SBPDCL BRGF Project phase-I Report S. No.NIT Name of Agency R & M work ( in %) New 33 KV line( in %) New 11 KV line( in %) Supply Erection Supply Erection Supply Erection 1 196 94.55% 73.92% 84.24% 69.92% 2.00% 35.96% 57.07% 5.00% 31.04% 50.30% 2 203 48.00% 29.00% 38.50% 58.00% 7.00% 32.50% 36.00% 3.00% 19.50% 30.17% 3 204 100.00% 87.45% 93.73% 90.46% 10.16% 50.31% 82.99% 41.32% 62.16% 68.73% 4 205 97.73% 78.33% 88.03% 92.18% 11.19% 51.69% 100.00% 41.55% 70.78% 70.16% 5 206 78.65% 64.13% 71.39 88.80% 24.30% 56.55 61.26% 16.59% 38.92 54.923 6 207 100.00% 61.62% 80.81% 72.62% 2.00% 37.31% 82.13% 27.78% 54.96% 57.69% 7 208 100.00% 49.05% 74.53% 100.00% 7.17% 53.59% 100.00% 13.10% 56.55% 61.55% Overall % overall R&M work (%) new 33 kv line work (%) 11 kv line work (%) M/s GKC-APL Joint Venture, M/s Supreme & Co. Pvt. Ltd, M/s. Vijai Electricals Limited M/s Bajaj Electricals Limited, M/s East India Udyog Limited, M/s Bajaj Electricals Limited, M/s Technofab-Gammon Joint Venture,

Nit 196 Final25

Embed Size (px)

DESCRIPTION

final report of notice inviting tenders

Citation preview

%wise0SBPDCL BRGF Project phase-I ReportS. No.NITName of AgencyR & M work ( in %)New 33 KV line( in %)New 11 KV line( in %)Overall %SupplyErectionoverall R&M work (%)SupplyErectionoverall new 33 kv line work (%)SupplyErectionoverall 11 kv line work (%)1196M/s GKC-APL Joint Venture,94.55%73.92%84.24%69.92%2.00%35.96%57.07%5.00%31.04%50.30%2203M/s Supreme & Co. Pvt. Ltd,48.00%29.00%38.50%58.00%7.00%32.50%36.00%3.00%19.50%30.17%3204M/s. Vijai Electricals Limited100.00%87.45%93.73%90.46%10.16%50.31%82.99%41.32%62.16%68.73%4205M/s Bajaj Electricals Limited,97.73%78.33%88.03%92.18%11.19%51.69%100.00%41.55%70.78%70.16%5206M/s East India Udyog Limited,78.65%64.13%71.3988.80%24.30%56.5561.26%16.59%38.9254.9236207M/s Bajaj Electricals Limited,100.00%61.62%80.81%72.62%2.00%37.31%82.13%27.78%54.96%57.69%7208M/s Technofab-Gammon Joint Venture,100.00%49.05%74.53%100.00%7.17%53.59%100.00%13.10%56.55%61.55%

196.Work Achivement of last month During 23.02.2015 to 03.03.2015 of Special Plan(BRGF) Phase-INIT NO: 196/PR/SBPDCL/2013 Name of Agency: M/s GKC -APL joint venture,Hydrabad District: Gaya,Nawada & JahanabadSl NODetails of WorkUnitSupply PortionErection PortionMar-15Mar-15Achievement up to 23.02.2015Achievement up to 03.03.2015Achievement During Last MonthAchievement up to 23.02.2015Achievement up to 03.03.2015Achievement During Last Month1New PSSNosaSoil testing & Contour SurveyNos0.00.0330bConstruction of Boundry WallsNos0.00.01.7531cConstruction of Control RoomsNos0.00.0000d10 MVA Power TransformerNos$220000e33 KV VCB with Control PanelNos0.00.00000f11 KV VCB with Control PanelNos0.00.00000g33 KV & 11 KV Current TransformerNos0.00.00000h33 KV & 11 KV Potential TransformerNos0.00.00000i33 KV AB switchNos$20200000j11 KV AB switchNos0.00.000002R&M of existing Power Sub StationsNos0a5 MVA to 10 MVANos550550b33 KV VCBNos8585047514c11 KV VCBNos13313301251272d33 KV AB switchNos4747052823e11 KV AB switchNos1151150245430fCivil Works for Control rooms and Boundary WallsNos0.00.00242403New 33 KV LineCKms00a13 Meter Rail PoleNos$3733730314716bACSR Wolf ConductorKms113.0114.0100.00c33 KV V Cross arm with matching materialsNos$2442440000d33 KV Pin InsulatorsNos$1,9151,9150000e33 KV Disc/Post InsulatorsNos$6426420000fStone Base PlateNos$80780703147164New 11 KV LineCKms0a13 Meter Rail PoleCKms14801480065650b400 Kg PSC poleNos4194321325927920cACSR Dog ConductorKms4154150000d11 KV V Cross arm with matching materialsNos7607600000e11 KV Disc & Post InsulatorsNos1031030000f11 KV Pin InsulatorsNos$9,0009,0000000gStone Base PlateNos$1,8991,9121332434420\

