  • 5/25/2018 Morgan Stanley Oil

    1/19

    TECHNIP-COFLEXIP

    LNG PLANT PRICING

    CONSIDERATION

    TECHNIPTECHNIP

    --COFLEXIPCOFLEXIP

    LNG PLANT PRICINGLNG PLANT PRICING

    CONSIDERATIONCONSIDERATION

  • 5/25/2018 Morgan Stanley Oil

    2/19

    BRIEF HISTORY OF LNGBRIEF HISTORY OF LNG

    ???????? : first liquefaction of methane by ???: first liquefaction of methane by ???

    1917 : Liquefaction of gas to extract helium (Texas)1917 : Liquefaction of gas to extract helium (Texas)

    1920/30s1920/30s : LNG produced to store natural gas in USA: LNG produced to store natural gas in USA

    1944 : major accident in Cleveland peak shaving1944 : major accident in Cleveland peak shaving

    1950s : start of new era of development1950s : start of new era of development

    1959/60 : trial runs of Methane Pioneer from USA to UK1959/60 : trial runs of Methane Pioneer from USA to UK

    1964 : Camel plant (Algeria) commissioned, first1964 : Camel plant (Algeria) commissioned, first

    commercial deliveries to UK and Francecommercial deliveries to UK and France

    2001 : annual LNG trade of 1072001 : annual LNG trade of 107 mtmt (+ 7.5% over last 20 years)(+ 7.5% over last 20 years)

  • 5/25/2018 Morgan Stanley Oil

    3/19

    0

    500

    1000

    1500

    2000

    2500

    70 72 74 76 78 80 82 84 86 88 90 92 94 96 98 '00

    Billioncm/

    NATURAL GAS AND LNG TRADENATURAL GAS AND LNG TRADENATURAL GAS AND LNG TRADE

    NG ConsumptionNG Consumption

    NG International TradeNG International Trade

    LNG TradeLNG Trade

  • 5/25/2018 Morgan Stanley Oil

    4/19

    LNG DEMAND VERSUS INSTALLED CAPACITYLNG DEMAND VERSUS INSTALLED CAPACITY

    0

    20

    40

    60

    80

    100

    120

    140

    160

    180

    200

    70 72 74 76 78 80 82 84 86 88 90 92 94 96 98 '00 '02 '04 '06 '08 '10

    M

    ta

    INSTALLED CAPACITYINSTALLED CAPACITY

    DEMANDDEMAND

  • 5/25/2018 Morgan Stanley Oil

    5/19

    LOCATIONS OF LNG PLANTS

    Existing

    Under construction

  • 5/25/2018 Morgan Stanley Oil

    6/19

    EVOLUTION OF TRAIN CAPACITYEVOLUTION OF TRAIN CAPACITY

    0,00

    1,00

    2,00

    3,00

    4,00

    5,00

    6,00

    1960 1970 1980 1990 2000 2010

    Milliontonn

    esperyea

  • 5/25/2018 Morgan Stanley Oil

    7/19

    FRACTIONATIONFRACTIONATION

    REFRIGERATIONREFRIGERATIONSULPHURSULPHURRECOVERYRECOVERY

    TYPICAL BLOCK DIAGRAMTYPICAL BLOCK DIAGRAM

    ACID GASACID GAS

    REMOVALREMOVAL

    DEHYDRATIONDEHYDRATION

    AND MERCURYAND MERCURYREMOVALREMOVAL

    LIQUEFACTIONLIQUEFACTIONNITROGENNITROGEN

    REMOVALREMOVAL

    LNG STORAGELNG STORAGE

    AND LOADINGAND LOADING

    C3C3 C4C4 GasolineGasoline

  • 5/25/2018 Morgan Stanley Oil

    8/19

    MAIN LIQUEFACTION TECHNOLOGIESMAIN LIQUEFACTION TECHNOLOGIES

    A.P.C.I.A.P.C.I. -- C3/MR : 57 trains in operation + 7 under constructionC3/MR : 57 trains in operation + 7 under construction

    PHILLIPSPHILLIPS -- Optimised Cascade : 3 trains in operation (Trinidad &Optimised Cascade : 3 trains in operation (Trinidad &

    Tobago) + 1 under construction (Tobago) + 1 under construction (IdkuIdku Egypt)Egypt)

    STATOIL/LINDESTATOIL/LINDE -- MFCP : 1 train under construction (MFCP : 1 train under construction (SnohvitSnohvit -- NorwNorw

    AXENSAXENS -- LIQUEFIN : No referenceLIQUEFIN : No reference

    SHELLSHELL DMR : 2 trains in project (Sakhalin)DMR : 2 trains in project (Sakhalin)

