57
NORFOLK AIRPORT AUTHORITY REQUESTS FOR PROPOSALS AIRPORT PARKING ACCESS AND REVENUE CONTROL SYSTEM ADDENDUM NO. 1 POSTED JUNE 18, 2018 Offerors are reminded to acknowledge this addendum on the proposal sheet. Included in this Addendum: 1. May 31, 2018 Pre-proposal Meeting Roster of attendees 2. May 31, 2018 Pre-proposal Meeting PowerPoint information 3. Questions from potential Vendors/Offerors with Norfolk Airport Authority Responses 4. The drawings, etc. referenced in the Questions and Answers may be referenced at the following link: https://spaces.hightail.com/receive/oMDittW3qX 5. Through this addendum, the following corrections/updates are made to the RFP documents: a. Please remove any reference to Appendix C (Governing Standards and Design Criteria). b. Please remove any reference to Appendix E regarding location of RFID equipment. c. Reference Question #81 that references Section 2.04.G.2, remove reference to “ORF’s Standards for Computing Resources”. d. Please remove reference to Pay on Foot capabilities in this RFP.

NORFOLK AIRPORT AUTHORITY REQUESTS FOR … Airport... · Rental Car Ready/Return Lots = 636 ... RFP-Airport Parking Access and Revenue Control System Pre-Proposal Meeting May 31,

  • Upload
    vancong

  • View
    221

  • Download
    0

Embed Size (px)

Citation preview

Page 1: NORFOLK AIRPORT AUTHORITY REQUESTS FOR … Airport... · Rental Car Ready/Return Lots = 636 ... RFP-Airport Parking Access and Revenue Control System Pre-Proposal Meeting May 31,

NORFOLK AIRPORT AUTHORITY

REQUESTS FOR PROPOSALS AIRPORT PARKING ACCESS AND REVENUE CONTROL SYSTEM

ADDENDUM NO. 1

POSTED JUNE 18, 2018

Offerors are reminded to acknowledge this addendum on the proposal sheet. Included in this Addendum:

1. May 31, 2018 Pre-proposal Meeting Roster of attendees 2. May 31, 2018 Pre-proposal Meeting PowerPoint information 3. Questions from potential Vendors/Offerors with Norfolk Airport Authority Responses 4. The drawings, etc. referenced in the Questions and Answers may be referenced at the

following link: https://spaces.hightail.com/receive/oMDittW3qX 5. Through this addendum, the following corrections/updates are made to the RFP

documents: a. Please remove any reference to Appendix C (Governing Standards and Design

Criteria). b. Please remove any reference to Appendix E regarding location of RFID

equipment. c. Reference Question #81 that references Section 2.04.G.2, remove reference to

“ORF’s Standards for Computing Resources”. d. Please remove reference to Pay on Foot capabilities in this RFP.

Page 2: NORFOLK AIRPORT AUTHORITY REQUESTS FOR … Airport... · Rental Car Ready/Return Lots = 636 ... RFP-Airport Parking Access and Revenue Control System Pre-Proposal Meeting May 31,
Page 3: NORFOLK AIRPORT AUTHORITY REQUESTS FOR … Airport... · Rental Car Ready/Return Lots = 636 ... RFP-Airport Parking Access and Revenue Control System Pre-Proposal Meeting May 31,
Page 4: NORFOLK AIRPORT AUTHORITY REQUESTS FOR … Airport... · Rental Car Ready/Return Lots = 636 ... RFP-Airport Parking Access and Revenue Control System Pre-Proposal Meeting May 31,
Page 5: NORFOLK AIRPORT AUTHORITY REQUESTS FOR … Airport... · Rental Car Ready/Return Lots = 636 ... RFP-Airport Parking Access and Revenue Control System Pre-Proposal Meeting May 31,
Page 6: NORFOLK AIRPORT AUTHORITY REQUESTS FOR … Airport... · Rental Car Ready/Return Lots = 636 ... RFP-Airport Parking Access and Revenue Control System Pre-Proposal Meeting May 31,
Page 7: NORFOLK AIRPORT AUTHORITY REQUESTS FOR … Airport... · Rental Car Ready/Return Lots = 636 ... RFP-Airport Parking Access and Revenue Control System Pre-Proposal Meeting May 31,
Page 8: NORFOLK AIRPORT AUTHORITY REQUESTS FOR … Airport... · Rental Car Ready/Return Lots = 636 ... RFP-Airport Parking Access and Revenue Control System Pre-Proposal Meeting May 31,

Pre-proposal Meeting May 31, 2018 2:00 p.m.

Page 9: NORFOLK AIRPORT AUTHORITY REQUESTS FOR … Airport... · Rental Car Ready/Return Lots = 636 ... RFP-Airport Parking Access and Revenue Control System Pre-Proposal Meeting May 31,

Sign Roster Meeting Agenda This meeting is optional. Representation is

not required in order to submit a proposal. Copy of this presentation will be available on

website. http://www.norfolkairport.com/about-us/business-opportunities

Authority representatives

Page 10: NORFOLK AIRPORT AUTHORITY REQUESTS FOR … Airport... · Rental Car Ready/Return Lots = 636 ... RFP-Airport Parking Access and Revenue Control System Pre-Proposal Meeting May 31,

Approximately 2002 – PARCS installed by (then) ACS Transport Systems, formerly ASCOM Transport Systems.

2006 – Kimley-Horn conducted study to help Authority decide whether to replace PARCS or upgrade. Airport decided to upgrade.

2008 - Subsequent to the 2006 study, PARCS was upgraded to include credit card express exit terminals (currently in use today)

Page 11: NORFOLK AIRPORT AUTHORITY REQUESTS FOR … Airport... · Rental Car Ready/Return Lots = 636 ... RFP-Airport Parking Access and Revenue Control System Pre-Proposal Meeting May 31,

2011 – Arrivals West cashier plaza relocated and expanded, adding additional credit card only exit lanes.

June 2017 – Kimley-Horn was contracted to evaulate the current PARCS.

May 2018 – Authority posted RFP for replacement PARCS.

Page 12: NORFOLK AIRPORT AUTHORITY REQUESTS FOR … Airport... · Rental Car Ready/Return Lots = 636 ... RFP-Airport Parking Access and Revenue Control System Pre-Proposal Meeting May 31,

ASCOM/ACS equipment installed, maintained and managed by Xerox Transport Solutions/Conduent

Maintenance performed by Conduent on-site staff

Page 13: NORFOLK AIRPORT AUTHORITY REQUESTS FOR … Airport... · Rental Car Ready/Return Lots = 636 ... RFP-Airport Parking Access and Revenue Control System Pre-Proposal Meeting May 31,

The Authority operates the parking department.

Parking staff consists of 55 employees (includes 2 part-time)

On-site technician(s) will be required to obtain a SIDA badge at a cost of $50. This badge is required to access the security-controlled areas of the airport.

Page 14: NORFOLK AIRPORT AUTHORITY REQUESTS FOR … Airport... · Rental Car Ready/Return Lots = 636 ... RFP-Airport Parking Access and Revenue Control System Pre-Proposal Meeting May 31,

First Data is the current credit card processor Currently utilize Monetra interface to bridge

communications between WebPRCS 8.2 and First Data. The Authority prefers to eliminate the need for a third-party interface.

