46
3GPP2 C.S0048-0 Version 1.0 Date: October 17, 2003 Mobile Equipment (ME) Conformance Testing for cdma2000 Spread Spectrum Standards Release 0 COPYRIGHT 3GPP2 and its Organizational Partners claim copyright in this document and individual Organizational Partners may copyright and issue documents or standards publications in individual Organizational Partner's name based on this document. Requests for reproduction of this document should be directed to the 3GPP2 Secretariat at [email protected]. Requests to reproduce individual Organizational Partner's documents should be directed to that Organizational Partner. See www.3gpp2.org for more information.

Mobile Equipment (ME) Conformance Testing for cdma2000 ...cdma2000 Spread Spectrum Standards Release 0 COPYRIGHT 3GPP2 and its Organizational Partners claim copyright in this document

  • Upload
    others

  • View
    8

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Mobile Equipment (ME) Conformance Testing for cdma2000 ...cdma2000 Spread Spectrum Standards Release 0 COPYRIGHT 3GPP2 and its Organizational Partners claim copyright in this document

3GPP2 C.S0048-0

Version 1.0

Date: October 17, 2003

Mobile Equipment (ME) Conformance Testing for cdma2000 Spread Spectrum Standards

Release 0

COPYRIGHT

3GPP2 and its Organizational Partners claim copyright in this document and individual Organizational Partners may copyright and issue documents or standards publications in individual Organizational Partner's name based on this document. Requests for reproduction of this document should be directed to the 3GPP2 Secretariat at [email protected]. Requests to reproduce individual Organizational Partner's documents should be directed to that Organizational Partner. See www.3gpp2.org for more information.

Page 2: Mobile Equipment (ME) Conformance Testing for cdma2000 ...cdma2000 Spread Spectrum Standards Release 0 COPYRIGHT 3GPP2 and its Organizational Partners claim copyright in this document
Page 3: Mobile Equipment (ME) Conformance Testing for cdma2000 ...cdma2000 Spread Spectrum Standards Release 0 COPYRIGHT 3GPP2 and its Organizational Partners claim copyright in this document

3GPP2 C.S0048-0

No text. 1

Page 4: Mobile Equipment (ME) Conformance Testing for cdma2000 ...cdma2000 Spread Spectrum Standards Release 0 COPYRIGHT 3GPP2 and its Organizational Partners claim copyright in this document
Page 5: Mobile Equipment (ME) Conformance Testing for cdma2000 ...cdma2000 Spread Spectrum Standards Release 0 COPYRIGHT 3GPP2 and its Organizational Partners claim copyright in this document

3GPP2 C.S0048-0

i

CONTENTS 1

1 Foreword............................................................................................................. 1-1 2

2 References........................................................................................................... 2-1 3

3 Definitions and Abbreviations .............................................................................. 3-1 4

3.1 Definitions..................................................................................................... 3-1 5

3.2 Abbreviations................................................................................................. 3-1 6

4 ME Test Environment.......................................................................................... 4-1 7

5 Testing of the ME ................................................................................................ 5-1 8

5.1 Definition of Default Values for R-UIM/ME Interface Testing........................... 5-1 9

5.1.1 EFCST (CDMA Service Table) ...................................................................... 5-1 10

5.1.2 EFADN (Abbreviated Dialing Number).......................................................... 5-2 11

5.1.3 CHV1 (PIN)............................................................................................... 5-3 12

5.1.4 CHV2 (PIN2) ............................................................................................. 5-3 13

5.1.5 Unblock CHV1 (PUK) ................................................................................ 5-3 14

5.1.6 Unblock CHV2 (PUK2) .............................................................................. 5-3 15

5.1.7 Definition of FDN R-UIM........................................................................... 5-3 16

5.1.8 EFFDN (Fixed Dialing Numbers).................................................................. 5-3 17

6 ME Test Procedures............................................................................................. 6-1 18

6.1 MS Identification ........................................................................................... 6-1 19

6.1.1 Mobile Station Identifier ........................................................................... 6-1 20

6.1.1.1 Definition and Applicability ................................................................... 6-1 21

6.1.1.2 Conformance Requirement .................................................................... 6-1 22

6.1.1.3 Test Purpose ......................................................................................... 6-1 23

6.1.1.4 Method of Test ...................................................................................... 6-1 24

6.1.1.4.1 Initial Conditions............................................................................. 6-1 25

6.1.1.4.2 Procedure........................................................................................ 6-1 26

6.1.1.5 Test Requirement .................................................................................. 6-1 27

6.1.2 MS Recognizing the Home SID/NID .......................................................... 6-2 28

6.1.2.1 Definition and Applicability ................................................................... 6-2 29

6.1.2.2 Conformance Requirement .................................................................... 6-2 30

6.1.2.3 Test Purpose ......................................................................................... 6-2 31

6.1.2.4 Method of Test ...................................................................................... 6-2 32

Page 6: Mobile Equipment (ME) Conformance Testing for cdma2000 ...cdma2000 Spread Spectrum Standards Release 0 COPYRIGHT 3GPP2 and its Organizational Partners claim copyright in this document

3GPP2 C.S0048-0

ii

6.1.2.4.1 Initial Conditions .............................................................................6-2 1

6.1.2.4.2 Procedure ........................................................................................6-2 2

6.1.2.5 Test Requirement ..................................................................................6-2 3

6.2 UIM_ID/ESN_ME Selection.............................................................................6-3 4

6.2.1 Removable UIM_ID Usage Indicator ...........................................................6-3 5

6.2.1.1 Definition and Applicability ....................................................................6-3 6

6.2.1.2 Conformance Requirement.....................................................................6-3 7

6.2.1.3 Test Purpose..........................................................................................6-3 8

6.2.1.4 Method of Test.......................................................................................6-3 9

6.2.1.4.1 Initial Conditions .............................................................................6-3 10

6.2.1.4.2 Procedure ........................................................................................6-3 11

6.2.1.5 Test Requirement ..................................................................................6-3 12

6.2.2 ESN Management .....................................................................................6-4 13

6.2.2.1 Definition and Applicability ....................................................................6-4 14

6.2.2.2 Conformance Requirement.....................................................................6-4 15

6.2.2.3 Test Purpose..........................................................................................6-4 16

6.2.2.4 Method of Test.......................................................................................6-4 17

6.2.2.4.1 Initial Conditions .............................................................................6-4 18

6.2.2.4.2 Procedure ........................................................................................6-4 19

6.2.2.5 Test Requirement ..................................................................................6-4 20

6.3 Security-related commands ............................................................................6-4 21

6.3.1 SSD Update..............................................................................................6-4 22

6.3.1.1 Definition and Applicability ....................................................................6-4 23

6.3.1.2 Conformance Requirement.....................................................................6-5 24

6.3.1.3 Test Purpose..........................................................................................6-5 25

6.3.1.4 Method of Test.......................................................................................6-5 26

6.3.1.4.1 Initial Conditions .............................................................................6-5 27

6.3.1.4.2 Procedure ........................................................................................6-5 28

6.3.1.5 Test Requirement ..................................................................................6-5 29

6.3.2 Authentication Calculation for Global Challenge ........................................6-6 30

6.3.2.1 Definition and Applicability ....................................................................6-6 31

6.3.2.2 Conformance Requirement.....................................................................6-6 32

Page 7: Mobile Equipment (ME) Conformance Testing for cdma2000 ...cdma2000 Spread Spectrum Standards Release 0 COPYRIGHT 3GPP2 and its Organizational Partners claim copyright in this document

3GPP2 C.S0048-0

iii

6.3.2.3 Test Purpose ......................................................................................... 6-6 1

6.3.2.4 Method of Test ...................................................................................... 6-6 2

6.3.2.4.1 Initial Conditions............................................................................. 6-6 3

6.3.2.4.2 Procedure........................................................................................ 6-6 4

6.3.2.5 Test Requirement .................................................................................. 6-6 5

6.3.3 Unique Challenge While the Mobile Station is in Idle State ........................ 6-6 6

6.3.3.1 Definition and Applicability ................................................................... 6-6 7

6.3.3.2 Conformance Requirement .................................................................... 6-7 8

6.3.3.3 Test Purpose ......................................................................................... 6-7 9

6.3.3.4 Method of Test ...................................................................................... 6-7 10

6.3.3.4.1 Initial Conditions............................................................................. 6-7 11

6.3.3.4.2 Procedure........................................................................................ 6-7 12

6.3.3.5 Test Requirement .................................................................................. 6-7 13

6.3.4 Unique Challenge While the Mobile Station is in Mobile Station Control on the 14

Traffic Channel State ............................................................................................. 6-7 15