  • 5/25/2018 Morgan Stanley Oil

    9/19

    TYPICAL PRICE BREAKTYPICAL PRICE BREAKDOWN OF A TWO TRAINDOWN OF A TWO TRAINLIQUEFACTION PLANTLIQUEFACTION PLANT

    LNG PRICESLNG PRICES

    Plant cost $/Plant cost $/tpytpy versus year of commissioningversus year of commissioning

    Unit cost $/Unit cost $/tpytpy versus year of commissioningversus year of commissioning

    Plant Cost s/Plant Cost s/tpytpy versus train capacityversus train capacity

    Price Break down of a two train liquefaction plantPrice Break down of a two train liquefaction plant

  • 5/25/2018 Morgan Stanley Oil

    10/19

    PLANT COST $/TPY VERSUS YEAR OF COMMISSIONINGPLANT COST $/TPY VERSUS YEAR OF COMMISSIONING

    100

    200

    300

    400

    1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 20

    Year

    $

    per

    tpy

  • 5/25/2018 Morgan Stanley Oil

    11/19

    PLANT COST $/PLANT COST $/TpyTpy VERSUS TRAIN CAPACITYVERSUS TRAIN CAPACITY

    100

    200

    300

    400

    0 1 2 3 4 5 6

    Train Capacity in MMTpy

    $

    pertpy

  • 5/25/2018 Morgan Stanley Oil

    12/19

    TRAIN COST VERSUS YEAR OF COMMISSIONINGTRAIN COST VERSUS YEAR OF COMMISSIONING

    0

    50

    100

    150

    1990 1995 2000

    Year

    $

    per

    tpy

    TYPICAL PRICE BREAKTYPICAL PRICE BREAK DOWN OF A TWO TRAINDOWN OF A TWO TRAIN

  • 5/25/2018 Morgan Stanley Oil

    13/19

    TYPICAL PRICE BREAKTYPICAL PRICE BREAKDOWN OF A TWO TRAINDOWN OF A TWO TRAINLIQUEFACTION PLANTLIQUEFACTION PLANT

    2 TRAINS2 TRAINS 45 %45 % toto 65 %65 %

    UTILITIESUTILITIES 8 %8 % toto 15 %15 %

    OFF SITEOFF SITE 20 %20 % toto 40 %40 %

    COMMONCOMMON 7 %7 % toto 10 %10 %

    TOTAL LNG PLANTTOTAL LNG PLANT

    OTHERSOTHERS 1515 toto 30 %30 %

    TOTAL LNG PROJECTTOTAL LNG PROJECT130 %130 %

    100 %100 %

    115 %115 %

    TYPICAL PRICE BREAKTYPICAL PRICE BREAK DOWN OF A TWO TRAINDOWN OF A TWO TRAIN

  • 5/25/2018 Morgan Stanley Oil

    14/19

    TYPICAL PRICE BREAKTYPICAL PRICE BREAKDOWN OF A TWO TRAINDOWN OF A TWO TRAINLIQUEFACTION PLANTLIQUEFACTION PLANT

    2 TRAINS2 TRAINSMini MaxiMini Maxi CriteriaCriteria

    Common/inlet facilitiesCommon/inlet facilities 1 % 10 %1 % 10 % Project DefinitionProject Definition

    Acid Gas removalAcid Gas removal 3 %3 % 8 %8 % Gas compositionGas composition

    DehydrationDehydration 2 %2 % 3 %3 %

    Mercury removalMercury removal 1 %1 % 1 %1 %

    Refrigeration/Liquefaction 25 % 40 %Refrigeration/Liquefaction 25 % 40 % Cooling systemCooling systemCompressors configurationCompressors configuration

    FractionationFractionation 1 %1 % 3 %3 %

    Sulphur recovery/Sulphur recovery/prillingprilling 0 %0 % 3 %3 %

    _____ ___________ ______

    TOTALTOTAL 45 % to 65 %45 % to 65 %

    TYPICAL PRICE BREAKTYPICAL PRICE BREAK DOWN OF A TWO TRAINDOWN OF A TWO TRAIN

  • 5/25/2018 Morgan Stanley Oil

    15/19

    TYPICAL PRICE BREAKTYPICAL PRICE BREAKDOWN OF A TWO TRAINDOWN OF A TWO TRAINLIQUEFACTION PLANTLIQUEFACTION PLANT

    UTILITESUTILITES

    Mini MaxiMini Maxi CriteriaCriteria

    Power Generation :Power Generation : 3 % 7 %3 % 7 % Gas or steam turbineGas or steam turbine

    Cooling water :Cooling water : 2 %2 % 6 %6 % Cooling systemCooling system

    (air(air waterwater seawater)seawater)

    Other Waters, Steam,Other Waters, Steam, Project definition,sparingProject definition,sparing

