1 NIRANTHARA JYOTHI SCHEME: NIRANTHARA JYOTHI SCHEME: Niranthara Jyothi Project is a prestigious scheme Niranthara Jyothi Project is a prestigious scheme of Government of Karnataka, to provide 24 hrs 3 of Government of Karnataka, to provide 24 hrs 3 phase power supply to non-agricultural loads like phase power supply to non-agricultural loads like domestic, commercial, water supply, street light, domestic, commercial, water supply, street light, rural industries, milk dairies etc., in rural rural industries, milk dairies etc., in rural areas by segregating the agricultural loads, which areas by segregating the agricultural loads, which is a boon to the rural economy. is a boon to the rural economy. Objectives : Objectives : This will enable BESCOM to give 24X7 supply to This will enable BESCOM to give 24X7 supply to Non-Agricultural loads in Rural areas Non-Agricultural loads in Rural areas Reduction in transformer failure Reduction in transformer failure Increase in metered sales Increase in metered sales Reduction in technical losses Reduction in technical losses Improved load management Improved load management The plan of implementation and progress is shown The plan of implementation and progress is shown separately. separately. NIRANTHARA JYOTHI SCHEME

NIRANTHARA JYOTHI SCHEME:

Embed Size (px)

DESCRIPTION

NIRANTHARA JYOTHI SCHEME. - PowerPoint PPT Presentation

Citation preview

Page 1: NIRANTHARA JYOTHI SCHEME:

1

NIRANTHARA JYOTHI SCHEME:NIRANTHARA JYOTHI SCHEME:

Niranthara Jyothi Project is a prestigious scheme of Niranthara Jyothi Project is a prestigious scheme of Government of Karnataka, to provide 24 hrs 3 phase Government of Karnataka, to provide 24 hrs 3 phase power supply to non-agricultural loads like domestic, power supply to non-agricultural loads like domestic, commercial, water supply, street light, rural commercial, water supply, street light, rural industries, milk dairies etc., in rural areas by industries, milk dairies etc., in rural areas by segregating the agricultural loads, which is a boon to segregating the agricultural loads, which is a boon to the rural economy. the rural economy.

Objectives :Objectives : This will enable BESCOM to give 24X7 supply to Non-This will enable BESCOM to give 24X7 supply to Non-

Agricultural loads in Rural areasAgricultural loads in Rural areas

Reduction in transformer failureReduction in transformer failure

Increase in metered salesIncrease in metered sales

Reduction in technical lossesReduction in technical losses

Improved load managementImproved load management The plan of implementation and progress is shown separately.The plan of implementation and progress is shown separately.

NIRANTHARA JYOTHI SCHEME

Page 2: NIRANTHARA JYOTHI SCHEME:

• Phase IPhase I– 25 Lots, 261 feeders, 19 taluks.25 Lots, 261 feeders, 19 taluks.– Project cost :Rs 355.85 cr.Project cost :Rs 355.85 cr.– Expected completion : Dec-2013.Expected completion : Dec-2013.

• Phase IIPhase II– 24 lots, 289 feeders, 23 taluks. 24 lots, 289 feeders, 23 taluks. – Project cost :Rs 385.71 cr.Project cost :Rs 385.71 cr.– Work Award issued for 6 Lots(86 feeders), Work Award issued for 6 Lots(86 feeders), DWA issued in Nov 2011, Jan-2012 & works are under progress.DWA issued in Nov 2011, Jan-2012 & works are under progress.– Work Award issued for 10 Lots (96 feeders) , Work Award issued for 10 Lots (96 feeders) , DWA issued in Oct, Nov 2012 & Works are under progress.DWA issued in Oct, Nov 2012 & Works are under progress.– For the 5 Lots (57 feeders), LOI is issued , DWA issued in May 2013 Work under For the 5 Lots (57 feeders), LOI is issued , DWA issued in May 2013 Work under

ProgressProgress– For the 2 Lot ( 34 feeders), LOI is issued , DWA issued in June 2013 Work under For the 2 Lot ( 34 feeders), LOI is issued , DWA issued in June 2013 Work under

ProgressProgress– For the 1 Lot ( 14 feeders),DWA issued in Oct-2013 Work under Progress.For the 1 Lot ( 14 feeders),DWA issued in Oct-2013 Work under Progress.– Note: Out of Proposed 289 feeders,287 feeders work executed by PTK and 2 feeders Note: Out of Proposed 289 feeders,287 feeders work executed by PTK and 2 feeders

are to be executed by Departmentally.are to be executed by Departmentally.