196South Bihar Power Distribution Company LtdProgress of Work of Special Plan(BRGF) Phase-IDate:-03/03/2015NIT NO: 196/PR/SBPDCL/2013 Name of Agency: M/s GKC -APL joint venture,Hydrabad District: Gaya,Nawada & JahanabadLOA No & Date:1545 & 1546 Date :-09.12.13 Date of Agreement/Effective date:07.01.14 Date of Completion: 7 Months for R&MDate of Completion for R&M :-06.08.14Date of Completion for New PSS :-06.11.14Package Cost: 85.20 CroresStatus of Land:1) Mayabigha - Land Made AvailableStatus of Mobilization Advance: Payment done (INR 6,71,00,000/- for Supply and INR 1,81,00,000/- for Erection portion) (Total INR 8.52 Crores)2) Majhwe - Land Made Available3) Dakhshini Jehanabad - Land Acquired by 11.09.2014Sl NODetails of WorkUnitFrozen. QuantitySupply PortionErection PortionMar-15Mar-15Cumulative TargetAchieved% of work completedCumulative TargetAchieved% of work completed1New PSSNos3aSoil testing & Contour SurveyNos30.00.00.00%33100%bConstruction of Boundry WallsNos30.00.00.00%33100%78.795cConstruction of Control RoomsNos30.00.00.00%3133%d10 MVA Power TransformerNos666100.00%600%e33 KV VCB with Control PanelNos121212100.00%1200%f11 KV VCB with Control PanelNos242424100.00%2400%g33 KV & 11 KV Current TransformerNos36+7236+7236+72100.00%36+7200%h33 KV & 11 KV Potential TransformerNos9+99+99+9100.00%9+900%i33 KV AB switchNos30302066.67%3000%j11 KV AB switchNos515151100.00%5100%2R&M of existing Power Sub StationsNos39a5 MVA to 10 MVANos555100.00%55100%b33 KV VCBNos858585100.00%725272%c11 KV VCBNos133133133100.00%13112797%d33 KV AB switchNos50504794.00%502448%e11 KV AB switchNos14614611578.77%1465840%fCivil Works for Control rooms and Boundary WallsNos29290.00.00%292483%4.71428571433New 33 KV LineCKms48.000%a13 Meter Rail PoleNos91291269275.88%999515%bACSR Wolf ConductorKms148.32170.07114.067.03%170.070.00%c33 KV V Cross arm with matching materialsNos84684624428.84%84600%d33 KV Pin InsulatorsNos285928591,91566.98%285900%e33 KV Disc/Post InsulatorsNos642642642100.00%64200%fStone Base PlateNos99999980780.78%999515%4New 11 KV LineCKms176.3800%a13 Meter Rail PoleCKms16151615148091.64%2304844%b400 Kg PSC poleNos13861386108478.21%154631921%cACSR Dog ConductorNos545.0142621.841566.74%621.800%d11 KV V Cross arm with matching materialsKms3096309676024.55%309600%e11 KV Disc & Post InsulatorsNos285628561033.61%285600%f11 KV Pin InsulatorsNos10578105789,00085.08%1057800%gStone Base PlateNos300138501,91249.66%385040310%