Sera-Brynn, LLC serves as the Authority’s PCI Quality Security Assessor (QSA).

Authority currently has a PCI DSS Policies and Procedures manual.

Page 15: NORFOLK AIRPORT AUTHORITY REQUESTS FOR … Airport... · Rental Car Ready/Return Lots = 636 ... RFP-Airport Parking Access and Revenue Control System Pre-Proposal Meeting May 31,

The RFP documents reference Exhibit C (IT Governing Standards and Design Criteria) This reference was a placeholder and no such

document exists. The Authority requires non-proprietary

equipment (switches, etc.) that can be replaced with off-the-shelf equipment.

The Authority prefers Cisco switches and Dell computers.

Page 16: NORFOLK AIRPORT AUTHORITY REQUESTS FOR … Airport... · Rental Car Ready/Return Lots = 636 ... RFP-Airport Parking Access and Revenue Control System Pre-Proposal Meeting May 31,

FY2017 Parking Revenue = $14,898,174 FY2017 Parking Revenue up 1.7% from 2016 Approximately 85% total revenue collected by

credit card During FY 2017, the parking department

processed a total of 896,299 revenue-paying vehicles.

Page 17: NORFOLK AIRPORT AUTHORITY REQUESTS FOR … Airport... · Rental Car Ready/Return Lots = 636 ... RFP-Airport Parking Access and Revenue Control System Pre-Proposal Meeting May 31,

Furnish and install a fully integrated on-line, real-time PARCS that shall function as described in the specifications included within the RFP documents.

Page 18: NORFOLK AIRPORT AUTHORITY REQUESTS FOR … Airport... · Rental Car Ready/Return Lots = 636 ... RFP-Airport Parking Access and Revenue Control System Pre-Proposal Meeting May 31,

The project shall utilize the industry’s latest technological advancements to control access and calculate and accurately report revenue for the parking facilities and improve the overall management, system efficiency, revenue accounting, revenue security, and customer service aspects of the parking operations at the Airport.

Page 19: NORFOLK AIRPORT AUTHORITY REQUESTS FOR … Airport... · Rental Car Ready/Return Lots = 636 ... RFP-Airport Parking Access and Revenue Control System Pre-Proposal Meeting May 31,

This project shall implement hardware and application software that will meet or exceed the Authority’s parking access and revenue control needs for at least 10 years after the system’s final acceptance.

Page 20: NORFOLK AIRPORT AUTHORITY REQUESTS FOR … Airport... · Rental Car Ready/Return Lots = 636 ... RFP-Airport Parking Access and Revenue Control System Pre-Proposal Meeting May 31,

The following are a highlighted objectives intended to prompt thought and conversation in this forum.

The PARCS shall be designed with an open architecture to provide integration to third party applications.

Contractor shall reuse existing infrastructure when possible, including such items as existing conduit, cashier booths, etc. Loops shall be installed new.

Page 21: NORFOLK AIRPORT AUTHORITY REQUESTS FOR … Airport... · Rental Car Ready/Return Lots = 636 ... RFP-Airport Parking Access and Revenue Control System Pre-Proposal Meeting May 31,

Achieve a PCI DSS and PA DSS compliant environment and use P2PE with chip- card processing to an off-site 3rd party to reduce PCI scope.

Accurately track required financial and statistical information

Increase efficiency of operations and maintenance

Page 22: NORFOLK AIRPORT AUTHORITY REQUESTS FOR … Airport... · Rental Car Ready/Return Lots = 636 ... RFP-Airport Parking Access and Revenue Control System Pre-Proposal Meeting May 31,

Provide flexibility in the timing and formatting of the pertinent operational and management reports

Ensure flexibility and scalability for any future need to update, upgrade, and/or expand the system readily (additional lanes and parking products as well as additional facilities)

Provide electronic validations that may be presented by the patron in all lanes, including processing in self-service lanes,

Page 23: NORFOLK AIRPORT AUTHORITY REQUESTS FOR … Airport... · Rental Car Ready/Return Lots = 636 ... RFP-Airport Parking Access and Revenue Control System Pre-Proposal Meeting May 31,

Provide Loyalty programs specified and designed by user, e.g. fee adjustments for frequent users, Reserved Parking Program.

Simplified maintenance procedures for lane equipment and back-office / IT infrastructure.

Provide a Command Center to overview activities in every lane and allow intercom communications and image reviewing for License Plate Recognition

PGS shall be an open architecture design

Page 24: NORFOLK AIRPORT AUTHORITY REQUESTS FOR … Airport... · Rental Car Ready/Return Lots = 636 ... RFP-Airport Parking Access and Revenue Control System Pre-Proposal Meeting May 31,

Accurately calculate parking space availability on a level-by-level and/or space- by-space basis.

Increase efficiency of operations through reduction of person-hours required for parking occupancy validation.

Commercial Ground Transportation Revenue Collection System

Page 25: NORFOLK AIRPORT AUTHORITY REQUESTS FOR … Airport... · Rental Car Ready/Return Lots = 636 ... RFP-Airport Parking Access and Revenue Control System Pre-Proposal Meeting May 31,
Page 26: NORFOLK AIRPORT AUTHORITY REQUESTS FOR … Airport... · Rental Car Ready/Return Lots = 636 ... RFP-Airport Parking Access and Revenue Control System Pre-Proposal Meeting May 31,
Page 27: NORFOLK AIRPORT AUTHORITY REQUESTS FOR … Airport... · Rental Car Ready/Return Lots = 636 ... RFP-Airport Parking Access and Revenue Control System Pre-Proposal Meeting May 31,

Five separate parking facilities ◦ Arrivals West – (3) Long Term entrance lanes, (2)

short term entrance lanes, 1 consolidated exit plaza with (4) cashier booths and (5) express exit lanes. ◦ Rental Ready/Return Facilities – located on the

ground and 2nd floors of Garage A with dedicated entrance and exit (non-revenue). ◦ Long Term East – (3) entrance lanes, (2) cashier

booths. ◦ Short Term North – (2) entrance lanes, (2) cashier

booths ◦ Short Term South – (4) entrance lanes, (2) cashier

booths.

Page 28: NORFOLK AIRPORT AUTHORITY REQUESTS FOR … Airport... · Rental Car Ready/Return Lots = 636 ... RFP-Airport Parking Access and Revenue Control System Pre-Proposal Meeting May 31,

ET = Entrance Terminal XT = Express Exit Terminal CB = Cashier Booth

Page 29: NORFOLK AIRPORT AUTHORITY REQUESTS FOR … Airport... · Rental Car Ready/Return Lots = 636 ... RFP-Airport Parking Access and Revenue Control System Pre-Proposal Meeting May 31,

Arrivals West = 4,595 long term spaces and 282 short term spaces ◦ Includes Garages A, B, C, Lot D

Rental Car Ready/Return Lots = 636 (non-revenue)

Long Term East = 2,052 spaces Short Term North = 152 spaces Short Term South = 177 spaces

Page 30: NORFOLK AIRPORT AUTHORITY REQUESTS FOR … Airport... · Rental Car Ready/Return Lots = 636 ... RFP-Airport Parking Access and Revenue Control System Pre-Proposal Meeting May 31,

All questions must be submitted in writing, preferably by email.

