TECHNIP-COFLEXIP
LNG PLANT PRICING
CONSIDERATION
TECHNIPTECHNIP
--COFLEXIPCOFLEXIP
LNG PLANT PRICINGLNG PLANT PRICING
CONSIDERATIONCONSIDERATION
5/25/2018 Morgan Stanley Oil
2/19
BRIEF HISTORY OF LNGBRIEF HISTORY OF LNG
???????? : first liquefaction of methane by ???: first liquefaction of methane by ???
1917 : Liquefaction of gas to extract helium (Texas)1917 : Liquefaction of gas to extract helium (Texas)
1920/30s1920/30s : LNG produced to store natural gas in USA: LNG produced to store natural gas in USA
1944 : major accident in Cleveland peak shaving1944 : major accident in Cleveland peak shaving
1950s : start of new era of development1950s : start of new era of development
1959/60 : trial runs of Methane Pioneer from USA to UK1959/60 : trial runs of Methane Pioneer from USA to UK
1964 : Camel plant (Algeria) commissioned, first1964 : Camel plant (Algeria) commissioned, first
commercial deliveries to UK and Francecommercial deliveries to UK and France
2001 : annual LNG trade of 1072001 : annual LNG trade of 107 mtmt (+ 7.5% over last 20 years)(+ 7.5% over last 20 years)
5/25/2018 Morgan Stanley Oil
3/19
0
500
1000
1500
2000
2500
70 72 74 76 78 80 82 84 86 88 90 92 94 96 98 '00
Billioncm/
NATURAL GAS AND LNG TRADENATURAL GAS AND LNG TRADENATURAL GAS AND LNG TRADE
NG ConsumptionNG Consumption
NG International TradeNG International Trade
LNG TradeLNG Trade
5/25/2018 Morgan Stanley Oil
4/19
LNG DEMAND VERSUS INSTALLED CAPACITYLNG DEMAND VERSUS INSTALLED CAPACITY
0
20
40
60
80
100
120
140
160
180
200
70 72 74 76 78 80 82 84 86 88 90 92 94 96 98 '00 '02 '04 '06 '08 '10
M
ta
INSTALLED CAPACITYINSTALLED CAPACITY
DEMANDDEMAND
5/25/2018 Morgan Stanley Oil
5/19
LOCATIONS OF LNG PLANTS
Existing
Under construction
5/25/2018 Morgan Stanley Oil
6/19
EVOLUTION OF TRAIN CAPACITYEVOLUTION OF TRAIN CAPACITY
0,00
1,00
2,00
3,00
4,00
5,00
6,00
1960 1970 1980 1990 2000 2010
Milliontonn
esperyea
5/25/2018 Morgan Stanley Oil
7/19
FRACTIONATIONFRACTIONATION
REFRIGERATIONREFRIGERATIONSULPHURSULPHURRECOVERYRECOVERY
TYPICAL BLOCK DIAGRAMTYPICAL BLOCK DIAGRAM
ACID GASACID GAS
REMOVALREMOVAL
DEHYDRATIONDEHYDRATION
AND MERCURYAND MERCURYREMOVALREMOVAL
LIQUEFACTIONLIQUEFACTIONNITROGENNITROGEN
REMOVALREMOVAL
LNG STORAGELNG STORAGE
AND LOADINGAND LOADING
C3C3 C4C4 GasolineGasoline
5/25/2018 Morgan Stanley Oil
8/19
MAIN LIQUEFACTION TECHNOLOGIESMAIN LIQUEFACTION TECHNOLOGIES
A.P.C.I.A.P.C.I. -- C3/MR : 57 trains in operation + 7 under constructionC3/MR : 57 trains in operation + 7 under construction
PHILLIPSPHILLIPS -- Optimised Cascade : 3 trains in operation (Trinidad &Optimised Cascade : 3 trains in operation (Trinidad &
Tobago) + 1 under construction (Tobago) + 1 under construction (IdkuIdku Egypt)Egypt)
STATOIL/LINDESTATOIL/LINDE -- MFCP : 1 train under construction (MFCP : 1 train under construction (SnohvitSnohvit -- NorwNorw
AXENSAXENS -- LIQUEFIN : No referenceLIQUEFIN : No reference
SHELLSHELL DMR : 2 trains in project (Sakhalin)DMR : 2 trains in project (Sakhalin)
5/25/2018 Morgan Stanley Oil
9/19
TYPICAL PRICE BREAKTYPICAL PRICE BREAKDOWN OF A TWO TRAINDOWN OF A TWO TRAINLIQUEFACTION PLANTLIQUEFACTION PLANT