&CPage &P of &N

Dist-gayaSouth Bihar Power Distribution Company Limited:Patna Achievement Vs Target for (Supply &Erection) (New & R&M Works) up to December 14 under Special Plan(BRGF) Phase-INIT NO: 196/PR/SBPDCL/2013 Date:13/03/2015Name of Agency: M/s GKC -APL joint venture,HydrabadDistricts: GayaLOA No & Date: 1545 & 1546 Date :-09.12.13Date of Agreement/Effective date: 07.01.14Date of Completion:-06.11.14Package Cost: 14.95 CroresStatus of Mobilization Advance: ( 1.495 Crores = Supply + Erection )Sl NODetails of WorkUnitFrozen. QuantityMar-15SupplyErectionRemarksCumulative TargetCumulative AchivementCumulative TargetCumulative Achivement1R&M of PSSNos160.0100.0a5 MVA to 10 MVANos22222b3.15MVA to 5MVANos0.00.00.00.00.0c33 KV VCBNos2929292925d11 KV VCBNos6565296559e33 KV AB switchNos4343374318f11 KV AB switchNos62626262132New Line (11 KV)CKms20.30.019.70.0a13 Meter Rail PoleNos1791791701790.0b400 Kg PSC poleNos161.5161.5132161.561cACSR Dog ConductorKms62.762.73162.70.0d11 KV V Cross arm with matching materialsNos345.0345.0253345.0e11 KV Disc & Post InsulatorsNos4140.04140.04140.0f11 KV Pin InsulatorsNos1156.01156.010261156.0gStone Base PlateNos340.0340.0340.0340.061As per Approved Bar Chart/Pert Network

Dist-NawadaSouth Bihar Power Distribution Company Limited:Patna Achievement Vs Target for (Supply &Erection) (New & R&M Works) up to December 14 under Special Plan(BRGF) Phase-INIT NO: 196/PR/SBPDCL/2013 Date:13/03/2015Name of Agency: M/s GKC -APL joint venture,HydrabadDistricts: NawadaLOA No & Date: 1545 & 1546 Date :-09.12.13Date of Agreement/Effective date: 07.01.14Date of Completion:-06.11.14Package Cost: 42.58 CroresStatus of Mobilization Advance: ( 4.258 Crores = Supply + Erection )Sl NODetails of WorkUnitFrozen. QuantityMar-15SupplyErectionRemarksCumulative TargetCumulative AchivementCumulative TargetCumulative Achivement1New PSSNos220.020.0aSoil testing & Contour SurveyNosbConstruction of Boundry WallsNoscConstruction of Control RoomsNosd10 MVA Power TransformerNos440.040.0e33 KV VCBNos880.080.0f11 KV VCBNos16160.0160.0g33 KV AB switchNos202020200.0h11 KV AB switchNos34340.0340.02R&M of PSSNos13130.0130.0a5 MVA to 10 MVANos0.00.00.00.00.0b3.15MVA to 5MVANos220.020.0c33 KV VCBNos1818171810c11 KV VCBNos4444324431d33 KV AB switchNos101010106e11 KV AB switchNos35353435273New 33 KV LineCKms40.50.047.50.0a13 Meter Rail PoleNos7707704927700.0bACSR Wolf ConductorKms125.145125.14590.0125.1450.0c33 KV V Cross arm with matching materialsNos729729729d33 KV Pin InsulatorsNos230723072307e33 KV Disc/Post InsulatorsNos729729729fStone Base PlateNos7707707704New 11 KV LineCKms100.40.082.30.0a13 Meter Rail PoleNos966.96115330811536b400 Kg PSC poleNos739805150805196cACSR Dog ConductorKms2542542332540.0d11 KV V Cross arm with matching materialsNos170619581958e11 KV Disc & Post InsulatorsNos602494494f11 KV Pin InsulatorsNos511858745874gStone Base PlateNos170619581958202As per Approved Bar Chart/Pert Network