Questions from Offerors must be submitted no later than June 8, 2018 at 5:00 p.m. to:

Steve Sterling, Deputy Executive Director A&O Norfolk Airport Authority 2200 Norview Ave. Norfolk, VA 23518 or by email to [email protected]

Page 31: NORFOLK AIRPORT AUTHORITY REQUESTS FOR … Airport... · Rental Car Ready/Return Lots = 636 ... RFP-Airport Parking Access and Revenue Control System Pre-Proposal Meeting May 31,

Responses will be in the form of an addendum and will be posted to the Norfolk Airport Authority website under Business Opportunities as well as emailed to the attendees of this meeting (to the email address on the roster).

Addendum will be posted by June 15, 2018 at 5 p.m.

Page 32: NORFOLK AIRPORT AUTHORITY REQUESTS FOR … Airport... · Rental Car Ready/Return Lots = 636 ... RFP-Airport Parking Access and Revenue Control System Pre-Proposal Meeting May 31,

Submit pricing using the pricing template provided with the RFP Documents. This template is on a separate MS Excel File which must be downloaded as part of the RFP package. Proposers must print and attach their completed Cost Proposal form to each copy of their proposal document, and submit an electronic file.

Page 33: NORFOLK AIRPORT AUTHORITY REQUESTS FOR … Airport... · Rental Car Ready/Return Lots = 636 ... RFP-Airport Parking Access and Revenue Control System Pre-Proposal Meeting May 31,

If the Authority issues an addendum to the Contract prior to the date established for receipt of Proposals, Offeror shall acknowledge the addendum(s) on the proposal sheet.

Page 34: NORFOLK AIRPORT AUTHORITY REQUESTS FOR … Airport... · Rental Car Ready/Return Lots = 636 ... RFP-Airport Parking Access and Revenue Control System Pre-Proposal Meeting May 31,

Submit responses to RFP by July 19, 2018 at 2:00 p.m. (1 pdf copy on CD, 1 original hard copy, 4 hard copies).

Award is anticipated by September 19, 2018.

Page 35: NORFOLK AIRPORT AUTHORITY REQUESTS FOR … Airport... · Rental Car Ready/Return Lots = 636 ... RFP-Airport Parking Access and Revenue Control System Pre-Proposal Meeting May 31,

Verify signed roster

Page 36: NORFOLK AIRPORT AUTHORITY REQUESTS FOR … Airport... · Rental Car Ready/Return Lots = 636 ... RFP-Airport Parking Access and Revenue Control System Pre-Proposal Meeting May 31,

Norfolk Airport Authority RFP-Airport Parking Access and Revenue Control System

Pre-Proposal Meeting May 31, 2018

The following additional instructions were announced by Chuck Reedstrom of Kimley Horn during the pre-proposal meeting on May 31, 2018. Offers shall incorporate this information into their proposals.

o Page 3-15 – The proposed Command Center will be located in the Parking Office o Page 3-15 – The Airport current deploys pre-capture LPR, but need to check the Short-

Term lost to see how if can implement pre-capture LPR. If we can’t Pre-Capture, we might need Post Capture in ST lots.

o Page 3-30 – Change Notice to Proceed to September, 2018. o Page 3-36 - Airport to provide level 1 maintenance and vendor will provide level 2 and

level 3. o Page 3-38 – Vendors will provide an electronic maintenance tracking system and the

airport should have access o Page 3-46 - The Airport estimates the following volumes of consumables:

• ET tickets 1,500,000 (1.5 million) • XT receipt tickets 200,000 • Exception tickets 25,000 • ST receipt rolls(small) 400 • LT receipt rolls(large) 350

o Page 3-49 – Change to five hard copies and one electronic (PDF) copy. o Page 3-50 – Change to five hard copies and one electronic (PDF) copy. o Page 3-52 – Change to five hard copies and one electronic (PDF) copy. o Page 3-50 – The list of reports is not intended to be all inclusive. o Page 3-75 - All entry stations and exits shall be keyed alike. o Page 3-80 – Add the requirement for all entry and exit devices to include Barcode

readers for electronic validation (smartphone or hardcopy). o Page 3-77 – All cashier terminals shall be provided with Dual drawers o Page 3-77 - If a cashier logs off, the lane should act as express exits o Page 3-80 - Unattended exit stations need to include add barcode readers and mobile

payment options. o Page 3-87 – We want to work with the selected vendor to figure out how to place LPR

cameras in the surface lots. This will require construction drawings stamped by a professional engineer licensed to practice in the State of Virginia.

o Page 3-112 – The vendor is responsible to remove existing equipment offsite. All equipment shall be wiped clean of all data prior to disposal.

o Page 3-112 - Field Quality Control: FAT, LAT, SAT, Vehicle sensor test (VST), and ODT. The vendor shall provide the methodology for testing LPR.

o The vendor shall provide a minimum of 100 license plates from VA and continuous states for testing the LPR.

Page 37: NORFOLK AIRPORT AUTHORITY REQUESTS FOR … Airport... · Rental Car Ready/Return Lots = 636 ... RFP-Airport Parking Access and Revenue Control System Pre-Proposal Meeting May 31,

Norfolk Airport Authority RFP – PARCS

Vendor Questions

Q&A – Page 1

Norfolk Airport Authority Request for Proposals

Parking Access and Revenue Control System Vendor Questions and Answers

Posted June 18, 2018

Q # RFP Section RFP Page

#

RFP Language Question

1. Section 8, Sub-section 3, Item E

8-5 These requirements may include compliance with DBE participation goals, the keeping of certain records of good faith compliance efforts, subject to review by the various agencies, the submission of various reports and, if so directed, the contract of specified percentages of goods and services contracts to DBEs.

Is there a specified DBE/SBE participation goal? No

2. Section 2.04, Item Z.1

116 The Contractor shall provide Monument Dynamic Signs for each garage to communicate pertinent facility information.

Is it the Authority’s intent to have a monument display that represents each level of each garage, A, B, & C? Yes, that is correct.

3. Section 2.04, Item CC.1.e

117 AVI transponders, antenna, and reader systems (see Appendix E for locations)

The Appendix E referenced in this requirement is not available on the website. Please provide appendix E. Appendix E will be removed in an addendum. Please ignore any references to Appendix E.

4. General Is it the authority's intent to reuse the existing gates in the helices and the associated loops? No, those gates should be replaced as part of this procurement.

5. Section 2.1 2-1 All pages of the Proposal should be numbered

Please confirm that it is acceptable to submit pre-existing documents, like financial reports filed with the regulatory bodies, that

Page 38: NORFOLK AIRPORT AUTHORITY REQUESTS FOR … Airport... · Rental Car Ready/Return Lots = 636 ... RFP-Airport Parking Access and Revenue Control System Pre-Proposal Meeting May 31,

Norfolk Airport Authority RFP – PARCS

Vendor Questions

Q&A – Page 2

Q # RFP Section RFP Page

#

RFP Language Question

have existing page numbering and some pages may not be numbered, unaltered. As long as there is a sequence that can be referenced for ORF to follow the document.

6. Section 2.1 2-1 Responders must also submit one (1) electronic copy of their complete response on a thumb drive utilizing Microsoft Office tools.

