13

Click here to load reader

MLD - Proposed TP-201.4 Proposed Vapor Recovery Test Procedure TP-201.4 DYNAMIC PRESSURE PERFORMANCE Public Workshop, June 20, 2001 CALIFORNIA AIR RESOURCES

Embed Size (px)

Citation preview

Page 1: MLD - Proposed TP-201.4 Proposed Vapor Recovery Test Procedure TP-201.4 DYNAMIC PRESSURE PERFORMANCE Public Workshop, June 20, 2001 CALIFORNIA AIR RESOURCES

MLD - Proposed TP-201.4

Proposed Vapor Recovery

Test Procedure

TP-201.4DYNAMIC PRESSURE PERFORMANCE

Public Workshop, June 20, 2001

CALIFORNIA AIR RESOURCES BOARDMONITORING AND LABORATORY DIVISION

VAPOR RECOVERY CERTIFICATION SECTION

Page 2: MLD - Proposed TP-201.4 Proposed Vapor Recovery Test Procedure TP-201.4 DYNAMIC PRESSURE PERFORMANCE Public Workshop, June 20, 2001 CALIFORNIA AIR RESOURCES

2MLD - Proposed TP-201.4June 20, 2001

PRESENTATION AGENDA

• TEST METHODOLOGY

• TEST EQUIPMENT

• COMPLIANCE TESTING

• QUESTIONS, COMMENTS & SUGGESTIONS

Page 3: MLD - Proposed TP-201.4 Proposed Vapor Recovery Test Procedure TP-201.4 DYNAMIC PRESSURE PERFORMANCE Public Workshop, June 20, 2001 CALIFORNIA AIR RESOURCES

3MLD - Proposed TP-201.4June 20, 2001

TEST METHODOLOGY

• Includes All Test Methods Used For Certification and Compliance Tests

• Modification includes 6 Test Methods

Page 4: MLD - Proposed TP-201.4 Proposed Vapor Recovery Test Procedure TP-201.4 DYNAMIC PRESSURE PERFORMANCE Public Workshop, June 20, 2001 CALIFORNIA AIR RESOURCES

4MLD - Proposed TP-201.4June 20, 2001

TEST METHODOLOGY - CONTINUED

• Method 1– standards imposed from nozzle to UST– no remote vapor check valve installed

• Method 2– Phase II balance and Hirt VCS 200 systems– standards imposed from nozzle to UST– remote vapor check valve installed– vapor check valve cannot be disabled

Page 5: MLD - Proposed TP-201.4 Proposed Vapor Recovery Test Procedure TP-201.4 DYNAMIC PRESSURE PERFORMANCE Public Workshop, June 20, 2001 CALIFORNIA AIR RESOURCES

5MLD - Proposed TP-201.4June 20, 2001

TEST METHODOLOGY - CONTINUED

• Method 3– Phase II balance and Hirt VCS 200 systems– standards imposed from nozzle to UST– remote vapor check valve installed that can be

disabled by removing the poppet on the fuel side

• Method 4– standards imposed from Phase II riser to UST– no vacuum-producing device between riser and

UST

Page 6: MLD - Proposed TP-201.4 Proposed Vapor Recovery Test Procedure TP-201.4 DYNAMIC PRESSURE PERFORMANCE Public Workshop, June 20, 2001 CALIFORNIA AIR RESOURCES

6MLD - Proposed TP-201.4June 20, 2001

TEST METHODOLOGY - CONTINUED

• Method 5– bellows-equipped Phase II systems– standards imposed at the nozzle/fillpipe interface

during vehicle fueling

• Method 6– verifies proper drainage of gasoline from the base

of vent pipe to the UST– used after compliance established for system

using appropriate of Methods 1-4

Page 7: MLD - Proposed TP-201.4 Proposed Vapor Recovery Test Procedure TP-201.4 DYNAMIC PRESSURE PERFORMANCE Public Workshop, June 20, 2001 CALIFORNIA AIR RESOURCES

7MLD - Proposed TP-201.4June 20, 2001

TEST EQUIPMENT

Methods 1, 2, 3

Dynamic Back Pressure Test Assembly

Page 8: MLD - Proposed TP-201.4 Proposed Vapor Recovery Test Procedure TP-201.4 DYNAMIC PRESSURE PERFORMANCE Public Workshop, June 20, 2001 CALIFORNIA AIR RESOURCES

8MLD - Proposed TP-201.4June 20, 2001

TEST EQUIPMENT - CONTINUED

Methods 1, 2, 3, 4, 6

Dynamic Pressure Release Assembly

Page 9: MLD - Proposed TP-201.4 Proposed Vapor Recovery Test Procedure TP-201.4 DYNAMIC PRESSURE PERFORMANCE Public Workshop, June 20, 2001 CALIFORNIA AIR RESOURCES

9MLD - Proposed TP-201.4June 20, 2001

TEST EQUIPMENT - CONTINUED

Methods 2, 4

Capped “T” Assembly

Page 10: MLD - Proposed TP-201.4 Proposed Vapor Recovery Test Procedure TP-201.4 DYNAMIC PRESSURE PERFORMANCE Public Workshop, June 20, 2001 CALIFORNIA AIR RESOURCES

10MLD - Proposed TP-201.4June 20, 2001

TEST EQUIPMENT - CONTINUED

Method 5

Donut Pressure Test Assembly

Page 11: MLD - Proposed TP-201.4 Proposed Vapor Recovery Test Procedure TP-201.4 DYNAMIC PRESSURE PERFORMANCE Public Workshop, June 20, 2001 CALIFORNIA AIR RESOURCES

11MLD - Proposed TP-201.4June 20, 2001

TEST EQUIPMENT - CONTINUED

Method 6

Vent Pipe Pressure Assembly

Page 12: MLD - Proposed TP-201.4 Proposed Vapor Recovery Test Procedure TP-201.4 DYNAMIC PRESSURE PERFORMANCE Public Workshop, June 20, 2001 CALIFORNIA AIR RESOURCES

12MLD - Proposed TP-201.4June 20, 2001

COMPLIANCE TESTING

• Compliance Tests = Certification Tests

• Option to Waive Requirement to Introduce Gasoline into Phase II Risers for Existing Stations

• Procedure Bias Created by Excessive Initial Flowrate Addressed

Page 13: MLD - Proposed TP-201.4 Proposed Vapor Recovery Test Procedure TP-201.4 DYNAMIC PRESSURE PERFORMANCE Public Workshop, June 20, 2001 CALIFORNIA AIR RESOURCES

13MLD - Proposed TP-201.4June 20, 2001

QUESTIONS, COMMENTS & SUGGESTIONS

• Written Comments

Due by July 9, 2001

• Send Comments To:– Paul Marzilli

Air Resources Board

1900 14th Street

Sacramento, CA 95812

or– [email protected]