Ministry of Rail Transportation Myanma Railways Developing a Myanma’s Rail Network that meet demand 23 rd November, 2015

Ministry of Rail Transportation Myanma Railways Developing ... · Ministry of Rail Transportation Myanma Railways Developing a Myanma’s Rail Network that meet demand 23rd November,

  • Upload
    others

  • View
    11

  • Download
    1

Embed Size (px)

Citation preview

Page 1: Ministry of Rail Transportation Myanma Railways Developing ... · Ministry of Rail Transportation Myanma Railways Developing a Myanma’s Rail Network that meet demand 23rd November,

Ministry of Rail Transportation

Myanma Railways

Developing a Myanma’s Rail

Network that meet demand

23rd November, 2015

Page 2: Ministry of Rail Transportation Myanma Railways Developing ... · Ministry of Rail Transportation Myanma Railways Developing a Myanma’s Rail Network that meet demand 23rd November,

CONTENTS

Current Situation and Demand Forecast of Myanma

Railways

New Railway Lines Under Construction

On-going Projects by External Assistance

Railway Links to the Neighboring Countries

Conclusion

2

Page 3: Ministry of Rail Transportation Myanma Railways Developing ... · Ministry of Rail Transportation Myanma Railways Developing a Myanma’s Rail Network that meet demand 23rd November,

3

Page 4: Ministry of Rail Transportation Myanma Railways Developing ... · Ministry of Rail Transportation Myanma Railways Developing a Myanma’s Rail Network that meet demand 23rd November,

Trends in Passengers Carried by MR

4

-

5,000

10,000

15,000

20,000

25,000

30,000

35,000

40,000

45,000

1990/91 1995/96 2000/01 2004/05 2005/06 2006/07 2007/08 2008/09 2009/10 2010/11 2011/12 2012/13 2013/14

Tho

usa

nd

pas

sen

gers

Intercity Yangon Circular Railway

Page 5: Ministry of Rail Transportation Myanma Railways Developing ... · Ministry of Rail Transportation Myanma Railways Developing a Myanma’s Rail Network that meet demand 23rd November,

Modal share with other mode of transport

Trip Distance (km)

Rail Fare ($)

Bus Fare ($)

Rail Time (h)

Bus Time

(h)

Rail Fare

(c$/km)

Bus Fare

(c$/km)

Rail Speed (km/h)

Bus Speed (km/h)

Yangon-Mandalay

650

5.5 (ordinary)

10.5

16

9.3

0.85

1.62

40.6

70

8.0 (upper)

1.23

Yangon-Mawlamyine

305

3.4 (ordinary

5.8 12.5 7.5

1.11

1.90 24.4 41

5.0 (upper)

1.64

Yangon-Pyay 280 2.5 (ordinary) 4.9 9 6 0.89 1.75 31.1 47

Mandalay-Lashio

280 2.5 (ordinary) 6.7 16 8.5 0.89 2.39 17.5 33 5

Page 6: Ministry of Rail Transportation Myanma Railways Developing ... · Ministry of Rail Transportation Myanma Railways Developing a Myanma’s Rail Network that meet demand 23rd November,

6

0

100000

200000

300000

400000

500000

600000

700000

800000

2009/10 2010/11 2011/12 2012/13 2013/14

Infrastructure Investment (Million Kyats)

Railway

Road

Page 7: Ministry of Rail Transportation Myanma Railways Developing ... · Ministry of Rail Transportation Myanma Railways Developing a Myanma’s Rail Network that meet demand 23rd November,

Market Segments

7

0

5

10

15

20

25 Air Car Bus IWT Rail

Page 8: Ministry of Rail Transportation Myanma Railways Developing ... · Ministry of Rail Transportation Myanma Railways Developing a Myanma’s Rail Network that meet demand 23rd November,

Projected Passengers – at Current Overall Trend

8

2014/15 2015/16 2016/17 2017/18 2018/19 2019/20

YCR 30.30 29.26 28.26 27.29 26.35 25.45

Intercity 20.45 19.30 18.09 16.97 15.93 14.96

0.0

10.0

20.0

30.0

40.0

50.0

60.0

Projected Passengers (millions)

