,698,408Masonry 04 00 00 $1,490,980Steel & Metals 05 00 00 $3,694,677Wood, Plastics & Composites 06 00 00 $7,434Thermal & Moisture Protection 07 00 00 $3,751,631Openings 08 00 00 $586,050Finishes 09 00 00 $740,195Specialties 10 00 00 $493,053Equipment 11 00 00 $2,647,404Furnishings 12 00 00 $61,400Special Construction 13 00 00 $0Conveying Equipment 14 00 00 $1,577,145Fire Suppression 21 00 00 $620,000Plumbing 22 00 00 $1,521,715HVAC 23 00 00 $1,245,991Electrical 26 00 00 $1,778,613Communications 27 00 00 $267,011Electronic Safety & Security 28 00 00 $151,125Subtotal $25,124,833Contingency 30.0% $7,537,450Total (Rounded) $32,700,000

Site Development

General Requirements 01 00 00 $216,630Concrete 03 00 00 $2,526,790Specialties 10 00 00 $70,000Electronic Safety & Security 28 00 00 $259,350Earthwork 31 00 00 $624,397Exterior Improvements 32 00 00 $1,246,412

C-12

Page 78: Meeting of the Transportation Disadvantaged Coordinating ... · Meeting of the Transportation Disadvantaged Coordinating Board(TDCB) Friday, June 23, 2017, 9:30 a.m. County Center,

Utilities 33 00 00 $2,919,574Transportation 34 00 00 $100,000Subtotal $7,963,153Contingency 30.0% $2,388,946Total (Rounded) $10,400,000

Hard Construction Cost Estimate $33,087,986Contingency 30.0% $9,926,396Total (Rounded) $43,000,000

Soft CostsPreliminary Engineering 4% $1,323,519Final Design 8% $2,647,039Project Manag. for Design and Construction 3% $992,640Construction Admin. And Management 6% $1,985,279Insurance 3% $992,640Legal: Permits: review fees 1% $330,880Subtotal $8,271,997Contingency 30.0% $2,481,599Total (Rounded) $10,800,000Notes:Cost Estimating Assumptions;Estimates are prepared using current dollars (2017)Adequate experienced craft labor is availableNormal productivity rates as historically experienced are utilizedCompatible trade agreements exist in the regionNo strike impacts will be experienced by the projectThere are sufficient experienced contractors available to perform said workNormal Tampa area weather impacts to constructions scheduleExisting state of the art construction technology will be utilizedAssumes cooperation between stakeholdersTemporary Power is included in the General Conditions

C-13

Page 79: Meeting of the Transportation Disadvantaged Coordinating ... · Meeting of the Transportation Disadvantaged Coordinating Board(TDCB) Friday, June 23, 2017, 9:30 a.m. County Center,

HART Operations and Maintenance Facility50 Bus 50 Van Facility

by JRH

checked by KS 03/29/17

Division 1 - General Requirements

General Construction 19,800,000$ ls 10% $1,980,000

Building Systems Commissioning 1 ls 2% $396,000

Bonding Cost 22,000,000$ ls 0.80% $176,000

Submittals 1 ls 100,000$ $100,000

Testing and Surveying 1 ls 100,000$ $100,000

Contract Close-Out & As-Builds 1 ls 40,000.00$ $40,000

Division 1 - Total $2,792,000

Division 2

Spec. No. Existing Conditions Qty Units Unit Cost Total Comments

$0

$0

Division 2 Total $0

Division 3

Spec. No. Concrete Qty Units Unit Cost Total Comments

03 30 00 Continuous Footing, Footers and Piers 355 cy 500.00$ $177,500

03 30 00 Slab on Grade - Operations Area 14,000 sf 6.50$ $91,000

03 30 00 Slab on Grade- Maintenance and Service 61,600 sf 7.90$ $486,640

03 30 00 White non-metallic dryshake w/ sealant 20,000 sf 5.00$ $100,000

03 30 00 Topping on Epic Mezzanine Composite Deck 1600 sf 12.50$ $20,000 3.5" conc on 3" deep deck03 30 00 Topping on Epic Maint Roof Comp. Deck 61,600 sf 10.89$ $670,824 3.25" conc on 2" deck 03 30 00 Topping on Epic Ops Roof Comp. Deck 14,000 sf 10.89$ $152,444

Division 3 Total $1,698,408

Division 4

Spec. No. Masonry Qty Units Unit Cost Total Comments

04 22 00 12" Block Wall 11,880 sf 20.00$ $237,600

04 22 00 8" Block Wall 11,880 sf 16.00$ $190,080

04 22 00 4" Glazed Block - one side glazed 1,620 sf 20.00$ $32,400

04 22 00 8" Glazed Block - two 4" glazed block one side 8,550 sf 38.00$ $324,900

04 22 00 8" Glazed Block - one side glazed 3,400 sf 30.00$ $102,000

04 22 00 12" SGFT both sides 3,500 sf 40.00$ $140,000

04 22 00 12" SGFT - 8" SGFT & 4" SGFT 11,600 sf 40.00$ $464,000

Division 4 Total $1,490,980

Division 5

Spec. No. Metals Qty Units Unit Cost Total Comments

05 12 00 Structural Steel (mat'l only) 588,006 lbs 2.10$ $1,234,813

05 12 00 Structural Steel (labor & equipment) 588,006 lbs 1.60$ $940,810

05 13 00 Misc. Metals 45,000 lbs 6.00$ $270,000

05 13 00 Stair Frames - 1 stairs @ 3,600 lbs 3.70$ $13,320

Stair Treads 22 ea 250.00$ $5,500

Handrails - steel for mezzanine stairs 54 lf 200.00$ $10,800

05 31 90 Bar Joist Roof System 249,214 lbs 2.50$ $623,035

05 32 00 Epic Composite Floor Deck - Mezzanine 1,600 sf 7.00$ $11,200

05 32 00 Epic Composite Roof Deck - OPS 14,000 sf 6.60$ $92,400

05 32 00 Epic Acoustic Composite Roof Deck 61,600 sf 8.00$ $492,800

Division 5 Total $3,694,677

Division 6

Spec. No. Wood, Plastics, Composites Qty Units Unit Cost Total Comments

06 10 00 Roof Carpentry

2x6 Roof Cap Blocking (2500 lf) 2250 bf 3.00$ $6,750

06 10 00 In-Wall Blocking

2x6 Misc. Blocking (210 lf) 190 bf 3.60$ $684

Division 6 Total $7,434

Division 7

Spec. No. Thermal and Moisture Protection Qty Units Unit Cost Total Comments

07 21 15 Batt Insulation- 4" unfaced sound batts 6220 sf 1.50$ $9,330

07 22 15 Roof Insulation - 4" Isocyanurate 75,600 sf 3.30$ $249,480

07 26 15 Slab Vapor Barrier 75,600 sf 0.90$ $68,040

07 40 10 Metal Wall Panels 50,762 sf 50.00$ $2,538,100 Centria 3"T Formawall Dim. Series w/insul.

Steel Stud Framing for Metal wall panels- 6" W 6,900 sf 4.69$ $32,361 Ops

Steel Stud Framing for Metal wall panels - 12"W 24,800 sf 6.50$ $161,200 Maintenance

07 54 15 Sarnafil PVC Roofing 75,600 sf 8.00$ $604,800

07 56 00 Roof Metal Coping 2122 ft 10.00$ $21,220

07 72 25 Roof Hatches 2-6x6-6 4 ea 3,500.00$ $14,000

07 84 20 Fire-Resistant Joint Sealants 1800 lf 2.50$ $4,500

07 92 15 Joint Sealants 27,000 lf 1.80$ $48,600

Division 7 Total $3,751,631

C-14

Page 80: Meeting of the Transportation Disadvantaged Coordinating ... · Meeting of the Transportation Disadvantaged Coordinating Board(TDCB) Friday, June 23, 2017, 9:30 a.m. County Center,

Division 8

Spec. No. Openings Qty Units Unit Cost Total Comments

08 10 00 Hollow Metal Door/Frame 3x7 Exterior Insulated 18 ea 1,100.00$ $19,800

08 10 00 Hollow Metal Door/Frame 6x7 Exterior Insulated 4 ea 1,800.00$ $7,200

08 10 00 Hollow Metal Door/Frame 3x7 Interior 60 ea 900.00$ $54,000

08 10 00 Hollow Metal Door/Frame 6x7 Interior 5 ea 1,350.00$ $6,750

08 30 00 Overhead Coiling Doors 12x12 6 ea 6,800.00$ $40,800

08 30 00 Overhead Coiling Doors 12x14 11 ea 8,800.00$ $96,800

08 40 00 Entrance Doors - Kawneer Aluminum 6 ea 2,500.00$ $15,000

08 40 00 Entrance Windows - Kawneer Aluminum 6 ea 1,200.00$ $7,200

08 55 00 Windows - alum frame 52 ea 1,375.00$ $71,500 5'H x 5'L double pane w/ low-e coating

08 60 00Polycarbonate Monitor Windows - 200 L w/ 8' x 8'

sloped sides w/ aluminum frames3,200 sf 50.00$ $160,000

08 71 00 Finish Hardware $0 Included in door prices

08 90 00 Louvers and Vents 1 ls 27,000.00$ $27,000

Division 8 Labor & Equipment 1 ls 80,000.00$ $80,000 Doors and Windows Only

Division 8 Total $586,050

Division 9

Spec. No. Finishes Qty Units Unit Cost Total Comments

09 20 00 Drywall & Studs

One sided 5800 sf 4.00$ $23,200

Two sided to 10' 13,500 sf 6.80$ $91,800

One sided Ceiling 5040 sf 4.20$ $21,168

09 30 00 Ceramic Tile $0

Toilet Rooms 5040 sf 28.00$ $141,120

09 50 00 Ceilings $0

ACT at 10' AFF 12,250 sf 6.00$ $73,500

09 65 80 Resilient Tile & Carpet Flooring $0

Rubber Flooring - recycled tires 9,000 sf 8.00$ $72,000

Rubber Base Cove 1700 lf 3.40$ $5,780

Office Carpeting - carpet squares 300 sy 60.00$ $18,000

Rubber Base 1200 lf 4.00$ $4,800

09 90 00 Painting $0

Interior Walls 32,800 sf 1.50$ $49,200

Interior Ceilings 5040 sf 1.80$ $9,072

Interior Ceilings - Industrial one-coat system 61,600 1.00$ $61,600

Epoxy and Enamel 35,100 sf 0.80$ $28,080

HM Door & Frames 96 ea 175.00$ $16,800

Metal OH Doors 17 ea 275.00$ $4,675

Anti Graffiti Coating 0 sf 1.60$ $0

09 90 10 Concrete Flooring Coating (Ashford Formula) 79,600 sf 1.50$ $119,400

Division 9 Total $740,195

Division 10

Spec. No. Specialties Qty Units Unit Cost Total Comments

10 11 00 Markerboards - 4'h x 8'l 8 ea 500$ $4,000

10 11 00 Tackboards - 4'h x 8'l 16 ea 350$ $5,600

10 14 00 Exterior Identification Sign 1 ls 3,840$ $3,840

10 14 00 Door Identification Signs 68 ea 30$ $2,040

10 14 00 Maintenance Hazard Signs 60 ea 19$ $1,165

10 40 00 FE Cabinets 12 ea 660$ $7,920

10 40 00 Extinguisher 24 ea -$ $0 See Division 21

10 50 00 Full Height Lockers - 15"w x 18"d x 60" h 60 ea 750$ $45,000 Recycled plastic lockers

10 50 00 Full Height Lockers - 12"w x 15"d x 60"h 40 ea 690$ $27,600 Recycled plastic lockers

10 50 00 Half Height Lockers - 12" w x 18"d x 60"h 100 ea 780$ $78,000 Recycled plastic lockers

10 50 00 Locker Benches - 8 feet long 18 ea 520$ $9,360

10 21 13 Toilet Partitions - recycled plastic 20 ea 1,100$ $22,000

10 21 13 Urinal Partitions - recycled plastic 10 ea 400$ $4,000

10 21 90 Work Station Cubicals - 8' x 8' space 6 ea 2,048$ $12,288

10 28 00 Toilet Paper Dispensers - two rolls 20 ea 100$ $2,000

10 28 00 Sanitary Dispensers 4 ea 90$ $360

10 28 00 Used Sanitary Container 4 ea 70$ $280

10 28 00 Paper Towel Dispensers 12 ea 200$ $2,400

10 28 00 Used Paper Towel Containers 12 ea 100$ $1,200

10 28 00 Soap Dispensers 14 ea 100$ $1,400

10 28 00 Grab Bars - Toilets 1@42",36",18" each toilet 6 sets 400$ $2,400

10 28 00 Grab Bars - Showers 1@ 30" & 2@18" 4 sets 300$ $1,200

10 28 00 Shower Curtains 20 ea 200$ $4,000

10 28 00 Shower Seats 4 ea 150$ $600

10 28 00 Dressing Seats 10 ea 200$ $2,000

10 28 00 Soap Dishes 10 ea 60$ $600

10 28 00 Dressing Hooks - double hooks 10 ea 30$ $300

10 55 40 Mail Boxes through wall, back loaded 150 ea 40$ $6,000

10 56 00 Parts Storage Equipment

1005 Pegboard 12 ea 400$ $4,800

1041 Drawer Cabinets 24 ea 2,200$ $52,800

1042 Drawer Cabinets under counter 3 ea 1,350$ $4,050

1046 Storage Cabinet, Electronics 3 ea 900$ $2,700

C-15

Page 81: Meeting of the Transportation Disadvantaged Coordinating ... · Meeting of the Transportation Disadvantaged Coordinating Board(TDCB) Friday, June 23, 2017, 9:30 a.m. County Center,

1070 Flammables Cabinet 4 ea 2,100$ $8,400

1116 Storage Cabinet, Heavy Duty, Tools/Accessories 8 ea 1,650$ $13,200

1117 Storage Cabinet, Heavy Duty, Shelving/Drawers 2 ea 1,500$ $3,000

1119 Storage Cabinet, Heavy Duty, Janitorial 2 ea 1,300$ $2,600

1136 Carousel, Large Tires 1 ea 24,000$ $24,000

1137 Carousel, Small Tires 1 ea 22,000$ $22,000

1325 Pallet Rack with Shelving 4 ea 1,200$ $4,800

1326 Pallet Rack with Wire Decking 1 ea 1,800$ $1,800

1344 Parts Storage Rack System 1 ea 75,000$ $75,000

1366 Shelving with wire shelves - 2' x 4' 8 ea 800$ $6,400

1367 Shelving with wire shelves - 1'-6" x 4' 12 ea 600$ $7,200

1391 Glass Rack 2 ea 750$ $1,500

1391 Panel Rack 1 ea 750$ $750

1489 Book Shelves 6 ea 350$ $2,100

1516 Storage Shelving 1 ea 400$ $400

10 75 00 Flag Poles - 40 feet high 2 ea 4,000$ $8,000

Division 10 Total $493,053

Division 11

Equip. No. Equipment Qty Units Unit Cost Total Comments

2036 Wheel Balancer - Vans 1 ea. 5,500$ $5,500

2037 Wheel Balancer 1 ea. 16,350.00$ $16,350

2065 Buffer/Grinder 10" w/ dust collector 3 ea. 9,900$ $29,700

2090 Tire Inflation Chamber 1 ea. 3,495$ $3,495

2106 Fleet Battery Charger 1 ea. 730$ $730

2107 Battery Charger/Tester w/ Cart 1 ea. 3,800$ $3,800

2169 Air Compressor, 20 HP Duplex 1 ea. 30,000$ $30,000

2170 Air Dryer 1 ea. 5,000$ $5,000

2178 Air Compressor, 7.5 HP Duplex 1 ea. 6,200$ $6,200

2179 Air Dryer 1 ea. 1,000$ $1,000

2227 Disc Grinder/Sander 12" 1 ea. 4,620$ $4,620

2230 Drill Press, Variable Speed 15" 2 ea. 600$ $1,200

2290 Tire Dunker 1 ea. 4,030$ $4,030

2320 Fall Protection 4 ea. 1,700$ $6,800

2400 Tire Mounter/Demounter 1 ea. 12,500$ $12,500

2456 Arbor Press 1 ea. 430$ $430

2466 Press, 60 Tons 2 ea. 7,500$ $15,000

2506 Refrigerant Recovery 1 ea. 5,300$ $5,300

2527 Vertical Band Saw, 20" 1 ea. 8,500$ $8,500

2543 Cold-Cut Saw, 12" 1 ea. 6,231$ $6,231

2585 Welding Screen 4 ea. 265$ $1,060

2628 Vise, Swivel Base, 5" 12 ea. 500$ $6,000

2662 MIG Welder, Portable 1 ea. 2,819$ $2,819

2668 Oxyacetylene Welder w/ Cart 1 ea. 1,100$ $1,100

2672 TIG Welder 1 ea. 2,500$ $2,500

3004 Abrasive Blast Cabinet 1 ea. 1,135.00$ $1,135

3012 Ultrasonic Cleaner 1 ea. 17,800.00$ $17,800

3031 High Pressure Hot Water, Portable 1 ea. 8,700$ $8,700

3071 High Pressure Washer 2 ea. 27,000$ $54,000

3087 Parts Washer, 500# Capacity 1 ea. 18,000$ $18,000

3216 Vehicle Washer 2 ea. 600,000$ $1,200,000

2348 Ladder, rolling with Safety Cage 4 ea. 16,000$ $64,000

3510 Vacuum System 1 ea. 45,000$ $45,000

3590 Welding Fume Extractor 1 ea. 6,600$ $6,600

3591 Fume Hood, Benchtop 1 ea. 1,074$ $1,074

3620 Vehicle Exhaust Reel 12 ea. 7,350$ $88,200

3700 Waste Hopper 2 Tons 4 ea. 2,500$ $10,000

5010 Wheel Dolly 4 ea. 800$ $3,200

5051 Service Carts 12 ea. 638$ $7,656

5065 Basket, Portable, Laundry 1 ea. 150$ $150

5071 Computer Cabinets 6 ea. 364$ $2,184

7012 Diesel Fuel Dispenser - 20 GPM 2 ea. 3,138$ $6,276

7702 DEF Dispensing System 2 ea. 5,930$ $11,859

CNG Dispenser 2 ea. 4,000$ $8,000

7425 Tank Monitoring System 2 ea. 2,500$ $5,000

7500 Fluid Management System 6 ea. 10,000$ $60,000

7520 Pump 75:1 (Grease) 1 ea. 3,500$ $3,500

7522 Pump 6:1 (EO) 1 ea. 3,200$ $3,200

7527 Pump 10:1 (Gear Oil) 1 ea. 3,300$ $3,300

7530 Pump 1:1 ( Antifreeze & Window Cleaner) 4 ea. 2,800$ $11,200

7531 Pump 3:1 (EO & ATF) 2 ea. 2,900$ $5,800

7533 Pump 5:1 (ATF) 1 ea. 3,100$ $3,100

7534 SS Submersible Pump (DEF) 1 ea. 7,500$ $7,500

7547 Fluid Evacuation Pump 4 ea. 1,850$ $7,400

7703 Window Washer Reel 2 ea. 1,800$ $3,600

7704 Antifreeze/Coolant Recycling System 1 ea. 4,500$ $4,500

7705 Waste Coolant Receiver 4 ea. 2,010$ $8,040

7706 Waste Oil Receiver 4 ea. 1,707$ $6,828

7750 Hose Reels - CA 28 ea. 1,800$ $50,400

7751 Hose Reels - ATF 14 ea. 2,675$ $37,450

7752 Hose Reels - EO 14 ea. 2,675$ $37,450

C-16

Page 82: Meeting of the Transportation Disadvantaged Coordinating ... · Meeting of the Transportation Disadvantaged Coordinating Board(TDCB) Friday, June 23, 2017, 9:30 a.m. County Center,

