1 LIST OF PROJECTS IN INFRASTRUCTURE AND CONSTRUCTION Conceptual/Planning Stage N Organization Project Title / Details Location Budget Euro* Contacts Sector 1 A2Z Maintenance & Engineering Services Gurgaon based engineering, procurement and construction (EPC) company plans to set up a 500-MW biomass power plant from municipal solid-waste, within two years. Funding planned through IPO and internal accruals. NA 521.12 Mamta Joshi, CEO (Admin), 5th & 6th Floor, Enkay Square 448–A, Udyog Vihar, Phase – V, Gurgaon – 122016, Haryana. T: 0124 - 4517600, 4776100, F: 4380014, (Amit Mittal, CMD) Biomass Energy 2 Jaiprakash Associates Ltd The company plans to expand its clinker and cement manufacturing capacity of existing unit Baga in Himachal Pradesh. The current capacity is 4 MTPA and would be further expanded by 2.5 MTPA by 2012. Baga Himachal Pradesh 217.13 Rahul Kumar, Chief Financial Offi cer, Jaypee Vasant Continental, Vasant Vihar, New Delhi - 110057. T: 011- 26140101 / 54099, F: 26151177, [email protected] Cement 3 Orient Paper & Industries Ltd The company is into paper, cement and electrical goods manufacturing. This company is contemplating plans to scale up its cement production capacity from 5 MTPA to 15 MTPA in the next few years. This expansion will be carried out mainly by setting up greenfield projects. These projects are likely to be announced in the next six months. NA NA 9/1, R. N. Mukherjee Road, Kolkata, West Bengal - 700001. T: 033- 2248 0135/22131680, F: 22430490, [email protected] Cement 4 Kalinga Calciners Ltd The company is interested in setting up a Calcined Petroleum Coke plant at Kalinganagar. Kalingana- gar Orissa NA G M Goenka, Head of Dept, Udayabata. Post Paradeepgarh, District Jagatsingpur, Paradip, Orissa - 754 Coke

N Organization Project Title / Details Location Budget ... · PDF fileN Organization Project Title / Details Location Budget ... [email protected] . 3 ... N Organization Project

  • Upload
    lecong

  • View
    223

  • Download
    3

Embed Size (px)

Citation preview

Page 1: N Organization Project Title / Details Location Budget ... · PDF fileN Organization Project Title / Details Location Budget ... cpc@maniyargroup.com . 3 ... N Organization Project

1

LIST OF PROJECTS IN INFRASTRUCTURE AND CONSTRUCTION

Conceptual/Planning Stage

N Organization Project Title / Details Location Budget Euro*

Contacts Sector

1 A2Z

Maintenance &

Engineering

Services

Gurgaon based engineering, procurement and construction (EPC)

company plans to set up a 500-MW biomass power plant from

municipal solid-waste, within two years. Funding planned through

IPO and internal accruals.

NA 521.12 Mamta Joshi, CEO (Admin), 5th & 6th

Floor, Enkay Square 448–A, Udyog

Vihar, Phase – V, Gurgaon – 122016,

Haryana. T: 0124 - 4517600, 4776100,

F: 4380014, (Amit Mittal, CMD)

Biomass

Energy

2 Jaiprakash

Associates Ltd

The company plans to expand its clinker and cement

manufacturing capacity of existing unit Baga in Himachal

Pradesh. The current capacity is 4 MTPA and would be further

expanded by 2.5 MTPA by 2012.

Baga

Himachal

Pradesh

217.13 Rahul Kumar, Chief Financial Offi cer,

Jaypee Vasant Continental, Vasant

Vihar, New Delhi - 110057. T: 011-

26140101 / 54099, F: 26151177,

[email protected]

Cement

3 Orient Paper &

Industries Ltd

The company is into paper, cement and electrical goods

manufacturing. This company is contemplating plans to scale up

its cement production capacity from 5 MTPA to 15 MTPA in the

next few years. This expansion will be carried out mainly by

setting up greenfield projects. These projects are likely to be

announced in the next six months.

NA NA 9/1, R. N. Mukherjee Road, Kolkata,

West Bengal - 700001. T: 033- 2248

0135/22131680, F: 22430490,

[email protected]

Cement

4 Kalinga

Calciners Ltd

The company is interested in setting up a Calcined Petroleum

Coke plant at Kalinganagar.

Kalingana-

gar Orissa

NA G M Goenka, Head of Dept,

Udayabata. Post Paradeepgarh, District

Jagatsingpur, Paradip, Orissa - 754

Coke

Page 2: N Organization Project Title / Details Location Budget ... · PDF fileN Organization Project Title / Details Location Budget ... cpc@maniyargroup.com . 3 ... N Organization Project

2

141. T: 033-22551801-3,

[email protected]

Page 3: N Organization Project Title / Details Location Budget ... · PDF fileN Organization Project Title / Details Location Budget ... cpc@maniyargroup.com . 3 ... N Organization Project

3

5 The Orissa

Renewable

Energy

Development

Agency

(OREDA)

Plans to setup a renewable energy park at Nawarangpur spread

over 2-3 acre of land. The detailed project report is being

prepared. The completion will take one year from the work

commencement date.

Nawrang-

pur Orissa

0.17 AK Chaudhary, Deputy Director, S-

3/59, Mancheswar Industrial Estate,

Bhubaneswar-751010, T: 0674-580660,

M: 09861310407

Energy

Park

6 Ishan

Developers &

Infrastructure

Ltd/Best

Western India

These companies have signed an agreement to set up Premier

Hotel Mohali near Chandigarh. The hotel will be built in 2 phases

consisting of 239 rooms and suites. The first phase will be

completed by March 2012.

Mohali

Chandigarh

(U.T.)

34.74 BB Geol, CFO, Ishan Group of

Companies, S.C.O. 24-25, Sector 33-D

Chandigarh. T: 0172-5026664-69, F:

2623025, [email protected] (R K

Sharma, MD)

Hospitality

7 The company is setting up an inland container depot (ICD) at

Kalinganagar. The Ministry of Commerce has recently accorded

approval to this project. This logistic park will cater to the

requirements of the steel units coming up in the area.