Page 9: Ministry of Rail Transportation Myanma Railways Developing ... · Ministry of Rail Transportation Myanma Railways Developing a Myanma’s Rail Network that meet demand 23rd November,

Passenger Trends, by Market Segment

9

0.0

2.0

4.0

6.0

8.0

10.0

12.0

14.0

2009-2010 2010-2011 2011-2012 2012-2013 2013-2014

Passenger Carried (millions)

Yangon-Mandalay Mandalay-Myitkyina Secondary Lines Tertiary Lines

Page 10: Ministry of Rail Transportation Myanma Railways Developing ... · Ministry of Rail Transportation Myanma Railways Developing a Myanma’s Rail Network that meet demand 23rd November,

Passenger volumes on Secondary Lines

10

2.143

1.982

1.827

1.453

1.080

0.739 0.686

Passengers in 2013/14 (million)

Amarapura (Mandalay) - Myitkyina Kemmendine (Yangon) - Pyay Pathein - Henthata - Kyangin

Pyudwin - Chauk Naungpattaya - Mawlamyine Thayeze- Madaya

Awk - O - Pakokku - Kyaw - Kalay

Page 11: Ministry of Rail Transportation Myanma Railways Developing ... · Ministry of Rail Transportation Myanma Railways Developing a Myanma’s Rail Network that meet demand 23rd November,

Projected Passenger Market

11

64.6 76

113.7

170.2

254.7

38.5 44.1 61.8

86.7 121.7

0

50

100

150

200

250

300

2013 2015 2020 2025 2030

Projected Passengers (million)

Yangon-Mandalay Corridor Other Areas

Page 12: Ministry of Rail Transportation Myanma Railways Developing ... · Ministry of Rail Transportation Myanma Railways Developing a Myanma’s Rail Network that meet demand 23rd November,

12

2015/16 2016/17 2017/18 2018/19 2019/20

Tertiary Lines 4.24 4.56 4.91 5.28 5.68

Secondary Lines 9.68 10.42 11.20 12.05 12.96

Mandalay-Myitkyina 2.48 2.67 2.87 3.09 3.32

Yangon-Mandalay 9.18 10.05 11.01 12.05 13.20

0

5

10

15

20

25

30

35

40

Million passengers

Projected Passengers by Market Segment - Potential Market

Page 13: Ministry of Rail Transportation Myanma Railways Developing ... · Ministry of Rail Transportation Myanma Railways Developing a Myanma’s Rail Network that meet demand 23rd November,

Projected Passengers by Scenario

13

Actual (2013/14) 2015/16 2016/17 2017/18 2018/19 2019/20

Target 21.83 19.29 18.09 18.03 18.83 20.44

Trend (Low) 21.83 19.29 18.09 16.97 15.93 14.96

Market (High) 21.83 25.58 27.70 29.99 32.47 35.16

0.0

5.0

10.0

15.0

20.0

25.0

30.0

35.0

40.0

Projected Passengers (million)

Page 14: Ministry of Rail Transportation Myanma Railways Developing ... · Ministry of Rail Transportation Myanma Railways Developing a Myanma’s Rail Network that meet demand 23rd November,

Target Passenger Volumes, Yangon-Mandalay

14

Actual (2013/14) 2015/16 2016/17 2017/18 2018/19 2019/20

Target 21.83 19.29 18.09 18.03 18.83 20.44

Trend (Low) 21.83 19.29 18.09 16.97 15.93 14.96

Market (High) 21.83 25.58 27.70 29.99 32.47 35.16

0.0

5.0

10.0

15.0

20.0

25.0

30.0

35.0

40.0

Projected Passengers (million)

Page 15: Ministry of Rail Transportation Myanma Railways Developing ... · Ministry of Rail Transportation Myanma Railways Developing a Myanma’s Rail Network that meet demand 23rd November,

Trends in MR Freight Traffic

15

-

500

1,000

1,500

2,000

2,500

3,000

3,500

4,000

1990/91 1995/96 2000/01 2004/05 2005/06 2006/07 2007/08 2008/09 2009/10 2010/11 2011/12 2012/13 2013/14