7753 Hose Reels - CO 14 ea. 1,800$ $25,200

7754 Hose Reels - GO 14 ea. 2,262$ $31,668

7755 Hose Reels - CG 14 ea. 2,644$ $37,016

7757 Electric Light/Outlet Wire Reel 28 ea. 300$ $8,400

7927 Tank, 120 Gal 3 ea. 2,050$ $6,150

7930 Tank, 280 Gal 3 ea. 4,249$ $12,747

7933 Tank, 500 Gal 1 ea. 5,080$ $5,080

7940 Tank, 120 Gal WW Polyethylene 2 ea. 600$ $1,200

7945 Tank, 1000 Gal DEF Polyethylene 1 ea. 5,000$ $5,000

7958 Waste Oil Tank, 1000 Gal Fiberglass 1 ea. 12,000$ $12,000

7965 Diesel Storage Tank, 10,000 Gal 2 ea. 30,000$ $60,000

8106 Electronics Workbench 4 ea. 744$ $2,976

8117 Severe Duty Workbench 12 ea. 2,000$ $24,000

Loading Dock 1 ea. 24,000$ $24,000

11800 Equipment Installation 1 ls 400,000$ $400,000

Division 11 Total $2,647,404

Division 12

Spec. No. Furnishings Qty Units Unit Cost Total Comments

Base Cabinet Units 60 lf 250.00$ $15,000

Counter Tops 80 lf 300.00$ $24,000

Coat Rack & Shelf 20 lf 120.00$ $2,400

Operation Control Center Furniture 1 LS 20,000.00$ $20,000 Allowance

Division 2 Total $61,400

Division 13

Spec. No. Special Construction Qty Units Unit Cost Total Comments

Division 13 Total $0

Division 14

Equip. No. Conveying Equipment Qty Units Unit Cost Total Comments

9120 Bridge Crane 3 ton 2 ea 40,000$ $80,000 Acco - above two bays

9306 Forklift, 4000# 2 ea 70,300$ $140,600 Mitsubishi

9513 Bus Lifts - Portable 6 ea 80,000$ $480,000 Sets of 4 portable wireless lifts - Stertil Koni

9672 Vertical Lift, Inground 75,000# capacity 1 ea 375,000$ $375,000

9672 Vehicle Platform Lifts 4 ea 125,000$ $500,000

9815 Pallet Jack, 5500# 3 ea 515$ $1,545

Division 14 Total $1,577,145

Division 21

Spec. No. Fire Suppression Qty Units Unit Cost Total Comments

Preaction Valve 1 ea 42,000$ $42,000

Fire Alarm Panel 1 ea 25,000$ $25,000

Wet-Pipe Sprinkler System 75,600 sf 7$ $529,200

Smoke Detectors 18 ea. 200$ $3,600

Heat Detectors 8 ea. 250$ $2,000

Fire Extinguishers 22 ea. 350$ $7,700

Fire Hydrants 3 ea. 2,500$ $7,500

Fire Line PIV 1 ea 3,000$ $3,000

Division 21 Total $620,000

Division 22

Spec. No. Plumbing Qty Units Unit Cost Total Comments

Horizontal Pipe Support 185 ea. 25$ $4,625

Hanger Rod Connection 645 ea. 30$ $19,350

15107 Water Piping 540 lf 15$ $8,100

Water Supply Piping 435 lf 45$ $19,575

Compressed Air Piping 1550 lf 25$ $38,750

Drain Piping 1845 lf 40$ $73,800

Roof Drain Piping with Hangers 2700 lf 35$ $94,500

Oil-Lubrication System Piping 3045 lf 40$ $121,800

Sanitary Line 1845 lf 40$ $73,800

15110 Domestic Water Ball Valves 18 ea. 70$ $1,260

Compressed Air Valves 36 ea. 250$ $9,000

Gas Supply Valves 18 ea. 320$ $5,760

Gas Supply Pressure Regulators 10 ea. 1,500$ $15,000

Butterfly Valves 18 ea. 750$ $13,500

15112 General Duty Valves for HVAC 36 ea. 250$ $9,000

Hot Water Valves 27 ea. 260$ $7,020

Main Water Meter Service 1 ea. 9,000$ $9,000

3" Diameter Cast Iron Valves 5 ea. 700$ $3,500

8" Diameter Cast Iron Valves 2 ea. 1,800$ $3,600

15120 Water Meter Service Gate Valves 3" 3 ea. 400$ $1,200

15124 Expansion Fittings 20 ea. 205$ $4,100

15140 Main Backflow Preventer 1 ea. 20,000$ $20,000

3" Service Backflow Preventers 2 ea. 2,500$ $5,000

15155 Floor Clean Outs 9 ea. 150$ $1,350

Clean Out Tees 9 ea. 400$ $3,600

C-17

Page 83: Meeting of the Transportation Disadvantaged Coordinating ... · Meeting of the Transportation Disadvantaged Coordinating Board(TDCB) Friday, June 23, 2017, 9:30 a.m. County Center,

Floor Drains 18 ea. 500$ $9,000

Roof Drains 25 ea. 650$ $16,250

Shower Drain with Strainer 10 ea. 180$ $1,800

Interceptors 5 ea. 2,000$ $10,000

Oil-Water Separators 4 ea. 4,000$ $16,000

Traps 10 ea. 300$ $3,000

Trench Drains 850 ft 210$ $178,500

15180 Hose Bibs 14 ea. 250$ $3,500

15400 Sink Fixtures with Hardware 14 ea. 700$ $9,800

Hand Sinks in Maintenance 2 ea. 800$ $1,600

Water Fountains 8 ea. 1,800$ $14,400

Urinals 6 ea. 1,100$ $6,600

Water Closets 18 ea. 1,200$ $21,600

Showers 10 ea. 1,500$ $15,000

15440 Grinder Pump System 1 ls 10,000$ $10,000

Material Mark Up 27% $238,475 Includes 7% Sales Tax

Plumbing Labor and Equipment from Detail Sheet $400,000 Assumes 4 months; includes mark-ups

Division 22 Total $1,521,715

Division 23

Spec. No. HVAC Qty Units Unit Cost Total Comments

Roof Duct Supports 22 ea. 150$ $3,300

15083 HVAC Insulation 9500 sf 4$ $38,000

Expansion Tanks - Diaphragm Type 1 ea. 2,800$ $2,800

15127 Meters and Gages for HVAC 9 ea. 250$ $2,250

Electronic Type Air Measuring Station 4 ea. 4,000$ $16,000

Venturi Type Water Measuring Sta. 1 ea. 3,500$ $3,500

15181 Hydronic Piping 1850 ft 25$ $46,250

15183 Refrigerant Piping 300 ft 20$ $6,000

Piping Through Penetrations 24 ea. 150$ $3,600

15185 Hydronic Pumps 2 ea 3,365$ $6,730

15189 HVAC Water Treatment 1 ls 1,500$ $1,500

Air Separator for Heating Water 1 ea. 1,000$ $1,000

Hot Water Pump Filter 1 ea. 565$ $565

Chemical By-Pass Feeder 1 ea. 1,500$ $1,500

15513 Gas Fired Boilers; Hot Water; 1400 MBH 2 ea. 25,000$ $50,000

15671 Condensing Units 1 ea. 40,000$ $40,000

Condensate Piping 600 ft 20$ $12,000

15725 Modular Indoor Air Handling 1 ea. 30,000$ $30,000

15738 Split System Air Conditioning 2 ea. 6,000$ $12,000

15762 Unit Heaters 9 ea. 1,400$ $12,600

15764 Convection Heating Units $0

Hot Water Finned Tube Radiation Units 700 lf 48$ $33,600

15785 Energy Recovery Units 4 ea. 18,000$ $72,000

Energy Unit Heat Exchanger (AHU-1) 1 ea. 10,000$ $10,000

15815 Metal Ducts 1 ls 120,000$ $120,000

15820 Duct Accessories 1 ls 20,000$ $20,000 Allowance

Sound Attenuation 2 ea. 2,000$ $4,000

15837 Centrifugal Fans $0

Exhaust Fans 1000 CFM 0.5" w.g. 9 ea. 1,800$ $16,200

Exhaust Fans 2000 CFM 1.0" w.g. 1 ea. 2,800$ $2,800

10,000 CFM Exhaust Fans 5 ea. 5,500$ $27,500

Variable Speed Return Air Fan 1 ea. 5,000$ $5,000

Variable Speed Supply Air Fan 1 ea. 5,000$ $5,000

15838 Power Ventilators 5 ea. 900$ $4,500

15840 Air Terminal Units 15 ea. 1,500$ $22,500

15855 Diffusers, Registers and Grilles 28 ea. 125$ $3,500

15856 Intake and Relief Valves 18 ea. 110$ $1,980

Air Blender Stations 2 ea. 3,000$ $6,000

15861 Air Filters 1 ea. 1,200$ $1,200

15900 HVAC Instrumentation 1 ls 90,000$ $90,000

Tamper Switches 5 ea. 150$ $750

HVAC Instrumentation 5 ea. 250$ $1,250

Duct Detectors 10 ea. 300$ $3,000

CO Sensors 10 ea. 200$ $2,000

CO2 Sensors 5 ea. 500$ $2,500

Material Mark Up 27% $201,116 Includes 7% Sales Tax

HVAC Labor and Equipment $300,000 Assumes 4 months; includes mark-ups

Division 23 Total $1,245,991

Division 26

Spec. No. Electrical Qty Units Unit Cost Total Comments

#10 THHN 23700 ft 0.25$ $5,925

12/2 MC 7500 ft 0.38$ $2,850

12/2 MC w/Insulated Ground 2800 ft 0.45$ $1,260

#2 XLP 9000 ft 1.46$ $13,171

#6 XLP 6500 ft 0.91$ $5,945

#8 XLP 9430 ft 0.57$ $5,391

12/2 Fire Alarm Cable 5500 ft 0.38$ $2,090

18/2 Alarm Cable 7500 ft 0.98$ $7,317

C-18

Page 84: Meeting of the Transportation Disadvantaged Coordinating ... · Meeting of the Transportation Disadvantaged Coordinating Board(TDCB) Friday, June 23, 2017, 9:30 a.m. County Center,

#4 XLP 2300 ft 1.16$ $2,665

#4 XLP (Switch Heaters) 19000 ft 1.16$ $22,012

#10 XLP 13000 ft 0.69$ $8,918

4/0 THHN 1300 ft 4.70$ $6,110

#12 XLP 1250 ft 0.55$ $688

#2 THHN 360 ft 1.20$ $432

500 MCM 14400 ft 6.60$ $95,040

#6 THHN 2280 ft 0.65$ $1,482

#4 THHN 4800 ft 0.85$ $4,080

Coaxial Cable RC6 1350 ft 0.95$ $1,283

Telephone Wire 1350 ft 0.25$ $338

Conduit - 1" EMT 1920 ft 3.60$ $6,912

3/4" EMT 5450 ft 2.80$ $15,260

1 1/2" EMT 1770 ft 4.20$ $7,434

2" EMT 200 ft 5.00$ $1,000

2 1/2" PVC 280 ft 4.00$ $1,120

1 1/2" PVC 770 ft 3.60$ $2,772

1 1/2" PVC (Buried) 7200 ft 8.20$ $59,040

1" PVC 2750 ft 3.20$ $8,800

3/4" RGS 1050 ft 5.00$ $5,250

3/4" PVC 925 ft 2.60$ $2,405

1 1/2" RGS 85 ft 7.50$ $638

2" PVC 1690 ft 3.80$ $6,422

Stub Up Conduits 280 ea. 150.00$ $42,000

4" PVC 3050 ft 12.00$ $36,600

Boxes; NEMA 1 6"x6"x4" 340 ea. 40.00$ $13,600

NEMA 12 24"x30" 10 ea. 400.00$ $4,000

Wiring Devices - Toggle Switches 56 ea. 20.00$ $1,120

Switch Plates 56 ea. 25.00$ $1,400

3 Gang Switch Plates 18 ea. 60.00$ $1,080

120v. Duplex Receptacles 145 ea. 15.00$ $2,175

GFI Duplex Receptacles 28 ea. 30.00$ $840

Duplex Receptacles w/Internal Ground 72 ea. 25.00$ $1,800

Welding Receptacles w/Disconnect 10 ea. 140.00$ $1,400

Flexible Conduit Connection to Motors 48 ea. 20.00$ $960

Emergency Generator - 1000 KVA 1 ea. 300,000$ $300,000

Single Phase 240/480 Transformers 2 ea. 15,000.00$ $30,000

Main Disconnect Panel 800 amp 3 ea. 18,000.00$ $54,000

Main Disconnect Panel 1200 amp 2 ea. 20,000.00$ $40,000

400 amp 3 Phase Panel 3 ea. 5,000.00$ $15,000

200 amp single Phase Panel 4 ea. 1,200.00$ $4,800

MCC Starter Combinations -Size 0 14 ea. 1,600.00$ $22,400

Size 1 9 ea. 1,800.00$ $16,200

Size 2 7 ea. 2,020.00$ $14,140

MCC Stand Up Bays 10 ea. 1,400.00$ $14,000

Disconnects - 30 amp 18 ea. 600.00$ $10,800

60 amp 12 ea. 800.00$ $9,600

Interior Lighting - 2x4 277volt 94 ea. 250.00$ $23,500

14x48 277 volt 38 ea. 190.00$ $7,220

Bathroom Overhead Sink Fixtures (4' ea.) 14 ea. 200.00$ $2,800

Down Light 120 volt 48 ea. 180.00$ $8,640

Exit Lights 15 ea. 190.00$ $2,850

Outdoor Wall Pack 250w 18 ea. 600.00$ $10,800

High Bay 1000w 135 ea. 650.00$ $87,750 Assumes 400 sf coverage per light

Material Mark-Up 27% $293,091 Includes 7% Sales Tax

Labor and Equipment Installation 1 ls $400,000 $400,000

Division 26 Total $1,778,613

Division 27

Spec. No. Communications Qty Units Unit Cost Total Comments

Fiber Optic Backbone 1200 lf 15.00$ $18,000

Equipment Rack 7ft- ADC 4 ea. 391$ $1,564

FDP-ADC-144 4 ea. 1,660$ $6,640

FDP-ADC-48 4 ea. 1,585$ $6,340

Ethernet Switch - 10GE w/ GBIC 2 ea. 12,133$ $24,266

L2 / L3 Ethernet Sw - applications 2 ea. 5,375$ $10,750

Cable Management Tray-ADC 1 ea. 328$ $328

CAT 6 Jack Panel-ADC 2 ea. 358$ $716

NVR Server 1 ea. 2,775$ $2,775

SAN Switch-Cisco 2960 1 ea. 1,295$ $1,295

RAID-5 Archive- Intransa 8T Edge Block 1 ea. 12,254$ $12,254

Analytics Server- Dell 2950 1 ea. 3,255$ $3,255

Wireless LAN Controller- Cisco 4402 1 ea. 11,755$ $11,755

Antenna 1 ea. $12,000 $12,000

Satellite Dish 1 ea. $5,000 $5,000

Operations Control Center Equipment 1 LS $50,000 $50,000

Material Mark-Up 27% $45,073 Includes 7% Sales Tax

Labor and Equipment Installation 1 ls $55,000 $55,000

Division 27 Total $267,011

C-19

Page 85: Meeting of the Transportation Disadvantaged Coordinating ... · Meeting of the Transportation Disadvantaged Coordinating Board(TDCB) Friday, June 23, 2017, 9:30 a.m. County Center,

Division 28

Spec. No. Electronic Safety & Security Qty Units Unit Cost Total Comments

Security and Surveillance System

Doors with Access Controls 9 ea. 6,000.00$ $54,000

Fixed Position Cameras 13 ea. 1,500.00$ $19,500

Digital Video Recorder 1 ea. 5,000.00$ $5,000

Security Controller Panel 1 ea. 1,500.00$ $1,500

Video Monitor 1 ea. 5,000.00$ $5,000

Operations Control Center Monitors 1 ea. 2,500.00$ $2,500

Material Mark-Up 27% $23,625 Includes 7% Sales Tax

Labor and Equipment Installation 1 ls 40,000$ $40,000

Division 28 Total $151,125

C-20

Page 86: Meeting of the Transportation Disadvantaged Coordinating ... · Meeting of the Transportation Disadvantaged Coordinating Board(TDCB) Friday, June 23, 2017, 9:30 a.m. County Center,

Order of Magnitude Estimate DRAFTOption: 50 Bus; 50 Van Prepared: JWB

Item Description Amount UOM Cost Sub-Total Notes1 Mobilization 154 1 LS 100,000$ 100,000$

17 MOT 155 1 LS 100,000$ 100,000$ 2 Silt Fence 156 3,326 lf 5$ 16,630$ Site perimeter

14 Concrete curb & gutter 330 9,000 lf 13$ 117,000$ P2S SOV12 Roadway - Concrete paving 331 26,775 sy 90$ 2,409,790$ 8" reinforced; incl stabilization; P2S SOV20 Parking Signage 1014 1 LS 45,000$ 45,000$ P2S SOV21 Monument entrance sign 1014 1 LS 25,000$ 25,000$ Place holder5 Embankment 3114 36,257 cy 4.00$ 145,028$ P2S SOV; Place holder

22 CCTV & conduit 2801 399 stall 650$ 259,350$ 3 Clear & Grub 3111 14.60 ac 8,000$ 116,800$ P2S SOV4 Regular excavation 3114 36,257 cy 10.00$ 362,569$ P2S SOV; 6 ft pond, parking excavate 15"

11 Hardscape 3206 1 LS 100,000$ 100,000$ Place holder: Bike racks; benches; trash receptacles13 Asphalt paving 3212 11,920 sy 35$ 417,184$ Incl stabization & superpave; P2S SOV8 Concrete sidewalks 3216 6,265 sf 4.50$ 28,193$ P2S SOV

15 Bumper stops 3216 293 stall 55$ 16,115$ FDOT state-wide average16 Pavement marking 3217 399 stall 100$ 39,900$ P2S SOV9 Fence & gate 3231 3,326 lf 15$ 99,890$ Includes Access gate allowance; FDOT state wide

10 Landscaping 3291 121,140 sf 4.50$ 545,130$ Includes irrigation; P2S SOV6 Site utilities 3311 1 LS 100,000$ 100,000$ Place holder7 Site drainage 3349 6,916 lf 125$ 864,474$ Place holder

19 Site Lighting & Power 3371 399 stall 4,900$ 1,955,100$ P2S SOV18 Signalize new intersection, simple 3441 1 ea 100,000$ 100,000$ Place holder

7,963,153$ Sub-Total30% 2,388,946$ Contingency

10,352,099$ TOTAL

Excluded items:Environmental & wetland mitigationRetaining wallsFiberLand acquisitionOff site improvementsEngineering, CEIArt-in-TransitStorm chambersCosts associated with CCTV central monitoring stationBuilding Costs

C-21

Page 87: Meeting of the Transportation Disadvantaged Coordinating ... · Meeting of the Transportation Disadvantaged Coordinating Board(TDCB) Friday, June 23, 2017, 9:30 a.m. County Center,

MAINTENANCE BUILDING OP

S A

ND A

DMIN

PA

RKIN

G

GE

NE

RA

L

DE

TAIL B

AY

S

FU

ELIN

G &

BA

YS

WA

SH

CO

LLE

CTIO

N

FA

RE

40

POND

10 DISABILITY

10 VISITOR

497 EMPLOYEE

CNG TANKS

23.4 AC.

APRIL 24, 2017

50 BUS

50 BUS + 10 DISABLED BUS

40 PARA-TRANSIT VANS

80 PARA-TRANSIT VANS

20 OPS AND MAINT NON REV

120 PARA-TRANSIT VANS

10 DISABLED BUS

100 BUS

100 BUS - 100 PARA-TRANSIT VANS

20 O

PS A

ND M

AIN

T N

ON R

EV

C-22

Page 88: Meeting of the Transportation Disadvantaged Coordinating ... · Meeting of the Transportation Disadvantaged Coordinating Board(TDCB) Friday, June 23, 2017, 9:30 a.m. County Center,

HART Operations and Maintenance Facility Estimate

Large (100 Bus 100 Van) Facility Order of Magnatude Cost Estimate

Land acqusitionLand (purchse price) $3.50 sf 4,116,420$ Buyers' fees 121,144$ Appraisal 17,000$ Boundary Survey 10,000$ Environmental studies 80,000$ Subtotal 4,344,564$ Contingency 30.0% $1,303,369Total (Rounded) $5,600,000

Buildings and Equipment DivisionGeneral Requirements 01 00 00 $3,256,000Existing Conditions 02 00 00 $0Concrete 03 00 00 $2,146,406Masonry 04 00 00 $1,650,720Steel & Metals 05 00 00 $4,192,838Wood, Plastics & Composites 06 00 00 $8,238Thermal & Moisture Protection 07 00 00 $4,043,882Openings 08 00 00 $806,450Finishes 09 00 00 $801,130Specialties 10 00 00 $737,103Equipment 11 00 00 $4,100,618Furnishings 12 00 00 $61,400Special Construction 13 00 00 $0Conveying Equipment 14 00 00 $2,147,145Fire Suppression 21 00 00 $761,600Plumbing 22 00 00 $1,669,848HVAC 23 00 00 $1,282,279Electrical 26 00 00 $1,896,369Communications 27 00 00 $267,011Electronic Safety & Security 28 00 00 $167,555Subtotal $29,996,593Contingency 30.0% $8,998,978Total (Rounded) $39,000,000

Site Development

General Requirements 01 00 00 $314,530Concrete 03 00 00 $152,628Specialties 10 00 00 $5,045,826Electronic Safety & Security 28 00 00 $100,000Earthwork 31 00 00 $4,215,099

C-23

Page 89: Meeting of the Transportation Disadvantaged Coordinating ... · Meeting of the Transportation Disadvantaged Coordinating Board(TDCB) Friday, June 23, 2017, 9:30 a.m. County Center,

Exterior Improvements 32 00 00 $2,230,372Utilities 33 00 00 $215,000Transportation 34 00 00 $723,965Subtotal $12,997,420Contingency 30.0% $3,899,226Total (Rounded) $16,900,000

Hard Construction Cost Estimate $42,978,013Contingency 30.0% $12,893,404Total (Rounded) $55,900,000

Soft CostsPreliminary Engineering 4% 1,719,121$ Final Design 8% 3,438,241$ Project Manag. for Design and Cons 3% 1,289,340$ Construction Admin. And Managem 6% 2,578,681$ Insurance 3% 1,289,340$ Legal: Permits: review fees 1% 429,780$ Subtotal 10,744,503$ Contingency 30.0% $3,223,351Total (Rounded) $14,000,000