Kalingana-

gar Orissa

NA Logistics

Park

8

Apeejay

Infralogistics Pvt

Ltd The company is setting up Haldia inte-grated logistics park

spread over 90 acre. This project will be executed in phases. The

project Phase-I will come up by year end comprising ICD,

warehousing facilities, trade facilitation centre and other facilities.

Haldia West

Bengal

34.74

Renu Kakkar, Corp Comm, Apeejay

House, 15 Park Street, Kolkata 700016.

T: 033- 44035455-58, F: 22172075, M:

9980946435, rkakkar@apee-

jaygroup.com, (Sourav Daspatnaik,

Director) [email protected],

(Sourav Daspatnaik, Director)

Logistics

Park

9 Gopalpur Ports

Ltd (GPL)

This company is a special purpose vehicle formed for developing

the minor port at Gopalpur into an all-weather port. GPL has

plans to construct eight stone embankments off the Ganjam

coast. Clearance from the MoEF are not yet received.

Ganjam

Orissa

4.69 M M Moharana, Director - Operations,

Arjeepalli, VIA Chhatrapur, Ganjam,

Orissa -761020. T: 06811-257699,

257799, F: 263383,

www.gopalpurports. com

Port

Page 4: N Organization Project Title / Details Location Budget ... · PDF fileN Organization Project Title / Details Location Budget ... cpc@maniyargroup.com . 3 ... N Organization Project

4

10 Gopalpur Ports

Ltd (GPL)

The port authorities plans to implement the second stage of

Phase-I project comprising construction of deep-water direct

berthing facility. The financial closure is achieved in this regard.

The port authorities had signed a loan agree-ment with a

consortium of 11 banks for a total amount of Rs 848.78 cr.

Ganjam

Orissa

156.33 M M Moharana, Director - Operations,

Arjeepalli, VIA Chhatrapur, Ganjam,

Orissa -761020. T: 06811-257699,

257799, F: 263383,

www.gopalpurports.com

Port

11 Dumraon

Textiles Ltd

Plans to set up a 2 MW husk based captive power plant. The

environment clearance is pending. The work is expected to start

in a couple of months.

Buxar Bihar NA Pawan Patwari, Director, 26A, Camac

Street, Park Street, Kolkata, West

Bengal-700016, T: 033-22873025,

M: 09831079279

Power

12 Ministry of

Power, Govt of

India

Requests for Qualification (RFQs) for the Surguja Ultra Mega

Power Project (UMPP) is current invited. This UMPP project will

have a capacity of 4,000 MW.

Chhattisgarh NA N D Tyagi, CEO, Power Finance Corpo-

ration (PFC), Urjanidhi, 1, Barakhamba

Lane, Connaught Place, New Delhi -

110001. T: 011-23456504, 23456000,

www.pfcindia.com

Power

13 The corporation has recently invited expression of interest for a

JV partner to setup 3200 MW coal based power plant at Dhopave

in Konkan. The JV model with 26% stake to Mahagenco would

ensure that the state gets 100% power generated at these plants

as Mahagenco will be able to leverage supply of coal and land.

Dhopave

Maharashtra

NA

14 Mahagenco

The corporation has recently invited expression of interest for a

JV partner to setup 1600 MW coal based power plant at Dhondai

in Dhule District. The JV model (26% stake to Mahagenco) would

ensure the State gets 100% power generated at these plants as

Mahagenco will be able to leverage supply of coal and land.

Dhule

District

Maharashtra

NA

AT Dawlekar, Executive Director -

Projects, Prakashgad, Plot No. G-9,

Bandra (East), Mumbai - 400051. T:

022-26478121, 26474211, F: 26476749

Power

Page 5: N Organization Project Title / Details Location Budget ... · PDF fileN Organization Project Title / Details Location Budget ... cpc@maniyargroup.com . 3 ... N Organization Project

5

15 Tata Power Ltd The company plans to start construction of 1,600-MW power

project in Raigad district by September 2010. This project will be

based on imported coal.

Raigad

District

Maharashtra

NA Shalini Singh-CCM, Corporate Center,

Block A, 34 Sant Tukaram Road,

Carnac Bunder, Mumbai - 400009. T:

022-66658748 / 7511, F: 66658626,

[email protected] (Prasad

Menon, MD)

Power

16 Sonebhadra

Power

Generation

Company Ltd

Plans to set up for 3x660 MW Dopaha Thermal Power project in

Sonebhadra District. So far, discussions are on with the State

Government with regard to signing of the MOU. After approval is

received the detailed project report will be prepared.

Lucknow

Uttar

Pradesh

NA VK Verma, Chief Engineer (Project),

3rd Floor, Shakti Bhawan Extension,

14-Ashok Marg, Lucknow, Uttar

Pradesh. T: 522- 2287867. F: 2288484,

[email protected]

Power

17 Prajay

Engineers

Syndicate Ltd

This company plans development of residential town ship of

approximate 45,00,000 square feet in Hyderabad. In this regard,

the company has received foreign investment.

Hyderabad

Andhra

Pradesh

NA Sujata Rao, Project Manager, 8-2-

293/82/APlot # 1091,Road#41, Near

Peddamma Temple Jubilee Hills,

Hyderabad -500033. T: 040 -

66222999, F: 66222966,

[email protected]

Real

Estate

18 The company is planning to build a residential project at

Ambattur. The total area floor space of the project would be

around 6-7 lakh sft.

Ambattur

Tamil Nadu

36.48 Real

Estate

19

Vijay Shanthi

Builders Ltd

(VSBL) The company is planning a premium residential project at

Thiruvanmiyur.

