24
1 National Positioning Navigation and Timing Architecture Update Civil GPS Service Interface Committee Meeting Presented by James Doherty Karen Van Dyke, DOT/RITA/Volpe Center LCDR Jeff Vicario, National Security Space Office Originally presented 24 September 2007 UNCLASSIFIED Submitted for approval for public release, distribution unlimited; not yet approved

National Positioning Navigation and Timing Architecture Update … 3 Future PN… · National Positioning Navigation and Timing Architecture Update Civil GPS Service Interface Committee

  • Upload
    others

  • View
    8

  • Download
    0

Embed Size (px)

Citation preview

Page 1: National Positioning Navigation and Timing Architecture Update … 3 Future PN… · National Positioning Navigation and Timing Architecture Update Civil GPS Service Interface Committee

1

National Positioning Navigation and TimingArchitecture Update

Civil GPS Service Interface Committee MeetingPresented by James Doherty

Karen Van Dyke, DOT/RITA/Volpe CenterLCDR Jeff Vicario, National Security Space Office

Originally presented 24 September 2007

UNCLASSIFIED

Submitted for approval for public release, distribution unlimited; not yet approved

Page 2: National Positioning Navigation and Timing Architecture Update … 3 Future PN… · National Positioning Navigation and Timing Architecture Update Civil GPS Service Interface Committee

2

Overview

• PNT Architecture Background• Architecture Development• Guiding Principles• Draft “Should Be” Architecture

Page 3: National Positioning Navigation and Timing Architecture Update … 3 Future PN… · National Positioning Navigation and Timing Architecture Update Civil GPS Service Interface Committee

3

PNT Architecture Background

• Study requested by– Assistant Secretary of Defense for Networks and Information

Integration– Under Secretary of Transportation for Policy– National Space-based PNT Executive Committee

• Justification - PNT Strategic Landscape is Changing– Gaps in current capabilities– Insufficient unity of effort towards future PNT capabilities

• Products– 20 year strategic outlook to guide near and mid-term decisions on

PNT capabilities

Page 4: National Positioning Navigation and Timing Architecture Update … 3 Future PN… · National Positioning Navigation and Timing Architecture Update Civil GPS Service Interface Committee

4

National PNT Architecture Scope

Military

HomelandSecurity

Civil

Commercial

Space

Air

Surface

Sub-Surface

Location Based ServicesTrackingSurvey

ScientificRecreation

TransportationMachine Control

AgricultureWeapons

OrientationCommunications

and Timing

GNSS

GNSS Augmentation

TerrestrialNAVAIDS

Onboard / User Equip

Networks

Military

Civil

Commercial

International

USERS DOMAIN MISSIONS PROVIDERSSOURCES

Broad Scope Requires Innovative Approaches and Focused Analysis Efforts

Page 5: National Positioning Navigation and Timing Architecture Update … 3 Future PN… · National Positioning Navigation and Timing Architecture Update Civil GPS Service Interface Committee

5

PNT Architecture StakeholdersPNT Architecture Stakeholders

• Dept of Defense / Networks and Information Integration

• Dept of Transportation / RITA• Dept of Commerce• Dept of Homeland Security• Dept of State• NASA• National Coordination Office for

Space-Based PNT • Dept of Transportation / FAA• Dept of Transportation / FHWA• Dept of Transportation / FRA• Department of Interior / USGS • National Security Agency• National Geospatial-Intelligence

Agency

• US Army• US Navy• US Air Force• US Marine Corps• US Coast Guard• US Strategic Command• Joint Staff• Air Force Space Command• Space & Missile Systems Center • Dept of Defense / S&T• US Naval Observatory • National Institute of Standards

and Technology • Joint Planning Development

Office• Policy Board on Federal Aviation

Page 6: National Positioning Navigation and Timing Architecture Update … 3 Future PN… · National Positioning Navigation and Timing Architecture Update Civil GPS Service Interface Committee

6

Cumulative Process

Data GatheringData GatheringConcept DevelopmentConcept Development

Analysis & AssessmentAnalysis & Assessment

Needs & Gaps

Environment, Technology& Evolved Baseline

Community InvolvementCommunity InvolvementArchitecture Development Team,

Subject Matter Experts,Small Working Groups

& Industry

Trade Space, Features & Architectures

Analytical Framework

Page 7: National Positioning Navigation and Timing Architecture Update … 3 Future PN… · National Positioning Navigation and Timing Architecture Update Civil GPS Service Interface Committee

7

PNT Evolved Baseline (2025)

EMI EMI

GPS

Tracking

Celestial

Star Trackers

Commercial Augmentations

Beacons

ENABLERS & INFRASTRUCTUREUSNO NIST

Star CatalogsCryptography

Modeling

Standards Science & Technology

PoliciesMapping/Charting/GeodesyElectro Optical Info.