Notes:Cost Estimating Assumptions;Estimates are prepared using current dollars (2017)Adequate experienced craft labor is availableNormal productivity rates as historically experienced are utilizedCompatible trade agreements exist in the regionNo strike impacts will be experienced by the projectThere are sufficient experienced contractors available to perform said workNormal Tampa area weather impacts to constructions scheduleExisting state of the art construction technology will be utilizedAssumes cooperation between stakeholdersTemporary Power is included in the General Conditions

C-24

Page 90: Meeting of the Transportation Disadvantaged Coordinating ... · Meeting of the Transportation Disadvantaged Coordinating Board(TDCB) Friday, June 23, 2017, 9:30 a.m. County Center,

HART Operations and Maintenance Facility100 Bus 100 Van Facility

by JRH

checked by 03/28/17

Division 1 - General Requirements

General Construction 23,400,000$ ls 10% $2,340,000

Building Systems Commissioning 1 ls 2% $468,000

Bonding Cost 26,000,000$ ls 0.80% $208,000

Submittals 1 ls 100,000$ $100,000

Testing and Surveying 1 ls 100,000$ $100,000

Contract Close-Out & As-Builds 1 ls 40,000.00$ $40,000

Division 1 - Total $3,256,000

Division 2

Spec. No. Existing Conditions Qty Units Unit Cost Total Comments

$0

$0

Division 2 Total $0

Division 3

Spec. No. Concrete Qty Units Unit Cost Total Comments

03 30 00 Continuous Footing, Footers and Piers 405 cy 500.00$ $202,500

03 30 00 Slab on Grade - Operations Area 16,000 sf 6.50$ $104,000

03 30 00 Slab on Grade- Maintenance and Service 79,600 sf 7.90$ $628,840

03 30 00 White non-metallic dryshake w/ sealant 30,000 sf 5.00$ $150,000

03 30 00 Topping on Epic Mezzanine Composite Deck 1600 sf 12.50$ $20,000 3.5" conc on 3" deep deck03 30 00 Topping on Epic Maint Roof Comp. Deck 79,600 sf 10.89$ $866,844 3.25" conc on 2" deck 03 30 00 Topping on Epic Ops Roof Comp. Deck 16,000 sf 10.89$ $174,222

Division 3 Total $2,146,406

Division 4

Spec. No. Masonry Qty Units Unit Cost Total Comments

04 22 00 12" Block Wall 13,200 sf 20.00$ $264,000

04 22 00 8" Block Wall 13,320 sf 16.00$ $213,120

04 22 00 4" Glazed Block - one side glazed 1,800 sf 20.00$ $36,000

04 22 00 8" Glazed Block - two 4" glazed block one side 9,500 sf 38.00$ $361,000

04 22 00 8" Glazed Block - one side glazed 3,700 sf 30.00$ $111,000

04 22 00 12" SGFT both sides 3,840 sf 40.00$ $153,600

04 22 00 12" SGFT - 8" SGFT & 4" SGFT 12,800 sf 40.00$ $512,000

Division 4 Total $1,650,720

Division 5

Spec. No. Metals Qty Units Unit Cost Total Comments

05 12 00 Structural Steel (mat'l only) 653,340 lbs 2.10$ $1,372,014

05 12 00 Structural Steel (labor & equipment) 653,340 lbs 1.60$ $1,045,344

05 13 00 Misc. Metals 50,000 lbs 6.00$ $300,000

05 13 00 Stair Frames - 1 stairs @ 3,600 lbs 3.70$ $13,320

Stair Treads 22 ea 250.00$ $5,500

Handrails - steel for mezzanine stairs 54 lf 200.00$ $10,800

05 31 90 Bar Joist Roof System 276,904 lbs 2.50$ $692,260

05 32 00 Epic Composite Floor Deck - Mezzanine 1,600 sf 7.00$ $11,200

05 32 00 Epic Composite Roof Deck - OPS 16,000 sf 6.60$ $105,600

05 32 00 Epic Acoustic Composite Roof Deck 79,600 sf 8.00$ $636,800

Division 5 Total $4,192,838

Division 6

Spec. No. Wood, Plastics, Composites Qty Units Unit Cost Total Comments

06 10 00 Roof Carpentry

2x6 Roof Cap Blocking (2500 lf) 2500 bf 3.00$ $7,500

06 10 00 In-Wall Blocking

2x6 Misc. Blocking (210 lf) 205 bf 3.60$ $738

Division 6 Total $8,238

Division 7

Spec. No. Thermal and Moisture Protection Qty Units Unit Cost Total Comments

07 21 15 Batt Insulation- 4" unfaced sound batts 6910 sf 1.50$ $10,365

07 22 15 Roof Insulation - 4" Isocyanurate 95,600 sf 3.30$ $315,480

07 26 15 Slab Vapor Barrier 95,600 sf 0.90$ $86,040

07 40 10 Metal Wall Panels 50,762 sf 50.00$ $2,538,100 Centria 3"T Formawall Dim. Series w/insul.

Steel Stud Framing for Metal wall panels- 6" W 8,300 sf 4.69$ $38,927 Ops

Steel Stud Framing for Metal wall panels - 12"W 29,700 sf 6.50$ $193,050 Maintenance

07 54 15 Sarnafil PVC Roofing 95,600 sf 8.00$ $764,800

07 56 00 Roof Metal Coping 2412 ft 10.00$ $24,120

07 72 25 Roof Hatches 2-6x6-6 4 ea 3,500.00$ $14,000

C-25

Page 91: Meeting of the Transportation Disadvantaged Coordinating ... · Meeting of the Transportation Disadvantaged Coordinating Board(TDCB) Friday, June 23, 2017, 9:30 a.m. County Center,

07 84 20 Fire-Resistant Joint Sealants 2000 lf 2.50$ $5,000

07 92 15 Joint Sealants 30,000 lf 1.80$ $54,000

Division 7 Total $4,043,882

Division 8

Spec. No. Openings Qty Units Unit Cost Total Comments

08 10 00 Hollow Metal Door/Frame 3x7 Exterior Insulated 20 ea 1,100.00$ $22,000

08 10 00 Hollow Metal Door/Frame 6x7 Exterior Insulated 4 ea 1,800.00$ $7,200

08 10 00 Hollow Metal Door/Frame 3x7 Interior 64 ea 900.00$ $57,600

08 10 00 Hollow Metal Door/Frame 6x7 Interior 5 ea 1,350.00$ $6,750

08 30 00 Overhead Coiling Doors 12x12 12 ea 6,800.00$ $81,600

08 30 00 Overhead Coiling Doors 12x14 22 ea 8,800.00$ $193,600

08 40 00 Entrance Doors - Kawneer Aluminum 6 ea 2,500.00$ $15,000

08 40 00 Entrance Windows - Kawneer Aluminum 6 ea 1,200.00$ $7,200

08 55 00 Windows - alum frame 52 ea 1,375.00$ $71,500 5'H x 5'L double pane w/ low-e coating

08 60 00Polycarbonate Monitor Windows - 280 L w/ 8' x 8'

sloped sides w/ aluminum frames4,480 sf 50.00$ $224,000

08 71 00 Finish Hardware $0 Included in door prices

08 90 00 Louvers and Vents 1 ls 30,000.00$ $30,000

Division 8 Labor & Equipment 1 ls 90,000.00$ $90,000 Doors and Windows Only

Division 8 Total $806,450

Division 9

Spec. No. Finishes Qty Units Unit Cost Total Comments

09 20 00 Drywall & Studs

One sided 6400 sf 4.00$ $25,600

Two sided to 10' 15,000 sf 6.80$ $102,000

One sided Ceiling 5040 sf 4.20$ $21,168

09 30 00 Ceramic Tile $0

Toilet Rooms 5040 sf 28.00$ $141,120

09 50 00 Ceilings $0

ACT at 10' AFF 13,600 sf 6.00$ $81,600

09 65 80 Resilient Tile & Carpet Flooring $0

Rubber Flooring - recycled tires 9,500 sf 8.00$ $76,000

Rubber Base Cove 1800 lf 3.40$ $6,120

Office Carpeting - carpet squares 325 sy 60.00$ $19,500

Rubber Base 1300 lf 4.00$ $5,200

09 90 00 Painting $0

Interior Walls 36,400 sf 1.50$ $54,600

Interior Ceilings 5040 sf 1.80$ $9,072

Interior Ceilings - Industrial one-coat system 79,600 1.00$ $79,600

Epoxy and Enamel 39,000 sf 0.80$ $31,200

HM Door & Frames 112 ea 175.00$ $19,600

Metal OH Doors 34 ea 275.00$ $9,350

Anti Graffiti Coating 0 sf 1.60$ $0

09 90 10 Concrete Flooring Coating (Ashford Formula) 79,600 sf 1.50$ $119,400

Division 9 Total $801,130

Division 10

Spec. No. Specialties Qty Units Unit Cost Total Comments

10 11 00 Markerboards - 4'h x 8'l 8 ea 500$ $4,000

10 11 00 Tackboards - 4'h x 8'l 16 ea 350$ $5,600

10 14 00 Exterior Identification Sign 1 ls 3,840$ $3,840

10 14 00 Door Identification Signs 70 ea 30$ $2,100

10 14 00 Maintenance Hazard Signs 60 ea 19$ $1,165

10 40 00 FE Cabinets 12 ea 660$ $7,920

10 40 00 Extinguisher 24 ea -$ $0 See Division 21

10 50 00 Full Height Lockers - 15"w x 18"d x 60" h 80 ea 750$ $60,000 Recycled plastic lockers

10 50 00 Full Height Lockers - 12"w x 15"d x 60"h 48 ea 690$ $33,120 Recycled plastic lockers

10 50 00 Half Height Lockers - 12" w x 18"d x 60"h 150 ea 780$ $117,000 Recycled plastic lockers

10 50 00 Locker Benches - 8 feet long 20 ea 520$ $10,400

10 21 13 Toilet Partitions - recycled plastic 22 ea 1,100$ $24,200

10 21 13 Urinal Partitions - recycled plastic 12 ea 400$ $4,800

10 21 90 Work Station Cubicals - 8' x 8' space 6 ea 2,048$ $12,288

10 28 00 Toilet Paper Dispensers - two rolls 24 ea 100$ $2,400

10 28 00 Sanitary Dispensers 4 ea 90$ $360

10 28 00 Used Sanitary Container 4 ea 70$ $280

10 28 00 Paper Towel Dispensers 14 ea 200$ $2,800

10 28 00 Used Paper Towel Containers 14 ea 100$ $1,400

10 28 00 Soap Dispensers 16 ea 100$ $1,600

10 28 00 Grab Bars - Toilets 1@42",36",18" each toilet 6 sets 400$ $2,400

10 28 00 Grab Bars - Showers 1@ 30" & 2@18" 4 sets 300$ $1,200

10 28 00 Shower Curtains 24 ea 200$ $4,800

10 28 00 Shower Seats 4 ea 150$ $600

10 28 00 Dressing Seats 12 ea 200$ $2,400

C-26

Page 92: Meeting of the Transportation Disadvantaged Coordinating ... · Meeting of the Transportation Disadvantaged Coordinating Board(TDCB) Friday, June 23, 2017, 9:30 a.m. County Center,

10 28 00 Soap Dishes 12 ea 60$ $720

10 28 00 Dressing Hooks - double hooks 12 ea 30$ $360

10 55 40 Mail Boxes through wall, back loaded 300 ea 40$ $12,000

10 56 00 Parts Storage Equipment

1005 Pegboard 12 ea 400$ $4,800

1041 Drawer Cabinets 24 ea 2,200$ $52,800

1042 Drawer Cabinets under counter 3 ea 1,350$ $4,050

1046 Storage Cabinet, Electronics 3 ea 900$ $2,700

1070 Flammables Cabinet 5 ea 2,100$ $10,500

1116 Storage Cabinet, Heavy Duty, Tools/Accessories 8 ea 1,650$ $13,200

1117 Storage Cabinet, Heavy Duty, Shelving/Drawers 2 ea 1,500$ $3,000

1119 Storage Cabinet, Heavy Duty, Janitorial 2 ea 1,300$ $2,600

1136 Carousel, Large Tires 2 ea 24,000$ $48,000

1137 Carousel, Small Tires 1 ea 22,000$ $22,000

1325 Pallet Rack with Shelving 4 ea 1,200$ $4,800

1326 Pallet Rack with Wire Decking 1 ea 1,800$ $1,800

1344 Parts Storage Rack System 1 ea 75,000$ $75,000

1366 Shelving with wire shelves - 2' x 4' 8 ea 800$ $6,400

1367 Shelving with wire shelves - 1'-6" x 4' 12 ea 600$ $7,200

1391 Glass Rack 2 ea 750$ $1,500

1391 Panel Rack 2 ea 750$ $1,500

1489 Book Shelves 6 ea 350$ $2,100

1516 Storage Shelving 1 ea 400$ $400

1730 Automated Vertical Storage System 1 ea 145,000$ $145,000

10 75 00 Flag Poles - 40 feet high 2 ea 4,000$ $8,000

Division 10 Total $737,103

Division 11

Equip. No. Equipment Qty Units Unit Cost Total Comments

2036 Wheel Balancer - Vans 1 ea. 5,500$ $5,500

2037 Wheel Balancer 1 ea. 16,350.00$ $16,350

2065 Buffer/Grinder 10" w/ dust collector 4 ea. 9,900$ $39,600

2090 Tire Inflation Chamber 1 ea. 3,495$ $3,495

2106 Fleet Battery Charger 1 ea. 730$ $730

2107 Battery Charger/Tester w/ Cart 1 ea. 3,800$ $3,800

2169 Air Compressor, 30 HP Duplex 1 ea. 40,000$ $40,000

2170 Air Dryer 1 ea. 5,000$ $5,000

2178 Air Compressor, 7.5 HP Duplex 1 ea. 6,200$ $6,200

2179 Air Dryer 1 ea. 1,000$ $1,000

2227 Disc Grinder/Sander 12" 1 ea. 4,620$ $4,620

2230 Drill Press, Variable Speed 15" 3 ea. 600$ $1,800

2290 Tire Dunker 1 ea. 4,030$ $4,030

2320 Fall Protection 4 ea. 1,700$ $6,800

2400 Tire Mounter/Demounter 1 ea. 12,500$ $12,500

2456 Arbor Press 1 ea. 430$ $430

2466 Press, 60 Tons 2 ea. 7,500$ $15,000

2506 Refrigerant Recovery 1 ea. 5,300$ $5,300

2527 Vertical Band Saw, 20" 1 ea. 8,500$ $8,500

2543 Cold-Cut Saw, 12" 1 ea. 6,231$ $6,231

2585 Welding Screen 4 ea. 265$ $1,060

2628 Vise, Swivel Base, 5" 12 ea. 500$ $6,000

2662 MIG Welder, Portable 1 ea. 2,819$ $2,819

2668 Oxyacetylene Welder w/ Cart 1 ea. 1,100$ $1,100

2672 TIG Welder 1 ea. 2,500$ $2,500

3004 Abrasive Blast Cabinet 1 ea. 1,135.00$ $1,135

3012 Ultrasonic Cleaner 1 ea. 17,800.00$ $17,800

3031 High Pressure Hot Water, Portable 1 ea. 8,700$ $8,700

3071 High Pressure Washer 2 ea. 27,000$ $54,000

3087 Parts Washer, 500# Capacity 1 ea. 18,000$ $18,000

3216 Vehicle Washer 2 ea. 600,000$ $1,200,000

2348 Ladder, rolling with Safety Cage 4 ea. 16,000$ $64,000

3510 Vacuum System 1 ea. 45,000$ $45,000

3590 Welding Fume Extractor 1 ea. 6,600$ $6,600

3591 Fume Hood, Benchtop 1 ea. 1,074$ $1,074

3620 Vehicle Exhaust Reel 23 ea. 7,350$ $169,050

3700 Waste Hopper 2 Tons 6 ea. 2,500$ $15,000

5010 Wheel Dolly 4 ea. 800$ $3,200

5051 Service Carts 12 ea. 638$ $7,656

5065 Basket, Portable, Laundry 2 ea. 150$ $300

5071 Computer Cabinets 6 ea. 364$ $2,184

7012 Diesel Fuel Dispenser - 20 GPM 2 ea. 3,138$ $6,276

7702 DEF Dispensing System 2 ea. 5,930$ $11,859

CNG Dispenser 6 ea. 4,000$ $24,000

7425 Tank Monitoring System 2 ea. 2,500$ $5,000

7500 Fluid Management System 8 ea. 10,000$ $80,000

7520 Pump 75:1 (Grease) 1 ea. 3,500$ $3,500

C-27

Page 93: Meeting of the Transportation Disadvantaged Coordinating ... · Meeting of the Transportation Disadvantaged Coordinating Board(TDCB) Friday, June 23, 2017, 9:30 a.m. County Center,

7522 Pump 6:1 (EO) 1 ea. 3,200$ $3,200

7527 Pump 10:1 (Gear Oil) 1 ea. 3,300$ $3,300

7530 Pump 1:1 ( Antifreeze & Window Cleaner) 4 ea. 2,800$ $11,200

7531 Pump 3:1 (EO & ATF) 2 ea. 2,900$ $5,800

7533 Pump 5:1 (ATF) 1 ea. 3,100$ $3,100

7534 SS Submersible Pump (DEF) 1 ea. 7,500$ $7,500

7547 Fluid Evacuation Pump 4 ea. 1,850$ $7,400

7703 Window Washer Reel 2 ea. 1,800$ $3,600

7704 Antifreeze/Coolant Recycling System 1 ea. 4,500$ $4,500

7705 Waste Coolant Receiver 6 ea. 2,010$ $12,060

7706 Waste Oil Receiver 6 ea. 1,707$ $10,242

7750 Hose Reels - CA 38 ea. 1,800$ $68,400

7751 Hose Reels - ATF 19 ea. 2,675$ $50,825

7752 Hose Reels - EO 19 ea. 2,675$ $50,825

7753 Hose Reels - CO 19 ea. 1,800$ $34,200

7754 Hose Reels - GO 19 ea. 2,262$ $42,978

7755 Hose Reels - CG 19 ea. 2,644$ $50,236

7757 Electric Light/Outlet Wire Reel 38 ea. 300$ $11,400

7927 Tank, 120 Gal 3 ea. 2,050$ $6,150

7930 Tank, 280 Gal 3 ea. 4,249$ $12,747

7933 Tank, 500 Gal 1 ea. 5,080$ $5,080

7940 Tank, 120 Gal WW Polyethylene 2 ea. 600$ $1,200

7945 Tank, 1000 Gal DEF Polyethylene 1 ea. 5,000$ $5,000

7958 Waste Oil Tank, 1000 Gal Fiberglass 1 ea. 12,000$ $12,000

7965 Diesel Storage Tank, 10,000 Gal 2 ea. 30,000$ $60,000

8062 Welding Table, 10' w/ Exhaust System 1 ea. 18,000.00$ $18,000

8106 Electronics Workbench 4 ea. 744$ $2,976

8117 Severe Duty Workbench 14 ea. 2,000$ $28,000

Loading Dock 1 ea. 24,000$ $24,000

Paint Booth with side lifts 1 ea. 1,200,000$ $1,200,000

11800 Equipment Installation 1 ls 400,000$ $400,000

Division 11 Total $4,100,618

Division 12

Spec. No. Furnishings Qty Units Unit Cost Total Comments

Base Cabinet Units 60 lf 250.00$ $15,000

Counter Tops 80 lf 300.00$ $24,000

Coat Rack & Shelf 20 lf 120.00$ $2,400

Operation Control Center Furniture 1 LS 20,000.00$ $20,000 Allowance

Division 2 Total $61,400

Division 13

Spec. No. Special Construction Qty Units Unit Cost Total Comments

Division 13 Total $0

Division 14

Equip. No. Conveying Equipment Qty Units Unit Cost Total Comments

9120 Bridge Crane 3 ton 2 ea 40,000$ $80,000 Acco - above two bays

9306 Forklift, 4000# 2 ea 70,300$ $140,600 Mitsubishi

9513 Bus Lifts - Portable 10 ea 80,000$ $800,000.00 Sets of 4 portable wireless lifts - Stertil Koni

9672 Vertical Lift, Inground 75,000# capacity 1 ea 375,000$ $375,000.00

9672 Vehicle Platform Lifts 6 ea 125,000$ $750,000

9815 Pallet Jack, 5500# 3 ea 515$ $1,545

Division 14 Total $2,147,145

Division 21

Spec. No. Fire Suppression Qty Units Unit Cost Total Comments

Preaction Valve 1 ea 42,000$ $42,000

Fire Alarm Panel 1 ea 25,000$ $25,000

Wet-Pipe Sprinkler System 95,600 sf 7$ $669,200

Smoke Detectors 20 ea. 200$ $4,000

Heat Detectors 10 ea. 250$ $2,500

Fire Extinguishers 24 ea. 350$ $8,400

Fire Hydrants 3 ea. 2,500$ $7,500

Fire Line PIV 1 ea 3,000$ $3,000

Division 21 Total $761,600

Division 22

Spec. No. Plumbing Qty Units Unit Cost Total Comments

Horizontal Pipe Support 205 ea. 25$ $5,120

Hanger Rod Connection 717 ea. 30$ $21,500

15107 Water Piping 600 lf 15$ $9,000

Water Supply Piping 480 lf 45$ $21,600

C-28

Page 94: Meeting of the Transportation Disadvantaged Coordinating ... · Meeting of the Transportation Disadvantaged Coordinating Board(TDCB) Friday, June 23, 2017, 9:30 a.m. County Center,