6.3.4.1 Definition and Applicability ................................................................... 6-7 16

6.3.4.2 Conformance Requirement .................................................................... 6-7 17

6.3.4.3 Test Purpose ......................................................................................... 6-8 18

6.3.4.4 Method of Test ...................................................................................... 6-8 19

6.3.4.4.1 Initial Conditions............................................................................. 6-8 20

6.3.4.4.2 Procedure........................................................................................ 6-8 21

6.3.4.5 Test Requirement .................................................................................. 6-8 22

6.3.5 Generate Key/VPM................................................................................... 6-8 23

6.3.5.1 Definition and Applicability ................................................................... 6-8 24

6.3.5.2 Conformance Requirement .................................................................... 6-8 25

6.3.5.3 Test Purpose ......................................................................................... 6-8 26

6.3.5.4 Method of Test ...................................................................................... 6-9 27

6.3.5.4.1 Initial Conditions............................................................................. 6-9 28

6.3.5.4.2 Procedure........................................................................................ 6-9 29

6.3.5.5 Test Requirement .................................................................................. 6-9 30

6.4 Reserved........................................................................................................ 6-9 31

6.5 OTASP/OTAPA Functionality.......................................................................... 6-9 32

6.5.1 Preferred Roaming List ............................................................................. 6-9 33

Page 8: Mobile Equipment (ME) Conformance Testing for cdma2000 ...cdma2000 Spread Spectrum Standards Release 0 COPYRIGHT 3GPP2 and its Organizational Partners claim copyright in this document

3GPP2 C.S0048-0

iv

6.5.1.1 Definition and Applicability ....................................................................6-9 1

6.5.1.2 Conformance Requirement.....................................................................6-9 2

6.5.1.3 Test Purpose..........................................................................................6-9 3

6.5.1.4 Method of Test.....................................................................................6-10 4

6.5.1.4.1 Initial Conditions ...........................................................................6-10 5

6.5.1.4.2 Procedure ......................................................................................6-10 6

6.5.1.5 Test Requirement ................................................................................6-10 7

6.5.2 OTASP/OTAPA Commands......................................................................6-10 8

6.5.2.1 Definition and Applicability ..................................................................6-10 9

6.5.2.2 Conformance Requirement...................................................................6-10 10

6.5.2.3 Test Purpose........................................................................................6-10 11

6.5.2.4 Method of Test.....................................................................................6-10 12

6.5.2.4.1 Initial Conditions ...........................................................................6-10 13

6.5.2.4.2 Procedure ......................................................................................6-10 14

6.5.2.5 Test Requirement ................................................................................6-10 15

6.6 Reserved ......................................................................................................6-11 16

6.7 Reserved ......................................................................................................6-11 17

6.8 Reserved ......................................................................................................6-11 18

6.9 Reserved ......................................................................................................6-11 19

6.10 Reserved ......................................................................................................6-11 20

6.11 Exchange Protocol Tests ...............................................................................6-11 21

6.12 Evaluation of Directory Characteristics .........................................................6-11 22

6.12.1 Operating Speed in Authentication Procedure..........................................6-11 23

6.12.1.1 Definition and Applicability ................................................................6-11 24

6.12.1.2 Conformance Requirement .................................................................6-11 25

6.12.1.3 Test Purpose......................................................................................6-11 26

6.12.1.4 Method of Test ...................................................................................6-11 27

6.12.1.4.1 Initial Conditions .........................................................................6-11 28

6.12.1.4.2 Procedure ....................................................................................6-12 29

6.12.1.5 Test Requirement...............................................................................6-12 30

6.12.2 Clock Stop ..............................................................................................6-12 31

6.12.2.1 Definition and Applicability ................................................................6-12 32

Page 9: Mobile Equipment (ME) Conformance Testing for cdma2000 ...cdma2000 Spread Spectrum Standards Release 0 COPYRIGHT 3GPP2 and its Organizational Partners claim copyright in this document

3GPP2 C.S0048-0

v

6.12.2.2 Conformance Requirement ................................................................ 6-12 1

6.12.2.3 Test Purpose ..................................................................................... 6-12 2

6.12.2.4 Method of Test .................................................................................. 6-12 3

6.12.2.4.1 Initial Conditions......................................................................... 6-12 4

6.12.2.4.2 Procedure.................................................................................... 6-12 5

6.12.2.5 Test Requirement .............................................................................. 6-13 6

6.12.3 Authentication ....................................................................................... 6-13 7

6.13 Mechanical Tests ......................................................................................... 6-13 8

6.14 Secret Code Usage ....................................................................................... 6-13 9

6.14.1 Entry of PIN ........................................................................................... 6-13 10

6.14.2 Change of PIN ........................................................................................ 6-13 11

6.14.3 Disabling the PIN ................................................................................... 6-14 12

6.14.3.1 Definition and Applicability ............................................................... 6-14 13

6.14.3.2 Conformance Requirement ................................................................ 6-14 14

6.14.3.3 Test Purpose ..................................................................................... 6-14 15

6.14.3.4 Method of Test .................................................................................. 6-14 16

6.14.3.4.1 Initial Conditions......................................................................... 6-14 17

6.14.3.4.2 Procedure.................................................................................... 6-14 18

6.14.3.5 Test Requirement .............................................................................. 6-14 19

6.14.4 PUK Entry.............................................................................................. 6-14 20

6.14.5 Entry of PIN2 ......................................................................................... 6-14 21

6.14.6 Change of PIN2 ...................................................................................... 6-14 22

6.14.7 PUK2 Entry............................................................................................ 6-14 23

6.14.8 CDMA Service Table ............................................................................... 6-15 24

6.14.8.1 Definition and Applicability ............................................................... 6-15 25

6.14.8.2 Conformance Requirement ................................................................ 6-15 26

6.14.8.3 Test Purpose ..................................................................................... 6-15 27

6.14.8.4 Method of Test .................................................................................. 6-15 28

6.14.8.4.1 Initial Conditions......................................................................... 6-15 29

6.14.8.4.2 Procedure.................................................................................... 6-15 30

6.14.8.5 Test Requirement .............................................................................. 6-15 31

6.15 Abbreviated Dialing Numbers (ADN) ............................................................. 6-15 32

Page 10: Mobile Equipment (ME) Conformance Testing for cdma2000 ...cdma2000 Spread Spectrum Standards Release 0 COPYRIGHT 3GPP2 and its Organizational Partners claim copyright in this document

3GPP2 C.S0048-0

vi

6.15.1 Definition and Applicability .....................................................................6-15 1

6.15.2 Conformance Requirement ......................................................................6-15 2

6.15.3 Test Purpose...........................................................................................6-16 3

6.15.4 Method of Test ........................................................................................6-16 4

6.15.4.1 Initial Conditions ...............................................................................6-16 5

6.15.4.2 Procedure ..........................................................................................6-16 6

6.15.5 Test Requirements ..................................................................................6-17 7

6.16 UI Reaction to R-UIM Status Encoding..........................................................6-17 8

6.17 Electrical Tests.............................................................................................6-17 9

6.18 Fixed Dialing Number (FDN) .........................................................................6-17 10

6.19 Version Identification ...................................................................................6-17 11

6.19.1 Definition and Applicability .....................................................................6-17 12

6.19.2 Conformance Requirement ......................................................................6-17 13

6.19.3 Test Purpose...........................................................................................6-17 14

6.19.4 Method of Test ........................................................................................6-18 15

6.19.4.1 Initial Conditions ...............................................................................6-18 16

6.19.4.2 Procedure ..........................................................................................6-18 17

6.19.5 Test Requirement....................................................................................6-18 18

6.20 R-UIM Presence Detection ............................................................................6-18 19

6.21 Reserved ......................................................................................................6-18 20

6.22 Suggested Slot Cycle Index ...........................................................................6-18 21

6.22.1 Definition and Applicability .....................................................................6-18 22

6.22.2 Conformance Requirement ......................................................................6-18 23

6.22.3 Test Purpose...........................................................................................6-18 24

6.22.4 Method of Test ........................................................................................6-18 25

6.22.4.1 Initial Conditions ...............................................................................6-18 26

6.22.4.2 Procedure ..........................................................................................6-19 27

6.22.5 Test Requirement....................................................................................6-19 28

6.23 Service Provider Name ..................................................................................6-19 29

6.23.1 Definition and Applicability .....................................................................6-19 30

6.23.2 Conformance Requirement ......................................................................6-19 31

6.23.3 Test Purpose...........................................................................................6-19 32

Page 11: Mobile Equipment (ME) Conformance Testing for cdma2000 ...cdma2000 Spread Spectrum Standards Release 0 COPYRIGHT 3GPP2 and its Organizational Partners claim copyright in this document

3GPP2 C.S0048-0

vii

6.23.4 Method of Test ....................................................................................... 6-20 1

6.23.4.1 Initial Conditions .............................................................................. 6-20 2

6.23.4.2 Procedure ......................................................................................... 6-20 3

6.23.5 Test Requirement ................................................................................... 6-20 4

5

6

Page 12: Mobile Equipment (ME) Conformance Testing for cdma2000 ...cdma2000 Spread Spectrum Standards Release 0 COPYRIGHT 3GPP2 and its Organizational Partners claim copyright in this document