Reference Frames NGA NGSNSA

TestingIndustrial Base

Laser Ranging NetworkLaunch

Version 21 Aug 2007

User Interface Orgs

Inertial

Clocks N

SEW

Space Comm & Nav Arch

EnvironmentWeather

Geo-politicalFiscal

SpectrumNavwar

Interference TechnologicalDemographics

WAAS GALILEO

Cell Phone Networks

TASS

GAGAN

GLONASS

EGNOSCommercial

Augmentations

Time Transfer

WAGEZMDS

NigComsat -1 SBAS

Compass IRNSS

QZSS

MTSAT

Doppler Tercom

ASI

GDGPS

NDGPSMDGPS

eLORAN

IGS

VOR/DME, TACANILS, NDB

GBAS Cat-I

Time Transfer

Compass

Pedometers

CORS

JPALS

NAVCEN

GPSOC NOCC

Time Transfer

Yellow font = New compared to “As Is” 2007 ArchitectureUNCLASSIFIED

Page 8: National Positioning Navigation and Timing Architecture Update … 3 Future PN… · National Positioning Navigation and Timing Architecture Update Civil GPS Service Interface Committee

8

Primary PNT Gaps

• Gaps primarily drawn from military’s PNT Joint Capabilities Document, with additions and modifications from parallel civil community documents and discussions– Physically Impeded Environments – Electromagnetically Impeded Environments – Higher accuracy with integrity– Notification of Hazardously Misleading Info (Integrity) – High Altitude/Space Position and Orientation– Geospatial information - access to improved GIS data

(regarding intended path of travel)– Insufficient modeling capability

Page 9: National Positioning Navigation and Timing Architecture Update … 3 Future PN… · National Positioning Navigation and Timing Architecture Update Civil GPS Service Interface Committee

9

PNT User Perspectives (2025)

Framework to describe user needs & environments, and which users are affected by each capability gapVersion 18 Jul 2007

Page 10: National Positioning Navigation and Timing Architecture Update … 3 Future PN… · National Positioning Navigation and Timing Architecture Update Civil GPS Service Interface Committee

10

Primary Objective of the Architecture

Near & Mid Term Decisions Guided

by Architecture

Near & Mid Term Near & Mid Term Decisions Guided Decisions Guided

by Architectureby Architecture

Based on Long Term

Vision

Based on Based on Long Term Long Term

VisionVision

Without Enterprise

Architecture Strategy

Without Without Enterprise Enterprise

Architecture Architecture StrategyStrategy

Cap

abili

tyC

apab

ility

ShouldShould--Be Be ArchitectureArchitecture

Evolved Evolved Baseline Baseline

(EBL)(EBL)

AsAs--Is Is ArchitectureArchitecture System EmphasisSystem Emphasis

ArchitectureArchitectureEmphasisEmphasis

NowNow 5 Years5 Years 10 Years10 Years 15 Years15 Years 20 Years20 Years

“…provide more effective and efficient PNT capabilities focused onthe 2025 timeframe and an evolutionary path for governmentprovided systems and services.” -- Terms of Reference

“…“…provide more effective and efficient PNT capabilities focused onprovide more effective and efficient PNT capabilities focused onthe 2025 timeframe and an evolutionary path for governmentthe 2025 timeframe and an evolutionary path for governmentprovided systems and services.provided systems and services.”” ---- Terms of ReferenceTerms of Reference

Page 11: National Positioning Navigation and Timing Architecture Update … 3 Future PN… · National Positioning Navigation and Timing Architecture Update Civil GPS Service Interface Committee

11

Status of PNT Architecture Effort

• Proposed National PNT Architecture recommendations presented to National PNT Architecture Decision Coordination Group on 14 Aug 2007