Please confirm that it is permissible to submit documents like audited financial statements, insurance documents and project schedules, which are not available in Microsoft Word, in PDF format. Yes

7. Section 2.2, item #8

2-3 Provide either (i) a balance sheet and income statement, certified by a certified public accountant who is not otherwise an employee of Offeror…

The length of our financial statements are of the order of 150 pages. Please confirm that it is permissible to submit them in an electronic form on a separate USB or provide a link to our website. Yes

8. Section 2.2 2-1 All pages must be consecutively numbered and correspond to the table of contents.

Please confirm that the intent of this requirement is to number the pages consecutively within each tab. Can be formatted in tabs or as a whole as long as there is a way to reference all documents.

9. Section 3, Sub-section 1.02, item C.1

3-6 Governing Standards and Design Criteria included in Appendix C.

The Appendix C referenced in this requirement is not available on the procurement website. Please provide Appendix C. Appendix C will be removed in an addendum. Please ignore any references to Appendix C.

10. General The existing ethernet connections from the mentioned fiber points go to all entry / exit areas (excluding future garage that will replace lot D and long term east parking lots)? We have fiber and Ethernet at all entry lanes and exit lanes.

11. General Do you have any plans that show the exact dimensions of the Entry / exit islands where current gates are? Any images would help. ORF will provide plans for the vendors.

12. What is the make and model of the current Entry / exit gates? Any images would help. The current equipment was installed by ACS. Conduent/Multipark

Page 39: NORFOLK AIRPORT AUTHORITY REQUESTS FOR … Airport... · Rental Car Ready/Return Lots = 636 ... RFP-Airport Parking Access and Revenue Control System Pre-Proposal Meeting May 31,

Norfolk Airport Authority RFP – PARCS

Vendor Questions

Q&A – Page 3

Q # RFP Section RFP Page

#

RFP Language Question

13. Section 3, Page 14, item #55

3-14 Provide a solution that detects over height vehicles in the North and South Lots.

In regards to section 3 Functional Specifications – 3-14 #55. What system is currently in place for this if a solution is currently in place? No existing equipment is mentioned in RFP for this solution. There is no existing equipment in place.

14. Section 3, Figure 1

3-29 Parking Facility Overview Can you identify exactly where all the entry and exit points are for each lot & parking garage from figure 1 in the RFP or site plans that outline these details. See attached Parking Layout Map.

15. General Please identify any and all bi-directional lanes that may exist in any lots or garages. No bi-directional lanes in the garages. There are bi-directional lanes in the short term and long term lots.

16. General Please identify any and all service entry / exit lanes (non-public / employee only lanes) No service or employee lanes

17. General What is the number of levels on each garage. Garage floor plans will be needed to build system designs. Public parking levels in Garages: Garage A: 7 (1 Short Term and 6 Long Term) Garage B: 5 (Long Term) Garage C: 5 (Long Term) Plans will be provided.

18. Section 3, Subsection 2.04-K.3.e

3-77 In regards to section 3 Functional Specifications – 3-76 – e. what is the intent of the key pad? A pinpad will only need to be installed for EMV processing if required.

19. Proximity Card and LPR ParkJockey has a LPR whitelist feature. Considering this, is there

Page 40: NORFOLK AIRPORT AUTHORITY REQUESTS FOR … Airport... · Rental Car Ready/Return Lots = 636 ... RFP-Airport Parking Access and Revenue Control System Pre-Proposal Meeting May 31,

Norfolk Airport Authority RFP – PARCS

Vendor Questions

Q&A – Page 4

Q # RFP Section RFP Page

#

RFP Language Question

still an need for a proximity card access system? Yes. Proximity Card to be used with LPR as a double verification if needed.

20. Section 3, Subsection 2.04-BB.2

3.95 The command center shall have two 70” or larger wall mounted monitors.

In regards to Section 3 Functional Specifications – 3-94 #2, there is no mention of two 70” existing monitors. Is this correct and proposer would need to include monitors in proposal? Yes

21. Ground Transportation Categories What categories of ground transportation vehicles will be used (registered in) by the GTM system? Please provide options for Hotel Shuttles, TNCs, Taxi, Limousine services, buses.

22. Ground Transportation (TNCs) Do you want the capability for the system to track TNC vehicles? Currently ORF has an agreement with Uber and Lyft to track TNC vehicles. It is up to the vendor to propose a system that can track them with Geographical Fences. ORF uses a system provided by AAAE to track TNCs.

23. Section 3, Subsection 2.04-CC-4

3-96 Proposer shall install and test the AVI system while the existing system, if applicable, at the airport continues to function with minimal or no downtime

Section 3.CC.4. Please describe the current “AVI system” in use. Where are the existing RFID readers located, how many vehicles are registered in the system, what hardware and software components are in use (manufacturer and model#) No current AVI system in place. Airport uses paid system with Taxis and Shuttles per driver that is self-reported. For TNC vehicles the airport has contract with AAE ABT software that allows them to track Uber and Lyft pickups and drop-offs.

24. Section 3, Subsection 2.04-CC-11

3-96 Software shall interface with existing Great Plains financial software for accounts receivable and billing.

Section 3.CC.11. Please provide the Microsoft Dynamics-GP version number that is use at ORF. Does the current system include the ability to use credit cards for payment of airport charges? If so what 3rd party software provides that function (manufacturer and model /version)? 2015 version 14.00.0952

25. Ground Transportation General Is there a requirement for the Ground Transportation software to vend any vehicle barrier gates? If so, what criteria is used to open

Page 41: NORFOLK AIRPORT AUTHORITY REQUESTS FOR … Airport... · Rental Car Ready/Return Lots = 636 ... RFP-Airport Parking Access and Revenue Control System Pre-Proposal Meeting May 31,

Norfolk Airport Authority RFP – PARCS

Vendor Questions

Q&A – Page 5

Q # RFP Section RFP Page

#

RFP Language Question

Question the gate? Vendor shall propose a system. System can be gated or gateless.

26. Section 3, Subsection 2.04-CC-15

3-96 Proposer shall provide internet access to allow commercial customers access to their accounts to review current transaction data for the previous sixty days or two months billing cycles.

Section 3.CC.15. This section identifies a requirement for the “Vendor” to provide internet access for commercial customers to access their accounts. Please clarify this requirement. Is it to provide a separate internet connection, or is the requirement to provide the functionality for commercial customers to access their account through an internet connection provided by the Airport? The intent of this requirement is to provide a method for commercial vehicles’ owners to track usage, add or delete vehicles, manage their accounts, and pay charges due. Vendor shall provide a way for commercial vehicles to check their accounts and see their current transactions and last billing cycles. No internet connection needed, just web-browser access to monitor their transactions.

27. Section 3, Subsection 2.04-CC-1

3-96 Section 3.CC.1.e identifies an Appendix E that shows the location of RFID readers for the system. I have not been able to locate Appendix E in the RFP documents available on your website. Can you please provide Appendix E, or some additional instructions on where that document can be obtained. Appendix E will be removed in an addendum. Please ignore any references to Appendix E.