3GPP2 C.S0048-0

viii

No text.1

Page 13: Mobile Equipment (ME) Conformance Testing for cdma2000 ...cdma2000 Spread Spectrum Standards Release 0 COPYRIGHT 3GPP2 and its Organizational Partners claim copyright in this document

3GPP2 C.S0048-0

1-1

1 FOREWORD 1

The present document provides the Conformance Test Specification for Removable User 2

Identity Module (R-UIM) enabled Mobile Equipment (ME) terminals defined in [1], [2], [8] 3

and [9]. 4

5

Page 14: Mobile Equipment (ME) Conformance Testing for cdma2000 ...cdma2000 Spread Spectrum Standards Release 0 COPYRIGHT 3GPP2 and its Organizational Partners claim copyright in this document

3GPP2 C.S0048-0

1-2

No text. 1

Page 15: Mobile Equipment (ME) Conformance Testing for cdma2000 ...cdma2000 Spread Spectrum Standards Release 0 COPYRIGHT 3GPP2 and its Organizational Partners claim copyright in this document

3GPP2 C.S0048-0

2-1

2 REFERENCES 1

[1] 3GPP2 C.S0023-A: "Removable User Identity Module (R-UIM) for cdma2000 2

Spread Spectrum Systems". 3

[2] 3GPP 51.011: "Digital cellular telecommunications system (Phase 2+); 4

Specification of the Subscriber Identity Module - Mobile Equipment (SIM - 5

ME) interface". 6

[3] ISO/IEC 7816-1 (1987): "Identification cards - Integrated circuit(s) cards 7

with contacts, Part 1: Physical characteristics". 8

[4] ISO/IEC 7816-2 (1988): "Identification cards - Integrated circuit(s) cards 9

with contacts, Part 1: Dimensions and locations of the contacts". 10

[5] ISO/IEC 7816-3 (1989): "Identification cards - Integrated circuit(s) cards 11

with contacts, Part 1: Electronic signals and transmission protocols." 12

[6] ISO/IEC 7811-1 (1995): "Identification cards - Recording technique - Part 1: 13

Embossing" 14

[7] ISO/IEC 7811-3 (1995): "Identification cards - Recording technique - Part 3: 15

Location of embossed characters on ID-1 cards" 16

[8] GSM 11.12: "Digital cellular telecommunications system (Phase 2); 17

Specification of the 3 Volt Subscriber Identity Module - Mobile Equipment 18

(SIM - ME) interface". 19

[9] 3GPP 31.101: "Digital cellular telecommunications system (Phase 2+); 20

Specification of the 1.8 Volt Subscriber Identity Module - Mobile Equipment 21

(SIM - ME) interface". 22

[10] 3GPP 51.010: “Mobile Station (MS) conformance specification; Part 1: 23

Conformance specification”. 24

[11] 3GPP2 C.S0031-0 version 2.0: “Signaling Conformance Tests for cdma2000 25

Spread Spectrum Systems”. 26

27

Page 16: Mobile Equipment (ME) Conformance Testing for cdma2000 ...cdma2000 Spread Spectrum Standards Release 0 COPYRIGHT 3GPP2 and its Organizational Partners claim copyright in this document

3GPP2 C.S0048-0

2-2

No text. 1

Page 17: Mobile Equipment (ME) Conformance Testing for cdma2000 ...cdma2000 Spread Spectrum Standards Release 0 COPYRIGHT 3GPP2 and its Organizational Partners claim copyright in this document

3GPP2 C.S0048-0

3-1

3 DEFINITIONS AND ABBREVIATIONS 1

3.1 Definitions 2

For the purposes of the present document, the following terms and definitions apply in 3

addition to the terms defined in [1]: 4

Implementation Conformance Statement (ICS): A statement made by the supplier of an 5

implementation or a system claimed to conform to a given specification, stating which 6

capabilities have been implemented. The ICS can take several forms: protocol ICS, profile 7

ICS, profile specific ICS, information object ICS, etc. 8

3.2 Abbreviations 9

For the purposes of the present document, the following abbreviations apply: 10

3GPP2 3rd Generation Partnership Project 2 11

CHV1 Card Holder Verification 1 12

CHV2 Card Holder Verification 2 13

CRn Conformance Requirement 'n' 14

DF Directory File 15

FT Fixed Termination 16

ICS Implementation Conformance Statement 17

IUT Implementation Under Test 18

ME Mobile Equipment 19

MF Master File 20

MS Mobile Station 21

PIN Personal Identity Number 22

PIN2 Personal Identity Number 2 23

PRL Preferred Roaming List 24

PUK PIN Unblocking Key 25

PUK2 PIN2 Unblocking Key 26

R-UIM Removable User Identity Module 27

SIM Subscriber Identity Module 28

SS System Simulator 29

TS Test Specification 30

31

Page 18: Mobile Equipment (ME) Conformance Testing for cdma2000 ...cdma2000 Spread Spectrum Standards Release 0 COPYRIGHT 3GPP2 and its Organizational Partners claim copyright in this document

3GPP2 C.S0048-0

3-2

No text. 1

Page 19: Mobile Equipment (ME) Conformance Testing for cdma2000 ...cdma2000 Spread Spectrum Standards Release 0 COPYRIGHT 3GPP2 and its Organizational Partners claim copyright in this document

3GPP2 C.S0048-0

4-1

4 ME TEST ENVIRONMENT 1

The test environment shall comply with the requirements specified in Clause 4, “Physical 2

Characteristics” and Clause 5, “Electronic Signals and Transmission Protocols” of [2]. 3

4

Page 20: Mobile Equipment (ME) Conformance Testing for cdma2000 ...cdma2000 Spread Spectrum Standards Release 0 COPYRIGHT 3GPP2 and its Organizational Partners claim copyright in this document

3GPP2 C.S0048-0

4-2

No text. 1

Page 21: Mobile Equipment (ME) Conformance Testing for cdma2000 ...cdma2000 Spread Spectrum Standards Release 0 COPYRIGHT 3GPP2 and its Organizational Partners claim copyright in this document

3GPP2 C.S0048-0

5-1

5 TESTING OF THE ME 1

The following sequence of tests confirms: 2

1) the correct interpretation of data read from the R-UIM (Removable-User 3

Identification Module) by the ME; 4

2) the correct writing of data to the R-UIM by the ME; 5

3) the initiation of appropriate procedures by the ME; 6

4) low level protocols; 7

5) electrical characteristics; 8

6) physical characteristics. 9

All tests apply to MEs conforming to [1] using either ID-1 or Plug-in R-UIM. 10

An R-UIM simulator may be included as part of the system simulator (SS). Alternatively, to 11

perform the logical tests, R-UIMs programmed with specific data may be used. The R-UIM 12

data is not defined within the initial conditions of the tests unless it differs from the default 13

values defined below. 14

5.1 Definition of Default Values for R-UIM/ME Interface Testing 15

An R-UIM containing the following default values is used for all tests of this section unless 16

otherwise stated. 17

For all data items, the logical default values and the coding within the elementary files (EFs) 18

of the R-UIM follow. 19

NOTE 1: Bx represents Byte x of the coding starting from left to right, i.e. MSB to LSB. 20

NOTE 2: Unless otherwise defined, the coding values are hexadecimal. 21

5.1.1 EFCST (CDMA Service Table) 22

Unless otherwise specified, the CDMA Service Table (EFCST) shall be coded as defined by the 23

entry “EFCST Setting 1” of Table 5-1. 24

Page 22: Mobile Equipment (ME) Conformance Testing for cdma2000 ...cdma2000 Spread Spectrum Standards Release 0 COPYRIGHT 3GPP2 and its Organizational Partners claim copyright in this document

3GPP2 C.S0048-0

5-2

Table 5-1. Coding of EFCST 1

Setting Description Byte Coding (binary)

EFCST Setting 1 • CHV1 disable function allocated and activated.

• Abbreviated dialing numbers allocated and activated.

• Fixed dialing numbers not activated.

B1 – xx0x1111

EFCST Setting 2 • CHV1 disable function allocated and activated.

• Abbreviated dialing numbers allocated and activated.

• Fixed dialing numbers allocated and activated.

B1 – xx111111

EFCST Setting 3 • CHV1 disable function not activated.

• Abbreviated dialing numbers allocated and activated.

• Fixed dialing numbers not activated.

B1 – xx0x110x

Note: The coding of bits designated ‘x’ shall conform to the capabilities of the R-UIM simulator used.