LNG PRICESLNG PRICES
Plant cost $/Plant cost $/tpytpy versus year of commissioningversus year of commissioning
Unit cost $/Unit cost $/tpytpy versus year of commissioningversus year of commissioning
Plant Cost s/Plant Cost s/tpytpy versus train capacityversus train capacity
Price Break down of a two train liquefaction plantPrice Break down of a two train liquefaction plant
5/25/2018 Morgan Stanley Oil
10/19
PLANT COST $/TPY VERSUS YEAR OF COMMISSIONINGPLANT COST $/TPY VERSUS YEAR OF COMMISSIONING
100
200
300
400
1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 20
Year
$
per
tpy
5/25/2018 Morgan Stanley Oil
11/19
PLANT COST $/PLANT COST $/TpyTpy VERSUS TRAIN CAPACITYVERSUS TRAIN CAPACITY
100
200
300
400
0 1 2 3 4 5 6
Train Capacity in MMTpy
$
pertpy
5/25/2018 Morgan Stanley Oil
12/19
TRAIN COST VERSUS YEAR OF COMMISSIONINGTRAIN COST VERSUS YEAR OF COMMISSIONING
0
50
100
150
1990 1995 2000
Year
$
per
tpy
TYPICAL PRICE BREAKTYPICAL PRICE BREAK DOWN OF A TWO TRAINDOWN OF A TWO TRAIN
5/25/2018 Morgan Stanley Oil
13/19
TYPICAL PRICE BREAKTYPICAL PRICE BREAKDOWN OF A TWO TRAINDOWN OF A TWO TRAINLIQUEFACTION PLANTLIQUEFACTION PLANT
2 TRAINS2 TRAINS 45 %45 % toto 65 %65 %
UTILITIESUTILITIES 8 %8 % toto 15 %15 %
OFF SITEOFF SITE 20 %20 % toto 40 %40 %
COMMONCOMMON 7 %7 % toto 10 %10 %
TOTAL LNG PLANTTOTAL LNG PLANT
OTHERSOTHERS 1515 toto 30 %30 %
TOTAL LNG PROJECTTOTAL LNG PROJECT130 %130 %
100 %100 %
115 %115 %
TYPICAL PRICE BREAKTYPICAL PRICE BREAK DOWN OF A TWO TRAINDOWN OF A TWO TRAIN
5/25/2018 Morgan Stanley Oil
14/19
TYPICAL PRICE BREAKTYPICAL PRICE BREAKDOWN OF A TWO TRAINDOWN OF A TWO TRAINLIQUEFACTION PLANTLIQUEFACTION PLANT
2 TRAINS2 TRAINSMini MaxiMini Maxi CriteriaCriteria
Common/inlet facilitiesCommon/inlet facilities 1 % 10 %1 % 10 % Project DefinitionProject Definition
Acid Gas removalAcid Gas removal 3 %3 % 8 %8 % Gas compositionGas composition
DehydrationDehydration 2 %2 % 3 %3 %
Mercury removalMercury removal 1 %1 % 1 %1 %
Refrigeration/Liquefaction 25 % 40 %Refrigeration/Liquefaction 25 % 40 % Cooling systemCooling systemCompressors configurationCompressors configuration
FractionationFractionation 1 %1 % 3 %3 %
Sulphur recovery/Sulphur recovery/prillingprilling 0 %0 % 3 %3 %
_____ ___________ ______
TOTALTOTAL 45 % to 65 %45 % to 65 %
TYPICAL PRICE BREAKTYPICAL PRICE BREAK DOWN OF A TWO TRAINDOWN OF A TWO TRAIN
5/25/2018 Morgan Stanley Oil
15/19
TYPICAL PRICE BREAKTYPICAL PRICE BREAKDOWN OF A TWO TRAINDOWN OF A TWO TRAINLIQUEFACTION PLANTLIQUEFACTION PLANT
UTILITESUTILITES
Mini MaxiMini Maxi CriteriaCriteria
Power Generation :Power Generation : 3 % 7 %3 % 7 % Gas or steam turbineGas or steam turbine
Cooling water :Cooling water : 2 %2 % 6 %6 % Cooling systemCooling system
(air(air waterwater seawater)seawater)
Other Waters, Steam,Other Waters, Steam, Project definition,sparingProject definition,sparing
Fuel, Air, Nitrogen :Fuel, Air, Nitrogen : 3 %3 % 6 %6 % philosophyphilosophy
_____ ___________ ______
TOTALTOTAL 8 % to 15 %8 % to 15 %
TYPICAL PRICE BREAKTYPICAL PRICE BREAK DOWN OF A TWO TRAINDOWN OF A TWO TRAIN
