New State significant assessment system

for EPLA

Marcus Ray Executive Director Assessment Systems

& General Counsel

October 2011

Page 2: New State significant assessment system for EPLA Marcus Ray Executive Director Assessment Systems & General Counsel October 2011

Implementation: Repeal of Part 3A

• Environmental Planning & Assessment Amendment (Part 3A Repeal) Act 2011 – commenced 1 October 2011

• New State & Regional Development SEPP 2011 – exhibition from 18 August 2011 until 2 September 2011

• EP&A Regulation amendments • Savings and Transitionals

Page 3: New State significant assessment system for EPLA Marcus Ray Executive Director Assessment Systems & General Counsel October 2011

SRD SEPP - Consultation

65 submissions were received, including:– 10 from government agencies – 23 from local councils – 13 from industry groups and associations (including the EDO and

LGSA) – 19 from other stakeholders (individuals, business and the Greens)

32 changes to the SEPP made

State significant classes remain similar to those set out June 2011 policy statement.

All submissions are on the Department’s website.

Page 4: New State significant assessment system for EPLA Marcus Ray Executive Director Assessment Systems & General Counsel October 2011

SRD SEPP - classes & sites

• State significant development– 24 classes– 18 sites + NSW Housing sites

• State significant infrastructure– carried out by public authority development who would also be a

determining authority & would require an EIS– 6 other classes– 4 projects and 1 concept plan transitioned from Part 3A

• Critical infrastructure– Pacific Highway, North West Rail Link, Light Rail extension

Page 5: New State significant assessment system for EPLA Marcus Ray Executive Director Assessment Systems & General Counsel October 2011

MD SEPP >>> SRD SEPP - 1

• About 50% less projects than Part 3A • Residential, retail and commercial, and coastal

subdivision classes removed• Marinas excluded • Employment excluded as criteria for SSD • Most CIV thresholds standardised at $30M• All $5M thresholds (ESASS) increased to $10M

Page 6: New State significant assessment system for EPLA Marcus Ray Executive Director Assessment Systems & General Counsel October 2011

MD SEPP >>> SRD SEPP - 2• Medical centres added to Hospitals • Distribution and storage facilities

– criteria $30M > $50M

– requires facilities to be on contiguous sites

• Tourist, convention and entertainment facilities – new clause ‘Cultural and Sporting Facilities’ with CIV at

$30M– new clause ‘Other Tourist Related Facilities’ to capture

remainder, and retains CIV for those at $100M.

– Research facilities added to educational establishments

Page 7: New State significant assessment system for EPLA Marcus Ray Executive Director Assessment Systems & General Counsel October 2011

MD SEPP >>> SRD SEPP - sites

• Developed sites removed• Generally CIV threshold raised from $5m -

$10m.– North Penrith and North Ryde Station Precinct -

principal subdivisions

– Royal Randwick Racecourse (10 m + all non-race day events)

– Housing NSW sites

Page 8: New State significant assessment system for EPLA Marcus Ray Executive Director Assessment Systems & General Counsel October 2011

SSD: Key features 1• Builds on existing Part 4 of the EP&A Act

– SSD requires development consent under an EPI

• Section 79C assessment – must consider all SEPPs & LEPs in making a decision – SEPP 1 applies– Development Control Plans do not apply (SRD SEPP)

• Local infrastructure contributions apply– ss94 or 94A

• Can determine partially prohibited development

Page 9: New State significant assessment system for EPLA Marcus Ray Executive Director Assessment Systems & General Counsel October 2011

SSD: Key features 2

• Call-in for prohibited development– Concurrent rezoning

• Broad power to modify proposal in assessment– To mitigate impacts by redesign

• Other approvals not required or must be issued consistently: ss89I & 89J (former ss75U & 75V)– except aquifer interference Water Management Act 2000

• Applicant and objector appeals & s123 review – No appeals if public hearing – Public meeting is not a public hearing.

Page 10: New State significant assessment system for EPLA Marcus Ray Executive Director Assessment Systems & General Counsel October 2011

SSD: Assessment 1

• Benchmark– 85% applications determined within 4 months of start of exhibition

• Pre-lodgement: – EP&A Regulation include requirements for request for Director

General’s Requirements (DGRs) – Online request– Consultation with councils & relevant agencies - 14 days to respond – 28 days for DP&I to issue DGRs– Extended period for planning focus meeting– DGRs refer to relevant guidelines– Standard DGRs

Page 11: New State significant assessment system for EPLA Marcus Ray Executive Director Assessment Systems & General Counsel October 2011
Page 12: New State significant assessment system for EPLA Marcus Ray Executive Director Assessment Systems & General Counsel October 2011