5.1.2 EFADN (Abbreviated Dialing Number) 2

At least 10 records. 3

Record 1: 4

Length of alpha identifier: 32 characters 5

Alpha identifier: "ABCDEFGHIJKLMNOPQRSTUVWXYZABCDEF" 6

Length of BCD number: "03" 7

TON and NPI: Telephony and Unknown 8

Dialed number: 123 9

CCI: None 10

Ext1: None 11

Coding: B1 B2 B3 ... B32 B33 B34 B35 B36 B37 B38 B39 ... B46

Record 1: 41 42 43 ... 46 03 81 21 F3 FF FF FF ... FF

Page 23: Mobile Equipment (ME) Conformance Testing for cdma2000 ...cdma2000 Spread Spectrum Standards Release 0 COPYRIGHT 3GPP2 and its Organizational Partners claim copyright in this document

3GPP2 C.S0048-0

5-3

5.1.3 CHV1 (PIN) 1

Logically: 2468 2

Coding: B1 B2 B3 B4 B5 B6 B7 B8 3

32 34 36 38 FF FF FF FF 4

5.1.4 CHV2 (PIN2) 5

Logically: 3579 6

Coding: B1 B2 B3 B4 B5 B6 B7 B8 7

33 35 37 39 FF FF FF FF 8

5.1.5 Unblock CHV1 (PUK) 9

Logically: 13243546 10

Coding: B1 B2 B3 B4 B5 B6 B7 B8 11

31 33 32 34 33 35 34 36 12

5.1.6 Unblock CHV2 (PUK2) 13

Logically: 08978675 14

Coding: B1 B2 B3 B4 B5 B6 B7 B8 15

30 38 39 37 38 36 37 35 16

5.1.7 Definition of FDN R-UIM 17

Some test cases require a different configuration from the one described in the previous 18

sections. For that purpose a default FDN R-UIM is defined. In general the values of the 19

FDN R-UIM are identical to the default R-UIM, with the following exceptions: 20

5.1.8 EFFDN (Fixed Dialing Numbers) 21

Multiple records: 22

Record 1: 23

Length of alpha identifier: 6 characters 24

Alpha identifier: "FDN111" 25

Length of BCD number: "06" 26

TON and NPI: Telephony and Unknown 27

Dialed number: 1357924680 28

CCI: None 29

Ext1: None 30

Page 24: Mobile Equipment (ME) Conformance Testing for cdma2000 ...cdma2000 Spread Spectrum Standards Release 0 COPYRIGHT 3GPP2 and its Organizational Partners claim copyright in this document

3GPP2 C.S0048-0

5-4

Coding for record 1: 1

B1 B2 B3 B4 B5 B6 B7 B8 B9 B10 B11 B12 B13

46 44 4E 31 31 31 06 81 31 75 29 64 08

B14 B15 B16 B17 B18 B19 B20

FF FF FF FF FF FF FF

Record 2: 2

Length of alpha identifier: 6 characters 3

Alpha identifier: "FDN222" 4

Length of BCD number: "04" 5

TON and NPI: Telephony and Unknown 6

Dialed number: 24680 7

CCI: None 8

Ext1: None 9

Coding for record 2: 10

B1 B2 B3 B4 B5 B6 B7 B8 B9 B10 B11 B12 B13

46 44 4E 32 32 32 04 81 42 86 F0 FF FF

B14 B15 B16 B17 B18 B19 B20

FF FF FF FF FF FF FF

Record 3: 11

Length of alpha identifier: 6 characters 12

Alpha identifier: "FDN333" 13

Length of BCD number: "0B" 14

TON and NPI: Telephony and Unknown 15

Dialed number: 12345678901234567890 16

CCI: None 17

Ext1: None 18

Page 25: Mobile Equipment (ME) Conformance Testing for cdma2000 ...cdma2000 Spread Spectrum Standards Release 0 COPYRIGHT 3GPP2 and its Organizational Partners claim copyright in this document

3GPP2 C.S0048-0

5-5

Coding for record 3: 1

B1 B2 B3 B4 B5 B6 B7 B8 B9 B10 B11 B12 B13

46 44 4E 33 33 33 0B 81 21 43 65 87 09

B14 B15 B16 B17 B18 B19 B20

21 43 65 87 09 FF FF 2

Page 26: Mobile Equipment (ME) Conformance Testing for cdma2000 ...cdma2000 Spread Spectrum Standards Release 0 COPYRIGHT 3GPP2 and its Organizational Partners claim copyright in this document

3GPP2 C.S0048-0

5-6

No text.1

Page 27: Mobile Equipment (ME) Conformance Testing for cdma2000 ...cdma2000 Spread Spectrum Standards Release 0 COPYRIGHT 3GPP2 and its Organizational Partners claim copyright in this document

3GPP2 C.S0048-0

6-1

6 ME TEST PROCEDURES 1

For each test procedure the following five (5) subsections are included: 2

1) Definition and Applicability 3

2) Conformance Requirement 4

3) Test Purpose 5

4) Method of Test 6

(a) Initial Conditions 7

(b) Procedure 8

5) Test Requirement 9

6.1 MS Identification 10

6.1.1 Mobile Station Identifier 11

6.1.1.1 Definition and Applicability 12

This test verifies the use of the Mobile Station Identifier (Mobile Station ID [MSID] or Mobile 13

Station Identification Number [MSIN]), Mobile Country Code (MCC), and International 14

Mobile Station Identity (IMSI) stored within the R-UIM. 15

This test applies to MEs conforming to [1] using either ID-1 or Plug-in R-UIM. 16

6.1.1.2 Conformance Requirement 17

The MS shall conform to the requirements specified in 2.12.3 of [11]. 18

6.1.1.3 Test Purpose 19

The purpose of the test is to verify that the ME uses the IMSI_S, IMSI_11_12, and MCC of 20

the R-UIM. 21

6.1.1.4 Method of Test 22

6.1.1.4.1 Initial Conditions 23

The default R-UIM is installed into the ME, and the MS is powered on. 24

6.1.1.4.2 Procedure 25

The tests shall be conducted in accordance with the procedures and requirements defined 26

in 2.12 (MSID, MCC, and IMSI) of [11]. 27

6.1.1.5 Test Requirement 28

The ME shall conform to the requirements defined in 2.12.3 (Minimum Standard) of [11]. 29

Page 28: Mobile Equipment (ME) Conformance Testing for cdma2000 ...cdma2000 Spread Spectrum Standards Release 0 COPYRIGHT 3GPP2 and its Organizational Partners claim copyright in this document

3GPP2 C.S0048-0

6-2

6.1.2 MS Recognizing the Home SID/NID 1

6.1.2.1 Definition and Applicability 2

This test verifies the ability of the ME to read the appropriate home system information 3

from the R-UIM, compare that stored information to that received by the ME in the Sync 4

Channel Message, and to display the appropriate roaming indication to the user. 5

This test applies to MEs conforming to [1] using either ID-1 or Plug-in R-UIM. 6

6.1.2.2 Conformance Requirement 7

The ME shall compare the values of SIDp and NIDp stored within EFCDMAHOME with those 8

received in the Sync Channel Message (SIDr and NIDr, respectively) as the basis for 9

displaying a roaming indication to the user. 10

6.1.2.3 Test Purpose 11

The purpose of the test is to verify the ME is able to read, interpret, and apply during the 12

normal course of operation the values of SIDp and NIDp stored within EFCDMAHOME. 13

6.1.2.4 Method of Test 14

6.1.2.4.1 Initial Conditions 15

The values of the SID and NID fields of the Sync Channel Message transmitted by the 16

system simulator shall be set to equal those stored in the R-UIM (EFCDMAHOME). 17

6.1.2.4.2 Procedure 18

1) Power-on the mobile station. 19

2) Observe the status of any roaming indicator icon or display element on the 20

mobile station. 21

3) Set the values of the SID and NID fields of the Sync Channel Message transmitted 22

by the system simulator to values other than those stored in the R-UIM 23

(EFCDMAHOME). 24

4) Power cycle (power-off then power-on) the mobile station. 25

5) Observe the status of any roaming indicator icon or display element on the 26

mobile station. 27

6.1.2.5 Test Requirement 28

1) In step 2) of the test procedure, the roaming indicator icon or display element of 29

the mobile station shall indicate the mobile station is operating within its home 30

system. 31

2) In step 5) of the test procedure, the roaming indicator icon or display element of 32

the mobile station shall indicate the mobile station is operating in a roaming 33

status. 34

Page 29: Mobile Equipment (ME) Conformance Testing for cdma2000 ...cdma2000 Spread Spectrum Standards Release 0 COPYRIGHT 3GPP2 and its Organizational Partners claim copyright in this document

3GPP2 C.S0048-0

6-3

6.2 UIM_ID/ESN_ME Selection 1

6.2.1 Removable UIM_ID Usage Indicator 2

6.2.1.1 Definition and Applicability 3

Removable UIM_ID Usage Indicator indicates whether the 32 bits of the UIM_ID or ESN_ME 4

is used in the MS identification procedure. 5

6.2.1.2 Conformance Requirement 6

The ME shall use the UIM_ID or ESN_ME correctly for over-the-air messages as indicated 7

by the Removable UIM_ID Usage Indicator stored in the R-UIM. 8

6.2.1.3 Test Purpose 9

This test verifies that the mobile station uses the UIM_ID or ESN_ME correctly depending 10

on the setting of the Removable UIM_ID Usage Indicator. 11

6.2.1.4 Method of Test 12

6.2.1.4.1 Initial Conditions 13

The default R-UIM is installed into the ME, and the MS is powered on. 14

6.2.1.4.2 Procedure 15

1) Ensure that the system simulator selects ESN as PREF_MSID_TYPE. 16

2) Set the Removable UIM_ID Usage Indicator in R-UIM to ‘1’. 17

3) Initiate a mobile station originated call. 18

4) Verify that the UIM_ID is used for identification in the Origination Message. 19