Compressed Air Piping 1700 lf 25$ $42,500

Drain Piping 2050 lf 40$ $82,000

Roof Drain Piping with Hangers 3000 lf 35$ $105,000

Oil-Lubrication System Piping 3380 lf 40$ $135,200

Sanitary Line 2050 lf 40$ $82,000

15110 Domestic Water Ball Valves 20 ea. 70$ $1,400

Compressed Air Valves 40 ea. 250$ $10,000

Gas Supply Valves 20 ea. 320$ $6,400

Gas Supply Pressure Regulators 12 ea. 1,500$ $18,000

Butterfly Valves 20 ea. 750$ $15,000

15112 General Duty Valves for HVAC 40 ea. 250$ $10,000

Hot Water Valves 30 ea. 260$ $7,800

Main Water Meter Service 1 ea. 9,000$ $9,000

3" Diameter Cast Iron Valves 5 ea. 700$ $3,500

8" Diameter Cast Iron Valves 2 ea. 1,800$ $3,600

15120 Water Meter Service Gate Valves 3" 3 ea. 400$ $1,200

15124 Expansion Fittings 20 ea. 205$ $4,100

15140 Main Backflow Preventer 1 ea. 20,000$ $20,000

3" Service Backflow Preventers 2 ea. 2,500$ $5,000

15155 Floor Clean Outs 10 ea. 150$ $1,500

Clean Out Tees 10 ea. 400$ $4,000

Floor Drains 20 ea. 500$ $10,000

Roof Drains 28 ea. 650$ $18,200

Shower Drain with Strainer 12 ea. 180$ $2,160

Interceptors 6 ea. 2,000$ $12,000

Oil-Water Separators 4 ea. 4,000$ $16,000

Traps 10 ea. 300$ $3,000

Trench Drains 1060 ft 210$ $222,600

15180 Hose Bibs 14 ea. 250$ $3,500

15400 Sink Fixtures with Hardware 16 ea. 700$ $11,200

Hand Sinks in Maintenance 2 ea. 800$ $1,600

Water Fountains 8 ea. 1,800$ $14,400

Urinals 8 ea. 1,100$ $8,800

Water Closets 20 ea. 1,200$ $24,000

Showers 12 ea. 1,500$ $18,000

15440 Grinder Pump System 1 ls 10,000$ $10,000

Material Mark Up 27% $269,968 Includes 7% Sales Tax

Plumbing Labor and Equipment from Detail Sheet $400,000 Assumes 4 months; includes mark-ups

Division 22 Total $1,669,848

Division 23

Spec. No. HVAC Qty Units Unit Cost Total Comments

Roof Duct Supports 24 ea. 150$ $3,600

15083 HVAC Insulation 10000 sf 4$ $40,000

Expansion Tanks - Diaphragm Type 1 ea. 2,800$ $2,800

15127 Meters and Gages for HVAC 10 ea. 250$ $2,500

Electronic Type Air Measuring Station 4 ea. 4,000$ $16,000

Venturi Type Water Measuring Sta. 1 ea. 3,500$ $3,500

15181 Hydronic Piping 2048 ft 25$ $51,200

15183 Refrigerant Piping 300 ft 20$ $6,000

Piping Through Penetrations 25 ea. 150$ $3,750

15185 Hydronic Pumps 2 ea 3,365$ $6,730

15189 HVAC Water Treatment 1 ls 1,500$ $1,500

Air Separator for Heating Water 1 ea. 1,000$ $1,000

Hot Water Pump Filter 1 ea. 565$ $565

Chemical By-Pass Feeder 1 ea. 1,500$ $1,500

15513 Gas Fired Boilers; Hot Water; 1400 MBH 2 ea. 25,000$ $50,000

15671 Condensing Units 1 ea. 40,000$ $40,000

Condensate Piping 600 ft 20$ $12,000

15725 Modular Indoor Air Handling 1 ea. 30,000$ $30,000

15738 Split System Air Conditioning 2 ea. 6,000$ $12,000

15762 Unit Heaters 10 ea. 1,400$ $14,000

15764 Convection Heating Units

Hot Water Finned Tube Radiation Units 700 lf 48$ $33,600

15785 Energy Recovery Units 4 ea. 18,000$ $72,000

Energy Unit Heat Exchanger (AHU-1) 1 ea. 10,000$ $10,000

15815 Metal Ducts 1 ls 120,000$ $120,000

15820 Duct Accessories 1 ls 20,000$ $20,000 Allowance

Sound Attenuation 2 ea. 2,000$ $4,000

15837 Centrifugal Fans

Exhaust Fans 1000 CFM 0.5" w.g. 10 ea. 1,800$ $18,000

Exhaust Fans 2000 CFM 1.0" w.g. 1 ea. 2,800$ $2,800

10,000 CFM Exhaust Fans 6 ea. 5,500$ $33,000

Variable Speed Return Air Fan 1 ea. 5,000$ $5,000

Variable Speed Supply Air Fan 1 ea. 5,000$ $5,000

15838 Power Ventilators 6 ea. 900$ $5,400

C-29

Page 95: Meeting of the Transportation Disadvantaged Coordinating ... · Meeting of the Transportation Disadvantaged Coordinating Board(TDCB) Friday, June 23, 2017, 9:30 a.m. County Center,

15840 Air Terminal Units 15 ea. 1,500$ $22,500

15855 Diffusers, Registers and Grilles 30 ea. 125$ $3,750

15856 Intake and Relief Valves 20 ea. 110$ $2,200

Air Blender Stations 2 ea. 3,000$ $6,000

15861 Air Filters 1 ea. 1,200$ $1,200

15900 HVAC Instrumentation 1 ls 90,000$ $90,000

Tamper Switches 6 ea. 150$ $900

HVAC Instrumentation 6 ea. 250$ $1,500

Duct Detectors 12 ea. 300$ $3,600

CO Sensors 12 ea. 200$ $2,400

CO2 Sensors 6 ea. 500$ $3,000

Material Mark Up 27% $206,414 Includes 7% Sales Tax

HVAC Labor and Equipment $311,371 Assumes 4 months; includes mark-ups

Division 23 Total $1,282,279

Division 26

Spec. No. Electrical Qty Units Unit Cost Total Comments

#10 THHN 24700 ft 0.25$ $6,175

12/2 MC 8000 ft 0.38$ $3,040

12/2 MC w/Insulated Ground 3000 ft 0.45$ $1,350

#2 XLP 9800 ft 1.46$ $14,341

#6 XLP 7000 ft 0.91$ $6,402

#8 XLP 9830 ft 0.57$ $5,619

12/2 Fire Alarm Cable 6000 ft 0.38$ $2,280

18/2 Alarm Cable 8000 ft 0.98$ $7,805

#4 XLP 2500 ft 1.16$ $2,896

#4 XLP (Switch Heaters) 20000 ft 1.16$ $23,171

#10 XLP 14000 ft 0.69$ $9,604

4/0 THHN 1500 ft 4.70$ $7,050

#12 XLP 1350 ft 0.55$ $743

#2 THHN 400 ft 1.20$ $480

500 MCM 15400 ft 6.60$ $101,640

#6 THHN 2480 ft 0.65$ $1,612

#4 THHN 5700 ft 0.85$ $4,845

Coaxial Cable RC6 1500 ft 0.95$ $1,425

Telephone Wire 1500 ft 0.25$ $375

Conduit - 1" EMT 2020 ft 3.60$ $7,272

3/4" EMT 6030 ft 2.80$ $16,884

1 1/2" EMT 1970 ft 4.20$ $8,274

2" EMT 220 ft 5.00$ $1,100

2 1/2" PVC 300 ft 4.00$ $1,200

1 1/2" PVC 850 ft 3.60$ $3,060

1 1/2" PVC (Buried) 8000 ft 8.20$ $65,600

1" PVC 3045 ft 3.20$ $9,744

3/4" RGS 1150 ft 5.00$ $5,750

3/4" PVC 950 ft 2.60$ $2,470

1 1/2" RGS 100 ft 7.50$ $750

2" PVC 1870 ft 3.80$ $7,106

Stub Up Conduits 300 ea. 150.00$ $45,000

4" PVC 3050 ft 12.00$ $36,600

Boxes; NEMA 1 6"x6"x4" 350 ea. 40.00$ $14,000

NEMA 12 24"x30" 10 ea. 400.00$ $4,000

Wiring Devices - Toggle Switches 60 ea. 20.00$ $1,200

Switch Plates 60 ea. 25.00$ $1,500

3 Gang Switch Plates 20 ea. 60.00$ $1,200

120v. Duplex Receptacles 150 ea. 15.00$ $2,250

GFI Duplex Receptacles 30 ea. 30.00$ $900

Duplex Receptacles w/Internal Ground 75 ea. 25.00$ $1,875

Welding Receptacles w/Disconnect 12 ea. 140.00$ $1,680

Flexible Conduit Connection to Motors 50 ea. 20.00$ $1,000

Emergency Generator - 1000 KVA 1 ea. 300,000$ $300,000

Single Phase 240/480 Transformers 2 ea. 15,000.00$ $30,000

Main Disconnect Panel 800 amp 3 ea. 18,000.00$ $54,000

Main Disconnect Panel 1200 amp 3 ea. 20,000.00$ $60,000

400 amp 3 Phase Panel 3 ea. 5,000.00$ $15,000

200 amp single Phase Panel 4 ea. 1,200.00$ $4,800

MCC Starter Combinations -Size 0 15 ea. 1,600.00$ $24,000

Size 1 10 ea. 1,800.00$ $18,000

Size 2 8 ea. 2,020.00$ $16,160

MCC Stand Up Bays 11 ea. 1,400.00$ $15,400

Disconnects - 30 amp 20 ea. 600.00$ $12,000

60 amp 13 ea. 800.00$ $10,400

Interior Lighting - 2x4 277volt 100 ea. 250.00$ $25,000

14x48 277 volt 40 ea. 190.00$ $7,600

Bathroom Overhead Sink Fixtures (4' ea.) 16 ea. 200.00$ $3,200

Down Light 120 volt 50 ea. 180.00$ $9,000

C-30

Page 96: Meeting of the Transportation Disadvantaged Coordinating ... · Meeting of the Transportation Disadvantaged Coordinating Board(TDCB) Friday, June 23, 2017, 9:30 a.m. County Center,

Exit Lights 17 ea. 190.00$ $3,230

Outdoor Wall Pack 250w 20 ea. 600.00$ $12,000

High Bay 1000w 150 ea. 650.00$ $97,500 Assumes 400 sf coverage per light

Material Mark-Up 27% $312,811 Includes 7% Sales Tax

Labor and Equipment Installation 1 ls $425,000 $425,000

Division 26 Total $1,896,369

Division 27

Spec. No. Communications Qty Units Unit Cost Total Comments

Fiber Optic Backbone 1200 lf 15.00$ $18,000

Equipment Rack 7ft- ADC 4 ea. 391$ $1,564

FDP-ADC-144 4 ea. 1,660$ $6,640

FDP-ADC-48 4 ea. 1,585$ $6,340

Ethernet Switch - 10GE w/ GBIC 2 ea. 12,133$ $24,266

L2 / L3 Ethernet Sw - applications 2 ea. 5,375$ $10,750

Cable Management Tray-ADC 1 ea. 328$ $328

CAT 6 Jack Panel-ADC 2 ea. 358$ $716

NVR Server 1 ea. 2,775$ $2,775

SAN Switch-Cisco 2960 1 ea. 1,295$ $1,295

RAID-5 Archive- Intransa 8T Edge Block 1 ea. 12,254$ $12,254

Analytics Server- Dell 2950 1 ea. 3,255$ $3,255

Wireless LAN Controller- Cisco 4402 1 ea. 11,755$ $11,755

Antenna 1 ea. $12,000 $12,000

Satellite Dish 1 ea. $5,000 $5,000

Operations Control Center Equipment 1 LS $50,000 $50,000

Material Mark-Up 27% $45,073 Includes 7% Sales Tax

Labor and Equipment Installation 1 ls $55,000 $55,000

Division 27 Total $267,011

Division 28

Spec. No. Electronic Safety & Security Qty Units Unit Cost Total Comments

Security and Surveillance System

Doors with Access Controls 10 ea. 6,000.00$ $60,000

Fixed Position Cameras 15 ea. 1,500.00$ $22,500

Digital Video Recorder 1 ea. 5,000.00$ $5,000

Security Controller Panel 1 ea. 1,500.00$ $1,500

Video Monitor 1 ea. 5,000.00$ $5,000

Operations Control Center Monitors 1 ea. 2,500.00$ $2,500

Material Mark-Up 27% $26,055 Includes 7% Sales Tax

Labor and Equipment Installation 1 ls 45,000$ $45,000

Division 28 Total $167,555

C-31

Page 97: Meeting of the Transportation Disadvantaged Coordinating ... · Meeting of the Transportation Disadvantaged Coordinating Board(TDCB) Friday, June 23, 2017, 9:30 a.m. County Center,

Board & Committee Agenda Item Agenda Item Community Transportation Coordinator (CTC) Service Rates for 2017/2018

Presenter

Karen Smith, Sunshine Line

Summary

Each year the Community Transportation Coordinator (CTC) is required to submit a completed Rate Calculation Model worksheet to the Commission for the Transportation Disadvantaged. This rate model determines the trip rates for reimbursement to the CTC from the Trip/Equipment Grant from the Commission for the Transportation Disadvantaged (CTD). Rates are determined by the model using budget and estimated trip and mileage data from the current fiscal year. Staff will report on the CTD Disadvantaged Rate Calculation Model for the 2017/2018 grant year effective July 1, 2017: DOOR-TO-DOOR SERVICE RATE PER ONE-WAY TRIP AMBULATORY TRIP $25.89 (currently $24.33) WHEELCHAIR TRIP $44.38 (currently $41.71) GROUP TRIP* $12.71 (currently $12.13) *(5 or more passengers going to or from the same address at the same time such that all passengers can be picked up and dropped off within one hour) BUS PASSES/TICKETS: Cost of pass or ticket plus administration.* *The per - trip co‐payment is on a sliding scale, depending on the client’s household income as follows: Household Income Co‐Pay per Trip 125% (or less) of Federal Poverty Guidelines No Co‐Pay 126%‐300% of Federal Poverty Guidelines $2.00 More than 300% of Federal Poverty Guidelines $5.00

The Transportation Disadvantaged Coordinating Board is required to review and approve the Service Rates annually. Recommended Action

Approve the 2017/2018 Service Rates and its inclusion in the TDSP update.

Prepared By

Michele Ogilvie, MPO staff

Attachments

Rate Model Worksheet

Plan Hillsborough planhillsborough.org

[email protected] 813 - 272 - 5940

601 E Kennedy Blvd 18th floor

Tampa, FL, 33602

Page 98: Meeting of the Transportation Disadvantaged Coordinating ... · Meeting of the Transportation Disadvantaged Coordinating Board(TDCB) Friday, June 23, 2017, 9:30 a.m. County Center,

Preliminary Information Worksheet Version 1.4

CTC Name:

County (Service Area):

Contact Person:

Phone #

Check Applicable Characteristic:

ORGANIZATIONAL TYPE: NETWORK TYPE:

Governmental Fully Brokered

Private Non-Profit Partially Brokered

Private For Profit Sole Source

Once completed, proceed to the Worksheet entitled "Comprehensive Budget"

Hillsborough County BOCC

Hillsborough

Karen Smith

813-276-8126

HillsboroughCTDRateCalc2017.xls: Preliminary InformationPage 1 of 8

Page 99: Meeting of the Transportation Disadvantaged Coordinating ... · Meeting of the Transportation Disadvantaged Coordinating Board(TDCB) Friday, June 23, 2017, 9:30 a.m. County Center,

Comprehensive Budget Worksheet Version 1.4 CTC: Hillsborough County BOCC

County: Hillsborough

1. Complete applicable GREEN cells in columns 2, 3, 4, and 7

Prior Year's

ACTUALS

Current Year's

APPROVED

Budget, as

amended

Upcoming Year's

PROPOSED

Budget

from from from Confirm whether revenues are collected as a system subsidy VS

Oct 1st of Oct 1st of 1 a purchase of service at a unit price.

2015 2016 2017

to to to

Sept 30th of Sept 30th of Sept 30th of

2016 2017 2018 Explain Changes in Column 6 That Are > ± 10% and Also > ± $50,000

1 2 3 4 5 6 7

REVENUES (CTC/Operators ONLY / Do NOT include coordination contractors!)

Local Non-Govt

Farebox 59,163$ 51,522$ 51,640$ -12.9% 0.2%

Medicaid Co-Pay Received

Donations/ Contributions

In-Kind, Contributed Services

Other

Bus Pass Program Revenue

Local Government

District School Board

Compl. ADA Services

County Cash 3,144,576$ 3,452,466$ 4,400,701$ 9.8% 27.5%

County In-Kind, Contributed Services

City Cash

City In-kind, Contributed Services

Other Cash

Other In-Kind, Contributed Services

Bus Pass Program Revenue 233,569$ 414,879$ 253,293$ 77.6% -38.9%

CTD

Non-Spons. Trip Program 1,253,932$ 1,478,936$ 987,751$ 17.9% -33.2%

Non-Spons. Capital Equipment

Rural Capital Equipment

Other TD (specify in explanation)

Bus Pass Program Revenue 767,807$ 824,620$ 925,874$ 7.4% 12.3%

USDOT & FDOT

49 USC 5307

49 USC 5310

49 USC 5311 (Operating)

49 USC 5311(Capital)

Block Grant

Service Development

Commuter Assistance

Other DOT (specify in explanation)

Bus Pass Program Revenue

AHCA

Medicaid

Other AHCA (specify in explanation)

Bus Pass Program Revenue

DCF

Alcoh, Drug & Mental Health

Family Safety & Preservation

Comm. Care Dis./Aging & Adult Serv.

Other DCF (specify in explanation)

Bus Pass Program Revenue

DOH

Children Medical Services

County Public Health

Other DOH (specify in explanation)

Bus Pass Program Revenue

DOE (state)

Carl Perkins

Div of Blind Services

Vocational Rehabilitation

Day Care Programs

Other DOE (specify in explanation)

Bus Pass Program Revenue

AWI

WAGES/Workforce Board

Other AWI (specify in explanation)

Bus Pass Program Revenue

DOEA

Older Americans Act 357,005$ 500,000$ 428,123$ 40.1% -14.4%

Community Care for Elderly

Other DOEA (specify in explanation)

Bus Pass Program Revenue

DCA

Community Services

Other DCA (specify in explanation)

Bus Pass Admin. Revenue 9,704$ -$ -$ -100.0%

Funding levels for this service has been fluctuating

Community Service Block Grant program no longer funding trnasportation.

% Change

from Prior

Year to

Current

Year

Proposed

% Change

from

Current

Year to

Upcoming

Year

County funding covers trips and passes funded by County sources, as well as

covering balance of expenses depending on revenue streams. FY 16/17 reflects

a greater portion of bus pass expenses covered by County funds than past year

or projected next year.

Reflects projected return of grant to previous year funding level. FY 16/17 higher

funding reflects one-time increase due to proviso funding.

HillsboroughCTDRateCalc2017.xls: Comprehensive BudgetPage 2 of 8

Page 100: Meeting of the Transportation Disadvantaged Coordinating ... · Meeting of the Transportation Disadvantaged Coordinating Board(TDCB) Friday, June 23, 2017, 9:30 a.m. County Center,

Comprehensive Budget Worksheet Version 1.4 CTC: Hillsborough County BOCC

County: Hillsborough

1. Complete applicable GREEN cells in columns 2, 3, 4, and 7

Prior Year's

ACTUALS

Current Year's

APPROVED

Budget, as

amended

Upcoming Year's

PROPOSED

Budget

from from from Confirm whether revenues are collected as a system subsidy VS

Oct 1st of Oct 1st of 1 a purchase of service at a unit price.

2015 2016 2017

to to to

Sept 30th of Sept 30th of Sept 30th of

2016 2017 2018 Explain Changes in Column 6 That Are > ± 10% and Also > ± $50,000

1 2 3 4 5 6 7

% Change

from Prior

Year to

Current

Year

Proposed

% Change

from

Current

Year to

Upcoming

Year

APD

Office of Disability Determination

Developmental Services

Other APD (specify in explanation)

Bus Pass Program Revenue

DJJ

(specify in explanation)

Bus Pass Program Revenue

Other Fed or State

xxx

xxx

Bus Pass Program Revenue 2,319$ -$ -$ -100.0%

Other Revenues

Interest Earnings

xxxx

xxxx

Bus Pass Program Revenue

Balancing Revenue to Prevent Deficit

Actual or Planned Use of Cash Reserve

Balancing Revenue is Short By = None None

Total Revenues = $5,828,075 $6,722,423 $7,047,382 15.3% 4.8%

EXPENDITURES (CTC/Operators ONLY / Do NOT include Coordination Contractors!)