Tho

usa

nd

to

ns

Commercial Parcels Departmental

Page 16: Ministry of Rail Transportation Myanma Railways Developing ... · Ministry of Rail Transportation Myanma Railways Developing a Myanma’s Rail Network that meet demand 23rd November,

freight market on different corridor

16

0

5

10

15

20

25Road Rail River

Page 17: Ministry of Rail Transportation Myanma Railways Developing ... · Ministry of Rail Transportation Myanma Railways Developing a Myanma’s Rail Network that meet demand 23rd November,

17

2014/15 2015/16 2016/17 2017/18 2018/19 2019/20

Parcels 479 436 397 362 330 300

Departmental 817 787 757 729 702 676

Commercial 1,052 1,014 977 942 908 875

0

500

1,000

1,500

2,000

2,500

Tho

usa

nd

to

ns

Projected Freight - Current Trend

Page 18: Ministry of Rail Transportation Myanma Railways Developing ... · Ministry of Rail Transportation Myanma Railways Developing a Myanma’s Rail Network that meet demand 23rd November,

18

2009-2010 2010-2011 2011-2012 2012-2013 2013-2014

Yangon - Mandalay 0.625 0.451 0.613 0.733 0.680

Mandalay - Myitkyina 0.128 0.281 0.301 0.337 0.271

Other lines 0.580 0.642 0.588 0.302 0.141

Departmental 1.045 1.033 0.966 0.806 0.849

Parcels 0.949 1.001 1.110 0.661 0.526

0

0.2

0.4

0.6

0.8

1

1.2

Freight Traffic Trends by Market Segment (million tons)

Page 19: Ministry of Rail Transportation Myanma Railways Developing ... · Ministry of Rail Transportation Myanma Railways Developing a Myanma’s Rail Network that meet demand 23rd November,

19

2015/16 2016/17 2017/18 2018/19 2019/20

Departmental 0.79 0.76 0.73 0.70 0.67

Parcels 0.44 0.40 0.36 0.33 0.30

Other trains 0.10 0.09 0.07 0.06 0.05

Mandalay-Myitkyina 0.41 0.50 0.61 0.74 0.91

Yangon-Mandalay 0.70 0.72 0.73 0.74 0.76

0.0

0.5

1.0

1.5

2.0

2.5

3.0

Million tons

Projected Freight Tons by Market Segment - At Current Trend

Page 20: Ministry of Rail Transportation Myanma Railways Developing ... · Ministry of Rail Transportation Myanma Railways Developing a Myanma’s Rail Network that meet demand 23rd November,

20

46.3

54.4

81.5

122

182.6

22.2 26.1

39.1

58.6

87.7

0

40

80

120

160

200

2013 2015 2020 2025 2030

Projected Freight Market (million tons)

Yangon-Mandalay Corridor

Other Areas

Page 21: Ministry of Rail Transportation Myanma Railways Developing ... · Ministry of Rail Transportation Myanma Railways Developing a Myanma’s Rail Network that meet demand 23rd November,

21

2015/16 2016/17 2017/18 2018/19 2019/20

Departmental 0.85 0.85 0.85 0.85 0.85

Parcels 0.53 0.53 0.53 0.53 0.53

Other trains 0.17 0.19 0.20 0.22 0.24

Mandalay-Myitkyina 0.32 0.36 0.39 0.43 0.47

Yangon-Mandalay 0.82 0.89 0.98 1.07 1.17

0.0

0.5

1.0

1.5

2.0

2.5

3.0

3.5

Mill

ion

to

ns

Projected Freight Tons - Potential Market

Page 22: Ministry of Rail Transportation Myanma Railways Developing ... · Ministry of Rail Transportation Myanma Railways Developing a Myanma’s Rail Network that meet demand 23rd November,

22

Actual 2013/14 2015/16 2016/17 2017/18 2018/19 2019/20

Target 2.47 2.31 2.25 2.21 2.22 2.31

Trend (Low) 2.47 2.44 2.43 2.45 2.50 2.69

Market (High) 2.47 2.68 2.81 2.95 3.09 3.26

0.0

0.5

1.0

1.5

2.0

2.5

3.0

3.5

Target tonnage (million)