Thiruvan-

miyur Tamil

Nadu

8.68

Jayanti, Sales Manager, Vijay Complex,

No 3, Blackers Road, Mount Road,

Chennai - 600002. T: 044-28582336,

M: 09790716666,

[email protected]

(Suresh Jain, MD)

Real

Estate

20 Rail Land

Development

Authority (RLDA)

RLDA is responsible for the commercial development of vacant

Railway land for revenue generation. The authority is likely to

invited private participation for exploiting about 33,000 sq mtr of

Kolkata

West Bengal

NA Anil Kumar Gupta, Project Manager,

IRCON Office Compound, Next to

Safdarjung Railway Station, Moti Bagh

Real

Estate

Page 6: N Organization Project Title / Details Location Budget ... · PDF fileN Organization Project Title / Details Location Budget ... cpc@maniyargroup.com . 3 ... N Organization Project

6

unused space in possession with the Kolkata Metro Railway. The

authority intends to develop air-space and railway land at six

Metro Railway stations — Central, Chandni Chowk, Mahanayak

Uttam Kumar, New Garia and Masterda Surya Sen — through a

long-term revenue sharing model.

I, New Delhi - 110021. T: 011-

24122834/5, F: 24104793

Page 7: N Organization Project Title / Details Location Budget ... · PDF fileN Organization Project Title / Details Location Budget ... cpc@maniyargroup.com . 3 ... N Organization Project

7

21 Andhra Pradesh

State Rural

Roads De-

velopment

Agency

(APSRRDA)

This agency is implementing Phase VI for construction of rural

roads in Andhra Pradesh under Pradhan Mantri Gram Sadak

Yojana (PMGSY). The Ministry of Rural Development has

released grant in aid of Rs 33 cr in this regard. The sum is from

the special window created in NABARD.

Andhra

Pradesh

5.73 R. Venkateswara Rao, Cheif Engineer,

SRTGN Bhavan, Erramanzil Colony,

O/O ENC PR Hyderabad. T: 040-

23321306

Roads/

Highways

22 Gujarat State

Rural Roads

Development

Agency

(GSRRDA)

This agency is implementing Phase- VIII, for construction of rural

roads in Gujarat under Pradhan Mantri Gram Sadak Yojana

(PMGSY).The Ministry of Rural Development has released grant

in aid of Rs 29 cr in this regard. The sum is from the special

window created in NABARD.

Gujarat 5.04 H D Vala, CEO, R&B Department,

Block No.-14/3, New Sachivalaya,

Gandhinagar. T: 02712-23220280,

23251816.

Roads/

Highways

23 Ministry of Road

Transport and

Highways, Govt

of India

The five national highways approved by the ministry are

Hamirpur-Sujanpur-Palampur 60-km highway, Brahmpukhar-

Bilaspur-Sarkaghat 12- km stretch, Bharmaur-Pathankot 133-km,

106-km Taradevi-Nalagarh road and Chandigarh-Baddi-

Shalaghat of 84-km length.

Himachal

Pradesh

NA S K Marva, Chief Engineer - North East

Projects, (P 10), Transport Bhavan,

Room No. 345, 3rd Floor No. 1,

Parliament Street, New Delhi - 110001.

T: 011-23719070. F: 23730647.

Roads/

Highways

24 Jammu &

Kashmir State

Rural Roads

Development

Agency

(JKSRRDA)

This agency is implementing Phase VII for construction of rural

roads in Jammu & Kashmir under Pradhan Mantri Gram Sadak

Yojana (PMGSY). The Ministry of Rural Development has

released grant in aid of Rs 20 cr in this regard. The sum is from

the special window created in NABARD.

Jammu &

Kashmir

3.47 Khalid Muzaffer, Cheif Engineer,

Engineering Complex Rajbagh Bund

Srinagar. T: 0191-2312435

Roads/

Highways

25 Karnataka Rural

Roads

Development

Agency

This agency is implementing Phase VIII for construction of rural

roads in Karnataka under Pradhan Mantri Gram Sadak Yojana

(PMGSY). The Ministry of Rural Development has released grant

in aid of Rs 131.11 cr in this regard. The sum is from the special

Karnataka 22.77 P S Prakash Kumar, Chief Engineer,

2nd Flr, Kscc Bldg,Nirman Bhavan, Dr

Rajkumar Rd, Rajajinagar, Bangalore -

560010. T: 080-23376145, 23376096,

Roads/

Highways

Page 8: N Organization Project Title / Details Location Budget ... · PDF fileN Organization Project Title / Details Location Budget ... cpc@maniyargroup.com . 3 ... N Organization Project

8

(KRRDA) window created in NABARD. 23376124, 23376112, F: 23376122

Page 9: N Organization Project Title / Details Location Budget ... · PDF fileN Organization Project Title / Details Location Budget ... cpc@maniyargroup.com . 3 ... N Organization Project

9

26 Maharashtra

Rural Roads

Development

Association

(MRRDA)

This agency is implementing Phase VII, for construction of rural

roads in Maharashtra under Pradhan Mantri Gram Sadak Yojana

(PMGSY).The Ministry of Rural Development has released grant

in aid of Rs 134.18 cr in this regard. The sum is from the special

window created in NABARD.

Maharashtra 23.31 Sudhir Thakare, CEO, 1st Floor, Main

Bldg, RD & Water Conservation Dept.,

Mantralaya, Mumbai-400032. T: 022-

22025201

Roads/

Highways

27 Geodesic

Techniques Pvt

Ltd

The company has proposed a 59-km monorail system for

Bangalore.The project is under evaluation by the Bangalore

Metropolitan Land and Transport Authority. The final clearance of

the Karnataka Govt is awaited and thereafter bids will be invited

for this project.

Bangalore

Karnataka

NA K S Kartik, Business Development

Officer, # 31, HM Elegance Museum

Road, Bangalore-560001. T: 080-

42971200/18, F: 42971219,

[email protected]

Transport

28 The State Government plans to implement a drinking water

scheme with a capacity to supply 270 million litres per day in

Vellore district.

Vellore

District

Tamil Nadu

312.67 Leelavati, Executive Engineer, Northern

Region, No.8, 1st East Main Road,

Gandhi Nagar, Vellore-632006. T:

0416-2243201, 2243743, F: 2242294,

[email protected]

Water

Sector

29 The State Government plans to take up drinking water projects in

Virudunagar, Pudukottai, Kovilpatti, Kayalpatti, Tiruvanamallai,

Pudukottai and Chennai.