• Study sponsors support recommendations in principle• National Coordination Office for Space-Based PNT

requested to coordinate an Executive Steering Group review of architecture recommendations

• Review and comment resolution in progress

Page 12: National Positioning Navigation and Timing Architecture Update … 3 Future PN… · National Positioning Navigation and Timing Architecture Update Civil GPS Service Interface Committee

12

Guiding Principles

SUPPORTING VECTORCooperative Organizational Structures

SUPPORTING VECTORFusion of PNT with Communications

VISIONUS Leadership in Global PNT

VISIONUS Leadership in Global PNT

STRATEGYGreater Common Denominator

STRATEGYGreater Common Denominator

PRIMARY VECTORMultiple Phenomenologies

PRIMARY VECTORMultiple Phenomenologies

PRIMARY VECTORInterchangeable Solutions

PRIMARY VECTORInterchangeable Solutions

Page 13: National Positioning Navigation and Timing Architecture Update … 3 Future PN… · National Positioning Navigation and Timing Architecture Update Civil GPS Service Interface Committee

13

National PNT Architecture Vision

• Embrace & expand upon the US Space-Based PNT Policy • Efficiently (cost, schedule, acceptable risks, user impact) develop and

field the best technologies and systems• Promulgate stable policies (commitment to funding, commitment to

performance, advanced notice of change, etc) • Foster innovation through commercial competition• Ensure robust and enduring inter-agency coordination and cooperation• Maximize the practical use of military, civil, commercial and foreign

systems and technologies• Judiciously develop and apply standards and best practices

US Leadership in Global PNTUS Leadership in Global PNTUS Leadership in Global PNT

Page 14: National Positioning Navigation and Timing Architecture Update … 3 Future PN… · National Positioning Navigation and Timing Architecture Update Civil GPS Service Interface Committee

14

National PNT Architecture Strategy

• Satisfy common needs with common solutions• Predominantly a “dependent” architecture where users rely

upon external sources • Leverage ongoing US GNSS modernization to assure global

service and support national interests• Promote wide adoption of low-burden “autonomous” features

for robustness• Specialized needs still require specialized solutions • Balance provided or enabled capabilities with the need for a

military PNT advantage

The US can Best Achieve Efficiency and Effectiveness through a Greater Common Denominator Approach

The US can Best Achieve Efficiency and Effectiveness The US can Best Achieve Efficiency and Effectiveness through a Greater Common Denominator Approachthrough a Greater Common Denominator Approach

Page 15: National Positioning Navigation and Timing Architecture Update … 3 Future PN… · National Positioning Navigation and Timing Architecture Update Civil GPS Service Interface Committee

15

High Level Vectors

Use Multiple Phenomenologies to the Maximum Extent Practical to Ensure Robust Availability

Use Multiple Phenomenologies to the Use Multiple Phenomenologies to the Maximum Extent Practical to Ensure Robust AvailabilityMaximum Extent Practical to Ensure Robust Availability

Strive for Interchangeable Solutions to Enhance Efficiency and Exploit Source Diversity

Strive for Interchangeable Solutions to Strive for Interchangeable Solutions to Enhance Efficiency and Exploit Source DiversityEnhance Efficiency and Exploit Source Diversity

Pursue Fusion of PNT with New and Evolving Communications Capabilities

Pursue Fusion of PNT with Pursue Fusion of PNT with New and Evolving Communications CapabilitiesNew and Evolving Communications Capabilities

Promote Interagency Coordination & Cooperation to Ensure the Necessary levels of Information Sharing

Promote Interagency Coordination & Cooperation to Promote Interagency Coordination & Cooperation to Ensure the Necessary levels of Information SharingEnsure the Necessary levels of Information Sharing

Page 16: National Positioning Navigation and Timing Architecture Update … 3 Future PN… · National Positioning Navigation and Timing Architecture Update Civil GPS Service Interface Committee

16

“Should-Be” PNT Architecture (2025)

EMI EMI

GPS

Tracking

Celestial

Star Trackers

Commercial Augmentations

Beacons

ENABLERS & INFRASTRUCTUREUSNO NIST

Star CatalogsCryptography

Modeling

Standards Science & Technology

PoliciesMapping/Charting/GeodesyElectro Optical Info.