5/25/2018 Morgan Stanley Oil
16/19
TYPICAL PRICE BREAKTYPICAL PRICE BREAKDOWN OF A TWO TRAINDOWN OF A TWO TRAINLIQUEFACTION PLANTLIQUEFACTION PLANT
OFF SITEOFF SITEMini Maxi Criteria
LPG Storage & Loading 10 % 20 %LPG Storage & Loading 10 % 20 % Storage capacity & tankStorage capacity & tank
specificationspecification
LPG Storage & LoadingLPG Storage & Loading 0 % 13 % Project definition0 % 13 % Project definition
Condensate StorageCondensate Storage
& Loading& Loading 0 %0 % 2 %2 % Project definitionProject definitionLoading JettyLoading Jetty 4 %4 % 8 %8 % Sea and Site conditionsSea and Site conditions
Flare & Liquid blowFlare & Liquid blow--down 3 % 5 %down 3 % 5 %
Others Fire protectionOthers Fire protection
Drainage, Waste tr.Drainage, Waste tr. 3 %3 % 4 %4 %_____ ___________ ______
TOTALTOTAL 25 % to 40 %25 % to 40 %
TYPICAL PRICE BREAKTYPICAL PRICE BREAK DOWN OF A TWO TRAINDOWN OF A TWO TRAIN
5/25/2018 Morgan Stanley Oil
17/19
TYPICAL PRICE BREAKTYPICAL PRICE BREAKDOWN OF A TWO TRAINDOWN OF A TWO TRAINLIQUEFACTION PLANTLIQUEFACTION PLANT
COMMONCOMMONMini MaxiMini Maxi
Site infrastructure, road & fencesSite infrastructure, road & fences 2 % 4 %2 % 4 %
Control roomControl room -- SubstationsSubstations 2 %2 % 2 %2 %
DCS, ESD,FG & TelecomDCS, ESD,FG & Telecom 2 %2 % 3 %3 %
Administration, maintenance buildingsAdministration, maintenance buildings 2 %2 % 3 %3 %
_____ ___________ ______
TOTALTOTAL 7 % to 10 %7 % to 10 %
TYPICAL PRICE BREAKTYPICAL PRICE BREAK DOWN OF A TWO TRAINDOWN OF A TWO TRAIN
5/25/2018 Morgan Stanley Oil
18/19
TYPICAL PRICE BREAKTYPICAL PRICE BREAKDOWN OF A TWO TRAINDOWN OF A TWO TRAINLIQUEFACTION PLANTLIQUEFACTION PLANT
OTHERSOTHERSMini Maxi Criteria
Gas pipelineGas pipeline 1MM$ per Km1MM$ per Km On project definitionsOn project definitions
Site PreparationSite Preparation 2 %2 % 5 %5 % Site conditionsSite conditions
Material Off LoadingMaterial Off Loading Airport 2 %Airport 2 % 6 %6 % Remote areaRemote area
Residential areaResidential area 4 %4 % 8 %8 % Client requirementClient requirementSpare partsSpare parts 2 % 5 %2 % 5 % Client requirementClient requirement
MovablesMovables 2 %2 % 4 %4 % Client requirementClient requirement
Training & StartTraining & Start--upup 1 %1 % 2 %2 % Take over definitionTake over definition
_____ _______ ________TOTALTOTAL 15 % to 30 %15 % to 30 %
5/25/2018 Morgan Stanley Oil
19/19
THE TRENDSTHE TRENDS
CONTINUOUS INCREASING OF THE UNIT CAPACITY :CONTINUOUS INCREASING OF THE UNIT CAPACITY :
8 Mty are now considered8 Mty are now considered
New Process developments : APCINew Process developments : APCI APX, AXENS, OthersAPX, AXENS, Others
New Driving MachinesNew Driving Machines
Frame 9 Gas Turbine (3,000 rpm)Frame 9 Gas Turbine (3,000 rpm)
Electric MotorsElectric Motors
New 3,000 rpm compressorsNew 3,000 rpm compressors
New Unit lay outNew Unit lay out
TANKS CAPACITY UP TO 200,000 m3 ARE CONSIDEREDTANKS CAPACITY UP TO 200,000 m3 ARE CONSIDERED
ENVIRONMENTAL CONCERNENVIRONMENTAL CONCERN
Acid Gas ReAcid Gas Re--injectioninjection
LNG FLOATING PLANT ON BARGE (FLNG)LNG FLOATING PLANT ON BARGE (FLNG)