Tamil Nadu 173.71

30

Government of

Tamil Nadu

The State Government also plans to take water connectivity

projects with the sup-port of Union Government for 7,000 rural

households.

Tamil Nadu 66.11

Raghunathan, Chief Engineer, 31,

Kamaraj Salai, Chepauk, Chennai - 5.

T: 044 28416420, 28412341, F:

2247368

Water

Sector

*figures are approximate (in million)

CONTRACT AWARDED

N Organization Project Title / Details Location Budget Contacts Sector

Page 10: N Organization Project Title / Details Location Budget ... · PDF fileN Organization Project Title / Details Location Budget ... cpc@maniyargroup.com . 3 ... N Organization Project

10

Euro*

Page 11: N Organization Project Title / Details Location Budget ... · PDF fileN Organization Project Title / Details Location Budget ... cpc@maniyargroup.com . 3 ... N Organization Project

11

31 Consolidated

Construction

Consortium Ltd

(CCCL)

This company has bagged Goa airport

construction project from Airport Authority of

India. The contract comprises building a 5 lakh

sq.ft terminal, with a capacity to handle over 8

lakh passengers annually, and a 1.6 lakh sq.ft

multi-level car park for the airport.

Goa 34.74 1) K. Nellaiappan, Manager -Business

Development, No 5, Second Link Street, CIT

Colony, Mylapore, Cennai-600004, Tamil Nadu.

T: 044-23454500, 24661083, F: 24990225 2)

PV Subbayam, Sr. DGM, No 5, Second Link

Street, CIT Colony, Mylapore, Chennai-600004,

Tamil Nadu. T: 044-23469300, 23454500,

24661083, F: 24990225

Airport

32 Larsen & Toubro

Ltd

The Metallurgical, Material Handling & Water

Operating Company of Larsen &Toubro has

bagged contract from Hindal-co Industries for

an aluminium rolling mill complex at its Hirakud

unit. The order is scheduled for completion in

16 months.

Hirakud

Orissa

36.65 K. Venkataramanan, President (Engineering

and Construction), Saki-Vihar Road, P.O. Box

8901, Powai, Mumbai-400072, T: 022-

67050505, F: 67051462, [email protected]

Aluminium

33 Sadbhav

Engineering Ltd

The company has been awarded the project/

works consisting of Two Jobs by Western Coal

Fields Ltd. (A subsidiary of Coal India Ltd.)

NA 15.99 Parul Shah, Sr. Business Develop-ment Officer

Sadbhav House Opp Law Garden Police

Chowki, Ellisbridge, Ahmedabad-

380006.Gujarat. T: 079-26463384, F:

26400210. parul.shah@ sadbhaveng. com,

(Vishnubhai M Patel, MD)

Coal

34 ARSS

Infrastructure

Projects Ltd

The company has received an order from

RITES Ltd, Nagpur for undertaking earthwork

and constructing bridges, supply of permanent

way material, supply of ballast and permanent

way linking for proposed private railway siding

for NTPC Mauda, Nagpur

Nagpur

Maharashtra

19.88 Gyanaranjan Bihari, Tender Manager, Plot No

38, Sector-A, Zone-D, Mancheswar Industrial

Estate, Bhubaneswar-751010. Orissa. T: 0674-

2588552 2588554, F: 2585074, M:

09437578023, gyanabihari@gmail. com

(Subhash Agarwal, Chairman)

Construction

Page 12: N Organization Project Title / Details Location Budget ... · PDF fileN Organization Project Title / Details Location Budget ... cpc@maniyargroup.com . 3 ... N Organization Project

12

35 Punj Lloyd Ltd This company has bagged contract from the

Rajiv Gandhi Institute of Petroleum Technology

(RGIPT) to construct their technical institute at

Jais in Rae Bareli, Uttar Pradesh. The scope of

work entails civil, structural and associated

work including site development for setting up

of RGIPT. This would involve construction of 27

building consisting of the adminis-tration and

library building, auditorium, community centre,

lecture halls, commer-cial centre, staff housing

facility, hostels and healthcare centre. The

order will be executed over a period of 24

months.

Rae Bareli

Uttar

Pradesh

NA Bhavna Dayal, Head PR, P.K. Gupta, Director,

78 Institutional Area, Sector 32, Gurgaon,

Haryana - 122001. T: 0124- 2620123, 2620152,

F: 2620111.

Construction

36 ARSS

Infrastructure

Projects Ltd

The company has received a new work order

from Northeast Frontier Railway,

Maligaon/Guwahati on June 04, 2010.

Guwahati

Assam

7.21 Gyanaranjan Bihari, Tender Manager, Plot No

38, Sector - A, Zone - D, Mancheswar Industrial

Estate, Bhubaneswar-751010. Orissa. T: 0674-

2588552 2588554, F: 2585074, M:

09437578023, [email protected]

(Subhash Agarwal, Chairman)

Railways

37 PBA Infrastructure

Ltd

The company has got contract from

Maharashtra Industrial Development

Corporation for the construction of WMM road

with asphalt treatment including central road

divider and allied work in IT Park-II (Phase-I).

The location is Nagpur (Butibori) Industrial

Area.

Nagpur

Maharashtra

2.49 Sunil Wadhawan, Project Manager, 611/3,

V.N.Purav Marg, Chembur, Mumbai - 400071.

T: 022-67978200, 67973767, F: 25229699,

[email protected], www.pbail.com

Roads/

Highways

Page 13: N Organization Project Title / Details Location Budget ... · PDF fileN Organization Project Title / Details Location Budget ... cpc@maniyargroup.com . 3 ... N Organization Project

13

38 Maytas Infra Ltd

Bagged a contract from ITNL ENSO Rail

Systems Ltd (IERS) for design and construction

of elevated viaduct (single/ double line) and six

stations for Rapid Metro Rail Gurgaon Ltd for a

total value of Rs 185.32 crore.