Page 23: Ministry of Rail Transportation Myanma Railways Developing ... · Ministry of Rail Transportation Myanma Railways Developing a Myanma’s Rail Network that meet demand 23rd November,

Freight Demand Forecast

Segment 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20

Yangon-Mandalay 1.018% 1.018% 2.5% 5.0% 10.0% 15.0%

Mandalay-Myitkyina 11.2% 5.6% 0.0% 0.0% 2.5% 10.0%

Other trains -15.1% -15.1% -15.1% -15.1% -15.1% -15.1%

Departmental -3.8% -3.8% -3.8% -3.8% -3.8% -3.8%

Parcels -8.9% -8.9% -8.9% -8.9% -8.9% -8.9%

23

Page 24: Ministry of Rail Transportation Myanma Railways Developing ... · Ministry of Rail Transportation Myanma Railways Developing a Myanma’s Rail Network that meet demand 23rd November,

24

2015/16 2016/17 2017/18 2018/19 2019/20

Current Trend (Low) 0.70 0.72 0.73 0.74 0.76

Market Potential (High) 0.82 0.89 0.98 1.07 1.17

Target 0.70 0.72 0.76 0.83 0.96

0.0

0.2

0.4

0.6

0.8

1.0

1.2

1.4

Target tonnage (million) Yangon-Mandalay

Page 25: Ministry of Rail Transportation Myanma Railways Developing ... · Ministry of Rail Transportation Myanma Railways Developing a Myanma’s Rail Network that meet demand 23rd November,

25

2015/16 2016/17 2017/18 2018/19 2019/20

Current Trend (Low) 0.70 0.72 0.73 0.74 0.76

Market Potential (High) 0.82 0.89 0.98 1.07 1.17

Target 0.70 0.72 0.76 0.83 0.96

0.0

0.2

0.4

0.6

0.8

1.0

1.2

1.4

Target tonnage (million) Yangon-Mandalay

Page 26: Ministry of Rail Transportation Myanma Railways Developing ... · Ministry of Rail Transportation Myanma Railways Developing a Myanma’s Rail Network that meet demand 23rd November,

Axle load and other technical standard

Item MR

Target speed Freight 48 km/hr

Passenger 68 km/hr

Radius of

Curvature

Rolling 200 m

Mountainous

Maximum

Gradients

Rolling 1.00%

Mountainous 4.00%

Track

Structure

Rail section 37 kg/m

Sleeper P.C

W.S

Depth ballast 120 mm

Axle load 12.5 ton

Track Structure

26

Page 27: Ministry of Rail Transportation Myanma Railways Developing ... · Ministry of Rail Transportation Myanma Railways Developing a Myanma’s Rail Network that meet demand 23rd November,

Route Length

Route 6207.644 km

Track 8047.069 km

(Including Double Track 700.82 km)

Bridges 12099 Nos

Stations 960 Nos

27

Total Number of Locomotives 368 Nos

(Including Overage 219 Nos - 60%)

Total Number of Passenger Coaches 1375 Nos

(Including Overage 404 Nos - 29%)

Total Number of Wagons 3384 Nos

(Including Overage 1611 Nos - 48%)

Page 28: Ministry of Rail Transportation Myanma Railways Developing ... · Ministry of Rail Transportation Myanma Railways Developing a Myanma’s Rail Network that meet demand 23rd November,

28

Bagan Stations 2000 HP DEL Dalian (China)

Passenger Coaches (China) Covered Wagon

Page 29: Ministry of Rail Transportation Myanma Railways Developing ... · Ministry of Rail Transportation Myanma Railways Developing a Myanma’s Rail Network that meet demand 23rd November,

29

Page 30: Ministry of Rail Transportation Myanma Railways Developing ... · Ministry of Rail Transportation Myanma Railways Developing a Myanma’s Rail Network that meet demand 23rd November,

New Railway Lines Under Construction

Sr

. Name of Project

Distance

(Mile)

construc

ted

(mile)

Ongoing

(Mile)