STAGES OF IMPLEMENTATION

2

Page 3: NIRANTHARA JYOTHI SCHEME:

3

BANGALORE ELECTRICITY SUPPLY COMPANY LIMITEDBANGALORE ELECTRICITY SUPPLY COMPANY LIMITED

Physical Progress of Phase-I

Page 4: NIRANTHARA JYOTHI SCHEME:

STATUS OF NIRANTHARA JYOTHI PHASE-I IN BESCOM4

Sl NoName of the

DistrictDivision

Name of the Taluk

No. of village

s covere

d

No. of existing feeders

No. of proposed

NJ feeders

Estimate cost (Rs. in Lakhs)

As per DPR

Progress Achieved

Completion

Date Feeders

completed

Feeders commision

ed

1 KolarKolar(pilot project)

Malur 272 20 10 18.67 10 10

Feb-14

2 RamanagaraRamanagara

Kanakapura 483 31 19 3184.78 18 18

3 RamanagaraRamanagara

Magadi 26 1 1 140.42 1 1

4 ChitadurgaChitradurga

Hosadurga 208 19 13 1606.12 13 13

5 Davanagere DVG Channagiri 147 53 18 1667.33 18 18

6 Davanagere HariharaHarapanahalli

113 18 10 1616.06 10 10

7 ChikkaballapuraCB pura Bagepalli 272 17 12 1588.41 12 128 Tumkur Tumkur Kunigal 414 23 16 2718.96 16 169 Tumkur Madhugiri Madhugiri 259 31 18 1897.95 18 18

10 Tumkur Tumkur Gubbi 185 68 11 1824.75 11 1111 Tumkur Madhugiri Sira 289 26 17 2423.93 17 1712 Davanagere Harihara Honnali 103 29 11 1194.42 11 1013 Chitradurga Hiriyur Hiriyur 237 29 16 2455.56 16 1614 Davanagere DVG Jagalur 106 13 9 1218.54 9 915 ChikkaballapuraChintamani Siddlaghatta 268 26 13 1969.07 13 1316 Bangalore RuralYalahanka Hosakote 222 35 18 2469.73 18 18

17 Bangalore RuralChandapura

Anekal 86 8 5 1102.06 5 5

18 Tumkur Tumkur Tumkur 569 60 25 3179.20 25 2519 Tumkur Tiptur Tiptur 224 23 12 1877.97 12 1220 Bangalore RuralYalahanka Devanahalli 208 25 17 1450.45 17 17

Total 4691 555 271 35604.38 270 269

Page 5: NIRANTHARA JYOTHI SCHEME:

5

BANGALORE ELECTRICITY SUPPLY COMPANY LIMITEDBANGALORE ELECTRICITY SUPPLY COMPANY LIMITED

Physical Progress of Phase-II

Page 6: NIRANTHARA JYOTHI SCHEME:

STATUS OF NIRANTHARA JYOTHI PHASE-II IN BESCOM

6

Sl NoName of the

DistrictName of

the Division Name of the

Taluk

LOT

NO.

No. of village

s covere

d

No. of existin

g feeder

s

No. of proposed NJ feeder

s

Estimate cost

(Rs. in Lakhs)

As per DPR

Progress Achieved

Completion

Date Feeders complet

ed

Feeders commisi

oned

1 Bangalore Rural NelamangalaDoddaballapu

ra1 240 26 17 1283.81 9 7

March-14

2 Bangalore Rural Nelamangala Nelamangala 2 235 7 7 1828.84 2 23 Ramanagara Ramanagar Ramanagara 3 20 1 1 301.97 WUP _4 Ramanagara Ramanagara Channapatna 4 168 21 10 2014.55 1 15 Tumkur Madhugiri Koratagere 9 212 17 11 1513.75 8 46 Tumkur Tiptur Turuvekere 6 207 22 14 2043.53 3 _ 7 Tumkur Tumkur Gubbi (part)** 5 190 23 14 1867.91 7 3

8 Tumkur TipturChikkanayaka

nahalli(Lot-8)

8 179 15 8 1434.704 2 2

9 Tumkur TipturChikkanayaka

nahalli(Lot-7)

7 157 15 7 1255.366 6 3

10 Kolar KGF Bangarpet 10 356 33 16 2229.28 WUP _11 Kolar KGF Mulbagal 11 233 21 12 1876.28 7 512 Kolar Kolar Kolar 12 258 40 21 2292.5 12 913 Kolar Chintamani Chintamani 13 300 33 15 2196.41 12 814 Kolar Kolar Srinivaspura 14 328 33 13 2372.22 3 _

15 ChikkaballapuraChikkaballapur

aChikkaballapu

ra15 156 16 11 1392.63 8 5

16 ChikkaballapuraChikkaballapur

aGowribidanur 16 318 31 19 2303.21 10 3

17 ChikkaballapuraChikkaballapur

aGudibande 17 77 5 3 487.67 2 _

18 Chitradurga Chitradurga Chitradurga 18 183 24 16 1346.22 1 _19 Chitradurga Chitradurga Holalkere 19 194 32 14 1761.23 WUP _20 Chitradurga Hiriyur Challakere 20 173 26 13 1807.49 _ _21 Chitradurga Hiriyur Molakalmur 21 142 25 10 1480.78 3 222 Davangere Harihara Harihara** 22 58 20 10 705.05 3 123 Davanagere Davanagere Davanagere 23 129 42 18 1859.4 3 2

24 Tumkur TumkurTumkur part 3

(Additional NJY)

24 94 14 9 917 8 8

Total   4607 542 289 38571.80 110 65