Gurgaon

Haryana

32.19 Tarun Udwala, Dy. Manager - Corporate

Communications, 285 6-3-1186 / 5 / A, 3rd

Floor, Amogh Plaza, Begumpet, Hyderabad -

500016. T: 040-23408100, 40037800, F:

23401107, [email protected],

www.maytasinfra.com

Transport

JOINT VENTURE

39 Indian Oil

Corporation(IOC)

The company is likely to an agreement with

NPCIL to form a joint venture to set up nuclear

power plant.

NA NA

V K Mittal, GM - Project, 3079 / 3, JB Tito Marg,

Sadiq Nagar, New Delhi - 110049. T: 011-

26260000, 24360443, www.iocl.com

Power

40 Indian Oil

Corporation(IOC)

The company has joined hands with Tata

Power for a thermal plant to be set up in Orissa

for the Paradip refi nery and petrochemical

complex. The Tatas will hold a 74 per cent

stake in the venture.

Paradip

Orissa NA

V K Mittal, GM - Project, 3079 / 3, JB Tito Marg,

Sadiq Nagar, New Delhi - 110049. T: 011-

26260000, 24360443, www.iocl.com

Power

*figures are approximate (in million)

Page 14: N Organization Project Title / Details Location Budget ... · PDF fileN Organization Project Title / Details Location Budget ... cpc@maniyargroup.com . 3 ... N Organization Project

14

COMMISSIONED PROJECT

N Organization Project Title / Details Location Budget Euro*

Contacts Sector

41 Airport Authority of

India

The new integrated terminal building of

Mangalore airport was inaugurated on 15th

May 2010. As part of the upgrada-tion

project, the work order for extending the

runway would be issued soon, cargo

complex will also come up.

Mangalore

Karnataka

31.27 Peter Abraham, Director, Airports Authority of India

Mangalore Airport Mangalore, T: 0824-2220400, F:

2254175, [email protected]

Airport

42 Consolidated

Construction

Consortium Ltd

(CCCL)

This company is implementing Chennai

Airport Project. The work on the Chennai

airport terminal expansion is likely to be

completed by August 2011.

Chennai

Tamil Nadu

NA 1) K. Nellaiappan, Manager -Business Development,

No 5, Second Link Street, CIT Colony, Mylapore,

Chennai-600004, Tamil Nadu. T: 044-23454500,

24661083, F: 24990225 2) PV Subbayam, Sr. DGM,

No 5, Second Link Street, CIT Colony, Mylapore,

Chennai-600004, Tamil Nadu. T: 044-23469300,

23454500, 24661083, F: 24990225

Airport

43 National Aviation

Company of India

Ltd (NACIL) /

Boeing

Plans to set up an aircraft maintenance

base along with Boeing at Nagpur in three

years time. Lease agreement is signed

between Air India and Maharashtra Airport

Development Company Ltd (MADC) for 50

acre land in the special economic zone

(SEZ) near Nagpur airport for this project.

Nagpur

Maharashtra

NA K Unnikrishnan, Additional General Manager -

NACIL, Old Airport, Santacruz (East), Mumbai -

400029. T: 022- 26263558,

[email protected]

Aviation

Page 15: N Organization Project Title / Details Location Budget ... · PDF fileN Organization Project Title / Details Location Budget ... cpc@maniyargroup.com . 3 ... N Organization Project

15

44 FACT-RCF

Building Products

Ltd (FRBL)

The joint venture between FACT and

Mumbai-based RCF is constructing a new

plant within the compound of FACT Kochi

Division at Ambalamedu. The plant will

manufacture wall panels, wall plaster, wall

putty and other products from gypsum, a

by-product in the production of phosphor-ic

acid. The commissioning of this project is

expected shortly.

Kochi Kerala NA FACT-CD Campus, Ambalamedu, Ernakulam Dist,

Kerala-682303. T: 0484-2721971, F: 2721972,

[email protected]

Building

Materials

45 Municipal

Corporation of

Delhi

The municipal corporation plans

construction of conventional underground

multilevel car parking at Central Market

Park Ashok Vihar in Rohini zone. Tenders

evaluation process is on. The completion

will take 18 months from the

commencement date.

Delhi NA M P Gupta, Executive Engineer (Project), Room No.

31, Ambedkar Stadium, Delhi Gate, Delhi-02, Delhi.

T: 011-23988845, M: 9717788605

Car Parking

46 Hindustan

Construction

Company Ltd

The company got an order from Nuclear

Power Corporation of India Ltd for civil

works of the main plant of Rajasthan

Atomic Power Project (RAPP), Units 7 & 8

(2x700 MW) PWHR at Rawatbhata, Kota,

Rajasthan. The completion period is of 50

months.

Kota

Rajasthan

154.23 Sandeep Sawant, DGM-Media Relations, Hincon

House, Lal Bahadur Shastri Marg, Vikhroli West,

Mumbai-400083. Maharashtra. T: 022-25775959, F:

25777568. sandeep.sawant@hccindia. com, ( Ajit

Gulabchand, CMD)

Construction

47 Adani-Welspun

Exploration Ltd

(AWEL)

The company will begin drilling at its

onshore block in the Cambay basin close

to Bharuch shortly.

Gujarat NA Devendra Amin, President, Sambhaav Press

Building, Nr Judges Bunglow, Bodakdev,

Ahmedabad – 380015. T: 079-25556900, 25556850,

Oil & Gas

Page 16: N Organization Project Title / Details Location Budget ... · PDF fileN Organization Project Title / Details Location Budget ... cpc@maniyargroup.com . 3 ... N Organization Project

16

F: 25556846, [email protected]

Page 17: N Organization Project Title / Details Location Budget ... · PDF fileN Organization Project Title / Details Location Budget ... cpc@maniyargroup.com . 3 ... N Organization Project

17

48 GAIL Ltd The company plans to commence work on

the 800-km pipeline shortly. This pipeline

will be used to transport gas from the LNG

terminal in Dabhol to Bidadi near

Bangalore.

Dabhol Ma-

harashtra

347.41 Jignesh Vasavada, Dy. Manager -Corporate

Communications, 16, Bhikaji Cama Place, New Delhi

- 110066. T: 011-26172580, 26182955, ext: 6771, F:

26185941, M: 09871039345

Pipeline

49 Cairn India Ltd The company plans to commission its 590-

KM heated crude oil pipeline, from its

Barmer field to near the Gujarat coast,

early next month.