1 Kyaukyi- Sinkhan –Bamow Rail

road Section of Katha-Bamow

Railway Line Project

94.87 37.06

57.81

2 Natmouk- KanPyar Rail road

Section of Pyawbwe-Natmouk-

Magwe Railway Line Project

94.71 65.22 29.49

3 Yechanbyin - Kwantaung and

Kyauk Taw - An- Minbu Rail road

Section of Minbu-An-Sittway

Railway Line Project

257.00 54.00 203.00

4 Einme-Nyaundong Rail road

Section of Pathein(Begayet) –

Einme - Nyaundong Yangon

(Hlaing Thayar) Railway Line

Project

96.51 61.09 35.42

Total 543.09 217.37 325.72 30

Page 31: Ministry of Rail Transportation Myanma Railways Developing ... · Ministry of Rail Transportation Myanma Railways Developing a Myanma’s Rail Network that meet demand 23rd November,

Katha-Bamaw Railway Line Project (94.87)Miles

Project Period 2007-2008 FY to 2018-2019 FY

kyaukgyi

Chaungwa

Section Length

(Mile) Starting Date Openning Date

Opened Section

Katha-Moetagyi

Moetagyi - Kyaukkyi

16.68

20.38

16-5-2007

16-5-2007

20-2-2010

7-2-2014

Total opened length 37.06

Sections to be opened

Kyaukkyi-Ayarwaddy Bridge(Sinkhan) –Bamaw 57.81 16-5-2007 -

Total length to be opened 57.81

Moetagy

i

Bama

w

Sinkh

an

31

Page 32: Ministry of Rail Transportation Myanma Railways Developing ... · Ministry of Rail Transportation Myanma Railways Developing a Myanma’s Rail Network that meet demand 23rd November,

Pyawbwe-Natmauk-Magwe Railway Line Project (94.71)mile

Pyawbw

e Ywadaw

Magw

e

Natmou

k

Kanbya

Section Length(mile) Starting Date Openning Date

Opened Sections

Magwe-Kanbya 7.68 10-11-2008 19-12-2009

Pyawbwe(Yan Aung) - Ywadaw 22.12 10-11-2008 16-1-2010

Ywadaw-Natmauk 35.42 10-11-2008 13-3-2013

Total Opened Length 65.22

Section to be opened

Kanbya-Natmauk 29.49 10-11-2008 -

Total length to be opened 29.49

Project Period 2008-2009 FY to 2017-2018 FY

32

Page 33: Ministry of Rail Transportation Myanma Railways Developing ... · Ministry of Rail Transportation Myanma Railways Developing a Myanma’s Rail Network that meet demand 23rd November,

Minbu –An – Sittwe Rail Line Project (257)Miles

Min

Chaung

Kispanad

i

Myauk

U

Sit twe

Section Length(mile) Starting Date Openning

Date

Opened section

Sit twe-Yechanbyin 11.46 15-2-2009 19-5-2009

Kwan Taung- Ponnagyun-Yotayouk 22.72 15-2-2009 15-5-2010

Yotayouk-Kyauk Taw 19.28 16-5-2010 10-4-2011

Total 54.00

Sections to be opened

Yechanbyin-Pardaleik 5.81 15-2-2009 -

Pardaleik-Kwan Taung 4.18 - -

Kyauk Taw-An- Minbu 193.01 - -

Total 203.00

Kyauktaw

Yechanbyin

Kwan

Taung Minbu

An

Project Period 2009-2010 FY to 2021-2022 FY

33

Page 34: Ministry of Rail Transportation Myanma Railways Developing ... · Ministry of Rail Transportation Myanma Railways Developing a Myanma’s Rail Network that meet demand 23rd November,

Pathein(Begayet)-Einme-Nyaungdong-Yangon(Hlaingthayar) Railway Line

Project (96.51)Mile

Section Length( mile) Starting Date Openning Date

Opened Section

Pathein(Begayet)-Einme 20.75 1-12-2009 20-3-2011

Section to be opened

Einme-Nyaungdong-Hlaingthayar 75.76 1-12-2009 -

Begayet

Einme

Hlaingthayar

Setka

wt

Project Period 2009-2010 FY to 2017-2018 FY

34

Page 35: Ministry of Rail Transportation Myanma Railways Developing ... · Ministry of Rail Transportation Myanma Railways Developing a Myanma’s Rail Network that meet demand 23rd November,