SSD: Assessment 2

• Environmental Impact Statement preparation– responds to DGRs – addresses the principles in Schedule 2 EP&A Regulation 2000,

as required– applicant prepares EIS in consultation with community, council

and relevant agencies

• Lodgement: – Comply with schedule 1 of the EP&A Regulation 2000– DA for SSD lodged with EIS – no adequacy test– 28 days from the lodgement for DP&I to stop the clock for more

information

Page 13: New State significant assessment system for EPLA Marcus Ray Executive Director Assessment Systems & General Counsel October 2011

SSD: Assessment 3

• Exhibition– minimum 30 day exhibition period (45 days for school holidays)– councils & agencies notified during exhibition – 90 day deemed refusal period– DP&I may request response to submissions– may amend proposal in response to submissions – limited

requirement to re-exhibit if reduce impacts

• Assessment report– Section 79C + DGRs

• DP&I Website– DGRs, EIS, all submissions & reports

Page 14: New State significant assessment system for EPLA Marcus Ray Executive Director Assessment Systems & General Counsel October 2011

SSI: Key features • SSI must be development that:

– does not need consent under a SEPP, and – carried out by a public authority requiring an EIS

• Other approvals not required or must be issued consistently: ss115ZG & 115ZH (former ss75U & 75V)– except aquifer interference Water Management Act 2000

• EPIs don’t apply to assessment• No merit appeals but s123 review

– No change

• Critical State Significant Infrastructure

Page 15: New State significant assessment system for EPLA Marcus Ray Executive Director Assessment Systems & General Counsel October 2011

SSI: Assessment 1

• Benchmark– Same as SSD

• Lodgement: – Online– Application

• Director General Requirements (DGRs): – Same as SSD, – except no standard DGRs, but model DGRs

• Environmental Impact Statement preparation– Same as SSD

Page 16: New State significant assessment system for EPLA Marcus Ray Executive Director Assessment Systems & General Counsel October 2011

SSI: Assessment 2• Environmental Impact Statement lodgement

– no adequacy test – same as SSD

• Exhibition– Same as SSD except:

• DP&I may request Preferred Infrastructure Report• 90 days for completion of DG’s report from end of exhibition

• Assessment report– DG’s report against DGRs

• DP&I Website– DGRs, EIS, all submissions & reports

Page 17: New State significant assessment system for EPLA Marcus Ray Executive Director Assessment Systems & General Counsel October 2011

SSD & SSI: Determination • Minister delegates determination to:

– Planning Assessment Commission• projects by private proponents• political donation statement lodged• where relevant council objects

• Minister determines:• Public authority projects

• DP&I• projects less than 25 objections by members of

public

Page 18: New State significant assessment system for EPLA Marcus Ray Executive Director Assessment Systems & General Counsel October 2011

PAC Determinations– PAC adopts new procedures 5 September 2011

• DG report published on DP&I webpage before• Meetings with DP&I, local council & applicant• Public meetings before determination

– Depending on number of objections– Applicant to respond to questions at meeting

• Public meeting is not a public hearing• May request further information before

determining

Page 19: New State significant assessment system for EPLA Marcus Ray Executive Director Assessment Systems & General Counsel October 2011

Part 3A Projects: Transitional Provisions • Part 3A projects + concept plans completed as

Part 3A – if DGRs issued when Act commences

• If DGRs not issued when Act commences: – if the project is SSD then an application for SSD will be

processed

• Part 3A approvals, including concept plans, will be modified under Part 3A

• Critical infrastructure projects under Part 3A will remain critical infrastructure

Page 20: New State significant assessment system for EPLA Marcus Ray Executive Director Assessment Systems & General Counsel October 2011

Regional panels

• Over 50% DAs now be determined by Council• subdivisions over 250 lots - removed

• $10m - $20m - removed

• $10m – $20m - referral after 120 days unless applicant delay

• coastal developments – smaller developments removed

• designated – extractive industries, waste facilities & marinas

• Savings & transitionals - in Schedule 6A of the Act

Page 21: New State significant assessment system for EPLA Marcus Ray Executive Director Assessment Systems & General Counsel October 2011

SSD: proposed call-in procedure

• Proponent requests – DP&I consults council & reports to PAC.

• PAC advises Minister on State & regional planning significance

• Minister determines if call-in.• All documents available on web

Page 22: New State significant assessment system for EPLA Marcus Ray Executive Director Assessment Systems & General Counsel October 2011

SSD Call-in – proposed State & regional significance criteria

• strategic consistency & importance • major public benefits• significant environmental, social or economic impacts• significant economic benefit to a region, the State or the

national economy• geographic scale• complexity, uniqueness or requirement for specialist

assessment• other relevant matters 

Page 23: New State significant assessment system for EPLA Marcus Ray Executive Director Assessment Systems & General Counsel October 2011

Implementation

• Proponent’s SSD/SSI checklist• SSD & SSI flow charts• Planning circulars• Fact Sheets• Regional Panel checklist + referral

template• Notification Policy• Call – in guideline

Page 24: New State significant assessment system for EPLA Marcus Ray Executive Director Assessment Systems & General Counsel October 2011