5) End the call. 20

6) Set the Removable UIM_ID Usage Indicator in the R-UIM to ‘0’. 21

7) Power-cycle the mobile station (Power “Off” and then Power “On”). 22

8) Initiate a mobile station originated call. 23

9) Verify that the ESN_ME is used for identification in Origination Message. 24

10) End the call. 25

6.2.1.5 Test Requirement 26

1) If the Removable UIM_ID Usage Indicator is set to ‘1’, the ME shall use the UIM_ID to 27

identify itself. 28

2) If the Removable UIM_ID Usage Indicator is set to ‘0’, the ME shall use the ESN_ME 29

to identify itself. 30

Page 30: Mobile Equipment (ME) Conformance Testing for cdma2000 ...cdma2000 Spread Spectrum Standards Release 0 COPYRIGHT 3GPP2 and its Organizational Partners claim copyright in this document

3GPP2 C.S0048-0

6-4

6.2.2 ESN Management 1

6.2.2.1 Definition and Applicability 2

ESN_ME is the electronic serial number of the Mobile Equipment (ME) to which the R-UIM 3

is attached. This number is transferred to the R-UIM when the Mobile Equipment 4

determines that the R-UIM has been inserted. 5

This test applies to MEs conforming to [1] using either ID-1 or Plug-in R-UIM. 6

6.2.2.2 Conformance Requirement 7

This test verifies that the ME provides its ESN to the R-UIM during the ME and R-UIM 8

initialization procedure. 9

6.2.2.3 Test Purpose 10

To ensure that the servicing ESN_ME is stored within the R-UIM. 11

6.2.2.4 Method of Test 12

6.2.2.4.1 Initial Conditions 13

EFESN_ME is initialized to the default value as defined in [1]. 14

6.2.2.4.2 Procedure 15

1) Insert this R-UIM into the ME being tested. 16

2) During the ME and R-UIM initialization process, verify that the ME invokes the 17

“Store ESN_ME” command to store its ESN in EF ‘6F38’. 18

3) Verify that the new ESN_ME is successfully stored in the R-UIM. 19

4) Verify the new ESN_ME stored in the EFESN_ME matches ESN of the ME being tested. 20

6.2.2.5 Test Requirement 21

The ME shall be able to store ESN_ME into the R-UIM as a result of the initialization 22

process. 23

6.3 Security-related commands 24

6.3.1 SSD Update 25

6.3.1.1 Definition and Applicability 26

SSD is derived from the “A-key” stored in the R-UIM. SSD updates are initiated when the 27

system simulator issues the command UPDATE SSD, containing the parameter RANDSSD, 28

to the ME. 29

This test applies to MEs conforming to [1] using either ID-1 or Plug-in R-UIM. 30

Page 31: Mobile Equipment (ME) Conformance Testing for cdma2000 ...cdma2000 Spread Spectrum Standards Release 0 COPYRIGHT 3GPP2 and its Organizational Partners claim copyright in this document

3GPP2 C.S0048-0

6-5

6.3.1.2 Conformance Requirement 1

This test verifies that the mobile equipment passes RANDSSD, RANDSeed and AUTHBS 2

correctly to R-UIM when the system simulator initiates an SSD Update process. 3

6.3.1.3 Test Purpose 4

To make sure that SSD update procedures are executed properly. 5

6.3.1.4 Method of Test 6

6.3.1.4.1 Initial Conditions 7

The default R-UIM is installed into the ME, and the MS is powered on. Ensure that the A-8

key, ESN and IMSI are aligned between the mobile station and the system simulator. 9

6.3.1.4.2 Procedure 10

1) At the system simulator, initiate an SSD Update on the paging channel. 11

2) Verify that the ME sends a Base Station Challenge Command to R-UIM with a 12

RANDSeed. 13

3) Verify that upon receipt of a Base Station Challenge Response from the R-UIM, the 14

ME sends a Base Station Challenge Order to the system simulator with RANDBS set 15

to the same value as that received from R-UIM. 16

4) Verify that the ME sends an Update SSD Command to the R-UIM, containing the 17

parameter RANDSSD received from the SSD Update Message. 18

5) Verify that upon receipt of a Base Station Challenge Confirmation Order from the 19

system simulator, the ME sends a Confirm SSD Command to the R-UIM with 20

AUTHBS set to the same value as that received from the Base Station Challenge 21

Confirmation Order. 22

6) Verify that the ME sends an SSD Update Confirmation Order upon receipt of a 23

response from R-UIM with ’90 00’, SW1= ’90’ and SW2=’00’. 24

7) Modify the IMSI in the system simulator to a different value. 25

8) Repeat steps 2) through 5). 26

9) Verify that the ME sends an SSD Update Rejection Order upon receipt of response 27

from R-UIM with ’98 04’, SW1= ’98’ and SW2=’04’. 28

6.3.1.5 Test Requirement 29

1) The ME sends an SSD Update Confirmation Order upon receipt of success 30

response from R-UIM. 31

2) The ME sends an SSD Update Rejection Order upon receipt of failure response 32

from R-UIM. 33

Page 32: Mobile Equipment (ME) Conformance Testing for cdma2000 ...cdma2000 Spread Spectrum Standards Release 0 COPYRIGHT 3GPP2 and its Organizational Partners claim copyright in this document

3GPP2 C.S0048-0

6-6

6.3.2 Authentication Calculation for Global Challenge 1

6.3.2.1 Definition and Applicability 2

The ME shall be able to initiate the start of the CAVE algorithm in R-UIM when the system 3

simulator enables authentication. 4

This test applies to MEs conforming to [1] using either ID-1 or Plug-in R-UIM. 5

6.3.2.2 Conformance Requirement 6

The ME shall initiate the start of the Run Cave Command and pass the response (AUTHR) 7

from the R-UIM to the system simulator within the appropriate signaling message. 8

6.3.2.3 Test Purpose 9

This test verifies that the mobile equipment correctly sends the Run CAVE Command to the 10

R-UIM and passes AUTHR from the R-UIM to the system simulator when the system 11

simulator enables or initiates authentication. 12

6.3.2.4 Method of Test 13

6.3.2.4.1 Initial Conditions 14

The default R-UIM is installed into the ME and the ME is powered on. 15

6.3.2.4.2 Procedure 16

1) At the system simulator, enable global challenge. 17

2) Originate a voice call from the mobile station. 18

3) Verify that the ME sends a Run CAVE Command with RANDTYPE set to 19

‘00000000’ and RAND to R-UIM. 20

4) Upon receipt of SW ’9F 03’, verify that ME sends a Get Response Command. 21

5) Upon receipt of the AUTHR, verify that AUTHR is included in the Origination 22

Message. 23

6) Verify the audio traffic in both directions. 24

6.3.2.5 Test Requirement 25

The ME shall correctly send the Run CAVE Command to the R-UIM and pass AUTHR from 26

the R-UIM to the system simulator within the Origination Message. 27

6.3.3 Unique Challenge While the Mobile Station is in Idle State 28

6.3.3.1 Definition and Applicability 29

The CAVE function is run in the R-UIM to calculate AUTHU when the ME sends Run CAVE 30

Command. 31

This test applies to MEs conforming to [1] using either ID-1 or Plug-in R-UIM. 32

Page 33: Mobile Equipment (ME) Conformance Testing for cdma2000 ...cdma2000 Spread Spectrum Standards Release 0 COPYRIGHT 3GPP2 and its Organizational Partners claim copyright in this document

3GPP2 C.S0048-0

6-7

6.3.3.2 Conformance Requirement 1

This test verifies that the ME sends the Run CAVE Command to the R-UIM during call 2

origination when the system simulator initiates a unique challenge to the mobile station. 3

6.3.3.3 Test Purpose 4

To ensure proper execution of the Run CAVE procedures. 5

6.3.3.4 Method of Test 6

6.3.3.4.1 Initial Conditions 7

The default R-UIM is installed into the ME, and the MS is powered on. 8

6.3.3.4.2 Procedure 9

1) Enable authentication within the system simulator. 10

2) Originate a voice call from the mobile station. 11

3) Instruct the system simulator to send an Authentication Challenge Message. 12

4) Verify that the ME sends a Run CAVE Command with RANDTYPE set to 13

‘00000001’ and RANDU to R-UIM. 14

5) Upon receipt of SW ’9F 03’, verify that ME sends a Get Response Command. 15

6) Upon receiving the AUTHU, verify that AUTHU is included in the Authentication 16

Challenge Response Message with AUTHU same as sent from R-UIM. 17

7) Verify the audio traffic in both directions. 18

6.3.3.5 Test Requirement 19

The ME correctly sends the Run CAVE Command with RANDU to the R-UIM and passes 20