28. L.1.a. & Price Sheet

100 The contractor shall provide fifteen (15) Unattended Exit Stations. Short Term North Lot: 2 (1 in Cashiered Lane) And so on…

The specification describes the use of an Unattended Exit in combination with a Cashiered Station occupying one lane. In the pricing sheet both the unattended exit station and the cashier station are required to have a Dynamic Sign (lane open/closed). This requirement for both device appears to be a duplicate. Please confirm that only one sign is required for this type of lane. For clarification, each physical lane will have one dynamic sign that reads open/closed/credit card only. Therefore if the lane is manned, it is open. If unmanned, it is credit card only, if closed, sign reads closed.

29. Cashier Booths General Question Regarding existing booths that will not be reused, can the bidder propose to remove these booths and place them with the other

Page 42: NORFOLK AIRPORT AUTHORITY REQUESTS FOR … Airport... · Rental Car Ready/Return Lots = 636 ... RFP-Airport Parking Access and Revenue Control System Pre-Proposal Meeting May 31,

Norfolk Airport Authority RFP – PARCS

Vendor Questions

Q&A – Page 6

Q # RFP Section RFP Page

#

RFP Language Question

booths stored on-site? Or shall they be removed from the site? Booths shall be reused. Page 3-76 shows the number of booths needed that match what it is existing on the field. All unattended booths will remain in place and shall have network connection to the booth. The intent is that if the Authority needs to man the booth, then equipment can be installed and connections are available.

30. Section 2.04, Item Z, Sub-item 3

116 The Contractor shall be responsible for the design and coordination of manufacturing of all Monument Dynamic Signs…

The locations and quantities for the monument signs are not detailed. Are there any detailed requirements or specifications that the Authority can provide for these signs? There shall be a monument sign for each garage (not for the lots). The monument signs shall provide level by level information and ADA spaces available. The text shall be readily readable from a minimum distance of forty-five feet by vehicles traveling as fast as 40 miles per hour and in all lighting conditions.

31. Pricing sheet POF General Question POF’s are mentioned only in the pricing sheet. Please describe the desired locations and quantities of the POF’s for installation purposes. Will the Authority provide specification for the POFs? POFs will not be part of the RFP. Will be fixed in Addendum

32. Pricing Sheet Loops General Question The pricing sheet assume 3 loops per entry or exit lane, and cashiered exit lanes show no loops. Can the proposer bid different loop counts per lane, as long as the required functionality is provided? Can we add a loop line item to the cashiered lanes? Or will the Authority make changes to the cost sheet? It is assumed that the loops will be shared with the unattended exit used in the same lane for when the cashier station is not in operation. Vendors can make additions to the pricing sheet, however, please note what is changed.

33. Pricing Sheet Cashier Stations General Question Cashiered exit lanes show less line items than other entries and/or exits. Can the bidder add the needed line items? Or will the Authority make changes to the cost sheet? Some items were removed since unattended stations will also be placed in the same lane and can share some equipment. Vendors can make additions to the pricing sheet, however, please note what

Page 43: NORFOLK AIRPORT AUTHORITY REQUESTS FOR … Airport... · Rental Car Ready/Return Lots = 636 ... RFP-Airport Parking Access and Revenue Control System Pre-Proposal Meeting May 31,

Norfolk Airport Authority RFP – PARCS

Vendor Questions

Q&A – Page 7

Q # RFP Section RFP Page

#

RFP Language Question

is changed. 34. Pricing Sheet PGS Pricing Sheet Facility Count Sign seems to be the only place for space count

system items (PGS). The number of sensors is fixed per garage level. In the pre-bid meeting it was stated by the Authority that the bidders can bid what they believe to be the best option for the Authority, including level counts of single space counts. Can the cost sheet be adjusted to accommodate a more flexible recording of line item counts and design, including necessary signage and back office hardware? Will be adjusted and added in an addendum.

35. Pricing Sheet Ground Transportation Pricing Sheet Ground Transportation System shows AVI readers and loops. As with PGS, the Authority stated in the pre-bid meeting that bidders should design and propose the best solution for the Authority. This could include more or less readers, gates, pedestals, gantries, etc. And where shall the software and back office hardware be listed? Will the Authority provide a more flexible GT costing section on the cost sheet? Will be adjusted and added in an addendum. Vendors can make additions to the pricing sheet, however, please note what is changed.

36. Pricing Sheet Gates Pricing Sheet On the unit cost tab, there is a line item for gates (replace if necessary). IN the pre-bid meeting the Authority stated that all gates shall be new. Please confirm. All gates shall be new.

37. Pricing Sheet General Question Does the Authority want pricing for the Factory Acceptance Test to be included with the Installation price, or will there be another line added to accommodate? If there is a separate cost for the FAT, then the vendor can adjust the pricing sheet, however, please note the change.

38. Pricing Sheet Spare Parts The RFP requests that we provide both consumables and spare parts, but there is no accommodation for these on the pricing sheet. Can the Authority provide guidance as to where this pricing should be included?

Page 44: NORFOLK AIRPORT AUTHORITY REQUESTS FOR … Airport... · Rental Car Ready/Return Lots = 636 ... RFP-Airport Parking Access and Revenue Control System Pre-Proposal Meeting May 31,

Norfolk Airport Authority RFP – PARCS

Vendor Questions

Q&A – Page 8

Q # RFP Section RFP Page

#

RFP Language Question

Vendors can make additions to the pricing sheet, however, please note what is changed.

39. Project Schedule What is the timeline for the project implementation? Timeline will be discussed during negotiations. Vendor shall propose a reasonable timeline for implementation in submittal

40. Counting System General Question Would the Airport want a level by level or space by space counting system? Would the Authority like the available handicap spaces listed for each floor? At least a level by level and single space for ADA spaces. Vendors can also provide space by space solutions if desired.

41. General Question For the PGS will there be drawings available for the garage, such as CADs, to assist in the location of ADA, communication rooms, and the placement of sensors, etc.? Yes, we will provide drawings.

42. Counting System General Question Is the current space counting system in the garages driven by the gates between the levels? In garage A, yes. In garages B&C, no. They are driven by loop at the entrance and exit.

43. Gate Arms General Question Will the current gate arms and hardware remain or be removed? All gates will be replaced.

44. Maintenance Tracking System General Questions

Is there an electronic maintenance work order system in place now? No

45. Ground Transportation General Question

Are all ground transportation vehicles registered with the Authority? No. There are a number of commercial limousines that operate at ORF and are not registered. TNC vehicles are not registered.

46. Is the Airport Authority considering gating the middle lanes on Arrivals for non-contractors? Vehicles are registered or have geographical fences (for Uber and Lyft). Gates are optional. Vendor shall provide a solution for the ground transportation system either with gate or gateless.

Page 45: NORFOLK AIRPORT AUTHORITY REQUESTS FOR … Airport... · Rental Car Ready/Return Lots = 636 ... RFP-Airport Parking Access and Revenue Control System Pre-Proposal Meeting May 31,

Norfolk Airport Authority RFP – PARCS

Vendor Questions

Q&A – Page 9

Q # RFP Section RFP Page

#

RFP Language Question

47. General Question Can vendor assume that existing site work, concrete, power, conduit, fiber can be reused? If in the course of the install, if vendor discovers that additional or replacement site work is needed, can vendor submit this for change order? Existing infrastructure should be reused if possible. There may be occasion where existing infrastructure cannot be reused. In this case, a change order can be issued. For areas such as the ground transportation, new communication system needs to be added since there is no current conduit.