Operating Expenditures

Labor 2,310,113$ 2,408,945$ 2,727,255$ 4.3% 13.2%

Fringe Benefits 879,960$ 1,048,286$ 1,198,606$ 19.1% 14.3%

Services 503,247$ 831,874$ 588,701$ 65.3% -29.2%

Materials and Supplies 306,728$ 281,464$ 411,231$ -8.2% 46.1%

Utilities 61,459$ 54,624$ 47,900$ -11.1% -12.3%

Casualty and Liability 60,745$ 61,437$ 61,135$ 1.1% -0.5%

Taxes

Purchased Transportation:

Purchased Bus Pass Expenses 1,013,399$ 1,239,499$ 1,179,167$ 22.3% -4.9%

School Bus Utilization Expenses

Contracted Transportation Services

Other 18,212$ 24,702$ 24,702$ 35.6% 0.0%

Miscellaneous 40,530$ 33,526$ 35,442$ -17.3% 5.7%

Operating Debt Service - Principal & Interest

Leases and Rentals

Contrib. to Capital Equip. Replacement Fund 581,239$ 738,066$ 773,243$ 27.0% 4.8%

In-Kind, Contributed Services -$ -$ -$

Allocated Indirect 52,443$ -$ -$ -100.0%

Capital Expenditures

Equip. Purchases with Grant Funds

Equip. Purchases with Local Revenue

Equip. Purchases with Rate Generated Rev.

Capital Debt Service - Principal & Interest

Total Expenditures = $5,828,075 $6,722,423 $7,047,382 15.3% 4.8%

Once completed, proceed to the Worksheet entitled "Budgeted Rate Base"

Reflects increase in personnel costs including projected pay increases, 2 new

driver postions and increased medical insurance costs; materials increase reflects

projected maintenance supplies including fuel and oil; increase to vehicle

replacement program is due to increased purchase cost of vehicles and

shortening of replacement schedule back to 5 years based on experience with

vehicles. Reduction in projected services costs reflects projected reduction in

maintenance service costs as older vehicles have been or are scheduled to be

replaced. Allocated indirect costs were only charged to Dept one year due to

temporary increase in grant funding that year.

Homleless Veterans program. No longer funding transportation.

HillsboroughCTDRateCalc2017.xls: Comprehensive BudgetPage 3 of 8

Page 101: Meeting of the Transportation Disadvantaged Coordinating ... · Meeting of the Transportation Disadvantaged Coordinating Board(TDCB) Friday, June 23, 2017, 9:30 a.m. County Center,

Budgeted Rate Base Worksheet Version 1.4 CTC: Hillsborough County BOCC

County: Hillsborough

1. Complete applicable GREEN cells in column 3; YELLOW and BLUE cells are automatically completed in column 3

2. Complete applicable GOLD cells in column and 5

Upcoming Year's

BUDGETED

Revenues

from

Oct 1st of

2017

to

Sept 30th of

2018

1 2 3 4 5

REVENUES (CTC/Operators ONLY)

Local Non-Govt

Farebox 51,640$ 51,640$ YELLOW cellsMedicaid Co-Pay Received -$ -$ are NEVER Generated by Applying Authorized RatesDonations/ Contributions -$ -$

In-Kind, Contributed Services -$ -$ -$

Other -$ -$

Bus Pass Program Revenue -$ -$ -$

Local Government

District School Board -$ -$ -$ BLUE cells

Compl. ADA Services -$ -$ -$ Should be funds generated by rates in this spreadsheetCounty Cash 4,400,701$ 1,901,979$ 2,498,722$

County In-Kind, Contributed Services -$ -$ -$

City Cash -$ -$

City In-kind, Contributed Services -$ -$ -$

Other Cash -$ -$

Other In-Kind, Contributed Services -$ -$ -$

Bus Pass Program Revenue 253,293$ -$ 253,293$

CTD local match req. GREEN cells

Non-Spons. Trip Program 987,751$ 987,751$ -$ -$ 109,750$ MAY BE Revenue Generated by ApplyingNon-Spons. Capital Equipment -$ -$ -$ -$ -$ Authorized Rate per Mile/Trip Charges

Rural Capital Equipment -$ -$ -$ -$ -$

Other TD -$ -$

Bus Pass Program Revenue 925,874$ -$ 925,874$

USDOT & FDOT

49 USC 5307 -$ -$ -$

49 USC 5310 -$ -$ -$ -$ -$

49 USC 5311 (Operating) -$ -$

49 USC 5311(Capital) -$ -$ -$ -$ -$

Block Grant -$ -$ -$

Service Development -$ -$ -$

Commuter Assistance -$ -$ -$

Other DOT -$ -$

Bus Pass Program Revenue -$ -$ -$

AHCA

Medicaid -$ -$ -$

Other AHCA -$ -$

Bus Pass Program Revenue -$ -$ -$

DCF

Alcoh, Drug & Mental Health -$ -$ -$

Family Safety & Preservation -$ -$ -$

Comm. Care Dis./Aging & Adult Serv. -$ -$ -$

Other DCF -$ -$ GOLD cells

Bus Pass Program Revenue -$ -$ -$

DOH

Children Medical Services -$ -$ -$

County Public Health -$ -$ -$

Other DOH -$ -$

Bus Pass Program Revenue -$ -$ -$

DOE (state)

Carl Perkins -$ -$ -$

Div of Blind Services -$ -$ -$

Vocational Rehabilitation -$ -$ -$

Day Care Programs -$ -$ -$

Other DOE -$ -$

Bus Pass Program Revenue -$ -$ -$

AWI

WAGES/Workforce Board -$ -$ -$

AWI -$ -$

Bus Pass Program Revenue -$ -$ -$

DOEA

Older Americans Act 428,123$ 428,123$ -$

Community Care for Elderly -$ -$ -$

Other DOEA -$ -$

Bus Pass Program Revenue -$ -$ -$

DCA

Community Services -$ -$ -$

Other DCA -$ -$

Bus Pass Program Revenue -$ -$ -$

What amount of the

Budgeted Revenue

in col. 2 will be

generated at the

rate per unit

determined by this

spreadsheet, OR

used as local match

for these type

revenues?

Budgeted Rate

Subsidy Revenue

EXcluded from

the Rate Base

What amount of the

Subsidy Revenue in

col. 4 will come

from funds to

purchase

equipment, OR will

be used as match

for the purchase of

equipment?

Fill in that portion of Budgeted Rate Subsidy Revenue in

Column 4 that will come from Funds Earmarked by the Funding

Source for Purchasing Capital Equipment. Also include the

portion of Local Funds earmarked as Match related to the

Purchase of Capital Equipment if a match amount is required

by the Funding Source.

Fill in that portion of budgeted revenue in Column 2 that will be

GENERATED through the application of authorized per mile,

per trip, or combination per trip plus per mile rates. Also,

include the amount of funds that are Earmarked as local match

for Transportation Services and NOT Capital Equipment

purchases.

If the Farebox Revenues are used as a source of Local Match

Dollars, then identify the appropriate amount of Farebox

Revenue that represents the portion of Local Match required

on any state or federal grants. This does not mean that

Farebox is the only source for Local Match.

Please review all Grant Applications and Agreements

containing State and/or Federal funds for the proper Match

Requirement levels and allowed sources.

HillsboroughCTDRateCalc2017.xls: Budgeted Rate BasePage 4 of 8

Page 102: Meeting of the Transportation Disadvantaged Coordinating ... · Meeting of the Transportation Disadvantaged Coordinating Board(TDCB) Friday, June 23, 2017, 9:30 a.m. County Center,

Budgeted Rate Base Worksheet Version 1.4 CTC: Hillsborough County BOCC

County: Hillsborough

1. Complete applicable GREEN cells in column 3; YELLOW and BLUE cells are automatically completed in column 3

2. Complete applicable GOLD cells in column and 5

Upcoming Year's

BUDGETED

Revenues

from

Oct 1st of

2017

to

Sept 30th of

2018

1 2 3 4 5

What amount of the

Budgeted Revenue

in col. 2 will be

generated at the

rate per unit

determined by this

spreadsheet, OR

used as local match

for these type

revenues?

Budgeted Rate

Subsidy Revenue

EXcluded from

the Rate Base

What amount of the

Subsidy Revenue in

col. 4 will come

from funds to

purchase

equipment, OR will

be used as match

for the purchase of

equipment?

APD

Office of Disability Determination -$ -$ -$

Developmental Services -$ -$ -$

Other APD -$ -$

Bus Pass Program Revenue -$ -$ -$

DJJ

DJJ -$ -$

Bus Pass Program Revenue -$ -$ -$

Other Fed or State

-$ -$

xxx -$ -$

xxx -$ -$

Bus Pass Program Revenue -$ -$ -$

Other Revenues

Interest Earnings -$ -$ -$

xxxx -$ -$

xxxx -$ -$

Bus Pass Program Revenue -$ -$ -$

Balancing Revenue to Prevent Deficit

Actual or Planned Use of Cash Reserve -$ -$ -$

Total Revenues = 7,047,382$ 3,317,853$ 3,729,529$ -$

EXPENDITURES (CTC/Operators ONLY) 3,729,529$

Operating Expenditures

Labor 2,727,255$

Fringe Benefits 1,198,606$

Services 588,701$

Materials and Supplies 411,231$

Utilities 47,900$

Casualty and Liability 61,135$

Taxes -$

Purchased Transportation:

Purchased Bus Pass Expenses 1,179,167$

School Bus Utilization Expenses -$

Contracted Transportation Services -$

Other 24,702$

Miscellaneous 35,442$

Operating Debt Service - Principal & Interest -$

Leases and Rentals -$

Contrib. to Capital Equip. Replacement Fund 773,243$

In-Kind, Contributed Services -$

Allocated Indirect -$

Capital Expenditures

Equip. Purchases with Grant Funds -$

Equip. Purchases with Local Revenue -$

Equip. Purchases with Rate Generated Rev. -$

Capital Debt Service - Principal & Interest -$

-$

Total Expenditures = 7,047,382$ 1,179,167$

minus EXCLUDED Subsidy Revenue = 3,729,529$

Budgeted Total Expenditures INCLUDED in

Rate Base = 3,317,853$

Rate Base Adjustment1 =

Adjusted Expenditures Included in Rate

Base = 3,317,853$

1 The Difference between Expenses and Revenues for Fiscal Year: 2015 - 2016

Once Completed, Proceed to the Worksheet entitled "Program-wide Rates"

Amount of

Budgeted

Operating Rate

Subsidy Revenue

1 Rate Base Adjustment Cell

If necessary and justified, this cell is where you could optionally adjust proposed service rates up or down to adjust for program revenue (or unapproved profit), or losses from the Actualperiod shown at the bottom of the Comprehensive Budget Sheet. This is not theonly acceptable location or method of reconciling for excess gains or losses. If allowed by the respective funding sources, excess gains may also be adjusted by providing system subsidy revenue or by the purchase of additional trips in a period following the Actual period. If such an adjustment has been made, provide notation in the respective exlanation area of the Comprehensive Budget tab.

HillsboroughCTDRateCalc2017.xls: Budgeted Rate BasePage 5 of 8

Page 103: Meeting of the Transportation Disadvantaged Coordinating ... · Meeting of the Transportation Disadvantaged Coordinating Board(TDCB) Friday, June 23, 2017, 9:30 a.m. County Center,

Worksheet for Program-wide Rates CTC: Hillsborough Coun Version 1.4

County: Hillsborough

1. Complete Total Projected Passenger Miles and ONE-WAY Passenger Trips ( GREEN cells) below

Do NOT include trips or miles related to Coordination Contractors!

Do NOT include School Board trips or miles UNLESS…........

INCLUDE all ONE-WAY passenger trips and passenger miles related to services you purchased from your transportation operators!

Do NOT include trips or miles for services provided to the general public/private pay UNLESS..

Do NOT include escort activity as passenger trips or passenger miles unless charged the full rate for service!

Do NOT include fixed route bus program trips or passenger miles!

PROGRAM-WIDE RATES

Total Projected Passenger Miles = 1,427,643 Fiscal Year

Rate Per Passenger Mile = 2.32$ 2017 - 2018

Total Projected Passenger Trips = 145,366

Rate Per Passenger Trip = 22.82$ Avg. Passenger Trip Length = 9.8 Miles

Rate Per Passenger Mile = 4.11$

Rate Per Passenger Trip = 40.37$

Once Completed, Proceed to the Worksheet entitled "Multiple Service Rates"

Vehicle Miles

The miles that a vehicle is scheduled to or actually travels from the time it pulls out from its garage to go into revenue service to the time it pulls in from revenue service.

Vehicle Revenue Miles (VRM)

The miles that vehicles are scheduled to or actually travel while in revenue service. Vehicle revenue miles exclude:

Deadhead

Operator training, and

Vehicle maintenance testing, as well as

School bus and charter services.

Passenger Miles (PM)

The cumulative sum of the distances ridden by each passenger.

Rates If No Revenue Funds Were Identified As Subsidy

Funds

HillsboroughCTDRateCalc2017.xls: Program-wide RatesPage 6 of 8

Page 104: Meeting of the Transportation Disadvantaged Coordinating ... · Meeting of the Transportation Disadvantaged Coordinating Board(TDCB) Friday, June 23, 2017, 9:30 a.m. County Center,

Worksheet for Multiple Service Rates CTC: Hillsborough CoVersion 1.4

1. Answer the questions by completing the GREEN cells starting in Section I for all services County: Hillsborough

2. Follow the DARK RED prompts directing you to skip or go to certain questions and sections based on previous answers

SECTION I: Services Provided

1 Ambulatory 1 Wheelchair 2 Stretcher 1 Group

1.Yes Yes Yes Yes

No No No No

Go to Section II

for Ambulatory

Service

Go to Section II

for Wheelchair

Service

STOP! Do NOT

Complete

Sections II - V

for Stretcher

Service

Go to Section II

for Group

Service

SECTION II: Contracted Services

2 Ambulatory 2 Wheelchair 2 Stretcher 2 Group

1. Will the CTC be contracting out any of these Services TOTALLY in the upcoming budget year?....Yes Yes Yes Yes

No No No No

Skip # 2, 3 & 4

and Go to

Section III for

Ambulatory

Service

Skip # 2, 3 & 4

and Go to

Section III for

Wheelchair

Service

Do Not

Complete

Section II for

Stretcher

Service

Skip # 2, 3 & 4

and Go to

Section III for

Group Service

2.2 Yes 2 Yes 2 Yes 2 Yes

No No No No

Leave Blank Leave Blank

Do NOT

Complete

Section II for

Stretcher

Service Leave Blank

3. If you answered YES to #1 & #2 above, how much is the proposed contract amount for the service? -$

How many of the total projected Passenger Miles relate to the contracted service? 0

How many of the total projected passenger trips relate to the contracted service? 0

Effective Rate for Contracted Services: Ambulatory Wheelchair Stretcher Group

per Passenger Mile =

per Passenger Trip =

Go to Section III

for Ambulatory

Service

Go to Section III

for Wheelchair

Service

Do NOT

Complete

Section II for

Stretcher

Service

Go to Section III

for Group

Service

4. If you answered # 3 & want a Combined Rate per Trip PLUS a per Mile add-on for 1 or more Combination Trip and Mile Rate

services, INPUT the Desired per Trip Rate (but must be less than per trip rate in #3 above =

Rate per Passenger Mile for Balance =

Leave Blank

and Go to

Section III for

Ambulatory

Service

Leave Blank

and Go to

Section III for

Wheelchair

Service

Do NOT

Complete

Section II for

Stretcher

Service

Leave Blank

and Go to

Section III for

Group Service

Will the CTC be providing any of these Services to transportation disadvantaged passengers in the

upcoming budget year?........................................................................................

If you answered YES to #1 above, do you want to arrive at the billing rate by simply dividing the proposed

contract amount by the projected Passenger Miles / passenger trips?.....

HillsboroughCTDRateCalc2017.xls: Multiple Service RatesPage 7 of 8

Page 105: Meeting of the Transportation Disadvantaged Coordinating ... · Meeting of the Transportation Disadvantaged Coordinating Board(TDCB) Friday, June 23, 2017, 9:30 a.m. County Center,

Worksheet for Multiple Service Rates CTC: Hillsborough CoVersion 1.4

1. Answer the questions by completing the GREEN cells starting in Section I for all services County: Hillsborough

2. Follow the DARK RED prompts directing you to skip or go to certain questions and sections based on previous answers

SECTION III: Escort Service 2

1. Do you want to charge all escorts a fee?................................................................. Yes

No

Skip # 2 - 4 and

Go to Section IV

2. If you answered Yes to #1, do you want to charge the fee per passenger trip OR ……….... Pass. Trip 1 Leave Blank

per passenger mile?......................... Pass. Mile

3. If you answered Yes to # 1 and completed # 2, for how many of the projected

Passenger Trips / Passenger Miles will a passenger be accompanied by an escort? Leave Blank

-$

4. How much will you charge each escort?.................................................................... Leave Blank

SECTION IV: Group Service Loading

1.

number of Group Service Passenger Miles? (otherwise leave blank)............................ 500,831

Loading Rate

………. And what is the projected total number of Group Vehicle Revenue Miles? 134,001 3.74 to 1.00

SECTION V: Rate Calculations for Mulitple Services:

1.

* Miles and Trips you input must sum to the total for all Services entered on the "Program-wide Rates" Worksheet, MINUS miles

and trips for contracted services IF the rates were calculated in the Section II above

* Be sure to leave the service BLANK if you answered NO in Section I or YES to question #2 in Section II

RATES FOR FY: 2017 - 2018

Ambul Wheel Chair Stretcher Group

Leave Blank

Projected Passenger Miles (excluding totally contracted services addressed in Section II) = 1,427,643 = 738,321 + 188,491 + + 500,831

Rate per Passenger Mile = $2.54 $4.35 $0.00 $1.25 $4.66per passenger per group

Ambul Wheel Chair Stretcher Group

Leave Blank

Projected Passenger Trips (excluding totally contracted services addressed in Section II) = 145,366 = 64,637 + 19,527 + + 61,202

Rate per Passenger Trip = $25.89 $44.38 $0.00 $12.71 $47.50per passenger per group

2 If you answered # 1 above and want a COMBINED Rate per Trip PLUS a per Mile add-on for 1 or more services,… Combination Trip and Mile Rate

Ambul Wheel Chair Stretcher Group

Leave Blank

…INPUT the Desired Rate per Trip (but must be less than per trip rate above) = $0.00

Rate per Passenger Mile for Balance = $2.54 $4.35 $0.00 $1.25 $4.66per passenger per group

Rates If No Revenue Funds Were Identified As Subsidy Funds

Ambul Wheel Chair Stretcher Group

Rate per Passenger Mile = $4.49 $7.69 $0.00 $2.20 $8.24

per passenger per group

Ambul Wheel Chair Stretcher Group

Rate per Passenger Trip = $45.79 $78.50 $0.00 $22.48 $84.02per passenger per group

Program These Rates Into Your Medicaid Encounter Data

You Must

Complete This

Section!

If the message "You Must Complete This Section" appears to the right, what is the projected total

Input Projected Passenger Miles and Passenger Trips for each Service in the GREEN cells and the Rates for each Service will be calculated automatically

HillsboroughCTDRateCalc2017.xls: Multiple Service RatesPage 8 of 8

Page 106: Meeting of the Transportation Disadvantaged Coordinating ... · Meeting of the Transportation Disadvantaged Coordinating Board(TDCB) Friday, June 23, 2017, 9:30 a.m. County Center,

Board & Committee Agenda Item

Agenda Item

Transportation Disadvantaged Coordinating Board (TDCB) Grievance Procedures Annual Review and Adoption

Presenter

Michele Ogilvie, MPO Staff

Summary

To ensure quality control of the Transportation Disadvantaged system and to provide participating users, funding agencies, and transportation providers with an impartial body to hear complaints and make recommendations on disputes concerning services rendered, the TDCB creates the Hillsborough County Transportation Disadvantaged Grievance Procedures and a Grievance subcommittee. The TDCB’s Grievance Procedures are also found in Section 4.3 of the Transportation Disadvantaged Service Plan. The procedures include establishing a subcommittee, membership, powers and duties.

The Transportation Disadvantaged Coordinating Board is required to review and approve its Grievance Procedures annually. Additionally, the Board confirms the members of the Grievance subcommittee. Currently, the following members serve as the Grievance subcommittee: Kelly Kelley, Gloria Mills and Nancy Castellano.

Recommended Action

Confirm Grievance Procedures and Grievance Subcommittee members.

Prepared By

Michele Ogilvie, MPO staff

Attachments

Grievance Procedures 2017

Plan Hillsborough planhillsborough.org

[email protected] 813 - 272 - 5940

601 E Kennedy Blvd 18th floor

Tampa, FL, 33602

Page 107: Meeting of the Transportation Disadvantaged Coordinating ... · Meeting of the Transportation Disadvantaged Coordinating Board(TDCB) Friday, June 23, 2017, 9:30 a.m. County Center,

GRIEVANCE PROCEDURES

2017

Hillsborough County Transportation Disadvantaged Coordinating Board 601 E. Kennedy Blvd. 18th Floor Tampa, FL. 33602

Page 108: Meeting of the Transportation Disadvantaged Coordinating ... · Meeting of the Transportation Disadvantaged Coordinating Board(TDCB) Friday, June 23, 2017, 9:30 a.m. County Center,

1 Hillsborough Transportation Disadvantaged Coordinating Board

GRIEVANCE SUBCOMMITTEE POLICIES AND PROCEDURES

The TDCB creates a Hillsborough County Transportation Disadvantaged Grievance Subcommittee. This subcommittee develops rules and procedures to ensure quality control of the TD system and to provide participating users, funding agencies, and transportation providers with an impartial body to hear complaints and make recommendations on disputes concerning services rendered.