Dist-JehanabadSouth Bihar Power Distribution Company Limited:Patna Achievement Vs Target for (Supply &Erection) (New & R&M Works) up to December 14 under Special Plan(BRGF) Phase-INIT NO: 196/PR/SBPDCL/2013 Date:30/03/2015Name of Agency: M/s GKC -APL joint venture,HydrabadDistricts: JahanabadLOA No & Date: 1545 & 1546 Date :-09.12.13Date of Agreement/Effective date: 07.01.14Date of Completion:-06.11.14Package Cost: 27.7 CroresStatus of Mobilization Advance: ( 2.77 Crores = Supply + Erection )Sl NODetails of WorkUnitFrozen. QuantityMar-15SupplyErectionRemarksCumulative TargetCumulative AchivementCumulative TargetCumulative Achivement1New PSSNos110.010.0aSoil testing & Contour SurveyNos111bConstruction of Boundry WallsNos111cConstruction of Control RoomsNos11d10 MVA Power TransformerNos22220.0e33 KV VCBNos440.040.0f11 KV VCBNos880.080.0g33 KV AB switchNos10100.0100.0h11 KV AB switchNos17170.0170.02R&M of PSSNos10100.0100.0a5 MVA to 10 MVANos33333b3.15MVA to 5MVANos33032c33 KV VCBNos2525252516c11 KV VCBNos5858365837d33 KV AB switchNos33030.0e11 KV AB switchNos4949494973New 33 KV LineCKms7.50a13 Meter Rail PoleNos14314314314351bACSR Wolf ConductorKms232323230.0c33 KV V Cross arm with matching materialsNos135135135135d33 KV Pin InsulatorsNos427427427427e33 KV Disc/Post InsulatorsNos13513513513596fStone Base PlateNos143143143143511624New Line (11 KV)CKms56.00740.057a13 Meter Rail PoleNos46946946946978b400 Kg PSC poleNos48648648648696cACSR Dog ConductorKms1731731201730.0d11 KV V Cross arm with matching materialsNos952952253952253.3333333333e11 KV Disc & Post InsulatorsNos672672100672f11 KV Pin InsulatorsNos30243024302430243000gStone Base PlateNos955955637955174637.3333333333As per Approved Bar Chart/Pert Network

Feeder-gayaSouth Bihar Power Distribution Company Limited:Patna Special Plan(BRGF) Phase-IDETAILS OF Feeders(33KV & 11KV Line)BRGF WORK IN Gaya DistrictDate:13/03/20151.Name of Agency: M/s GKC-APL Joint Venture,Survey No. 9(P), CII Green Building Lane, Hitech City Kondapur, Hyderabad-500084Sl.No.ParticularName of FeederLength of Line On rail Pole(LOA Quantity)CKmLength of Line on PSC Pole(LOA Quantity)CKmRail Pole(LOA Quantity)CKmPSC Pole(LOA Quantity)CKmLength of Line (In CKm.)Proposed Qty (In Nos)Pole dumped at sitePole Erection(In Nos.)Stringing(In Ckm)RemarksFromToRail PolePSC PoleRail PolePSC PoleRail PolePSC PoleRail PolePSC PoleRail PolePSC Pole1New 11 KV LinepaibighaKathar30.930.9170170406807000000Imamgunj PSSImamgunj Town3.1505406000000Imamgunj PSSRanigunj3.3805706000WIP00BelaganjKabirpur04.507708802700PaibighaMen05085011203400Sub-Total30.930.917017010.539.5179.01161.519020006100

feeder-nawadaSouth Bihar Power Distribution Company Limited:Patna Special Plan(BRGF) Phase-IDETAILS OF Feeders(33KV & 11KV Line)BRGF WORK IN Nawada DistrictDate:03/03/2015A. Special Plan(BRGF) Phase-I1.Name of Agency: M/s GKC-APL Joint Venture,Sl.No.ParticularName of FeederLength of Line On rail Pole(LOA Quantity)CKMRail Pole(LOA Quantity)CKMLength of Line (In Km.)Proposed Qty (In Nos)Pole dumped at sitePole Erection(In Nos.)Stringing(In Ckm)RemarksFromToRail PoleRail PoleRail PoleRail PoleRail Pole1New 33 KV LineNawadaOrhanpur New PSS60114012.523824000Nawada GridMayabigha New PSS152851700Wagirganj GridMajhwe1324723500Sub-Total60114040.5770492002New 11 KV LineFromToLength of Line On rail Pole(LOA Quantity)CKMLength of Line on PSC Pole(LOA Quantity)CKMRail Pole(LOA Quantity)CKMPSC Pole(LOA Quantity)CKMRail PolePSC PoleRail PolePSC PoleRail PolePSC PoleRail PolePSC PoleRail PolePSC Pole1)Majhwe toChetriya64641088108812.68021600000002)Majhwe New PSS toBaidnathpur06.1701050150015003)Majhwe New PSS toLatawan70119080000004)Majhwe New PSS toGaundane Bigha16.3027701000110005)Majhwe New PSS toNagma16.4102790113000006)Majhwe New PSS toTungi02.4704205000007) Govindpur PSS toLakhpath bigha08.8801510150013600row problem9) Mayabigha New PSS toKadirganj Town1.20200200000010) Mayabigha New PSS toPachiya05.4709301200450011)Mayabigha New PSS toThika06.701140125000012) Mayabigha New PSS toHemja0601020110000013) Mayabigha New PSS toDaulatia Village07.7801320140000014) Mayabigha New PSS toAathi3.2905605600000Sub-Total64641088108856.8843.47966.967393698451119600