Barmer

Rajasthan

NA Manu Kapoor, Director - Corporate Affairs, 3rd & 4th

Floor, Vipul Plaza, Suncity, Sector 54, Gurgaon -

122002. T: 0124-4593000, 2703000, F: 2889320,

cilmediainfo@cairnindia. com (Rahul Dhir, CEO)

Pipeline

50 Cochin Port Trust

(CPT)

The port trust plans to set up an interna-

tional bunkering terminal to supply fuel to

foreign vessels calling at port.

Kochi Kerala NA Jay Karthikeyan, Chief Engineer, Willingdon Island,

Cochin - 682 009. T: 0484-2666414, 2666871,

2668122, F:2668163, [email protected]

Port

51 Ministry of Power,

Govt of India

Requests for Qualification (RFQs) for the

Bedabahal Ultra Mega Power Project

(UMPP) is current invited and the deadline

for submitting the proposal is July 31. This

UMPP project will have a capacity of 4,000

MW.

Chhattisgarh NA N D Tyagi, CEO, Power Finance Corporation (PFC),

Urjanidhi, 1, Barakhamba Lane, Connaught Place,

New Delhi -110001. T: 011-23456504, 23456000,

www.pfcindia.com

Power

52 Gammon

Infrastructure

Projects Ltd

The company plans setting up a 250 MW

coal based power plant, in Western India.

The letter of allocation for supply of water

for its operations is received.

NA NA Satish Chandran, Company Secretary, Gammon

House, Veer Savarkar Marg, P O Box No 9129,

Prabhadevi, Mumbai-400025. T: 022- 6661400, F:

67444025. (R L Telang, VP - Marketing)

Power

53 Neyveli Lignite

Corporation Ltd

The company has dedicated Unit-I of the

Barsingsar Thermal Power Plant and

announced the inauguration of Unit-II

synchronization of the Barsingsar Power

Rajasthan NA S RajaGopal, CEO-Projects, Block - 1, Neyveli -

607801, Cuddalore District, Tamil Nadu. T & F :

04142- 252205, F: 252645, M: 09443369327,

[email protected], (A R Ansari, CMD)

Power

Page 18: N Organization Project Title / Details Location Budget ... · PDF fileN Organization Project Title / Details Location Budget ... cpc@maniyargroup.com . 3 ... N Organization Project

18

Plant.

Page 19: N Organization Project Title / Details Location Budget ... · PDF fileN Organization Project Title / Details Location Budget ... cpc@maniyargroup.com . 3 ... N Organization Project

19

54 National Highway

Authority of India

(NHAI)

Request for Qualification was recently

invited for the project of design,

engineering, fi nance, construction,

operation & maintenance of 6 laning of

Kishangarh Udaipur Ahmedabad Section

of NH 79A, 79, 78 & NH -8 on BOT (Toll)

Basis in the State of Gujarat & Rajasthan.

Gujarat 891.81 B K Thakur, Deputy General Manager (MC II), G-5&

6, Sector-10, Dwarka, New Delhi-110075. T: 011-

25074100 Ext. 2251, F: 25074100

Roads/

Highways

55 CCCL

Infrastructure Ltd

This company is a subsidiary of CCCL and

is setting up a food processing SEZ in

Tuticorin.

Tuticorin

Tamil Nadu

NA 1) K. Nellaiappan, Manager - Busi-ness

Development, No 5, Second Link Street, CIT Colony,

Mylapore, Chennai-600004, Tamil Nadu. T: 044-

23454500, 24661083, F: 24990225 2) PV Sub-

bayam, Sr. DGM, No 5, Second Link Street, CIT

Colony, Mylapore, Chennai-600004, Tamil Nadu. T:

044-23469300, 23454500, 24661083, F: 24990225

SEZ

56 Rapid Metro Rail

Gurgaon Ltd

The company a joint venture between

ITNL, ENSO Rail Systems Ltd, DLF Metro

Ltd and IL&FS, is developing the rail metro

link in Gurgaon. The project will be

executed on build, operate and transfer

basis and has achieved financial closure.

Gurgaon

Haryana

188.99 The IL&FS Financial Centre’, Plot No. C 22, G Block,

Bandra-Kurla Complex, Bandra (East), Mumbai 400

051. T: 022- 26533333

Transport

*figures are approximate (in million)

Page 20: N Organization Project Title / Details Location Budget ... · PDF fileN Organization Project Title / Details Location Budget ... cpc@maniyargroup.com . 3 ... N Organization Project

20

PROJECTS UNDER IMPLEMENTATION STAGE

N Organization Project Title / Details Location Budget Euro*

Contacts Sector

57 Airports Authority

of India (AAI)

Plans to install solar panels on the roof of the

new terminal at Leh Airport that will be used to

generate about 100kw and use that to heat up

water. This green project is likely to be ready in

next two years.

Leh Jammu &

Kashmir

0.86 Piyush Joshi, Director (Planning), Rajiv Gandhi

Bhawan, Safdarjung Airport, New Delhi -

110003. T: 011- 24610517, 24632950

Airport

58 Grand Luxe

Hotels Ltd

Chennai based company is refurbishing Queen’s

Palace hotel spread over 3.5 acre at Pudukottai.

The hotel in Pudukottai will be converted into 27-

room luxury hotel.

Pudokottai

Tamil Nadu

6.94 K Shriram, Head (Finance), Pallavaram -

Thuraipakkam 200 Feet Road, Okkiam

Thuraipakkam, Chennai - 600 097. T: 044-

24967013, 24967020, F: 24967070,

[email protected], www.etlinfra.com

Hospitality

59 Uniworld

Logistics

The company is setting up an integrated logistics

park in Mumbai. The work has started and likely

to complete in 5 months.