35

Page 36: Ministry of Rail Transportation Myanma Railways Developing ... · Ministry of Rail Transportation Myanma Railways Developing a Myanma’s Rail Network that meet demand 23rd November,

Three Phase

Phase 1 Yangon - Taungoo

267 km

Phase 2 Taungoo – Yameithin

175 km

Phase 3 Yameithin – Mandalay

178 km

Phrase 1 Yangon – Taungoo Rail Line

Upgrading

According to the Project Schedule;

Detailed Purpose has been conduct by

JICA Expert Team as Grant,

The Construction Management

Consulting Service selection Purpose

is under the negotiation.

36

Yangon-Mandalay Railway Improvement Project Phase 1 (Yangon-Taungoo

Rail-line of 267 km) by Japan ODA Loan of US$647.8 million

On-going Project by External Assistance

Mandalay

Yameithin

Taungoo

Yangon

On-going

Page 37: Ministry of Rail Transportation Myanma Railways Developing ... · Ministry of Rail Transportation Myanma Railways Developing a Myanma’s Rail Network that meet demand 23rd November,

37

The project consists of two parts:

One is cover by Japan ODA Loan of Japanese Yen (24.866) billion (US$ 207.8

million)

the other is cover by national budget of Japanese Yen (11.41) billion (US$ 43.38

million).

The project composition is defined as follow:

At present, MR submitted to parliament for approval of the using Japan ODA Loan and

also for National Budget.

The Project

“Project components covered by Japanese

ODA Loan

Signaling Works

DEMU Procurement works

“Project components covered by National

Budjet

Civil and Track Works

On-going Project by External Assistance

The Yangon Circular Railway Line Upgrading Project

Page 38: Ministry of Rail Transportation Myanma Railways Developing ... · Ministry of Rail Transportation Myanma Railways Developing a Myanma’s Rail Network that meet demand 23rd November,

38

Upgrading of Bago-Dawei Rail ways Line 507 km as Pipe Line Project

On-going Project by External Assistance

Dawei

Bago

Myanma Railways submitted the project with

estimated cost about 29.6 million US$.

But ADB increased the estimated cost up to US$

100 million at 17th Sub – regional Transport Forum

(STF) held in Vientiane, Laos on 11 to 12

November 2013.

Dawei deep seaport project and Dawei –

Kanchanaburi rail line project would be linked with

this line and for possible containerization; this

Bago – Dawei rail line project should be upgraded.

The project period is from 2016 to 2020.

Page 39: Ministry of Rail Transportation Myanma Railways Developing ... · Ministry of Rail Transportation Myanma Railways Developing a Myanma’s Rail Network that meet demand 23rd November,

39

Page 40: Ministry of Rail Transportation Myanma Railways Developing ... · Ministry of Rail Transportation Myanma Railways Developing a Myanma’s Rail Network that meet demand 23rd November,

The missing link between Kalay and Tamu is 135 kms in Myanmar territory. A survey team from Rail India Technical and Economics Services (RITES) had made the feasibility study for that link in 2004. That study reported this railway line is not

economically viable.

The first meeting of the Joint Working Group on Railways between India and Myanmar was held in Naypyitaw on 16-17 January, 2013.

Participants from both side discussed to construct the new railway line from the termination station to border points in respective territory.

In Myanmar territory, the new railway line will be 127.4 kilometer from the existing termination station (Kalay) to border

township (Tamu).

Both sides agreed to cooperate in preparing of detail report for Rail Line construction project.

Missing link between Myanmar and India

Railways Links to the Neighboring Countries

40

Page 41: Ministry of Rail Transportation Myanma Railways Developing ... · Ministry of Rail Transportation Myanma Railways Developing a Myanma’s Rail Network that meet demand 23rd November,

For Muse-Kyaukphu Rail Transportation System implemented by BOT System, China Railway Engineering

Corporation-CREC of the People’s Republic of China and Ministry of Rail Transportation, the Republic of the

Union of Myanmar signed Memorandum of Understanding in April, 2011 at Nay Pyi Taw and then the

Supplementary Memorandum of Understanding was signed in May, 2011 at Beijing, China.