feeder-jehanabadSouth Bihar Power Distribution Company Limited:Patna Special Plan(BRGF) Phase-IDETAILS OF Feeders(33KV & 11KV Line)BRGF WORK IN Jehanabad DistrictA. Special Plan(BRGF) Phase-IDate:26.03.20151.Name of Agency: M/s GKC-APL Joint Venture,Sl.No.ParticularName of FeederLength of Line On rail Pole(LOA Quantity)CKMRail Pole(LOA Quantity)CKMLength of Line (In Km.)Proposed Qty (In Nos)Pole dumped at sitePole Erection(In Nos.)Stringing(In Ckm)RemarksFromToRail PoleRail PoleRail PoleRail PoleRail Pole133KV Line1) Erki Grid toDakshin Jahanabad152857.51432005100Sub-Total152857.51432005100211 kV LineFromToLength of Line On rail Pole(LOA Quantity)CKMLength of Line on PSC Pole(LOA Quantity)CKMRail Pole(LOA Quantity)CKMPSC Pole(LOA Quantity)CKMRail PolePSC PoleRail PolePSC PoleRail PolePSC PoleRail PolePSC PoleRail PolePSC PoleDakshin Jehanabad New PSSBharthua50508508501.5002603507000Dakshin Jehanabad New PSSHajipur4.1907108000000Dakshin Jehanabad New PSSNarayanpur2.0003403000000Dakshin Jehanabad New PSSNonhi8.510145017500000Dakshin Jehanabad New PSSPijora11.1001890200071000Dakshin Jehanabad New PSSRanipur0.20040500000Ghosi PSSGhosi Town04.5007709007300Hulasganj PSSHulasganj town04.5007709702300Jehnabad old PSSJehanabad Town FS05.00085000000Kako PssKako town03.500600500000Makhdampur PSSMakhdampur town05.000850500000Sakurabad PssSakurbad Town06.00010201000000Sub- Total505085085027.5028.50469.00486.00525.00387.0078.0096.000.000.000.00

