Page 1: New York State Department of Transportation

NEW YORK STATE DEPARTMENT OF TRANSPORTATION

NY Route 347

Route 111 to Mount Pleasant Road

Design-Build Project

Request for Qualifications

Informational Meeting

September 5, 2012

1

Page 2: New York State Department of Transportation

NY Route 347 – Design BuildAgenda

Introductions and Opening Remarks Project Overview Quality Control & Quality Assurance Procurement Questions and Answers

2

Page 3: New York State Department of Transportation

Peter RussellAttn: NY Route 347

Office of Contracts ManagementNew York State Department of

Transportation50 Wolf Road, 6th Floor

Albany, New York [email protected]

NY Route 347 – Design BuildRules of Contact

3

Page 4: New York State Department of Transportation

NY Route 347 – Design BuildAgenda

Introductions and Opening Remarks Project Overview

General Location Goals General Scope of Work

NY Route 347 Vision Plan Quality Control & Quality Assurance Procurement Questions and Answers

4

Page 5: New York State Department of Transportation

NY Route 347 – Design Build General Location

5

Page 6: New York State Department of Transportation

Bike

Path

NY Route 347 – Design Build General Location

Start

End

6

Page 7: New York State Department of Transportation

NY Route 347 – Design Build Goals

Improve safety and mobility along the Route 347 Corridor;

Efficient and Effective Project Delivery; and

Implementation of the NY 347 Vision Plan.

7

Page 8: New York State Department of Transportation

NY Route 347 – Design Build Goals Continued…

Improve safety and mobility along the Route 347 Corridor by: Providing additional roadway lanes and

improving traffic flow; Implementing Intelligent Transportation

System (ITS) technology (use of INFORM); Improving access to public transportation; Providing enhancement to infrastructure for

use by pedestrians; and Creating a shared-use path for bicyclists and

pedestrians.

8

Page 9: New York State Department of Transportation

NY Route 347 – Design Build Goals Continued…

Efficient and Effective Project Delivery by: Ensure coordination with other construction

projects Minimize disruption to existing traffic Minimizing temporary construction impacts to

adjacent residents and businesses Keep adjacent residents and business informed Address general project related questions from public Forward project concept questions to NYSDOT Forward questions from elected & public officials and

the media to NYSDOT Deliver Project Safely, On Schedule, On Budget,

and Environmentally Compliant.

9

Page 10: New York State Department of Transportation

Implementation of the NY 347 Vision Plan by: Implement the principles of traffic calming

measures; Improving pedestrian and bicycle connectivity

along the roadway and to bus transit; Minimize the removal of existing vegetation and

provide extensive new plantings; Planting native vegetation to support wildlife; and Treating road runoff to improve water quality

NY Route 347 – Design Build Goals Continued…

10

Page 11: New York State Department of Transportation

NY Route 347 – Design Build General Scope of Work

Widening of NY Route 347 with additional travel lanes and shared-use path for pedestrians and bicyclists;

Pedestrian facility design and installation; Bus turnouts and enhanced bus stop design and

installation; Extensive landscape design and installation

potentially including, but not limited to: vegetated screening, planted raised median, street trees, vegetated drainage features;

Sound wall design and installation; and Installation of street and pedestrian lighting.

11

Page 12: New York State Department of Transportation

NY Route 347 – Design Build Typical Cross Section

12

Page 13: New York State Department of Transportation

NY Route 347 – Design Build General Scope of Work Continued…

Installation and integration of the INFORM system;

Traffic signals; Signing & pavement markings; Work Zone Traffic Control; Drainage and Utilities

13

Page 14: New York State Department of Transportation

NY Route 347 – Design Build General Scope of Work Continued…

Relocation and/or preservation of existing utilities Inventory of existing utilities provided to DB Team DB Team responsible for holding utility

coordination meetings DB Team to provide supporting documents for

utility design, including: plans, Special Note of Utility Coordination & Table of Conflicts

Special Note of Utility Coordination must include work description, proposed locations and time frames

Table of Conflicts to include existing & proposed locations

14

Page 15: New York State Department of Transportation

NY Route 347 – Design Build General Scope of Work Continued…

Relocation and/or preservation of existing utilities (continued) Supporting documents are required for Utility &