That project is from Rulei of China to Kyaukpyu through Muse, Lashio, Mandalay, Magwe, Minbu and Ann in

Myanmar. Total length is 4.2 km in China territory and 808.8 km in Myanmar territory altogether 813.015 km.

The Expert team of CREC and Myanma Railway joint group made survey, geological investigation and checking

infringed of buildings along the proposed alignment. And then the Feasibility Study Report was submitted in

April, 2012.

In the Feasibility Study Report, there are some unclear issues related to check the alignment, EIA and SIA

evaluation, and also EIRR and FIRR evaluation. So Myanma Railways want to discuss with CREC on those

issues.

The original MoU was expired on April 27, 2013 and one year extension of MoU was signed on July 18, 2013 that

term also expired again on 27th April 2014.

The 2nd time Addendum to the MoU was signed on December 2014.

The 3rd Addendum to the MoU is under process.

Railways Links to the Neighboring Countries

Missing link between Myanmar and China

Mandalay

Musel

Lashio

Magwe

Kyaukphu

Length 868.262 km

41

Page 42: Ministry of Rail Transportation Myanma Railways Developing ... · Ministry of Rail Transportation Myanma Railways Developing a Myanma’s Rail Network that meet demand 23rd November,

The rail link between three pagoda pass (Myanmar) and Namtok

(Thailand) was spur line of Singapure - Kumming Rail Link Project.

From 2005 to 2007, Feasibility Study for that rail link has been

conducted by Korea International Cooperation Agency (KOICA) and

submitted their report to each government.

Due to construction of dam in Thailand side, some rail areas were

flooded. New alignment might be mountainous area, steep gradient,

high construction cost and low passenger & freight transport and

more running time.

Therefore, Thailand and Myanmar agree to put off the project at the

13th SKRL- SWG Meeting held in Myanmar in October, 2011.

At the 14th Special Working Group Meeting on Singapore-Kunming

Rail Link Project, held in Vientiane, Laos PDR, in 2012,

representative from Thailand submitted to construct new rail line,

Dawei - Kanchanaburi instead of old line Three Pagoda Pass -

Kanchanaburi.

Missing link between Myanmar and Thailand

42

Railways Links to the Neighboring Countries

Page 43: Ministry of Rail Transportation Myanma Railways Developing ... · Ministry of Rail Transportation Myanma Railways Developing a Myanma’s Rail Network that meet demand 23rd November,

Yephyu

Sinbyudaing

Thi Tha

Kachanaburi Dawei Deep Sea Port to Phu Nam Ron 170 km

Tha Laot Tar

Myita Ai One

Kose Chaung

Nyaungdon Ye Boub

Nabule Thit Ka Don

Dawei

Maungmagan

Phu Nam Ron to Kachanaburi 80 km

Kachanaburi to Bangkok 110 km

Proposed Alignment

Myanma Railways would like to request MLIT to provide the

technical assistance for the Feasibility Study on Dawei– Phu Nam

Ron 170 km long (Myanmar– Thailand border) .

43

Phu Nam Ron

Dawei Deep Sea Port

Page 44: Ministry of Rail Transportation Myanma Railways Developing ... · Ministry of Rail Transportation Myanma Railways Developing a Myanma’s Rail Network that meet demand 23rd November,

44

CONCLUSION

Page 45: Ministry of Rail Transportation Myanma Railways Developing ... · Ministry of Rail Transportation Myanma Railways Developing a Myanma’s Rail Network that meet demand 23rd November,

“ CONCLUSION ”

As presented above , although Myanma Railways is facing

Big demand and lack of infrastructure and rolling stocks,

we will try our very best for Myanma Railways to meet

demand , and enhance the quality of the Rail Transport

Service , with Modernization and Rationalization in the

short future

45

Page 46: Ministry of Rail Transportation Myanma Railways Developing ... · Ministry of Rail Transportation Myanma Railways Developing a Myanma’s Rail Network that meet demand 23rd November,

Thank You