Section 1. Creation of Board

1.01 There is hereby created and established a Hillsborough County Transportation Disadvantaged Grievance Subcommittee, hereinafter referred to as Grievance Subcommittee, a subcommittee of the TDCB, as specified pursuant to Chapter 427, F.S. and Rule 41-2, Rules of the State of Florida and Operations Plan 2c of the Memorandum of Agreement (MOA) between Hillsborough County and the CTD.

Section 2. Definitions

2.01 As used in these Rules and Procedures, the following words and terms shall have the meanings assigned herein:

(a) CTC: Board of County Commissioners (BOCC) of Hillsborough County of the State of Florida.

(b) TDCB: Entity appointed by the Metropolitan Planning Organization (MPO) that provides assistance to the CTC relative to the coordination of transportation service.

(c) Funding Agency: Those agencies which have a funding contract with the CTC for transportation services for the TD.

(d) MPO: The Hillsborough County MPO, an organization responsible for carrying out transportation planning and staffing the TDCB.

(e) Program Manager: The individual responsible for the operation of the transportation program for the transportation provider.

(f) Transportation Provider: The entity providing transportation services for the TD whether it be the County or private non-profit or private for profit provider.

(g) TD (User): Those persons who because of physical or mental disability, income status or age, or who for other reasons are unable to purchase transportation and are; therefore, dependent upon others to obtain access to health care, employment, education, shopping, social activities, and other life sustaining activities.

(h) CTD: Entity responsible for fostering the coordination of transportation services statewide provided to the transportation disadvantaged.

Section 3. Objective

3.01 The objective of the Grievance Subcommittee shall be to develop rules and procedures to ensure quality control and to provide participating users, funding agencies, and

denniss
Sticky Note
What is CTD? Suggest putting it in full words, for the first time in the chapter.
denniss
Sticky Note
CTC should be in full words.
Page 109: Meeting of the Transportation Disadvantaged Coordinating ... · Meeting of the Transportation Disadvantaged Coordinating Board(TDCB) Friday, June 23, 2017, 9:30 a.m. County Center,

2 Hillsborough Transportation Disadvantaged Coordinating Board

transportation providers with an impartial body to hear complaints and make recommendations on disputes concerning services rendered.

Section 4. Membership

4.01 Members of the Grievance Subcommittee shall be appointed by the Chairman of the Hillsborough County Local Coordinating Board (LCB) and shall be composed of five voting members of the LCB as follows:

(a) One user of transportation services, (b) One representative of a recognized disabled group, and (c) Three representatives of the LCB at-large.

4.02 The designated representative of the CTC, charged with responsibility of overseeing the TD program shall be an advisory member of the Grievance Subcommittee. The MPO shall staff the Grievance Subcommittee.

Section 5. Terms of Members

5.01 The members of the Grievance Subcommittee shall serve a 2-year term.

5.02 A member of the Grievance Subcommittee may be removed for cause by the Chairman of the LCB. Vacancies in the membership of the subcommittee shall be filled in the same manner as the original appointments. An appointment to fill a vacancy shall only be for the remainder of the unexpired term being filled.

5.03 The Grievance Subcommittee shall elect a chairperson and a vice chairperson at the first scheduled meeting of each year who shall serve for 1 year.

5.04 A quorum (three voting members) shall be present for any official action. In the event of a tie vote, the chairperson shall then have the deciding vote. Meetings shall be held at such times as the Grievance Subcommittee may determine.

5.05 No voting member will have a vote on an issue that is deemed a conflict of interest.

Section 6. Grievance Procedures

6.01 Grievance procedures will be those as specified by the Grievance Subcommittee as set forth below.

6.02 Complaints that emanate from continued tardiness, driver behavior, passenger discomfort, irregularities in the system of delivery, or decisions made to deny, reduce, or terminate services constitute grievances for users or funding agencies. Complaints about charges or billing constitute grievances by a funding agency or transportation provider. Other complaints can be heard at the discretion of the Grievance Subcommittee.

Page 110: Meeting of the Transportation Disadvantaged Coordinating ... · Meeting of the Transportation Disadvantaged Coordinating Board(TDCB) Friday, June 23, 2017, 9:30 a.m. County Center,

3 Hillsborough Transportation Disadvantaged Coordinating Board

6.03 Complaints involving Medicaid Non-Emergency Transportation (NET) will be referred directly to the full TDCB in lieu of the Grievance Subcommittee. The TDCB will make a determination as to whether the complaint is a Medicaid NET issue or a CTC-related issue. If a complaint is determined by the TDCB to be a Medicaid NET issue, then the grievant will be informed of his/her right to file a grievance directly with the CTD.

The CTC is selected and recommended by the MPO, while the Medicaid NET in Hillsborough County is selected directly by the CTD without MPO involvement. Therefore, the TDCB cannot make recommendations on complaints regarding Medicaid NET. Medicaid clients should direct grievances to the CTD Ombudsman Program.

6.04 Clients or funding agencies shall contact the CTC Program Manager verbally or in writing in an attempt to resolve the complaint following the procedures of his/her agency.

6.05 If this effort is not successful, the grievant may present their grievance to the Grievance Subcommittee by securing a grievance form (Figure 4-1) from the program managers of the transportation providers care of the MPO. The client will also be advised about the CTD Ombudsman Program.

6.06 Upon receipt of the grievance form, the TDCB chairperson shall, within 15 working days, contact Grievance Subcommittee members and the CTC Program Manager to set a grievance hearing date and location.

Page 111: Meeting of the Transportation Disadvantaged Coordinating ... · Meeting of the Transportation Disadvantaged Coordinating Board(TDCB) Friday, June 23, 2017, 9:30 a.m. County Center,

4 Hillsborough Transportation Disadvantaged Coordinating Board

FIGURE 4-1: HILLSBOROUGH COUNTY TDCB GRIEVANCE FORM

Page 112: Meeting of the Transportation Disadvantaged Coordinating ... · Meeting of the Transportation Disadvantaged Coordinating Board(TDCB) Friday, June 23, 2017, 9:30 a.m. County Center,

Board & Committee Agenda Item

Agenda Item

Transportation Disadvantaged Coordinating Board (TDCB) By-Laws Annual Review and Adoption

Presenter

Michele Ogilvie, MPO Staff

Summary

Guidance from the Florida Commission for the Transportation Disadvantaged, states that the local coordinating board shall annually develop and adopt a set of By-Laws. Further, the By-Laws shall state that the local Coordinating Board will conduct business using parliamentary procedures according to Robert’s Rules of Order, unless stated otherwise in the By-Laws. The TDCB By-Laws establish the formal procedures for the TDCB activities including board meetings, staff, board duties, subcommittees, communication with other organizations. The By-Laws of all of the MPO’s committees are incorporated into the MPO By-Laws. No issues regarding the TDCB’s By-Laws have been reported since 2011’s adoption. The TDCB’s By-Laws are attached for review.

Recommended Action

Confirm By-Laws.

Prepared By

Michele Ogilvie, MPO staff

Attachments

TDCB By-Laws

Plan Hillsborough planhillsborough.org

[email protected] 813 - 272 - 5940

601 E Kennedy Blvd 18th floor

Tampa, FL, 33602

Page 113: Meeting of the Transportation Disadvantaged Coordinating ... · Meeting of the Transportation Disadvantaged Coordinating Board(TDCB) Friday, June 23, 2017, 9:30 a.m. County Center,

  

 

HILLSBOROUGH COUNTY METROPOLITAN PLANNING ORGANIZATION

VOTING MEMBERSHIP

Commissioner Les Miller (Chair) Hillsborough County Paul Anderson, CEO Port Authority Commissioner Kevin Beckner Hillsborough County Wallace Bowers HART Mayor Frank Chillura City of Temple Terrace Commissioner Victor Crist (Alternate) Hillsborough County Trent Green Planning Commission Commissioner Ken Hagan Hillsborough County Joe Lopano, CEO Aviation Authority

Councilman Harry Cohen (Vice-Chair) City of Tampa Mayor Rick A. Lott City of Plant City Councilman Guido Maniscalco City of Tampa

Councilwoman Lisa Montelione City of Tampa Commissioner Sandra Murman Hillsborough County Cindy Stuart Hillsborough County School Board Commissioner Stacy White Hillsborough County Joseph Waggoner, Executive Director Expressway Authority

Beth Alden, AICP Executive Director

Page 114: Meeting of the Transportation Disadvantaged Coordinating ... · Meeting of the Transportation Disadvantaged Coordinating Board(TDCB) Friday, June 23, 2017, 9:30 a.m. County Center,

TAC REQUEST AMENDMENT REQUEST

1

BY-LAWS OF

THE HILLSBOROUGH COUNTY METROPOLITAN PLANNING ORGANIZATION

AND ITS COMMITTEES Updated: March 8, 2017

1.0 PURPOSE: These By-laws are adopted by the Hillsborough County Metropolitan

Planning Organization hereinafter called the “MPO” to govern the performance of the MPO’s duties as well as those of MPO committees and to inform the public of the nature of the MPO’s internal organization, operations and other related matters.

2.0 DEFINITIONS:

2.1 EMERGENCY: Any occurrence or threat thereof, whether accidental or natural, caused by man, in war or in peace, which necessitates immediate action because it results or may result in substantial injury or harm to the population or the MPO or substantial damage to or loss of property or public funds.

2.2 GOOD CAUSE: A substantial reason which is put forward in good faith.

2.3 INTERESTED PERSON: Any person who has or may have or who

represents any group or entity which has or may have some concern, participation or relation to any matter which will or may be considered by the MPO.

2.4 MEMBER(S): The MPO consists of sixteen (16) official members, with

FDOT designated as a non-voting advisor. Each member government or authority may also appoint an alternate member, who may vote at any MPO meeting in place of a regular member. MPO committee membership is as provided in these By-laws.

2.5 PUBLIC HEARING: A meeting of the MPO convened for the purpose of

receiving public testimony regarding a specific subject and for the purpose of taking action on amendment to or adoption of a plan or program. A public hearing may be convened with less than a quorum present; however, no official action other than adjournment or continuation of the public hearing to another time may be taken unless a quorum is present.

2.6 REGULAR MEETING: The regular scheduled meeting of the MPO at which

all official business may be transacted.

2.7 SPECIAL MEETING: A meeting of the MPO held at a time other than the regularly scheduled meeting time. All official business may be transacted at a special meeting.

clarendonr
Sticky Note
remove obsolete footer?
Page 115: Meeting of the Transportation Disadvantaged Coordinating ... · Meeting of the Transportation Disadvantaged Coordinating Board(TDCB) Friday, June 23, 2017, 9:30 a.m. County Center,

TAC REQUEST AMENDMENT REQUEST

2

2.8 WORKSHOP: A conference where members are present and are meeting to discuss a specific subject. A workshop may be convened with less than a quorum present; however, no official action other than adjournment or continuation of the workshop to another time may be taken.

3.0 MPO OFFICERS: There shall be a Chair and a Vice-Chair. All officers shall be

voting members of the MPO. 3.1 TENURE: All officers shall hold office for one (1) year or until a successor is

elected. However, any officer may be removed by a majority of the total members.

3.2 SELECTION: At the regular meeting in December, the members shall

nominate one or more candidates to fill each office. Immediately following the close of nominations, the MPO shall vote to fill each office, with the vote for each office being taken in the order in which candidates for that office were nominated, until one is elected. New officers shall take office immediately upon the conclusion of the election of officers.

3.3 VACANCY IN OFFICE: A vacant office shall be filled by the MPO at its first

regular meeting following the vacancy. The officer so elected shall serve the remainder of their predecessor’s term in office.

3.4 DUTIES: The officers shall have the following duties:

3.4.1 CHAIR: The Chair shall: (a) Preside at all regular and special meetings, workshops and public

hearings. (b) Represent the MPO on the West Central Florida MPO Chairs

Coordinating Committee (CCC) and the Florida MPO Advisory Council (MPOAC).

(c) Establish such ad hoc committees as the Chair may deem necessary and appoint their members and chairs.

(d) Call special meetings and workshops and public hearings. (e) Sign all contracts, resolutions, and other official documents of the

MPO, unless otherwise specified by the By-laws or Policies. (f) Express the position of the MPO as determined by vote or consensus

of the MPO. (g) See that all actions of the MPO are taken in accordance with the By-

laws, Policies and applicable laws. (h) Perform such duties as are usually exercised by the Chair of a

commission or board, and perform such other duties as may from time to time be assigned by the MPO.

3.4.2 Vice-Chair: the Vice-Chair shall, during the absence of the Chair or

the Chair’s inability to act, have and exercise all of the duties and powers of the Chair, and shall perform such other duties as may from time to time be assigned to the Chair by the MPO.

Page 116: Meeting of the Transportation Disadvantaged Coordinating ... · Meeting of the Transportation Disadvantaged Coordinating Board(TDCB) Friday, June 23, 2017, 9:30 a.m. County Center,

TAC REQUEST AMENDMENT REQUEST

3

4.0 COMMITTEES:

4.1 AD HOC COMMITTEES:

4.1.1 Chair and Expiration: An ad hoc committee shall consist of a committee chair, who shall be a member of the MPO. All ad hoc committees shall have an expiration time identified by the Chair at the time of creation or shall dissolve at the expiration of the Chair’s term.

4.1.2 Purpose: The purpose of establishing ad hoc committees is to

facilitate the accomplishment of a specific task identified by the Chair.

4.2 STANDING COMMITTEES:

4.2.1 Appointment of Committee Members: Members and alternate

members of all committees shall be appointed by action of the MPO. Members representing an organization on a committee, as specified in the committee membership list, shall be nominated in writing by their organization. Members representing the citizens of Hillsborough County, and not representing any particular entity as specified in the committee membership list, shall be recommended for membership by action of the committee on which they would like to serve. Using the same procedure, alternate members may be designated to act on behalf of regular members with all the privileges accorded thereto. The MPO shall not appoint committee applicants who are affiliated with private MPO consultants or contractors. If such an affiliation occurs, an existing committee member shall be deemed to have resigned.

4.2.2 Termination of Committee Membership: Any member of any committee may resign at any time by notice in writing to the Chair. Unless otherwise specified in such notice, such resignation shall take effect upon receipt thereof by the Chair. Each member of each committee is expected to demonstrate his/her interest in the committee’s activities through attendance of the scheduled meetings, except for reasons of an unavoidable nature. In each instance of an unavoidable absence, the absent member should ensure that his/her alternate will attend. The MPO may review, and consider rescinding, the appointment of any member of any committee who fails to attend three (3) consecutive meetings. In each case, the MPO will warn the member in writing, and if applicable the member’s nominating organization, thirty days in advance of an action to rescind membership. At a minimum, committee member attendance will be reviewed annually. In the case of members representing an organization on a committee as specified in the committee membership list, the individual’s membership may also be rescinded by the nominating organization, by letter to the Chair.

Page 117: Meeting of the Transportation Disadvantaged Coordinating ... · Meeting of the Transportation Disadvantaged Coordinating Board(TDCB) Friday, June 23, 2017, 9:30 a.m. County Center,

TAC REQUEST AMENDMENT REQUEST

4

4.2.3 Officers of Standing Committees: The committee shall hold an

organizational meeting each year for the purpose of electing a committee chair (unless designated by the MPO), a committee vice-chair, and, at the discretion of the committee chair, an officer-at-large. Officers shall be elected by a majority vote of a quorum of the members. Except as otherwise provided in these By-laws, officers shall serve a term of one year starting with the next meeting. The powers and duties of the committee chair shall be to preside at all meetings; to express the position of the committee as determined by vote or consensus of the committee; and to ensure that all actions of the committee are taken in accordance with the bylaws and applicable law. The committee vice chair shall have these same powers and responsibilities in the absence of the committee chair. The officer-at-large shall, during the absence of both the committee chair and the committee vice-chair or their inability to act, have these same duties and responsibilities, and in addition shall perform other duties as may from time to time be assigned by the committee chair.

4.2.4 Conduct of Committee Meetings: Sections 5 through 9, excluding Section 8.1, of these MPO By-laws shall be used for the conduct of all MPO committee meetings.

4.2.5 Standing Committee Sub-Committees: An MPO standing

committee or the MPO may establish such sub-committees to a standing committee as deemed necessary to investigate and report on specific subject areas within the scope of the standing committee. Such sub-committees shall be of limited duration and shall dissolve at such time as designated at the time of establishment or upon completion of the task(s) specified at the time of establishment. These MPO By-laws shall be used for the conduct of such sub-committees meetings in the same manner as the MPO committees.

4.2.6 MPO Technical Advisory Committee (TAC): Established pursuant to Section 339.175, Florida Statutes, the TAC shall be responsible for considering safe access to schools in the review of transportation project priorities, long-range transportation plans and transportation improvement programs and shall advise the MPO on such matters. In addition, the TAC shall be responsible for assisting in the development of transportation planning work programs; coordinating transportation planning and programming; review of all transportation studies, reports, plans and/or programs, and making recommendations to the MPO that are pertinent to the subject documents based upon the technical sufficiency, accuracy, and completeness of and the needs as determined by the studies, plans and/or programs. The TAC shall coordinate its actions with the School Board of Hillsborough County and other local programs and organizations within Hillsborough County that participate in school

Page 118: Meeting of the Transportation Disadvantaged Coordinating ... · Meeting of the Transportation Disadvantaged Coordinating Board(TDCB) Friday, June 23, 2017, 9:30 a.m. County Center,

TAC REQUEST AMENDMENT REQUEST

5

safety activities and shall also coordinate its actions with the appropriate representatives of the Florida Department of Transportation.

TAC Membership: The TAC shall be composed of technically qualified representatives for the purpose of planning, programming and engineering of the transportation system within the Hillsborough County Metropolitan Planning Organization area boundary. The membership shall be composed of: two (2) members from Hillsborough County, two (2) members from City of Tampa, two (2) members from the Hillsborough County City-County Planning Commission, one (1) member from the Tampa Hillsborough Expressway Authority, one (1) member from the Hillsborough Area Regional Transit Authority, one (1) member from Environmental Protection Commission, one (1) member from the Tampa Port Authority, one (1) member from City of Temple Terrace, one (1) member from the Tampa Bay Regional Planning Council, one (1) member from the Florida Department of Environmental Protection, one (1) member from City of Plant City, one (1) member from the Hillsborough County Aviation Authority, one (1) member from the Hillsborough County School Board, one (1) member from the Tampa Bay Area Regional Transportation Authority, one (1) member from the Tampa Historic Streetcar, Inc., one (1) member from the Department of Health-Hillsborough and one (1) member from the Florida Trucking Association. Terms of Membership: Members shall serve terms of indefinite length at the pleasure of their respective nominating organizations and the MPO.

4.2.7 MPO Citizens Advisory Committee (CAC): The CAC shall be responsible for providing information and overall community values and needs into the transportation planning program of the MPO; evaluating and proposing solutions from a citizens perspective concerning alternative transportation proposals and critical issues; providing knowledge gained through the CAC into local citizen group discussions and meetings; and establishing comprehension and promoting credibility for the MPO Program.

CAC Membership: The CAC shall be composed of appointed citizens (transportation agency staff are not eligible) who together shall represent a broad spectrum of social and economic backgrounds and who have an interest in the development of an efficient, safe and cost-effective transportation system. Minorities, the elderly and persons with disabilities must be adequately represented on the CAC.

All members must be residents of Hillsborough County. Membership will be as follows: one (1) member nominated by each member of the

Page 119: Meeting of the Transportation Disadvantaged Coordinating ... · Meeting of the Transportation Disadvantaged Coordinating Board(TDCB) Friday, June 23, 2017, 9:30 a.m. County Center,

TAC REQUEST AMENDMENT REQUEST

6

Board of County Commissioners serving on the MPO, one (1) member nominated by each member from the City of Tampa serving on the MPO, one (1) member from the City of Temple Terrace nominated by the Mayor of the City of Temple Terrace, one (1) member from the City of Plant City nominated by the Mayor of the City of Plant City, one (1) member nominated by each respective Chairperson of the Hillsborough County Aviation, Tampa-Hillsborough Expressway, Tampa Port and Hillsborough Area Regional Transit Authorities, one (1) member representing the transportation disadvantaged nominated by the Chairman of the Transportation Disadvantaged Coordinating Board, one (1) member nominated by the Chairperson of the Hillsborough County City-County Planning Commission and one (1) member nominated by the School Board member serving on the MPO. In addition, there shall be six (6) at-large members nominated by local organizations representing the following constituencies or through application directly to the CAC as provided in Section 4.2.1. These shall comprise one (1) person of Hispanic ethnicity, one (1) person of African-American descent, one (1) person under the age of 30, one (1) woman, one (1) person to represent neighborhoods, and one (1) person to represent the business community.

Terms of appointment shall be for a two-year period with an opportunity for reappointment thereafter, unless the official who appointed the member leaves office or the MPO board during the term of the member’s appointment. In that case, the member shall be deemed to have resigned from the CAC and the new official shall have the right to appoint a new member or reappoint the same member. A member of the committee whose term has expired shall continue to serve until they are reappointed or replaced. The terms of appointment notwithstanding, CAC members shall serve at the pleasure of the MPO.

4.2.8 MPO Policy Committee: The MPO Policy Committee shall be responsible for the review and in-depth discussion of items and issues proposed to come before the MPO and for development of recommendations to the MPO, as appropriate, regarding such items and issues in order to facilitate the accomplishment of the MPO’s responsibilities to manage a continuing, cooperative and comprehensive transportation planning process and the development of transportation plans and programs.