48. General Question If vendor takes exception to any portion of the system requirements, must the vendor commit to and price the costs to meet the specification in the future? The Authority prefers the vendor meet the system specs. Please provide an alternative that meets the same functional and note the exception.

49. General Question Can you provide “as built” drawings for the garages? Drawings will be provided.

50. Ground Transportation General Question

Will barrier gates be acceptable for the ground transportation system? Gates are optional. Vendor shall provide a solution for the ground transportation system either with gate or gateless.

51. Civil Work General Question The requirements state, “Provide Pre-capture LPR solution in all garages and lots. For Lots, the contractor shall propose civil designs to make LPR work in the Exit Plazas.” Please confirm vendor is responsible for civil work required to accommodate Pre-capture LPR in the exit plazas. Yes

52. General Question The requirements state, “Responders must also submit one (1) electronic copy of their complete response on a thumb drive utilizing Microsoft Office tools.” Is PDF acceptable? Yes

53. Section 3, Subsection 1.13-E.8

3-38 All consumable office supplies shall be the responsibility of the contractor.

1.13.E.8 - Please clarify “Consumable office supplies?” Any office supply that a technician might need (not limited to tools, writing supplies, paper, etc.)

54. Are there drawings or network schematics that identity network switch locations/IDFs that can be provided? Please see attached network diagram. These are the only

Page 46: NORFOLK AIRPORT AUTHORITY REQUESTS FOR … Airport... · Rental Car Ready/Return Lots = 636 ... RFP-Airport Parking Access and Revenue Control System Pre-Proposal Meeting May 31,

Norfolk Airport Authority RFP – PARCS

Vendor Questions

Q&A – Page 10

Q # RFP Section RFP Page

#

RFP Language Question

schematics available.

55. Section 3, Subsection 2.03 and 2.04

3-64 Cisco Equipment Requirements Section 2.03 Communications states All provided network equipment shall be Cisco in accordance with other airport network equipment. However, 2.04.A.11.a.4 states Vendor shall provide optional costs for new Cisco Network equipment and associated integration. Please clarify. All new network equipment shall be Cisco.

56. Section 3, Subsection 2.04-H.5

3-73 Contactor shall provide pay-by-phone application

2.04.H.5 pay by phone – Please clarify pay by phone use case i.e. reservation or booking and/or post entry payment. All of these functions are to be provided.

57. General Question The specification states that “Server design shall comply with ORF’s Standards for Computing Resources.” Can that document be provided? Appendix C will be removed in Addendum.

58. Cashier Stations General Question

The specification states that the Airport will provide certain computers however it is not stated that they will be provided for cashier stations. Please confirm if the Airport intends to source the computers for cashier stations also? Vendor will provide computers for cashier stations. ORF will provide workstations for locations such as the command center.

59. Section 3, Subsection 2.04-X.3.3.7

3-93 Link to an interactive park for the airport.

2.04.X.3.3.7 Link to an interactive car park for the Airport. Who is responsible to produce the interactive car park for the Airport? Vendor shall provide an interface that allows patrons to see parking facilities and parking availability.

60. Web Integration General Question Please give an example of the following considering the web integration, “Should reference marketing messages and integration or tie-in with other airport marketing programs.” Material shall comply with marketing designs from ORF (colors, images, fonts, etc)

61. Section 3, Subsection 2.03-A

3-64 2.0.3.A Communications – Are the vendors expected to replace existing Ethernet connections? The vendor is expected to reuse existing infrastructure if possible. If existing infrastructure is compromised, then it shall be replaced.

62. Section 3, 3-96 AVI software shall be compatible with 2.04.CC.12 – “AVI software shall be compatible with the Authority’s parking software and capable of integrating into the parking software

Page 47: NORFOLK AIRPORT AUTHORITY REQUESTS FOR … Airport... · Rental Car Ready/Return Lots = 636 ... RFP-Airport Parking Access and Revenue Control System Pre-Proposal Meeting May 31,

Norfolk Airport Authority RFP – PARCS

Vendor Questions

Q&A – Page 11

Q # RFP Section RFP Page

#

RFP Language Question

Subsection 2.04-CC-12

the Authority’s parking software and capable of integrating into the parking software to allow patrons to pay parking fees through AVI transponders and associated AVI accounts

to allow patrons to pay parking fees through AVI transponders and associated AVI accounts.” Please clarify “Authority’s parking software” and integrating into the parking software. We are looking to confirm pre-proposal conference advice that AVI is not used and not required at this time and will be solved via addendum. AVI is not currently used. Any new AVI software for the ground transportation system shall integrate with proposed parking system

63. PGS General Question What is the expectation of integration of the existing PGS and new PGS? What type of PGS is currently deployed? Current system uses loops and gates at each level. PGS system shall be a new system.

64. PCI Compliance General Question Please confirm that if the PARCS system is deployed “out of PCI scope” vendor is not responsible for FIM and/or IDS systems. Vendor shall provide PCI compliance for the parking equipment

65. General Question Is the Project Tax exempt? Yes.

66. Cashier Booths General Question Are any of the booths to be relocated? No, all booths will stay.

67. Cashier Booths General Question Please provide designs/Booth dimension for the Exit Cashiers? The Authority will include this information in the addendum.

68. General Question Is there an IT policy to be followed? The Authority does not have a formal policy, other than the PCI policy included in the RFP documents. The Authority prefers Dell computers and Cisco switches.

69. CCTV General Question Are any CCTV security requirements to be followed or integrated into? No. This is to be a standalone CCTV.

70. Fiber General Question Is the fiber single or multi? Multi.

71. General Question Are any drawings currently available for the impacted locations? Drawings will be provided.

72. Dynamic Sign General Question Is there a Dynamic Sign model the Airport has in mind? (Daktronic Galaxy XYZ?) Vendors to propose Signs. No preferred model.

73. General Question Anything available to be re-used? For size reference, can the models for these be provided?

Page 48: NORFOLK AIRPORT AUTHORITY REQUESTS FOR … Airport... · Rental Car Ready/Return Lots = 636 ... RFP-Airport Parking Access and Revenue Control System Pre-Proposal Meeting May 31,

Norfolk Airport Authority RFP – PARCS

Vendor Questions

Q&A – Page 12

Q # RFP Section RFP Page

#

RFP Language Question

a. UPS devices – to be replaced b. Helix Signs – may be reused

The Helix space indicators signs were manufactured by Daktronics

c. Lane Control Lights – No, the Authority prefers an LED solution

d. MLPI – prefer to be re-used. Genetec, Inc. See attached for more information.

Booths will be available for re-use as well as existing conduit and fiber if possible.

74. General Question Are there drawings available the garage and lots? Drawings will be provided.

75. Ground Transportation System General Question

Page 118 – Taxi – “Proposer shall provide a taxi dispatch system that shall call up a minimum of the next eight (8) taxis via a dynamic message sign located at the taxi holding area for dispatch to the terminal. The Proposer shall coordinate the business rules with the airport for determination of which taxis from which taxi company shall be called.” Is there a concept in mind for instructing and controlling taxis, given there is no AVI in scope for the GTMS? Is there a preference for the sign type (8 rows or a single row scrolling for example)? AVI is included in Ground Transportation options - See page 3-97)

76. Pricing Form Pricing Form General Questions Pricing form – “All Parking Costs” tab a. Row 75 and 77 appear to be duplicate? b. Row 78 Does the Airport have a Gantry design in

mind (a) and therefore are the pedestals required (b)?