Navi Mumbai

Maharashtra

13.03 Nihar Parida, Vice President - Logistics &

Marketing, #225, S.T Bed Extn, 5th Main, 4th

Block, Koramangala, Ban-galore - 560034. T:

080-25633366, M: 09910897083,

[email protected], (Prem

Kumar M, Group Managing Director & CEO)

Logistics

Park

60 Sri City Pvt Ltd This company is developing Sri City Logistics &

Warehousing Park spread over 500 acre near

TADA near Chennai bordering Andhra Pradesh.

250-acre will be for a Free Trade Warehousing

Zone (FTWZ) and another 250 acre in the

domestic industrial zone. The project will be

Tamil Nadu NA Raghini Peter, Vice President -Business

Development, 85, Kutchery Road, Mylapore,

Chennai, Tamil Nadu - 600004. T: 044-

39402000, 24616768, M: 09840444085,

[email protected]

Logistics

Park

Page 21: N Organization Project Title / Details Location Budget ... · PDF fileN Organization Project Title / Details Location Budget ... cpc@maniyargroup.com . 3 ... N Organization Project

21

executed in 3 phases. Phase-1 will commission

by end of 2010. So far, the preliminary work has

started.

Page 22: N Organization Project Title / Details Location Budget ... · PDF fileN Organization Project Title / Details Location Budget ... cpc@maniyargroup.com . 3 ... N Organization Project

22

61 Adani Welspun

Exploration Ltd

(AWEL)

The company is a 65:35 venture between Adani

Enterprises Ltd and Welspun Natural Resources

Pvt Ltd. The company has recently commenced

exploratory drilling in the Palej block in Cambay

Basin near Bharuch.

Bharuch

District Gujarat

NA Devendra Amin, President, Sambhaav Press

Building, Nr Judges Bunglow, Bodakdev,

Ahmedabad – 380015. T: 079-25556900,

25556850, F: 25556846, [email protected]

Oil & Gas

62 Jindal Power Ltd Setting up a 4000 MW hydroelectric power

project in Etalin, Arunachal Pradesh. The

projects in Arunachal Pradesh are being

developed through joint ventures with Hydro

Power Development Corporation of Arunachal

Pradesh Ltd. (HPDCAPL).

Etalin

Arunachal

Pradesh

NA Shoubhik Khamrohi, Asst. Manager, 2nd Floor,

DCM Building, Plot No: -94, Sector- 32,

Gurgaon- 122001, T: 0124-6689000, F:

6689101.

Power

63 Jindal Power Ltd Setting up a 2400 MW (4x600 MW) power

project in Chhattisgarh. This project is expected

to be completed by 2013.

Chhattisgarh 2329.42 Shoubhik Khamrohi, Asst. Manager, 2nd Floor,

DCM Building, Plot No: -94, Sector- 32,

Gurgaon- 122001, T: 0124-6689000, F:

6689101.

Power

64 Jindal Power Ltd The company is setting up 1,320 MW at Dumka

Equipment supplier is not yet finalised.

Dumka

Jharkhand

NA Shoubhik Khamrohi, Asst. Manager, 2nd Floor,

DCM Building, Plot No: -94, Sector- 32,

Gurgaon- 122001, T: 0124-6689000, F:

6689101.

Power

65 Jindal Power Ltd The company is setting up 660 MW coal based

power project in Godda. Equipment supplier is

not yet finalised.

Godda

Jharkhand

NA Shoubhik Khamrohi, Asst. Manager, 2nd Floor,

DCM Building, Plot No: -94, Sector- 32,

Gurgaon- 122001, T: 0124-6689000, F:

6689101.

Power

Page 23: N Organization Project Title / Details Location Budget ... · PDF fileN Organization Project Title / Details Location Budget ... cpc@maniyargroup.com . 3 ... N Organization Project

23

66 A2Z Maintenance

& Engineering

Services

Gurgaon based engineering, procurement and

construction (EPC) company is setting up three

co-generation power plants in collaboration with

sugar mills on a Build-Own-Operate-Transfer

(BOOT) model for a period of 15 years. A2Z will

provide steam and power for operating the

manufacturing process of the sugar mills during

the crushing season.

Punjab NA Mamta Joshi, CEO (Admin), 5th & 6th Floor,

Enkay Square 448–A, Udyog Vihar, Phase – V,

Gurgaon – 122016, Haryana. T: 0124 -

4517600, 4776100, F: 4380014, (Amit Mittal,

CMD)

Power

67 Sri Krishna

Developers

The company is coming up with a commercial

office space project named ‘Krishe Sapphire’ in

Hyderabad. This project will have 6,00,000 sq. ft

office space and is expected to be ready by

December 2010. The funding is through a mix of

debt, equity and internal accruals.

Hyderabad

Andhra

Pradesh

60.79 Suresh Sarma, Marketing Manager, Krishe

Gardens, Opp Begumpet Police Stn, Huda

Lane, Begumpet, Hyderabad - 500016. T: 040-

23201829, 23201379, 23202288,

www.krishegardens.com (Saji Koshy Paul, Vice-

President)

Real

Estate

68 Sri Krishna

Developers

The company is coming up with a one luxury

residential complex project named ‘Krishe Valley

‘in Hyderabad. This project will have premium

apartments and is expected to be ready by

December 2011.

Hyderabad

Andhra

Pradesh

13.89 Suresh Sarma, Marketing Manager, Krishe

Gardens, Opp Begumpet Police Stn, Huda

Lane, Begumpet, Hyderabad - 500016. T: 040-

23201829, 23201379, 23202288,

www.krishegardens.com (Saji Koshy Paul, Vice-

President)

Real

Estate

69 Acron Developers

Pvt Ltd

Vivara Residences’ is a real estate project

addressing senior citizens housing category. The

project is on and the first set of Vivara homes will

be ready in 2-3 months. The project comprises

52 apartments.

Arpora Goa NA HH Fernandes, Marketing & Sales Consultant,

591, Montemar, Retreat House Road, Baga,

Goa 403 516. T: 0832-2276147, 2276342, F:

2277706 (Dr John Britto, Director)

Real

Estate

Page 24: N Organization Project Title / Details Location Budget ... · PDF fileN Organization Project Title / Details Location Budget ... cpc@maniyargroup.com . 3 ... N Organization Project

24

70 Sunil Mantri

Group

The Square is a residential cum com-mercial

project coming up at Solapur. The project

comprises G+7 floors of 2-3 bhk, total 140

apartments with amenities like clubhouse, gym,

swimming pool, shops etc.