Membership: The Policy Committee shall be composed of at least five (5) members of the MPO who shall serve on a voluntary basis. Volunteers for membership will be solicited at the MPO meeting at which the Chair is elected and at any MPO meeting thereafter if the total membership of the Policy Committee falls below five (5). Those MPO members requesting to be made Policy Committee members in response to such solicitation or upon the initiative of an individual

Page 120: Meeting of the Transportation Disadvantaged Coordinating ... · Meeting of the Transportation Disadvantaged Coordinating Board(TDCB) Friday, June 23, 2017, 9:30 a.m. County Center,

TAC REQUEST AMENDMENT REQUEST

7

MPO member shall be so appointed by action of the MPO and shall serve terms that last until the next MPO meeting at which the Chair is elected.

4.2.9 Transportation Disadvantaged Coordinating Board (TDCB): The

primary purpose of the TDCB is to assist the MPO in identifying local service needs and providing information, advice, and direction to the Community Transportation Coordinator (CTC) on the coordination of services to be provided to the transportation disadvantaged pursuant to Section 427.0157, Florida Statutes.

The following agencies or groups shall be represented on the TDCB

as voting members: an elected official serving on the Hillsborough County MPO who

has been appointed by the MPO to serve as TDCB Chairperson;

a local representative of the Florida Department of Transportation;

a local representative of the Florida Department of Children & Families;

a local representative of the Public Education Community, which could include, but is not limited to, a representative of Hillsborough County Public Schools, School Board Transportation Office or Headstart Program;

a local representative of the Florida Division of Vocational Rehabilitation or the Division of Blind Services, representing the Department of Education;

a person recommended by the local Veterans Service Office representing the veterans in the county;

a person who is recognized by the Florida Association for Community Action (President) as representing the economically disadvantaged in the county;

a person over sixty years of age representing the elderly citizens in the county;

a person with a disability representing the disabled citizens in the county;

two citizen advocates in the county, one of whom must be a user of the transportation services of the coordinated transportation disadvantaged system as their primary means of transportation;

a local representative for children at risk; the chairperson or designee of the local mass transit system's

board except when they are also the CTC; a local representative of the Florida Department of Elder Affairs; a local representative of the local for-profit transportation

industry; a local representative of the Florida Agency for Health Care

Administration;

Page 121: Meeting of the Transportation Disadvantaged Coordinating ... · Meeting of the Transportation Disadvantaged Coordinating Board(TDCB) Friday, June 23, 2017, 9:30 a.m. County Center,

TAC REQUEST AMENDMENT REQUEST

8

a local representative of the Regional Workforce Development Board, and;

a representative of the local medical community, which may include, but is not limited to, kidney dialysis centers, long term care facilities, assisted living facilities, hospitals, local health department or other home and community based services.

TDCB Terms of Appointment. Except for the TDCB Chairperson, the members of the TDCB shall be appointed for three (3) year terms which shall be staggered equally among the membership. The TDCB Chairperson shall serve until elected term of office has expired or is otherwise replaced by the MPO. TDCB Duties. The TDCB shall perform the following duties which include those specified in Chapter 41-2, Florida Administrative Code and Section 427.0157, Florida Statutes.

a. Maintain official meeting minutes, including an attendance roster, reflecting official actions and provide a copy of same to the Commission for the Transportation Disadvantaged and the MPO Chairperson;

b. Review and approve the CTC’s memorandum of agreement and the transportation disadvantaged service plan;

c. On a continuing basis, evaluate services provided under the transportation disadvantaged service plan. Not less than annually provide the MPO with an evaluation of the CTC’s performance relative to the standards adopted by the Commission for the Transportation Disadvantaged and the MPO. Recommendations relative to performance and the renewal of the CTC's memorandum of agreement with the Commission for the Transportation Disadvantaged shall be included in the report;

d. In cooperation with the CTC, review and provide recommendations to the Commission for the Transportation Disadvantaged and the MPO on all applications for local, state, or federal funds relating to transportation of the transportation disadvantaged in the county to ensure that any expenditures within the county are provided in the most cost effective and efficient manner;

e. Review coordination strategies for service provision to the transportation disadvantaged in the county to seek innovative ways to improve cost effectiveness, efficiency, safety, working hours, and types of service in an effort to increase ridership to a broader population. Such strategies should also encourage multi-county and regional transportation service agreements between area CTCs and consolidation of adjacent counties when it is appropriate and cost effective to do so;

f. Appoint a Grievance Subcommittee to process, investigate, resolve complaints, and make recommendations to the

Page 122: Meeting of the Transportation Disadvantaged Coordinating ... · Meeting of the Transportation Disadvantaged Coordinating Board(TDCB) Friday, June 23, 2017, 9:30 a.m. County Center,

TAC REQUEST AMENDMENT REQUEST

9

TDCB for improvement of service from agencies, users, or potential users, of the systems in the county. This Subcommittee shall meet as often as necessary to resolve complaints in a timely manner;

g. In coordination with the CTC, jointly develop applications for funds that may become available;

h. Prepare quarterly reports outlining the accomplishments and activities or other areas of interest to the Commission for the Transportation Disadvantaged and the MPO;

i. Consolidate the annual budget of local and federal government transportation disadvantaged funds estimates and forward them to the Commission for the Transportation Disadvantaged. A copy of the consolidated report shall also be used by the TDCB for planning purposes;

j. Develop and maintain a vehicle inventory and utilization plan of those vehicles purchased with transportation disadvantaged funds for inclusion in the transportation disadvantaged service plan for the Commission for the Transportation Disadvantaged;

k. Assist the MPO in preparing a Transportation Disadvantaged Element in their Transportation Improvement Program (TIP);

l. Assist the CTC in establishing eligibility guidelines and priorities with regard to the recipients of nonsponsored transportation disadvantaged services that are purchased with Transportation Disadvantaged Trust Fund moneys;

m. Work cooperatively with regional workforce boards established in Chapter 445, Florida Statutes, to provide assistance in the development of innovative transportation services for participants in the welfare transition program.

4.2.10 MPO Intelligent Transportation Systems (ITS) Committee: The

ITS Committee is responsible for assisting in the development of Intelligent Transportation System (ITS) planning work programs, as well as reviewing ITS related studies, reports, plans, projects (including consistency with regional architecture and other standards and/or programs) and making recommendations to the MPO and/or other agencies. ITS Committee recommendations to the MPO shall be based upon the technical sufficiency, accuracy, and completeness of studies, plans and/or programs. The ITS Committee shall coordinate its actions with the appropriate representatives of the Florida Department of Transportation.

ITS Committee Membership: The ITS Committee shall be composed of members technically qualified in the planning, programming, engineering and/or implementation of intelligent transportation systems or projects within the Hillsborough County Metropolitan Planning Organization area boundary or in the case of the member nominated by the Environmental Protection

Page 123: Meeting of the Transportation Disadvantaged Coordinating ... · Meeting of the Transportation Disadvantaged Coordinating Board(TDCB) Friday, June 23, 2017, 9:30 a.m. County Center,

TAC REQUEST AMENDMENT REQUEST

10

Committee, technically qualified in the area of air quality impacts of transportation. The membership shall be composed of: one (1) member each from Hillsborough County, the City of Tampa, the Environmental Protection Commission, Tampa-Hillsborough Expressway Authority, Hillsborough Area Regional Transit Authority, the City of Plant City and the City of Temple Terrace. Members and Alternate Members shall serve terms of indefinite length at the pleasure of their respective governmental bodies or agencies and the MPO.

4.2.11 MPO Bicycle/Pedestrian Advisory Committee (BPAC): The

BPAC shall be responsible for making recommendations to the MPO, Hillsborough County, City of Tampa, City of Plant City, City of Temple Terrace, the Hillsborough County Environmental Protection Commission, the Florida Department of Transportation, the Southwest Florida Water Management District, and others, on matters concerning the planning, implementation and maintenance of a comprehensive bikeway and pedestrian system. In addition, the BPAC shall be responsible for studying and making recommendations concerning the safety, security, and regulations pertaining to bicyclists and pedestrians. The BPAC shall coordinate its actions with the appropriate representatives of the Florida Department of Transportation.

BPAC Membership: The BPAC shall be composed of up to twenty- five members. One member shall represent each of the following entities, except as noted: City of Tampa (three seats), City of Temple Terrace, City of Plant City, Hillsborough County (three seats), University of South Florida USF, the Environmental Protection Commission of Hillsborough County, the Hillsborough County City-County Planning Commission, HART, and the Florida Health Department. The remaining members shall be citizen representatives. All members of this Committee shall serve for a two-year term, ending on June 30th of its respective year. Without restriction, each member can be appointed to serve an unlimited number of two-year terms.

4.2.12 MPO Livable Roadways Committee (LRC): The LRC shall be

responsible for integrating Livable Roadways principles into the design and use of public rights-of-way and the major road network throughout Hillsborough County. The LRC seeks to accomplish this responsibility by: making recommendations to create a transportation system that balances design and aesthetics with issues of roadway safety and function; ensuring that public policy and decisions result in a transportation system that supports all modes of transportation, with a special emphasis on pedestrian and bicycle infrastructure and transit infrastructure and service;

Page 124: Meeting of the Transportation Disadvantaged Coordinating ... · Meeting of the Transportation Disadvantaged Coordinating Board(TDCB) Friday, June 23, 2017, 9:30 a.m. County Center,

TAC REQUEST AMENDMENT REQUEST

11

providing information and assistance to the MPO, local governments and transportation agencies relating to the mission of the Committee; and enhancing coordination among MPO member agencies and public participation in the transportation planning process. The LRC shall coordinate its actions with the appropriate representatives of the Florida Department of Transportation.

LRC Membership: The LRC shall be composed of representatives of local government departments, transportation agencies and other organizations. They may be elected officials, appointed officials, organization members, designated representatives or staff, but may not be staff to the MPO. Members will represent the following: City of Plant City; City of Tampa Parks and Recreation Department, Public Works, Transportation Division, or Urban Development Department (up to two members); City of Temple Terrace; Hillsborough County Planning and Infrastructure (up to two members); Hillsborough Area Regional Transit; Hillsborough County MPO Board Member (appointed by the MPO to serve as chair of the committee); Hillsborough County City-County Planning Commission; Tampa Hillsborough Expressway Authority and five members from professional organizations whose mission is consistent with the principles of Livable Roadways (such as American Planning Association; American Society of Landscape Architects; Urban Land Institute; Institute of Transportation Engineers; Congress for New Urbanism and American Institute of Architects); University of South Florida; New North Transportation Alliance; Tampa Downtown Partnership; Westshore Alliance; Person with disabilities; Neighborhood representative; Transit user representative; Citizen advocate for livable communities and/or multimodal transportation.

5 MEETINGS:

5.1 SCHEDULE OF MPO MEETINGS:

5.1.1 Regular Meetings: Regular meetings shall take place on the first Tuesday of each month, unless otherwise decided by the MPO and shall be held in the Chamber of the Hillsborough County Board of County Commissioners or at another suitable location designated by the Chair.

5.1.2 Special Meetings and Workshops: Special meetings and workshops shall be held at the call of the Chair or majority of officers. Special meetings and workshops shall convene at a time designated by the Chair and shall be held in the Chambers of the Hillsborough County Board of County Commissioners or at another suitable location designated by the Chair.

5.1.3 Public Hearings: Public hearings of the MPO shall be held at a time designated by the Chair. A public hearing can be continued until a date and time certain, with due allowance of time for public notice of the continuation of the public hearing. Public hearings

Page 125: Meeting of the Transportation Disadvantaged Coordinating ... · Meeting of the Transportation Disadvantaged Coordinating Board(TDCB) Friday, June 23, 2017, 9:30 a.m. County Center,

TAC REQUEST AMENDMENT REQUEST

12

shall be held in the Chambers of the Hillsborough County Board of County Commissioners or at another suitable location designated by the Chair.

5.2 SCHEDULE OF STANDING COMMITTEE MEETINGS: Each standing

committee shall meet monthly, with the exception of the Intelligent Transportation Systems Committee and the Transportation Disadvantaged Coordinating Board which shall meet every two months, at a regular date and time designated by the Chair.

5.3 SCHEDULE OF AD HOC COMMITTEE MEETINGS: Each ad hoc committee shall meet at the call of the committee chair. Ad hoc committee meetings shall not be scheduled during the times reserved for MPO meetings. Ad hoc committee meetings shall be held at a suitable location designated by the committee chair.

5.4 NOTICE OF MPO AND COMMITTEE MEETINGS: The Executive Director

of the MPO shall be responsible for providing written public notice of all MPO meetings, public hearings and committee meetings. Except in case of emergencies, written notice of any meeting shall be given at least five (5) days prior to the meeting. In case of emergency, notice of such meeting shall be given to each member as far in advance of the meeting as possible and by the most direct means of communications. In addition, notice of such emergency meeting shall be given to the media, utilizing the most practicable method. Written notice of any meeting shall state the date, time and place of the meeting, a brief description of the agenda for the meeting, and shall be provided in accordance with the requirements of Florida law and the MPO’s Public Participation Plan.

5.5 AGENDA OF MPO AND COMMITTEE MEETINGS: The agenda for all MPO

regular and special meetings, workshops and public hearings shall be established by the Chair with the assistance of the Executive Director. Members or the Executive Director may request that an item be placed on the agenda by communicating such request to the Executive Director at least ten (10) days prior to the meeting date. The Chair shall consider with the Executive Director on a month to month basis whether there shall be a consent agenda.

The agenda for each committee meeting shall be established by the committee chair and shall be prepared by the Executive Director or designated MPO support staff. Members of a committee or the Executive Director may request that an item be placed on a committee agenda by communicating such request to the MPO support staff assigned to the committee, or the Executive Director at least ten (10) days prior to the committee meeting date.

The agenda shall list the items in the order they are to be considered. For good cause stated in the record, items on the agenda may be considered out of order with the approval of the MPO Chair or the committee chair.

Page 126: Meeting of the Transportation Disadvantaged Coordinating ... · Meeting of the Transportation Disadvantaged Coordinating Board(TDCB) Friday, June 23, 2017, 9:30 a.m. County Center,

TAC REQUEST AMENDMENT REQUEST

13

The agenda for any MPO or committee meeting shall be delivered to each member at least five (5) days prior to the meeting date and shall be mailed or delivered to interested persons at that time, except in case of an emergency meeting, where the agenda will be provided to members, and interested parties as far in advance of such meetings as practicable.

5.6 RULES OF ORDER: Except where they are inconsistent with the By-laws, Roberts Rule of Order shall be used for the conduct of all MPO and committee meetings.

5.7 QUORUM: A simple majority of the total non-vacant membership of the MPO

or MPO committee shall constitute a quorum for the transaction of business at all regular and special meetings and public hearings, except seven (7) members shall constitute a quorum for the CAC. Public hearings may be conducted with less than a quorum, but no action, other than as noted at the end of this section, shall be taken unless a quorum is present. When a quorum is present, a majority of those present may take action on matters properly presented at the meeting. Workshops may be conducted with less than a quorum, but no official action may be taken. A majority of the members present, whether or not a quorum exists, may adjourn any meeting or continue any public hearing to another time.

5.8 CONDUCT OF MEETINGS:

5.8.1 Chair Participation: The presiding MPO Chair, or committee chair,

shall not be deprived of any rights and privileges by reason of being presiding Chair, but may move or second a motion only after the gavel has been passed to the Vice-Chair or another member.

5.8.2 Form of Address: Each member shall address only the presiding

Chair for recognition; shall confine his/her remarks to the question under debate; and shall avoid personalities or indecorous language or behavior.

5.8.3 Public Participation: Any member of the public may address the

MPO or MPO committee at a regular or special meeting, public hearing, or public participation type workshop, after signing in with the MPO Staff for a specific item. When recognized by the Chair, a member of the public shall state their name, address, the person on whose behalf they are appearing and the subject of their testimony. Each member of the public shall limit his or her presentation to three (3) minutes unless otherwise authorized by the Chair.

5.8.4 Limitation of Testimony: The Chair may rule testimony out of order

if it is redundant, irrelevant, indecorous or untimely.

5.8.5 Motions: The Chair shall restate motions before a vote is taken and shall state the maker of the motion and the name of the supporter.

Page 127: Meeting of the Transportation Disadvantaged Coordinating ... · Meeting of the Transportation Disadvantaged Coordinating Board(TDCB) Friday, June 23, 2017, 9:30 a.m. County Center,

TAC REQUEST AMENDMENT REQUEST

14

5.8.6 Voting: Voting shall be done by voice, as a group, but a member

shall have his/her vote recorded in the minutes of the meeting if so desired. A roll call vote shall be taken if any member so requests. Any member may give a brief explanation of his/her vote. A tie vote shall result in failure of a motion.

5.8.7 Reconsideration: A motion to reconsider an item on which vote has

been taken may be made only by a member who voted with the prevailing side. The motion to reconsider must be made on the day the vote to be reconsidered was taken, or at the next succeeding meeting of the same type of meeting at which the vote to be reconsidered was taken (i.e., at the next succeeding regular meeting if the vote to be reconsidered was taken at a regular meeting). To be in order, the motion to reconsider must be made under the consideration of old business. Adoption of a motion to reconsider requires the approval of at least a simple majority of the votes cast. If a motion to reconsider is adopted, the members shall consider the need for additional notice to interested persons before a vote subject to the motion for reconsideration was taken at a special meeting or a public hearing for which no subsequently scheduled meeting will provide an opportunity for reconsideration of the item, then the motion to reconsider may be made at the next regular meeting in the manner provided.

5.9 ORDER OF BUSINESS AT MEETINGS: The order of business shall be

determined by the Chair; however, the following is provided as a guide:

5.9.1 Regular MPO Meetings:

(a) Call to Order and Pledge of Allegiance (b) Approval of minutes of prior meetings, workshops and public

hearings. (c) Public input on Agenda Items, MPO Committee Reports (d) Presentation of the Chair’s Report (e) Presentation of the Executive Director’s Report (f) Consideration of Action Items (g) Consideration of Status Reports (h) Public input regarding general concerns (i) Consideration of items under old business (j) Consideration of items under new business (k) Adjournment

5.9.2 Special Meetings or Workshops

(a) Call to Order (b) Consideration of individual agenda items (c) Adjournment

5.9.3 Public Hearings

Page 128: Meeting of the Transportation Disadvantaged Coordinating ... · Meeting of the Transportation Disadvantaged Coordinating Board(TDCB) Friday, June 23, 2017, 9:30 a.m. County Center,

TAC REQUEST AMENDMENT REQUEST

15

(a) Call to Order (b) Consideration of individual agenda items 1. Presentation by staff 2. Public comment 3. Board deliberation (c) Adjournment

5.9.4 Order of Consideration of Action Items: The order of consideration

of any individual agenda item shall be as follows unless otherwise authorized by the Chair:

(a) Chair introduces the agenda item. (b) Staff presents the agenda item. (c) Other invited speaker(s) make presentations. (d) MPO or committee members ask questions. (e) Motion is made, seconded and debated. (f) Vote is taken.

The Chair may expand all time limitations established by this section. 5.9 OPEN MEETINGS: All MPO regular and special meetings, workshops and

public hearings, MPO committee meetings, and all meetings of the committees are open to the public as provided by Florida’s Government-in-the-Sunshine Law, Section 286.011, Florida Statutes.

6.0 ATTENDANCE: Members are expected to attend all regular and special meetings,

public hearings and workshops of the MPO and its committees.

6.1 EXCUSAL FROM MEETINGS: Each member who knows that his/her attendance at a regular or special meeting, public hearing or workshop will not be possible, shall notify the Executive Director, or committee support staff, of the anticipated absence and the reason thereof. The Executive Director, or committee support staff, shall communicate this information to the Chair who may excuse the absent member for good cause.

7.0 CODE OF ETHICS:

7.1 COMPLIANCE WITH LAWS: Members shall comply with the applicable provisions of the Code of Ethics for Public Officers and Employees, Part III, Chapter 112, Florida Statutes.

7.2 REQUESTS FOR INFORMATION: Members may request information

readily available to the general public directly from the appropriate staff person. Requests for information not readily available to the general public, or information which would involve the expenditure of staff time in preparation or compilation, shall be made to the Executive Director, who may consult with the Chair for guidance.

Page 129: Meeting of the Transportation Disadvantaged Coordinating ... · Meeting of the Transportation Disadvantaged Coordinating Board(TDCB) Friday, June 23, 2017, 9:30 a.m. County Center,

TAC REQUEST AMENDMENT REQUEST

16

7.3 LOBBYING ACTIVITIES: Members shall use their discretion in conducting private discussions with interested persons regarding MPO business, as long as all interested persons are treated equally. Any written material received by a member in connection with a private discussion with an interested person shall be given to the Executive Director for distribution to other members and as appropriate, to staff.

7.4 GOVERNMENT IN THE SUNSHINE: Members shall refrain from

participating in any private communications regarding MPO business involving two or more members. For purposes of this section, a private discussion is one that is not conducted in accordance with the requirements of Florida’s Government-in-the-Sunshine Law, Section 286.011, Florida Statutes.

Any written material received by a member in connection with MPO Business shall be given to the Executive Director or the member’s committee support staff for distribution to other members and as appropriate, to staff.