Reference Frames NGA NGSNSA

TestingIndustrial Base

Laser Ranging NetworkLaunch

Version 22 Aug 2007

Networks

User Interface Orgs

Pseudolites & Beacons

Geospatial Data PNT UserEquipment

Autonomous

Inertial

Sensors & Sensor Aiding

Clocks

N

SEW

Wireless Networks

Space Comm & Nav Arch

Pseudolites

SATCOMAiding Data &

Ranging Signals

Fusion of PNT with Communications Multiple

PhenomenologiesGround Based Radio Freq

Foreign GNSS

Cell Phone Networks

Pseudolites & Beacons

PNT signal monitoring

EvolvedGNSS Augmentation

Foreign Regional Nav

Interchangeable Solutions

Cooperative Organizational Structures

EnvironmentWeather

Geo-politicalFiscal

SpectrumNavwar

Interference TechnologicalDemographics

Page 17: National Positioning Navigation and Timing Architecture Update … 3 Future PN… · National Positioning Navigation and Timing Architecture Update Civil GPS Service Interface Committee

17

Next Steps

• Complete National Space-based PNT Executive Steering Group (ESG) review of PNT Architecture recommendations

• Sponsors (Asst Sec Def for Networks and Info Integration and Under Sec of Transportation for Policy) review and approve National PNT Architecture recommendations in an Architecture Decision Memorandum

• Workshop to Obtain Public Feedback on Recommendations

• NSSO, RITA & NII oversee development of detailed transition and implementation planning

• Architecture Implementation Memorandum – Approved event-based implementation timeline– Coordinate through Decision Coordination Group members and co-sponsors as

appropriate

• Influence update to PNT planning documents– Federal Radionavigation Plan– Five-Year National Space-Based PNT Plan

Page 18: National Positioning Navigation and Timing Architecture Update … 3 Future PN… · National Positioning Navigation and Timing Architecture Update Civil GPS Service Interface Committee

18

Points of Contact

• Karen Van Dyke– DOT/RITA/Volpe Center– [email protected]– 617-494-2432

• Lieutenant Commander Jeff Vicario– NSSO– [email protected][email protected]– 571-432-1535

A copy of this brief will be posted at http://www.acq.osd.mil/nsso/pnt/pnt.htmas well as on CGSIC meeting website

Acknowledgement of additional co-authors:CAPT Milton Abner, NSSOCAPT James Dalberg, NSSOLt Col Shawn Brennan, NSSOLt Col John Maguire, NSSOCDR Ed Kneller, NSSOCDR Eric Watkiss, NSSOJules McNeff, OSD/NIIKent Hyatt, OSD/NII

John Anton, NSSOJennifer Buchanan, NSSOMichael David, NSSOJohn Emilian, NSSOPaul Popejoy, NSSODavid Schoonenberg, NSSO James Wentworth, NSSOMary Zappi, NSSO

Page 19: National Positioning Navigation and Timing Architecture Update … 3 Future PN… · National Positioning Navigation and Timing Architecture Update Civil GPS Service Interface Committee

19

BACKUP SLIDESAVAILABLE FOR PRESENTATION

USE ONLY IF NEEDED

Page 20: National Positioning Navigation and Timing Architecture Update … 3 Future PN… · National Positioning Navigation and Timing Architecture Update Civil GPS Service Interface Committee

20

Related Efforts & Upcoming Decisions

• Recent & Upcoming Decisions – Future of eLORAN– Future of NDGPS and High Accuracy NDGPS– Backup SATNAV Tasking – Backup PNT Needs (ADS-B, NGATS, Timing Infrastructure)– GPS III and OCX Acquisition Strategies