AUTHU from the R-UIM to the system simulator. 21

6.3.4 Unique Challenge While the Mobile Station is in Mobile Station Control on the 22

Traffic Channel State 23

6.3.4.1 Definition and Applicability 24

The CAVE function is executed within the R-UIM to calculate AUTHU when the ME sends 25

the Run CAVE Command with RANDU when the mobile station is in the Mobile Station 26

Control on the Traffic Channel State. 27

This test applies to MEs conforming to [1] using either ID-1 or Plug-in R-UIM. 28

6.3.4.2 Conformance Requirement 29

This test verifies that the ME sends the Run CAVE Command to the R-UIM when the 30

system simulator initiates a unique challenge while the mobile station is in the Mobile 31

Station Control on the Traffic Channel State. 32

Page 34: Mobile Equipment (ME) Conformance Testing for cdma2000 ...cdma2000 Spread Spectrum Standards Release 0 COPYRIGHT 3GPP2 and its Organizational Partners claim copyright in this document

3GPP2 C.S0048-0

6-8

6.3.4.3 Test Purpose 1

To ensure that Run CAVE procedures are executed correctly while the mobile station is in 2

the Mobile Station Control on the Traffic Channel State. 3

6.3.4.4 Method of Test 4

6.3.4.4.1 Initial Conditions 5

The default R-UIM is installed into the ME, and the MS is powered on. 6

6.3.4.4.2 Procedure 7

1) At the system simulator, enable authentication. 8

2) Originate a voice call from the mobile station. 9

3) Verify the audio traffic in both directions. 10

4) While the call is in progress, instruct the system simulator to send an 11

Authentication Challenge Message. 12

5) Verify that the ME sends a Run CAVE Command with RANDTYPE set to 13

‘00000001’ and RANDU to R-UIM. 14

6) Upon receipt of SW ’9F 03’, verify that ME sends a Get Response Command. 15

7) Upon receipt of AUTHU from R-UIM, verify that the ME sends an Authentication 16

Challenge Response Message with AUTHU same as sent from R-UIM. 17

6.3.4.5 Test Requirement 18

The ME correctly sends the Run CAVE Command with RANDU to the R-UIM and passes 19

AUTHU from the R-UIM to the system simulator. 20

6.3.5 Generate Key/VPM 21

6.3.5.1 Definition and Applicability 22

The CAVE function is run in the R-UIM to generate the encryption key/VPM when the ME 23

sends a Generate Key/VPM command. 24

This test applies to MEs conforming to [1] using either ID-1 or Plug-in R-UIM. 25

6.3.5.2 Conformance Requirement 26

This test verifies that the ME sends a Generate Key/VPM command to the R-UIM when the 27

user enables voice privacy. 28

6.3.5.3 Test Purpose 29

To ensure that Run CAVE procedures are executed correctly to generate the encryption 30

key/VPM. 31

Page 35: Mobile Equipment (ME) Conformance Testing for cdma2000 ...cdma2000 Spread Spectrum Standards Release 0 COPYRIGHT 3GPP2 and its Organizational Partners claim copyright in this document

3GPP2 C.S0048-0

6-9

6.3.5.4 Method of Test 1

6.3.5.4.1 Initial Conditions 2

The default R-UIM is installed into the ME, and the MS is powered on. 3

6.3.5.4.2 Procedure 4

1) At the system simulator, enable authentication. On the mobile station, enable 5

voice privacy. 6

2) Originate a voice call from the mobile station. 7

3) Verify that the ME sends a Run CAVE Command with the following: 8

RANDTYPE is set to ‘00000000’, Bit 4 of Process_Control is set to ‘1’ 9

and a RAND. 10

4) Upon receipt of SW ’9F 03’, verify that the ME sends a Get Response Command. 11

5) Upon receiving the AUTHR, verify that AUTHR is included in the Origination 12

Message. 13

6) Verify that the ME sends a Generate Key/VPM command to the R-UIM. 14

6.3.5.5 Test Requirement 15

The ME correctly sends a Generate Key/VPM command to R-UIM after sending a Run CAVE 16

with Save Register On. 17

6.4 Reserved 18

6.5 OTASP/OTAPA Functionality 19

6.5.1 Preferred Roaming List 20

6.5.1.1 Definition and Applicability 21

This test verifies that a mobile station can respond to an OTAPA mobile terminated call, 22

download a preferred roaming list (PRL) and correctly store the list in the R-UIM. The size 23

of the PRL downloaded to the mobile station shall be 4096 octets or MAX_PRL_LIST_SIZE 24

octets, whichever is smaller. 25

This test applies to MEs conforming to [1] using either ID-1 or Plug-in R-UIM. 26

6.5.1.2 Conformance Requirement 27

The network-initiated OTAPA session shall result in the mobile station responding to a 28

General Page Message and downloading a new PRL. The ME shall update EFPRL with the 29

PRL downloaded from the system simulator. 30

6.5.1.3 Test Purpose 31

This test verifies that an ME can respond to an OTAPA mobile terminated call, download a 32

PRL and correctly store and retrieve the PRL from the R-UIM. 33

Page 36: Mobile Equipment (ME) Conformance Testing for cdma2000 ...cdma2000 Spread Spectrum Standards Release 0 COPYRIGHT 3GPP2 and its Organizational Partners claim copyright in this document

3GPP2 C.S0048-0

6-10

6.5.1.4 Method of Test 1

6.5.1.4.1 Initial Conditions 2

The default R-UIM is installed into the ME, and the MS is powered on. 3

6.5.1.4.2 Procedure 4

1) The test shall be conducted in accordance with the procedures defined in 15.5 5

(OTAPA Service Provisioning for System Selection and Preferred Roaming for a Mobile 6

Station in the Mobile Station Idle State) of [11]. 7

6.5.1.5 Test Requirement 8

The ME shall conform to the test requirements defined in 15.5.3 (Minimum Standard) of 9

[11]. The ME shall update EFPRL with the PRL downloaded from the system simulator. 10

6.5.2 OTASP/OTAPA Commands 11

6.5.2.1 Definition and Applicability 12

The ME maps OTASP/OTAPA messages sent from the system simulator correctly to the 13

OTASP/OTAPA commands to R-UIM and maps responses from R-UIM to OTASP/OTAPA 14

messages. 15

This test applies to MEs conforming to [1] using either ID-1 or Plug-in R-UIM. 16

6.5.2.2 Conformance Requirement 17

The ME shall map between messages and command/responses correctly. 18

6.5.2.3 Test Purpose 19

This test verifies that an ME can respond to OTASP/OTAPA messages sent from the system 20

simulator correctly and map responses from R-UIM to OTASP/OTAPA message correctly to 21

the system simulator. 22

6.5.2.4 Method of Test 23

6.5.2.4.1 Initial Conditions 24

The default R-UIM is installed into the ME, and the MS is powered on. 25

6.5.2.4.2 Procedure 26

The test shall be conducted in accordance with the procedures defined in [11]. 27

6.5.2.5 Test Requirement 28

The ME shall correctly map the OTASP/OTAPA messages to corresponding commands and 29

map responses from R-UIM to OTASP/OTAPA messages. In addition, the ME shall conform 30

to the test requirements defined in [11]. 31

Page 37: Mobile Equipment (ME) Conformance Testing for cdma2000 ...cdma2000 Spread Spectrum Standards Release 0 COPYRIGHT 3GPP2 and its Organizational Partners claim copyright in this document

3GPP2 C.S0048-0

6-11

6.6 Reserved 1

6.7 Reserved 2

6.8 Reserved 3

6.9 Reserved 4

6.10 Reserved 5

6.11 Exchange Protocol Tests 6

The ME shall conform to the requirements specified in subclause 27.11 of [10]. 7

6.12 Evaluation of Directory Characteristics 8

6.12.1 Operating Speed in Authentication Procedure 9

6.12.1.1 Definition and Applicability 10

Authentication is performed in a cdma2000®1 network on an R-UIM enabled mobile station 11

by the ME sending a random number received from the network to the R-UIM. The R-UIM 12

then performs a calculation on the random number, and sends the result to the network for 13

verification. 14

This test applies to MEs conforming to [1] using either ID-1 or Plug-in R-UIM. 15

6.12.1.2 Conformance Requirement 16

If bit b2 of the file characteristics is set to 1, the ME shall provide a clock frequency of at 17

least 13/4 MHz to enable the R-UIM to run the authentication process in the required time. 18

6.12.1.3 Test Purpose 19

To verify that the authentication procedure is performed with a frequency of at least 13/4 20

MHz if the bit b2 of the file characteristics (byte 1 of the directory characteristics) is set to 21

1. 22

6.12.1.4 Method of Test 23

6.12.1.4.1 Initial Conditions 24

The ME shall be powered on and connected to an R-UIM simulator with bit b2 of the file 25

characteristics set to ‘1’. 26

1 cdma2000® is the trademark for the technical nomenclature for certain specifications and standards of the

Organizational Partners (OPs) of 3GPP2. Geographically (and as of the date of publication), cdma2000® is a

registered trademark of the Telecommunications Industry Association (TIA-USA) in the United States.