7.5 STATEMENTS BY MEMBERS: Members will from time to time be asked to

give their opinions regarding matters which have been or will be considered by the MPO or one of its committees. No member shall be prohibited from stating his/her individual opinion on any matter; however, in doing so, each member shall take care to make clear that the opinion expressed is his/her own, and does not constitute the official position of the MPO or one of its committees.

8.0 ADMINISTRATION: The administration of MPO activities shall be accomplished

through official actions of the MPO in accordance with the following guidelines:

8.1 POLICIES: The MPO shall adopt, by a vote of a majority of the total membership, Policies to guide the administration of the MPO. The Policies shall be published in conjunction with the By-laws. The Policies may be amended from time to time by a vote of a majority of the total voting membership of the MPO.

8.2 STATUTES: The MPO shall abide by legislation authorizing and specifying

its duties and functions and all other requirements of Florida law. 8.3 STAFF: The staff of the MPO shall consist of the Executive Director and

such additional employees as provided by the Hillsborough County City-County Planning Commission. The staff shall be directed by the Executive Director of the MPO.

9.0 RULES OF CONSTRUCTION: The following rules apply to the text of this

document.

9.1 The particular controls the general.

Page 130: Meeting of the Transportation Disadvantaged Coordinating ... · Meeting of the Transportation Disadvantaged Coordinating Board(TDCB) Friday, June 23, 2017, 9:30 a.m. County Center,

TAC REQUEST AMENDMENT REQUEST

17

9.2 The word “shall” is mandatory and not discretionary. The word “may” is permissive.

9.3 Words used in the present tense include the future; words used in the

singular number shall include the plural and the plural the singular unless the context indicates the contrary.

9.4 Words not defined shall have the meaning commonly ascribed to them.

10.0 AMENDMENT: The By-laws may be amended by two-thirds majority vote of the

total voting membership of the MPO. Any amendment shall be proposed at a regular meeting and voted upon the next regular meeting.

Page 131: Meeting of the Transportation Disadvantaged Coordinating ... · Meeting of the Transportation Disadvantaged Coordinating Board(TDCB) Friday, June 23, 2017, 9:30 a.m. County Center,

Board & Committee Agenda Item

Agenda Item

Vision Zero Hillsborough Update

Presenter

Gena Torres, MPO Staff

Summary

Vision Zero is an approach based on the belief that traffic death and injury is preventable – that these aren’t “accidents,” but the result of poor behaviors combined with unforgiving roadway designs. The resulting philosophy is to approach the problem from multiple angles, including targeted education and data-driven enforcement, as well as street designs that emphasize safety, predictability, and the potential for human error.

The MPO’s Policy Committee has taken the lead locally to develop a Vision Zero Action Plan centered around four Action Tracks:

Paint Saves Lives – about low-cost engineering strategies

One Message, Many Voices – about public education strategies

Consistent and Fair – about community-oriented law enforcement

The Future Will Not Be Like the Past – focusing on design standards

Three of four workshops to develop the plan have been held. The draft strategies for each Action Track will be presented at this meeting along with the responsible party for implementation and the expected timeframe. The last workshop is scheduled for August 22, 2017. The location is to be decided, but the public is welcome to attend.

Recommended Action

None; for information only.

Prepared By

Gena Torres, MPO Staff

Attachments

Vision Zero Overview

Plan Hillsborough planhillsborough.org

[email protected] 813 - 272 - 5940

601 E Kennedy Blvd 18th floor

Tampa, FL, 33602

Page 132: Meeting of the Transportation Disadvantaged Coordinating ... · Meeting of the Transportation Disadvantaged Coordinating Board(TDCB) Friday, June 23, 2017, 9:30 a.m. County Center,

ONE TRAFFIC DEATH IS TOO MANY

S A F E S T R E E T S N O W

VISION ZERO. No more traffic-related deaths. No more pedestrians killed trying to cross the street. No more bicyclists and motorcyclists hit by unaware drivers. Safe streets for everyone.

IT’S AMBITIOUS. IT’S OUR MOTIVATION. IT’S OUR DRIVE.

WE HAVE A CRISIS IN HILLSBOROUGH COUNTY. No loss of life is acceptable. Between 2005 and 2016, there were 2,100 traffic-related deaths and 93,262 traffic-related injuries in Hillsborough County. Each one of these resulted in untold pain and suffering for the victims and their families. Moreover, every one of these was preventable.

Hillsborough County has the dubious distinction of being one of the highest traffic injury and death locations in the US. Pedestrians and bicyclists are particularly vulnerable. In 2015 there were 52 pedestrian traffic deaths and eight bicyclist traffic deaths in Hillsborough County. This is not surprising given the relationship between speed and pedestrian fatalities. Add in distracted driving, inadequate street lighting, and other contributing factors and we have a recipe for crashes.

DEATHS

HILLSBOROUGH COUNTY TRAFFIC DEATHS2006-2015SOURCE: PLAN HILLSBOROUGH

0

20

40

60

80

100

120

2006 2007 2008 2009 2010 2011 2012 2013 2014 2015

DEATH AND INJURY DUETO SPEED

20

010

30

50 70

90

110

12020MPH

100

40 8060

10% LIKELIHOOD OF FATALITY OR SERIOUS INJURY

20

010

30

50 70

90

110

12030MPH

100

40 8060

40% LIKELIHOOD OF FATALITY OR SERIOUS INJURY

20

010

30

50 70

90

110

12040MPH

100

40 8060

80% LIKELIHOOD OF FATALITY OR SERIOUS INJURY

Source: U.S. Department ofTransportation, Literature Reviewed

on Vehicle Travel Speeds andPedestrian Injuries. March 2000.

Page 133: Meeting of the Transportation Disadvantaged Coordinating ... · Meeting of the Transportation Disadvantaged Coordinating Board(TDCB) Friday, June 23, 2017, 9:30 a.m. County Center,

HILLSBOROUGH COUNTY IS DOING SOMETHING ABOUT IT.We are joining an international movement called Vision Zero. Many U.S. cities have joined and adopted Vision Zero, including New York, Chicago, Washington DC, Seattle, Austin, San Diego, and now Tampa and Hillsborough County.

At the core of the movement is the belief that death and injury on city streets is preventable – that these aren’t “accidents,” but the result of poor behaviors combined with unforgiving roadway designs. Vision Zero attacks the problem with a systematic approach that includes targeted education, data-driven analysis, enforcement, and street designs that emphasize safety, predictability, and the need for countermeasures for human error.

The Hillsborough Metropolitan Planning Organization is taking the lead, with help from local partners including Florida DOT, the Cities of Tampa, Temple Terrace, and Plant City, law enforcement, schools, hospitals, and media, among others. The MPO is engaging committed citizens to bring Vision Zero to reality, with four “Action Track” working groups:

ONE TRAFFIC DEATH IS TOO MANY

S A F E S T R E E T S N O W

“PAINT SAVES LIVES” Identifying low-cost engineering strategies

“ONE MESSAGE, MANY VOICES” Educating and informing the public

“CONSISTENT AND FAIR” Focusing on community-oriented law enforcement

“THE FUTURE WILL NOT BE LIKE THE PAST” Implementing context sensitive design

JOIN OUR CAUSE. We need your help to get the word out, locate problem areas, identify solutions, and advocate for investments in traffic safety. Join us to make Vision Zero a reality. Please check out our website, http://www.planhillsborough.org/vision-zero/ and follow us on Facebook at Vision Zero Hillsborough to learn more.

VISION ZERO.

ALL ROAD USERS.

ALL AGES.

ALL THE TIME.

Page 134: Meeting of the Transportation Disadvantaged Coordinating ... · Meeting of the Transportation Disadvantaged Coordinating Board(TDCB) Friday, June 23, 2017, 9:30 a.m. County Center,

Committee Reports

Meeting of the Citizens Advisory Committee (CAC) on May 10, 2017

The CAC approved and forwarded to the MPO:

The TIP “Early Start” Amendments, and The TIP Annual Update, after discussing funding allocations to Complete

Streets and multi-use trails standards, and the need to reflect in the TIP the number of comments received for and against the TBX project.

The CAC held a special election to fill officer positions that were vacated due to a member going off the Committee, electing Bill Roberts as vice chair, and Ray Alzamora to fill the Member at Large seat that Mr. Roberts had occupied. The CAC also received status reports from: FDOT on Tampa Bay Next; Coast BikeShare on bicycle utilization since the program was grown from downtown Tampa; and MPO staff seeking input on the Innovation Gateway landscaping concepts for the interchanges at I-275 and Busch Blvd and Fowler Ave. The CAC also discussed the then-upcoming May 12th Regional Transportation Leadership Workshop, and several members participated. Meeting of the Technical Advisory Committee (TAC) on May 15, 2017

The TAC approved and forwarded to the MPO:

The TIP “Early Start” Amendments, and The TIP Annual Update. Members asked for clarification if the amendments meant that sidewalks would be constructed sooner or if only planning dollars were advancing; if the access management on Kennedy Boulevard included complete median closures; and if the Bypass Canal trail amendment will need the LAP certification completed sooner.

The TAC heard status reports on the FDOT Intersection Lighting Program; Coast BikeShare and its commuter vs. entertainment analysis of bike usage; the Innovation Gateway project; and FDOT’s Community Working Groups for Tampa Bay Next. Verification was asked on the design of the Howard Frankland bridge and on addressing diverse needs, including health impact analyses. Members discussed moving forward on segments that have greater community support.

Policy Committee Meeting of May 23, 2017

The committee approved and forwarded to the MPO:

The TIP “Early Start” Amendments, after requesting that the Henderson intersection receive another look in the Kennedy Blvd project, and

Plan Hillsborough planhillsborough.org

[email protected] 813 - 272 - 5940

601 E Kennedy Blvd 18th floor

Tampa, FL, 33602

Page 135: Meeting of the Transportation Disadvantaged Coordinating ... · Meeting of the Transportation Disadvantaged Coordinating Board(TDCB) Friday, June 23, 2017, 9:30 a.m. County Center,

The TIP Annual Update. The committee also was briefed on Tampa Bay Next, and on the MPO’s Innovation Gateway study, and agreed to recess in June. There was discussion of broad-brush allocations of funds between types of projects, such as highway and transit projects, and agreement to explore this topic in July as a beginning step towards the 2045 Long Range Transportation Plan. Meeting of the Bicycle Pedestrian Advisory Committee on May 10, 2017

The committee:

approved the TIP Annual Update as presented; recommended that the MPO make the Real Choices When Not Driving program

the number one priority, and budget more funds for these projects in the TIP.

The members also decided that their June 14th meeting will consist of participation in the Bike/Walk Tampa Bay Forum, with no official business conducted. Start time is 6:00 pm on the 26th Floor of the County Center.

Meeting of the Livable Roadways Committee (LRC) on May 17, 2017

The LRC approved and forwarded to the MPO:

The TIP “Early Start” Amendments, and The TIP Annual Update, after discussion about agencies setting goals to

increase walk/bike spending to at least 1% of the transportation budget. In honor of national bike month, the committee heard status reports on Coast BikeShare and USF’s Bicycle Friendly Designation. Additionally, they weighed in on the I-275/Busch and Fowler Innovation Gateway and Student “Complete Street” Concepts for Morgan St. The committee was reminded of upcoming events and opportunities to review and provide comments on the Hillsborough County Technical Manuals and FDOT Compete Streets Handbook. TBARTA MPO Directors Meeting of May 19, 2017

The region’s MPO directors met and discussed:

Organizing the first annual Gulf Coast Safe Streets Summit in February 2018, and collaborating with Bike/Walk Tampa Bay and FDOT on safety messaging;

Setting performance targets regionally for the first of several federally-mandated performance metrics, transit asset management;

The agenda for the June 16 meeting of the TBARTA MPO Chairs with the Central Florida MPO Alliance, including updates of the regional priorities for the TRIP and Multi-Use Trails programs;

The public input received during the May 12 Regional Transportation Leadership Workshop – recurring themes were the importance of multimodalism, equity, public engagement and consensus-building, and coordination with economic development and land use -- and the next steps for the Regional Planning Best Practices study.

Tampa Bay TMA Leadership Group Meeting of June 2, 2017

Members developed the attached list of top priorities for the tri-county area. These have been integrated into Hillsborough MPO’s draft list of priority projects.

Page 136: Meeting of the Transportation Disadvantaged Coordinating ... · Meeting of the Transportation Disadvantaged Coordinating Board(TDCB) Friday, June 23, 2017, 9:30 a.m. County Center,

Tampa Bay Transportation Management Area (TMA) Leadership Group

2017 Top Priorities Approved by consensus June 2, 2017

Interstate Modernization Projects

Status: Funding is requested for reconstruction of two interchanges, I-275/SR 60 and I-275/I-4; interstate modernization including technology; reevalution of Tampa Interstate Study EIS; and for locational studies for transit centers in the Gateway and Fletcher/Fowler areas. Environmental impact studies are underway, and construction is funded for the Howard Frankland Bridge replacement.

Regional Transit Catalyst Project(s) which may include:

a. Central Avenue BRT, St. Petersburg downtown to beaches; b. Westshore Multimodal Center with fixed guideway connections to downtowns and airports; c. Further development of the Regional Transit Feasibility Plan; d. Regional Express Bus - opportunities include SR 60/Gulf-to-Bay Blvd, the Veterans

Exwy/Suncoast Pkwy, the Gandy/Selmon Exwy corridor, the SR 54/56 corridor, and as a part of Tampa Bay Next; and expansion of regional farebox system to adjoining counties;

e. Elevated transit in the SR 60 corridor – pilot project from downtown Clearwater to Clearwater Beach.

CSX Rail Corridors – Funding is requested for right-of-way preservation for development of potential commuter routes.

SR 54/56 Corridor, from US 19 to US 301 – Funding is requested to complete a Multimodal Corridor Assessment Study.

I-75 Improvements: a. I-75 at Overpass Road – new interchange b. I-75 at Big Bend Road – interchange reconfiguration

Waterborne Transportation Projects – Funding is requested for regional waterborne transportation

priority projects, which could include the Cross-Bay Ferry, waterborne service from south Hillsborough County to MacDill Air Force Base, and other regional projects.

“BELOW THE LINE” - projects are not in priority order

Interstate Express Lanes with Express Bus on I-4 and I-75 Partially Controlled Access Improvements on US 19 north of SR 580 to Pasco County New Road Extension of Ridge Road from Moon Lake Rd. to US 41 New Toll Road in New Tampa (East-West Road) from I-275 to Commerce Park US 41, Port Tampa Bay to Manatee County Line

Page 137: Meeting of the Transportation Disadvantaged Coordinating ... · Meeting of the Transportation Disadvantaged Coordinating Board(TDCB) Friday, June 23, 2017, 9:30 a.m. County Center,

Monday, June 19, 2017HCC Southshore Campus551 24th St NERuskin, FL 3357010:00 am – 12:00 pm(10:30 presentation)

Tuesday, June 27, 2017CDC of Tampa1907 E. Hillsborough Ave #100Tampa, FL 336106:00 pm – 8:00 pm(6:30 presentation)

Thursday, July 6, 2017Kate Jackson Community Center821 S. Rome AveTampa, FL 336066:00 pm – 8:00 pm(6:30 presentation)

Monday, July 10, 2017University Area CDC14013 North 22nd StTampa, FL 336136:00 pm – 8:00 pm(6:30 presentation)

Public Hearing

Wednesday, July 26, 2017HART Ybor, 1201 E. 7th Ave

Tampa, FL 336055:30 pm – 7:00 pm

Public Workshops

Your opinion is critical in designing transit service as HART plans for the next 10 years.

PUBLIC HEARING AND OUTREACH MEETINGSProposed Service Changes & Transit Development Plan Update

HART is analyzing how public transportation in Hillsborough County is currently being delivered, and what that service might look like in the future. Doing both a review of the current network, and planning for service over the next ten years allows HART to essentially “reset” the transit network, providing a strong foundation for future expansion.

During the first phase of outreach on the Transit Development Plan, we asked for your input on your commuting habits and your preferences for service additions or changes.

In this next phase, we need your input on the proposed service changes, and the various options that are being considered.

Help plan the next 10 years of HART service.

Join us at any of the following open-house style community meetings:

Page 138: Meeting of the Transportation Disadvantaged Coordinating ... · Meeting of the Transportation Disadvantaged Coordinating Board(TDCB) Friday, June 23, 2017, 9:30 a.m. County Center,

Special Accommodations:Any person requiring special accommodations to attend or participate, pursuant to the Americans with Disabilities Act,

should contact HART within at least three (3) business days prior to the meeting at (813) 384-6553.

Any questions concerning these community meetings and the public hearing may be directed to HART Service Development, 1201 East 7th Ave, Tampa, FL 33605, or by email

at [email protected] / HARTinfo Line: (813) 254-4278 / TDD: (813) 626-9158

You can also visit goHART.org/TDP for more information on this important plan being developed by HART.

Tuesday, June 20, 2017Marion Transit Center1211 N. Marion StTampa, FL 336026:30 am – 8:30 am and 4:00 pm – 6:00 pm

Wednesday, June 21, 2017University Area Transit Center13110 N. 27th StTampa, FL 336126:30 am – 8:30 am and 4:00 pm – 6:00 pm

Thursday, June 22, 2017Northwest Transfer Center9325 W. Waters AveTampa, FL 336156:30 am – 8:30 am and 4:00 pm – 6:00 pm

Sunday, June 25, 2017Tampa Outdoor Market – Al Barnes Jr. Park2902 N 32nd StTampa, FL 336051:00 pm – 4:00 pm

Sunday, June 25, 2017Multicultural Family DayWater Works Park1710 N Highland AveTampa, FL 3360211:00 am – 7:00 pm

Tuesday, June 27, 2017Marion Transit Center1211 N. Marion StTampa, FL 336026:30 am – 8:30 am and 4:00 pm – 6:00 pm

Wednesday, June 28, 2017University Area Transit Center13110 N. 27th StTampa, FL 336126:30 am – 8:30 am and 4:00 pm – 6:00 pm

Wednesday, June 28, 2017Town ‘N Country Public Library7606 Paula Drive #120Tampa, FL 336155:30 pm – 7:00 pm

Thursday, June 29, 2017West Tampa Transfer Center4201 N Himes AveTampa, FL 336076:30 am – 8:30 am and 4:00 pm – 6:00 pm

Thursday, July 6, 2017 Westfield- Brandon Transfer Center459 Brandon Town Center MallBrandon, FL 335116:30 am – 8:30 am and 4:00 pm – 6:00 pm

Friday, July 7, 2017netp@rk Transfer Center 5003 N. 56th StTampa, FL 336106:30 am – 8:30 am and 4:00 pm – 6:00 pm

Saturday, July 15, 2017Hillsborough County Neighborhoods Conference Sheraton Tampa East 10221 Princess Palm AveTampa, FL 336108:00 am – 2:30 pm

Saturday, July 15, 2017Brandon Mall – Back to School Bash459 Brandon Town Center MallBrandon, FL 3351110:00 am – 3:00 pm

Additional Outreach Opportunities

Page 139: Meeting of the Transportation Disadvantaged Coordinating ... · Meeting of the Transportation Disadvantaged Coordinating Board(TDCB) Friday, June 23, 2017, 9:30 a.m. County Center,

Florida Department of Transportation RICK SCOTT GOVERNOR

11201 North McKinley Drive Tampa, FL 33612-6456

MIKE DEW SECRETARY

www.dot.state.fl.us

Date: June 07, 2017 Subject: Officials/Agencies Kick-Off Meeting West Busch Boulevard (SR 580) Corridor Study from North Dale Mabry Highway to North Nebraska Avenue Hillsborough County, Florida FDOT Financial Project ID Number: 435908-1-22-01 Dear Agency Partner: The Florida Department of Transportation (FDOT), District Seven has scheduled an officials/agencies kick-off meeting to discuss the above referenced project. The West Busch Blvd Corridor study limits extend from North Dale Mabry Highway to North Nebraska Avenue, a distance of approximately 3.3 miles. The study area includes portions of incorporated Hillsborough County and the City of Tampa. This notice has been sent to other public officials and agency representatives interested in the project. The meeting is scheduled for June 29, 2017, from 10:00 AM to Noon at the North Tampa Branch Library, 8916 North Boulevard, Tampa, Florida 33604. The purpose of the Corridor Study is to work with the community, stakeholders and a Project Advisory Group (PAG) to develop a vision and identify needs and issues in the corridor. At the kick-off meeting, we hope to identify PAG participants from the area to help develop a vision for the corridor that will guide proposed short and long-term recommendations. This may include issues related to capacity, traffic operations, safety, access and egress, mobility, freight movements, transit, bicycles, and pedestrian movements. Public participation is solicited without regard to race, color, national origin, age, sex, religion, disability or family status. Persons who require special accommodations under the Americans with Disabilities Act or persons who require translation service (free of charge) should contact Christopher Speese, Public Involvement Coordinator, at (813) 975-6405 or (800) 226-7220 at least seven (7) working days in advance of the meeting.

The environmental review, consultation, and other actions required by applicable federal environmental laws for this project are being, or have been, carried out by the Florida Department of Transportation (FDOT) pursuant to 23 U.S.C. §327 and a Memorandum of Understanding dated December 14, 2016 and executed by the Federal Highway Administration and FDOT. If you require further information concerning this project, please contact Brian Shroyer, Florida Department of Transportation Project Manager at 813-975-6449 or by email at [email protected].

Sincerely,

Brian Shroyer Multimodal Project Manager

Florida Department of Transportation