R&M-196RENOVATION & MODERNIZATION OF 33/11 KV PSSNIT NO: 196/PR/SBPDCL/2013 Name of Agency: M/s GKC -APL joint venture,Hydrabad District: Gaya,Nawada & JahanabadS. NoName Of PSSRural/UrbanAugmentation of Power TransformerVCB InstallationCR Panel InstallationLightning ArrestersIsolator/AB switchPSS EarthingLaying Of Cantrol CableGravel FillingStructure PaintingYard LightingPatch WorkPaintingRural/Urban3.15 To 5 MVA5 To 10 MVAas per Loa33 KV11 KV33 KV11 KV33 KV11 KV33 KV11 KVBoundry WallCantrol RoomCable TrenchBoundry WallCantrol RoomGAYA1BelaganjRNo scope113211111--1completecompletecompletecompletecompletenot startedCompleteComplete112TekariR122424142711WIPcomplete-143SherghatiUNo scope22627124611completecompletecompletecompletecompleteCompleteCompleteComplete124GuraruR23535123-1-completecompletecompletecompletecompleteCompleteCompleteComplete125GuruaR21515141-1-completecompletecompletecompletecompleteCompleteCompleteComplete146SobhR2252522331-completecompletecompletecompletecompleteCompleteCompleteComplete227ChakandR3333413-21-WIPWIPcompletecompletecompleteCompleteCompleteComplete138KonchR123--12----completeWIPcompletecompletecompleteCompleteCompleteComplete129CherkiR226-614--WIP-completecompletecompletecompletecompleteCompleteCompleteComplete1410ImamaganjR4---234--completecompletecompletecompletecompleteCompleteCompleteComplete-211PaibighaR62-2completecomplete-212DhobiR3636161completecompletecompletecompleteCompleteCompleteComplete1613DumariaRcompletecompletecompletecompleteCompleteCompleteComplete--14AmasR1412completecompletecompletecompleteCompleteCompleteComplete1215BaltarwaR116Cherkiriya112completecompleteCompleteCompleteComplete12.completed021726591743133818246300000000JEHANABAD1ErkiR12251300-11-CompleteCompleteCompletecompletecompletecompletecompletecomplete2MakadampurR11225261--611CompleteCompleteCompleteCompleteCompletecompleteCompleteComplete3SakurabadRNo scope2252522----CompleteCompleteCompletecompletecompletecompleteCompleteComplete4TehtaR132424------not started-CompleteCompleteCompletecompleteCompleteComplete5KakoRNo scope211--11----WIPCompleteCompletecompleteCompletecompleteCompleteComplete6GhosiR2-4-4----WIPCompleteWIP7HulasganjR3353523----not startedCompleteCompletecompleteCompletecompleteCompleteComplete8ChauriR22WIP2-------WIPCompleteWIPcompleteCompletecompleteCompleteComplete9JehanabadU1318-1------WIPComplete----10MaKpaRNo scope11-1-------CompleteCompleteCompleteCompleteCompletecompleteCompleteCompleteCompleted2371637132866072100076666NAWADA1HISSUAUNo scopeNo scope336--2737complete-completecompleteWIPcompletecompletecompletecompletecomplete2PAKRIBARAWAU25--10-5complete-completecompleteWIPcompletecompletecompletecompletecomplete3SIRDALLAR214--34--complete-completecompletecompletecompletecompletecompletecompletecomplete4BADUKRAR214--0514complete-completecompletecompletecompletecompletecompletecompletecomplete5AKBARPURR314--2527complete--completecompletecompletecompletecompletecompletecomplete6ROHAR234--12--complete-WIPcompleteWIPcompletecompletecompletecompletecomplete7WARISALIGANJU214--25-4complete-WIPcompletecomplete8KAWAKOLR2-0-------completeWIPcompletecompletecompletecompletecomplete9RAJAULIU2-0------complete--WIP10CherkiyarRcompletecompletecompletecompletecompletecompletecomplete11NardiganjRcompletecompletecompletecompletecompletecompletecomplete12OrhanpurRcompletecompletecompletecompletecompletecompletecomplete13GovindpurRcompletecompletecompletecompletecompleteCompleted1110310011286270000077667Total Completed253552127307130722458140001413121213326

BRGF:Damage conditionBRGF:DAMAGE CONDITIONBRGF:Painting completedBRGF-:Damage condition.Approval from SBPDCL ProcessBRGF:Damage contion.Approval from SBPDCL PROPESS

Line_cluster-196South Bihar Power Distribution Company Limited:Patna Special Plan(BRGF) Phase-IDETAILS OF Feeders(33KV & 11KV Line)BRGF Phase-IDate:-11/03/2015NIT NO: 196/PR/SBPDCL/2013 District: Gaya,Nawada & JahanabadName of Agency: M/s GKC -APL joint venture,HydrabadSl.No.ParticularName of FeederLength of Line On rail Pole(LOA Quantity)CKMRail Pole(LOA Quantity)CKMLength of Line in CKMProposed Qty (In Nos)Pole dumped at sitePole Erection(In Nos.)Stringing(In Ckm)RemarksFromToRail PoleRail PoleRail PoleRail PoleRail Pole133KV LineSub-Total75142548912692510211KV LineFromToLength of Line On rail Pole(LOA Quantity)CKMLength of Line on PSC Pole(LOA Quantity)CKMRail Pole(LOA Quantity)CKMPSC Pole(LOA Quantity)CKMRail PolePSC PoleRail PolePSC PoleRail PolePSC PoleRail PolePSC PoleRail PolePSC PoleSub-Total144.9144.92108210894.9181.47161513861084143289353000

Sheet1