Page 38: Mobile Equipment (ME) Conformance Testing for cdma2000 ...cdma2000 Spread Spectrum Standards Release 0 COPYRIGHT 3GPP2 and its Organizational Partners claim copyright in this document

3GPP2 C.S0048-0

6-12

6.12.1.4.2 Procedure 1

The test shall be conducted in accordance with the procedures defined in 6.11 2

(Authentication Upon Originations) of [11]. 3

6.12.1.5 Test Requirement 4

The frequency of the clock shall be at least 13/4 MHz during the authentication procedure. 5

6.12.2 Clock Stop 6

6.12.2.1 Definition and Applicability 7

The ME may switch off the clock signal to the R-UIM if the R-UIM indicates that it supports 8

this feature. 9

This test applies to MEs conforming to [1] using either ID-1 or Plug-in R-UIM. 10

6.12.2.2 Conformance Requirement 11

The ME shall not stop the clock, unless the requirements indicated in byte 1 of the file 12

characteristics are met. 13

The ME shall wait at least 860 clock cycles after having received the last character 14

including the minimum guard time (2 elementary time units [etu]) of the response before 15

switching off the clock. The ME shall wait at least 744 clock cycles before it sends the first 16

command after having restarted the clock. 17

6.12.2.3 Test Purpose 18

1) To verify that the clock is only switched off if requirements are met as indicated in the 19

file characteristics (byte 1 of the directory characteristics). 20

2) To verify that the timing of the clock switching is as specified. 21

6.12.2.4 Method of Test 22

6.12.2.4.1 Initial Conditions 23

The ME is connected to an R-UIM simulator. CHV1 is enabled. 24

6.12.2.4.2 Procedure 25

1) An R-UIM simulator is used with the file characteristics bits set as follows: 26

Bit b1 Bit b3 Bit b4 27

0 0 0 28

2) The ME is powered on. When the ME is in mode PIN check, 10 seconds shall 29

elapse before the PIN is entered. 30

3) The ME is powered off, and an R-UIM simulator is used with the file 31

characteristics bits set as follows: 32

Bit b1 Bit b3 Bit b4 33

Page 39: Mobile Equipment (ME) Conformance Testing for cdma2000 ...cdma2000 Spread Spectrum Standards Release 0 COPYRIGHT 3GPP2 and its Organizational Partners claim copyright in this document

3GPP2 C.S0048-0

6-13

0 1 0 1

4) The ME is powered on. When the ME is in mode PIN check, 10 seconds shall 2

elapse before the PIN is entered. 3

5) The ME is powered off, and an R-UIM simulator is used with the file 4

characteristics bits set as follows: 5

Bit b1 Bit b3 Bit b4 6

0 0 1 7

6) The ME is powered on. When the ME is in mode PIN check, 10 seconds shall 8

elapse before the PIN is entered. 9

7) The ME is powered off, and an R-UIM simulator is used with the file 10

characteristics bits set as follows: 11

Bit b1 Bit b3 Bit b4 12

1 0 0 13

8) The ME is powered on. When the ME is in mode PIN check, 10 seconds shall 14

elapse before the PIN is entered. 15

6.12.2.5 Test Requirement 16

1) During step 2), the ME shall not switch off the clock. 17

2) During step 4), the ME shall not switch off the clock, unless at high level. 18

3) During step 6), the ME shall not switch off the clock, unless at low level. 19

4) During steps 4), 6) and 8), the ME shall not switch off the clock until at least 20

1,860 clock cycles after having received the last character of the response 21

including the minimum guard time (2 etu). 22

5) During steps 4), 6) and 8), the ME shall wait at least 744 clock cycles before it 23

sends the first command after having restarted the clock. 24

6.12.3 Authentication 25

The ME shall conform to the test requirements defined in 6 (Authentication Tests) of [11]. 26

6.13 Mechanical Tests 27

The ME shall conform to the requirements specified in subclause 27.13 of [10]. 28

6.14 Secret Code Usage 29

6.14.1 Entry of PIN 30

The ME shall conform to the requirements specified in subclause 27.14.1 of [10]. 31

6.14.2 Change of PIN 32

The ME shall conform to the requirements specified in subclause 27.14.2 of [10]. 33

Page 40: Mobile Equipment (ME) Conformance Testing for cdma2000 ...cdma2000 Spread Spectrum Standards Release 0 COPYRIGHT 3GPP2 and its Organizational Partners claim copyright in this document

3GPP2 C.S0048-0

6-14

6.14.3 Disabling the PIN 1

6.14.3.1 Definition and Applicability 2

Entry of the PIN may be disabled by the user, depending on the service table of the R-UIM. 3

It is the responsibility of the ME to check the R-UIM service table. 4

This test applies to MEs conforming to [1] using either ID-1 or Plug-in R-UIM that support a 5

feature to disable the PIN. 6

6.14.3.2 Conformance Requirement 7

Disabling PIN is achieved through the DISABLE CHV command. If the PIN disable function 8

in the R-UIM service table is not allocated or activated, the ME shall not attempt to disable 9

the PIN. 10

6.14.3.3 Test Purpose 11

To verify that the ME does not attempt to disable the PIN. 12

6.14.3.4 Method of Test 13

6.14.3.4.1 Initial Conditions 14

The ME is connected to the R-UIM simulator. 15

Elementary files in the R-UIM simulator shall be set to the default values. EFCST (CDMA 16

Service Table) shall be set to the value defined for “EFCST Setting 3” in Table 5-1. 17

The ME is powered on and a correct PIN entered. 18

6.14.3.4.2 Procedure 19

Using the ME's user interface procedure, an attempt is made to disable the PIN. 20

6.14.3.5 Test Requirement 21

The ME shall not send a DISABLE CHV command across the R-UIM/ME interface. 22

6.14.4 PUK Entry 23

The ME shall conform to the requirements specified in subclause 27.14.4 of [10]. 24

6.14.5 Entry of PIN2 25

The ME shall conform to the requirements specified in subclause 27.14.5 of [10]. 26

6.14.6 Change of PIN2 27

The ME shall conform to the requirements specified in subclause 27.14.6 of [10]. 28

6.14.7 PUK2 Entry 29

The ME shall conform to the requirements specified in subclause 27.14.7 of [10]. 30

Page 41: Mobile Equipment (ME) Conformance Testing for cdma2000 ...cdma2000 Spread Spectrum Standards Release 0 COPYRIGHT 3GPP2 and its Organizational Partners claim copyright in this document

3GPP2 C.S0048-0

6-15

6.14.8 CDMA Service Table 1

6.14.8.1 Definition and Applicability 2

This test applies to MEs conforming to [1] using either ID-1 or Plug-in R-UIM. 3

6.14.8.2 Conformance Requirement 4

The ME shall read the contents of EFCST from the R-UIM and shall provide user access 5

and/or service to the functions and services allocated and activated within EFCST. 6

6.14.8.3 Test Purpose 7

6.14.8.4 Method of Test 8

6.14.8.4.1 Initial Conditions 9

Byte 1 of EFCST shall be coded as ‘01010101’ to indicate “service allocated” and “service not 10

activated” for the following services: SMS, FDN, ADN, and CHV1. 11

6.14.8.4.2 Procedure 12

1) Insert the R-UIM into the ME being tested and power on the MS. 13

2) Verify that the SMS, FDN, ADN, and CHV functions and services are inoperative. 14

3) Power off the MS and remove the R-UIM. 15

4) Code Byte 1 of EFCST on the R-UIM to ‘11111111’ to indicate “service allocated” 16

and “service activated” for SMS, FDN, ADN, and CHV1. 17

5) Insert the R-UIM into the ME being tested and power on the MS. 18

6) Verivy that the SMS, FDN, ADN, and CHV1 functions and services are 19

operational. 20

6.14.8.5 Test Requirement 21

The services and functions should be operational only when coded as “service allocated” 22

and “service activated” within EFCST. 23

6.15 Abbreviated Dialing Numbers (ADN) 24

6.15.1 Definition and Applicability 25

Abbreviated Dialing Numbers contain subscriber number and supplementary service 26

control strings. They may also contain alpha identifiers. 27

This test applies to both MEs conforming to [1] using either ID-1 or plug-in R-UIMs, that 28

support ADN. 29

6.15.2 Conformance Requirement 30

The ME shall be able to update and retrieve ADNs from the R-UIM and set up calls to these 31

numbers. 32

Page 42: Mobile Equipment (ME) Conformance Testing for cdma2000 ...cdma2000 Spread Spectrum Standards Release 0 COPYRIGHT 3GPP2 and its Organizational Partners claim copyright in this document

3GPP2 C.S0048-0

6-16

6.15.3 Test Purpose 1

To verify that the ME can update and retrieve ADNs from the R-UIM. 2

6.15.4 Method of Test 3

6.15.4.1 Initial Conditions 4

EFCST shall be set in accordance with “EFCST Setting 2” described in Table 5-1. 5