Row 75 and 77 are duplicated, will fix in addendum. Gantry design shall be proposed by the vendor as part of the solution. A gantry might not be the best solution. As discussed during the pre-proposal conference, cameras may be installed in the landscaped areas. Any proposed infrastructure, such as a gantry, shall be designed and sealed by a licensed engineer in the state of Virginia.

77. Section 3, 3-64 Appendix C Section 2.03.D Page 3-64 – Please provide the Airport Guidelines including Appendix C so the proper Ethernet equipment and design

Page 49: NORFOLK AIRPORT AUTHORITY REQUESTS FOR … Airport... · Rental Car Ready/Return Lots = 636 ... RFP-Airport Parking Access and Revenue Control System Pre-Proposal Meeting May 31,

Norfolk Airport Authority RFP – PARCS

Vendor Questions

Q&A – Page 13

Q # RFP Section RFP Page

#

RFP Language Question

Subsection 2.03-D

may be proposed. Appendix C will be removed in addendum.

78. Section 3, Subsection 2.03-F

3-65 Network Switches General Question Section 2.03.F Page 3-65 – Does the owner desire a particular family of Cisco switches to be provided by the PARCS vendor? Vendor shall propose the best option for the design

79. Section 3, Subsection 2.04-A.7

3-65 Firewall General Question Section 2.04.A.7 Page 3-65 – Does the owner have a preferred firewall device the PARCS vendor is to supply? Vendor shall propose best option

80. Section 3, Subsection 2.04-D

3-71 General Question Section 2.04.D Page 3-71 – Is there a preferred network monitoring software the airport desires? Vendor shall propose best option

81. Section 3, Subsection 2.04-G.2

3-71 ORF Standards General Question Section 2.04.G.2.a Page 3-71 – Please provide ORF standards for computing resources. Will be removed in addendum.

82. Section 3, Subsection 2.04-U

3-90 Intercom Video General Question Section 2.04.U Page 3-90 – Does the intercom video need to be recorded? Yes, 30-day storage is preferred.

83. Section 3, Subsection 2.04-BB

3-95 Surveillance Camera General Question

Section 2.04.BB Page 3-95 – Is the PARCS vendor to supply the CCTV lane surveillance cameras mentioned in this section? If yes, what are the camera specifications CCTV head end requirements? The Authority does not have any particular specifications in mind. This entire CCTV will be a new installation as there is no current system in place.

84. Section 3, Subsection 3.02-F

3-112 Disposal of Existing Equipment Section 3.02.F Page 3-112 – Will the PARCS contractor have use of any existing onsite dumpsters or will the PARCS contractor need to supply a dumpster? Contractor is responsible for removal of all existing equipment not used to a location off-site. Airport will not provide a dumpster for removed equipment.

85. Offline mode General Question Is credit card processing functionality (store & forward) required at the lane level if the station is in an offline state? Yes

86. General Question Which document shall take precedence for required PARCS

Page 50: NORFOLK AIRPORT AUTHORITY REQUESTS FOR … Airport... · Rental Car Ready/Return Lots = 636 ... RFP-Airport Parking Access and Revenue Control System Pre-Proposal Meeting May 31,

Norfolk Airport Authority RFP – PARCS

Vendor Questions

Q&A – Page 14

Q # RFP Section RFP Page

#

RFP Language Question

equipment, the RFP, Vendor Pricing Sheet or drawings? RFP

87. General Question. Section 2. CC. Please provide Appendix E. Appendix E will be removed in addendum.

88. Licensing General Question Is the PARCS vendor required to hold a VA contractor’s license? Yes, the equipment installation contractor must hold a VA contractor’s license.

89. Testing General Question Is the PARCS vendor responsible for the cost of the penetration testing? If penetration testing is required prior to installation, the cost shall be covered by the vendor.

90. Section 3, Subsection 2.04-W.1

3-92 LPR General Question Section 3 2.4.W.1 Please provide the name of the current LPR provider? The current system was installed by ACS and is currently maintained by Conduent.

91. PGS General Question When PGS is referred to in the RFP, is it the intent to have single space for every space or only the ADA spaces? At least a level by level and single space for ADA spaces. Vendors can also provide space by space solutions if they believe that is the most efficient method of providing a PGS solution.

92. Maintenance General Question Is it NAA’s desire to have an onsite manufactures maintenance representative for warranty and field service? Refer to Maintenance and Warranty sections in specs for support requirements. The Authority is interested in vendor’s recommendation for onsite versus remote (or combination) staffing.

93. Anti-Virus General Question 5.1 – 5.2 Deploy Properly Configured Anti-Virus Software. Who pays for it anti-virus? Vendor pays for anti-virus.

94. System Security General Question 2.2.3 – 2.2.4 System Security Configuration Process. Who pays for penetration testing and file integrity monitoring? See previous question and answer (#89).

95. Contract General Question TERMS AND CONDITIONS PARKING ACCESS AND REVENUE CONTROL (PARCS) REPLACEMENT. Will the payment terms be part of the final negotiations? Yes

96. Pricing Sheet Pricing Sheet General Question Section 4 Cost Proposal Worksheets – 4-4 Where should we place the price for items that do not appear on the Worksheet?

Page 51: NORFOLK AIRPORT AUTHORITY REQUESTS FOR … Airport... · Rental Car Ready/Return Lots = 636 ... RFP-Airport Parking Access and Revenue Control System Pre-Proposal Meeting May 31,

Norfolk Airport Authority RFP – PARCS

Vendor Questions

Q&A – Page 15

Q # RFP Section RFP Page

#

RFP Language Question

Vendors can make additions to the pricing sheet, however, please note what is changed.

97. General Question Can Norfolk International Airport please provide a full set of architectural files (PDF or CAD) of Garage A, B, C and proposed D that show bay striping for each level and sign placement? Will be provided.

98. General Question Can Norfolk International Airport please provide PDF files with bay striping for the North Lot, South Lot, East Lot and Lot D? Will be provided.

99. General Questions Can Norfolk International Airport please advise if this project is union or prevailing wage? No, it is not. Can Norfolk International Airport please advise on the location for the Parking Guidance server? Will it be located in a temperature controlled environment inside or outside of the garage? Servers will be located in parking office and/or current vendor offices that are in a temperature controlled environment.

100. General Question Can Norfolk International Airport provide a copy of the sign in sheet from the preproposal meeting? Will be provided.

101. General Question Will the Norfolk Airport provide an alternative internet service provider for service failure switchover procedures? Yes

102. P2PE Communication General Question

Does the PARCS Spec indicate if the credit card reader is contactless P2PE or just standard P2PE reader? Standard

103. Intercom General Question What type of VOIP intercom is installed in the ACS Equipment? GE700, powered by Commend.

104. Construction General Question Will concrete repair in lanes be considered a change order if the condition of the surface does not allow for proper installation of induction loops? No.

105. Proximity Cards General Question Can the Airport provide a Sample card set of proximity cards for format testing? Airport currently uses badge system so no current proximity cards.