Solapur

Maharashtra

NA Park Chowk, Solapur 413001. T: 0217-2740221,

2740222, F: 2740223, solapuroffi

[email protected]

Real

Estate

71 Satra Properties

India Ltd

The company has undertaken ‘Satra City’ which

is a SRA (Slum Rehabilita-tion Authority) project

at Ghatkopar in Mumbai. The project is spread

over 7.50 acre and will have a saleable area of

nine lakh sq ft.

Mumbai

Maharashtra

NA Anuradha Singh, Leasing Manager, Dev Plaza,

2nd Floor, Opp. Andheri Fire Station, S. V.

Road, Andheri (W), Mumbai 400058. T: 022-

26719999, F: 26203999,

[email protected],

[email protected] (Praful N. Satra, CMD)

Real

Estate

72 Satra Properties

India Ltd

The company was successful in getting a tender

sanctioned for a property located at Matunga for

premium luxurious residence project on 1.5 acre.

Mumbai

Maharashtra

15.63 Anuradha Singh, Leasing Manager, Dev Plaza,

2nd Floor, Opp. Andheri Fire Station, S. V.

Road, Andheri (W), Mumbai 400058. T: 022-

26719999, F: 26203999,

[email protected],

[email protected] (Praful N. Satra, CMD)

Real

Estate

73 SJ Developers &

Housing Ltd

Royal Heritage’ is an upcoming residential

project to be developed on 1.3 acre at

Patrapada. The project comprises 70 flats in

eight storeys bldgs offering a mix of 1-2-3-4 BHK

flats and a total built-up area of 1.3 lakh sq ft.

The construction work has already started and

completion is targeted by March 2012.

Bhubaneswar

Orissa

NA Mohan Chaudhary, Manager-Marketing, 103,

Miknik Mall,Room No B/6, Nr Iscon Temple &

Rajdhani GAS Complex, Nayapalli,, Nayapalli,

Bhubaneshwar - 751012. T: 0674-2725875,

2565575, 2565675, [email protected],

(Debidutta Mishra, MD)

Real

Estate

Page 25: N Organization Project Title / Details Location Budget ... · PDF fileN Organization Project Title / Details Location Budget ... cpc@maniyargroup.com . 3 ... N Organization Project

25

74 Earth

Infrastructure Ltd

Earth Town’ is an affordable housing project

being developed by the company comprising

2,400 units. The completion is expected by June

2012.

Greater Noida

Uttar Pradesh

86.85 Shubham Khanna, Marketing Associate, Karol

Bagh, New Delhi, Noida, T: 09311114064-68,

M: 9268573999

Real

Estate

75 Earth

Infrastructure Ltd

Earth Sapphire Court is a commercial project

which would be a green building with a saleable

area of six lakh sq feet. The completion is

expected by June 2013.

Greater Noida

Uttar Pradesh

22.58 Shubham Khanna, Marketing Associate, Karol

Bagh, New Delhi, Noida, T: 09311114064-68,

M: 9268573999

Real

Estate

76 Satra Properties

India Ltd

The company has joined hands with Gammon

India for undertaking a township project spread

over 15 acre in Bhopal. This project will take 3

years to complete and will have 25 lakh sq ft

saleable area.

Bhopal

Madhya

Pradesh

NA Anuradha Singh, Leasing Manager, Dev Plaza,

2nd Floor, Opp. Andheri Fire Station, S. V.

Road, Andheri (W), Mumbai 400058. T: 022-

26719999, F: 26203999,

[email protected],

[email protected] (Praful N. Satra, CMD)

Township

77 The Kolkata

Metro Rail

Corporation

(KMRC)

East-West Kolkata Metro corridor project is 14.5-

km corridor starting from Salt Lake Sector V up

to Howrah Maidan. Of this, around 8 km will be

underground with six stations and the balance

will be on an elevated track. About 6 km of

elevated roads work is awarded to Gammon

India and so far they have completed 30% of the

work. Recently the contract for con-structing 5

km underground pathway is awarded to Afcons.

This work will start by December 2010. The

project completion will take 4 years.

Kolkata West

Bengal

846.75 Tarun Kumar, Chief Engineer, 4th Floor, HRBC

House, Munsi Premchand Sarani, Kolkata-

700021. T: 033-22134350, F: 2213 4347,

[email protected], www. kmrc.in, (Sumantra

Chowdhury, MD)

Transport

Page 26: N Organization Project Title / Details Location Budget ... · PDF fileN Organization Project Title / Details Location Budget ... cpc@maniyargroup.com . 3 ... N Organization Project

26

78 A2Z Maintenance

& Engineering

Services

Gurgaon based engineering, procurement and

construction (EPC) company is setting municipal

15 MW solid-waste-to-power project using RDF

(Refuse Derived Fuel), which is derived from

solid waste for Kanpur Municipal Corporation.

This plant will be operational by March 2011.

Kanpur Uttar

Pradesh

NA Mamta Joshi, CEO (Admin), 5th & 6th Floor,

Enkay Square 448–A, Udyog Vihar, Phase – V,

Gurgaon – 122016, Haryana. T: 0124 -

4517600, 4776100, F: 4380014, (Amit Mittal,

CMD)

Waste-to-

Energy

79 Government of

Karnataka

Karnataka Rural Water Supply and Sanitation

Project (Jal Nirmal Project) aims to increase rural

communities’ access to improved and

sustainable drinking water and sanitation

services. The World Bank has recently approved

Rs 698 crore International Development

Association (IDA) credit in additional financing

for this project.

Karnataka NA P Boregowda, Director, 2nd Floor, E Block,

K.H.B Complex, Cauvery Bhavan, K.G Road,

Bangalore-560009. T: 080-22240508,22122851,

F: 22240509

Water

Sector

*figures are approximate (in million)