National PNT ArchitectureDOT and FAA

• Aviation Navigation Evolution RoadmapDOT and FAA

• Aviation Navigation Evolution Roadmap

National Coordination Office for Space-Based PNT

• 5-Year Plan & Assessment• Alternate Financing Study

National Coordination Office for Space-Based PNT

• 5-Year Plan & Assessment• Alternate Financing Study

DOD• DOD PNT S&T

Roadmap update

DOD• DOD PNT S&T

Roadmap update

USSTRATCOM• PNT Joint Capabilities Document

• PNT Functional Solutions Analysis

USSTRATCOM• PNT Joint Capabilities Document

• PNT Functional Solutions Analysis

NSSO• NSS Program Assessment

• NSS Plan

NSSO• NSS Program Assessment

• NSS Plan

RAND• Ensuring Effective PNT

RAND• Ensuring Effective PNT

Joint Planning & Development Office• Next Generation Air Transportation System

Joint Planning & Development Office• Next Generation Air Transportation System

MAINTAIN SHARED SITUATIONAL AWARENESS

Page 21: National Positioning Navigation and Timing Architecture Update … 3 Future PN… · National Positioning Navigation and Timing Architecture Update Civil GPS Service Interface Committee

21

“As-Is” PNT Architecture (2007)

EMI EMI

GPS

Tracking

Celestial

Star Trackers

Commercial Augmentations

Beacons

ENABLERS & INFRASTRUCTUREUSNO NIST

Star CatalogsCryptography

Modeling

Standards Science & Technology

PoliciesMapping/Charting/GeodesyElectro Optical Info.

Reference Frames NGA NGSNSA

TestingIndustrial Base

Laser Ranging NetworkLaunch

Version 21 Aug 2007

User Interface Orgs

Inertial

Clocks N

SEW

WAASGALILEO(GIOVE-A)

Cell Phone Networks

TASS

GLONASS

EGNOSCommercial

Augmentations

Time Transfer

WAGEZAOD

Compass

MTSAT

Doppler Tercom

ASI

GDGPS

NDGPSMDGPS

IGS

VOR/DME, TACANILS, NDB

GBAS Cat-I

Time Transfer

Compass

Pedometers

CORS

NAVCEN

GPSOC NOCC

Time Transfer

LORAN-C

AAI

UNCLASSIFIED

EnvironmentWeather

Geo-politicalFiscal

SpectrumNavwar

Interference

Page 22: National Positioning Navigation and Timing Architecture Update … 3 Future PN… · National Positioning Navigation and Timing Architecture Update Civil GPS Service Interface Committee

22

Industry Day Participants (Sep-Oct 06)

• On-Grid• Analytical Graphics

Incorporated• Oak Ridge National

Labs • Boeing Commercial

Aircraft• Lockheed Martin

IS&S• Jet Propulsion Lab• Boeing Phantom

Works

• Advanced Navigation & Positioning Corporation

• NavComTech• OmniStar• SiRF• AeroAstro• NAVSYS Corp• Viasat• Advanced Research

Corporation• USGIC

• Boeing Navigation & Communication Systems

• Honeywell• Booz Allen

Hamilton• International Loran

Association• Rockwell Collins• AFRL – AFIT ANT• Penn State ARL • Raytheon• A-B-Sea Research

Page 23: National Positioning Navigation and Timing Architecture Update … 3 Future PN… · National Positioning Navigation and Timing Architecture Update Civil GPS Service Interface Committee

23

PNT Architecture Workshop at Volpe26 April 07, DOT Volpe Center

• Institute of Navigation• GPS World Magazine• Boeing• Booz Allen Hamilton• Giftet Inc.• OnGrid• GPS Industry Council• NavComTech• Rockwell Collins• LMCO• Alion Science & Technology• Advanced Research Corp• Omnistar• Megapulse

• Ohio University• Chungnam National University

• NIST• STRATCOM• USCG C2CEN• Navy JPALS Team• DOT/FHWA• Oak Ridge National Lab• MITRE• DoD (Retired)• FAA

• GPS World review http://sidt.gpsworld.com/gpssidt/article/articleDetail.jsp?id=422965

Page 24: National Positioning Navigation and Timing Architecture Update … 3 Future PN… · National Positioning Navigation and Timing Architecture Update Civil GPS Service Interface Committee

24

Three Themes (Hybrid Architectures)

Hybrid A• Common solutions

for many users• Horizontal integration• Greatest common

denominator• Emphasis on global

and long range broadcasts direct to users

Hybrid B• Common solutions

for many users• Horizontal integration• Greatest common

denominator• Emphasis on

networks

Hybrid C• Specialized solutions

for each user group• Vertical integration • Least common

denominator• Emphasis on

autonomous solutions