Municipal Agreements to be completed by RUE DB Team must include the cost to relocate

Suffolk County Water Authority facilities in their bid. The cost shall include all permits from the Suffolk County Dept of Health and all service connections

LIPA to provide a cost estimate for their work to the RUE, once all supporting documents are provided by the DB Team. The RUE will complete the Agreement

15

Page 16: New York State Department of Transportation

NY Route 347 – Design Build “The Threads that Weave”

Concepts in the Vision Plan include: Sustainability Smart Growth Context Sensitive Solutions Environmental Stewardship Walkability Livability GreenLITES

16

Page 17: New York State Department of Transportation

NY Route 347 – Design Build GreenLITES – Evergreen Certification

The New York State Department of Transportation (NYSDOT) is committed to improving the quality of our transportation infrastructure through the use of best practices that minimize impacts to the environment.

NYSDOT implemented “GreenLITES” (Leadership In Transportation and Environmental Sustainability), a project rating program recognizing four levels of successfully attaining these goals in our projects.

Route 347 will continue to implement as many of these best practices as possible achieving the

highest level of certification… …Evergreen.

17

Page 18: New York State Department of Transportation

NY Route 347 – Design Build Making Route 347 More “Bicycle & Pedestrian Friendly” & Multimodal

Improving Bicycle & Pedestrian Facilities Constructing a Shared-Use Path Adding Sidewalks Reducing Crossing Distances Extending Crossing Times at Crosswalks Creating “Greenway Stops” along the proposed shared-use path Enhancing Visibility & Motorist Cues at High Pedestrian Areas ie. Senior “Activity Centers”, Schools, etc

Improving Connections to Places of Interest, Community Centers, & Transit Identifying Destinations Improving Access to Community Centers & Parks Enhancing Bus Stops

18

Page 19: New York State Department of Transportation

NY Route 347 – Design Build “Enhancing the Plan”

Recognizing Opportunities for Improving & Expanding Non-Motorized Transportation

Alternatives Improving & Expanding Access to Mass Transit &

Connections Conserving Energy Improving & Preserving Quality of Life, Aesthetics, & the

Environment Stimulating the Economy

Developing a Corridor Theme “ Parks to Ports Greenway ”

Identifying & Highlighting Environmental Assets Greenway Stops, Interpretive Signs, Info. Kiosks

Utilizing Traffic Calming Features Narrowing Lane Widths Narrowing Shoulders Visually Narrowing by Adding Vertical Elements ie. Street

Trees, Decorative Street Lighting, and Aesthetically Enhanced Raised Planted Medians

Constructing a Buffer between Multi-Use Path and Shoulder Reducing the Posted Speed

19

Page 20: New York State Department of Transportation

NY Route 347 – Design Build Typical Plan

20

Page 21: New York State Department of Transportation

NY Route 347 – Design Build Proposed Sound Walls or Vegetated Screening

Sound Wall Design Objective to Provide Noise Abatement;

Must Maintain Proposed Wall’s : Location, Top Elevation, Length;

Must Integrate Sound Absorptive Material on Select Walls;

Must Provide a Through-Access Panel on at least one Wall

Design to Meet Conceptual Aesthetic Design Criteria

Vegetated Screening Design Objective to Provide Visual Screening to

the Road May use a combination of preservation

of existing vegetation, new planting and durable fence materials;

Design to Meet Conceptual Aesthetic Design Criteria

Page 22: New York State Department of Transportation

NY Route 347 – Design Build Proposed Greenway Stop

22

Page 23: New York State Department of Transportation

NY Route 347 – Design Build Implementing the NY Route 347 Vision Plan

23

Page 24: New York State Department of Transportation

NY Route 347 – Design Build Implementing the NY Route 347 Vision Plan

24

Page 25: New York State Department of Transportation

NY Route 347 – Design BuildAgenda

Introductions and Opening Remarks Project Overview Quality Control & Quality Assurance Procurement Questions and Answers

25

Page 26: New York State Department of Transportation

NY Route 347 – Design Build Quality Control (QC)

QC is Design-Builder’s Responsibility Design-Builder shall appoint a QC Manager responsible

for developing QC Plan for both Design and Construction

Design QC shall be by the Designer in accordance with the QC Plan

Construction Inspection shall be by an Independent Engineering Firm (Hired by the Design-Builder)

Materials Testing shall be by an Independent Testing Firm or Laboratory (Hired by the Design-Builder)

The Independent Testing Firm shall report to the Construction Inspection Firm who shall report to the Department

Offsite Plant Quality Control will be performed by the Department

26

Page 27: New York State Department of Transportation

NY Route 347 – Design Build Quality Assurance (QA)

QA is Department’s Responsibility The Department may perform QA on any

of the Design-Builder’s activities The Department may utilize an

independent Consultant to perform QA of the Design-Builder’s Designs

The Construction QA will be department staff.