106. Monument Dynamic Signs General Question

What are the size specifications for the Monument Dynamic signs, so the signs provided fit in the existing signs? See previous

Page 52: NORFOLK AIRPORT AUTHORITY REQUESTS FOR … Airport... · Rental Car Ready/Return Lots = 636 ... RFP-Airport Parking Access and Revenue Control System Pre-Proposal Meeting May 31,

Norfolk Airport Authority RFP – PARCS

Vendor Questions

Q&A – Page 16

Q # RFP Section RFP Page

#

RFP Language Question

question and answer. 107. Communications General Question The spec mentions that the PARCS Proposer will use existing

conduit. Will bad conduit or fiber be considered a change order and out of the scope of the PARCS provider? See previous question and answer.

108. General Question Can the airport provide a current network diagram from the server room to the demarks in the booths or in boxes on the lots? Attached are the only diagrams available.

109. Cashier Stations General Question. Are touch screen Qwerty key boards required for the Cashier Fee Computers or are standard keyboards acceptable? Touch screen is preferred

Page 53: NORFOLK AIRPORT AUTHORITY REQUESTS FOR … Airport... · Rental Car Ready/Return Lots = 636 ... RFP-Airport Parking Access and Revenue Control System Pre-Proposal Meeting May 31,

ET = Entrance Terminal (Ticket Spitter) CT = Cashier Terminal (Staffed Lane) XT = Express Terminal (Unstaffed Lane – CC Only)

ddFBCCY

CCT

CT CT CT CT XT XT XT XT XT 34 35 34 35 36 37 38 39 40 41 42

CT CT 44 43

Rental Car

Return

Question #14 Attachment (Parking Layout)

Page 54: NORFOLK AIRPORT AUTHORITY REQUESTS FOR … Airport... · Rental Car Ready/Return Lots = 636 ... RFP-Airport Parking Access and Revenue Control System Pre-Proposal Meeting May 31,

Computer Room Conduent Shop/Office

Norfolk PRCS Network Topology v.1.02PA-DSS 3.2 VLAN SEGMENTATION

RTS1VLAN300

WHS1VLAN400

LPR1VLAN600

CSAVLAN500

WEBAVLAN500

ADC1 ADC2 WSUS1 AV SANMgr

RTS2 WHS2 LPR2 CSB WEBB

ADC3 RADIUS

HYPERV-1 HYPERV-2

Internet

SAN1

(FC Patch Bay) (FC Patch Bay)

L3PCI_IN

L3PCI_OUT

L2LE

L3

L3

L2

A B

To Lane EquipmentSANSwitch

SANSwitch

Author: Shawki ErawocCONDUENT (Info Tech)11/2017 - 11/2018 v.1.02

TEST

PCI_INPCI_OUT

LANEEQ

DC-VLAN700

MONETRA-1MONETRA-2

360ITManaged

WKSVLAN800

Page 55: NORFOLK AIRPORT AUTHORITY REQUESTS FOR … Airport... · Rental Car Ready/Return Lots = 636 ... RFP-Airport Parking Access and Revenue Control System Pre-Proposal Meeting May 31,

Norfolk PRCS PCI-PA-DSS v3.2Network Segmentation Diagram

Layer3 Switch

Switch

WSUS

AV

WebPRCS

CS

DCRTS WHS LPR

WareHouseOracle DB Server

RealTime ServerOracle Application ServerCard Processor

License PlateRecognition SQL Server

DC/WSUS/AVVLAN-30

Web

App

licat

ion

Serv

er (n

o In

tern

et a

cces

s)

Communication Server

LANE EQUIPMENTNETWORK

Switch

Switch

WORKSTATIONNETWORK

Author: Shawki ErawocXerox Services 12/05/2016

Exit/Entry Lane path to RTS

Fire

wal

l Airp

ort M

anag

ed(A

cces

s R

ules

Lis

t)

All Accesses Managedby Firewall rules -Deny AllExplicit port-to-port

LEGENDRedLine: encryptedBlue-DottedLine: Lane ExitGreenLine: CS commBlackLine: LAN/WANDarkBlueLine: LPR commLightDottedGreen: Internet

Support StaffVPN Access

VPN Tunnel

VPN Tunnel

Parking Administration

Exit and Entry Lanes

Recommend to Implement ( RSA)two-factor authentication

Exit/Entry Lane pathto Firewall

WebPRCS initiates Commto SQL DataBase/LPR

LPRVLAN-50

RTS/WHSVLAN-40

WEB/CSVLAN-20

WKSTVLAN-60

LE VLAN-10

AVSwitch

LPR

toW

ebPR

CS

Monetra Server

InternetAccess

Page 56: NORFOLK AIRPORT AUTHORITY REQUESTS FOR … Airport... · Rental Car Ready/Return Lots = 636 ... RFP-Airport Parking Access and Revenue Control System Pre-Proposal Meeting May 31,
ssterling
Text Box
Question #74 MLPI information
Page 57: NORFOLK AIRPORT AUTHORITY REQUESTS FOR … Airport... · Rental Car Ready/Return Lots = 636 ... RFP-Airport Parking Access and Revenue Control System Pre-Proposal Meeting May 31,

Norfolk Airport Authority RFP-Airport Parking Access and Revenue Control System

Pre-Proposal Meeting May 31, 2018

The following additional instructions were announced by Chuck Reedstrom of Kimley Horn during the pre-proposal meeting on May 31, 2018. Offers shall incorporate this information into their proposals.

o Page 3-15 – The proposed Command Center will be located in the Parking Office o Page 3-15 – The Airport current deploys pre-capture LPR, but need to check the Short-

Term lost to see how if can implement pre-capture LPR. If we can’t Pre-Capture, we might need Post Capture in ST lots.

o Page 3-30 – Change Notice to Proceed to September, 2018. o Page 3-36 - Airport to provide level 1 maintenance and vendor will provide level 2 and

level 3. o Page 3-38 – Vendors will provide an electronic maintenance tracking system and the

airport should have access o Page 3-46 - The Airport estimates the following volumes of consumables:

• ET tickets 1,500,000 (1.5 million) • XT receipt tickets 200,000 • Exception tickets 25,000 • ST receipt rolls(small) 400 • LT receipt rolls(large) 350

o Page 3-49 – Change to five hard copies and one electronic (PDF) copy. o Page 3-50 – Change to five hard copies and one electronic (PDF) copy. o Page 3-52 – Change to five hard copies and one electronic (PDF) copy. o Page 3-50 – The list of reports is not intended to be all inclusive. o Page 3-75 - All entry stations and exits shall be keyed alike. o Page 3-80 – Add the requirement for all entry and exit devices to include Barcode

readers for electronic validation (smartphone or hardcopy). o Page 3-77 – All cashier terminals shall be provided with Dual drawers o Page 3-77 - If a cashier logs off, the lane should act as express exits o Page 3-80 - Unattended exit stations need to include add barcode readers and mobile

payment options. o Page 3-87 – We want to work with the selected vendor to figure out how to place LPR

cameras in the surface lots. This will require construction drawings stamped by a professional engineer licensed to practice in the State of Virginia.

o Page 3-112 – The vendor is responsible to remove existing equipment offsite. All equipment shall be wiped clean of all data prior to disposal.

o Page 3-112 - Field Quality Control: FAT, LAT, SAT, Vehicle sensor test (VST), and ODT. The vendor shall provide the methodology for testing LPR.