Coding of elementary files in the R-UIM shall be as default, with the addition of: 6

EFADN (Abbreviated Dialing Number) 7

Logically: 8

At least 101 records. 9

Record 1: 10

Length of alpha identifier: 32 characters 11

Alpha identifier: "ABCDEFGHIJKLMNOPQRSTUVWXYZABCDEF" 12

Length of BCD number: "03" 13

TON and NPI: Telephony and Unknown 14

Dialed number: 123 15

CCI: None 16

Ext1: None 17

Coding for record 1: 18

B1 B2 B3 ... B32 B33 B34 B35 B36 B37 B38 B39 ... B46

41 42 43 ... 46 03 81 21 F3 FF FF FF ... FF

19

The ME is installed with the default R-UIM or R-UIM simulator, and switched on. 20

6.15.4.2 Procedure 21

1) The code "1234567890123456" is stored (entered) in the MS as abbreviated 22

dialing entry number 7 on the R-UIM. 23

2) The code "00112233" is stored (entered) in the MS as abbreviated dialing entry 24

number 6 on the R-UIM. 25

3) The code "**21*44556677#" is stored (entered) in the MS as abbreviated dialing 26

entry number 101 on the R-UIM. 27

4) Retrieve data from R-UIM entry number 7 using the procedure N(N)(N)#. 28

5) Retrieve data from R-UIM entry number 6 using the procedure N(N)(N)#. 29

6) Retrieve data from R-UIM entry number 101 using the procedure N(N)(N)#. 30

Page 43: Mobile Equipment (ME) Conformance Testing for cdma2000 ...cdma2000 Spread Spectrum Standards Release 0 COPYRIGHT 3GPP2 and its Organizational Partners claim copyright in this document

3GPP2 C.S0048-0

6-17

7) Retrieve data from R-UIM entry number 1 using the procedure N(N)(N)#, and 1

display the alpha identifier. 2

6.15.5 Test Requirements 3

1) After step 4), the number "1234567890123456" shall be displayed. 4

2) After step 5), the number "00112233" shall be displayed. 5

3) After step 6), the number "**21*44556677#" (or an equivalent representation) 6

shall be displayed. 7

4) After step 7), the ME shall display at least part of the alpha identifier, and shall 8

sustain normal operation. 9

6.16 UI Reaction to R-UIM Status Encoding 10

The ME shall conform to the requirements specified in subclause 27.16 of [10]. 11

6.17 Electrical Tests 12

The ME shall conform to the requirements specified in subclause 27.17 of [10] with the 13

following exception: the command “SELECT CDMA” shall be used in place of “SELECT 14

GSM”. 15

6.18 Fixed Dialing Number (FDN) 16

The ME shall conform to the requirements specified in subclause 27.18 of [10] with the 17

following exceptions: 18

1) Appropriate cdma2000 system simulator settings shall be used in place of the 19

GSM-specific settings identified in [10]. 20

2) Rehabilitation of EFLOCI is not applicable. 21

3) EFCST shall be set in accordance with “EFCST Setting 2” described in Table 5-1. 22

6.19 Version Identification 23

6.19.1 Definition and Applicability 24

The version of the R-UIM is indicated in the Elementary File EFRevision. This allows the ME to 25

identify the version of the R-UIM and adapt its functionality accordingly. 26

This test applies to MEs conforming to [1] using either ID-1 or plug-in R-UIMs. 27

6.19.2 Conformance Requirement 28

The version of the card shall be determined as part of the initialization procedure. 29

6.19.3 Test Purpose 30

To verify that the ME requests the R-UIM version (EFRevision) as part of the initialization 31

procedure. 32

Page 44: Mobile Equipment (ME) Conformance Testing for cdma2000 ...cdma2000 Spread Spectrum Standards Release 0 COPYRIGHT 3GPP2 and its Organizational Partners claim copyright in this document

3GPP2 C.S0048-0

6-18

6.19.4 Method of Test 1

6.19.4.1 Initial Conditions 2

The ME is connected to the R-UIM simulator and powered off. 3

The default values are used. 4

6.19.4.2 Procedure 5

1) The mobile is powered on. 6

2) The R-UIM simulator monitors the R-UIM initialization procedure. 7

6.19.5 Test Requirement 8

The ME shall request the version (EFRevision) of the R-UIM as part of the initialization 9

procedure. 10

6.20 R-UIM Presence Detection 11

The ME shall conform to the requirements specified in subclause 27.20 of [10]. 12

6.21 Reserved 13

6.22 Suggested Slot Cycle Index 14

6.22.1 Definition and Applicability 15

This test applies to MEs conforming to [1] using either ID-1 or Plug-in R-UIM. 16

6.22.2 Conformance Requirement 17

The ME shall read the contents of EFSSCI (Suggested Slot Cycle Index) and apply it to mobile 18

station processing. 19

6.22.3 Test Purpose 20

The purpose of this test is to ensure that the ME is able to read the contents of the EFSSCI 21

and compare this value with MAX_SLOT_CYCLE_INDEX obtained from the System 22

Parameters Message in determining the appropriate value to set SLOT_CYCLE_INDEX. 23

6.22.4 Method of Test 24

6.22.4.1 Initial Conditions 25

1) The mobile station shall be connected to a mobile station diagnostic monitor. 26

2) The mobile station shall be connected to a network system simulator. 27

3) The network system simulator shall be configured such that the value of 28

MAX_SLOT_CYCLE_INDEX within the System Parameters Message is set to ‘011’. 29

4) EFSSCI shall be set to the value ‘00000010’. 30

Page 45: Mobile Equipment (ME) Conformance Testing for cdma2000 ...cdma2000 Spread Spectrum Standards Release 0 COPYRIGHT 3GPP2 and its Organizational Partners claim copyright in this document

3GPP2 C.S0048-0

6-19

6.22.4.2 Procedure 1

1) Power on the mobile station. 2

2) Allow a sufficient time for the mobile station to complete power-up registration 3

with the network system simulator. Determine the value of the Slot Cycle Index 4

used by the mobile station. Also note the value of the preferred Slot Cycle Index 5

(SLOT_CYCLE_INDEX) reported by the mobile station in the Registration Message. 6

3) Power off the mobile station. 7

4) Configure the network system simulator such that the 8

MAX_SLOT_CYCLE_INDEX within the System Parameters Message is set to ‘001’. 9

5) Power on the mobile station. 10

6) Allow a sufficient time for the mobile station to complete power-up registration 11

with the network system simulator. Determine the value of the Slot Cycle Index 12

used by the mobile station. Also note the value of the preferred Slot Cycle Index 13

(SLOT_CYCLE_INDEX) reported by the mobile station in the Registration Message. 14

6.22.5 Test Requirement 15

As part of step 2 of the test procedure, the mobile station shall send a Registration Message 16

to the network system simulator with a preferred Slot Cycle Index (SLOT_CYCLE_INDEX) 17

value of ‘010’. Similarly, the mobile station shall be operating using a value of ‘010’ for the 18

Slot Cycle Index. 19

As part of step 6 of the test procedure, the mobile station shall send a Registration Message 20

to the network system simulator with a preferred Slot Cycle Index (SLOT_CYCLE_INDEX) 21

value of ‘010’. The mobile station shall also, however, be operating using a value of ‘001’ for 22

the Slot Cycle Index. 23

6.23 Service Provider Name 24

6.23.1 Definition and Applicability 25

This test applies to MEs conforming to [1] using either ID-1 or Plug-in R-UIM. 26

6.23.2 Conformance Requirement 27

The ME shall be capable of reading the contents of EFSPN and displaying the corresponding 28

information to the mobile station user. 29

6.23.3 Test Purpose 30

To verify that the ME is capable of reading and displaying the contents of EFSPN. 31

Page 46: Mobile Equipment (ME) Conformance Testing for cdma2000 ...cdma2000 Spread Spectrum Standards Release 0 COPYRIGHT 3GPP2 and its Organizational Partners claim copyright in this document

3GPP2 C.S0048-0

6-20

6.23.4 Method of Test 1

6.23.4.1 Initial Conditions 2

6.23.4.2 Procedure 3

1) Input the Service Provider Name with a length not more than 16 bytes on the R-4

UIM using a card reader/programmer. 5

2) Insert the R-UIM into the mobile station and power up the mobile station. Note 6

the appearance of the mobile station display. 7

3) Input the Service Provider Name with a length more than 16 bytes on the R-UIM 8

using a card reader/programmer. 9

4) Insert the R-UIM into the mobile station and power up the mobile station. Note 10

the appearance of the mobile station display. 11

6.23.5 Test Requirement 12

1) Following step 2 of the test procedure, verify the Service Provider Name is 13

displayed on the screen of the mobile station while in the idle state. 14

2) Following step 4 of the test procedure, verify the first 16 bytes of the Service 15

Provider Name is displayed on the screen of the mobile station while in the Mobile 16

Station Idle State. 17