27

Page 28: New York State Department of Transportation

NY Route 347 – Design BuildAgenda

Introductions and Opening Remarks Project Overview Quality Control & Quality Assurance Procurement

Schedule Contract Information SOQ Evaluation and Selection Additional Information and Website

Questions and Answers

28

Page 29: New York State Department of Transportation

NY Route 347 – Design Build Procurement Schedule

Activity Due Date

Final RFQ Released September 12, 2012

Final Date for receipt of Proposer’s questions September 28, 2012

Issue Date for Final Addendum to the RFQ and/or answers to Proposer’s questions

October 5, 2012

SOQ Due Date October 17, 2012

Shortlisted DB Teams Announced November 1, 2012

Draft RFP Issued November 7, 2012

Draft RFP Info Meeting November 20, 2012

Final RFP to Shortlisted Firms December 5, 2012

Proposals Due January 17, 2013

Selection of Best Value February 1, 2013

Execute Contract February 28, 2013

Notice to Proceed March 1, 2013

29

Page 30: New York State Department of Transportation

NY Route 347 – Design Build Contract Information

Lump Sum Design-Build Contract Two Step Design-Build Procurement Process Project Schedule

Total Duration 28 Months +/- (under review) There will be a Payment Schedule provided in the RFP Stipend Under Consideration by NYSDOT Liquidated Damages may be imposed for missed

milestones and final completion ROW by NYSDOT Construction Related Permits (i.e., SPDES) by Design-

Builder The final RFQ will be updated to reflect that only

Greenman-Pedersen, Inc. and Stantec Consulting Services, Inc. will be disqualified

30

Page 31: New York State Department of Transportation

NY Route 347 – Design Build SPDES General Permit

D/B Team to prepare SPDES Stormwater Pollution Prevention Plan (SWPPP) consistent with NYSDEC and NYSDOT procedures;

D/B Team shall design drainage system to treat Stormwater Quality and Quantity as per NYSDEC and NYSDOT guidance documents;

D/B Team to prepare Notice of Intent (NOI) for NYSDOT signature/submission to NYSDEC.

31

Page 32: New York State Department of Transportation

NY Route 347 – Design Build SOQ Evaluation and Selection

Pass/Fail Evaluation Factors Legal; Financial; Backlog Capacity; Proposal responsiveness; and Vendor Responsibility.

Quality Evaluation Factors Organization and Key Personnel (40%) Experience of the Firms (25%) Project Understanding (20%) Past Performance (15%)

32

Page 33: New York State Department of Transportation

NY Route 347 – Design Build Additional Information

Responses to Proposer Questions will be posted on the Department Website

Final Addendum to the RFQ will be issued by Friday, October 5, 2012

Additional Reference Information to be Posted on Website: Final Design Report / Final EIS / Final Section 4(F) Evaluation  Contract D261357 Design Drawings (Adjacent Contract)  As-Built Drawings NY 347 Soil Borings   SUE Utility Data   Route 347 Revaluation 23CFR771.129 – Review & Appendixes (Including

NY 347 Vision Plan)

There will be a Buy America Clause There will be a DBE Participation Goal

33

Page 34: New York State Department of Transportation

NY Route 347 – Design Build Project Website

https://www.dot.ny.gov/main/business-center/designbuildproject1

34

Page 35: New York State Department of Transportation

Peter RussellAttn: NY Route 347

Office of Contracts ManagementNew York State Department of

Transportation50 Wolf Road, 6th Floor

Albany, New York [email protected]

NY Route 347 – Design Build Project Contact

35

Page 36: New York State Department of Transportation

NY Route 347 – Design Build Questions and Answers

Questions??

36