    Fuel, Air, Nitrogen :Fuel, Air, Nitrogen : 3 %3 % 6 %6 % philosophyphilosophy

    _____ ___________ ______

    TOTALTOTAL 8 % to 15 %8 % to 15 %

    TYPICAL PRICE BREAKTYPICAL PRICE BREAK DOWN OF A TWO TRAINDOWN OF A TWO TRAIN

  • 5/25/2018 Morgan Stanley Oil

    16/19

    TYPICAL PRICE BREAKTYPICAL PRICE BREAKDOWN OF A TWO TRAINDOWN OF A TWO TRAINLIQUEFACTION PLANTLIQUEFACTION PLANT

    OFF SITEOFF SITEMini Maxi Criteria

    LPG Storage & Loading 10 % 20 %LPG Storage & Loading 10 % 20 % Storage capacity & tankStorage capacity & tank

    specificationspecification

    LPG Storage & LoadingLPG Storage & Loading 0 % 13 % Project definition0 % 13 % Project definition

    Condensate StorageCondensate Storage

    & Loading& Loading 0 %0 % 2 %2 % Project definitionProject definitionLoading JettyLoading Jetty 4 %4 % 8 %8 % Sea and Site conditionsSea and Site conditions

    Flare & Liquid blowFlare & Liquid blow--down 3 % 5 %down 3 % 5 %

    Others Fire protectionOthers Fire protection

    Drainage, Waste tr.Drainage, Waste tr. 3 %3 % 4 %4 %_____ ___________ ______

    TOTALTOTAL 25 % to 40 %25 % to 40 %

    TYPICAL PRICE BREAKTYPICAL PRICE BREAK DOWN OF A TWO TRAINDOWN OF A TWO TRAIN

  • 5/25/2018 Morgan Stanley Oil

    17/19

    TYPICAL PRICE BREAKTYPICAL PRICE BREAKDOWN OF A TWO TRAINDOWN OF A TWO TRAINLIQUEFACTION PLANTLIQUEFACTION PLANT

    COMMONCOMMONMini MaxiMini Maxi

    Site infrastructure, road & fencesSite infrastructure, road & fences 2 % 4 %2 % 4 %

    Control roomControl room -- SubstationsSubstations 2 %2 % 2 %2 %

    DCS, ESD,FG & TelecomDCS, ESD,FG & Telecom 2 %2 % 3 %3 %

    Administration, maintenance buildingsAdministration, maintenance buildings 2 %2 % 3 %3 %

    _____ ___________ ______

    TOTALTOTAL 7 % to 10 %7 % to 10 %

    TYPICAL PRICE BREAKTYPICAL PRICE BREAK DOWN OF A TWO TRAINDOWN OF A TWO TRAIN

  • 5/25/2018 Morgan Stanley Oil

    18/19

    TYPICAL PRICE BREAKTYPICAL PRICE BREAKDOWN OF A TWO TRAINDOWN OF A TWO TRAINLIQUEFACTION PLANTLIQUEFACTION PLANT

    OTHERSOTHERSMini Maxi Criteria

    Gas pipelineGas pipeline 1MM$ per Km1MM$ per Km On project definitionsOn project definitions

    Site PreparationSite Preparation 2 %2 % 5 %5 % Site conditionsSite conditions

    Material Off LoadingMaterial Off Loading Airport 2 %Airport 2 % 6 %6 % Remote areaRemote area

    Residential areaResidential area 4 %4 % 8 %8 % Client requirementClient requirementSpare partsSpare parts 2 % 5 %2 % 5 % Client requirementClient requirement

    MovablesMovables 2 %2 % 4 %4 % Client requirementClient requirement

    Training & StartTraining & Start--upup 1 %1 % 2 %2 % Take over definitionTake over definition

    _____ _______ ________TOTALTOTAL 15 % to 30 %15 % to 30 %

  • 5/25/2018 Morgan Stanley Oil

    19/19

    THE TRENDSTHE TRENDS

    CONTINUOUS INCREASING OF THE UNIT CAPACITY :CONTINUOUS INCREASING OF THE UNIT CAPACITY :

    8 Mty are now considered8 Mty are now considered

    New Process developments : APCINew Process developments : APCI APX, AXENS, OthersAPX, AXENS, Others

    New Driving MachinesNew Driving Machines

    Frame 9 Gas Turbine (3,000 rpm)Frame 9 Gas Turbine (3,000 rpm)

    Electric MotorsElectric Motors

    New 3,000 rpm compressorsNew 3,000 rpm compressors

    New Unit lay outNew Unit lay out

    TANKS CAPACITY UP TO 200,000 m3 ARE CONSIDEREDTANKS CAPACITY UP TO 200,000 m3 ARE CONSIDERED

    ENVIRONMENTAL CONCERNENVIRONMENTAL CONCERN

    Acid Gas ReAcid Gas Re--injectioninjection

    LNG FLOATING PLANT ON BARGE (FLNG)LNG FLOATING PLANT ON BARGE (FLNG)